Profile Key Experience Profession
Firas has over 25 years’ experience
in Civil Engineering mainly within the
management, design and
assessment of rail, roads, bridges,
tunnels and other structures.
His duties have included design,
project and construction
management, technical approvals,
structural design, site management
and supervision, contract documents
and administration.
Firas is currently the Lead Civil
Engineer responsible for delivering
designs for Crossrail/Network Rail.
He was the delivery manager
responsible for the delivery of twin
tracking works as part of the
WIMBLEDON Line Capacity
Improvements Project for TFL –
London/Tram Link which partially
completed in June 2015.
• Project Management
• Design/Project Management from
conceptual stage onto completion
• Detailed design, assessment and
inspection of road/rail/underground
and over ground structures
• Technical and statutory approvals
• Conceptual design and preliminary
design for road/rail bridges and line
routes, viaducts, as well as,
footbridges, lifts, retaining walls,
drainage, embankment and
foundations
• Programming and monitoring of
deliverables
• Producing tenders /cost estimates
• Design liaison and relationship with
client, third parties and design team
• Supervision of engineers and
contractors
• Preparation of design risk
assessments
Civil Engineering and design
Management
Joined Atkins
August 2015
Nationality / Languages
Qualifications
BSC (Hons) - MSC
Building – Construction - Design and
Management
Skills Profile/Competences
CRE (Civil and construction)
Accreditation
Design Review and Design
Coordination
IOSH Health & Safety and IOSH
Environmental
Environmental advanced
management auditor
Appointed person lifting co-ordinator
Scaffold inspector
Valid PTS card, CSCS mangers,
LUCAS and Tram Link Pink cards
Confined Space training.
Asbestos awareness / training
Valid Railway medical test certificate
Firas Abbawy Aug 2015
Firas Abbawy Aug 2015
Experience with Cleshar Contract Services Ltd. (Feb 2014 – July 2015)
Senior Construction Manager – Working within WIMBLEDON Line Capacity Improvements Project
for TFL - London Tram Link.
This project was mainly Design and build of mix of CIVIL, P-Way, Signalling and Telecoms works. This was in two parts, one
of which is upgrading existing single file line to twin tracking between Mitcham Junction / Beddington Lane tram stops. It was
involved with the following design and build elements:
• New concrete foundations for new OLE structures,
• Design and upgrade of 700m long - underground track drainage, to include for linin, jetting and patch repairs as well
as construction of new catch pits chambers, with 4no UTX’s and under track directional drilling and shaft
construction works,
• Design and upgrade of new service’s - draw pit chambers with new multi ducting system cable routes and
design/construction of Cess footpath,
• Design and build of new external switch cabinets and signaling equipment’s concrete bases with S&T (signaling and
telecoms) cables including new fibers,
• Design and build of embankment, embankment’s support, concrete retaining walls, OLE support structures, metal
fences, handrails and gates.
• Design and build of new speed signage and warning signage systems with concrete foundations / bases.
Other Civil associated works such as a ramp construction, anti-tress pass cattle grids installation, new platform / track
crossings, tendering, resource and technical management. My position was managing and coordinating Civil design and
leading technical delivery with all liaison required between different parties, the client, contractors and the design team.
Co-ordination with other companies and local authority and obtaining statutory approvals for the design works,
Prepare and producing relevant paper works, manage and oversee implementation of different work packages,
Senior construction manager working on the East London Line, Platforms extensions as part of
London Over ground Capacity Improvement Program.
Looking after CIVIL / M&E Design, structural assessments and Construction works, as part of the East
London Line - platform extensions scheme on the following stations: Haggerston, Shadwell, Wapping, Surrey
Quays, Highbury & Islington and Clapham Junction station.
Responsible for managing a team of engineers, responsible for ensuring the technical content and quality of the
deliverables produced comply with London Overground Standards. Produce progress reports and ensure that
programme and man hour targets were met. Provides support and mentoring to my team in both managerial and
technical issues. Carried out performance and development reviews of the group as well as interviewing candidates. This
included carrying out and producing principal inspection reports, AIP’s and risk assessments. Successfully completed in
Oct 2014.
Experience with J. Murphy & Sons Ltd. (Feb 2006 – Jan 2014)
Senior Project Manager / CRE Civil and Construction reporting to the project CEM on the following
projects:
Network Rail Infrastructure Projects – CP4 Enhance spending phase 2 - Hidden critical elements. This project is an
NEC - Design and build Rail project of under bridge hidden critical elements surveys, inspections, desk study and issue
reports, ballast board replacement or installation of new.
Network Rail Infrastructure Projects - South Hampstead railway station - Design and build Rail project the
proposed work involves the construction of a 115m long bored pile retaining structure and in total 203 piles of 600mm
diameter and a depth of 17.5m were to be constructed and connected into a reinforced concrete pile cap. Re-instatement
Firas Abbawy Aug 2015
of a section of disturbed/demolished platform, brick repair and drainage works.
Network Rail Signalling projects - Demolition of Hampden Park Signal Box and 2 no. Pway Huts as part of the East
Sussex Coast Resignalling project. This project is an NEC - Design and build Rail project mainly the Demolition and
temporary scaffold works, protection of services, traffic management, stripping out and heavy demolition works to the
Hampden Park Signal Box and 2no Pway Huts.
Network Rail Signalling projects – Basingstoke Campus Enabling Works. This was an NEC - Design and build
project. Main scheme targets are: construction of two number under track crossings UTX for the SSE-33KVA overhead
cable diversion and 11KVA power supply to the site, construction of new concrete bases for external switch cabinets,
supply and install external switch gear/cubical with switch rooms, removal of Japanese Knot Weed, construction of Haul
Road and other associated works.
Network Rail Signalling projects - MML Junction lighting scheme. This is a pre-designed Rail project, involved
mainly with the supply and installation of trackside lighting at Carlton Road Junction, Dock Road Junction and Kentish
Town Junction. To provide an appropriate level of illumination that will permit maintenance activities currently undertaken
in daylight to be carried out during the night. Also to enable easy access and egress to and from the Junction area and to
give quick and easy general Task Lighting for regular maintenance of the Railways Junctions. This allowed safe
navigation around the site during a possession in hours of darkness.
Network Rail / Cross Rail and HOCHTIEF UK - construction Ltd. Bridge parapet modifications works in Slough-London.
This is NEC - Design and build project. The purpose of this project is to enable the introduction of Overhead Line
Equipment (OLE) to the Crossrail West surface works from Heathrow airport Junction to Maidenhead. As a precursor to
the electrification, four bridge reconstructions including Middle green Road Bridge and Trenches Bridge within the
Borough of Slough are to be partly demolished and reconstructed to provide sufficient electrical clearance. To give
adequate protection from the OLE equipment to be installed on the route, the parapets of another 12no. Bridges,
including 9no within the Borough of Slough, are to be altered to achieve compliance with HMRI overhead electrification
requirements.
Canary Wharf Contractors – Canary Wharf Highway and junction alterations Works – A Design and build Civil and
Highway project. Alteration of West - ferry Road, Marsh Wall, Bank Street and Heron Quay road and Roundabout to
form a new highway junction. The client is Canary Wharf Contractors Ltd.
Wilmot Dixon - Woolwich Central – Sewer Diversion and Shaft Construction for the principle contractor Willmott Dixon
and client Thames Water and Tesco. Design and build Civil and Highway project. The project is mainly construction of
4m internal diameter x 22m deep pre-cast concrete shaft, timber heading and breaking in to the existing Victorian sewer
pipes (2no.) with installation of 600mm diameter new pipe line of sewer then diverting the flow.
Ipswich station – AFA scheme, This was an NEC - Design and build Rail project. Construction of a new footbridge
with two sets of stairs, two brick lifts shafts, new CCTV cameras and PA systems, platform tactile paving, local surfacing,
canopy removal and dismantles of an existing station building, etc.
Audley End Station - AFA scheme - Design and build Rail project. Construct of new footbridge with two lift shafts,
new CCTV cameras and PA systems, platform edge tactile paving, new surfacing, new boundary walls, etc.
St. Albans City Station - AFA scheme - Design and build Rail project Construction of three lift shafts build station
extension & new ticket office, construct two retail units, refurbish existing footbridge and existing building enhancement.
Network Rail - Demolishing of Bridge 19 over Christmas and erecting new brick walls adjacent to the tracks.
LUL - Waterloo underground station, Building step free access for the Waterloo and City lines.
Brent Council - Carlyon Road to Mount Pleasant over Canal - Footbridge reconstruction - Demolish an existing
concrete footbridge and install new steel footbridge over the Grand Union Canal with construction of new brick and
concrete ramps and stainless steel handrails, supply and install of 33KVA power cables, Improvement to approaching
roads and providing of secure storage facilities as part of the main bridge structure / abutments.
LUL - Wembley park Station - Olympic way leading to Wembley Stadium, construction of new gathering areas, under
floor LED lighting, install seats and complete landscape works to existing gardens and green areas as part of phase 2
refurbishments of the Wembley park station works.
Firas Abbawy Aug 2015
Experience with Scanmoor Ltd. (Dec 2004 – Jan 2006)
Site Engineer / Manager worked at the following projects:
Harefield – Construction of a new building for Watford football team (Watford football school.
Wembley Park station - Carry out re-habitation and extension for the old station, building extensions, new paving and
extend of Bobby Moor stairs, etc.
Wembley park-Train crew mess accommodation - New two story building for the LUL (Train crew accommodation.
Chelsea - Fulham road – Construction of new tow stories building for the (NHS) Elderly people house, and construction
of new six stories residential building for Taylor Woodrow’s company.
Stanmore station – Construction of third platform for the Jubilee line for the LUL.
Waterloo station – Construction of new access platform for the central line within the underground Arches, new lift shaft
and general enhancement.
Firas Abbawy Aug 2015
Experience with Scanmoor Ltd. (Dec 2004 – Jan 2006)
Site Engineer / Manager worked at the following projects:
Harefield – Construction of a new building for Watford football team (Watford football school.
Wembley Park station - Carry out re-habitation and extension for the old station, building extensions, new paving and
extend of Bobby Moor stairs, etc.
Wembley park-Train crew mess accommodation - New two story building for the LUL (Train crew accommodation.
Chelsea - Fulham road – Construction of new tow stories building for the (NHS) Elderly people house, and construction
of new six stories residential building for Taylor Woodrow’s company.
Stanmore station – Construction of third platform for the Jubilee line for the LUL.
Waterloo station – Construction of new access platform for the central line within the underground Arches, new lift shaft
and general enhancement.
Firas Abbawy Aug 2015

More Related Content

Firas Abbawy CV - Atkins

  • 1. Firas Abbawy Lead Civil Engineer Profile Key Experience Profession Firas has over 25 years’ experience in Civil Engineering mainly within the management, design and assessment of rail, roads, bridges, tunnels and other structures. His duties have included design, project and construction management, technical approvals, structural design, site management and supervision, contract documents and administration. Firas is currently the Lead Civil Engineer responsible for delivering designs for Crossrail/Network Rail. He was the delivery manager responsible for the delivery of twin tracking works as part of the WIMBLEDON Line Capacity Improvements Project for TFL – London/Tram Link which partially completed in June 2015. • Project Management • Design/Project Management from conceptual stage onto completion • Detailed design, assessment and inspection of road/rail/underground and over ground structures • Technical and statutory approvals • Conceptual design and preliminary design for road/rail bridges and line routes, viaducts, as well as, footbridges, lifts, retaining walls, drainage, embankment and foundations • Programming and monitoring of deliverables • Producing tenders /cost estimates • Design liaison and relationship with client, third parties and design team • Supervision of engineers and contractors • Preparation of design risk assessments Civil Engineering and design Management Joined Atkins August 2015 Nationality / Languages Qualifications BSC (Hons) - MSC Building – Construction - Design and Management Skills Profile/Competences CRE (Civil and construction) Accreditation Design Review and Design Coordination IOSH Health & Safety and IOSH Environmental Environmental advanced management auditor Appointed person lifting co-ordinator Scaffold inspector Valid PTS card, CSCS mangers, LUCAS and Tram Link Pink cards Confined Space training. Asbestos awareness / training Valid Railway medical test certificate Firas Abbawy Aug 2015
  • 3. Experience with Cleshar Contract Services Ltd. (Feb 2014 – July 2015) Senior Construction Manager – Working within WIMBLEDON Line Capacity Improvements Project for TFL - London Tram Link. This project was mainly Design and build of mix of CIVIL, P-Way, Signalling and Telecoms works. This was in two parts, one of which is upgrading existing single file line to twin tracking between Mitcham Junction / Beddington Lane tram stops. It was involved with the following design and build elements: • New concrete foundations for new OLE structures, • Design and upgrade of 700m long - underground track drainage, to include for linin, jetting and patch repairs as well as construction of new catch pits chambers, with 4no UTX’s and under track directional drilling and shaft construction works, • Design and upgrade of new service’s - draw pit chambers with new multi ducting system cable routes and design/construction of Cess footpath, • Design and build of new external switch cabinets and signaling equipment’s concrete bases with S&T (signaling and telecoms) cables including new fibers, • Design and build of embankment, embankment’s support, concrete retaining walls, OLE support structures, metal fences, handrails and gates. • Design and build of new speed signage and warning signage systems with concrete foundations / bases. Other Civil associated works such as a ramp construction, anti-tress pass cattle grids installation, new platform / track crossings, tendering, resource and technical management. My position was managing and coordinating Civil design and leading technical delivery with all liaison required between different parties, the client, contractors and the design team. Co-ordination with other companies and local authority and obtaining statutory approvals for the design works, Prepare and producing relevant paper works, manage and oversee implementation of different work packages, Senior construction manager working on the East London Line, Platforms extensions as part of London Over ground Capacity Improvement Program. Looking after CIVIL / M&E Design, structural assessments and Construction works, as part of the East London Line - platform extensions scheme on the following stations: Haggerston, Shadwell, Wapping, Surrey Quays, Highbury & Islington and Clapham Junction station. Responsible for managing a team of engineers, responsible for ensuring the technical content and quality of the deliverables produced comply with London Overground Standards. Produce progress reports and ensure that programme and man hour targets were met. Provides support and mentoring to my team in both managerial and technical issues. Carried out performance and development reviews of the group as well as interviewing candidates. This included carrying out and producing principal inspection reports, AIP’s and risk assessments. Successfully completed in Oct 2014. Experience with J. Murphy & Sons Ltd. (Feb 2006 – Jan 2014) Senior Project Manager / CRE Civil and Construction reporting to the project CEM on the following projects: Network Rail Infrastructure Projects – CP4 Enhance spending phase 2 - Hidden critical elements. This project is an NEC - Design and build Rail project of under bridge hidden critical elements surveys, inspections, desk study and issue reports, ballast board replacement or installation of new. Network Rail Infrastructure Projects - South Hampstead railway station - Design and build Rail project the proposed work involves the construction of a 115m long bored pile retaining structure and in total 203 piles of 600mm diameter and a depth of 17.5m were to be constructed and connected into a reinforced concrete pile cap. Re-instatement Firas Abbawy Aug 2015
  • 4. of a section of disturbed/demolished platform, brick repair and drainage works. Network Rail Signalling projects - Demolition of Hampden Park Signal Box and 2 no. Pway Huts as part of the East Sussex Coast Resignalling project. This project is an NEC - Design and build Rail project mainly the Demolition and temporary scaffold works, protection of services, traffic management, stripping out and heavy demolition works to the Hampden Park Signal Box and 2no Pway Huts. Network Rail Signalling projects – Basingstoke Campus Enabling Works. This was an NEC - Design and build project. Main scheme targets are: construction of two number under track crossings UTX for the SSE-33KVA overhead cable diversion and 11KVA power supply to the site, construction of new concrete bases for external switch cabinets, supply and install external switch gear/cubical with switch rooms, removal of Japanese Knot Weed, construction of Haul Road and other associated works. Network Rail Signalling projects - MML Junction lighting scheme. This is a pre-designed Rail project, involved mainly with the supply and installation of trackside lighting at Carlton Road Junction, Dock Road Junction and Kentish Town Junction. To provide an appropriate level of illumination that will permit maintenance activities currently undertaken in daylight to be carried out during the night. Also to enable easy access and egress to and from the Junction area and to give quick and easy general Task Lighting for regular maintenance of the Railways Junctions. This allowed safe navigation around the site during a possession in hours of darkness. Network Rail / Cross Rail and HOCHTIEF UK - construction Ltd. Bridge parapet modifications works in Slough-London. This is NEC - Design and build project. The purpose of this project is to enable the introduction of Overhead Line Equipment (OLE) to the Crossrail West surface works from Heathrow airport Junction to Maidenhead. As a precursor to the electrification, four bridge reconstructions including Middle green Road Bridge and Trenches Bridge within the Borough of Slough are to be partly demolished and reconstructed to provide sufficient electrical clearance. To give adequate protection from the OLE equipment to be installed on the route, the parapets of another 12no. Bridges, including 9no within the Borough of Slough, are to be altered to achieve compliance with HMRI overhead electrification requirements. Canary Wharf Contractors – Canary Wharf Highway and junction alterations Works – A Design and build Civil and Highway project. Alteration of West - ferry Road, Marsh Wall, Bank Street and Heron Quay road and Roundabout to form a new highway junction. The client is Canary Wharf Contractors Ltd. Wilmot Dixon - Woolwich Central – Sewer Diversion and Shaft Construction for the principle contractor Willmott Dixon and client Thames Water and Tesco. Design and build Civil and Highway project. The project is mainly construction of 4m internal diameter x 22m deep pre-cast concrete shaft, timber heading and breaking in to the existing Victorian sewer pipes (2no.) with installation of 600mm diameter new pipe line of sewer then diverting the flow. Ipswich station – AFA scheme, This was an NEC - Design and build Rail project. Construction of a new footbridge with two sets of stairs, two brick lifts shafts, new CCTV cameras and PA systems, platform tactile paving, local surfacing, canopy removal and dismantles of an existing station building, etc. Audley End Station - AFA scheme - Design and build Rail project. Construct of new footbridge with two lift shafts, new CCTV cameras and PA systems, platform edge tactile paving, new surfacing, new boundary walls, etc. St. Albans City Station - AFA scheme - Design and build Rail project Construction of three lift shafts build station extension & new ticket office, construct two retail units, refurbish existing footbridge and existing building enhancement. Network Rail - Demolishing of Bridge 19 over Christmas and erecting new brick walls adjacent to the tracks. LUL - Waterloo underground station, Building step free access for the Waterloo and City lines. Brent Council - Carlyon Road to Mount Pleasant over Canal - Footbridge reconstruction - Demolish an existing concrete footbridge and install new steel footbridge over the Grand Union Canal with construction of new brick and concrete ramps and stainless steel handrails, supply and install of 33KVA power cables, Improvement to approaching roads and providing of secure storage facilities as part of the main bridge structure / abutments. LUL - Wembley park Station - Olympic way leading to Wembley Stadium, construction of new gathering areas, under floor LED lighting, install seats and complete landscape works to existing gardens and green areas as part of phase 2 refurbishments of the Wembley park station works. Firas Abbawy Aug 2015
  • 5. Experience with Scanmoor Ltd. (Dec 2004 – Jan 2006) Site Engineer / Manager worked at the following projects: Harefield – Construction of a new building for Watford football team (Watford football school. Wembley Park station - Carry out re-habitation and extension for the old station, building extensions, new paving and extend of Bobby Moor stairs, etc. Wembley park-Train crew mess accommodation - New two story building for the LUL (Train crew accommodation. Chelsea - Fulham road – Construction of new tow stories building for the (NHS) Elderly people house, and construction of new six stories residential building for Taylor Woodrow’s company. Stanmore station – Construction of third platform for the Jubilee line for the LUL. Waterloo station – Construction of new access platform for the central line within the underground Arches, new lift shaft and general enhancement. Firas Abbawy Aug 2015
  • 6. Experience with Scanmoor Ltd. (Dec 2004 – Jan 2006) Site Engineer / Manager worked at the following projects: Harefield – Construction of a new building for Watford football team (Watford football school. Wembley Park station - Carry out re-habitation and extension for the old station, building extensions, new paving and extend of Bobby Moor stairs, etc. Wembley park-Train crew mess accommodation - New two story building for the LUL (Train crew accommodation. Chelsea - Fulham road – Construction of new tow stories building for the (NHS) Elderly people house, and construction of new six stories residential building for Taylor Woodrow’s company. Stanmore station – Construction of third platform for the Jubilee line for the LUL. Waterloo station – Construction of new access platform for the central line within the underground Arches, new lift shaft and general enhancement. Firas Abbawy Aug 2015