Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
An Entity of Type: agent, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

The Fitzroy Iron Works at Mittagong, New South Wales, was the first commercial iron smelting works in Australia. It first operated in 1848. From 1848 to around 1910, various owners and lessees attempted to achieve profitable operation but ultimately none succeeded. More than once, new managers repeated more or less the same mistakes made by earlier ones. Over the second half of the 19th century, the name 'Fitzroy Iron Works' became almost synonymous with lost opportunities, repeated failure, lost capital, misplaced trust, and general misfortune.

Property Value
dbo:abstract
  • The Fitzroy Iron Works at Mittagong, New South Wales, was the first commercial iron smelting works in Australia. It first operated in 1848. From 1848 to around 1910, various owners and lessees attempted to achieve profitable operation but ultimately none succeeded. More than once, new managers repeated more or less the same mistakes made by earlier ones. Over the second half of the 19th century, the name 'Fitzroy Iron Works' became almost synonymous with lost opportunities, repeated failure, lost capital, misplaced trust, and general misfortune. The Fitzroy Iron Works was—several times—a commercial failure, but it played a part in laying the foundations of the later success of the Australian iron and steel industry, and it was important in the growth of the township of Mittagong. Relics of the old iron-works were discovered during excavations for redevelopment of its site, during 2004, have been preserved and are on display. There are also some remnants and a commemorative cairn at the adjacent site of its former blast furnace. (en)
dbo:formerName
  • Fitzroy Iron Mine (en)
dbo:foundingYear
  • 1850-01-01 (xsd:gYear)
dbo:headquarter
dbo:thumbnail
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 35104748 (xsd:integer)
dbo:wikiPageLength
  • 151765 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1075017664 (xsd:integer)
dbo:wikiPageWikiLink
dbp:areaServed
  • New South Wales (en)
dbp:formerName
  • Fitzroy Iron Mine (en)
dbp:founded
  • 1850 (xsd:integer)
dbp:founders
  • (en)
  • Thomas Holmes (en)
  • John Thomas Neale (en)
  • Thomas Tipple Smith (en)
  • William Tipple Smith (en)
dbp:hqLocation
  • Mittagong, New South Wales (en)
dbp:hqLocationCountry
  • Australia (en)
dbp:imageCaption
  • Fitzroy Iron Works, Mittagong, New South Wales, ca. 1873 (en)
dbp:name
  • Fitzroy Iron Works (en)
dbp:products
  • iron (en)
dbp:type
  • Iron Mine and Smelting operation (en)
dbp:wikiPageUsesTemplate
dct:subject
gold:hypernym
rdf:type
rdfs:comment
  • The Fitzroy Iron Works at Mittagong, New South Wales, was the first commercial iron smelting works in Australia. It first operated in 1848. From 1848 to around 1910, various owners and lessees attempted to achieve profitable operation but ultimately none succeeded. More than once, new managers repeated more or less the same mistakes made by earlier ones. Over the second half of the 19th century, the name 'Fitzroy Iron Works' became almost synonymous with lost opportunities, repeated failure, lost capital, misplaced trust, and general misfortune. (en)
rdfs:label
  • Fitzroy Iron Works (en)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • Fitzroy Iron Works (en)
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License