Da Proceso 08-1-31437 205001001 491748
Da Proceso 08-1-31437 205001001 491748
Da Proceso 08-1-31437 205001001 491748
DESCRIPCIN
UNIDAD
CANTIDAD
ITEM
PRELIMINARES
1.2
ml
40
51,616.00
2,064,640.00
RETIROS Y DEMOLICIONES
2.1
m3
12
137,145.00
1,645,740.00
MOVIMIENTOS DE TIERRA
3.2
3.2.1
De 0.00 a 2.00 m.
m3
20
16,187.00
323,740.00
3.3
m3
95,072.00
380,288.00
3.5
m3
262,179.00
1,048,716.00
3.8
m3
40
26,923.00
1,076,920.00
3.11
m3
20
48,134.00
962,680.00
3.12
m3
20
56,686.00
1,133,720.00
CONCRETOS
5.2
m3
14
421,842.00
5,905,788.00
5.3
m3
20
248,163.00
4,963,260.00
ACEROS
6.1
kg
1008
3,564.00
3592512
23,098,004.00
23,098,004.00
CONSTRUCCION DE OBRAS DE PROTECCIN QUEBRADA EL BUEY ENTRE LA CALLE 11 ESTE, Y LA VIA ANTIGUA A SAN
ANTONIO DE PRADO COMUNA 80 DE LA CIUDAD DE MEDELLN.
ITEM
DESCRIPCIN
UNIDAD CANTIDAD
VALOR UNITARIO
VALOR TOTAL
PRELIMINARES
1.1
dia
300,000.00
600,000.00
1.2
ml
30
51,616.00
1,548,480.00
1.3
m2
73
1,202.00
87,746.00
RETIROS Y DEMOLICIONES
2.1
m3
137,145.00
274,290.00
MOVIMIENTOS DE TIERRA
3.1
m2
60
20,449.00
1,226,940.00
3.2
3.2.1
De 0.00 a 2.00 m.
m3
104
16,187.00
1,683,448.00
3.3
m3
10
95,072.00
950,720.00
3.5
m3
10
262,179.00
2,621,790.00
3.8
m3
127
26,923.00
3,419,221.00
3.10
m3
39
28,805.00
1,123,395.00
CONCRETOS
5.3
m3
108
248,163.00
26,801,604.00
OBRAS VARIAS
9.1
m2
60
6,436.00
386,160.00
SUBTOTAL
40,723,794.00
TOTAL
40,723,794.00
CONSTRUCCION CANAL DE LA QUEBRADA EL SALADO CARRERA 103 POR CALLES 39 Y 40 BARRIO VEINTE DE JULIO PARTE BAJA
COMUNA 13 DE LA CIUDAD DE MEDELLN
ITEM
DESCRIPCIN
UNIDAD CANTIDAD
PRELIMINARES
1.1
dia
300,000.00
900,000.00
1.2
ml
33
51,616.00
1,703,328.00
RETIROS Y DEMOLICIONES
2.1
m3
137,145.00
274,290.00
MOVIMIENTOS DE TIERRA
3.1
m2
116
20,449.00
2,372,084.00
3.2
3.2.1
De 0.00 a 2.00 m.
m3
116
16,187.00
1,877,692.00
3.3
m3
12
95,072.00
1,140,864.00
3.8
m3
129
26,923.00
3,473,067.00
3.10
m3
528
28,805.00
15,209,040.00
3.12
m3
33
56,686.00
1,870,638.00
3.13
66
62,277.00
4,110,282.00
CONCRETOS
5.1
m3
50
387,173.00
19,358,650.00
CONSTRUCCION CANAL DE LA QUEBRADA EL SALADO CARRERA 103 POR CALLES 39 Y 40 BARRIO VEINTE DE JULIO PARTE BAJA
COMUNA 13 DE LA CIUDAD DE MEDELLN
ITEM
DESCRIPCIN
UNIDAD CANTIDAD
5.2
m3
31
421,842.00
16,029,996.00
5.3
m3
248,163.00
744,489.00
m3
349,615.00
1,398,460.00
ACEROS
6.1
kg
6415
3,564.00
22,863,060.00
OBRAS VARIAS
9.1
m2
660
6,436.00
4,247,760.00
SUBTOTAL
97,573,700.00
TOTAL
97,573,700.00
CONSTRUCCION PISO Y RECINTES QUEBRADA LA QUINTANA CARRERA 72 C POR CALLE 85 ATRS DE LA I E REPUBLICA
DE URUGUAY COMUNA 5 DE LA CIUDAD DE MEDELLN.
ITEM
DESCRIPCIN
PRELIMINARES
1.2
RETIROS Y DEMOLICIONES
2.1
MOVIMIENTOS DE TIERRA
3.1
3.2
3.2.1
UNIDAD CANTIDAD
VALOR UNITARIO
VALOR TOTAL
ml
33
51,616.00
1,703,328.00
m3
137,145.00
960,015.00
m2
132
20,449.00
2,699,268.00
De 0.00 a 2.00 m.
m3
33
16,187.00
534,171.00
3.3
m3
95,072.00
285,216.00
3.5
m3
262,179.00
786,537.00
3.8
m3
46
26,923.00
1,238,458.00
3.10
m3
66
28,805.00
1,901,130.00
3.11
m3
100
48,134.00
4,813,400.00
3.12
m3
10
56,686.00
566,860.00
CONSTRUCCION PISO Y RECINTES QUEBRADA LA QUINTANA CARRERA 72 C POR CALLE 85 ATRS DE LA I E REPUBLICA
DE URUGUAY COMUNA 5 DE LA CIUDAD DE MEDELLN.
ITEM
DESCRIPCIN
CONCRETOS
5.3
ACEROS
6.1
OBRAS VARIAS
9.1
UNIDAD CANTIDAD
VALOR UNITARIO
VALOR TOTAL
m3
37
248,163.00
9,182,031.00
kg
500
3,564.00
1,782,000.00
m2
200
6,436.00
1,287,200.00
SUBTOTAL
27,739,614.00
TOTAL
27,739,614.00
CONSTRUCCION CANAL DE LA QUEBRADA LA CANTERA CARRERA 75 APOR CALLE 93 AGUAS ARRIBA BARRIO KENNEDY
COMUNA 6 DE LA CIUDAD DE MEDELLN.
ITEM
DESCRIPCIN
UNIDAD CANTIDAD
PRELIMINARES
1.1
dia
300,000.00
600,000.00
1.2
ml
22
51,616.00
1,135,552.00
RETIROS Y DEMOLICIONES
2.1
m3
137,145.00
411,435.00
MOVIMIENTOS DE TIERRA
3.2
3.2.1
De 0.00 a 2.00 m.
m3
84
16,187.00
1,359,708.00
3.3
m3
13
95,072.00
1,235,936.00
3.5
m3
13
262,179.00
3,408,327.00
3.8
m3
113
26,923.00
3,042,299.00
3.10
m3
29
28,805.00
835,345.00
56,686.00
226,744.00
3.12
3.13
44
62,277.00
2,740,188.00
CONCRETOS
5.1
m3
26
387,173.00
10,066,498.00
5.2
m3
17
421,842.00
7,171,314.00
5.3
m3
248,163.00
744,489.00
5.4
349,615.00
699,230.00
ACEROS
6.1
OBRAS VARIAS
9.1
kg
3049
3,564.00
10,866,636.00
m2
44
6,436.00
283,184.00
SUBTOTAL
44,826,885.00
TOTAL
44,826,885.00
REPARACION DE PLACAS Y PISOS EN LAS QUEBRADAS LA PICACHA DESEMBOCADURA AL RIO AGUAS ARRIBA, ALTAVISTA
CARRERA 70 AGUAS ARRIBA Y LA HUESO CARRERA 73 AGUAS ARRIBA COMUNAS 11 Y 16 DE LA CIUDAD DE MEDELLN.
ITEM
DESCRIPCIN
UNIDAD CANTIDAD
VALOR UNITARIO
VALOR TOTAL
PRELIMINARES
1.1
dia
300,000.00
600,000.00
1.2
ml
180
51,616.00
9,290,880.00
RETIROS Y DEMOLICIONES
2.1
m3
122
137,145.00
16,731,690.00
MOVIMIENTOS DE TIERRA
3.2
3.2.1
De 0.00 a 2.00 m.
m3
90
16,187.00
1,456,830.00
3.8
m3
212
26,923.00
5,707,676.00
3.10
m3
180
28,805.00
5,184,900.00
3.12
m3
180
56,686.00
10,203,480.00
3.13
15
62,277.00
934,155.00
CONCRETOS
5.2
m3
79
421,842.00
33,325,518.00
5.3
m3
248,163.00
1,240,815.00
5.4
m3
18
349,615.00
6,293,070.00
ACEROS
6.1
kg
4410
3,564.00
15,717,240.00
OBRAS VARIAS
9.1
m2
360
6,436.00
2,316,960.00
SUBTOTAL
109,003,214.00
TOTAL
109,003,214.00
REPARACION DE PLACAS QUEBRADA LA ANA DIAZ CARRERA 89 POR CALLE 35 AGUAS ABAJO BARRIOS SANTA TERESITA Y
CRISTOBAL COMUNA 12 DE LA CIUDAD DE MEDELLN.
ITEM
DESCRIPCIN
UNIDAD CANTIDAD
PRELIMINARES
1.1
dia
300,000.00
600,000.00
1.2
ml
23
51,616.00
1,187,168.00
RETIROS Y DEMOLICIONES
2.1
m3
31
137,145.00
4,251,495.00
MOVIMIENTOS DE TIERRA
3.2
3.2.1
De 0.00 a 2.00 m.
m3
12
16,187.00
194,244.00
3.3
m3
95,072.00
190,144.00
3.5
m3
262,179.00
524,358.00
3.8
m3
47
26,923.00
1,265,381.00
23
56,686.00
1,303,778.00
CONCRETOS
5.2
m3
48
421,842.00
20,248,416.00
REPARACION DE PLACAS QUEBRADA LA ANA DIAZ CARRERA 89 POR CALLE 35 AGUAS ABAJO BARRIOS SANTA TERESITA Y
CRISTOBAL COMUNA 12 DE LA CIUDAD DE MEDELLN.
ITEM
DESCRIPCIN
5.3
ACEROS
6.1
OBRAS VARIAS
9.1
UNIDAD CANTIDAD
248,163.00
1,240,815.00
kg
3381
3,564.00
12,049,884.00
m2
46
6,436.00
296,056.00
SUBTOTAL
43,351,739.00
TOTAL
43,351,739.00
CONSTRUCCION DE SOLUCION HIDRAULICA Y ESTRUCTURAL QUEBRADA LA INDIA CRA 15 CC POR CALLE 40 Y 45 BARRIO
QUINTA LINDA COMUNA 9 DE LA CIUDAD DE MEDELLIN
ITEM
DESCRIPCIN
UNIDAD CANTIDAD
PRELIMINARES
1.1
dia
300,000.00
300,000.00
1.2
ml
23
51,616.00
1,187,168.00
RETIROS Y DEMOLICIONES
2.1
137,145.00
411,435.00
MOVIMIENTOS DE TIERRA
3.2
3.2.1
De 0.00 a 2.00 m.
m3
111
16,187.00
1,796,757.00
3.3
12
95,072.00
1,140,864.00
3.5
m3
12
262,179.00
3,146,148.00
3.8
138
26,923.00
3,715,374.00
3.10
30
28,805.00
864,150.00
3.12
m3
23
56,686.00
1,303,778.00
3.13
25
62,277.00
1,556,925.00
CONCRETOS
5.3
65
248,163.00
16,130,595.00
5.4
349,615.00
1,048,845.00
ACEROS
6.1
OBRAS VARIAS
9.2
kg
2594
3,564.00
9,245,016.00
m2
184
20,070.00
3,692,880.00
SUBTOTAL
45,539,935.00
TOTAL
45,539,935.00
CONSTRUCCION CANAL DE LA QUEBRADA LA BERMEJALA CARRERA 50 B POR CALLE 85 BARRIO BRASILIA COMUNA 4 DE LA
CIUDAD DE MEDELLN.
ITEM
DESCRIPCIN
UNIDAD CANTIDAD
PRELIMINARES
1.1
1.2
1.3
RETIROS Y DEMOLICIONES
2.1
m3
MOVIMIENTOS DE TIERRA
3.2
3.2.1
De 0.00 a 2.00 m.
3.3
3.5
dia
300,000.00
600,000.00
ml
20
51,616.00
1,032,320.00
m2
100
1,202.00
120,200.00
137,145.00
274,290.00
m3
92
16,187.00
1,489,204.00
m3
95,072.00
855,648.00
m3
262,179.00
2,359,611.00
3.8
m3
112
26,923.00
3,015,376.00
3.10
m3
52
28,805.00
1,497,860.00
3.12
m3
20
56,686.00
1,133,720.00
3.13
40
62,277.00
2,491,080.00
CONCRETOS
5.1
m3
30
387,173.00
11,615,190.00
5.2
m3
18
421,842.00
7,593,156.00
5.3
m3
248,163.00
744,489.00
5.4
m3
349,615.00
1,048,845.00
ACEROS
6.1
kg
3840
3,564.00
13,685,760.00
OBRAS VARIAS
9.1
m2
40
6,436.00
257,440.00
SUBTOTAL
49,814,189.00
TOTAL
49,814,189.00
49,814,189.00
40,723,794.00
44,826,885.00
27,739,614.00
97,573,700.00
45,539,935.00
23,098,004.00
REPARACION DE PLACAS QUEBRADA LA ANA DIAZ CARRERA 89 POR CALLE 35 AGUAS ABAJO BARRIOS
SANTA TERESITA Y CRISTOBAL COMUNA 12 DE LA CIUDAD DE MEDELLN.
43,351,739.00
109,003,214.00
481,671,074.00
PORCENTAJE ADMINISTRACIN
PORCENTAJE UTILIDADES
PORCENTAJE IMPREVISTOS
AIU TOTAL
EL PORCENTAJE DE AIU SE CALCULAR SOBRE EL VALOR DE LOS COSTOS DIRECTOS DE LAS OBRAS, NO SE INCLUIRN
PARA ESTE CLCULO LAS ACTIVIDADES DEL PLAN DE MANEJO SOCIO AMBIENTAL DE LAS OBRAS
PLAN DE MANEJO AMBIENTAL
VALLAS SEALIZACIN DE OBRA (1m por 1 m)
UND
VALLA INFORMATIVA DE OBRA (1 m POR 1 m)
UND
INGENIERO AMBIENTAL
MES
TOTAL COSTOS DIRECTOS
TALLER
UN
JORNAL
%
%
%
Los anteriores items corresponden a los mnimos exigidos por la Secretara Del Medio Ambiente dentro del anlisis de la
administracin del proyecto, son de obligatorio cumplimiento por parte de los contratistas, no obstante el proponente deber
considerar los adicionales que a su criterio se requieran, lo anterior no implica el aumento del presupuesto oficial.
Descripcin
Equipo
Comision de topografia
Suma de Equipo
Unidad
Cantidad
dia
da
Costo
1.00
Importe
300,000
Costo Directo
300,000
300,000
300,000
Control de aguas de todo tipo (de la quebrada, infiltradas, freticas y de escorrenta), se pagar por ml de
cobertura o canal construido.
Descripcin
Unidad
Cantidad
Costo
ml
Importe
Materiales
Cemento gris (50 Kg)
Arena fina para concretos
Triturado 3/4"
Caneca metalica
Suma de Materiales
UND
M3
M3
UND
0.60
0.06
0.06
1.00
18,700
53,170
53,170
17,000
11,220
3,190
2,924
17,000
34,335
Mano de Obra
Cuadrilla Mvto de tierra 1 Of 2 ayudante
Suma de Mano de Obra
JOR
0.15
110,760
11,887
11,887
Herramienta
Herramienta menor
Suma de Herramienta
(%)mo
0.05
11,887
594
594
Equipo
Retroexcavadora
Suma de Equipo
HORA
0.06
80,000
4,800
4,800
51,616
51,616
Costo Directo
Desmonte y limpieza
m2
Descripcin
Mano de Obra
1 Ayudante
Suma de Mano de Obra
Herramienta
Herramienta menor
Suma de Herramienta
Equipo
Volqueta - botada de material paleros
Suma de Equipo
Unidad
Cantidad
Costo
Importe
hor
50.00
35,878
718
718
(%)mo
0.05
718
36
36
m3
0.02
23,000
449
449
1,202
1,202
Costo Directo
Demolicin de concreto en cualquier tipo de estructura, en cualquier resistencia, incluye pavimentos y tuberas,
adems incluye transporte hasta el sitio de cargue y la botada en el sitio de disposicin final.
Descripcin
Mano de Obra
1 ayudante
Suma de Mano de Obra
Unidad
Cantidad
Costo
m3
Importe
JOR
0.14
27,690
3,900
3,900
Herramienta
Herramienta menor
Suma de Herramienta
(%)mo
0.05
3,900
195
195
Equipo
Compresor / operador y combustible
Suma de Equipo
HORA
1.00
69,800
69,800
69,800
Transporte
Transporte local
Suma de Transporte
M3
1.40
23,000
32,200
32,200
Conceptos
Cargue (Paleros)-transp-botada.
Suma de Conceptos
M3
1.35
23,000
31,050
31,050
137,145
137,145
Costo Directo
DEMOLICION PAVIMENTO ASF. BRECHA Demolicin de carpeta asfltica en brecha cualquier espesor. Incluye
corte con maquina de disco segn trazado de topografia, picada en tamaos maximo 40 cm, acopio, cargue y
transporte.
Descripcin
Mano de Obra
1 Ayudante
Suma de Mano de Obra
Herramienta
Herramienta menor
Suma de Herramienta
Equipo
Volqueta - botada de material paleros
Cortadoras pisos duros y asfalto(disco y operador)
Suma de Equipo
Unidad
Cantidad
Costo
m2
Importe
dia
10.00
35,878
3,588
3,588
(%)mo
0.05
3,588
179
179
m3
h
0.20
10.00
23,000
86,400
5,980
8,640
14,620
18,387
18,387
18,387
Costo Directo
Excavacin manual de 0 a 2 m en material heterogneo, bajo cualquier grado de humedad, dureza y profundidad,
medido en sitio. Incluye entibado temporal, bombas sumergibles y retiro del material hasta el sitio de cargue.
Descripcin
Mano de Obra
1 ayudante
Suma de Mano de Obra
Unidad
Cantidad
Costo
m3
Importe
JOR
0.50
27,690
13,845
13,845
Herramienta
Herramienta menor
Suma de Herramienta
(%)mo
0.05
13,845
692
692
Equipo
Bomba Sumergible
Suma de Equipo
HORA
0.05
33,000
1,650
1,650
16,187
16,187
16,187
Costo Directo
Excavacin manual de 2 a 4 m en material heterogneo, bajo cualquier grado de humedad, dureza y profundidad,
medido en sitio. Incluye entibado temporal, bombas sumergibles y retiro del material hasta el sitio de cargue.
Descripcin
Mano de Obra
1 ayudante
Suma de Mano de Obra
Unidad
Cantidad
Costo
m3
Importe
JOR
0.65
27,690
17,999
17,999
Herramienta
Herramienta menor
Suma de Herramienta
(%)mo
0.05
17,999
900
900
Equipo
Bomba Sumergible
Suma de Equipo
HORA
0.05
2,280
114
114
19,012
19,012
19,012
Costo Directo
Excavacin de 0 a 2 m en rocas de gran tamao, bajo cualquier grado de humedad. medido en sitio. Incluye
entibado temporal, bombas sumergibles, explosivos, perforacin, voladura, desembombe y retiro del material
hasta el sitio de cargue.
Descripcin
Materiales
Explosivos para voladura de roca
Suma de Materiales
Unidad
Cantidad
Costo
m3
Importe
PULG
60.00
1,200
72,000
72,000
JOR
0.25
83,070
20,402
20,402
Herramienta
Herramienta menor
Suma de Herramienta
(%)mo
0.05
20,402
1,020
1,020
Equipo
Bomba Sumergible
Suma de Equipo
HORA
0.05
33,000
1,650
1,650
95,072
95,072
95,072
Mano de Obra
1 of y 1 ayudante
Suma de Mano de Obra
Costo Directo
Excavacin en roca cemento demoledor no explosivo CRAS. Incluye cemento demoledor a una dosificacin de 7
kg por metro cubico, desembombe, cargue, transporte y botada a donde lo indique la interventoria. Se pagar
como roca compacta. Se deben seguir las recomendaciones del productor y garantizar la aplicacin de personal
autorizado. se medira como roca compacta.
Descripcin
Materiales
Cemento demoledor expansivo CRAS
Suma de Materiales
Unidad
Cantidad
KG
Mano de Obra
Minero - barreno diametro 32 mm
1 ofic. y 1 ayud.
Suma de Mano de Obra
PULG
DIA
Herramienta
Herramienta menor
Suma de Herramienta
(%)mo
Costo
Importe
7.35
19,807
145,581
145,581
0.33
550
83,070
57,750
27,413
85,163
0.05
85,163
767
1,534
1.30
23,000
29,900
29,900
105.00
Equipo
Volqueta - botada de material paleros
Suma de Equipo
m3
262,179
262,179
Costo Directo
Demolicin y remocin de pavimento asfaltico (incluye tuberias, ademas incluye transporte hasta el sitio de
cargue, cargue, transporte y la botada en el sitio de disposicin final).
Descripcin
Equipo
Cortadoras pisos duros y asfalto(disco y operador)
Suma de Equipo
Unidad
Cantidad
Costo
m2
Importe
HORA
0.14
20,300
2,741
2,741
JOR
0.07
27,690
1,846
1,846
Transporte
Transporte local
Suma de Transporte
M3
0.15
23,000
3,450
3,450
Conceptos
Cargue (Paleros)-transp-botada.
Suma de Conceptos
M3
0.15
23,000
3,450
3,450
11,487
11,487
11,487
Mano de Obra
1 Ayudante
Suma de Mano de Obra
Costo Directo
Descripcin
m3
Unidad
Cantidad
Costo
Importe
Mano de Obra
2 ayudantes
Suma Mano de Obra
JOR
0.02
55,380
923
923
Equipo
Transporte en volqueta
Suma de Equipo
M3
1.00
23,000
23,000
23,000
Conceptos
Derecho de Botadero
Suma de Conceptos
M3
1.00
3,000
3,000
3,000
26,923
26,923
26,923
Costo Directo
Descripcin
m2
Unidad
Cantidad
Costo
Importe
Materiales
Clavos
Can
Tabla Comun 0.25 X 2.5 m - 0.2 X 3 m
Suma de Materiales
lb
dia
un
0.2
5.0
1.3
Mano de Obra
1 ofic. y 1 ayud.
Suma de Mano de Obra
dia
10.000
102,142
10,214
10,214
0.05
10,214
511
511
20,449
20,449
20,449
Herramienta
Herramienta menor
Suma de Herramienta
Costo Directo
(%)mo
1,600
800
4,200
264
4,000
5,460
9,724
Lleno estructural en material de prstamo compactado mecnicamente, hasta la densidad determinada en los
diseos o la indicada por la interventora.
Descripcin
Materiales
Material de prestamo
Suma de Materiales
Equipos
Buldozer D - 6\operador y combustible
Vibrocompactador\operador y combustible
Motoniveladora 120 G\operador y combustible
Suma de equipos
Unidad
Cantidad
Costo
m3
Importe
M3
1.35
1,500
2,025
2,025
HORA
HORA
HORA
0.22
0.05
0.05
85,000
75,000
90,000
18,530
3,750
4,500
26,780
28,805
28,805
28,805
Costo Directo
Descripcin
Materiales
Arenilla, incluye transporte
Material Granular Seleccionado, incluye transporte
Suma de Materiales
Unidad
Cantidad
Costo
m3
Importe
M3
M3
0.65
0.55
25,330
44,470
16,465
24,459
40,923
JOR
0.05
83,070
4,154
4,154
Herramienta
Herramienta menor
Suma de Herramienta
(%)mo
0.05
4,154
208
208
Equipo
Canguro compactador / operador y combustible
Suma de Equipo
HORA
0.05
57,000
2,850
2,850
48,134
48,134
48,134
Mano de Obra
1 of y 1 ayusante
Suma de Mano de Obra
Costo Directo
Descripcin
Materiales
Piedra canto rodado
Suma de Materiales
m3
Unidad
Cantidad
Costo
Importe
M3
1.00
42,730
42,730
42,730
JOR
0.12
110,760
13,291
13,291
Herramienta
Herramienta menor
Suma de Herramienta
(%)mo
0.05
13,291
665
665
Transporte
Transporte local
Suma de Transporte
M3
1.00
23,000
23,000
23,000
56,686
56,686
56,686
Mano de Obra
1 of y 2 ayudantes
Suma de Mano de Obra
Costo Directo
Construccin de filtros 1.5m x 0.4m con tubera pvc drenaje de 100 mm y material filtrante, incluye geotextil NT
1600 o simlar.
Descripcin
Materiales
Triturado "
Suma de Materiales
Unidad
Cantidad
Costo
ml
Importe
M3
0.60
53,170
31,902
31,902
JOR
0.11
83,070
9,420
9,420
(%)mo
0.05
9,420
471
471
Auxiliares
Transporte interno
Suma de Auxiliares
GL
1.00
23,000
23,000
23,000
Conceptos
Geotextil no tejido 1600.
Tuberia perf filtros pvc 4.
Suma de Conceptos
M2
ML
4.20
1.05
2,200
16,333
9,240
17,150
26,390
91,183
91,183
91,183
Mano de Obra
1 of y 1 ayudante
Suma de Mano de Obra
Herramienta
Herramienta menor
Suma de Herramienta
Costo Directo
Suministro, transporte y colocacin de hormigon de Fc= 14 Mpa para solados y atraques de tuberias.
Descripcin
Mano de Obra
1 Of y 1 Ayudante
Suma de Mano de Obra
Unidad
Cantidad
m3
Costo
Importe
JOR
0.80
83,070
66,456
66,456
(%)mo
0.05
66,456
3,323
3,323
Equipo
Formaleta
Suma de Equipo
GL
1.00
5,000
5,000
5,000
Transpote
Transporte local
Suma de Transporte
M3
1.05
3,500
3,675
3,675
Conceptos
Concreto 2000 psi.
Suma de Conceptos
M3
1.05
258,249
271,162
271,162
349,615
349,615
349,615
Herramienta
Herramienta menor
Suma de Herramienta
Costo Directo
Suministro, transporte y colocacin de hormigon premezclado con aditivo acelerante a tres (3) das de Fc= 28
Mpa para losa de superior y muros de cobertura o canal, incluye formaletera.
Descripcin
Unidad
m3
Cantidad
Costo
m3
Importe
Materiales
1.05
319,877
Suma de Materiales
335,871
335,871
Mano de Obra
1 of y 2 ayudantes
Suma de Mano de Obra
Herramienta
Herramienta menor
Suma de Herramienta
Equipo
Vibrador de concreto, elctrico
Suma de Equipo
Costo Directo
JOR
0.70
110,760
77,532
77,532
(%)mo
0.05
77,532
3,877
3,877
dia
0.13
36,500
4,563
4,563
421,842
421,842
421,842
Suministro, transporte y colocacin de hormigon premezclado con aditivo acelerante a tres (3) das de Fc= 21
Mpa para losa de superior y muros de cobertura o canal, incluye formaletera.
Descripcin
Materiales
Concreto premezclado de 3000 psi, incluye aditivo
Suma de Materiales
Mano de Obra
1 of y 2 ayudantes
Suma de Mano de Obra
Herramienta
Herramienta menor
Suma de Herramienta
Equipo
Vibrador de concreto, elctrico
Formaleta
Suma de Equipo
Unidad
Cantidad
Costo
m3
Importe
m3
1.05
282,098
296,202
296,202
JOR
0.70
110,760
77,532
77,532
(%)mo
0.05
77,532
3,877
3,877
DIA
GL
0.13
1.00
36,500
5,000
4,563
5,000
9,563
382,611
387,173
387,173
Costo Directo
Suministro, transporte y colocacin de concreto ciclpeo 60 % f'c=28 MPa para recintes, llaves, presas o pisos.
Descripcin
Unidad
Cantidad
Costo
m3
Importe
Materiales
Concreto en obra de 4000 psi, incluye aditivo
Piedra
Tabla 1" x 10" madera comun
Clavo Comun
Suma de Materiales
M3
M3
UND
LIB
0.60
0.40
4.00
0.10
282,098
49,690
4,200
1,600
169,259
19,876
16,800
160
206,095
Mano de Obra
1 of y 1 ayudante
Suma de Mano de Obra
JOR
0.43
83,070
35,720
35,720
(%)mo
0.05
35,720
1,786
1,786
DIA
0.13
36,500
4,563
4,563
Herramienta
Herramienta menor
Suma de Herramienta
Equipo
Vibrador de concreto, elctrico
Suma de Equipo
Costo Directo
248,163
248,163
Descripcin
Materiales
Acero G-60 figurado
Alambre recocido C 18
Suma de Materiales
Unidad
Cantidad
Kg
Costo
Importe
Kg
Kg
1.05
0.03
2,668
2,900
2,801
87
2,888
JOR
0.01
83,070
581
581
Herramienta
Herramienta menor
Suma de Herramienta
(%)mo
0.05
581
29
29
Transporte
Transporte interno
Suma de Transporte
Kg
1.00
65
65
65
Mano de Obra
1 of y 1 ayudante
Suma de Mano de Obra
3,564
3,564
Costo Directo
Suministro, transporte y colocacin de Base granular de mximo 2 1/2", reacomodado con medios mecnicos
y compactado al 98% mnimo del ensayo del proctor modificado.
Descripcin
Materiales
Base granular
Suma de Materiales
Unidad
Cantidad
Costo
M3
Importe
m3
1.30
44,470
57,811
57,811
JOR
0.01
110,760
1,108
1,108
(%)mo
0.05
1,108
55
55
Equipo
Motoniv.Diesel-120G
Hor
0.05
90,000
4,500
Compac.vibr.R:48"x66"(operador y combustible)DS-70
Hor
0.05
75,000
3,750
Mano de Obra
1 of y 2 ayudante
Suma de Mano de Obra
Herramienta
Herramienta menor
Suma de Herramienta
Suma de Equipo
Costo Directo
8,250
67,224
67,224
Suministro, transporte y colocacin de mezcla asfltica en caliente. Compactada con medios mecnicos incluye
riego de liga.
Descripcin
Materiales
Liga (Para repavimentaciones)
Mezcla asf. Rodadura " al 6%
Suma de Materiales
Mano de Obra
1 of y 6 ayudante
Suma de Mano de Obra
Herramienta
Herramienta menor
Suma de Herramienta
Equipo
Vibrocompactador DS-70 CA-15/operador combustible
Finisher-tipo28000/operador y combustible
Vibrocompactador Neumatico
Suma de Equipo
Costo Directo
Unidad
Cantidad
Costo
M3
Importe
Kg
m3
5.00
1.30
2,100
365,400
10,500
475,020
485,520
JOR
0.01
221,520
1,582
1,582
(%)mo
0.05
1,582
79
79
Hor
Hor
Hor
0.05
0.05
0.05
75,000
57,000
75,000
3,750
2,850
3,750
10,350
497,531
497,531
Descripcin
Materiales
Grama
Suma de Materiales
Mano de Obra
1 ofic. y 1 ayud.
Suma de Mano de Obra
Herramienta
Herramienta menor
Suma de Herramienta
Auxiliares
Transporte interno
Suma de Auxiliares
m2
Unidad
Cantidad
Costo
Importe
M2
1.05
4,176
4,385
4,385
JOR
0.01
83,070
1,097
1,097
(%)mo
0.05
1,097
55
55
M2
1.00
900
900
900
6,436
6,436
Costo Directo
Suministro e inatalacin Tuberas de PVC Rip Loc de 1500 mm de dimetro (incluye suministro,transportes,
almacenamiento e instalacin).
Descripcin
Unidad
Cantidad
Costo
ml
Importe
Materiales
Tubera Rip Loc 1500mm
Acoples
Suma de Materiales
ml
un
1.05
0.33
1,081,759
593,178
1,135,847
195,749
1,331,596
Mano de Obra
1 ofic. y 1 ayud.
Suma de Mano de Obra
JOR
0.50
83,070
41,535
41,535
(%)mo
0.05
41,535
2,077
2,077
Auxiliares
Transporte
Suma de Auxiliares
GL
1.00
34,286
34,286
34,286
Equipos
retroexcavadora\operador y combustible
Suma de Equipos
hr
0.50
80,000
40,000
40,000
Herramienta
Herramienta menor
Suma de Herramienta
Costo Directo
1,449,493
1,449,493
Construccin de camara de inspeccin de 1.5 m en concreto de 21 mpa en obra . base y cauela . Segn normas
de EPM.
Descripcin
Unidad
Cantidad
Costo
un
Importe
Materiales
Concr.en obra 3000 psi 3/4"
Telera en madera 0.90x1.35
cemento gris
Suma de Materiales
m3
da
sac
0.8
1.0
0.1
252,755
1,200
18,700
212,314
1,200
1,870
215,384
Mano de Obra
1 ofic. y 1 ayud.
Suma de Mano de Obra
dia
3.0
102,142
34,047
34,047
(%)mo
0.05
34,047
1,702
1,702
Herramienta
Herramienta menor
Suma de Herramienta
Costo Directo
251,134
251,134
Cmara de cada incluye losa inferior, cauelas, ganchos tapa. Altura entre 3,0 m y 6,0 m, D=1.5m.
Descripcin
Unidad
Cantidad
un
Costo
Importe
Materiales
Concr.en obra 3000 psi 3/4"
Cuellos para camara de 1.5 m
Transporte de cuello
Cono excentrico para camara de 1.5 m
Gancho escalon
Transporte de cono para MH
tapa para MH 1.5 m
Suma de Materiales
M3
UND
UND
UND
UND
UND
UND
0.14
3.00
3.00
1.00
22.50
1.00
1.00
282,098
123,772
12,000
368,184
6,000
26,000
81,900
38,083
371,316
36,000
368,184
135,000
26,000
81,900
1,056,483
Mano de Obra
1 ofic. y 1 ayud.
Suma de Mano de Obra
DIA
0.37
83,070
30,767
30,767
(%)mo
0.05
30,767
767
1,534
Equipo
Retroexcavadora ford 755(con operador) 4X4
Suma de Equipo
DIA
0.50
80,000
40,000
40,000
Conceptos
Mort.1:5 En obra
Suma de Conceptos
M3
0.14
192,929
26,045
26,045
Herramienta
Herramienta menor
Suma de Herramienta
Costo Directo
1,154,829
1,154,829
Construccin de camara de inspeccin de 1.2 m en concreto de 21 mpa en obra . base y cauela . Segn normas
de EPM.
Descripcin
Unidad
Cantidad
Costo
un
Importe
Materiales
Concr.en obra 3000 psi 3/4"
Telera en madera 0.90x1.35
Suma de Materiales
m3
da
0.7
1.0
252,755
4,200
172,505
4,200
176,705
Mano de Obra
1 ofic. y 1 ayud.
Suma de Mano de Obra
dia
3.0
102,142
34,047
34,047
(%)mo
0.05
34,047
1,702
1,702
Herramienta
Herramienta menor
Suma de Herramienta
Costo Directo
212,455
212,455
Excavacin manual de 4 a 6 m en material heterogneo, bajo cualquier grado de humedad, dureza y profundidad,
medido en sitio. Incluye entibado temporal, bombas sumergibles y retiro del material hasta el sitio de cargue.
Descripcin
Mano de Obra
1 ayudante
Suma de Mano de Obra
Unidad
Cantidad
Costo
m3
Importe
JOR
0.85
27,690
23,537
23,537
Herramienta
Herramienta menor
Suma de Herramienta
(%)mo
0.05
23,537
1,177
1,177
Equipo
Bomba Sumergible
Suma de Equipo
HORA
0.05
3,241
162
162
24,875
24,875
24,875
Costo Directo
Excavacin manual de 6m en adelante en material heterogneo, bajo cualquier grado de humedad, dureza y
profundidad, medido en sitio. Incluye entibado temporal, bombas sumergibles y retiro del material hasta el sitio
de cargue.
Descripcin
Mano de Obra
1 ayudante
Suma de Mano de Obra
Unidad
Cantidad
Costo
m3
Importe
JOR
0.95
27,690
26,306
26,306
Herramienta
Herramienta menor
Suma de Herramienta
(%)mo
0.05
26,306
1,315
1,315
Equipo
Bomba Sumergible
Suma de Equipo
HORA
0.05
4,561
228
228
27,849
27,849
27,849
Costo Directo
Dragado a maquina bajo cualquier grado de humedad y profundidad, medido en sitio. Incluye cargue, transporte
y botada de material.
Descripcin
Equipo
Retroexcavadora ford 755(con operador) 4X4
Suma de Equipo
Mano de Obra
1 ofic. y 1 ayud.
Suma de Mano de Obra
Herramienta
Unidad
Cantidad
Costo
m3
Importe
15.000
75,000
5,000
5,000
dia
50.000
102,142
2,043
2,043
(%)mo
0.05
2,043
102
102
7,145
7,145
7,145
Costo Directo
Excavacin a maquina en material heterogeneo bajo cualquier grado de humedad y profundidad, medido en sitio.
Incluye entibado donde sea necesario, cargue, transporte y botada de material.
Descripcin
Equipo
Retroexcavadora ford 755(con operador) 4X4
Volqueta - botada de material paleros
Suma de Equipo
Unidad
Cantidad
h
M
Costo
20.0
1.2
m3
Importe
80,000
23,000
Costo Directo
4,000
27,600
31,600
31,600
31,600
31,600
Descripcin
Materiales
Malla D50
Alambre recocido C 18
Suma de Materiales
Unidad
m2
Cantidad
Costo
Importe
m2
Kg
1.15
0.03
2,253
2,900
2,591
73
2,663
JOR
0.01
83,070
415
415
Herramienta
Herramienta menor
Suma de Herramienta
(%)mo
0.05
415
21
21
Transporte
Transporte de Malla
Suma de Transporte
Kg
1.32
65
86
86
Mano de Obra
1 of y 1 ayudante
Suma de Mano de Obra
3,185
3,185
Costo Directo
Suministro, colocacin de llenos en material granular 3/4" - 1 1/2", colocado uniformemente en capas de hasta
0.20 m, para atraque y cimentacion de tuberia.
Descripcin
Materiales
Material Granular Seleccionado, incluye transporte
Suma de Materiales
Mano de Obra
1 of y 1ayudante
Suma de Mano de Obra
Unidad
Cantidad
Costo
m3
Importe
M3
1.15
44,470
51,141
51,141
JOR
0.08
83,070
6,646
6,646
Costo Directo
(%)mo
0.05
6,646
332
332
58,118
58,118
58,118
CODIGO
MANO DE OBRA
HERRAMIENTA
CONCRETOS Y
MORTEROS
DINAMITA
FORMALETA
DESCRIPCIN
COD. 2
1 Ayudante
1 Ayudante
1 Oficial
1 Oficial
1 ofic. y 1 ayud.
Topografo
2 ayudantes
3 ayudantes
6 ayudantes
Transito Kern dKm-1
Nivel de presicin gKo-a,gK-1, AL3
Concretadora 11/2sacos electrica
Compresor con manguera de 40 m, martillo, punta,
combustible (combustible y operador)
Retroexcavadora ford 755(con operador) 4X4
Buldozer D - 6
Maquina fresadora RR250
Finisher 880
Motoniveladora 120 G
Vibrocompactador DS-70 CA-15
Compactador Canguro
Rana y/o placa vibratoria
Vibrador electrico o gasolina
Volqueta - botada de material paleros
Volqueta
Volqueta
Cortadoras pisos duros y asfalto(disco y operador)
Guadaadora 2 h.p. flexible
Andamio completo
Can
pulidora electrica manual - disco
motosierra electrica espada 40 cm
Telera de 0.90x1.35m
Telera de 0.45x1.35m
Cortadora de Ladrillo electrica
Retroexcavadora orugas 320
Malacate 2000 lbs
taco metalico extra largo 4.5 - 5.5 m
Chapeta
Tensor
Bomba sumergible
Bomba para concreto
concreto de pega 0.3 : 1 : 3 : 2 cal:cemento:arena:agregado grueso
Concr.en obra 2000 psi 3/4"
Concr.en obra 2500 psi 3/4"
Concr.en obra 3000 psi 3/4"
Concr.en obra 3500 psi 3/4"
Concr.en obra 4000 psi 3/4"
Mort.1:2 En obra
Mort.1:3 En obra
Mort.1:4 En obra
Mort.1:5 En obra
Mort.1:6 En obra
Mort.1:7 En obra
Dinamita
Tabla Comun 0.25 X 2.5 m - 0.2 X 3 m
UN
COD. 3
V/UNITARIO
COD. 4
DIA
HORA
DIA
HORA
DIA
dia
DIA
DIA
dia
dia
dia
dia
hr
35,878
4,485
66,264
8,283
102,142
57,225
71,756
107,634
215,268
35,000
25,000
34,500
69,800
hr
hr
hr
hr
hr
hr
dia
dia
dia
M3
hr
m3-km
HORA
dia
dia
dia
dia
dia
dia
dia
dia
hora
dia
dia
dia
dia
dia
m3
M3
80,000
85,000
450,000
75,000
90,000
75,000
57,000
39,000
36,500
23,000
55,400
950
86,400
29,000
800
250
35,100
40,000
421
332
20,300
98,000
60,000
500
151
93
33,000
26,500
267,968
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
pul
Un
208,315
224,292
252,755
269,975
270,691
313,612
251,703
215,982
192,929
177,125
158,187
1,200
4,200
FECHA
14-Jan-08
14-Jan-08
14-Jan-08
14-Jan-08
14-Jan-08
14-Jan-08
14-Jan-08
14-Jan-08
14-Jan-08
22-Jan-08
22-Jan-08
22-Jan-08
22-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
22-Jan-08
29-Jan-08
22-Jan-08
22-Jan-08
29-Jan-08
22-Jan-08
22-Jan-08
22-Jan-08
29-Jan-08
22-Jan-08
22-Jan-08
29-Jan-08
22-Jan-08
22-Jan-08
22-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
22-Jan-08
22-Jan-08
20-Feb-08
29-Jan-08
25-Jan-08
25-Jan-08
25-Jan-08
25-Jan-08
25-Jan-08
25-Jan-08
25-Jan-08
25-Jan-08
25-Jan-08
25-Jan-08
25-Jan-08
25-Jan-08
29-Jan-08
29-Jan-08
FORMALETA
ACERO
CASETON
TUBERIA EN
CONCRETO
m
m
m
m
lb
un
un
un
un
un
un
kg
kg
kg
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
un
un
un
un
un
un
un
un
un
7,000
14,800
28,500
9,600
1,600
13,200
4,500
22,000
38,300
49,000
92,000
2,900
2,668
70
1,997
2,322
2,958
3,448
2,253
2,763
3,670
4,663
2,280
6,800
7,250
10,600
13,500
19,500
25,700
29,000
11,600
14,500
21,500
26,100
37,200
44,100
52,200
75,500
104,400
133,400
174,000
203,000
232,000
238,000
348,000
488,000
5,620
9,692
6,610
9,873
13,759
29,137
1,282
1,849
3,695
16,195
1,959
4,261
7,818
54,165
3,241
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
25-Jan-08
25-Jan-08
25-Jan-08
25-Jan-08
25-Jan-08
25-Jan-08
25-Jan-08
25-Jan-08
25-Jan-08
25-Jan-08
25-Jan-08
29-Jan-08
29-Jan-08
16-Mar-07
16-Mar-07
16-Mar-07
16-Mar-07
16-Mar-07
16-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
1-Feb-08
1-Feb-08
1-Feb-08
1-Feb-08
1-Feb-08
1-Feb-08
1-Feb-08
1-Feb-08
1-Feb-08
1-Feb-08
1-Feb-08
1-Feb-08
1-Feb-08
1-Feb-08
1-Feb-08
TUBERIA PVC
GEOTEXTILES
CEMENTO
LADRILLO
PINTURA
un
un
un
m
m
m
m
m
m
m
m
m
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
g/4
m
m
m2
m2
m2
m2
SACO
SACO
un
un
un
un
un
un
un
un
un
gal
gal
gal
4,068
8,398
76,967
1,369
1,726
2,517
4,534
5,921
9,078
14,712
19,643
33,505
198
313
510
935
1,275
2,091
8,272
10,247
22,262
309
493
966
1,857
3,468
5,683
16,368
19,083
41,030
484
817
1,344
3,473
4,561
7,262
17,225
24,685
53,386
27,535
57,108
16,333
34,587
2,200
4,400
3,900
3,150
18,700
37,000
550
830
580
680
720
780
1,140
1,100
450
33,700
44,000
50,000
1-Feb-08
1-Feb-08
1-Feb-08
1-Feb-08
1-Feb-08
1-Feb-08
1-Feb-08
1-Feb-08
1-Feb-08
1-Feb-08
1-Feb-08
1-Feb-08
1-Feb-08
1-Feb-08
1-Feb-08
1-Feb-08
1-Feb-08
1-Feb-08
1-Feb-08
1-Feb-08
1-Feb-08
1-Feb-08
11-Feb-08
11-Feb-08
11-Feb-08
11-Feb-08
11-Feb-08
11-Feb-08
11-Feb-08
11-Feb-08
11-Feb-08
11-Feb-08
11-Feb-08
11-Feb-08
11-Feb-08
11-Feb-08
11-Feb-08
11-Feb-08
11-Feb-08
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
20-Feb-08
20-Feb-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
31-Jan-08
31-Jan-08
31-Jan-08
PINTURA
TRITURADOS Y
ASFALTOS
PISOS
BAOS Y
GRIFERIAS
Esmalte-base aceite-pintulux
Barniz Mate
Siliconite (hidrofugo)
Estucor
removedor - pintuco
adelgazador (disolvente)
Arena para concreto
Triturado de 3/4 pulg
Piedra entresuelo
Piedra canto rodado
Arena revoque
Arena de pega
Mezcla asfaltica MDC-2 MDC-1 asfalto 60-70 invias
Mezcla asfaltica MDC-3 con asfalto 60-70
Material de prestamo
Arenilla
Base granular
Sub-base granular
Base asfltica al 3%
Base asfltica al 4%
Mezcla asf. Rodadura " al 6%
Mezcla asf. Rodadura " al 6%
Liga (Para repavimentaciones)
MC - 70
Asfaltex Negro
Pegacor
Lechada
Azulejo enchape color. Incluye transporte
Azulejo enchape blanco. Incluye transporte
Baldosa grano. Incluye transporte
Varilla aluminio 3 mm
Polvillo blanco
Vitrificado gres
Arenon chino # 1 # 2
Granito # 1 # 2
Zocalo b. Grano
Zocalo madera Zapan 10 x 1.5 cm
Zocalo Cedro wino 10 x 1.5 cm
Chazos plasticos
Baldosa monocolor. Incluye tte
Azulejo piso. Incluye tte
Sanitario econmico color
Sanitario econmico blanco
Lavamanos econmico color
Lavamanos econmico blanco
Orinal Institucional (INC. GRIF. AUTM)
Valvula regulacin de 1/2". Metalica
Sifon 3" con registro
Llave terminal
Taza fluxmetro
Griferia fluxometro sanitario bajo consumo
Transporte bloque de 10
Transporte bloque de 15
Transporte bloque de 20
Transporte ladrillo de 10
Transporte ladrillo de 15
Transporte ladrillo de 20
Transporte adoqun
Transporte cordn 35
Transporte cordn 45
Transporte de cono para MH
gal
gal
gal
kg
gal
gal
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
ton
kg
gal
kg
kg
m2
m
m
m
ml
kg
m
kg
kg
m
m
m
un
m
m
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
m
m
m
un
50,950
36,000
32,500
1,000
49,300
15,000
53,170
53,170
49,690
42,730
38,670
38,670
350,000
366,000
1,500
25,330
44,470
38,090
250,500
290,000
365,400
203,000
2,100
6,960
5,250
1,050
980
19,100
16,800
28,300
1,520
480
17,800
340
428
8,500
12,400
9,500
65
16,200
19,400
195,000
176,000
48,000
45,200
210,000
2,850
10,800
10,900
427,000
385,000
180
205
245
130
160
180
5,300
2,000
2,600
26,000
31-Jan-08
31-Jan-08
31-Jan-08
31-Jan-08
31-Jan-08
31-Jan-08
20-Feb-08
20-Feb-08
20-Feb-08
25-Feb-08
20-Feb-08
20-Feb-08
31-Jan-08
31-Jan-08
16-Mar-07
20-Feb-08
20-Feb-08
20-Feb-08
31-Jan-08
31-Jan-08
31-Jan-08
31-Jan-08
31-Jan-08
31-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
29-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
TRANSPORTES
CUBIERTAS
PREFABRICADOS
un
un
un
un
un
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
ml
un
un
un
un
un
UN
un
un
un
un
un
un
m
m
m
m
m
m
m2
m2
un
un
ml
ml
un
un
un
un
un
ml
ml
ml
ml
23,000
35,000
12,000
12,000
21,200
900
1,400
1,700
2,700
3,800
4,400
5,900
6,800
8,500
8,600
10,400
13,150
13,150
14,200
17,000
17,200
21,000
25,000
31,800
32,000
33,500
39,500
45,000
12,700
15,950
19,100
25,500
31,800
500
15,500
200
500
132,000
21,200
11,900
26,000
22,500
26,200
30,400
31,900
31,800
31,900
42,775
70
80
298,584
495,088
224,576
368,184
123,772
81,900
13,500
3,850
4,300
5,000
16,008
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
30-Jan-08
1-Jan-06
1-Jan-06
1-Jan-06
1-Jan-06
16-Mar-07
1-Jan-06
16-Mar-07
16-Mar-07
22-Mar-07
22-Mar-07
16-Mar-07
16-Mar-07
16-Mar-07
16-Mar-07
16-Mar-07
16-Mar-07
16-Mar-07
16-Mar-07
16-Mar-07
16-Mar-07
28-Aug-07
INSUMOS
AMBIENTALES
ml
ml
UN
UN
UN
UN
m2
un
un
17,864
19,952
1,100
1,400
1,700
1,800
13,125
2,360
75,400
un
54,100
28-Aug-07
28-Aug-07
29-Jun-07
29-Jun-07
29-Jun-07
21-Mar-07
21-Mar-07
21-Mar-07
28-Aug-07
16-Mar-07
un
139,200
28-Aug-07
un
un
un
un
un
ml
ml
ml
69,600
42,400
65,700
86,500
111,000
15,544
15,312
16,008
28-Aug-07
1-Jan-06
1-Jan-06
1-Jan-06
1-Jan-06
26-Aug-07
26-Aug-07
26-Aug-07
m
m
m
m
m
m
Un
Un
Un
kg
m
m
m
m
m
m
un
un
un
un
un
un
un
un
un
un
un
un
un
g/4
un
un
un
un
m
m2
m
m3
9,665
15,626
20,462
11,295
18,460
26,500
40,600
60,320
85,840
4,400
22,275
48,350
81,948
126,811
178,365
317,348
10,359
25,105
34,523
92,742
150,445
277,032
306,933
61,952
71,803
164,070
124,405
138,753
167,570
57,608
5,044
6,671
11,505
1,522
26,680
11,832
280
60,000
21-Mar-07
21-Mar-07
21-Mar-07
21-Mar-07
21-Mar-07
21-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
11-Feb-08
11-Feb-08
11-Feb-08
11-Feb-08
11-Feb-08
11-Feb-08
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
30-Jan-08
30-Jan-08
30-Jan-08
12-Mar-07
INSUMOS
AMBIENTALES
ADITIVOS
REJILLAS
DEFENSA VIAL
ARBOLES
Grama macana
m2
stockosorb
triple 15x15x15
borax
Cicatrizante Hormonal M
gr
gr
gr
gr
42
12-Mar-07
5
50
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
7,400
2-Jan-06
21,489
762
31-Jan-08
31-Jan-08
20
31-Jan-08
50,068
31-Jan-08
43,948
31-Jan-08
2,517
31-Jan-08
5,598
31-Jan-08
19,807
31-Jan-08
20
31-Jan-08
6,479
31-Jan-08
5,410
31-Jan-08
kg
11,099
31-Jan-08
kg
kg
kg
kg
10,385
1,400
6,900
16,000
31-Jan-08
6-Jan-06
6-Jan-06
6-Jan-06
26,667
6-Jan-06
29,400
6-Jan-06
m
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
15,267
10,600
14,850
23,300
36,000
120,640
148,480
220,772
258,200
114,840
47,700
80,000
85,000
110,000
90,000
100,000
255,000
255,000
255,000
255,000
138,450
6-Jan-06
1-Jan-06
2-Jan-06
3-Jan-06
4-Jan-06
22-Jun-07
22-Jun-07
31-Jan-08
31-Jan-08
31-Jan-08
31-Jan-08
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
12-Mar-07
9/11/2007
9/11/2007
9/11/2007
9/11/2007
9/11/2007
4,176
1.6
ENSAYOS
un
6,496
2/25/2008
FECHA
SALARIO MINIMO
FACTOR PRESTACIONAL
AUXILIO TRANSPORTE
SALARIO+PRESTACIONES
SALARIO+PRESTACIONES+
AUXILIO TRANSPORTE
DIA AYUD.(INCL. PRESTACION)
DIA OFICIAL(INCL.PRESTACION)
DIAS LABORADOS
gasolina $ 33060 saeco
AYUD.
461,500
90%
55,000
877,826
OFICIAL
876,850
90%
55,000
1,667,870
932,826
1,722,870
35,878
66,264
26
ARGOS
20-Feb-08
20-Feb-08
20-Feb-08
20-Feb-08
20-Feb-08
253924
263900
280024
306240
328280
329440
304500
288028
273528
256012
248936
Promedio
258249.06
267692.62
282097.5
300917.34
319876.96
1,873.28
2,232.79
2,857.22
3,330.27
2,176.03
2,668.00
3,557.33
4,503.43
25-Feb-08 Diaco
25-Feb-08
25-Feb-08
25-Feb-08
25-Feb-08
25-Feb-08
25-Feb-08
25-Feb-08
349,698.24
420,523.20
25-Feb-08
25-Feb-08
343,058.40
190,588.00
25-Feb-08 Al 3% Conasfaltos
25-Feb-08 Al 3% Conasfaltos AreaMetropolitana
Mar-07
Mar-07
No incluye transporte
COD.
ANAL.
011010
011012
011014
RECURSO
UND
CANT UNIT
und
dia
m3
2.000
0.200
RETIRO DE PUERTAS
0 1 Ayudante
0 Volqueta - botada de material paleros
und
dia
m3
2.000
0.100
RETIRO DE VENTANAS
0 1 Ayudante
Volqueta - botada de material paleros
und
dia
m3
3.000
0.100
ml
dia
m3
15.000
0.050
0
0
0
0
0
RETIRO CUB.TEJA-BARRO(+botada)
1 Oficial
1 Ayudante
Volqueta - botada de material paleros
Andamio completo
Can
m2
da
da
M
da
da
15.000
15.000
0.200
1.000
1.000
0
0
0
0
0
m2
dia
dia
m
da
da
011034
011036
011053
011057
011058
SUBTOTAL
23,436
17,939
4,600
0
0
35,878
23,000
21,251
17,939
2,300
35,878
23,000
14,972
11,959
2,300
35,878
23,000
3,661
2,392
1,150
0
0
0
0
0
66,264
35,878
23,000
800
250
12,800
4,418
2,392
4,600
800
250
20.000
20.000
0.100
1.000
1.000
0
0
0
0
0
66,264
35,878
23,000
800
250
8,712
3,313
1,794
2,300
800
250
un
dia
m3
m3
3.000
0.045
0.045
10
30
35,878
243,542
23,000
25,958
11,959
12,055
1,346
ml
dia
m3
3.500
0.300
30
66,264
23,000
28,849
18,933
8,970
m2
dia
m3
5.000
0.150
0
30
35,878
23,000
12,019
7,176
4,485
m2
dia
m3
5.000
0.250
0
30
35,878
23,000
15,009
7,176
7,475
m2
dia
m3
5.000
0.150
0
30
35,878
23,000
12,019
7,176
4,485
60
37
%MO
%HTA
m2
dia
m3
5.000
0.250
0
30
35,878
23,000
15,009
7,176
7,475
48
50
%MO
%HTA
m2
dia
m3
4.000
0.300
30
35,878
23,000
18,388
8,969
8,970
0
0
0
35,878
23,000
69,800
43,962
11,959
10,465
20,940
PRECIO
35,878
23,000
011018
011032
%
DESP
011016
011030
%
HTA
10
m2
m3
0.110
5
30
23,000
10,269
3,289
10.000
69,800
6,980
und
dia
m3
15.000
0.100
0
0
66,264
23,000
7,053
4,418
2,300
m2
dia
m
20.000
0.030
35,878
23,000
2,781
1,794
897
m2
dia
m3
8.000
0.040
35,878
23,000
5,905
4,485
1,196
m2
30
9,269
volqueta
1 Ayudante
m3
dia
0.130
6.000
23,000
35,878
2,990
5,980
m2
dia
m3
6.000
0.330
0
0
35,878
23,000
13,869
5,980
7,590
43
55
%MO
%HTA
ml
dia
m3
8.000
0.075
0
30
35,878
23,000
6,951
4,485
2,243
65
32
%MO
%HTA
m2
dia
m3
h
10.000
0.200
10.000
0
30
0
35,878
23,000
86,400
18,387
3,588
5,980
8,640
m2
m3
h
dia
0.200
15.000
15.000
30
0
0
23,000
86,400
35,878
14,132
5,980
5,760
2,392
DEMOLICION DE CONCRETO
0 1 Ayudante
0 Volqueta - botada de material paleros
Compresor con manguera de 40 m, martillo, punta,
0 combustible (combustible y operador)
0
m3
dia
m3
3.000
1.300
0
0
35,878
23,000
112,257
11,959
29,900
1.000
69,800
69,800
DEMOLICION DE ANILLO-TAPA DE MH
1 Ayudante
volqueta
Compresor con manguera de 40 m, martillo, punta,
combustible (combustible y operador)
un
dia
m3
30.000
0.400
30
35,878
23,000
36,423
1,196
11,960
hr
3.000
69,800
23,267
un
dia
m3
1.000
0.500
30
35,878
23,000
52,622
35,878
14,950
0
0
35,878
23,000
1,202
718
449
DESMONTE Y LIMPIEZA
0 1 Ayudante
0 Volqueta - botada de material paleros
014022
m2
hor
m3
50.0
0.015
m3
dia
kg
m3
pul
3.000
7.000
1.300
105.000
EXCAVACION EN ROCA
0 1 ofic. y 1 ayud.
0 Volqueta - botada de material paleros
Dinamita
m3
dia
m3
pul
4.000
1.300
30.000
m3
m
h
1.100
30.000
m3
dia
m
4.000
1.300
DESCAPOTE A MQUINA
0 Volqueta - botada de material paleros
0 Retroexcavadora ford 755(con operador) 4X4
m3
m
h
1.300
20.000
DESCAPOTE MANUAL
Volqueta - botada de material paleros
1 Ayudante
m3
m3
dia
1.300
3.500
LOCALIZACION Y REPLANTEO
Transito Kern dKm-1
Nivel de presicin gKo-a,gK-1, AL3
Topografo
cadenero 1
cadenero 2
dia
dia
dia
dia
dia
dia
1.000
1.000
1.000
1.000
1.000
m3
h
h
h
0.400
0.100
0.040
ml
dia
dia
m
un
10.000
0.100
0.350
0.800
014012
102,142
19,807
23,000
550
5
102,142
23,000
1,200
94,512
25,536
29,900
36,000
0
0
23,000
85,000
28,133
25,300
2,833
0
0
35,878
23,000
39,318
8,969
29,900
0
0
23,000
80,000
33,900
29,900
4,000
23,000
35,878
40,151
29,900
10,251
35,000
25,000
57,225
35,878
35,878
201,879
35,000
25,000
57,225
35,878
35,878
4,485
85,000
90,000
13,984
1,794
8,500
3,600
421
36,500
217,083
4,200
185,634
4,210
3,650
83,577
3,360
5
0
0
0
10
%HTA
%MO
11
89
%MO
%HTA
0
0
0
83
17
27
32
%MO
%HTA
30 %HTA
64 %MO
m
dia
dia
dia
1.450
3.000
8.000
8.000
23,000
102,142
66,264
107,634
33,350
34,047
8,283
13,454
ml
dia
dia
m
u
m
dia
dia
dia
10.000
0.100
0.350
0.800
1.450
3.000
7.000
7.000
421
36,500
217,083
4,200
23,000
102,142
66,264
107,634
188,739
4,210
3,650
83,577
3,360
33,350
34,047
9,466
15,376
ml
dia
dia
m
u
m
dia
dia
dia
10.000
0.150
0.350
0.800
1.450
2.500
6.000
6.000
421
36,500
217,083
4,200
23,000
102,142
66,264
107,634
201,855
4,210 pila diamtero exterior 1.2 m,
5,475 incluyendo un anillo de 10 cm
83,577 en concreto 21 Mpa
3,360
33,350
40,857
11,044
17,939
ml
dia
dia
m
un
m
dia
dia
dia
10.000
4.000
0.350
1.000
1.450
2.500
5.000
5.000
421
36,500
217,083
4,200
23,000
102,142
66,264
107,634
212,141
4,210
9,125
83,577
4,200
33,350
40,857
13,253
21,527
ml
dia
dia
m3
un
m3
dia
dia
dia
10.000
3.000
0.350
1.000
1.450
2.000
4.000
4.000
421
36,500
217,083
4,200
23,000
102,142
66,264
107,634
236,777
4,210
12,167
83,577
4,200
33,350
51,071
16,566
26,908
m3
dia
m3/km
m3
60.000
18.000
1.000
102,142
950
2,500
21,387
1,702
17,100
2,500
EXCAVACIN-DRAGADO
Retroexcavadora ford 755(con operador) 4X4
1 ofic. y 1 ayud.
m3
h
dia
15.000
50.000
75,000
102,142
7,145
5,000
2,043
m3
h
20.000
80,000
4,000
4,000
EXCAVACIN MECNICA
0 Retroexcavadora ford 755(con operador) 4X4
0 Volqueta - botada de material paleros
m3
h
M
20.000
1.200
0
0
80,000
23,000
31,600
4,000
27,600
m3
dia
3.000
35,878
12,557
11,959
m3
dia
2.500
35,878
15,069
14,351
m3
dia
2.000
35,878
18,836
17,939
m3
dia
1.500
35,878
25,115
23,919
EXCAVACION DE TALUDES
0 1 Ayudante
0 Volqueta - botada de material paleros
m3
dia
m3
3.000
1.300
0
0
35,878
23,000
42,457
11,959
29,900
pul
pul
1.0
1,200
1,260
1,200
0
0
0
0
0
014030
014032
014034
014036
014038
014044
014052
10
10
10
10
45
23
%CO
%MO
24
44
23
%HTA
%CO
%MO
8
92
%MO
%HTA
70
29
%HTA
%MO
m3
dia
hr
dia
20.0
20.0
7.0
m3
h
h
20.000
20.000
m3
m3
dia
1.000
2.000
m3
dia
LLENO EN PIEDRA
Piedra entresuelo
1 Ayudante
LLENO EN TRITURADO
Triturado de 3/4 pulg
1 Ayudante
35,878
75,000
35,878
10,759
1,794
3,750
5,125
0
0
85,000
75,000
8,000
4,250
3,750
5
0
217,083
102,142
281,562
227,938
51,071
6.000
35,878
6,279
5,980
m3
m3
dia
1.000
6.000
20
40,930
35,878
55,395
49,116
5,980
m3
m3
dia
1.000
6.000
10
46,034
35,878
m3
m3
hr
hr
1.000
25.000
25.000
30
0
m3
dia
dia
1.000
6.000
20.000
m3
m3
m3-km
hr
hr
1.000
15.000
20.000
20.000
m3
dia
h
5.000
20.000
m3
m3
m3-km
sac
hr
dia
1.000
15.000
2.000
20.000
15.000
un
m3
m3-km
kg
un
dia
0.060
0.900
10.000
1.000
30.000
m2
lb
dia
un
dia
0.150
5.000
1.300
10.000
021005
SOLADOS (e=5cm)
0 Concr.en obra 2000 psi 3/4"
0 1 ofic. y 1 ayud.
m2
m3
dia
0.050
25.000
m2
m3
m3
lb
und
dia
und
0.100
0.100
0.200
1.000
0.160
0.200
CONCRETO CICLOPEO-CIMENTACION
0 Piedra entresuelo
0 Concr.en obra 3000 psi 3/4"
0 1 ofic. y 1 ayud.
m3
m3
m3
dia
0.400
0.600
1.500
m3
m3
dia
dia
1.000
1.500
10.000
015050
015052
015058
015060
016012
021010
0
0
0
0
0
0
021012
021060
64
35
%MO
%HTA
81
18
%CO
%MO
56,617
50,637
5,980
89
11
%AM
%MO
18,368
75,000
90,000
30,658
23,878
3,000
3,600
78
10
12
%AM
%HTA
%MO
30
18,368
35,878
39,000
32,107
23,878
5,980
1,950
30
30
1,180
950
75,000
90,000
28,534
1,534
18,525
3,750
4,500
35,878
75,000
11,284
7,176
3,750
30
30
5
1,180
950
17,500
75,000
102,142
67,709
1,534
18,525
36,750
3,750
6,809
30
30
5
1,180
950
350
1,000
102,142
9,454
92
1,112
3,675
1,000
3,405
10
1,600
800
4,200
102,142
20,449
264
4,000
5,460
10,214
5
0
202,167
102,142
14,904
10,614
4,086
71
27
%CO
%MO
0
0
0
40,930
243,542
1,600
250
102,142
13,200
48,817
4,093
24,354
320
250
16,343
2,640
20
5
40,930
243,542
102,142
244,577
19,646
153,431
68,095
28
8
63
%MO
%AM
%CO
5
0
0
243,542
102,142
36,500
335,068
255,719
68,095
3,650
76
20
2
%CO
%MO
%HTA
021062
021063
021064
021065
021090
021090
021091
029010
un
ml
m3
un
dia
dia
1.000
0.030
0.300
14.000
20.000
ml
m3
m
dia
dia
4,200
4,200
5
0
0
0
243,542
4,200
102,142
36,500
18,417
7,672
1,260
7,296
1,825
0.040
0.400
14.000
20.000
5
0
0
0
243,542
4,200
102,142
36,500
21,394
10,229
1,680
7,296
1,825
m3
un
dia
dia
0.120
0.500
8.000
20.000
243,542
4,200
102,142
36,500
48,017
30,686
2,100
12,768
1,825
ml
m3
m
dia
dia
0.030
0.300
10.000
20.000
10
0
0
0
243,542
4,200
102,142
36,500
21,847
8,037
1,260
10,214
1,825
ml
m3
m
dia
dia
0.040
0.320
10.000
20.000
10
0
0
0
243,542
4,200
102,142
36,500
24,610
10,716
1,344
10,214
1,825
ZAPATAS
0 Concr.en obra 3000 psi 3/4"
0 1 ofic. y 1 ayud.
0 Vibrador electrico o gasolina
m3
m3
dia
dia
1.000
1.200
6.000
5
0
0
243,542
102,142
36,500
351,176
255,719
85,118
6,083
PEDESTAL
0 Concr.en obra 3000 psi 3/4"
Tabla Comun 0.25 X 2.5 m - 0.2 X 3 m
0 1 ofic. y 1 ayud.
Vibrador electrico o gasolina
m3
m3
un
dia
dia
1.000
4.000
1.100
10.000
5
0
0
243,542
4,200
102,142
36,500
m3
m3
dia
un
dia
1.000
6.000
0.500
3.000
5
0
0
0
m3
m3
dia
un
m3
dia
1.000
7.000
1.000
1.300
0.800
m3
m3
dia
un
m3
dia
CONCRETO INYECTADO
Concr.en obra 2500 psi 3/4"
bomba elctrica/gasolina
1 ofic. y 1 ayud.
48
34
%CO
%MO
73
24
%CO
%MO
373,668
255,719
16,800
92,857
3,650
68
5
25
%CO
%HTA
%MO
243,542
36,500
4,200
102,142
303,057
255,719
6,083
2,100
34,047
84
11
3
%CO
%MO
%HTA
10
243,542
36,500
4,200
23,000
102,142
447,656
267,896
5,214
4,200
29,900
127,678
1.000
7.000
2.000
1.300
0.700
10
243,542
36,500
4,200
23,000
102,142
471,919
267,896
5,214
8,400
29,900
145,917
m3
m3
m3
dia
1.000
1.000
3.000
217,083
26,500
102,142
290,187
227,938
26,500
34,047
un
m3
un
dia
0.028
0.250
5.000
243,542
4,200
102,142
29,660
7,160
1,050
20,428
un
m3
und
da
und
m3
dia
und
0.050
25.000
4.000
25.000
0.030
12.000
0.300
5
5
0
0
5
102,142
1,100
102,142
205
217,083
102,142
4,200
82,190
5,362
28,875
25,536
5,125
6,838
8,512
1,260
und
m3
m3
und
dia
0.060
0.030
10.000
3.000
10
10
217,083
239,956
1,400
102,142
71,996
14,328
7,919
14,000
34,047
57
31
9
%CO
%MO
%HTA
029015
029020
029030
041010
041012
5
5
0
0
0
217,083
1,600
4,200
102,142
65,700
5
0
0
0
0
217,083
4,200
102,142
111,000
86,500
220,529
231,926
79,778
168
3,780
78,571
65,700
358,200
291,368
113,969
8,400
78,571
111,000
86,500
5
5
0
0
0
217,083
1,600
4,200
102,142
42,400
167,574
153,898 40X40X40 medidas internas L=40 - 0.152m3
36,470 40X40X70 medidas internas L=70 - 0.22m3
168
3,360
68,095
42,400
10
5
0
5
5
206,615
1,100
102,142
180
202,167
102,142
18,794
1,364
5,775
4,086
945
2,335
4,086
0.009
5.000
25.000
5.000
0.020
25.000
10
5
0
5
5
206,615
1,400
102,142
205
202,167
102,142
23,093
2,045
7,350
4,086
1,076
4,246
4,086
0.012
5.000
20.000
5.000
0.026
20.000
10
5
0
5
5
206,615
1,700
102,142
245
202,167
102,142
28,927
2,727
8,925
5,107
1,286
5,519
5,107
185,153
550
102,142
102,142
20,300
800
23,158
21,371 ranurado 9.4m2/dia
3,259 revitado 10m2/dia
7,563
8,512
10,214
812
800
185,153
550
102,142
102,142
20,300
800
37,849
36,062 ranurado 8 m2/dia
10,387 revitado 9 m2/dia
15,125
8,512
10,214
812
800
185,153
830
102,142
102,142
20,300
800
29,452
27,665
5,703 ranurado 8 m2/dia
11,413 revitado 9 m2/dia
8,512
10,214
812
800
und
m3
lb
m
dia
und
0.300
0.350
0.100
0.900
1.300
1.000
und
m3
und
dia
und
und
0.720
0.500
2.000
1.300
1.000
1.000
und
m3
lb
und
dia
und
0.220
0.160
0.100
0.800
1.500
1.000
ml
m3
und
dia
und
m
dia
0.006
5.000
25.000
5.000
0.011
25.000
ml
m3
und
dia
und
m
dia
ml
m3
und
dia
und
m
dia
m2
m2
m3
und
dia
dia
da
da
m2
m2
m3
und
da
dia
da
da
m2
m2
m3
und
da
dia
da
da
0.028
12.500
12.000
10.000
25.000
1.000
10
10
0
0
0
0
0
0
0
0
m2
m3
und
da
da
da
0.053
35.000
4.500
25.000
1.000
10
10
0
0
0
185,153
580
102,142
20,300
800
58,570
10,794
22,330
22,698
812
800
0
0
0
0
0
m2
m3
und
da
da
da
0.053
35.000
4.500
25.000
1.000
10
10
0
0
0
185,153
680
102,142
20,300
800
62,420
10,794
26,180
22,698
812
800
042010
0
0
0
0
042012
0
0
0
0
042014
0
0
0
5
0.016
12.500
12.000
10.000
25.000
1.000
10
10
0
0
0
0
5
0.051
25.000
12.000
10.000
25.000
1.000
10
10
0
0
0
0
5
0
0
0
042016
0
0
0
0
0
m2
m3
und
da
da
da
0.037
16.70
9.000
25.000
1.000
0
0
0
0
0
MUROS 12 LADR.BOCADILLO
Mort.1:5 En obra
Bocadillo 6*12*24
1 ofic. y 1 ayud.
Cotadora de Ladrillo electrica
Andamio completo
m2
m3
und
da
da
da
0.060
69.500
8.000
25.000
1.000
m2
m3
und
da
da
da
0.016
12.500
12.000
25.000
1.000
042043
m2
m3
und
da
da
da
0.051
25.000
12.000
25.000
1.000
042044
042020
042040
043010
043012
10
10
0
0
0
0
185,153
830
102,142
20,300
800
36,311
7,536
15,247
11,349
812
800
5
5
0
0
0
185,153
450
102,142
20,300
800
59,522
11,665
32,839
12,768
812
800
10
10
0
0
0
185,153
550
102,142
20,300
800
21,371
3,259
7,563
8,512
812
800
10
10
0
0
0
0
185,153
550
102,142
20,300
800
36,062
10,387
15,125
8,512
812
800
10
10
0
0
0
0
185,153
830
102,142
20,300
800
27,868
5,906
11,413
8,512
812
800
10
10
0
0
0
0
185,153
830
102,142
20,300
800
27,868
5,906
11,413
8,512
812
800
10
10
0
0
0
185,153
550
102,142
20,300
800
36,062
10,387
15,125
8,512
812
800
10
5
0
0
5
185,153
1,100
102,142
800
180
31,584
3,259
14,438
10,214
800
2,363
10
5
0
0
185,153
1,700
102,142
245
42,587
5,295
22,313
11,349
3,063
5
5
102,142
185,153
13,125
26,423
6,809
5,832
13,781
10
5
185,153
2,360
102,142
245
52,064
6,110
30,975
11,349
3,063
0
0
0
0
0
m2
m3
und
da
da
da
0.029
12.500
12.000
25.000
1.000
0
0
0
0
0
m2
m3
und
da
da
da
0.029
12.500
12.000
25.000
1.000
m2
m3
und
da
da
da
0.051
25.000
12.000
25.000
1.000
m2
m3
und
da
da
und
0.016
12.500
10.000
1.000
12.500
m2
m3
und
da
und
0.026
12.500
9.000
12.500
m2
dia
m3
m2
15.000
0.030
1.000
m2
m3
un
dia
un
0.030
12.500
9.000
12.500
m2
m3
und
m
da
und
0.030
12.500
0.071
8.000
12.500
10
5
10
0
5
185,153
1,700
202,167
102,142
245
60,834
6,110
22,313
15,789
12,768
3,216
ml
m3
un
m3
dia
un
dia
0.026
12.500
0.036
5.000
12.500
10.000
5
5
5
185,153
1,400
170,408
102,142
180
102,142
75,276
5,055
18,375
6,441
20,428
2,250
10,214
042047
042048
24
29
5
42
%MO
%CO
%HTA
%MM
12
34
52
%CO
%MO
%PR-%MM
36
21
42
%CO
%MO
%PR-%MM
27
27
41
2
%CO
%PR-%MM
%MO
%HTA
e=10 cm - 8 m2/dia
e=15 cm - 7.3 m2/dia
e=20 cm - 6.7 m2/dia
217,083
4,200
36,500
9,118
1,680
183
10
10
0
10
185,153
1,400
102,142
205
40,299
6,314
19,250
11,349
2,819
14.000
0.090
0.300
10.000
10.000
10.000
10
10
10
1,800
46,034
46,034
66,264
71,756
71,756
69,495
27,720
4,557
15,191
6,626
7,176
7,176
m3
m3
dia
dia
dia
1.000
1.600
7.000
32.000
243,542
102,142
36,500
1,400
477,332
255,719
163,427
5,214
44,800
MURO EN GAVION
Gavin 1x1x1
0 Piedra entresuelo
Alambre galvanizado para gavion
0 Telera de 0.90x1.35m
0 1 ofic. y 1 ayud.
m3
un
m
kg
un
dia
1.000
1.000
2.000
6.000
2.000
40,600
40,930
4,400
421
102,142
159,200
40,600
53,209
9,240
2,526
51,071
DINTELES LADR.HUECO DE 10
0 Concr.en obra 2500 psi 3/4"
0 Mort.1:3 En obra
ladrillo 10x20x40 ray.
0 1 ofic. y 1 ayud.
ml
m3
m3
und
dia
0.009
0.010
2.500
0.070
5
5
5
0
217,083
239,956
550
102,142
13,453
2,051
2,520
1,375
7,150
DINTELES LADR.HUECO DE 20
Concr.en obra 2500 psi 3/4"
Mort.1:3 En obra
ladrillo 15x20x40 ray.
1 ofic. y 1 ayud.
ml
m3
m3
und
dia
0.009
0.020
2.500
0.077
5
5
5
0
217,083
239,956
830
102,142
17,527
2,051
5,039
2,179
7,865
DINTELES CONCRETO 10 x 20
0 Concr.en obra 3000 psi 3/4"
FORMALETA
Tabla Comun 0.25 X 2.5 m - 0.2 X 3 m
0 1 ofic. y 1 ayud.
0 Andamio completo
ml
m3
m
da
da
0.020
1.000
8.000
1.000
10
0
0
0
243,542
4,200
102,142
800
23,764
5,358
4,200
12,768
800
044017
CONCRETO DINTELES 15 x 20
0 Concr.en obra 3000 psi 3/4"
FORMALETA
Tabla Comun 0.25 X 2.5 m - 0.2 X 3 m
0 1 ofic. y 1 ayud.
0 Andamio completo
ml
m3
m
da
da
0.030
1.000
8.000
1.000
10
0
0
0
243,542
4,200
102,142
800
26,443
8,037
4,200
12,768
800
045010
ml
m3
und
dia
0.003
1.000
20.000
170,408
3,850
102,142
9,749
537
3,850
5,107
ml
m3
dia
un
0.015
8.000
2.000
10
243,542
102,142
4,200
19,525
4,018
12,768
2,100
ml
m3
und
dia
0.004
1.200
13.500
170,408
4,300
102,142
13,820
716
5,160
7,566
ml
m3
und
dia
170,408
5,000
102,142
15,018
1,074
6,000
7,566
043014
044010
m3
un
dia
0.040
0.400
200.000
m2
m3
und
da
und
0.031
12.500
9.000
12.500
m2
un
m3
m3
dia
dia
dia
044012
0
0
0
0
044015
#REF!
045012
#REF!
045014
045050
045052
#REF!
30
5
0
5
0.006
1.200
13.500
ml
m3
m
dia
5
0.003
1.000
13.500
5
0
0
170,408
16,008
102,142
24,489
537
16,008
7,566
ml
m3
un
dia
0.030
0.500
8.000
10
243,542
4,200
102,142
23,543
8,037
2,100
12,768
ml
m3
m
dia
0.004
1.000
13.500
5
0
0
170,408
17,864
102,142
26,524
716
17,864
7,566
33612
41191
33
31
2
32
%AM
%HI
%HTA
%MO
045054
ml
m3
m
dia
5
0.005
1.000
13.500
048010
048012
048016
5
0
0
170,408
19,952
102,142
28,791
895
19,952
7,566
5
5
0
239,956
5,410
102,142
14,525
4,535
2,840
6,809
ml
m3
0.020
5
5
239,956
15,029
5,039
kg
dia
0.500
15.000
5
0
5,410
102,142
2,840
6,809
m2
lb
kg
dia
0.040
2.000
20.000
1,600
5,250
66,264
14,043
64
10,500
3,313
m2
kg
0.700
3,600
2,520
048018
049020
m2
kg
kg
dia
1.000
0.250
16.000
ANTEPECHOS PREFABRICADOS
0 Concr.en obra 3000 psi 3/4"
0 1 Oficial
0 1 Ayudante
m2
m3
h
h
0.050
2.000
2.000
0
0
0
0
m2
m3
dia
da
da
0.020
15.000
0.500
0.500
0
0
0
0
m2
m3
dia
da
da
0.025
14.500
0.500
0.500
0
0
0
0
m2
m3
da
da
da
0.020
14.500
0.500
0.500
051010
051012
051014
051018
051060
053010
053012
061010
ACERO
061012
5
11,099
10,385
66,264
5
0
0
243,542
8,283
4,485
39,598
12,786
16,566
8,969
10
0
0
0
206,615
102,142
800
250
12,220
4,546
6,809
400
125
10
0
0
0
152,795
102,142
800
250
11,998
4,202
7,044
400
125
15
0
0
0
206,615
102,142
800
250
12,674
4,752
7,044
400
125
10
10
0
0
0
206,615
5,410
102,142
800
250
66,264
3,479
3,313
5
5
0
16,800
1,050
102,142
33,802
17,640
2,756
12,768
5
5
0
19,100
1,050
102,142
36,217
20,055
2,756
12,768
15
5
0
1,997
2,982
102,142
70
15
2,322
RANURAS Y FILETES
0 1 Oficial
ml
dia
5
20.000
m2
m2
Kg
dia
1.000
2.500
8.000
m2
m2
Kg
dia
1.000
2.500
8.000
m2
m
Kg
dia
kg
1.000
0.020
200.000
0.710
m2
m
1.000
5
5
0
37
56
5
%CO
%MO
%HTA
ACERO
Alambre negro
0 1 ofic. y 1 ayud.
Transporte de malla
Kg
dia
kg
0.020
200.000
0.820
061014
m2
m
Kg
dia
kg
1.000
0.020
200.000
1.050
m2
m
Kg
dia
kg
1.000
0.020
200.000
1.230
061018
m2
m
Kg
dia
kg
1.000
0.020
200.000
0.810
061020
m2
m
Kg
dia
kg
1.000
0.020
200.000
0.990
m2
m
Kg
dia
kg
1.000
0.020
200.000
1.320
061024
m2
m
Kg
dia
kg
1.000
0.020
200.000
1.670
kg
kg
kg
dia
kg
1.000
0.030
180.000
1.000
ACERO
061016
ACERO
061022
ACERO
061036
5
0
2,982
102,142
70
63
511
57
15
5
0
2,958
2,982
102,142
70
4,074
3,402
63
511
74
15
5
0
3,448
2,982
102,142
70
4,650
3,965
63
511
86
15
5
0
2,253
2,982
102,142
70
15
5
0
2,763
2,982
102,142
70
3,846
3,177
63
511
69
15
5
0
3,670
2,982
102,142
70
4,912
4,221
63
511
92
15
5
0
4,663
2,982
102,142
70
6,078
5,362
63
511
117
5
0
0
2,280
2,982
102,142
70
3,149
2,394
89
567
70
81
18
%HI
%MO
80
%PVCS
14
%MO
23,647
36,442
ml
ml
1.000
10
15,267
16,793
ml
kg
dia
1.000
0.500
20.000
10
26,667
2,982
102,142
29,333
1,491
5,107
m3
m3
m3
un
dia
0.300
0.700
3.000
1.100
30
5
0
0
40,930
217,083
4,200
102,142
285,618
15,963
159,556
12,600
92,857
56
6
33
063010
m2
m3
un
dia
dia
0.100
0.500
10.000
20.000
5
0
243,542
4,200
102,142
36,500
40,222
25,572
2,100
10,214
1,825
64
25
10
063012
m2
m3
un
dia
dia
0.120
0.500
9.000
20.000
243,542
4,200
102,142
36,500
46,528
30,686
2,100
11,349
1,825
063014
m2
m3
m
dia
dia
0.150
0.500
8.000
20.000
243,542
4,200
102,142
36,500
55,689
38,358
2,100
12,768
1,825
063016
m2
m3
dia
0.050
12.000
217,083
102,142
20,334
11,397
8,512
m2
m3
m3
lb
und
m
m2
0.160
0.170
0.200
0.690
1.300
0.750
5
0
243,542
19,200
1,600
1,400
7,000
6,800
96,867
40,915
3,264
320
966
9,100
5,100
062020
063050
0
5
5
0
0
5
5
0
0
5
0
0
0
%CO
%AM
%MO
%CO
%MO
%HTA
0 1 ofic. y 1 ayud.
0 Can
0 Telera de 0.90x1.35m
Vigas metalicas de 3m
Malacate 3000 LB
0 Vibrador electrico o gasolina
da
da
da
da
da
da
3.500
3.000
6.870
2.400
0.075
60.000
m2
m3
m3
lb
und
m
und
m2
da
da
da
da
da
da
da
0.170
0.170
0.200
0.690
1.280
2.250
0.750
3.500
2.730
0.650
6.870
2.180
2.240
60.000
063052
m2
m3
m3
m2
dia
da
da
da
da
dia
0.170
0.170
0.750
3.500
2.900
7.200
2.800
2.500
60.000
063056
m2
m3
und
da
da
da
da
da
da
0.100
10.000
3.500
2.900
7.200
2.800
2.500
60.000
063060
LOSA MACIZAS(e=10cm-elevada)
Concr.en obra 3000 psi 3/4"
1 ofic. y 1 ayud.
Can
Telera de 0.90x1.35m
Vigas metalicas de 3m
Taco metal.largos 2.10-3.5
Malacate 3000 LB
0 Vibrador electrico o gasolina
m2
m3
da
da
da
da
da
da
da
0.100
5.000
2.900
14.000
2.800
2.500
0.025
50.000
LOSAS MACIZAS(e=15cm-elevada)
0 Concr.en obra 3000 psi 3/4"
1 ofic. y 1 ayud.
Can
0 Telera de 0.90x1.35m
Vigas metalicas de 3m
Taco metal.largos 2.10-3.5
Malacate 3000 LB
0 Vibrador electrico o gasolina
m2
m3
da
da
da
da
da
da
da
0.150
4.400
2.900
7.200
2.800
2.500
0.025
50.000
CONCR.COLUMNAS(12m2/m3-35*35)
0 Concr.en obra 3000 psi 3/4"
1 ofic. y 1 ayud.
0 Andamio completo
Chapeta tensora 3/8 cua
Tapa colum.2.4x(.30-.40) metal
Tensor
Cua en T form.columna
Malacate 3000 LB
0 Vibrador electrico o gasolina
m3
m3
da
da
da
da
da
da
da
dia
1.000
0.600
1.200
5.000
1.500
5.000
6.500
0.250
0.500
CONCR.COLUMNAS(10m2/m3-30*50)
0 Concr.en obra 3000 psi 3/4"
1 ofic. y 1 ayud.
0 Andamio completo
0 Chapeta tensora 3/8 cua
Tapa colum.2.4x0.5 metal.
Tensor
Cua en T form.columna
Taco metal.largos 2.10-3.5
0 Vibrador electrico o gasolina
m3
m3
da
da
da
da
da
da
da
da
1.000
0.600
1.300
5.000
1.630
5.000
6.500
6.500
0.500
CONCR.COLUMNAS( 8m2/m3-50*50)
0 Concr.en obra 3000 psi 3/4"
0 1 ofic. y 1 ayud.
0 Andamio completo
m3
m3
da
da
1.000
0.800
1.200
063051
0
0
0
0
063062
064010
064012
064014
0
0
0
0
0
0
102,142
250
421
74
28,420
36,500
29,183
750
2,892
178
2,132
608
5
0
0
0
0
0
0
0
0
0
0
0
0
243,542
19,700
1,600
1,560
7,000
4,200
6,800
102,142
250
65
421
74
101
36,500
106,983
43,472
3,349
320
1,076
8,960
9,450
5,100
29,183
683
42
2,892
161
226
608
5
0
0
0
0
0
0
0
0
243,542
19,700
6,800
102,142
250
421
74
101
36,500
84,039
43,472
3,349
5,100
29,183
725
3,031
207
253
608
5
5
0
0
0
0
0
0
243,542
550
102,142
250
421
74
101
36,500
66,814
25,572
5,775
29,183
725
3,031
207
253
608
5
0
0
0
0
0
0
0
243,542
102,142
250
421
74
101
28,420
36,500
55,541
25,572
20,428
725
5,894
207
253
711
730
5
0
0
0
0
0
0
0
243,542
102,142
250
421
74
101
28,420
36,500
68,389
38,358
23,214
725
3,031
207
253
711
730
5
0
0
0
0
0
0
0
0
243,542
102,142
800
46
1,007
46
11
28,420
36,500
462,825
255,719
170,237
960
230
1,511
230
72
7,105
18,250
5
0
0
0
0
0
0
0
0
243,542
102,142
800
46
1,085
46
11
101
36,500
456,714
255,719
170,237
1,040
230
1,769
230
72
657
18,250
5
0
0
243,542
102,142
800
412,435
255,719
127,678
960
38
9
7
44
%CO
%MM
%HTA
%MO
55
37
6
%CO
%MO
%HTA
064015
064016
064017
064018
064019
064020
064021
064022
da
da
da
da
da
da
5.000
2.080
5.000
6.500
6.500
0.500
CONCR.COLUMNAS 30*30
0 Concr.en obra 3000 psi 3/4"
0 1 ofic. y 1 ayud.
0 Andamio completo
Chapeta tensora 3/8 cua
Tapa colum.2.4x0.25 metal.
Tensor
Cua en T form.columna
Taco metal.largos 2.10-3.5
0 Vibrador electrico o gasolina
ml
m3
da
da
da
da
da
da
da
da
0.090
7.000
0.125
5.000
1.500
5.000
6.500
1.500
0.010
CONCR.COLUMNAS 20*20
0 Concr.en obra 3000 psi 3/4"
0 1 ofic. y 1 ayud.
0 Andamio completo
Chapeta tensora 3/8 cua
Tapa colum.2.4x0.20 metal
Tensor
Cua en T form.columna
Taco metal.largos 2.10-3.5
0 Vibrador electrico o gasolina
ml
m3
da
da
da
da
da
da
da
da
0.040
8.000
0.080
5.000
1.300
5.000
6.500
0.960
14.000
ml
m3
da
da
da
da
da
da
da
da
da
0.160
6.000
0.046
0.450
5.000
1.630
5.000
6.500
6.500
0.027
ml
m3
gal
da
da
da
da
da
da
0.200
0.620
6.000
5.000
2.080
5.000
6.500
0.034
ml
m3
da
da
da
da
da
da
da
da
da
0.250
6.000
0.046
0.450
5.000
1.630
5.000
6.500
6.500
0.043
ml
m3
da
gal
da
da
da
da
0.240
0.046
0.200
6.000
5.000
2.100
0.041
ml
m3
da
da
da
da
da
da
da
da
da
0.360
5.000
0.046
0.450
5.000
1.630
5.000
6.500
6.500
0.060
ml
m3
da
gal
0.200
0.046
0.620
0
0
0
0
0
0
46
1,085
46
11
101
36,500
230
2,257
230
72
657
18,250
5
0
0
0
0
0
0
0
0
243,542
102,142
800
46
997
46
11
101
36,500
40,980
23,015
14,592
100
230
1,496
230
72
152
365
5
0
0
0
0
0
0
0
0
243,542
102,142
800
46
888
46
11
101
36,500
28,089
10,229
12,768
64
230
1,154
230
72
97
2,607
5
0
0
0
0
0
0
0
0
0
243,542
102,142
800
77
46
1,035
46
11
101
36,500
62,722
40,915
17,024
37
35
230
1,687
230
72
657
986
5
0
0
0
0
0
0
0
0
243,542
2,090
102,142
46
1,085
46
11
36,500
74,344
51,144
1,296
17,024
230
2,257
230
72
1,241
5
0
0
0
0
0
0
0
0
0
243,542
102,142
800
77
46
1,085
46
6
101
36,500
86,370
63,930
17,024
37
35
230
1,769
230
39
657
1,570
5
0
0
0
0
0
0
243,542
800
2,090
102,142
46
1,208
36,500
83,929
61,372
37
418
17,024
230
2,537
1,497
5
0
0
0
0
0
0
0
0
0
243,542
102,142
800
77
46
1,450
46
11
101
36,500
119,322
92,059
20,428
37
35
230
2,364
230
72
657
2,190
5
0
0
259,366
800
2,090
82,361
54,467
37
1,296
36
45
16
%CO
%MO
%HTA
064023
064024
064025
066010
066011
066012
066013
0 1 ofic. y 1 ayud.
Acarreo int.mezclas
Chapeta tensora 3/8 cua
Tapa colum.2.4x0.5 metal.
0 Vibrador electrico o gasolina
da
m3
da
da
da
5.000
0.220
0.410
2.080
0.060
0
0
0
0
0
102,142
3,200
46
1,075
36,500
ml
m3
0.250
gal
da
da
da
da
da
da
da
0.200
4.000
5.000
6.600
5.000
6.500
6.500
0.060
0
0
0
0
0
0
0
0
0
259,366
800
2,090
102,142
46
1,035
46
11
101
36,500
ml
m3
gal
da
da
da
da
da
da
da
da
0.240
0.200
4.000
0.046
5.000
2.100
5.000
6.500
6.500
0.060
ml
m3
20,428
704
19
2,236
2,190
105,523
68,084
418
25,536
230
6,831
230
72
657
2,190
98,179
65,360
418
25,536
37
230
2,174
230
72
657
2,190
5
0
0
0
0
0
0
0
0
0
259,366
2,090
102,142
800
46
1,035
46
11
101
36,500
0.360
gal
da
da
da
da
da
da
da
0.200
4.000
5.000
2.100
5.000
6.500
6.500
0.060
0
0
0
0
0
0
0
0
259,366
800
2,090
102,142
46
1,190
46
11
101
36,500
m3
m3
un
da
da
da
da
da
da
dia
1.000
8.000
0.600
1.300
1.200
16.000
12.000
24.000
10.000
5
0
0
0
0
0
0
0
0
243,542
4,200
102,142
800
250
121
74
101
36,500
478,306
255,719
33,600
170,237
1,040
300
1,936
888
2,424
3,650
ml
m3
m
da
da
da
da
da
da
da
da
0.030
0.240
9.000
1.000
1.000
6.800
6.300
6.300
0.006
10.000
5
0
0
0
0
0
0
0
0
0
243,542
4,200
102,142
800
250
121
74
101
28,420
36,500
27,392
7,672
1,008
11,349
800
250
823
466
636
171
3,650
CONCR.VIGAS CANOAS
0 Concr.en obra 3000 psi 3/4"
Tabla Comun 0.25 X 2.5 m - 0.2 X 3 m
0 1 ofic. y 1 ayud.
0 Andamio completo
0 Can
Telera en madera 0.90x1.35
Vigas metalicas de 3m
Taco metal.largos 2.10-3.5
Malacate 3000 LB
0 Vibrador electrico o gasolina
m3
m3
m
da
da
da
da
da
da
da
da
1.000
11.000
1.900
1.900
1.200
16.000
12.000
24.000
0.200
0.170
5
0
0
243,542
4,200
102,142
800
250
121
74
101
28,420
36,500
524,649
255,719
46,200
194,070
1,520
300
1,936
888
2,424
5,684
6,205
ml
m3
m
da
dia
da
da
da
da
da
0.040
0.320
9.000
1.000
6.800
6.300
6.300
0.008
14.000
243,542
4,200
102,142
800
121
74
101
28,420
36,500
29,049
10,229
1,344
11,349
800
823
466
636
227
2,607
0
0
0
0
0
0
5
5
0
0
0
0
0
0
0
131,148
98,040
418
25,536
230
2,499
230
72
657
2,190
066014
m3
m3
da
da
da
da
da
da
da
da
da
da
da
1.000
0.700
2.550
22.000
18.000
32.000
32.000
18.000
32.000
16.000
20.000
0.170
5
0
0
0
0
0
0
0
0
0
0
0
243,542
102,142
800
250
46
98
121
46
11
74
101
36,500
434,897
255,719
145,917
2,040
5,500
828
3,136
3,872
828
352
1,184
2,020
6,205
ml
m3
m
da
da
da
da
dia
0.018
0.320
0.150
6.800
6.300
6.300
0.040
5
0
0
0
0
0
0
243,542
4,200
102,142
121
74
101
36,500
25,420
4,603
1,344
15,321
823
466
636
1,460
ESCALERAS MACIZAS
0 Concr.en obra 3000 psi 3/4"
Tabla Comun 0.25 X 2.5 m - 0.2 X 3 m
0 1 ofic. y 1 ayud.
Telera en madera 0.90x1.35
Vigas metalicas de 3m
Taco metal.largos 2.10-3.5
Malacate 3000 LB
0 Vibrador electrico o gasolina
m3
m3
m
dia
da
da
da
da
dia
1.000
10.000
0.450
45.000
27.000
55.000
0.250
6.000
5
0
0
0
0
0
0
0
243,542
4,200
102,142
121
74
101
28,420
36,500
562,237
255,719
42,000
226,983
5,445
1,998
5,555
7,105
6,083
m3
m3
un
dia
1.000
5.000
0.600
10
243,542
4,200
102,142
467,645
267,896
21,000
170,237
m3
m3
un
m3
m3
dia
0.500
6.000
0.450
0.150
0.600
10
243,542
4,200
40,930
18,368
102,142
361,188
133,948
25,200
20,260
3,031
170,237
m3
m3
m3
m3
dia
un
1.000
1.500
0.500
1.500
5.000
5
10
10
243,542
40,930
18,368
102,142
4,200
515,230
255,719
67,535
10,102
153,213
21,000
m2
m3
dia
un
ml
0.150
4.000
1.500
1.000
243,542
102,142
4,200
1,000
72,470
38,358
25,536
6,300
1,000
m2
und
und
und
und
m
dia
1.100
0.200
0.200
2.200
0.600
15.000
12,700
15,500
200
500
7,000
102,142
29,560
13,970
3,100
40
1,100
4,200
6,809
m2
und
und
und
und
und
und
und
dia
0.200
0.100
0.200
0.400
0.150
0.150
0.150
15.000
0
0
0
0
0
132,000
21,200
11,900
500
780
1,456
1,294
102,142
38,779
26,400
2,120
2,380
200
117
218
194
6,809
m2
und
m3
lb
m2
m
m
m2
m
dia
22.000
0.015
0.250
1.000
1.800
1.000
1.000
0.500
6.500
500
185,153
1,600
6,500
14,800
7,000
9,600
28,500
102,142
97,075
12,650
3,055
400
6,500
26,640
7,000
10,080
14,250
15,714
ml
m
und
1.000
1.000
5,620
1,200
11,034
5,620
1,200
0
0
0
0
066016
067014
071020
0
0
0
0
0
071030
0
0
0
0
072010
0
0
0
0
0
0
0
073082
10
10
5
15
10
45
40
12
%CO
%MO
%HTA
57
4
36
%CO
%HTA
%MO
37
7
6
47
%CO
%HTA
%AM
%MO
3
80
16
%CO
%MC
%MO
0
0
0
0
1 ofic. y 1 ayud.
Unin pvc = 3"
Soldadura pvc
Limpiador pvc (760 gr)
dia
und
g/4
gr
30.000
0.300
0.001
0.001
0
0
0
0
0
ml
und
m
g/4
gr
und
dia
1.000
1.100
0.001
0.001
0.300
30.000
ml
m3
un
da
da
da
0.012
2.500
15.000
0.750
8.800
073084
074020
078010
078020
078030
083020
ENCOROZADO EN MURO DE 20 cm
0 Mort.1:4 En obra
ladrillo 10x20x40 ray.
0 1 ofic. y 1 ayud.
0 Andamio completo
0 Can hasta 2.80 m M.C.
091011
091013
102,142
1,849
57,108
27,535
3,405
555
57
28
0
0
1,150
9,692
57,108
27,535
3,695
102,142
16,579
1,150
10,661
57
28
1,109
3,405
10
0
0
0
0
206,615
550
102,142
800
250
14,052
2,727
1,375
6,809
600
2,200
5
0
206,615
5,410
102,142
33,464
16,271
3,787
12,768
5
0
5
0
206,615
2,100
16,000
102,142
31,868
8,678
2,100
16,800
4,086
8,450
102,142
16,111
8,450
7,296
0
0
1,600
9,600
815
102,142
800
25,912
320
9,600
571
14,592
100
30
18,368
102,142
4,258
1,194
2,918
15
30
0
40,930
18,368
102,142
14,213
7,060
1,194
5,675
5
0
0
185,153
2,000
102,142
18,270
9,721
1,400
6,809
243,542
4,200
102,142
32,442
20,457
1,260
10,214
30,258
30,258
638
102,142
70
39,000
7,067
100
67
3,509
2,554
385
325
30,258
30,258
102,142
39,000
5,104
70
20,167
666
333
4,086
650
14,036
193
IMPERMEAB.PENDIENTADOS(edific)
m2
0 Mort.1:4 En obra
m3
0.075
Aditivo impermeabilizante integral para hormigon y mortero- Toxement
kg 1A - Sika 1 0.700
0 1 ofic. y 1 ayud.
dia
8.000
m2
m3
m2
m2
dia
0.040
1.000
1.000
25.000
m2
m2
dia
1.000
14.000
CIELORR.-TABLILLA CEDRO
0 Clavos
0 Tablilla de pino para techo
Moldura 1/4 bocel l=2.80
0 1 ofic. y 1 ayud.
0 Andamio completo
m2
lb
m2
und
dia
da
0.200
1.000
0.700
7.000
0.125
m2
m3
dia
0.050
35.000
m2
m3
m3
dia
0.150
0.050
18.000
m2
m3
und
dia
0.050
0.700
15.000
m2
m3
und
dia
0.080
0.300
10.000
ml
m3
m3
un
dia
un
dia
0.003
0.002
5.000
40.000
5.000
120.000
10
10
10
m
m3
m3
dia
dia
un
un
0.020
0.010
25.000
60.000
2.500
2.500
10
10
m2
m3
m3
m2
dia
dia
0
0
10
10
10
28
69
%AM
%MO
58
40
%AM
%MO
50,676 40X40X8 cm
0.050
0.020
1.000
9.000
30.000
10
5
10
30,258
30,258
31,900
102,142
39,000
53,966
1,664
635
35,090
11,349
1,300
31,800
4
65
21
9
%AM
%PR
%MO
%HTA
091050
0
0
0
0
0
092510
092530
092540
092550
092562
092570
092574
transporte de adoquin
un
48.000
m2
m3
m3
m2
dia
dia
un
0.050
0.020
1.000
9.000
30.000
48.000
m2
m3
m3
m2
da
da
un
m2
m3
m3
m2
dia
dia
un
70
3,360
62,219 40x40x8 cm
10
5
10
30,258
30,258
31,900
102,142
39,000
70
53,966
1,664
635
35,090
11,349
1,300
3,360
0.050
0.020
1.000
9.000
30.000
48.000
10
5
10
0
0
5
30,258
30,258
22,500
102,142
39,000
70
43,794
1,664
635
24,750
11,349
1,300
3,528
0.050
0.020
1.000
9.000
30.000
48.000
10
5
10
30,258
30,258
26,200
102,142
39,000
70
47,864
1,664
635
28,820
11,349
1,300
3,528
30,258
18,368
22,000
6,500
102,142
39,000
37,897
1,997
386
16,940
1,950
12,768
1,300
206,615
610
102,142
7,910
455
305
6,809
206,615
8,500
102,142
15,658
455
8,500
6,384
6,600
206,615
685
6,600
102,142
9,348
1,320
651
14
660
6,384
17,000
239,956
8,500
102,142
15,877
170
504
8,500
6,384
428
37,000
239,956
480
102,142
1,520
33,531
4,237
4,070
2,520
756
20,428
1,520
1,500
15,133
66,264
3,391
1,500
151
1,657
65
9,500
102,142
13,205
130
9,500
3,405
0
0
0
65
12,400
102,142
16,105
130
12,400
3,405
7,400
900
700
66,264
993
389
45
294
265
m2
m3
m3
m2
m2
da
da
5
0.060
0.020
0.700
0.300
8.000
30.000
GUARDAESC.DE CEMENTO
0 Mort.1:4 En obra
Tiranta 2"x1"madera comun (3m)
0 1 ofic. y 1 ayud.
ml
m3
und
dia
0.002
0.500
15.000
10
ml
m3
ml
dia
0.002
1.000
16.000
10
GUARDAESC.CERAMICO
Color mineral rojo y amarillo
0 Mort.1:4 En obra
Cem.ceramico gris IPB(25 kg)
Piso Bochica 10x20 Ceram.Andin
0 1 ofic. y 1 ayud.
ml
kg
m3
kg
m2
dia
0.200
0.003
0.020
0.100
16.000
GUARDAESCOBA ALFA
Cemento gris Nare (50 Kg)
0 Mort.1:3 En obra
Tableta lisa griega 10x10 rojo
0 1 ofic. y 1 ayud.
ml
sac
m3
m2
dia
ml
kg
sac
m3
kg
dia
ml
9.000
0.100
0.010
1.500
5.000
1.000
GUARDAESC.VINILO DE 10cm.
Zocalo vinilo 10 cm
adhesivo pegante #10 Pavco (5
0 1 Oficial
ml
ml
gal
dia
1.000
0.010
40.000
GUARDAESC.CEDRO
Chazos plasticos
Zoc.Cedro wino 10x1 cm
0 1 ofic. y 1 ayud.
ml
un
m
dia
2.000
1.000
30.000
GUARDAESCOBA ZAPAN
Chazos plasticos
Zoc. Sapan 10x1 cm
0 1 ofic. y 1 ayud.
ml
un
m
dia
2.000
1.000
30.000
LECHADA
Color mineral rojo y amarillo
Blanco de zinc
Cem.ceramico gris IPB(25 kg)
1 Oficial
m2
kg
kg
kg
dia
0.050
0.050
0.400
250.000
m2
10
5
10
0
0
5
5
0
5
0.010
0.002
1.000
16.000
5
0
5
10
10
5
5
0
5
0
5
5
42,775
5
65
26
3
%AM
%PR
%MO
%HTA
093011
093012
093016
259,129
28,300
102,142
993
35,100
1,520
11,402
29,715
17,024
993
2,340
1,520
m2
m2
m3
dia
dia
m3
1.000
0.050
10.000
4.000
0.050
10
10
14,000
206,615
35,100
102,142
30,258
58,750
15,400
11,364
3,510
25,536
1,664
10
m2
m3
m2
dia
m
m2
5
0.040
1.000
6.000
1.000
1.000
10
5
0
206,615
28,300
102,142
1,520
980
58,784
9,091
29,715
17,024
1,520
980
m2
m3
dia
m2
gr
m2
0.025
4.0
1.000
750.000
0.020
10
206,615
102,142
22,000
20
20,000.00
71,117
72,844
5,682
25,536
24,200
15,750
400
m2
gr
dia
750.000
40.000
20
66,264
17,407
15,750
1,657
10
5
0
259,129
55,680
102,142
14,252
58,464
17,024
10
5
170,408
16,200
993
102,142
33,414
4,686
17,010
993
10,214
10
10
5
340
206,615
17,800
102,142
48,750
7,480
6,818
14,952
18,571
206,615
68,060
685
845
102,142
100,134
9,763
68,060
16
845
20,428
428
37,000
239,956
480
102,142
72,751
14,830
14,800
10,078
2,400
29,183
0
0
185,153
1,050
19,400
102,142
22,802
1,944
1,050
6,402
12,768
9,570
102,142
10,262
9,570
659
16,492
7,559
10
5
m3
m2
dia
0.050
1.000
6.000
m2
m3
m2
m2
dia
0.025
1.000
1.000
10.000
m2
kg
m3
m2
dia
20.000
0.030
0.800
5.500
m2
m3
m2
kg
m2
dia
0.045
1.000
0.024
1.000
5.000
m2
kg
sac
m3
kg
dia
33.000
0.400
0.040
5.000
3.500
ml
m3
kg
m2
dia
0.010
1.000
0.330
8.000
m2
m2
dia
1.000
155.000
m2
m3
0.030
239,956
kg
dia
0.600
20.000
10
0
5,410
102,142
un
m3
un
dia
0.200
0.500
1.000
10
243,542
4,200
102,142
0
0
0
0
099020
10
5
m2
094512
099015
0.040
1.000
6.000
1.000
15.000
1.000
PISO PIEDRA
concreto de pega 0,3:1:3:2 - cal:cemento:arena:agregado
0 grueso
PIEDRA VALDIVIA RETAL. TTE
0 1 ofic. y 1 ayud.
0
0
0
0
093062
m3
m2
dia
m2
dia
ml
093020
093040
IMPERMEAB.CON S.M.POLIESTER
Manto polyester Edil 3mm MP3
0 1 ofic. y 1 ayud.
IMPERMEABILIZACION DE PISOS, BANOS, LOSAS
CONCRETO
0 Mort.1:3 En obra
Aditivo impermeabilizante integral para hormigon y morteroToxement 1A - Sika 1
0 1 ofic. y 1 ayud.
EMBOQUILLADO DE TUBERIA DE 36"-900mm. A 48"
Concr.en obra 3000 psi 3/4"
Tabla Comun 0.25 X 2.5 m - 0.2 X 3 m
1 ofic. y 1 ayud.
18
49
27
%AM
%PIS
%MO
15
29
51
3
%CO
%MO
%PIS
%HTA
90,452
0
0
5
5
5
0
0
5
5
15-Sep-04
m3
un
m3
un
dia
m3
23,000
5,980
243,542
4,200
102,142
23,000
95,909
40,184
2,100
51,071
4,485
0.150
0.500
2.000
0.150
ml
ml
gl
dia
1.000
0.050
10.000
100,000
50,950
102,142
113,272
100,000
2,548
10,214
ml
gl
dia
1.000
0.150
10.000
220,000
50,950
102,142
238,367
220,000
7,643
10,214
ml
m3
m
m
dia
m
0.003
1.000
1.000
40.000
1.000
5
0
0
0
0
239,956
7,250
132
102,142
290
11,109
756
7,250
132
2,554
290
111012
ml
m3
m
m
dia
m
0.005
1.000
1.000
20.000
1.000
5
0
0
0
0
239,956
10,600
132
102,142
290
17,644
1,260
10,600
132
5,107
290
ml
m3
m
dia
m
0.006
1.000
18.000
1.000
10
5
0
0
239,956
13,500
102,142
1,700
23,417
1,584
14,175
5,675
1,700
ml
m3
m
dia
m
0.008
1.000
15.000
1.000
10
5
0
0
239,956
19,500
102,142
2,700
32,437
2,112
20,475
6,809
2,700
ml
m3
m
dia
m
m
0.010
1.000
11.000
1.000
1.000
5
0
0
0
0
239,956
25,700
102,142
500
800
39,269
2,520
25,700
9,286
500
800
ml
m3
m
dia
m
m
0.013
1.000
10.000
1.000
1.000
5
0
0
0
0
239,956
26,100
102,142
506
1,630
42,236
3,275
26,100
10,214
506
1,630
ml
m
dia
m
1.000
17.000
1.000
5
0
0
11,600
102,142
1,400
19,889
12,180 rendimiento diario 130 pul X ml en tuberia 4" - 12"
6,008
1,400
ml
m
dia
m
1.000
17.000
1.000
5
0
0
14,500
102,142
1,700
23,234 $4500 MO
15,225
73
6,008
26
1,700
ml
m
dia
m
1.000
14.000
1.000
5
0
0
21,500
102,142
2,700
32,936
22,575
77
%PR
7,296
22
%MO
2,700 rendimiento diario 120 pul X ml en tuberia 10" - 14"
ml
ml
dia
hora
ml
1.000
12.000
14.000
1.000
5
0
0
0
26,100
102,142
80,000
3,800
45,857
27,405
8,512
5,714
3,800
ml
ml
dia
hora
ml
1.000
10.000
12.000
1.000
5
0
0
0
37,200
102,142
80,000
4,400
60,852
39,060
82
%PR
10,214
17
%MO
6,667 rendimiento diario 110 pul X ml en tuberia 14" - 24"
4,400
ml
ml
dia
1.000
8.000
5
0
44,100
102,142
73,611
46,305
12,768
111010
111014
111016
111018
111020
111040
111042
111044
111046
0.200
30
10
30
%PR
%MO
111048
hora
ml
10.000
1.000
ml
ml
dia
hora
ml
1.000
7.000
7.000
1.000
ml
ml
dia
hora
ml
1.000
6.000
6.000
1.000
ml
ml
dia
ml
ml
1.000
4.000
1.000
1.000
112005
112030
1.000
0.250
0.250
0.200
0.001
0.001
50.000
0
0
0
0
0
0
0
ml
ml
und
und
g/4
gr
und
dia
1.000
0.250
0.250
0.002
0.002
0.200
50.000
0
0
0
0
0
0
0
ml
ml
und
und
g/4
gr
und
dia
1.000
0.250
0.250
0.003
0.003
0.200
40.000
0
0
0
0
0
0
ml
und
ml
g/4
gr
und
dia
0.200
1.000
0.006
0.006
0.200
30.000
ml
ml
und
g/4
gr
und
dia
1.000
0.200
0.001
0.001
0.200
60.000
0
0
0
0
0
ml
ml
und
g/4
gr
und
dia
1.000
0.200
0.002
0.002
0.200
40.000
0
0
0
0
0
0
0
ml
und
ml
und
und
g/4
gr
dia
0.200
1.000
0.250
0.250
0.003
0.003
35.000
ml
ml
und
und
und
und
g/4
gr
dia
1.000
1.000
1.000
1.000
1.000
0.001
0.001
120.0
112032
112034
112050
5
0
0
0
52,200
102,142
80,000
6,800
88,360
54,810
14,592
11,429
6,800
5
0
0
0
75,500
102,142
80,000
8,500
118,983
79,275
17,024
13,333
8,500
5
0
0
0
104,400
102,142
1,353
10,400
148,185
109,620
25,536
1,353
10,400
6,610
1,282
3,241
1,282
57,108
27,535
102,142
10,227
6,610
321
810
256
57
28
2,043
9,873
4,261
4,068
57,108
27,535
1,849
102,142
14,639
9,873
1,065
1,017
114
55
370
2,043
13,759
7,818
8,398
57,108
27,535
3,695
102,142
21,487
13,759
1,955
2,100
171
83
739
2,554
76,967
29,137
57,108
27,535
16,195
102,142
51,852
15,393
29,137
343
165
3,239
3,405
0
0
5,044
1,282
57,108
27,535
1,522
102,142
7,477
5,044
256
57
28
304
1,702
6,671
4,261
57,108
27,535
1,849
102,142
10,744
6,671
852
114
55
370
2,554
7,818
11,505
3,695
8,398
57,108
27,535
102,142
19,410
1,564
11,505
924
2,100
171
83
2,918
1,850
484
309
198
240
57,108
27,535
102,142
4,059
1,850
484
309
198
240
57
28
851
ml
ml
und
und
und
g/4
gr
dia
112014
8,000
5,900
112012
80,000
5,900
0
0
0
0
0
0
0
112010
0
0
5
0
0
0
0
5
85
14
%PR
%MO
78
1
20
%PVCS
%HTA
%MO
86
12
1
%PVCS
%MO
%HTA
112052
ml
und
ml
und
und
und
g/4
gr
dia
1.000
1.000
1.000
1.000
1.000
0.002
0.002
120.0
ml
ml
und
und
g/4
gr
und
und
dia
1.000
0.750
0.750
0.002
0.002
0.750
0.500
70.00
ml
und
ml
und
und
und
g/4
gr
dia
0.500
1.000
0.500
0.500
0.500
0.002
0.002
70.000
0
0
0
0
0
0
0
ml
und
ml
und
und
g/4
gr
dia
0.330
1.000
0.330
0.330
0.003
0.003
50.000
0
0
0
0
0
0
0
ml
ml
und
und
g/4
gr
und
dia
1.000
0.300
0.300
0.003
0.003
0.250
50.000
0
0
0
0
0
0
0
ml
und
ml
und
und
g/4
gr
dia
0.250
1.000
0.250
0.250
0.004
0.004
50.000
0
0
0
0
0
0
0
ml
und
ml
und
und
g/4
gr
dia
0.200
1.000
0.250
0.250
0.003
0.003
50.000
0
0
0
0
0
0
0
ml
und
ml
und
und
g/4
gr
dia
0.200
1.000
0.250
0.250
0.006
0.006
50.000
ml
m3
ml
m
dia
0.600
1.000
4.200
5.000
0
0
0
0
112054
0
0
0
0
0
0
112056
0
0
0
0
112058
112060
112062
112064
112066
112084
5
313
1,726
817
493
406
57,108
27,535
102,142
4,818
313
1,726
817
493
406
114
55
851
2,517
1,344
966
57,108
27,535
510
815
102,142
6,741
2,517
1,008
725
114
55
383
408
1,459
935
4,534
3,473
1,857
1,603
57,108
27,535
102,142
10,169
468
4,534
1,737
929
802
114
55
1,459
1,275
5,921
4,561
3,468
57,108
27,535
102,142
11,390
421
5,921
1,505
1,144
171
83
2,043
9,078
7,262
5,683
57,108
27,535
2,091
102,142
15,883
9,078
2,179
1,705
171
83
523
2,043
8,272
14,712
17,225
16,368
57,108
27,535
102,142
27,662
2,068
14,712
4,306
4,092
228
110
2,043
10,247
19,643
19,083
24,685
57,108
27,535
102,142
35,033
2,049
19,643
4,771
6,171
171
83
2,043
22,262
33,505
41,030
53,386
57,108
27,535
102,142
64,214
4,452
33,505
10,258
13,347
343
165
2,043
46,034
16,333
2,200
102,142
5
10
5
5
5,659
5,109
4,284
3,239
SUMINISTRO,TTE Y COLOCACION GEOTEXTIL
Geotextil NT 1600
Geotextil T 2400
m2
m2
m2
1.000
1.000
10
10
2,200
4,400
2,420
4,840
T 2400
NT 2000
T 1400
NT 1600
$ 9000 MO 0.4x1.4 m
$ 6000 MO
116001
116004
116020
116025
119012
119070
131011
131012
131014
131015
131016
131017
Geotextil NT 2000
Geotextil T1400
1 Oficial
m2
m2
dia
1.000
1.000
85.000
10
10
3,900
3,150
66,264
4,290
3,465
780
ml
ml
dia
1.000
1.000
20.000
5
5
16,333
34,587
66,264
39,795
20,629
17,150
36,316
3,313
GEODREN PLANAR
geodren 1.05x50m
1 Oficial
m2
m2
dia
1.000
40.000
10
25,000
102,142
30,181
27,500
2,554
ml
ml
dia
1.000
15.000
47,000
102,142
54,150
47,000
6,809
ml
m
dia
1.000
30.000
9,665
102,142
13,240
9,665
3,405
ml
m
dia
1.000
25.000
15,626
102,142
19,916
15,626
4,086
RED DE CU DE 1/2"
0 Tubera rigida CU = "
Codo Cu 45 1/2" (106)
Soldadura Cu 40/60 1/2 lb
0 1 ofic. y 1 ayud.
ml
m
und
und
dia
1.000
0.500
0.010
34.000
11,295
1,350
8,553
102,142
15,210
11,295
675
86
3,004
RED DE CU 3/4"
0 Tubera rigida CU = "
Codo Cu 45 3/4" (106)
Soldadura Cu 40/60 1/2 lb
0 1 ofic. y 1 ayud.
ml
m
und
und
dia
1.000
0.500
0.010
34.000
18,460
2,776
8,553
102,142
23,088
18,460
1,388
86
3,004
10,600
14,850
23,300
36,000
1,200
66,264
43,102
30,402
21,952
17,702
10,600
14,850
23,300
36,000
144
6,626
0
0
0
0
0
7,487
1,852
277,748
45,710
102,142
368,948
14,974
3,704
277,748
45,710
25,536
176,000
615
2,850
102,142
206,277
176,000
615
2,850
25,536
45,200
682
2,850
102,142
75,544
45,200
682
2,850
25,536
0
0
36,000
682
66,264
55,440
36,000
2,046
16,566
0
0
0
0
195,000
682
2,850
102,142
226,026
195,000
1,364
2,850
25,536
0
0
0
0
48,000
682
2,850
102,142
78,344
48,000
682
2,850
25,536
0
0
0
210,000
682
102,142
5
0
0
5
und
und
und
und
und
kg
dia
und
m
und
und
und
dia
2.000
2.000
1.000
1.000
4.000
SANIT.BLANCO ECON.INCL.GRIF
0 Sanitario econmico blanco
Cem.ceramico gris IPB(25 kg)
Valvula regulacin de 1/2". Metalica
0 1 ofic. y 1 ayud.
und
und
kg
und
dia
1.000
1.000
1.000
4.000
und
und
kg
und
dia
1.0
1.0
1.000
4.000
gl
und
kg
dia
1.0
3.0
4.000
und
und
kg
und
dia
1.0
2.0
1.0
4.0
und
und
kg
und
dia
1.0
1.0
1.0
4.0
und
und
kg
dia
1.000
2.000
4.000
1.000
1.000
1.000
1.000
0.120
10.000
5
0
0
5
25281.04
Abril 25/05
47006.68
Abril 25/05
6"
5"
4"
3"
87
12
%AS
%MO
238,176
210,000 orinal pequeo $65000
1,364 orinal mediano $105000
25,536 griferia automatica $97000
griferia porcelana $60000
131019
131023
DUCHA GRIVAL
Conjunto ducha sencilla con mezclador
0 1 Oficial
und
und
dia
1.000
5.000
FLUXOMETRO
0 Taza fluxmetro
Cem.ceramico gris IPB(25 kg)
0 Griferia fluxometro sanitario bajo consumo
0 1 ofic. y 1 ayud.
und
und
kg
und
dia
1.000
3.000
1.000
3.000
ml
kg
kg
m3
m3
sac
un
dia
3.000
28.000
0.064
0.034
0.350
1.000
2.500
134010
0
0
0
0
0
141010
141012
141060
151010
151012
157010
157011
157012
162050
162052
190510
190512
5
0
0
36,000
66,264
49,915
36,000
13,253
427,000
682
385,000
102,142
849,796
427,000
2,046
385,000
34,047
3,149
428
243,542
239,956
37,000
4,200
102,142
107,486
9,920
12,583
16,366
8,566
12,950
4,200
40,857
0
0
0
44,414
818
102,142
60,274
44,414
2,454
12,768
0
0
0
0
49,594
818
102,142
7,163
65,454
49,594
2,454
12,768
7,163
0
0
43,878
102,142
86,778
43,878
40,857
0
0
132,680
102,142
145,550
132,680
12,257
0
0
0
0
118,504
6,916
160,901
6,916
293,583
118,504
6,916
160,901
6,916
0
0
0
39,339
170,408
102,142
62,326
39,339
5,112
17,024
0
0
42,365
170,408
102,142
67,908
42,365
7,668
17,024
0
0
0
45,391
170,408
102,142
73,490
45,391
10,224
17,024
0
5
5
0
5
5
139,200
185,153
550
102,142
206,615
50,000
13,000
205,498
139,200
2,527
5,775
34,047
3,471
5,775
13,000
0
5
5
0
69,600
185,153
780
102,142
115,873
69,600
2,333
8,190
34,047
10
0
0
1,000
66,264
800
5,416
1,870
3,313
67
0
0
5
5
5
5
5
und
und
und
dia
1.000
3.000
0.125
und
und
und
dia
und
1.000
3.000
0.125
1.000
und
und
dia
1.000
0.400
m2
m2
dia
1.000
0.120
VENT.ALUMINIO CELOSIA
Vent.Al.celos.1x1 Incol M100 2
Coloc.ventana Al.
Vent.corr.Analok S13 vidr.br.
Coloc.ventana Al.
m2
und
m2
m2
m2
1.000
1.000
1.000
1.000
und
und
m3
dia
1.000
0.030
6.000
und
und
m3
dia
1.000
0.045
6.000
und
und
m3
dia
1.000
0.060
6.000
und
und
m3
und
dia
m3
gl
un
1.000
0.013
10.000
3.000
0.016
0.110
1.000
und
und
m3
und
dia
1.000
0.012
10.000
3.000
m2
kg
da
da
1.7
20.000
12.000
ESTUCO EN CIELOS
0 Estucor
0 1 Oficial
0 Andamio completo
m2
kg
dia
da
1.7
17.000
12.000
10
0
0
1,000
66,264
800
6,029
1,870
3,898
67
m2
gal
un
0.042
0.500
10
43,280
450
6,178
2,000
225
35
61
1.2
%MM
%MO
%HTA
Canes
0 1 Oficial
resane y adecuacin de la superficie
obra nueva sobre estuco 25-30 m2/galon 1 mano
repinte color diferente 30-40 m2/galon 1 mano
repinte color similar 40-50 m2/galon 1 mano
190542
m2
gal
dia
da
da
gl
m2
gal
dia
da
da
gl
0
0
0
0
192022
192042
192090
m2
gal
dia
dia
dia
gl
1.000
20.000
1.000
0.042
0.036
0.027
75
66,264
400
10
75
3,313
400
6,178
5,893
5,464
6,051
1,742
3,313
400
30
400
6,342
6,051
5,712
0.036
20.000
0.500
0.120
1.000
0.042
0.036
0.029
10
0
0
0
44,000
66,264
800
250
400
0.130
20.000
0.500
0.120
1.000
0.068
0.040
0.130
10
50,000
66,264
800
250
400
0.060
20.000
0.500
0.120
1.000
0.061
0.041
0.056
10
50,950
66,264
800
250
400
5
0
50,950
66,264
17,125
3,210
13,253
10
0
50,950
66,264
31,599
8,407
22,088
10
0
50,950
66,264
3,160
841
2,209
0
0
0.060
5.000
und
gal
dia
0.150
3.000
ml
gal
dia
0.015
30.000
m2
gal
dia
da
0.060
40.000
2.000
15
0
0
32,500
102,142
800
6,524
2,243
2,554
1,600
m3
m3
dia
1.000
0.700
243,542
102,142
408,932
255,719
145,917
m3
m3
dia
un
1.000
0.700
2.000
243,542
102,142
4,200
417,332
255,719
145,917
8,400
m3
m3
m3
m2
ml
cartucho
dia
dia
un
1.000
1.000
12.500
7.000
1.000
5.000
0.900
2.000
5
5
5
10
10
260,000
243,542
2,253
762
21,489
86,400
102,142
4,200
476,922
459,641
273,000
255,719
29,571
5,867
23,638
17,280
113,491
8,400
m3
m3
un
dia
m3
dia
1.000
3.000
0.900
1.000
7.000
10
243,542
4,200
102,142
6,279
36,500
411,782
267,896
12,600
113,491
6,907
5,214
m2
m3
m3
m3
0.150
0.099
0.050
40,930
243,542
18,368
47,096
6,753
25,316
1,010
10
5
10
5
10
29
55
14
%PI
%MO
%HTA
61
29
7
%PI
%MO
%HTA
16
54
4
%AM
%CO
%HTA
7,674
3,363
3,313
400
30
400
7,674
6,207
7,047
und
gal
dia
11,816
7,150
3,313
400
30
400
8,049
6,509
11,816
gl
dia
gl
201030
und
dia
0.500
9.000
0
0
4,200
102,142
2,100
11,349
m2
m3
un
dia
0.093
0.300
12.000
243,542
4,200
102,142
33,979
23,782
1,260
8,512
m2
kg
dia
5.000
30.000
2,517
102,142
m2
kg
kg
kg
dia
4.000
0.300
0.250
9.000
3
3
3
1,400
6,900
16,000
102,142
24,504
5,768
2,132
4,120
11,349
m2
kg
sac
m3
dia
25.000
0.800
0.050
5.000
340
17,500
170,408
102,142
53,321
8,925
14,000
8,946
20,428
m3
m3
dia
un
lb
1.000
0.500
1.500
1.000
10
243,542
102,142
38,300
1,600
541,444
267,896
204,284
57,450
1,600
ml
m3
un
dia
0.0525
0.0675
0.600
12.000
10
243,542
4,200
102,142
25,522
29,540
18,083
2,520
8,512
ml
m
m
dia
m
1.000
0.020
15.000
1.000
16,008
206,615
102,142
2,600
ml
m
m
dia
m
1.000
0.020
15.000
1.000
15,312
206,615
102,142
2,000
29,007 transporte Area Metropolitana $100.000 - 140.000 viaje por 10 Ton, sin
15,312 descargue
4,546
6,809
2,000
ml
m
m3
dia
m
1.000
0.015
15.000
1.000
15,544
206,615
102,142
2,000
28,103
15,544
3,409
6,809
2,000
ml
m3
m3
m3
dia
un
0.115
0.110
0.058
7.000
1.000
5
5
5
243,542
33,700
18,368
102,142
4,200
5,196
53,940
29,408
3,892
1,119
14,592
4,200
ml
m3
m
m
dia
un
0.070
0.036
0.070
8.000
0.500
5
5
10
40,930
18,368
243,542
102,142
2,500
ml
m3
m3
m3
dia
un
0.065
0.065
0.033
8.000
0.500
5
5
5
217,083
40,930
18,368
102,142
4,200
33,742
14,816
2,793
627
12,768
2,100
ml
m3
un
dia
kg
0.210
1.000
6.000
8.000
ml
m
m
un
dia
0.100
0.1675
1.000
9.000
5
5
10
10
10
acero
CUNETA EN "V"
Piedra entresuelo
Arenilla
0 Concr.en obra 3000 psi 3/4"
0 1 ofic. y 1 ayud.
Tabla Comun 0.25 X 2.5 m - 0.2 X 3 m
1.65
243,542
4,200
102,142
3,149
46,034
243,542
4,200
102,142
24
%MO
70
4
25
%CO
%HTA
%MO
59,136
79
20
201032
ml
m3
m3
un
dia
0.110
0.080
1.000
9.000
5
10
243,542
46,034
4,200
102,142
48,297
28,129
4,051
4,200
11,349
MURO CORDON
Concr.en obra 2500 psi 3/4"
concreto ciclopeo 30% piedra
Formaletas
1 ofic. y 1 ayud.
ml
m3
m3
un
dia
0.080
0.180
1.5
5.0
5
10
217,083
244,577
4,200
102,142
94,411
18,235
48,426
6,300
20,428
und
m3
und
dia
0.010
1.000
20.000
5
0
0
206,615
13,500
102,142
25,288
2,169
13,500
5,107
kg
0.085
TOPELLANTAS
0 Mort.1:4 En obra
Topellanta 0.30x0.60 cm
0 1 ofic. y 1 ayud.
aditivo. Adhesivo epoxico para pega de concreto nuevo a
endurecido- epotoc, sikadur 32
REALCE SUMIDERO H= 8/10 CM
Concr.en obra 3000 psi 3/4"
1 ofic. y 1 ayud.
Tabla Comun 0.25 X 2.5 m - 0.2 X 3 m
50,068
4,256
243,542
102,142
4,200
70,939
26,790
34,047
8,400
un
m3
dia
un
0.100
3.000
2.000
SUMIDERO TIPO A
0 1 ofic. y 1 ayud.
Formaleta
0 Concr.en obra 2500 psi 3/4"
Reja para sumidero tipo A tipo 2 (40x60cm)
und
dia
un
m3
un
1.400
2.000
0.550
1.000
SUMIDERO TIPO B
0 1 ofic. y 1 ayud.
Formaleta
0 Concr.en obra 2500 psi 3/4"
Reja para sumidero tipo B tipo 2 (50x80cm)
un
dia
un
m3
un
1.400
3.000
0.740
1.000
un
m3
un
un
dia
1.120
3.000
2.000
0.750
217,083
4,200
148,480
102,142
707,849
255,290
12,600
296,960
136,190
un
m3
dia
un
m3
un
dia
un
m3
dia
m3
dia
un
dia
0.430
1.100
3.000
0.096
48.000
2.500
48.000
0.400
4.000
0.290
3.000
3.000
12.000
217,083
102,142
4,200
185,153
1,700
102,142
180
217,083
102,142
217,083
102,142
4,200
36,500
616,498
98,013
112,356
12,600
19,552
85,680
40,857
8,640
86,833
25,536
66,102
34,047
12,600
3,042
m3
m3
dia
dia
h
h
1.300
100.000
100.000
20.000
20.000
32,578
107,634
66,264
90,000
75,000
52,427
42,351
1,076
663
4,500
3,750
m2
hora
hora
viaje
150.000
150.000
2.000
90,000
75,000
350
1,800
600
500
700
m3
m3
dia
dia
h
h
1.300
100.000
100.000
20.000
20.000
0
0
0
37,334
107,634
66,264
90,000
75,000
58,610
48,534
1,076
663
4,500
3,750
m2
gl
dia
0.450
100.000
10
0
6,960
35,878
3,822
3,445
359
m3
m3
gal
hr
dia
dia
1.000
4.000
2.500
5.000
5.000
30
365,400
6,960
55,400
57,000
102,142
676,994
475,020
30,624
138,500
11,400
20,428
PAVIMENTO ASFALTICO 1 M3
Mezcla asf. Rodadura " al 6%
MC - 70
Volqueta
Compactador Canguro
1 ofic. y 1 ayud.
10
102,142
4,200
217,083
120,640
5
0
10
5
102,142
4,200
217,083
148,480
0
0
0
81
%AM
1
16
%MO
%HTA
83
3
14
%AM
%MO
%HTA
90
9
%PA
%MO
0
0
0
0
0
PAVIMENTO ASFALTICO
Liga (Para repavimentaciones)
Mezcla asf. Rodadura " al 6%
1 Oficial
6 ayudantes
Vibrocompactador DS-70 CA-15
Vibrocompactador Neumatico
Finisher-tipo28000
Transporte
m3
kg
m3
dia
dia
hor
hor
hor
m3-km
5
5.000
1.300
140.000
140.000
20.000
20.000
20.000
25.0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
5
10
203,000
2,100
69,800
57,000
950
23,000
102,142
352,154
213,150
1,733
6,980
11,400
8,512
12,880
92,857
10
5
0
0
2,100
203,000
66,264
215,268
35,878
71,756
75,000
69,800
80,000
75,000
950
23,000
2,100
365,400
66,264
215,268
75,000
75,000
75,000
950
5
0
0
0
0
0
0
m3
m3
kg
1.300
2.000
365,400
2,100
hr
m3-km
m3
dia
dia
dia
0.600
20.800
1.300
4.000
4.000
5.000
69,800
850
23,000
66,264
215,268
39,000
116,333
17,680
29,900
16,566
53,817
7,800
5
5
0
0
0
0
2,100
365,400
66,264
107,634
215,268
39,000
69,800
23,000
950
675,690
11,025
498,771
6,626
10,763
21,527
5,571
69,800
29,900
19,760
5
5
0
0
0
2,100
365,400
71,756
215,268
39,000
75,000
m3
kg
m3
dia
dia
hr
hr
5.000
1.300
20.000
20.000
15.000
15.000
hr
hr
m3
m3-km
3.000
3.000
1.300
20.800
m3
kg
m3
dia
dia
hor
hor
hor
m3-km
5.000
1.300
140.000
140.000
20.000
20.000
20.000
26.0
m3
kg
m3
dia
dia
dia
h
m3
m3
m3-km
5.000
1.300
0.060
0.060
0.060
1.000
1.000
1.000
20.800
69,800
80,000
23,000
950
23,267
26,667
29,900
19,760
2,100
250,500
66,264
215,268
75,000
75,000
75,000
950
374,736
11,025
325,650
473
1,538
3,750
3,750
3,750
24,700
2,100
250,500
66,264
107,634
215,268
20,588
4,118
32,588
950
437,722
10,500
325,650
3,976
6,458
12,916
20,588
4,118
32,588
19,760
5
5
0
0
0
0
0
5
0
0
0
0
0
0
m3
hora
hora
hora
hora
gl
gl
gl
1.000
1.000
1.000
1.000
1.000
1.000
1.000
45,833
5,000
4,167
2,083
4,000
5,000
500
66,583
45,833
5,000
4,167
2,083
4,000
5,000
500
m2
litro
1.050
520
546
gal
556,800
556,800
m3
hr
hr
gl
m
dia
20
20
300
20.8
150
450,000
80,000
600,000
950
71,756
m3
m3
ml
cartucho
hr
dia
dia
dia
1.000
7.000
1.000
5.000
1.000
6.000
3.000
m2
m3
m3
m2
dia
da
un
0.050
0.020
1.000
9.000
30.000
48.000
m2
m3
m3
m2
dia
da
un
0.050
0.020
1.000
9.000
30.000
48.000
ml
un
m3
un
dia
ml
LIMPIEZA DE COBERTURAS
Volqueta - botada de material paleros
1 ofic. y 1 ayud.
acarreo interno
300,000
762
21,489
86,400
102,142
36,500
4,200
470,036
300,000
5,334
21,489
17,280
102,142
6,083
12,600
30,258
30,258
26,000
102,142
39,000
80
48,148
1,664
635
28,600
11,349
1,300
4,032
30,258
30,258
30,400
102,142
39,000
80
52,988
1,664
635
33,440
11,349
1,300
4,032
3.000
0.080
4.000
2.000
1.000
4,200
217,083
500
102,142
15,000
100,591
12,600
17,367
2,000
51,071
15,000
m3
m3
dia
m3
1.000
10.000
1.000
23,000
102,142
6,279
40,004
23,000
10,214
6,279
m3
dia
8.000
35,878
4,709
4,485
m3
dia
6.000
35,878
6,279
5,980
m3
dia
3.000
35,878
12,557
11,959
M3
m3
un
un
un
dia
dia
un
dia
1.000
2.500
2.000
1.000
0.800
7.000
2.000
6.000
10
0
0
0
0
0
0
243,542
4,200
4,200
4,200
102,142
36,500
4,200
35,878
444,651
267,896
10,500
8,400
4,200
127,678
5,214
8,400
5,980
COBERTURA(LOSA DE FONDO-LLAVES) A2
Concr.en obra 4000 psi 3/4"
0 Concr.en obra 3000 psi 3/4"
Formaleta
0 1 ofic. y 1 ayud.
Vibrador electrico
1 Ayudante acarreo interno
M3
m3
m3
un
dia
dia
dia
1.000
1.000
4.000
1.200
7.000
6.000
10
10
0
0
0
259,366
243,542
4,200
102,142
36,500
35,878
402,671
385,264
285,303
267,896
16,800
85,118
5,214
5,980
M3
0
0
5
10
5
10
5
5
10
5
10
496,518
60
8
29
%CO
%HTA
%MO
70
22
1
%CO
%MO
%HTA
m3
un
un
dia
dia
gl
dia
1.000
0.500
16.000
7.000
0.750
1.000
6.000
243,542
4,200
4,200
36,500
102,142
10,000
35,878
263,025
2,100
67,200
5,214
136,190
10,000
5,980
M3
m3
un
dia
dia
dia
1.000
0.500
7.000
1.100
6.000
10
243,542
4,200
36,500
102,142
35,878
378,689
267,896
2,100
5,214
92,857
5,980
M3
m3
un
dia
un
un
un
dia
dia
dia
1.000
0.500
28.000
160.000
80.000
28.000
0.900
7.000
6.000
243,542
4,200
421
151
93
500
102,142
36,500
35,878
450,437
260,590
2,100
11,788
24,160
7,440
14,000
113,491
5,214
5,980
m2
m3
m3
m
dia
da
un
0.050
0.020
1.000
9.000
30.000
48.000
5
5
5
0
0
30,258
30,258
22,500
102,142
39,000
70
42,426
1,589
635
23,625
11,349
1,300
3,360
m
gr
m
dia
60.000
1.000
60.000
22
7,877
102,142
10,984
1,320
7,877
1,702
m
gr
m
dia
60.000
1.000
60.000
22
12,000
102,142
15,107
1,320
12,000
1,702
m
gr
m
dia
60.000
1.000
60.000
22
16,400
102,142
19,507
1,320
16,400
1,702
M
gr
m
dia
60.000
1.000
50.000
26
28,000
102,142
31,705
1,560
28,000
2,043
M
gr
m
dia
60.000
1.000
40.000
22
55,000
102,142
59,001
1,320
55,000
2,554
M
gr
m
dia
70.000
1.000
40.000
22
110,000
102,142
114,221
1,540
110,000
2,554
M
gr
m
dia
70.000
1.000
30.000
22
170,000
102,142
175,115
1,540
170,000
3,405
M
gr
m
dia
70.000
1.000
30.000
22
232,000
102,142
237,115
1,540
232,000
3,405
m
g/4
gr
m
dia
0.060
0.060
1.000
50.000
34,445
27,535
22,275
102,142
28,139
2,067
1,652
22,275
2,043
un
tarro
tarro
un
un
1.000
0.200
0.0066
3.000
0.100
12,893
57,338
74,788
2,499
102,142
43,076
12,893
11,468
494
7,497
10,214
un
tarro
1.000
0.330
19,981
57,338
64,001
19,981
18,922
0
0
0
0
0
5
0
5
0
0
5
0
0
53
17
27
%CO
%HTA
%MO
71
2
26
%CO
%HTA
%MO
58
14
27
%CO
%HTA
%MO
Acondicionador
Hidrosello
0 1 ofic. y 1 ayud.
tarro
un
un
0.0110
3.000
0.100
74,788
4,517
102,142
823
13,551
10,214
m
g/4
gr
m
un
un
dia
0.006
0.006
1.000
0.167
0.100
45.000
57,608
27,535
48,350
25,105
61,952
102,142
61,632
346
165
48,350
4,193
6,195
2,270
m
g/4
gr
m
u
u
dia
0.005
0.005
1.000
0.167
0.100
40.000
57,608
27,535
81,948
34,523
71,803
102,142
100,436
288
138
81,948
5,754
7,180
2,554
m
g/4
gr
m
u
u
dia
0.006
0.006
1.000
0.170
0.100
35.000
57,608
27,535
126,811
92,742
164,070
102,142
162,559
346
165
126,811
15,766
16,407
2,918
un
un
tarro
tarro
un
un
1.000
0.500
0.0110
3.000
0.104
56,663
57,338
74,788
7,893
102,142
120,988
56,663
28,669
823
23,679
10,623
m
g/4
gr
m
un
un
dia
0.007
0.007
1.000
0.170
0.100
0.026
57,608
27,535
178,365
150,445
124,405
102,142
219,766
403
193
178,365
25,576
12,441
2,656
m
g/4
gr
m
un
un
dia
0.010
0.010
1.000
0.170
0.100
20.000
57,608
27,535
317,348
277,032
138,753
102,142
384,533
576
275
317,348
47,095
13,875
5,107
m
g/4
gr
un
un
m
dia
0.020
0.020
0.170
0.100
1.000
20.000
57,608
27,535
306,933
167,570
115,000
102,142
190,746
1,152
551
52,179
16,757
115,000
5,107
ml
m
dia
hora
m
1.000
5.000
7.000
1.000
0
0
0
133,400
102,142
98,000
10,400
179,250
133,400 rendimiento diario 110 pul X ml en tuberia entre 15" - 24"
20,428
14,000
10,400
ml
m
dia
h
m
1.000
4.000
6.000
1.000
0
0
0
174,000
102,142
98,000
13,150
230,296
174,000 rendimiento diario 90 pul X ml tuberia entre 27" - 60 "
25,536
16,333
13,150
ml
m
dia
h
m
1.000
3.000
5.000
1.000
0
0
0
203,000
102,142
80,000
14,200
268,950
203,000
34,047
16,000
14,200
ml
m
dia
hora
m
1.000
3.000
6.000
1.000
232,000
102,142
98,000
17,000
301,083
232,000
34,047
16,333
17,000
M
m
dia
h
m
1.000
3.000
4.000
1.000
238,000
102,142
98,000
21,000
319,250
238,000
34,047
24,500
21,000
5
0
0
0
5
0
0
0
5
0
0
5
0
0
m
dia
h
m
1.000
2.000
2.500
1.000
348,000
102,142
80,000
32,000
465,625
348,000
51,071
32,000
32,000
m
dia
h
m
1.000
1.500
1.000
1.000
488,000
102,142
80,000
45,000
681,095
488,000
68,095 mano obra tuberia $500 pulgada+retro
80,000
45,000
un
dia
2.000
102,142
un
dia
1.000
102,142
un
dia
0.750
102,142
142,999
136,190
un
dia
0.600
102,142
178,749
170,237
un
m3
dia
1.000
0.050
3.000
123,772
243,542
102,142
173,401
123,772
12,177
34,047
UND
53,625
51,071
703,190
UND
und
UND
und
UND
m3
m3
und
UND
und
UND
dia
dia
und
und
5
1.000
1.000
1.000
1.000
0.030
0.030
1.000
1.000
1.000
1.000
2.000
2.700
1.000
1.000
123,772
12,000
368,184
26,000
243,542
185,153
123,772
12,000
224,576
26,000
80,000
102,142
81,900
81,900
561,474
123,772
12,000
368,184
26,000
7,672
5,832
123,772
12,000
224,576
26,000
40,000
37,830
81,900
81,900
ml
ml
und
und
und
und
dia
h
1.000
1.000
1.000
1.000
5.000
0.500
0
0
495,088
35,000
298,584
23,000
102,142
80,000
590,516
382,012
495,088
35,000
298,584
23,000
20,428
40,000
UND
m3
dia
da
0.650
3.000
1.000
5
0
0
243,542
102,142
4,200
206,167
166,217
34,047
4,200
UND
sac
m3
dia
da
0.100
0.800
3.000
1.000
5
0
0
17,500
243,542
102,142
4,200
246,275
1,750
204,575
34,047
4,200
UND
un
un
dia
un
123,772
12,000
102,142
81,900
1.000
1.000
5.000
1.000
ml
m3
un
dia
dia
un
dia
0.240
5.000
24.000
24.000
0.500
2.000
10
243,542
92,000
151
93
4,500
102,142
142,176
64,295
18,400
3,624
2,232
2,250
51,071
ml
m3
un
ml
dia
dia
0.265
2.500
0.350
10.000
2.500
10
243,542
4,200
6,610
36,500
102,142
130,356
70,992
10,500
2,314
3,650
40,857
5
5
0
0
5
0
0
77
2
7
%PR
%CO
%MO
%HTA
10
78
5
%HTA
%PR
%MO
17
2
81
%MO
%HTA
%CO
TAMBOR INFORMATIVO 2
ladrillo 15x20x40 ray.
Mort.1:5 En obra
Cotadora de Ladrillo electrica
Andamio completo
Can
Mort.1:4 En obra
Concr.en obra 3000 psi 3/4"
Triplex 7 mm 2.4x1.2 m
1 Oficial
un
un
m3
dia
dia
dia
m3
m3
un
dia
110.000
0.300
2.000
8.000
12.000
0.250
0.350
2.000
0.400
15
10
10
5
830
185,153
20,300
800
250
206,615
243,542
38,300
102,142
un
707,139
104,995
61,100
40,600
6,400
3,000
56,819
89,502
76,600
255,355
94,106
un
dia
un
1.000
8.000
0.250
75,400
102,142
21,200
75,400
12,768
5,300
un
ml
m3
dia
gl
1.500
0.012
10.000
0.050
18,500
243,542
102,142
50,950
44,492
27,750
3,215
10,214
2,802
ml
m
m
kg
gl
ml
m
kg
sac
m3
kg
kg
dia
1.330
0.033
2.261
0.030
1.000
0.013
25.000
0.250
0.025
3.000
0.500
2.500
10
10
10
2,280
206,615
1,000
46,000
1,520
243,542
428
37,000
239,956
240
2,280
102,142
93,118
3,336
7,557
2,487
1,380
1,520
3,349
11,770
10,175
6,599
792
1,254
40,857
ml
m3
un
dia
dia
m2
kg
dia
m
un
kg
un
ml
dia
un
m
kg
sac
kg
dia
un
m2
0.010
6.000
15.000
40.000
1.000
3.000
6.000
0.055
1.000
4.000
1.000
2.000
5.000
2.000
0.050
35.000
0.400
5.000
3.000
1.000
1.000
10
10
185,153
550
102,142
20,300
19,100
1,050
102,142
243,542
10,600
3,149
10,800
1,520
102,142
4,200
239,956
428
37,000
480
102,142
2,850
5,000
230,072
2,037
3,630
6,809
508
21,010
3,465
17,024
14,734
10,600
13,857
10,800
3,040
20,428
8,400
13,198
16,478
16,280
2,640
34,047
2,850
5,000
ml
m
un
kg
un
ml
m
kg
sac
un
un
kg
dia
0.110
0.500
5.000
0.500
1.000
0.050
42.000
0.480
0.500
1.000
6.000
1.000
243,542
10,600
3,149
10,800
1,520
239,956
428
37,000
2,850
10,900
480
102,142
228,814
28,129
5,300
15,746
5,400
1,520
12,598
18,875
18,648
1,425
10,900
3,024
102,142
LAVAESCOBAS
Granito # 1 # 2
polvillo blanco
cemento blanco (40 kg)
0 Mort.1:3 En obra
ladrillo 10x20x40 ray.
Mort.1:5 En obra
Cotadora de Ladrillo electrica
Varilla de cobre
0 1 ofic. y 1 ayud.
rejilla cromada 3"
Llave terminal 1/2"
ml
kg
kg
sac
m
un
m3
dia
ml
dia
un
un
55.000
8.500
0.600
0.068
5.000
0.007
50.000
3.000
2.000
1.000
1.000
10
5
5
5
10
5
428
480
37,000
239,956
550
185,153
20,300
1,520
102,142
10,600
10,900
155,097
25,894
4,284
23,310
17,133
3,025
1,361
406
4,560
51,071
10,600
10,900
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
5
5
5
80
%PR
CERRAMIENTO EN MALLA
OBRA CIVIL CERRAMIENTO
Piedra entresuelo
1 ofic. y 1 ayud. Fundacin
0 Concr.en obra 3000 psi 3/4"
Tabla Comun 0.25 X 2.5 m - 0.2 X 3 m
Vibrador electrico o gasolina
1 ofic. y 1 ayud. Viga muro-columna
Transporte bloque de 20
1 ofic. y 1 ayud. Bloque 20x20x40
0 Acero
Bloque conc. 20x20x40
0 Mort.1:5 En obra
poste galvanizado 2 " liviano 2.70 ml
1 ofic. Y 1 ayud. Tuberia galvanizada
Malla eslabonada galvaniz. Cal. 10 2"*2"
1 ofic. y 1 ayud. Malla eslabonada
Alambre galvanizado puas calibre 16
1 ofic. Y 1 ayud. Alambre de puas calibre 12
TOTAL MANO DE OBRA
CERRAMIENTO EN REJA HIERRO EN PRFIL
CUADRADO 1/2"
obra civil
reja en hierro perfil cuadrado 1/2"
ml
ml
m3
dia
m
un
dia
dia
un
dia
kg
un
m
m
dia
m
m2
ml
dia
0.045
20.000
0.140
0.250
20.000
10.000
5.000
25.000
6.000
5.000
0.010
1.450
15.000
2.000
60.000
3.000
150.000
ml
ml
m2
1.000
2.000
ml
m
und
Fco
Gln
Fco
dia
DEFENSA VIAL
Tramo recto (long. 4.13 m)
Tramo curvo (long. 4.13 m)
Paral h : 1.8 m. incluye tornilleria
Terminal (tapn)
Excavacin
Volqueta - botada de material paleros
0 Concr.en obra 3000 psi 3/4"
Pintura
0 1 ofic. y 1 ayud.
Transporte de materiales - volqueta
ml
un
un
un
un
m3
m3
m3
gl
dia
hr
0.16
0.11
0.27
0.27
0.01
0.01
0.01
1
5
10
un
m3
un
m3
dia
0.4
1
0.2
8
m3
m
dia
dia
5
1
1.1
7
40,930
102,142
243,542
4,200
36,500
102,142
245
102,142
3,149
1,700
185,153
26,680
102,142
11,832
102,142
280
102,142
5
5
5
5
91,859
75,000
241,859
91,859
150,000
4,018
3,300
0
61,700
15,347
4,018
1,155
624
1,543
5
1.000
0.350
7800
0.025
0.070
102,142
5
5
10
30
10
166,897
91,859
1,934
5,107
35,801
1,050
1,825
10,214
1,225
4,086
19,841
8,925
1,852
38,686
6,809
24,847
1,702
882
681
28,600
17
1
23
2
13
50
%MO
%AM
%CO
%HTA
%PR
%HI
71
26
%CO
%MO
56
14
28
%CO
%HTA
%MO
7,150
500
197,100
236,500
114,840
47,700
12,557
23,000
243,542
31,294
102,142
55,400
164,693
33,113
27,316
31,007
12,879
138
299
2,679
31,294
20,428
5,540
243,542
13,689
40,930
102,142
132,698
97,417
13,689
8,186
12,768
243,542
102,142
36,500
358,432
255,719
92,857
5,214
425,824
m3
m
m
dia
dia
dia
dia
un
hr
dia
5
1
1
21.000
120.000
60.000
42.000
1.000
6
0.8
m2
m
m3
dia
litro
0.04
5
1
5
5
217,083
243,542
421
151
93
500
4,200
36,500
102,142
453,605
227,938
255,719
8,841
18,120
5,580
21,000
4,200
6,083
127,678
61,000
93,756
61,000
65
%AM
259,129
102,142
900
10,883
20,428
900
12
22
1
%CO
%MO
%HTA
ml
m
un
un
m2
kg
dia
0.12
1
2.2
0.5
4.5
4
10
10
5
217,083
4,200
20,000
14,213
3,149
102,142
ml
m3
dia
un
m3
10
ml
m
cartucho
dia
dia
1.000
9.000
30.000
50.000
10
10
762
21,489
86,400
102,142
m2
lt
lt
dia
0.33333
0.16667
0.05
3
3
10,500
10,500
102,142
acabado verde
0 1 ofic. y 1 ayud.
lt
dia
0.16667
0.03
10,500
102,142
hidrosil tonner
1 Oficial
lt
hora
0.125
0.04
3,750
8,283
10,770
3,605
1,803
5,107
5,020
1,803
3,064
831
483
331
un
un
m3
dia
un
1
0.02
6
1
54,100
185,153
102,142
25,000
100,863
54,100
3,888
17,024
25,000
m2
10
217,083
102,142
2,500
40,930
0.05
10
0.5
0.11
8,490
838
2,626 rendimiento de cortadora profundidad 5 cm-20
2,880 ml/hr, profundidad 10 cm-10ml/hr. Cartucho
2,043 300cm3/10ml junta
19,777
Mort.1:4 En obra
malla tipo gallinero- revoque
Aditivo impermeabilizante integral para hormigon y morteroToxement 1A - Sika 1
1 ofic. y 1 ayud.
m3
m2
0.03
1
5
5
206,615
2,280
kg
dia
0.7
15
Un
m3
dia
8
1
23,000
102,142
m2
m2
dia
m2
1
30
1
3,600
35,878
900
Un
m3
dia
un
0.1
5
1
10
70,534
102,142
1,500
TRANSPLANTE DE ARBOLES 2 A 4 m
tierra abonada
1 ofic. y 1 ayud.
Costal
un
m3
dia
un
0.2
2
1
10
70,534
102,142
1,500
70,642
15,518
51,071
1,500
TRANSPLANTE DE ARBOLES 4 A 6 m
tierra abonada
1 ofic. y 1 ayud.
costal
un
m3
dia
un
0.3
1
1
10
70,534
102,142
1,500
132,026
23,276
102,142
1,500
un
gr
gr
gr
m3
m3
dia
un
4
30
10
0.027
0.027
50
1
5
5
5
42
1.6
5.0
23,000
70,534
66,264
7,500
11,696
176
50
53
621
1,904
1,325
7,500
un
gr
gr
gr
m3
m3
dia
un
15
50
10
0.15
0.15
40
1
5
5
5
42
1.6
5
23,000
70,534
66,264
35,000
51,568
662
84
53
3,450
10,580
1,657
35,000
un
ml
ml
dia
3
8
30
3,000
267
102,142
14,708
9,000
2,133
3,405
ml
ml
5,410
102,142
300
6,446
2,394 SIKA 1: consumo de 0.5kg/m2
en paetes de e=25mm 2kg
3,787 por bulto de 50 kg
6,809
300,449
193,200
102,142
5,936
3,780
1,196 volqueta 6 m3 - 250 m2 $ 120000
900
79
grama
20
%MO
20,122
1,260 ROLLO $250ml
Abril 26/05
estacon 10x150 cm
1 ofic. y 1 ayud.
un
dia
1
20
13,500
102,142
13,500
5,107
ml
un
un
dia
1
2
15
12,000
4,500
102,142
28,150
12,000
9,000
6,809
un
m3
dia
3
6
23,000
102,142
86,875
69,000
17,024
un
m3
dia
4
2
23,000
102,142
145,625
92,000
51,071
un
dia
m3
dia
1
6
1.5
40,000
23,000
102,142
338,874
40,000 Alquiler motosierra $20000
138,000 dia. Incluye gasolina. No
153,213 operador
40,000
23,000
102,142
53
45
%HTA
%MO
dia
m3
dia
0.5
10
3
m2
m3
dia
dia
0.002
2000
2000
30
23,000
66,264
29,000
0.22
10
50,950
ml
gal
1 Oficial
base wash preimer
dia
1/4gl
109
60
33
15
66,264
20,000
ml
gal
gal
dia
dia
0.25
0.15
8
8
49,300
15,000
35,100
102,142
un
un
m3
dia
1
0.009
50
1,800
70,534
66,264
m3
dia
dia
m3
m3
bto
dia
m3
hr
kg
dia
un
0.11
0.11
0.7
0.65
10
7
8
12
9
7
2
66,264
71,756
46,034
46,034
17,500
34,500
23,000
55,400
6,479
36,500
38,300
3,041,153
602,402
652,326
32,224
29,922
175,000
241,500
184,000
664,800
64,142
255,500
76,600
m3
gl
dia
dia
dia
dia
kg
m3
gl
gl
gl
gl
gl
gl
2
2
2
4
2200
0.66
1
1
1
10
1
1
35,878
102,142
102,142
35,878
1,353
17,000
1,800,000
300,000
1,250
5,000
8,000
5,000
7,852,057
2,610,689
17,939
204,284
204,284
143,512
3,065,898
11,220
1,800,000
300,000
1,250
50,000
8,000
5,000
m3
hr
m3
0.025
1
69,800
23,000
3,887,493
2,792,000
23,000
10
3,826
1,800 Achiras $1600
635 Lirio amarillo $1500
1,325 azucenas $1600
1 ofic. y 1 ayud.
dia
10
102,142
ml
m3
m3
gl
dia
dia
dia
ml
0.2275
0.2275
0.7
7
7
7
1
10
TIERRA ABONADA
tierra abonada
1 Ayudante
m3
m3
dia
1
5
60,000
35,878
70,534
63,000
7,176
m2
m3
un
dia
dia
dia
m3
un
m3
un
dia
0.1
0.5
25
3
0.2
0.012
6.2
0.035
6.2
15
243,542
4,200
36,500
102,142
800
185,153
1,700
202,167
245
102,142
95,178
25,572
2,100
1,460
34,047
160
2,444
11,594
7,430
1,519
6,809
m3
un
dia
dia
dia
m3
un
m3
un
dia
0.08
1
30
5
0.2
0.015
8
0.04
7
15
243,542
4,200
36,500
102,142
800
185,153
1,700
202,167
245
102,142
82,261
20,457
4,200
1,217
20,428
160
3,055
14,280
8,491
1,801
6,809
m2
kg
dia
1.65
50
43,948
66,264
77,531
76,140
1,325
m2
kg
dia
0.45
20
50,068
66,264
27,136
23,657
3,313
10
10
10
5
10
5
5
5
365,400
55,400
6,960
35,878
39,000
102,142
14,286
1,021,422
150,232
91,441 rendimiento de 10 ton por dia12,604 2.4 ton compactas
5,359
5,125
5,571
14,592
14,286
63,339
29,796
55,840
ADITIVO- ACELERANTE DE FRAGUADO PARA
HORMIGN Y MORTERO- ACCELGUARD HE
Aditivo. Dosificacin al 2% peso del cemento. Concreto
21 Mpa
Aditivo. Dosificacin al 2% peso del cemento. Concreto
28 Mpa
m3
44,084
kg
7.5
5,598
44,084
kg
9.5
5,598
55,840
m3
m3
kg
dia
dia
1
9
20
6
10
10
206,615
6,479
66,264
26,500
299,315
227,277
64,142
3,313
4,417
m2
gr
800
TRINCHO
Can 1 1/2" X 0.25m. Inmunizado
Estacn 4" X 3.5m.-4.0m. Inmunizado
Pernos 3/8" X 16 cms. HG.
1 ofic + 1 ayud.
Herramienta 5% M.O.
ML
ml
ml
ml
ml
0.67
1.67
6.67
9.5
ML
Gl
ml
hr
hr
16,800
1,000
0.15
0.02
20
16,800
44,600
36,000
2,150
95,000
500
114,845
29,882
60,120
14,343
10,000
500
3,500
11,250
60,000
14,784 M2-E=7.5cm
87
3,500
6,750
1,200
Botada
Ayudante (1)
m3
dia
0.15
0.07
25% 10-kms
850
26,100
1,594
1,740
$ 9000 MO 0.4x1.4 m
0.4x0.4 m
%PI
%MO
53
16
23
7
51
10
34
3
%CO
%AM
%MO
%HTA
%PR
%CO
%MO
%HTA
41
34
24
%PIS
%HTA
%MO
ITEM
DESCRIPCIN
1
1.1
PRELIMINARES
Localizacin, trazado, replanteo y nivelacin.
1.2
1.3
2
VALOR TOTAL
dia
300,000.00
0.00
ml
51,616.00
0.00
m2
1,202.00
0.00
2.1
m3
137,145.00
0.00
2.2
m2
18,387.00
0.00
3
3.1
MOVIMIENTOS DE TIERRA
Entibado temporal. Incluye todo lo necesario para su
correcto funcionamiento.
0.00
m2
20,448.93
0.00
3.2
3.2.1
3.2.2
3.2.3
3.2.4
De 0.00 a 2.00 m.
De 2.00 a 4.00 m.
De 4.00 a 6.00 m.
De 6.00 m. en adelante
m3
m3
m3
m3
16,187.25
19,012.43
24,875.38
27,848.83
0.00
0.00
0.00
0.00
3.3
m3
95,072.09
0.00
3.4
pulg
1,260.00
0.00
3.5
m3
262,178.55
0.00
3.6
m3
7,144.99
0.00
3.7
m3
31,600.00
0.00
3.8
m3
26,923.00
0.00
3.9
Suministro, colocacin de llenos en material granular 3/4" 11/2", colocado uniformemente en capas de hasta 0.20 m,
para atraque y cimentacion de tuberia.
m3
58,118.38
0.00
0.00
ITEM
DESCRIPCIN
VALOR TOTAL
3.10
28,805.00
0.00
3.11
48,134.18
0.00
56,685.76
0.00
62,277.00
0.00
m3
387,173.48
0.00
5.2
m3
421,841.91
0.00
5.3
m3
248,163.11
0.00
5.4
m3
349,615.31
0.00
m3
349,615.31
0.00
kg
3,563.96
0.00
m2
3,185.37
0.00
7.1
m3
67,223.98
0.00
7.2
m3
497,531.40
0.00
3.12
3.13
5
5.1
5.5
6
6.1
6.2
7
ITEM
DESCRIPCIN
Construccin de camara de inspeccin de 1.2 m en
8.1
VALOR TOTAL
un
8.2
212,454.82
un
251,133.68
8.3
un
1,154,829.25
0.00
8.4
ml
1,449,493.19
0.00
8.5
un
1,449,493.19
0.00
OBRAS VARIAS
9.1
m2
6,436.15
0.00
9.2
m2
20,070.00
0.00
SUBTOTAL
0.00
TOTAL
0.00