Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
Jump to content

Rapid (San Diego)

From Wikipedia, the free encyclopedia
Rapid
Rapid bus stopped at Santa Fe Depot in downtown San Diego.
ParentSan Diego Metropolitan Transit System (MTS)
San Diego Association of Governments (SANDAG)
Founded2002 (start of BRT planning by SANDAG)
Commenced operationJune 8, 2014; 10 years ago (2014-06-08)
LocaleSan Diego County, California
Service typeBus rapid transit
Routes10
Hubs
Stations39
Fleet
Daily ridership18,378 (FY 2023) [1]
Fuel typeBiogas, electric
OperatorMTS (201, 202, 204, 215, 235, 237)
Transdev (225, 227, 280, 290)
WebsiteSDMTS Rapid website
System map

Rapid is a bus rapid transit system serving San Diego County, California. It is part of the San Diego Metropolitan Transit System (MTS). The system mainly operates on the HOV lanes of Interstate 15 and 805. Freeway-level stations are located in the medians of Interstate 15, Park Boulevard, and East Palomar Street.

The system is administered, built and managed by San Diego Association of Governments (SANDAG). Planning for the initial "showcase" route began in 2002 with the commencement of an environmental review. It took 12 years and $238 million to get Rapid operational. Regular service began in summer 2014.

History

[edit]

Early Beginnings (1990–2006)

[edit]

In the 1990s, an extension of the San Diego Trolley was studied along Interstate 15. However, projected low ridership, hilly terrain and high cost estimates shelved this proposal. It was instead decided to construct a HOV lane system with Direct Access Ramps and transit centers in proximity to these ramps. Construction on these lanes began by 2001 with the first phase (between SR 163 and Sabre Springs) opening for traffic in 2006. At the same time, another trolley proposal was studied in Otay Ranch, but it was also decided that a BRT system would be essential.

In July 2002, the San Diego Association of Governments (SANDAG), the county's planning organization, initiated the planning process for what would eventually become the Mid City route. An environmental review for this route would later be published in 2008.[2]

The SuperLoop experiment (2007–2013)

[edit]

To test the technology to be used on the system, in 2007, SANDAG selected a series of streets in University City to be fitted with transit signal priority, in addition to building stations with real-time arrival displays. These services, dubbed as SuperLoop, began by mid-2009.[3]

The success of these routes resulted in the SuperLoop routes becoming permanent additions, and eventually led to SANDAG placing a large order of 60-foot CNG buses, and the start of construction of the rest of the network. All phases of the I-15 HOV investment project were finished by 2011. The Rapid branding was announced in 2013, with the new buses arriving in December of that year, with corridor testing and driver training beginning the following January.

In Service (2014–present)

[edit]

On May 17, 2014, the buses were accepted for passenger occupation, and in-service testing began on route 20 during a record-breaking heatwave caused by the Santa Ana winds at the time.[4] These buses were wrapped with a vinyl sticker containing the official slogan, all in an effort to promote the upcoming service. MTS also registered the rapidmts.com domain around this time (since merged into the main site). It was also announced that the service would begin at the next service change on June 8, 2014.

The Interior of a Rapid coach

At the same time, the existing Premium Express routes would gradually be phased out. Former route 810 would become Rapid 235 and supplemented by Rapid Express routes 280 and 290, while former route 880 would be replaced by Rapid 237. The remaining routes would be discontinued altogether with June 6, 2014 being the final date of operation for the Premium Express network. Rapid service formally began the following Sunday, June 8, 2014, on schedule. Free bus rides were offered on that day.[5] Rapid Express service began the following day. It inherited the 26 already existing motorcoach buses.

On March 11, 2018, MTS placed the I-15 CenterLine median stations into commission. These were the first stations on the I-15 Rapid (Route 235) to feature light-rail style station platforms, shelters, and NextBus information displays, and the first to be implemented since the Mid-City Rapid guideway in 2014.[6]

By 2019, the full network was implemented and in operation.

COVID-19 pandemic precautions

[edit]

In March 2020, the COVID-19 pandemic was declared. MTS began disinfecting vehicles as they return to the maintenance yards, and has begun sanitizing station platforms and installing handwashing stations at transit centers.[7] MTS subsequently announced reductions to all Rapid services in April. There will be only 3 runs of route 280, 2 runs of route 290,[8] 30 minute headways for routes 204,[9] 225, 235 and 237, and 15 minute headways for the remainder.[10] These schedules will remain in effect indefinitely.

On January 28, 2021, it was announced that MTS, in cooperation with the North County Transit District, would begin offering free rides for passengers en route to receive a COVID-19 vaccine, by carrying a confirmation paper for their appointment.[11]

On March 1, 2021, MTS placed 24 new Rapid Express motorcoaches into service.[12] These motorcoaches are the MCI D-Series, and replaced the Express 4500s. The agency also switched to Biogas, a renewable form of CNG as an interim measure until the electric transition is completed in 2040.

Current services

[edit]

Currently there are nine routes, three of which run on the I-15 corridor. Route 235 operates all day serving all stations along the corridor from Escondido to San Diego and then to downtown San Diego, ending at the Santa Fe Depot. Service operates every 15 minutes during peak hours and every 30 minutes at all other times. The Rapid Express service operates from selected bus stations to downtown San Diego, bypassing City Heights and Kearny Mesa. Route 280 serves the two northernmost stations (Escondido and Del Lago) while Route 290 serves the Rancho Bernardo and Sabre Springs/Peñasquitos stations. Route 237 serves the Miramar College Transit Station and then proceeds to UC San Diego via Mira Mesa Boulevard and the UTC Transit Center. Route 215 is the mid-city line providing service to downtown through SDSU, while Route 225 is the South Bay route, connecting downtown with the South Bay communities. Additionally, Routes 201, 202 and 204 provide SuperLoop service between UC San Diego and the Westfield UTC mall.

Routes 201/202/204 (SuperLoop Rapid)

[edit]
Route 201/202/204 (SuperLoop Rapid)
Routes 201 and 202
Gilman Dr &
Eucalyptus Grove Ln
Gilman Dr &
Mandeville Ln
Gilman Dr & Evening Way
Villa La Jolla Dr
& Gilman Dr
VA Hospital
Nobel Dr & La Jolla
Village Square Drwy
Nobel Dr & Lebon Dr
La Jolla Village
Dr & Lebon Dr
Arriba St & Regents Rd
Nobel Dr & Regents Rd
La Jolla Village Dr
& Regents Rd
UTC
Routes 204
UTC
Genesee Av &
La Jolla Village Dr
Nobel Dr & Towne Centre Dr
Executive Dr &
Executive Wy
Judicial Dr & Executive Dr
Judicial Dr &
Golden Haven Dr
Nobel Dr & Shoreline Dr
Judicial Dr &
Research Pl
Legend
interchange
station
stop

Connection to San Diego Trolley
Connection to other Rapid routes

In 2015, the SuperLoop system was formally incorporated into the Rapid network and began using the XN60 buses for added capacity

On September 6, 2015, the MTS SuperLoop (Routes 201, 202 and 204) were incorporated into the network. MTS markets the routes as a sub-brand and called SuperLoop Rapid. Routes 201 (counter-clockwise) and 202 (clockwise) connect UC San Diego and Westfield UTC on a loop that passes through La Jolla Village, north University City, and the Jacobs Medical Center complex, while Route 204 serves the office parks and apartment complexes due east of UTC in a clockwise loop. In addition, it inherited the 12 Gas-Electric Hybrid buses that originally provided the service. These buses were re-vinyled into the Rapid livery, and also began serving Route 237 in addition to their native SuperLoop routes. In April 2018, these buses were retired from service and replaced by re-vinyled C40LF buses from the Mainline fleet.

Route 215 (Mid-City Rapid)

[edit]
Route 215 (Mid-City Rapid)
SDSU
College Ave
54th St
Winona Ave
43rd St
Boulevard Transit Plaza
35th St
30th St
Texas St
Howard Ave
University Ave
San Diego Zoo/Balboa Park
Naval Medical Center
City College
Horton Plaza
Courthouses
Santa Fe Depot
Legend
interchange
station
stop

Connection to San Diego Trolley
Connection to other Rapid routes

On October 12, 2014, the Mid-City Rapid (Route 215) service commenced operations from San Diego State University to downtown San Diego via Balboa Park, North Park, Normal Heights, and City Heights. The buses used on this route are vinyled into the Rapid livery, but feature regular local-style transit bus seating instead. The next day, a peak hour rapid route, Route 237, commenced operation from the UC San Diego area to Rancho Bernardo, via Kearny Mesa and the I-15 HOT lanes. These routes have been described as "diet trolleys", but critics claim that the limited amount of spending on BRT compared to highway spending shows SANDAG's emphasis on highway and automobile-based transportation.[13] Eventually, Route 237 was shortened to Miramar College due to an increased amount of transfers there, essentially making the route a school-to-school route, having colleges on both ends. This change was incorporated into the Transit Optimization Plan (TOP) in 2017.[14]

Route 225 (South Bay Rapid)

[edit]
Route 225
(South Bay Rapid)
Santa Fe Depot
Courthouses
Horton Plaza
City College
SR 94 Station
(future)
47th Street
(future)
E Plaza Blvd
(future)
H Street
(future)
East Palomar
Parking
Heritage
Lomas Verdes
Santa Venetia
Otay Ranch
Parking
Millenia
Otay Mesa Transit Center
Legend
interchange
station
stop

Connection to San Diego Trolley
Connection to other Rapid routes
Parking Parking is available

The South Bay Rapid (Route 225) began limited peak-hour service on September 4, 2018 between the East Palomar Park and Ride in Chula Vista and downtown San Diego.[15] The route initially operated in the Rapid Express pattern, headed northbound (into downtown) in the morning and southbound (returning from downtown) in afternoons with no reverse-commute opportunities or weekend service. This route expanded to full daily service on January 26, 2019 and now operates along a 21-mile (34-kilometer) route between the Otay Mesa Transit Center near the Otay Mesa Port of Entry and downtown San Diego.[16][17] With this opening five new stations were also opened; these are located at Heritage Park, Lomas Verdes, Santa Venetia, the Otay Ranch Town Center, and at the recently developed, mixed-use Millenia community in Eastlake. It mostly follows the median on East Palomar Street, before running alongside Olympic Parkway and Eastlake Parkway to serve Otay Ranch. Throughout its planning, the route sparked controversy mainly by HOAs due to its bisection of the Otay Ranch and Eastlake communities and its proximity to nearby homes.[18] The buses used on this route feature intercity coach-style seating, but have silver-colored destination displays on the outside compared to the rest of the fleet, which have amber ones. As with the opening of the original route, free bus rides were offered on the first week of operation on this route only.

Route 227 (Iris Rapid)

[edit]
Route 227
Imperial Beach Pier
Dahlia Av
3rd St
Palm / 9th St
Ebony Av
Imperial Beach Library
13th St
Saturn Bl
Hollister St
Iris Avenue Transit Center
Parking
Caliente Av
Otay Mesa Transit Center
Legend
interchange
station
stop

Connection to San Diego Trolley
Connection to other Rapid routes
Parking Parking is available

In late 2018, ABC 10News reported that rumors are speculating on a new route, possibly a route along the border, that would be the first new-built all-electric route.[19] On September 13, 2019, SANDAG confirmed the rumors and announced the route as the Iris Rapid project (proposed route 227). MTS hopes to have the route operational by January 2023 at the earliest.[20] The planned route is expected to run from Otay Mesa to Imperial Beach, and call at the route's namesake, the Iris Avenue Transit Center along the way. The SDMTS Rapid Route 227 started service on October 15, 2023, although construction completion with full implementation is expected by Late 2024. [21]

Route 235 (I-15 Rapid)

[edit]
Route 235 (I-15 Rapid)
Escondido Transit Center
Parking
Del Lago Transit Station
Parking
Rancho Bernardo Transit Station
Parking
Sabre Springs/Peñasquitos Transit Station
Parking
Miramar College Transit Station
Parking
Kearny Mesa Transit Center
Overland Ave
Ruffin Rd
Boulevard Transit Plaza
City Heights Transit Plaza
City College
Horton Plaza
Courthouses
Santa Fe Depot
Legend
interchange
station
stop

Connection to San Diego Trolley
Connection to other Rapid routes
Connection to Sprinter
Parking Parking is available

The I-15 Rapid (Route 235) saves up to 45 minutes from local MTS Route 20, which continues to operate along the corridor to serve locations not served by the Rapid network. It also eliminates a transfer at Del Lago Transit Center between Route 20 and Breeze Rapid to central Escondido.[22]

Initial cost

[edit]

The cost for the initial operating segment is approximately $238 million, consisting primarily of transit centers at City Heights, Del Lago, Escondido, and Rancho Bernardo; parking structures at Miramar College and Sabre Springs; and new 60-foot buses. This is in addition to the investment in the I-15 HOT lane project, which cost approximately $1 billion for four new lanes and direct access ramps. Taxpayer advocates have supported the Rapid due to its lower cost compared to rail extensions at the time.[23]

Route 237 (Mira Mesa Blvd. Rapid)

[edit]
Route 237 (Mira Mesa Blvd. Rapid)
Gilman & Myers (UCSD)
Gilman Dr &
Eucalyptus Grove Ln
La Jolla Village Dr
& Regents Rd
La Jolla Village Dr
& Gennessee Ave
Scranton Road
Lusk Blvd/Oberlin Dr
Pacific Heights Blvd
Genetic Center Dr/
Steadman St
Schilling Av/
Caminito Alvared
Caminito Ruiz
Black Mtn Rd.
Miramar College
Legend
interchange
station
stop

Connection to San Diego Trolley
Connection to other Rapid routes
Connection to Sprinter
Parking Parking is available

Route 237 operates between the Miramar College Transit Station and UCSD with stops at other transit centers and along Mira Mesa Boulevard.

Route 280/290 (I-15 Rapid Express)

[edit]
Route 280/290 (I-15 Rapid Express)
Escondido Transit Center (280 only)
Parking
Del Lago Transit Station (280 only)
Parking
Rancho Bernardo Transit Station (290 only)
Parking
Sabre Springs/Peñasquitos Transit Station (290 only)
Parking
City College
Horton Plaza
Courthouses
Pacific Highway
County Admin. Center
Legend
interchange
station
stop

Connection to San Diego Trolley
Connection to other Rapid routes
Connection to Sprinter
Parking Parking is available

Rapid Express service replaced the Premium Express service which formerly operated along the corridor, The new system now only calls at Transit Stations. Until March 2021, Biodiesel powered intercity coaches operate this service, when they were replaced with Biogas commuter coaches. Much like the network it replaced, Rapid Express operates peak-hours only, inbound in morning peak and outbound in afternoon peak, without reverse-commute services. Rapid Express services also terminate at the County Administration Building instead of the Santa Fe Depot.

Future plans

[edit]

South Bay Rapid infill stations

[edit]

Early concept maps of the South Bay Rapid revealed the possibility of additional CenterLine stations in the medians of I-805 and SR 94. These will be located at Hilltop, National City/East, 47th Street trolley station, 28th Street and in East Village.

No concept art was initially drawn or published, but on January 26, 2019, this project was officially announced in a dedication ceremony and concept art was unveiled. Construction will begin once funding is secured.

Converting basic stops into stations

[edit]

New shelters are due to be installed at the three Kearny Mesa stops, located at Ruffin Road, Overland Avenue, and at the Kearny Mesa interchange. The first shelter was installed on the inbound side of the Ruffin stop in 2017, next to the Kaiser Permanente San Diego Hospital. The remaining shelters are still in the final design stages.[24][25]

Electrification

[edit]

On November 30, 2017, MTS announced its procurement of all-electric buses.[26] This makes MTS the fourth agency to place electric buses of any propulsion method into revenue service, only behind Muni, Antelope Valley Transit Authority, and Anaheim Resort Transit. Electrification is set for Summer 2019, when the Xcelsior CHARGE pilot units arrive. This Demonstrates MTS committed to be in compliance with Initiative Clean Transit, a proposed California law that could result in full electrification by 2040.[27] These new buses will be placed into the system's Copley Park division and replace the C40LFs.

A grant for 11 more buses has been awarded to MTS.

Downtown layover facility

[edit]

On June 22, 2018 SANDAG announced that it has seized control of a block of land currently occupied by an auto maintenance facility, a law firm and a car park. The agency plans to construct a downtown layover facility for buses. Its perimeter will be bordered by A Street, Union Street, State Street and B Street. It will not serve passengers, but act in a similar manner to a yard, but without maintenance bays. SANDAG plans to begin construction in 2021 and the resulting facility being commissioned in Summer 2023.[28]

Operation

[edit]

Fares

[edit]

As of September 1, 2019, the fare structure for Rapid is as follows. Passes can be purchased at any fare vending machine within the network.[29]

Fare Type One Way Day

Pass

Monthly

Pass

Adult Rapid $2.50 $6 $72
Rapid Express $5.00 $12 $100
Youth

(Valid photo ID required)

Rapid $1.25 $3 $23
Rapid Express $2.50 $6 $32
Senior (65+) / Disabled / Medicare

(Valid photo ID required)

Rapid $1.25 $3 $23
Rapid Express $2.50 $6 $32

Maintenance and operations

[edit]

Operation of Rapid is split, with Transdev operating 4 routes under contract to MTS (225, 227, 280 and 290), and directly by MTS for the remainder.[30] This is because buses from different divisions are used on certain routes.

The fleet is maintained at the system's Imperial, Kearny Mesa, East County and South Bay divisions. The latter two are under maintenance contract to Transdev, which also includes routes assigned to these divisions.

In downtown, the Broadway Rapid stations are patterned after the nearby Trolley stations on C Street, with stops at Horton Plaza, Civic Center/Courts, and at America Plaza.

Fleet

[edit]

Shown below is a summary of the MTS Rapid fleet from the past, present, and future:

Current Fleet

[edit]
Make/Model
(Platform)
Image Routes Served Division Propulsion Model Year Entered Service Fleet Numbers
(Quantity)
Notes
New Flyer Xcelsior
(XN60)
201, 202, 235, 237 Kearny Mesa CNG 2013 2014 1101–1129
(29 buses)
  • These are the first buses to feature passenger information displays.
  • These are also the first buses constructed specifically for MTS Rapid.
  • These are also MTS's first ever Xcelsior buses.
  • As of early 2024, most of these buses have been retired or auctioned off. 10 buses will be sold to Santa Cruz METRO.
215 Imperial Avenue 2014 2014 1201–1218
(18 buses)
  • These buses have regular mainline bus seats.
201, 202, 215, 235, 237 Kearny Mesa 2015 2015 1301–1313
(13 buses)
  • These buses are painted in the standard MTS livery, but are regularly assigned to Rapid routes.
201, 202, 235, 237 Kearny Mesa 2023 2023 1901-1929
(29 buses)
  • These buses entered service in late 2023, and they are replacing the soon-to-be-retired 1100-series New Flyer XN60 buses.
  • As of early 2024, most of these buses have been delivered to MTS.
225 South Bay 2018 2018 7501–7517
(17 buses)
MCI D-Series
(D4500CT-NG)
280, 290 East County 2020 2021 8531–8554
(24 buses)
New Flyer Xcelsior CHARGE
(XE60)
227 South Bay Battery Electric 2023 2023 7551-7562
(12 buses)
  • These are MTS's first ever electric buses in the MTS Rapid fleet.
  • They officially entered service in late 2023, and are used exclusively on the new Rapid Route 227.

Past Fleet

[edit]
Make/Model Image Propulsion Model Year Year Retired Fleet Numbers
(Quantity)
Notes
New Flyer GE35LFR Gasoline-Electric Hybrid 2009 2018 501–512 (12 buses)
  • The model had mechanical problems and maintenance difficulties due to the manufacturer of the hybrid drive system going out of business in 2010. All buses were retired from service and auctioned off in early 2018.
Blue Bird Express 4500 Biodiesel 2007 2021 8501–8526
(26 buses)
  • These were the last Biodiesel-powered vehicles in the MTS fleet.
  • These were also the only buses that were not updated with passenger information displays.
New Flyer Low Floor
(C40LF)
CNG 2008 2023 339-350 (12 buses)
  • These buses were originally mainline buses that were wrapped in the MTS Rapid livery.
  • These buses replaced the 12 gasoline-electric hybrid buses in 2018.
  • They were in the process of being retired from service and auctioned off beginning in late 2022, with the final 3 buses being auctioned off in early 2023.

Future Fleet

[edit]
Image Model Year Make/Model
(Platform)
Routes Served Propulsion Division Fleet Numbers
(Quantity)
To Enter Service Notes

The MTS Rapid fleet is maintained across all of the system's divisions.

References

[edit]
  1. ^ "Annual Service Performance Report" (PDF). San Diego Metropolitan Transit System . November 2, 2023. Retrieved December 14, 2023.
  2. ^ "Final Environmental Initial Study for the Mid City Rapid Bus Project". San Diego Association of Governments. 2 October 2008. Archived from the original on 26 July 2020. Retrieved 30 August 2020.
  3. ^ "San Diego launches SuperLoop to University City". www.metro-magazine.com. Archived from the original on 2019-01-25. Retrieved 2019-01-24.
  4. ^ 1MTSRider. "MTS_2013 New Flyer XN60 New "Rapid" #1114 – Route 20, First Day In Service". Archived from the original on 2020-11-15. Retrieved 2019-01-24 – via YouTube.{{cite web}}: CS1 maint: numeric names: authors list (link)
  5. ^ "New 'Rapid' Bus Service Opens Sunday on I-15 Corridor". 5 June 2014. Archived from the original on 25 January 2019. Retrieved 26 January 2019.
  6. ^ "How to use the I-15 CenterLine stations". SANDAG. Archived from the original on 2020-11-15. Retrieved 2019-01-31.
  7. ^ "MTS Cleaning Procedures to Limit Spread of Coronavirus". Archived from the original on 31 October 2020. Retrieved 14 March 2020.
  8. ^ "Rapid Express Coronavirus Schedule" (PDF). 6 April 2020. Archived (PDF) from the original on 6 April 2020. Retrieved 6 April 2020.
  9. ^ "UTC Rapid Coronavirus Schedule" (PDF). 6 April 2020. Archived (PDF) from the original on 6 April 2020. Retrieved 6 April 2020.
  10. ^ "Mid City Rapid Coronavirus Schedule" (PDF). 6 April 2020. Archived (PDF) from the original on 6 April 2020. Retrieved 6 April 2020.
  11. ^ "MTS and NCTD Will Offer Free Rides to Vaccination Appointments" (Press release). 28 January 2021. Archived from the original on 26 April 2021. Retrieved 16 February 2021.
  12. ^ "MTS Continues Building Clean Air Fleet With Retirement of Last Diesel Buses and Adds More Electric Buses" (Press release). 1 March 2021. Archived from the original on 31 May 2021. Retrieved 4 March 2021.
  13. ^ "Meet Mid-City's New 'Diet Trolley' – Speak City Heights". Archived from the original on 2014-07-14. Retrieved 2014-06-09.
  14. ^ "Transit Optimization Plan". San Diego Metropolitan Transit System. 12 August 2016. Archived from the original on 17 November 2019. Retrieved 25 January 2019.
  15. ^ Smith, Joshua Emerson. "South Bay Rapid bus opens with limited service through early 2019". sandiegouniontribune.com. Archived from the original on 2019-01-24. Retrieved 2019-01-24.
  16. ^ "South Bay Rapid Introduction". www.keepsandiegomoving.com. Archived from the original on 2018-07-30. Retrieved 2018-07-29.
  17. ^ "Archived copy" (PDF). Archived (PDF) from the original on 2021-10-23. Retrieved 2019-01-24.{{cite web}}: CS1 maint: archived copy as title (link)
  18. ^ Chris Nichols (25 July 2013). "South County bus project that sparked outrage up for vote". The San Diego Union-Tribune. Archived from the original on 9 June 2014. Retrieved 9 June 2014.
  19. ^ Aarons, Jared (20 December 2018). "Switch to electric buses could cost MTS hundreds of millions of dollars". 10News. Scripps Broadcast Group. Archived from the original on 20 December 2018. Retrieved 17 March 2019.
  20. ^ "New Iris Rapid project". San Diego Metropolitan Transit System. 10 September 2019. Archived from the original on 29 March 2021. Retrieved 13 September 2019.
  21. ^ "Iris Rapid". 2023-07-04.
  22. ^ "New "Rapid 235" Bus Line Launches". NBC 7 San Diego. Archived from the original on 2014-07-14. Retrieved 2014-06-09.
  23. ^ Chris Nichols (4 June 2014). "New MTS Rapid bus service to launch on Sunday connecting North County with downtown San Diego. - SanDiegoUnionTribune.com". The San Diego Union-Tribune. Archived from the original on 14 July 2014. Retrieved 9 June 2014.
  24. ^ "SANDAG :: PROJECTS :: San Diego's Regional Planning Agency". www.sandag.org. Archived from the original on 2019-03-15. Retrieved 2019-03-15.
  25. ^ "New Kearny Mesa Rapid Station Shelters" (PDF). Archived (PDF) from the original on 2019-03-03. Retrieved 2019-03-15.
  26. ^ "It's Electric (Boogie Woogie)". San Diego Metropolitan Transit System. 30 November 2017. Archived from the original on 23 October 2021. Retrieved 25 January 2019.
  27. ^ "Zero Emissions Bus Pilot Program". San Diego Metropolitan Transit System. 11 July 2018. Archived from the original on 1 November 2020. Retrieved 25 January 2019.
  28. ^ "Downtown Bus Layover Facility". www.sandag.org. Archived from the original on 2019-01-25. Retrieved 2019-01-25.
  29. ^ "Fare Change – Sept. 1, 2019". San Diego Metropolitan Transit System. July 11, 2019. Archived from the original on October 23, 2021. Retrieved October 23, 2021.
  30. ^ "San Diego". Archived from the original on 2017-09-24. Retrieved 2017-09-23.