Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
skip to main content
research-article

Crews_ns: : Scheduling Train Crews in The Netherlands

Published: 01 March 1998 Publication History

Abstract

We present a system, crews_ns, that is used in the long‐term scheduling of drivers and guards for the Dutch Railways. crews_ns schedules the work of about 5000 people. crews_ns is built on top of crews, a scheduling tool for speeding the development of scheduling applications. crews heavily relies on the use of AI techniques and has been built as a white‐box system, in the sense that the planner can perceive what is going on, can interact with the system by proposing alternatives or querying decisions, and can adapt the behavior of the system to changing circumstances. Scheduling can be done in automatic, semiautomatic, or manual mode. crews has mechanisms for dealing with the constant changes that occur in input data, can identify the consequences of the change, and guides the planner in accommodating the changes in the already built schedules (rescheduling).

References

[1]
Bisiani, R. 1987. Beam Search. In Encyclopedia of Artificial Intelligence, ed. S. C. Shapiro, 56–58. New York: Wiley.
[2]
Cadete H., and Sousa S. 1994. Tratamento de Mudança em Sistemas de Escalamento (Handling Change in Scheduling Systems). SISCOG, Lisbon, Portugal.
[3]
Doyle J. 1979. A Truth‐Maintenance System. Artificial Intelligence 12(3): 231–272.
[4]
Fox, M. S. 1987. Constraint‐Directed Search: A Case Study of Job‐Shop Scheduling. San Francisco, Calif.: Morgan Kaufmann.
[5]
Linssen, C. 1995. Written communication. September, Utrecht, The Netherlands.
[6]
Martins, J. P., and Shapiro, S. C. 1988. A Model for Belief Revision. Artificial Intelligence 35(1): 25–79.
[7]
Morgado, E. M., and Martins, J. P. 1989. CREWS: A Crew‐Scheduling System. Paper presented at EXPERSYS‐89, Expert Systems Applications, 23–24 October, Paris.
[8]
Morgado, E. M., and Martins, J. P. 1992. Scheduling and Managing Crew in the Portuguese Railways. Expert Systems with Applications, an International Journal 5:301–321.
[9]
Morgado, E. M., and Martins, J. P. 1993. An AI‐Based Approach to Crew Scheduling. In Proceedings of the IEEE Conference on AI Applications, CAIA 93, 71–77. Washington, D.C.: Institute of Electrical and Electronics Engineers.
[10]
Morgado, E. M., and Martins, J. P. 1996. Managing Change in Scheduling Data. Computers in Railways V, Volume 1: Railway Systems and Management, 479–489. Southampton, U.K.: Computational Mechanics.
[11]
Notermans, M. 1996. Oral communication. October, Utrecht, The Netherlands.
[12]
van Aarle, J. 1996. Scheduling Crew in the Dutch Railways. Paper presented at the Transportation Seminar, October, Lisbon, Portugal.
[13]
Sadeh, N., and Fox, M. S. 1991. Variable‐ and Value‐Ordering Heuristics for Hard–Constraint‐Satisfaction Problems: An Application to Job‐Shop Scheduling, Technical Report, CMU‐RI, TR‐91‐23, The Robotics Institute, Carnegie Mellon University.
[14]
Smith, S. F. 1989. The OPIS Framework for Modeling Manufacturing Systems, Technical Report, TR‐CMU‐RI‐89‐10, The Robotics Institute, Carnegie Mellon Univ.

Cited By

View all

Recommendations

Comments

Information & Contributors

Information

Published In

cover image AI Magazine
AI Magazine  Volume 19, Issue 1
March 1998
136 pages
ISSN:0738-4602
EISSN:2371-9621
DOI:10.1002/aaai.v19.1
Issue’s Table of Contents

Publisher

John Wiley & Sons, Inc.

United States

American Association for Artificial Intelligence

United States

Publication History

Published: 01 March 1998

Qualifiers

  • Research-article

Contributors

Other Metrics

Bibliometrics & Citations

Bibliometrics

Article Metrics

  • Downloads (Last 12 months)0
  • Downloads (Last 6 weeks)0
Reflects downloads up to 18 Feb 2025

Other Metrics

Citations

Cited By

View all

View Options

View options

Figures

Tables

Media

Share

Share

Share this Publication link

Share on social media