Metrados (Imp 1 Cara)
Metrados (Imp 1 Cara)
Metrados (Imp 1 Cara)
NNT +0.00
1.00x1.20 m. (h=0.60m.)
8 5/8
NFZ -1.40
h =1.50
0.80
a =1.00
6 5/8
0.60
h =0.60
0.10
b = 1.20 m
5/8 L = 20 cm
3/4 L = 25 cm
Metrado de zapatas
PLANTILLA PARA METRADOS
a (m)
b (m)
ELEMENTO
PARTIDA
ZAPATA 1
Excavacin
1.00
1.20
Solado
1.00
1.20
Encofrado
1.00
1.20
Concreto
1.00
1.20
perim (m)
h (m)
Area (m2)
1.50
Vol (m3)
1.80
1.20
4.40
0.60
0.60
Excavacin:
1.80 m3
Solado:
1.20 m2
Encofrado:
Concreto:
0.72 m3
2.64
0.72
Metrado de zapatas
PLANTILLA PARA METRADOS DE ACERO
ELEMENTO
Despiece
ZAPATA 1 (1.00x1.20)
N elem
1
2
l (m)
Ltotal (m)
1/4"
3/8"
1/2"
5/8"
0.86
6.88
6.88
1.06
6.36
6.36
3/4"
1"
85/8
65/8 2
L total
(m)
Factor (Kg/ml)
Recubrimiento r = 7 cm
Peso
(Kg)
13.24
0.25
0.56
1.02
1.56
2.24
20.65
r
8 5/8
Para 1 :
Para 2 :
6 5/8
4.04
Metrado de columnas
Columna C1: (25x50 cm.)
DETALLE DE NUDOS
43/4+45/8
COLUMNA
3/8 @ .20
1@ .05 + 5@.10
DATOS:
VIGA
@ .10
N pisos: 2
H entrepiso: 2.60 m.
1@ .05 + 5@.10
H/6
Le
2H/3
Le
H/6
LOS ESTRIBOS
Metrado de columnas
N +5.30
VIGA
(.25x.50)
N +4.80
43/4+45/8
6
N +4.25
2.60
4
N +3.25
6
N +2.70
VIGA
(.25x.50)
4
N +2.20
6
N +1.65
2.60
4
N +0.65
6
NFP +0.10
0.90
0.60
NFZ -1.40
3/8 @ .20
Metrado de columnas
PLANTILLA PARA METRADOS
ELEMENTO
PARTIDA
COLUMNA 1 Concreto
Encofrado
a (m)
b (m)
0.25
0.50
0.25
0.50
perim (m)
h (m)
Area (m2)
6.10
1.50
5.10
Vol (m3)
0.76
7.65
Metrado de columnas
PLANTILLA PARA METRADOS DE ACERO
ELEMENTO
Despiece
COLUMNA 1 (.25x.50)
1
43/4"
45/8"
.13
N elem
l (m)
Ltotal (m)
1/4"
3/8"
7.10
28.4
7.10
28.4
2.32
49
113.68
113.68
(m)
113.68
1/2"
5/8"
3/4"
1"
28.40
28.40
.17
7
.42
L total
Factor (Kg/ml)
Peso
(Kg)
0.25
0.56
63.66
1.02
28.40
28.40
1.56
2.24
44.30
63.62
4.04
Metrado de vigas
Metrado de vigas
Ubicacin de Tapas
Metrado de vigas
P L A N T IL L A P A R A M E T R A D O S
a (m )
b (m )
EL EM EN TO
P A R T ID A
V IG A V - 2
C o n c r e to
0 .2 5
0 .5 0
En c o f ra d o
0 .2 5
0 .3 0
Concreto:
0.90 m3
Encofrado:
6.67 m2
p e rim (m )
L (m )
Are a (m 2 )
7 .2 0
0 .8 5
7 .8 5
V o l (m 3 )
0 .9 0
6 .6 7
Metrado de vigas
PLANTILLA PARA METRADOS DE ACERO
ELEMENTO
Despiece N elem
1
l (m)
Ltotal (m)
8mm
3/8"
1/2"
5/8"
9.94
39.76
39.76
6.27
25.08
25.08
9.74
38.96
38.96
1.52
34
103.36
1.52
21.28
3/4"
1"
103.36
21.28
.19
4
.13
.44
L total
(m)
Factor (Kg/ml)
Peso
(Kg)
103.36
21.28
0.40
0.56
41.34
11.92
103.80
1.02
1.56
161.93
2.24
4.04
3.80
O
PA
3.90 m
Vol.concreto= (0.40x0.05 +
0.10x0.15)2.5 = 0.0875 m3
Nladrillos= (100/30)2.5 = 8.33 und.
.05
.15
0.40
0.40
0.20
Encofrado = 29.64 m2
NOTA:
Para el metrado del concreto de losas, se considera el
rea interior, entre las caras de las vigas que definen
los paos.
Despiece N elem
LOSA ALIGERADA
11/2"
13/8"
1
2
13/8"
13/8"
l (m)
Ltotal (m)
8mm
3/8"
8.49
76.41
1.07
9.63
9.63
1.55
13.95
13.95
2.15
19.35
19.35
1.07
9.63
9.63
1/2"
5/8"
3/4"
1"
76.41
13/8"
5
L total
(m)
Factor (Kg/ml)
Peso
(Kg)
0.40
52.56
76.41
0.56
1.02
29.43
77.94
1.56
2.24
4.04