Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
SlideShare a Scribd company logo
GIP Monthly Meeting May 2014
How are you
doing??
Agenda
Performance
Updates
Consultancy
Output
Matching
Updates!
Operations &
Transition
Quality for
GIP Fruit
Peak
Myaiesec.net
changes
GIP Monthly Meeting May 2014
GIP Monthly Meeting May 2014
Indicator Last 90 days (completed)
NPS 44 (38)
RR 42% (30%)
% Promoters 59% (58%)
Cases Open/Total Cases 51/83
Promoters Detractors
Communication by the Host LC (4%) Support by the host entity during the experience (8%)
Objectives of the Program (4%) Integration into the local chapter (5%)
The Selection Interview (4%) Accommodation (5%)
Net Promoter Score
Top
oGIP
Ma Q2
Top
iGIP
Ma Q2
Global Realisation Forecast
iGIP Consultancy Output
How can we
stop iGIP
members from
dropping out
so quickly?
How can we
get our LCPs
more
committed to
growing iGIP
in their LCs?
How can we
increase the
sales intensity
of our LCs?
How can we
increase the
sales intensity
of our LCs?
How do we
know if we
need to
improve our
talent capacity
to grow in
iGIP?
What do the
following images
have in common?
GIP Golden Forms
Guaranteed responses. Faster Matching.
GIP Golden Forms
 A google spreadsheet with top forms in marketing and teaching from the top 8
TN suppliers for Summer 2014
 Brazil, MoC, Colombia, Czech Republic, Germany, India, Mexico, Turkey
 All EPs and EP Managers are welcome
 How will this be faster? Everything is in one place, and we have rules to speed
up communication and matching!!
GIP Golden Forms
Rules for EPs and EP Managers
1. CC the MC of the iGIP entity on every email and the EP application
2. Apply only to TNs for which you meet the requirements
3. Respond to all TN Manager emails within 48 hours
4. Attend all interviews for TNs you apply to, unless you have been
matched
5. You can have a maximum of 10 ongoing applications
If an EP breaks a rule, their EP form will be put on hold
GIP Golden Forms
Rules for TN Managers
1. Respond to all EP emails and EP applications within 48 hours
2. When an EP applies for a TN, they must be given an interview with
time and date or a rejection within 7 days
If a TN Manager doesn’t follow these rules, their TN will be
kicked out of the Golden Forms
GIP Golden Forms
If everyone is qualified for the TNs they are applying for . . .
And everyone is communicating with each other quickly . . .
And the interviews happen as soon as possible . . .
There’s no reason we can’t match our Marketing and Teaching
forms for Summer Peak!!
GIP Golden Forms
 Start using the Golden Forms today to match your EPs!
 If you have any questions or suggestions email
colew@ai.aiesec.org
 If anyone breaks a rule email colew@ai.aiesec.org
 Even if you don’t have TNs on Golden Forms, you should
start enforcing these rules in your entity
Brazil
 TN Managers have to respond to EPs within 48 hours (tracked by NST)
 If TN Managers don’t respond to EPs within 48 hours or if the company or
EPs complain about the TN Manager, then . . .
 First time they get a warning
 Second time their LC loses points in Brazil’s challenge
 Third time the TN gets rejected and the LC can’t raise TNs until they solve
the issues
Matching Updates!
Golden
Forms!
Matching
Mania
Teaching
S&D
Knowledge
GCP:
Greece &
Ukraine
GCP: Brazi
Matching
Mania
Teaching
• Bring TN and EP forms with start date of July or August
• Ensure ALL LCs that are doing the Teaching sub product (Specifically 3 month and 6 month English
teaching) are at the MATCHING MANIA
• iGIP Entities can bring promotion booklet for their teaching TNs and upload them here - Promotion
Booklets for Teaching TNs
• iGIP MCs and LCs can upload their reception information/toolkits here - Reception information
• oGIP LCs can have EP Managers and EPs on the chat space as well
• Be aware of Product, duration, start and end date and language requirements while bringing TN forms,
EP forms/EPs
Preparation for Matching Mania!
How will the space run?
We will
showcase top
TN forms
across each
teaching
product
Email LCs
clear
action steps on
how to match
faster
Track matches
of LCs
attending
matching
mania
What will be the follow up by AI?
Email MCs a
list
of LCs that
attended
Email LCs
clear
action steps on
how to match
faster
Track matches
of LCs
attending
matching
mania
S&D
Knowledge
S&D for Global Product is updated!
Fill out your search tool and find others!
AFT Updated! (Live and Offline ones)
Match Wiki for continuous updates
Matching in Partnerships
Classify your
current supply
in products.
Use AFT
Classify the
products in
your LC’s
Classify your
partners supply
in products
Connect your
& your partner
entity’s LC’s
Track the
matches in
LC’s
Communicate
with your partner
(MC VP or
NST)
 Greece raised a large marketing contract with
a hotel chain for Ukrainian EPs—there was no
partnership before, so they had to make one
fast!
 Greece contacted LCs in Ukraine and gave
very specific EP profiles for them to raise
 Communication between the LCs was daily,
with Skype meetings and emails
 The LCs in Ukraine started visa paperwork in
advance so that delivery would be easy
Three Tips for Matching from
Greece:
1) Clear product – TN
requirements and EP profiles
2) Daily communication
3) Clarify visa processes and
requirements at the very
beginning
Greece – Ukraine Partnership:
40 GIP Matches in 2014
Quality for GIP
What Are We
Trying to
Achieve?
NPS = 48
Integration
What’s Keeping Us from NPS of 48?
Our NPS for
GIP is 38
16% of our
passive and
detractors
recommend
we improve
integration
JD Clarity
Accommodatio
n
15% of our
passive and
detractors
recommend
we improve
JD clarity
12% of our
passive and
detractors
recommend
we improve
accommodatio
n
If we eliminate
these three
issues, our NPS
will be 48
2015 NPS
Goal
Achieved!!
How Can We Improve Integration?
 Understand the EP’s integration expectations between match
and realization
 Make an integration plan with each EP upon reception of
what activities they’d like to do and be involved with
 On the EP’s first day, run a 1-day integration agenda with the
TN-taker, the EP Manager, and the EP
 EP buddies with clear JD, training, and tracking
How Can We Improve JD Clarity?
 Ensure a professional working environment for the EP with a
clear MoS for the EP
 Ensure the company provides training and support for the EP
to do their JD
 Give a suggested working agenda to the TN-taker for the first
two weeks
 Make sure the salary payment process is clear and always
followed
How Can We Improve Accommodation?
 Before realization, clarify with every EP the plan for
their accommodation
 Set accommodation standards with your LCs
 Only have EPs housed in safe neighborhoods
Quality for GIP
 If you have more suggestions or materials for these
detractor issues, email colew@ai.aiesec.org
 Stay tuned for the Quality Wiki to have more content
on these issues in the next week!
 Address these issues with your VPs now!
Operations management & transition
Who has already started MC transition?
Which of you has your elects running
most operations?
Add your MC VPs 1415 to the Global
MC VP Contact List!!
Have
working
time to
make it
happen!
Be clear when
your
successor is
taking over
and make sure
he/she is
directly
driving it!
Plan key
activities to
support from
MC level until
end of your
term
Have a clear
direction and
mandate for
LC level,
starting with
knowing your
RE for Q3!
What to do to keep running
operations?
Aiesec.net Changes
What is happening during
making a match?
Match!
Upload TN and
EP ILs & ANs
Adjust Field of
Work to 1
primary and 1
secondary in for
TN and 2&2 for
EP forms
GIP Monthly Meeting May 2014
What information can I access?
How does it work?
Capacity indicators
How does it work?
Capacity indicators
• You can check % of people in functions – Both exchange and exchange
support
• You can check % of people by process – In Raise, Match, Delivery, Re-
integration, Re-raising
• You can check % of people by process for ALL teams or for teams in
SPECIFIC FUNCTION
How does it work?
Productivity
How does it work?
• You can check the formula used everywhere by clicking on the i (for
information) tab
• To be able to have accurate information around productivity and capacity
indicators ALL TEAMS being created starting TODAY will have to assign
exchange process and exchange function
• There is also a small modification while doing role assignment so that for
every member in a team we can assign specific exchange processes
Work with the MCVP TM to ensure ALL GIP teams are on
myAIESEC.net
You can choose to modify roles of existing teams if you want the data to
be more accurate
Start tracking your focus LCs in GIPs productivity, number of members
and % supporting exchange process through myAIESEC.net
Educate LCs on how to use these changes
Track your talent planning and manage talent pipeline
using capacity indicators
Golden Forms:
https://docs.google.com/a/ai.aiesec.org/spreadsheets/d/13ueLxM6V_cAifVMIe7aFnSoF_AJYYIA_cBuDK
dzil1Q/edit
S&D:
https://docs.google.com/a/ai.aiesec.org/spreadsheet/ccc?key=0Ap6bTNYUAcwbdEg0cmZQTTRGSmJO
N0phRS05a3NWeVE&usp=drive_web#gid=9
Live AFT:
http://live.myaiesec.net/aft/aft.php
Offline AFT:
http://www.myaiesec.net/content/viewfile.do?contentid=10304189
Match GIP Wiki:
http://www.myaiesec.net/content/viewwiki.do?contentid=10303308
Global 1415 Contact List:
https://docs.google.com/a/ai.aiesec.org/spreadsheet/ccc?key=0AooK2vHYB3emdG5lMHg4c0lHMlg3c1d
UQkNkWC1FX1E&usp=docslist_api#gid=1
Global Realization Forecast:
https://docs.google.com/a/ai.aiesec.org/spreadsheets/d/1l3T6GO9S3AasRKFE1xeS6Tr7y_1Iauv05GzzD
Yk3hUI/edit#gid=0
Links

More Related Content

GIP Monthly Meeting May 2014

  • 6. Indicator Last 90 days (completed) NPS 44 (38) RR 42% (30%) % Promoters 59% (58%) Cases Open/Total Cases 51/83 Promoters Detractors Communication by the Host LC (4%) Support by the host entity during the experience (8%) Objectives of the Program (4%) Integration into the local chapter (5%) The Selection Interview (4%) Accommodation (5%) Net Promoter Score
  • 9. iGIP Consultancy Output How can we stop iGIP members from dropping out so quickly? How can we get our LCPs more committed to growing iGIP in their LCs? How can we increase the sales intensity of our LCs? How can we increase the sales intensity of our LCs? How do we know if we need to improve our talent capacity to grow in iGIP?
  • 10. What do the following images have in common? GIP Golden Forms Guaranteed responses. Faster Matching.
  • 11. GIP Golden Forms  A google spreadsheet with top forms in marketing and teaching from the top 8 TN suppliers for Summer 2014  Brazil, MoC, Colombia, Czech Republic, Germany, India, Mexico, Turkey  All EPs and EP Managers are welcome  How will this be faster? Everything is in one place, and we have rules to speed up communication and matching!!
  • 12. GIP Golden Forms Rules for EPs and EP Managers 1. CC the MC of the iGIP entity on every email and the EP application 2. Apply only to TNs for which you meet the requirements 3. Respond to all TN Manager emails within 48 hours 4. Attend all interviews for TNs you apply to, unless you have been matched 5. You can have a maximum of 10 ongoing applications If an EP breaks a rule, their EP form will be put on hold
  • 13. GIP Golden Forms Rules for TN Managers 1. Respond to all EP emails and EP applications within 48 hours 2. When an EP applies for a TN, they must be given an interview with time and date or a rejection within 7 days If a TN Manager doesn’t follow these rules, their TN will be kicked out of the Golden Forms
  • 14. GIP Golden Forms If everyone is qualified for the TNs they are applying for . . . And everyone is communicating with each other quickly . . . And the interviews happen as soon as possible . . . There’s no reason we can’t match our Marketing and Teaching forms for Summer Peak!!
  • 15. GIP Golden Forms  Start using the Golden Forms today to match your EPs!  If you have any questions or suggestions email colew@ai.aiesec.org  If anyone breaks a rule email colew@ai.aiesec.org  Even if you don’t have TNs on Golden Forms, you should start enforcing these rules in your entity
  • 16. Brazil  TN Managers have to respond to EPs within 48 hours (tracked by NST)  If TN Managers don’t respond to EPs within 48 hours or if the company or EPs complain about the TN Manager, then . . .  First time they get a warning  Second time their LC loses points in Brazil’s challenge  Third time the TN gets rejected and the LC can’t raise TNs until they solve the issues
  • 19. • Bring TN and EP forms with start date of July or August • Ensure ALL LCs that are doing the Teaching sub product (Specifically 3 month and 6 month English teaching) are at the MATCHING MANIA • iGIP Entities can bring promotion booklet for their teaching TNs and upload them here - Promotion Booklets for Teaching TNs • iGIP MCs and LCs can upload their reception information/toolkits here - Reception information • oGIP LCs can have EP Managers and EPs on the chat space as well • Be aware of Product, duration, start and end date and language requirements while bringing TN forms, EP forms/EPs Preparation for Matching Mania!
  • 20. How will the space run? We will showcase top TN forms across each teaching product Email LCs clear action steps on how to match faster Track matches of LCs attending matching mania
  • 21. What will be the follow up by AI? Email MCs a list of LCs that attended Email LCs clear action steps on how to match faster Track matches of LCs attending matching mania
  • 22. S&D Knowledge S&D for Global Product is updated! Fill out your search tool and find others! AFT Updated! (Live and Offline ones) Match Wiki for continuous updates
  • 23. Matching in Partnerships Classify your current supply in products. Use AFT Classify the products in your LC’s Classify your partners supply in products Connect your & your partner entity’s LC’s Track the matches in LC’s Communicate with your partner (MC VP or NST)
  • 24.  Greece raised a large marketing contract with a hotel chain for Ukrainian EPs—there was no partnership before, so they had to make one fast!  Greece contacted LCs in Ukraine and gave very specific EP profiles for them to raise  Communication between the LCs was daily, with Skype meetings and emails  The LCs in Ukraine started visa paperwork in advance so that delivery would be easy Three Tips for Matching from Greece: 1) Clear product – TN requirements and EP profiles 2) Daily communication 3) Clarify visa processes and requirements at the very beginning Greece – Ukraine Partnership: 40 GIP Matches in 2014
  • 26. What Are We Trying to Achieve? NPS = 48
  • 27. Integration What’s Keeping Us from NPS of 48? Our NPS for GIP is 38 16% of our passive and detractors recommend we improve integration JD Clarity Accommodatio n 15% of our passive and detractors recommend we improve JD clarity 12% of our passive and detractors recommend we improve accommodatio n
  • 28. If we eliminate these three issues, our NPS will be 48 2015 NPS Goal Achieved!!
  • 29. How Can We Improve Integration?  Understand the EP’s integration expectations between match and realization  Make an integration plan with each EP upon reception of what activities they’d like to do and be involved with  On the EP’s first day, run a 1-day integration agenda with the TN-taker, the EP Manager, and the EP  EP buddies with clear JD, training, and tracking
  • 30. How Can We Improve JD Clarity?  Ensure a professional working environment for the EP with a clear MoS for the EP  Ensure the company provides training and support for the EP to do their JD  Give a suggested working agenda to the TN-taker for the first two weeks  Make sure the salary payment process is clear and always followed
  • 31. How Can We Improve Accommodation?  Before realization, clarify with every EP the plan for their accommodation  Set accommodation standards with your LCs  Only have EPs housed in safe neighborhoods
  • 32. Quality for GIP  If you have more suggestions or materials for these detractor issues, email colew@ai.aiesec.org  Stay tuned for the Quality Wiki to have more content on these issues in the next week!  Address these issues with your VPs now!
  • 34. Who has already started MC transition?
  • 35. Which of you has your elects running most operations?
  • 36. Add your MC VPs 1415 to the Global MC VP Contact List!!
  • 37. Have working time to make it happen! Be clear when your successor is taking over and make sure he/she is directly driving it! Plan key activities to support from MC level until end of your term Have a clear direction and mandate for LC level, starting with knowing your RE for Q3! What to do to keep running operations?
  • 39. What is happening during making a match? Match! Upload TN and EP ILs & ANs Adjust Field of Work to 1 primary and 1 secondary in for TN and 2&2 for EP forms
  • 41. What information can I access?
  • 42. How does it work? Capacity indicators
  • 43. How does it work? Capacity indicators • You can check % of people in functions – Both exchange and exchange support • You can check % of people by process – In Raise, Match, Delivery, Re- integration, Re-raising • You can check % of people by process for ALL teams or for teams in SPECIFIC FUNCTION
  • 44. How does it work? Productivity
  • 45. How does it work? • You can check the formula used everywhere by clicking on the i (for information) tab • To be able to have accurate information around productivity and capacity indicators ALL TEAMS being created starting TODAY will have to assign exchange process and exchange function • There is also a small modification while doing role assignment so that for every member in a team we can assign specific exchange processes
  • 46. Work with the MCVP TM to ensure ALL GIP teams are on myAIESEC.net You can choose to modify roles of existing teams if you want the data to be more accurate Start tracking your focus LCs in GIPs productivity, number of members and % supporting exchange process through myAIESEC.net Educate LCs on how to use these changes Track your talent planning and manage talent pipeline using capacity indicators
  • 47. Golden Forms: https://docs.google.com/a/ai.aiesec.org/spreadsheets/d/13ueLxM6V_cAifVMIe7aFnSoF_AJYYIA_cBuDK dzil1Q/edit S&D: https://docs.google.com/a/ai.aiesec.org/spreadsheet/ccc?key=0Ap6bTNYUAcwbdEg0cmZQTTRGSmJO N0phRS05a3NWeVE&usp=drive_web#gid=9 Live AFT: http://live.myaiesec.net/aft/aft.php Offline AFT: http://www.myaiesec.net/content/viewfile.do?contentid=10304189 Match GIP Wiki: http://www.myaiesec.net/content/viewwiki.do?contentid=10303308 Global 1415 Contact List: https://docs.google.com/a/ai.aiesec.org/spreadsheet/ccc?key=0AooK2vHYB3emdG5lMHg4c0lHMlg3c1d UQkNkWC1FX1E&usp=docslist_api#gid=1 Global Realization Forecast: https://docs.google.com/a/ai.aiesec.org/spreadsheets/d/1l3T6GO9S3AasRKFE1xeS6Tr7y_1Iauv05GzzD Yk3hUI/edit#gid=0 Links