The document outlines the key project management processes. It discusses the six phases of a project - initiation, planning, implementation, monitoring, adaptation and closure. It then describes the nine core management processes which include scope, schedule, budget, quality, team, stakeholder, information, risk and contract management. Each process involves planning, execution, monitoring and control activities to ensure successful project delivery.
3. Build a common understanding of the principles, practices, and methodologies of project management Share best practices related to project management Develop a community/network of project managers as a support system with on-going resources for each other
4. 09:00 – 09:15 Introduction and Presentations 12:00 – 01:30 Break 09:15 – 10:15 PROJECT MANAGEMENT FOR DEVELOPMENT 01:30 – 03:00 PROJECT MANAGEMENT PROCESSES 10:15 – 10:45 THE DEVELOPMENT PROJECT ENVIRONMENT 03:00 – 03:15 Break 10:45 – 11:00 Break 03:15 – 05:00 PROJECT MANAGEMENT PROCESSES 11:00 – 12:00 THE PROJECT MANAGEMENT CYCLE
10. What is a project? What are some definitions of a project? Examples: 1 2 3 4
11. A temporary process, which has a clearly defined start and end time, with a set of tasks and a budget, developed to accomplish a well-defined objective. A temporary effort of sequential activities designed to accomplish a unique purpose A group of inter-related activities, constrained by time, cost, and scope, designed to deliver a unique purpose A temporary endeavor undertaken to create a unique product or service. An undertaking that encompasses a set of tasks or activities having an identifiable starting point and well defined objectives.
13. “ Unique process consisting of a set of coordinated and controlled activities with start and finish dates, undertaken to achieve an objective conforming to specific requirements, including constraints of time, cost and resources”. ISO 10006 “ A temporary organization that is needed to produce a unique and predefined outcome or result at a pre-specified time using predetermined resources” PRINCE2
14. “ A time and cost constrained operation to realize a set of defined deliverables up to quality standards and requirements,” ipma “ Project management is the application of knowledge, skills, tools, and techniques to a broad range of activities in order to meet the requirements of a particular project”. pmi
15. Coordinated and controlled activities A temporary organization A time and cost constrained operation Application of knowledge, skills, tools, and techniques
17. What are some of the characteristics that make development projects different from other projects? 1 2 3 4
18. Development projects work in difficult environments, facing ever increasing demands to do more with less. Complex environment with constant challenges and risks.
19. What are some of the challenges development projects face today? 1 2 3 4
20. Objectives not properly defined Insufficient planning and coordination of resources Poor estimation of duration and cost Incomplete, unrealistic and outdated project plans Lack of communication Inadequate definition and acceptance of roles Poor commitment to the project by the team Weak control processes Lack of risk analysis Lack of good quality controls
21. What has changed in the last years that caused an increase in these challenges? What new competencies and skills are required today?
22. A project management methodology can help development organizations meet their strategic goals by standardizing processes, reducing risks, and avoiding duplication of efforts
23. Which of the following is not a common cause for project failure. Objectives not properly defined Insufficient planning and coordination of resources Poor estimation of duration and budget Use of a consistent methodology
24. What is a challenge in development projects? Lack of accountability Limited Funds Deal with extremely complex social, economic, and political factors All of the above
27. Development Projects must operate in a broader environment, project managers need to consider projects within this greater context. Projects don’t exist in isolation they are influenced by two strong factors: the internal and external environment.
28. The internal environment includes conditions that the organization has established for the project work, including: Policies and procedures, compensation, benefits, standards, access and use of technology, norms, values, politics and the general organizational culture.
29. The external environment is made of the conditions that the project has little or no influence to change, including: donor and government requirements, international or local regulations, local infrastructure, limited availability of skills or a competitive labor market .
30. Every project is dependent upon processes, people, and tools and they determine how the work gets done. But these three essential elements are not equals. Each has its own strengths and weaknesses, and provides different values to projects. Process People Tools
31. Process -Â The policies and procedures and the roles and responsibilities required in managing development projects. Processes determine how the work needs to be accomplished. People -Â The skills and capabilities of the people in charge of managing the project, and whether or not they follow the processes and procedures to ensure quality of the services provided by the organization. Tools -Â The techniques and devices selected by the organization with the purpose to facilitate the management of the project.
34. A development project has to manage four basic constraints; scope , schedule , budget and quality . The success of a project depends heavily on the ability, skills and knowledge of the project manager to take into consideration these constraints and develop the plans and processes to keep them in balance.
35. Scope , the boundaries of the project Schedule , the time to complete the project activities Budget , the funding available to cover all expenses of the project Quality , achieving the expectations of the stakeholdersÂ
36. Scope , is what the project is trying to achieve, it entails all the work involved in delivering the project outcomes and the processes used to produce them. Scope is the boundary of a project, it is what the beneficiaries, and the donors expect from the project. Â
37. Schedule , is defined as the time required to complete the project. It is an approximation of the duration of all activities in the project. Schedule constraints include specific dates to deliver an activity or complete the project.
38. Budget , are the funds approved for the project, they include all the required expenses needed in order to deliver the project within scope and schedule. A number of constraints, financial, political, and organizational, may dictate the methods by which resources such as personnel, equipment, services and materials are acquired. Â
39. Quality , is the fourth constraint and it is defined as delivering the project outcomes according to the stated or implied needs and expectations of the project beneficiaries and the donor agency. Quality is also defined as the conformance to requirements or fitness for use.
40. What is project scope? The boundaries of a project The strategy for implementing a project The activities of a project The duration of a project
41. What are some examples of influence factors from the project external environment? Donor regulations and government requirements Policies and Procedures Norms and values of the organization Senior management requirements
42. What are the four project constraints? Scope, People, Schedule, Budget Quality, Schedule, People, Budget Scope, Schedule, Budget, Quality Budget, People, Schedule, Resources
43. In which project constraint do project beneficiaries have a significant role? Project Quality Project Budget Project Schedule Project Scope
52. Initiation Phase. This phase is where an idea or a concept is authorized and funded as a project. It includes some planning and estimating to clarify its objective and scope. The major steps during the Initiation include: Project Concept Concept Approval Project Proposal Proposal Approval Project Negotiations Project Contract INITIATE CLOSE PLAN IMPLEMENT ADAPT MONITOR
56. Planning Phase. This phase includes the development of detailed plans required to manage the implementation of the project. Major steps during planning include: Project Charter Organize Project team Project Kick off Project Management Plans Project Plan Approval Communicate plans INITIATE CLOSE PLAN IMPLEMENT ADAPT MONITOR
59. What do we need in order to implement a project?
60. Implementation Phase. The implementation phase includes taking all necessary actions to ensure the activities in the project plan are completed and the outputs of the plan are delivered. Steps in this phase include: Develop Project Team Assign Work Contract Management Procurement Processes Quality Assurance Communications INITIATE CLOSE PLAN IMPLEMENT ADAPT MONITOR
64. Monitoring Phase. Monitoring is about measuring the progress of a project against its objectives, looking at deviations from the plan, and recommending corrective steps to put the project back on track. Steps in this phase include: Evaluate Project Reports. Quality Control Issues/Risk Monitoring Team Evaluation Variance Analysis Determine need for Changes INITIATE CLOSE PLAN IMPLEMENT ADAPT MONITOR
68. Adapt Phase. The Adaptation phase refers to the process by which the project manager learns and adapts the methods, plans, and approaches and determines what works best for the project. Steps in this phase include: Review Performance Reports Review Change Requests Develop Proposals for Changes Approval of Proposed Changes Update Project Plans Capture Lessons Learned INITIATE CLOSE PLAN IMPLEMENT ADAPT MONITOR
72. Closing Phase. The closing phase of the project is when the project has achieved the planned objectives and all deliverables have been completed.  Steps in this phase include: Project Evaluation Project Final Reports Closing Contracts Administrative Close Team Reassignments Distribute Lessons Learned INITIATE CLOSE PLAN IMPLEMENT ADAPT MONITOR
77. Which statement contains the correct order of the project phases? Initiate, plan, implement, monitor, adapt, close Plan, adapt, initiate, implement, monitor, close Plan, initiate, implement, monitor, adapt, close Initiate, plan, implement, adapt, monitor, close
78. In which phase are changes to the project plans approved? Planning phase Monitoring phase Initiate phase Adapt phase
80. Definition of Processes A process is defined as a collection of related, structured activities or tasks that produce a specific result.
81. Scope Management Schedule Management Budget Management Quality Management There are nine management processes that are relevant to development projects. These are designed to help manage the different elements of a project. Different projects may have different needs from each process. Team Management Stakeholder Management Information Management Risk Management Contract Management
82. The nine management processes occur during the entire project and each one of them requires a cyclical approach that consists of planning, doing, checking and adapting to ensure process quality.
83. INITIATE CLOSE PLAN IMPLEMENT ADAPT MONITOR The PM processes are organized into two groups:
85. Scope Management includes the processes involved in defining and controlling all the activities that make up the project and that are required to complete the project successfully.
87. The Work Breakdown Structure (WBS) which is a management technique of breaking the project down into a hierarchy of work tasks which represent 100% of the work.
88. Schedule Management includes the development of a project schedule that contains all project activities, the project schedule is a communication tool that informs project stakeholders the status of the project and gives information as to when each activity must begin and end.
89. The key steps of the schedule management process are: Define the Schedule Publish the Schedule Monitor the Schedule Update the Schedule
90. A GANTT diagram that list all project activities from the WBS; the length and duration of each activity is represented as a bar. Additionally, the chart shows the dependencies amongst activities.
91. Budget Management processes are required to ensure that the project is completed within the approved budget. The project’s ability to manage the financial resources is a measure of the organization’s compliance with donor’s requirements and its efficiency.
92. Budget Management consist of the following steps: Defining the Budget Executing the Budget Controlling the Budget Updating the Budget
93. Budget Management is the activity to see if the project expenses are being executed according to the budget plan and helps identify deviations and develop corrective actions.
95. Quality Management is the process to ensure that the project will satisfy the needs of the beneficiaries. Quality is defined as a commitment to deliver the project outputs and meet the expectations of the beneficiaries, which means that quality is ultimately defined by the beneficiary.
96. There are four steps in quality management: Quality Definition Quality Assurance Quality Control Quality Improvements
97. The most popular tool used to determine quality assurance is the Shewhart Cycle. This cycle for quality assurance consists of four steps: Plan, Do, Check, and Act. These steps are commonly abbreviated as PDCA.
98. What are the four core project management processes? Scope, Schedule, Budget and Quality Schedule, Budget, Risk and Quality Risk, Schedule, Budget and Scope People, Schedule, Budget and Quality
99. What is a GANTT chart? A diagram that shows the roles in a project A diagram to represent the cost of each activity A diagram that list all project activities from the WBS A diagram used to monitor the project quality
100. What does the term scope creep means? Scope creep is delaying activities in the schedule Scope creep is to increase the funding of the project to accommodate additional activities. Scope creep is to reduce the scope of the project Scope creep is to do more than what was originally planned and budgeted for
101. What does WBS stands for? Work Breakdown Scope Work Baseline Schedule Work Schedule Breakdown Work Breakdown Structure
104. Team Management includes the processes required to make the most effective use of the people involved with the project. Team management involves the careful planning to ensure the project has the right people at the right time doing the right things.
105. Steps during the team management process: Team identification Team building Team evaluation Team improvement
106. The “project organization chart” illustrates the structure to manage the project team. The chart identifies the reporting relationships amongst the project team members and how the project integrates within the organizational structure.
107. Stakeholders are all the people who have an interest in the project, they are the most critical element for the success of the project. They include donors, beneficiaries, local government, partner organizations and anyone who will be impacted by the project.
108. There are four steps in stakeholder management process: Stakeholder Mapping Stakeholder relationship building Stakeholder evaluation Stakeholder management improvement
109. An important tool on identifying stakeholders is the creation of a stakeholder map that places each stakeholder on a matrix of influence and interest. Interest Influence Low Low High High Keep Engaged Keep Informed Keep Committed Keep Satisfied A C D B
111. Stakeholder Map Stakeholder Influence Type of Influence Interest Type of Interest Impact Donor Beneficiaries partners Local Gov. Other NGOs Others
113. Information Management includes the steps required to ensure timely and appropriate generation, collection, dissemination, storage, and ultimate disposition of project information. 80% of a project managers’ time is spent communicating via reports, email, telephone, meetings or presentations.
114. The steps in information management include: Information Planning Information Management Information Evaluation Information Improvement
115. Managing information requires the same level of discipline as the management of other project processes; by adequately taking care of each one of the steps the project can have control on the outcomes of the process and be confident on the quality of the information generated.
116. Risk Management includes the processes concerned with identifying, analyzing, and responding to project risks. Risk in projects is defined as something that may happen and if it does, it will have an adverse impact on the project.
117. The four steps in risk management are: Risk Planning Risks Monitoring and Response Risk Evaluation Risk Plan Improvement
118. The list of project risks changes as the project matures, new risks develop, or anticipated risks disappear. As the project makes progress the probability for risks to occur changes, but the potential impact increases; this has implications on the budget and other contingency plans developed by the team.
120. Risk Probability Impact Risk factor Priority Risk A M (2) L(1) 2 4 Risk B L (1) H(3) 3 3 Risk C H(3) H(3) 9 1 Risk D M(2) H(3) 6 2
121. Contract Management includes the processes required to manage the three types of contracts: Grants, sub-grants and procurement contracts. Different projects have different needs relating to contract management.
123. Contract management involves managing the relationship with the donor, sub-grantee and/or suppliers, monitoring contract performance, ensuring reports and payments are made on time and goods and services are delivered under specifications.
124. What are the five supporting processes? Scope, Stakeholder, Information, Risk and Contract Team, Scope, Information, Risk and Contract Contract, Stakeholder, Budget, Risk and Scope Team, Stakeholder, Information, Risk and Contract
125. Who are the Project Stakeholders? Stakeholders are the group of people who work for the project Stakeholders are all the people who have an interest in the project Stakeholders are all the people who know about the project Stakeholders are all the people who contribute to the project
126. What is the purpose of Team Management Processes? Processes required to make the most effective use of the people involved with the project Processes for the correct allocation of team salaries Processes required to ensure that the team is doing the right job Processes required to make the most effective use of the stakeholders involved with the project
129. Roles of the Project Manager - There are three critical roles of the project manager: Integrator ; ensures all the project activities, strategies and approaches are an integrated effort. Communicator ; most of the work is spent here, communicating with all stakeholders and building the right support and relationships. Leader ; motivating and inspiring a team to deliver the project work by providing a vision and direction.
130. Integrator A role to ensure the proper integration of the project management processes and coordinate the project phases through the project management cycle.
131. Communicator The communication or informational role is the most critical role for the success of the project, the organization, project staff, donors, beneficiaries and key stakeholders need to make critical decisions based on the information they receive.
132. Leader The focus on this role is to ensure that the project team and the project stakeholders have a clear vision of the objectives of the project. A project manager does this by facilitating, coordinating and motivating the team to achieve the project goals.
136. Planning , developing the project plans that will guide the actions to implement the project Organizing , coordinate the work to make optimum use of the resources. Directing , leading and motivating the team and other key stakeholders Controlling , and monitoring progress against plans, which may need modifications based on results from evaluations
137. Â The responsibility for planning involves defining what the project will accomplish, when it will be completed, how it will be implemented and monitored, and who will do it.
138. Â The responsibility of the project manager is to establish a structure that will maximize the efficiency (doing the things right) and effectiveness (doing the right things) of the project.
139. The responsibility of the project manager is to direct, lead and motivate the members of the project to perform in a unified, consistent and manner.
140. Controlling is a responsibility to ensure the actions of the project team contribute toward the project goals; the project manager must establish standards for performance, measure performance and compare it with the established standards.
144. There are two basic group of skills needed from project managers: Managerial skills , which deal with managing the procedures, resources and constraints of the project Interpersonal skills , which deal with managing the interpersonal relations with the team and key stakeholders
145. Managerial skills help in the day to day management of resources, constraints, and application of policies and procedures as well as develop ideas, solve problems creatively, negotiate and skills to interpret abstract information.
146. The use of good interpersonal abilities helps build trust and confidence between members of the project team and helps create good relations and a good working environment.
149. The level of authority provides a level of power and influence on the project and its members. Â There are five different types of power: Coercive power Reward power Expert power Legitimate power Referent power
150. Use of some form of punishment or threat to get people to do things.
151. Involves the use of incentives such as money, status, promotions, official recognition or special work assignments.
152. Use of personal expertise to influence the team to follow directions.
153. Based on formal authority, and uses the power vested on the project manager by the organization to make decisions and assign work to the project team.
154. Based on the personal charisma of the project manager; it is based on the leadership qualities of the project manager and his or her ability to build a good level of trust with the team.
156. What are the three roles of a Project Manager? Integrator, Leader, Manager Integrator, Communicator, Leader Leader, Communicator, Facilitator Communicator, Integrator, Facilitator
157. Which interpersonal skill are used to help and motivate the team? Leadership skills Behavioral skills Communication skills Conceptual skills
158. What type of power is based on the project manager's formal authority? Coercive power Referent power Legitimate power Reward power
159. What are the responsibilities of a project manager? Planning, Leading, Directing and Controlling Integrating, Communicating, Leading and Controlling Planning, Organizing, Directing and Controlling Planning, Organizing, Monitoring and Controlling
160. Which management style requires a consensus for decision making? Autocratic Paternalistic Democratic Laissez-Faire
163. A project organization is a structure that facilitates the coordination and implementation of project activities. Its main purpose is to create an environment that fosters interactions among the team members with a minimum amount of disruptions, overlaps and conflict.
164. Each project has its unique characteristics. The design of an organizational structure should consider the organizational environment, the project constraints in which it will operate, and the level of authority the project manager is given. A project structure can take on various forms with each form having its own advantages and disadvantages.
165. Factors in Designing a Project Structure There are two design factors that significantly influence the design of a project management structure. These are the level of specialization , and the need for coordination .
166. A project has three organization structures available for design: Program based , project managers have authority only within a programmatic focus area, such as health or education. Matrix based , the project manager shares responsibility with other program unit managers. Project based, project managers have total authority over project actions.
167. The program structure refers to a traditional structure in which program sector managers have formal authority over most resources. In a program focus organization, a project team is staffed with people from the same area. All the resources needed for the project team come from the same unit.
169. Allows program units to focus on their specific technical competencies and allow projects to be staffed with specialists from throughout the organization. Â It is common for people to report to one person in the functional organization, while working for one or two project managers from other units.
171. Project managers have a high level of authority to manage and control the project resources.  With this type of structure the project manager has more control over the project and the resources needed to accomplish project objectives from within or outside the parent organization, subject only to the scope, schedule, budget, and quality constraints of the project.
173. What are the project structures in your organization?
174. What are the three basic forms of project structure design? Programmatic, Matrix, Project Functional, Matrix, Program Program, Specialization, Matrix Project, Matrix, Specialization
175. Which project organization structure is most advantageous to make an efficient allocation of resources? Programmatic Based Structure Collaboration Based Structure Project Based Structure Matrix Based Structure
180. www.pmi.org Project Management Institute www.pm4dev.com Articles, ebooks, newsletters pm4dev.securespsite.com Intranet to share information, ask questions and provide online support on PM. www.lingos.org A site with a series of online learning resources for NGOs
Editor's Notes
Break
Break 15 minutes
The monitoring phase is input for changes and modifications at the implementation and planning phases until there are no additional changes and all project deliverables have been completed.
Scope is the way to describe the boundaries of the project. It defines what the project will deliver and it also defines what it will not deliver. This process ensures that the project has identified the goals and objectives and those have been documented and that each objective has a well defined set of indicators to monitor their progress.
Define the Scope, define what needs to be done, the objectives to be achieved and what will not be part of the project, includes the creation of a work breakdown structure Assign Work, assignment of work to the project team, consultants and partners Verify the Scope , ensuring that the work is done according to plans Adapt the Scope , making the necessary changes that occur from changes in the environment and changes in priorities
A Work Breakdown Structure (WBS) is a project management technique for defining and organizing the total scope of a project, using a hierarchical tree structure. The first two levels of the WBS define a set of planned outcomes that collectively and exclusively represent 100% of the project scope. At each subsequent level, the children of a parent node collectively and exclusively represent 100% of the scope of their parent node.
Define the Schedule : Using the WBS the schedule is developed with help from key stakeholders, this will determine the total duration of the project Publish the Schedule : Distributing the schedule to key stakeholders Monitor the Schedule : Monitor events that will impact the schedule and come up with alternative solutions Update the Schedule : Update the schedule to reflect decisions potentially affecting the time variable and the implementation of activities
Defining the Budget , the development of all the costs that the project will incur and the approach to manage the budget Executing the Budget , authorizing expenditures Controlling the Budget , monitoring budget performance according to plans Updating the Budget , making necessary changes to the budget following clauses set by the contract or grant
Quality Definition, determining the quality standards for the project Quality Assurance, ensuring that quality is built into every element of the project Quality Control, monitoring and auditing quality Quality Improvements, making improvements to the project that will increase quality levels
Break
Team identification , the process of identifying the skills and competencies required for carrying out the project activities. Team building , organizing the team and building their capacity to perform in the project, assigning roles and responsibilities. Team evaluation , evaluating the performance of the team and dealing with conflict and people issues. Team improvement , improving team performance, and using motivational techniques.
Stakeholder Mapping , the process of mapping and analysis of stakeholders and develop stakeholder management strategies. Stakeholder relationship building , implementing the strategies through communications and relationship building. Stakeholder evaluation , evaluating the results of stakeholder management strategies. Stakeholder management improvement , improving stakeholder management strategies to increase support to the project.
Information Planning , the process of defining the information needs and plans to manage project information Information Management , the process of collecting, analyzing and reporting project information Information Evaluation , evaluating the results of information management plans Information Improvement , improving information management processes
Risk Planning , involves the identification and quantification of all risks and the development of a response plan. Risks Monitoring and Response, includes the activities to monitor risks and respond to risk events. Risk Evaluation , involves the evaluation of the risk management plan and response to actions taken by the project. Risk Plan Improvement , the actions to improve the risk plan and response mechanisms as well as an update on the risk levels.
Develop the proposals , which include: sending a proposal to the donor, sending a request for procurement of goods and services needed by the project. Contract award , includes: identifying the steps for approval and negotiation of the donor contract or grant, selecting the vendors. Review performance and monitor application of clauses and obligations under the contracts, grants and sub-grants Update the contract as needed to reflect authorized changes or modifications.
Break
Programmatic Based Project Organization Advantages: There are usually clear lines of authority There is not need to negotiate with other program units for resources Team members are usually familiar with each other, since they all work in the same area. Disadvantages: Program area may not have all of the specialists needed to work on a project with varied technical needs Current program area members may have other responsibilities in the unit Â
Matrix Based Project Organization Advantages: Efficient allocation of all resources Flexible when dealing with changing program needs and priorities Allows team members to share information more readily across the unit boundaries Disadvantages: Reporting relationships are complex Requires good communication and cooperation between multiple programmatic units
Project Based Organization Advantages: Personnel are specifically assigned to the project and report directly to the project manager Complete line of authority over project efforts affords the project manager strong project controls and centralized lines of communication Project teams develop a strong sense of project identification and ownership Disadvantages: Limited opportunities exist for knowledge sharing between projects Team members concerning the lack of career continuity and opportunities for professional growth Duplication of resources