This document discusses the evolution of flood action planning in Bangladesh over several decades. It began with national water planning approaches in the 1960s and 1980s that emphasized large-scale infrastructure projects but overlooked other factors. In response to devastating 1988 floods, the Flood Action Plan was developed which initially proposed a structural flood control approach but later incorporated more participation and environmental considerations. Post-FAP planning has further emphasized participatory and multi-sectoral approaches, as well as regional cooperation, to better manage flooding in Bangladesh. Implementing these new planning principles remains an ongoing challenge.
1 of 3
More Related Content
Bangladesh Flood Action Plan
1. Contributing Paper
Flood Action Plan in Bangladesh
Herb Wiebe
Northwest Hydraulic Consultants, Canada
Prepared for Thematic Review IV.4:
Assessment of Flood Control and Management Options
For further information see http://www.dams.org/
This is one of 126 contributing papers to the World Commission on Dams. It reflects solely the views
of its authors. The views, conclusions, and recommendations are not intended to represent the views of
the Commission. The views of the Commission are laid out in the Commission's final report quot;Dams and
Development: A New Framework for Decision-Makingquot;.
2. BANGLADESH – THE EVOLUTION PLANNING FOR FLOOD CONTROL
OF
BACKGROUND
Bangladesh (area 144,000 km2) experiences flooding every year on up to two-thirds of its territory. During
the monsoon months (Jun-Sep), when 80% of annual rainfall occurs, the Ganges, Brahmaputra, and
Meghna Rivers bring about 1x1012 m3 of water plus 500 Mt to 1500 Mt of sediment into Bangladesh from
the upstream catchment area (area 1.74 million km2). Rainfall within Bangladesh accounts for a further
0.12x1012 m3.
Normal annual flooding provides numerous benefits - common access to the large natural floodplain
fishery, deposition of fertile loam on agricultural fields, and flushing of stagnant water in low-lying areas.
But when the major river flood peaks coincide, unusually high floods can occur, causing catastrophic losses
- damage to crops, housing, and infrastructure, and increased incidence of disease and death. Adverse tidal
conditions and heavy local rainfall, if also present, aggravate the situation. Floods are then slow to recede
due to the low average gradient (about 5 cm km-1), and drainage system conveyance limitations caused by
sediment deposition. In addition to and distinct from the major river floods, flash floods affect smaller
areas of the country that are located on hill streams and in piedmont areas.
Population has increased from about 70 million in the early 1970s to about 130 million in 2000, with
172 million forecast for 2025, even though population growth has been significantly reduced in recent
years. Over 80% of the population lives in rural areas, and over half still depends on agriculture for
livelihood. Increasing population density and agriculture dependence compels people to inhabit flood-
vulnerable areas, intensifying flood impacts and placing severe constraints on flood control options.
To cope with these challenges, over the past several decades water resources planning has evolved in three
phases: national water planning, the Flood Action Plan (FAP), and post-FAP.
NATIONAL WATER PLANNING
In 1964, a national (at that time provincial) water planning approach was initiated with the 20-year Water
and Power Master Plan. Though this Plan did lead the way to protecting most of the coastal zone from
tidally-induced flooding, overall it was too ambitious, overestimating public sector capabilities and
overemphasizing large-scale surface water interventions. It largely overlooked the country’s ground water
resource, later the key to rapid irrigation expansion.
In 1986, Phase I of the National Water Management Plan (NWP) was completed. This was primarily a
food grain self-sufficiency sector strategy, lacking implementation details. This time around, planners
emphasized ground water development for irrigation, mindful of the weak performance of existing flood
control drainage infrastructure. The Government, concerned about possible over-estimation of ground
water, did not accept this plan.
In 1991, NWP Phase II was completed, including a detailed investment program. It was overtaken by
events when severe flooding in 1988 led to the formulation of the Flood Action Plan.
FLOOD ACTION PLAN
After the 1988 floods, a debate on how to address the flooding problem began to develop through various
preliminary studies. These proposed interventions ranging from an almost purely structural “once-for-all”
massive engineering solution, to a mainly non-structural “living with the floods” approach. The debate was
subsequently short-circuited by a set of eleven principles prepared to guide future studies; directives from
senior levels of Government to proceed despite the unresolved issues; and also, in part, international
commercial interests that favored structural interventions.
3. The compromise five-year plan that emerged from this debate was called the Flood Action Plan (FAP).
FAP consisted of regional planning studies, project preparation studies, and pilot projects. FAP was
strongly opposed by local and international NGOs, organized around a coalition of
environmental NGOs that initially raised awareness through public meetings outside Bangladesh. The
opposition to FAP challenged a number of basic assumptions related to structural flood control, among
these, that flood control was desirable; that the major rivers could be embanked sustainably despite large
sediment loads and alluvial soils; that structural measures were affordable; and that planners could work in
isolation from the people for whom the interventions were intended.
The FAP process gradually produced a consensus on several issues, among them support for a softer
“controlled flooding” concept in place of the more hard-edged idea of “flood control;” the need for greatly
enhanced people's participation; and an emphasis on improving drainage through dredging planned at the
river system level. In the end, the FAP did not recommend large-scale works; rather, it initiated guidelines
on people’s participation and environmental assessment.
POST FAP
It is clear now that FAP resulted in a new planning approach. It is now widely accepted that planning must
be participatory and that consultation at all levels is essential to correctly identify development needs and
interventions. Furthermore, greater emphasis on participation has led to the recognition that as people’s
lives are not compartmentalized by sectors, so too must planning be multi-objective and multi-sectoral.
Other outcomes of FAP included much greater emphasis in the planning process on environmental and
institutional aspects, flood mitigation as an integral part of flood management, acceptance that flood control
should be addressed in a regional context, and that cooperation among riparian countries is essential.
Many of these new concepts are enshrined in the first National Water Policy, established in 1999 and in the
National Water Management Plan that will be completed 2001. The challenge will be to put these lofty
principles into practice in the field. Progress is likely to be slow, given public sector capacity limitations.