This document provides an overview of construction project planning and scheduling using Primavera Project Planner software. It discusses key aspects of construction including time control, cost control, quality control, and construction stages. Methods for planning construction projects are outlined, including bar charts, network diagrams, line of balance, and time-location diagrams. Contract documents and method statements are also summarized.
15. Primavera Project Planner <l^Â憹]<ì…]ý<íé‰^‰ù]<Üéâ^˹]æ<ðï^f¹]K<<Ùæù]<Ø’ËÖ]
Look Out Primavera
<ífÎ]†Úæ<…]ç¹]<Äè‡çiæ<íÖæ‚¢]æ<¼éŞ~jÖ]<Ù^ÛÂù<ØÚ^ÓjÚ<sÚ^Þ†e<çâ<Primavera<<sÚ^Þ†e
<ïçÎ<îÛ×Â<Œ^‰_<î×Â<ì‚é¢]<íé×ÛÃÖ]<ì…]ý]<Ý‚Ïè<sÚ^ÞÖ]<]„â<ádÊ<ÔÖ„Öæ<íË×j~¹]<l^Âæ†Û×Ö<ÌéÖ^ÓjÖ]
< <<Øu]†¹]<Ì×j§<îÊ<Å憹]<ì…]c<àÚ<àÓ³<îjÖ]æ
<<
< <V<ð]ˆq_<4 <àÚ<sÚ^ÞÖ]<áçÓjèæ
1- The Network Processing Module<V<Ùæù]<ðˆ¢]
<ÔÖ„Òæ<½^Þ<ØÒ<íè^ãÞæ<íè]‚e<kÎæ<h^Šuæ<Åæ†Û×Ö<îÓfÖ]<¼éŞ~jÖ^e<”^¤]<ðˆ¢]<çâæ
< <<t†£]<…^Š¹]<±^jÖ^eæ<íq†£]<íŞÞù]<Ìè†Ãiæ<Å憹]<ì‚Ú<h^Šu
2- The Resource Scheduling Module<V<îÞ^nÖ]<ðˆ¢]
<Åæ†Û×Ö<íË×j~¹]<íŞÞù]<î×Â<íeçת¹]æ<ì†Êçj¹]<…]ç¹]<Äè‡çiæ<h^Š<”^¤]<ðˆ¢]<çâæ
< <<íË×j~¹]<…]ç¹]<ì…]c<îÊ<íé‰^‰_<ì]_<çâæ<…]ç¹]<Ô×jÖ<íéßÚˆÖ]<íÖæ‚¢]æ
3- The Cost Module<V<oÖ^nÖ]<ðˆ¢]
< <<Å憹^e<íË×j~¹]<íŞÞù]<íË×Ói<íÃe^j²<”^¤]<ðˆ¢]<çâæ
4- The Reports Module<V<Äe]†Ö]<ðˆ¢]
<íÃe^jÛ×Ö<íÚ‡øÖ]<†è…^ÏjÖ]<]‚Âcæ<…]ç¹]æ<„éËßj×Ö<íÚ‡øÖ]<†è…^ÏjÖ]<]‚Âde<”^¤]<ðˆ¢]<çâæ
<ä×u]†Ú<ØÒ<îÊ<<Å憹]<ífÎ]†Úæ
<<
<<
19 < <<†ÛÂ<‚Û¦<K<h†ÃÖ]<á牂ßã¹]
16. Primavera Project Planner <l^Â憹]<ì…]ý<íé‰^‰ù]<Üéâ^˹]æ<ðï^f¹]K<<Ùæù]<Ø’ËÖ]
< <1- The Network Processing Module
<<
Input Data
<<
<<
1- Activities no. , Description and Duration
<<
2- Successors to the activities (logic)
3- Time Constraints
<<
4- Project Calendar and< Holidays
<
<<
<<
<<
Network Processing Module
<<
<<
1- Activities no. , Description and Duration
2- Successors to the activities (logic)
<<
3- Time Constraints < <
4- Project Calendar and Holidays
<<
5- Calendar Dating
<<
<<
<<
Output <Module
<
1- Project Duration < <
2- Critical Path identifications
<<
3- Activity Time and Float
<<
4- Transferring activity times to Report
Generation Module
<<
<<
<<
20 < <<†ÛÂ<‚Û¦<K<h†ÃÖ]<á牂ßã¹]
17. Primavera Project Planner <l^Â憹]<ì…]ý<íé‰^‰ù]<Üéâ^˹]æ<ðï^f¹]K<<Ùæù]<Ø’ËÖ]
2- The Resource Scheduling Module
<<
<<
Input Data
<<
1- Resource codes, availability Limits
<<
2- Allocation the resource for every activity
<<
3- Budgeted quantity of resources to complete the
Activity
<<
<<
4- Activity codes: responsibility, supervision …
<<
<<
The Resource Processing Module
<<
<<
1- Computing the earned value based on
Percent Complete < <
<<
2- Computing the Variance between the
Budgeted cost and actual costs
<<
<<
<<
<<
<<
Output Module
<<
1- Earned Value based on percent Complete
<<
2- Variance between budget and actual Cost
<<
4- Transferring Cost data, Cost data to report
Generation Module< <
<<
<<
21 < <<†ÛÂ<‚Û¦<K<h†ÃÖ]<á牂ßã¹]
18. Primavera Project Planner <l^Â憹]<ì…]ý<íé‰^‰ù]<Üéâ^˹]æ<ðï^f¹]K<<Ùæù]<Ø’ËÖ]
3- The Cost Processing Module
<<
Input Data
<<
<<
1- Cost account codes, resource price rates
2- Budgeted cost of the <resources, previously
<
<<
Allocated in resource module
3- Cost account categories (Labour, …. )
<<
<<
<<
<<
The Cost Processing Module
<<
1- Resource leveling analysis
<<
2- Recourse smoothing < <
3- Computing the earned value on percent complete
<<
4- Computing the variance between the budgeted
and actual quantities <
<
<<
<<
Output <Module
<
<<
1- Earned Value based on percent
<<
2- Variance between budget and actual
Quantities <<
<<
3- Leveling Report showing effect of leveling on
Act. Time <<
4- Transferring Recourse data, Cost data to
<<
report Generation Module
<<
22 < <<†ÛÂ<‚Û¦<K<h†ÃÖ]<á牂ßã¹]
19. Primavera Project Planner <l^Â憹]<ì…]ý<íé‰^‰ù]<Üéâ^˹]æ<ðï^f¹]K<<Ùæù]<Ø’ËÖ]
4- The Reports Module
Input Data
<<
Report Specification < <
<<
1- Selecting of activities or/and resource to be reported
2- Order the sorted data < <
3- Design of report contents<
<
4- Design of report format< <
5- Design of report timescale
<<
<<
Input from Resource
<<
Module Reporting Module
<<
Executing Report
Input from Cost Module < <1- Individuals
< <2- Standard Batches
Input from Network < <3- Extended Batches
Module <<
<<
<<
Output <<
Output Output
Resource Report Schedule <Report
< Cost Report
1- Resource Profiles << 1- Cost Profiles
2- Cumulative Resource 2- Cumulative Cost
1-Tabular Schedule
<<
Profiles Profiles
Report
3- Earned Value Reports <<
2- Bar Charts
3- Earned Value
4- Resource Control Reports
3- Network <Logic
<
Report 4- Cost Control Report
Diagrams <
<
5- Productivity Report 5- Productivity Report
6- Tabular Resource << 6- Tabular Cost Report
Report
23 < <<†ÛÂ<‚Û¦<K<h†ÃÖ]<á牂ßã¹]
21. Primavera Project Planner <l^Â憹]<ì…]ý<íé‰^‰ù]<Üéâ^˹]æ<ðï^f¹]K<<Ùæù]<Ø’ËÖ]
Capabilities of Primavera<
• CPM is the main concept of Scheduling
• May users can use software by User name and Password
• Unlimited number of Main Projects and Sub-Projects
• PDM/Precedence Diagrams Method of Activity
Representation
• No. of Activities per Project is up to 100,000
• 31 Project AGEDA of holidays
• Planning unit is Hour/day/weak/month
• 24 Code for activities to organize responsibilities
• Unlimited Resources per activity for all types
• (Equipment, Material, Labour, ….)
• Resource Leveling /120 Res. Per Run and Smoothing
• 500 Codes for Activities cost / 6 items for each code
• Updating Schedule and Status of Work in Progress
• Saving Data of 2 Schedules/Same Project for
Comparison
• Follow up many Projects in the same time
• Follow up Main Project Contains all Sub-Projects
• Exchange Data with some software / Excel, Word …
<<
25 < <<†ÛÂ<‚Û¦<K<h†ÃÖ]<á牂ßã¹]