Cited By
View all- Ventura R(2016)Four Decades of AI in PortugalAI Magazine10.1609/aimag.v37i4.269437:4(107-109)Online publication date: 1-Dec-2016
We present a system, CREWS_NS, that is used in the long-term scheduling of drivers and guards of the Dutch Railways. CREWS_NS schedules the work of about 5,000 people. CREWS_NS is built on top of CREWS, a scheduling tool for speeding the development of ...
In this paper, we consider the problem of scheduling n deteriorating jobs with release dates on a single (batching) machine. Each job's processing time is a simple linear function of its starting time. The objective is to minimize the maximum lateness. ...
In this paper, we study a new primary-secondary bicriteria scheduling problem on identical machines. The primary objective is to minimize the total completion time of all jobs and the secondary objective is to minimize the maximum T-time of all machines,...
John Wiley & Sons, Inc.
United States
American Association for Artificial Intelligence
United States