Cited By
View all- Yin YCheng TXu DWu C(2012)Common due date assignment and scheduling with a rate-modifying activity to minimize the due date, earliness, tardiness, holding, and batch delivery costComputers and Industrial Engineering10.1016/j.cie.2012.02.01563:1(223-234)Online publication date: 1-Aug-2012
- Li JYuan XLee EXu D(2011)Setting due dates to minimize the total weighted possibilistic mean value of the weighted earliness-tardiness costs on a single machineComputers & Mathematics with Applications10.1016/j.camwa.2011.09.06362:11(4126-4139)Online publication date: 1-Dec-2011
- Shabtay DSteiner GYedidsion L(2010)Bicriteria problems to minimize maximum tardiness and due date assignment cost in various scheduling environmentsDiscrete Applied Mathematics10.1016/j.dam.2010.02.010158:10(1090-1103)Online publication date: 1-May-2010
- Show More Cited By