ADICIONALES (OC) MONTAJE -DESALADOR

: AMPLIACIÓN
Proyecto DE SHOUGANG HIERRO PERÚ S.A.A.
Presupues: SERVICIO DE MONTAJE ELECTROMECANICO PAQUETE 12
Componen: PLANTA DESALINIZADORA
Concepto :RESUMEN CONSOLIDADO DE PRESUPUESTOS ADICIONALES - MONTAJE -DESALADORA 2018
Cliente : CHINA COMUNICATIONS CONSTRUCTION COMPANY DEL PERU S.A.C.
Ubicación
PPTO. : SAN NICOLAS - MARCONA - NAZCA - ICA
CONTRA
CTUAL $ 4,560,139.14
(US$):
NOVIEMBRE 2018

Item O/C

1 I-11
2 I-12
3 I-39
4 I-37
5 I-05

6 I-01
7 I-02
8 I-09
9 I-13
10 I-22
11 I-23

12 I-25
14 I-27
15 I-28
16 I-29
17 I-30

18 I-20
19 I-21
20 I-17
21 I-43
22 I-42
23 I-46
24 I-47
25 I-19
26 I-24
27 I-48

153 E-01
154 E-09
155 E-22
156 E-47
157 E-57
158 E-58
159 E-21
160 E-74

161 E-63
162 E-64
163 E-23
164 E-24
165 E-31
166 E-34
167 E-44
168 E-70
169 E-45
170 E-71

171 E-11
172 E-50
173 E-51
174 E-52

175 E-36
176 E-37
177 E-38
178 E-39
179 E-40
181 E-42
182 E-42
183 E-75
184 E-76
185 E-65
186 E-66
187 E-68
ADICIONALES (OC) MONTAJE -DESALADORA
ANG HIERRO PERÚ S.A.A.
DE MONTAJE ELECTROMECANICO PAQUETE 12
ESALINIZADORA
CONSOLIDADO DE PRESUPUESTOS ADICIONALES - MONTAJE -DESALADORA 2018
MUNICATIONS CONSTRUCTION COMPANY DEL PERU S.A.C. Costo Directo
AS - MARCONA - NAZCA - ICA Gtos. Gen.

+ IGV Utilidad
Total
Incidencia:
Trabajo Cant. Unid.
Instrumentación
Suministro e instalacion de Conduit flexible y rigido Galvanizado
Suministro E Instalación De Conduit Flexible De 3/4" Galvanizado, Con Recubrimiento De PVC E 20.00 m
Suministro E Instalación De Conduit Flexible De 1/2" Galvanizado, Con Recubrimiento De PVC E 15.00 m
Instalación de Conduit rígido de 2" galvanizado en caliente. Incluye soporte, curvas y accesori 50.00 m
Instalación de Conduit rígido de 2" galvanizado en caliente. Incluye soporte, curvas y accesori 194.00 m
Instalación De Conduit Rígido De 2" Galvanizado En Caliente. Incluye Soporte, Curvas Y Acce 181.00 m
Suministro e instalacion de tuberias PVC embebidas (losa de piso de concreto)
Sumin.e instalación Tubería PVC 2" y accesorios 40.00 m
Sumin.e instalación Tubería PVC 1.5" y accesorios 100.00 m
Suministro E Instalación De Tubería PVC 1". Incluye Curvas Y Accesorios. 40.00 m
Suministro E Instalación De Tubería PVC 1". Incluye Curvas Y Accesorios. 196.65 m
Suministro de Tubería PVC de 1 ". Incluye soporte, curvas y accesorios 650.00 m
Suministro de Tubería PVC de 2". Incluye soporte, curvas y accesorios 40.00 m
Suministro e instalacion de accesorios varios para redes de instrumentacion
Sumnistro De Toma Ethernet Doble RJ45, CAT5. Tipo Empotrable, Color Blanco, Tipo Rectangu 2.00 Un
Suministro De Toma Corriente Universal Doble Con Tierra (Para Enchufe Plano Y Redondo), Ti 7.00 Un
Suministro De Tapa Ciega De PVC Para Caja Empotrable, Color Blanco, Tipo Rectangular Está 16.00 Un
Suministro De Toma Telefónica RJ11, Tipo Empotrable, Color Blanco, Tipo Rectangular Estánd 3.00 Un
Reubicación De Tomacorrientes Y Puntos Ethernet De Pared A Interior Escritorio 11.00 Un
Suministros e instalaciones varias
Fabricación Y Montaje De Bayonetas Para Conexión De Bandeja Principal, Con Cada Tablero 10.00 Un
Fabricación y montaje de Curva Vertical Ext.200 X 100mm Para Cada Tablero Neumático 192 10.00 Un
Suministro e instalación de soporte de 3mts de largo, para acometidas de confirmaciones en vál 30.00 Un
Suministro y montaje de abrazaderas de dos piezas para 2, 4, 6, 8 y 16 tubing de 8mm, en mate 1.00 Glb
Suministro e instalación de manómetros de 2 1/2" de caratula, marca WIKA, modelo 232.50, 200ps 6.00 Un
Suministro e instalación de dos cajas de empalme en poste 2.00 Un
Suministro de cables de alimentación y señal para instrumento y gabinete RIO (Shogesa-Capta 1.00 Un
Desmontaje Y Reubicación De Bandeja Tipo Solida 400x100mm En Zona De Filtros De Arena, 60.00 m
Sumin. E Instal. Tuberías PVC 1" emb. - Sandfilters 110.00 m
Suministro de fibra óptica monomodo, tipo ADSS, 24 hilos, vano de 200 mts. 1200.00 m
Eléctrica
SALAS ELECTRICAS
1.00
MONTAJE Y DESMONTAJE DE TUBERIA RGS 4 Y BANDEJA ELECTRICA EN CELDA NUEVA 1900- Glb
INSTALACION DE CABLE SECO N2XSY 1C-3X150MM2, 6/10KV, EN INTERIOR DE EDIFI 450.00 m
INSTALACION DE BATERIAS EN SALA E HOUSE 1910-ER-100 (BANCO DE 25 BATERÍAS) 1.00 Un
INSTALACION DE TERMINACIONES TIPO BOTA SF6, EN SALAS ELECTRICAS 1920-ER-10 24.00 Kit
INSTALACION DE BATERIAS EN SALAS ELECTRICAS 4.00 Un
INSTALACION DE BARRAS DE CU EN SALAS ELECTRICAS 105.00 m
INSTALACION DE UPS EN SALA E HOUSE 1910-ER-100 1.00 Und.
INSTALACION DE UPS EN SALAS E HOUSE 1920-ER-100/100A/100B 3.00 Un
TRABAJOS VARIOS
INSALACION DE POSTE METALICO 3.0 M PARA MONTAJE DE LUMINARIA EN ZONA DE 30.00 Un
REUBICACION DE CANALIZACION ELECTRICA DE ILUNINACION EN TANQUE QUIMICO 1.00 Glb
DESCONEXIONADO Y CONEXIONADO DE CABLES DE MEDIA TENSION, EN BORNERAS 4.00 Un
DESCONEXIONADO Y CONEXIONADO DE CABLES DE HITER, EN BORNERAS DE MOTO 4.00 Un
SUMINISTRO E INSTALACIÓN DE TUBERIA FLEXIBLE (RECUBIERTO CON PVC) Ø 6" TIPO 16.00 m
SUMINISTRO E INSTALACION DE CONECTOR RECTO HERMÉTICO LIQUID TIGHT Ø6" PA 4.00 Un
SUMINISTRO Y MONTAJE DE CABLE DE COBRE AISLADO COLOR VERDE 70 MM2, PAR 85.00 punto
SUMINISTRO DE CABLE DE COBRE, 70 MM2, CON FORRO AISLANTE DE POLIETILENO 45.00 punto
INSTALACIÓN DE BUS BAR DE PUENTE GRÚA DE 5TON., INCLUYE INSTALACIÓN DE S 60.00 m
INSTALACION DE BUS BAR PUENTE GRUA .ZONA DE BOMBAS 70.00 m
APOYO A VENDOR (MO)
APOYO A SALA ELECTRICA VENDOR 1910-ER-100 5.00 día
APOYO A SALA ELECTRICA VENDOR 1920-ER-100 5.00 día
APOYO A SALA ELECTRICA VENDOR 1920-ER-100A 4.00 día
APOYO A SALA ELECTRICA VENDOR 1920-ER-100B 5.00 día
ILUMINACIÓN PERIMETRICA DE PLANTA
13.00
SUMINISTRO Y MONTAJE DE POSTE GALVANIZADO EN CALIENTE DE 6" -4"ø DE 12 METR Un
CONSTRUCCION DE PEDESTALES DE CONCRETO DE 1.40Mx0.55M, PARA POSTE META 13.00 Un
SUMINISTRO, INSTALACION, FLECHADO Y CONEXIONADO DE CONDUCTOR AUTOPORTA350.00 m
SUMINISTRO, INSTALACION Y CONEXIONADO DE REFLECTOR DE VAPOR DE SODIO SON- 33.00 Un
SUMISTRO, MONTAJE Y CONEXIONADO TABLERO DE ACERO INOXIDABLE USO EXTERIO 1.00 un
SUMINISTRO DE FERRETERÍA ELECTRICA PARA ALUMBRADO EXTERIOR 1.00 glb
SUMINISTRO DE FERRETERÍA ELECTRICA PARA ALUMBRADO EXTERIOR 1.00 glb
INSTALACION DE CLAVOS DE A°G°, EN POSTES DE MADERA 55' 310.00 Un
INSTALACION DE LISTONES DE 50X19MMX2.7M, EN POSTES DE MADERA 55' 10.00 Un
SUMINISTRO Y MONTAJE DE POSTE DE CONCRETO ARMADO CENTRIFUGADO DE 12/300 6.00 Un
SUMINISTRO Y CONSTRUCCIÓN DE BANCO DE DUCTOS ENTERRADO, INCLUYE SUMINIST190.00 m
SUMINISTRO, INSTALACION Y CONEXIONADO DE REFLECTOR DE VAPOR DE SODIO SON- 28.00 Un
Costo Directo $ 238,919.44
11.7% $ 27,953.57

7.0% $ 16,724.36
$ 283,597.38
Incidencia: 6.22%
P.Unitario Sub Total (USD)
105339.38

28.54 570.80
25.7 385.50
51.59 2579.50
51.59 10008.46
51.59 9337.79

62.76 2510.40
59.84 5984.00
57.61 2304.40
57.61 11329.01
10.83 7039.50
14.93 597.20

38.13 76.26
31.02 217.14
16.26 260.16
29.42 88.26
56.59 622.49

149.64 1496.40
141.78 1417.80
229.18 6875.40
6698.19 6698.19
108.02 648.12
5990.72 11981.44
5147.16 5147.16
53.34 3200.40
64.76 7123.60
5.7 6840.00
133580.06

4398.51 4398.51
25.4 11430.00
547.48 547.48
128.9 3093.60
547.48 2189.92
29.85 3134.25
1207.3 1207.30
1207.3 3621.90

132.63 3978.90
262.53 262.53
44.5 178.00
16.46 65.84
329.65 5274.40
260.17 1040.68
117.32 9972.20
117.32 5279.40
52.04 3122.40
18.04 1262.80

413.07 2065.35
413.07 2065.35
413.07 1652.28
413.07 2065.35

1760.51 22886.63
322.59 4193.67
17.1 5985.00
247.52 8168.16
2074.3 2074.30
974.07 974.07
754.83 754.83
1.94 601.40
12.55 125.50
971.3 5827.80
37.63 7149.70
247.52 6930.56
ANALISIS DE PRECIOS UNITARIOS

Suministro E Instalación De Conduit Flexible De 3/4" Galvanizado, Con Recubrimiento De PVC En El Exterior (20
Tipo Partida Recurso m/día MO -- Unidad --- Cant Unit.
1 R_un/dia 8 R_EQ: 8 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 1 CAPATAZ INSTRUMENTISTA HH 0.1 0.100
1 1 OPERARIO INSTRUMENTISTA HH 1 1.000
1 1 OFICIAL INSTRUMENTISTA HH 1 1.000
1 1

Descripción Materiales Unidad Cantidad


2 1 Tubería Flexible de 0.75" m 1
2 1 Tubo PVC 1" (Unión Mixta) Un 1
2 1 Tubo PVC 1" (Red. Bushing -3/4") Un 1
2 1 Conector Recto hermético Liquid Tight de 0.75 UND 2
2 1 Tubería PVC SAP 1" Unión Und. 2
2 1 BROCA DIAMANTADA UND 0.01
2 1 Disco 4.5" de Corte Fe Und. 0.03
2 1 Disco 4.5" de Desbaste Und. 0.03
2 1 Pegamento OATEY 1/4 Gal 0.05
2 1 Cinta Teflón 1/2" Rollo 0.1
2 1 % Mater.Consum. s/Mat %Mat
2 1 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 1 TALADRO MANUAL H-M 0.25 0.250
3 1 AMOLADORA CHICA H-M 0.25 0.250
3 1
3 1
3 1
3 1
3 1
3 1
3 1
3 1
3 1 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 1
4 1
4 1
4 1
Suministro E Instalación De Conduit Flexible De 1/2" Galvanizado, Con Recubrimiento De PVC En El Exterior (20
Tipo Partida Recurso m/día MO -- Unidad --- Cant Unit.
2 R_un/dia 8 R_EQ: 8 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 2 CAPATAZ INSTRUMENTISTA HH 0.1 0.100
1 2 OPERARIO INSTRUMENTISTA HH 1 1.000
1 2 OFICIAL INSTRUMENTISTA HH 1 1.000
1 2

Descripción Materiales Unidad Cantidad


2 2 Tubería Flexible de 0.5" m 1
2 2 Tubo PVC 1" (Unión Mixta) Un 1
2 2 Tubo PVC 1" (Red. Bushing -1/2") Un 1
2 2 Conector Recto hermético Liquid Tight de 0.5 UND 1
2 2 Conector curvo hermético Liquid Tight de 1/2" Un 1
2 2 Tubería PVC SAP 0.75" Unión Und. 2
2 2 Disco 4.5" de Corte Fe Und. 0.03
2 2 Disco 4.5" de Desbaste Und. 0.03
2 2 Pegamento OATEY 1/4 Gal 0.05
2 2 Cinta Teflón 1/2" Rollo 0.1
2 2 % Mater.Consum. s/Mat %Mat
2 2 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 2 TALADRO MANUAL H-M 0.25 0.250
3 2 AMOLADORA CHICA H-M 0.25 0.250
3 2
3 2
3 2
3 2
3 2
3 2
3 2
3 2
3 2 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 2
4 2
4 2
4 2

Instalación de Conduit rígido de 2" galvanizado en caliente. Incluye soporte, curvas y accesorios
Tipo Partida Recurso m/día MO -- Unidad --- Cant Unit.
3 R_un/dia 16 R_EQ: 16 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 3 CAPATAZ INSTRUMENTISTA HH 0.1 0.050
1 3 OPERARIO INSTRUMENTISTA HH 1 0.500
1 3 OFICIAL INSTRUMENTISTA HH 1 0.500
1 3 AYUDANTE INSTRUMENTISTA HH 1 0.500

Descripción Materiales Unidad Cantidad


2 3 Tubería Conduit Galvanizada RGS 2"Ø por 3m de longitud Aea 0.33333333
2 3 Canal UNISTRUT 1 5/8"x 1 5/8"x 3m. Modelo: P1000 10¨PG,UND 0.2
2 3 Acero plancha A36 3/8" (4'x8') m2 0.02
2 3 Pernos Hilti 1/2" x 4" Und 0.25
2 3 Kit empalme Condulet 2" Un 0.24
2 3 Abrazadera Strut de 2" Un 0.5
2 3 BROCA DIAMANTADA UND 0.01
2 3 Disco 4.5" de Corte Fe Und. 0.02
2 3 Disco 4.5" de Desbaste Und. 0.02
2 3 Soldadura KG 0.02
2 3 % Mater.Consum. s/Mat %Mat
2 3 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 3 ANDAMIOS CERTIFICADOS H-M 4 2.000
3 3 TALADRO MANUAL H-M 0.25 0.125
3 3 AMOLADORA CHICA H-M 1 0.500
3 3 CAMION GRUA - 12TON H-M 0.1 0.050
3 3 MAQUINA DE SOLDAR ELECTRICA H-E 0.25 0.125
3 3
3 3
3 3
3 3
3 3
3 3 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 3
4 3
4 3
4 3

Instalación de Conduit rígido de 2" galvanizado en caliente. Incluye soporte, curvas y accesorios
Tipo Partida Recurso m/día MO -- Unidad --- Cant Unit.
4 R_un/dia 16 R_EQ: 16 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 4 CAPATAZ INSTRUMENTISTA HH 0.1 0.050
1 4 OPERARIO INSTRUMENTISTA HH 1 0.500
1 4 OFICIAL INSTRUMENTISTA HH 1 0.500
1 4 AYUDANTE INSTRUMENTISTA HH 1 0.500

Descripción Materiales Unidad Cantidad


2 4 Tubería Conduit Galvanizada RGS 2"Ø por 3m de longitud Aea 0.33333333
2 4 Canal UNISTRUT 1 5/8"x 1 5/8"x 3m. Modelo: P1000 10¨PG,UND 0.2
2 4 Acero plancha A36 3/8" (4'x8') m2 0.02
2 4 Pernos Hilti 1/2" x 4" Und 0.25
2 4 Kit empalme Condulet 2" Un 0.24
2 4 Abrazadera Strut de 2" Un 0.5
2 4 BROCA DIAMANTADA UND 0.01
2 4 Disco 4.5" de Corte Fe Und. 0.02
2 4 Disco 4.5" de Desbaste Und. 0.02
2 4 Soldadura KG 0.02
2 4 % Mater.Consum. s/Mat %Mat
2 4 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 4 ANDAMIOS CERTIFICADOS H-M 4 2.000
3 4 TALADRO MANUAL H-M 0.25 0.125
3 4 AMOLADORA CHICA H-M 1 0.500
3 4 CAMION GRUA - 12TON H-M 0.1 0.050
3 4 MAQUINA DE SOLDAR ELECTRICA H-E 0.25 0.125
3 4
3 4
3 4
3 4
3 4
3 4 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 4
4 4
4 4
4 4

Instalación De Conduit Rígido De 2" Galvanizado En Caliente. Incluye Soporte, Curvas Y Accesorios
Tipo Partida Recurso m/día MO -- Unidad --- Cant Unit.
5 R_un/dia 16 R_EQ: 16 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 5 CAPATAZ INSTRUMENTISTA HH 0.1 0.050
1 5 OPERARIO INSTRUMENTISTA HH 1 0.500
1 5 OFICIAL INSTRUMENTISTA HH 1 0.500
1 5 AYUDANTE INSTRUMENTISTA HH 1 0.500

Descripción Materiales Unidad Cantidad


2 5 Tubería Conduit Galvanizada RGS 2"Ø por 3m de longitud Aea 0.33333333
2 5 Canal UNISTRUT 1 5/8"x 1 5/8"x 3m. Modelo: P1000 10¨PG,UND 0.2
2 5 Acero plancha A36 3/8" (4'x8') m2 0.02
2 5 Pernos Hilti 1/2" x 4" Und 0.25
2 5 Kit empalme Condulet 2" Un 0.24
2 5 Abrazadera Strut de 2" Un 0.5
2 5 BROCA DIAMANTADA UND 0.01
2 5 Disco 4.5" de Corte Fe Und. 0.02
2 5 Disco 4.5" de Desbaste Und. 0.02
2 5 Soldadura KG 0.02
2 5 % Mater.Consum. s/Mat %Mat
2 5 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 5 ANDAMIOS CERTIFICADOS H-M 4 2.000
3 5 TALADRO MANUAL H-M 0.25 0.125
3 5 AMOLADORA CHICA H-M 1 0.500
3 5 CAMION GRUA - 12TON H-M 0.1 0.050
3 5 MAQUINA DE SOLDAR ELECTRICA H-E 0.25 0.125
3 5
3 5
3 5
3 5
3 5
3 5 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 5
4 5
4 5
4 5

Sumin.e instalación Tubería PVC 2" y accesorios


Tipo Partida Recurso m/día MO -- Unidad --- Cant Unit.
6 R_un/dia 24 R_EQ: 24 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 6 CAPATAZ INSTRUMENTISTA HH 0.1 0.033
1 6 AYUDANTE INSTRUMENTISTA HH 1 0.333
1 6 OFICIAL MECANICO HH 1 0.333
1 6 OPERARIO INSTRUMENTISTA HH 1 0.333

Descripción Materiales Unidad Cantidad


2 6 Tubería PVC SAP 2" dia.x 5 m Und. 0.2
2 6 Tubería PVC SAP 2" curva Und. 0.5
2 6 Tubería PVC SAP 2" Unión Und. 0.2
2 6 Disco 4.5" de Corte Fe Und. 0.05
2 6 Pegamento OATEY 1/4 Gal 0.06
2 6
2 6
2 6
2 6
2 6
2 6 % Mater.Consum. s/Mat %Mat
2 6 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 6 AMOLADORA CHICA H-M 1 0.333
3 6 TALADRO MANUAL H-M 0.5 0.167
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6 % Herramienas Manuales s/MO %MO 5%

Descripción Sub Partidas Unidad Cantidad


4 6 Excavación manual de zanja terreno semi rocoso (0.5 x0.6 m 1.000
4 6 Relleno de canalización m 1.000
4 6 Cobertura losa concreto Fc=100 Kg/cm2 (a=0.5m/ e=0.1 m)m 1.000
4 6

Sumin.e instalación Tubería PVC 1.5" y accesorios


Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
7 R_un/dia 24 R_EQ: 24 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 7 CAPATAZ INSTRUMENTISTA HH 0.1 0.033
1 7 AYUDANTE INSTRUMENTISTA HH 1 0.333
1 7 OFICIAL INSTRUMENTISTA HH 1 0.333
1 7 OPERARIO INSTRUMENTISTA HH 1 0.333
Descripción Materiales Unidad Cantidad
2 7 Tubería PVC SAP 1.5" dia.x 3 m Und. 0.33333333
2 7 Tubería PVC SAP 1.5" curva Und. 0.5
2 7 Tubería PVC SAP 1.5" Unión Und. 0.33333333
2 7 Disco 4.5" de Corte Fe Und. 0.05
2 7 Pegamento OATEY 1/4 Gal 0.06
2 7
2 7
2 7
2 7
2 7
2 7 % Mater.Consum. s/Mat %Mat
2 7 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 7 AMOLADORA CHICA H-M 1 0.333
3 7 TALADRO MANUAL H-M 0.5 0.167
3 7
3 7
3 7
3 7
3 7
3 7
3 7
3 7
3 7 % Herramienas Manuales s/MO %MO 5%

Descripción Sub Partidas Unidad Cantidad


4 7 Excavación manual de zanja terreno semi rocoso (0.5 x0.6 m 1.000
4 7 Relleno de canalización m 1.000
4 7 Cobertura losa concreto Fc=100 Kg/cm2 (a=0.5m/ e=0.1 m)m 1.000
4 7

Suministro E Instalación De Tubería PVC 1". Incluye Curvas Y Accesorios.


Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
8 R_un/dia 30 R_EQ: 30 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 8 CAPATAZ INSTRUMENTISTA HH 0.1 0.027
1 8 AYUDANTE INSTRUMENTISTA HH 1 0.267
1 8 OFICIAL INSTRUMENTISTA HH 1 0.267
1 8 OPERARIO INSTRUMENTISTA HH 1 0.267

Descripción Materiales Unidad Cantidad


2 8 Tubería PVC SAP 1" x 3 m Und. 0.33333333
2 8 Tubería PVC SAP 1" curva Und. 0.5
2 8 Tubería PVC SAP 1" Unión Und. 0.33333333
2 8 Disco 4.5" de Corte Fe Und. 0.05
2 8 Pegamento OATEY 1/4 Gal 0.06
2 8
2 8
2 8
2 8
2 8
2 8 % Mater.Consum. s/Mat %Mat
2 8 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 8 AMOLADORA CHICA H-M 1 0.267
3 8 TALADRO MANUAL H-M 0.5 0.133
3 8
3 8
3 8
3 8
3 8
3 8
3 8
3 8
3 8 % Herramienas Manuales s/MO %MO 5%

Descripción Sub Partidas Unidad Cantidad


4 8 Excavación manual de zanja terreno semi rocoso (0.5 x0.6 m 1.000
4 8 Relleno de canalización m 1.000
4 8 Cobertura losa concreto Fc=100 Kg/cm2 (a=0.5m/ e=0.1 m)m 1.000
4 8

Suministro E Instalación De Tubería PVC 1". Incluye Curvas Y Accesorios.


Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
9 R_un/dia 30 R_EQ: 30 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 9 CAPATAZ INSTRUMENTISTA HH 0.1 0.027
1 9 AYUDANTE INSTRUMENTISTA HH 1 0.267
1 9 OFICIAL INSTRUMENTISTA HH 1 0.267
1 9 OPERARIO INSTRUMENTISTA HH 1 0.267

Descripción Materiales Unidad Cantidad


2 9 Tubería PVC SAP 1" x 3 m Und. 0.33333333
2 9 Tubería PVC SAP 1" curva Und. 0.5
2 9 Tubería PVC SAP 1" Unión Und. 0.33333333
2 9 Disco 4.5" de Corte Fe Und. 0.05
2 9 Pegamento OATEY 1/4 Gal 0.06
2 9
2 9
2 9
2 9
2 9
2 9 % Mater.Consum. s/Mat %Mat
2 9 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 9 AMOLADORA CHICA H-M 1 0.267
3 9 TALADRO MANUAL H-M 0.5 0.133
3 9
3 9
3 9
3 9
3 9
3 9
3 9
3 9
3 9 % Herramienas Manuales s/MO %MO 5%

Descripción Sub Partidas Unidad Cantidad


4 9 Excavación manual de zanja terreno semi rocoso (0.5 x0.6 m 1.000
4 9 Relleno de canalización m 1.000
4 9 Cobertura losa concreto Fc=100 Kg/cm2 (a=0.5m/ e=0.1 m)m 1.000
4 9

Suministro de Tubería PVC de 1 ". Incluye soporte, curvas y accesorios


Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
10 R_un/dia 18 R_EQ: 18 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 10
1 10
1 10
1 10

Descripción Materiales Unidad Cantidad


2 10 Tubería PVC SAP 1" x 3 m Und. 0.33333333
2 10 Tubería PVC SAP 1" curva Und. 0.5
2 10 Tubería PVC SAP 1" Unión Und. 0.33333333
2 10 Abrazaderas, arandelas, conectores, amarres preformados, KgG 0.15
2 10 Pegamento OATEY 1/4 Gal 0.06
2 10
2 10
2 10
2 10
2 10
2 10 % Mater.Consum. s/Mat %Mat 5%
2 10 % Mater.Consum. s/MO %MO

Descripción Equipos Unidad Cuadrilla Cantidad


3 10
3 10
3 10
3 10
3 10
3 10
3 10
3 10
3 10
3 10
3 10 % Herramienas Manuales s/MO %MO

Descripción Servicios Unidad Cantidad


4 10
4 10
4 10
4 10

Suministro de Tubería PVC de 2". Incluye soporte, curvas y accesorios


Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
11 R_un/dia 18 R_EQ: 18 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 11
1 11
1 11
1 11

Descripción Materiales Unidad Cantidad


2 11 Tubería PVC SAP 2" dia.x 5 m Und. 0.2
2 11 Tubería PVC SAP 2" curva Und. 0.5
2 11 Tubería PVC SAP 2" Unión Und. 0.2
2 11 Abrazaderas, arandelas, conectores, amarres preformados, KgG 0.15
2 11 Pegamento OATEY 1/4 Gal 0.06
2 11
2 11
2 11
2 11
2 11
2 11 % Mater.Consum. s/Mat %Mat 5%
2 11 % Mater.Consum. s/MO %MO

Descripción Equipos Unidad Cuadrilla Cantidad


3 11
3 11
3 11
3 11
3 11
3 11
3 11
3 11
3 11
3 11
3 11 % Herramienas Manuales s/MO %MO

Descripción Servicios Unidad Cantidad


4 11
4 11
4 11
4 11

Sumnistro De Toma Ethernet Doble RJ45, CAT5. Tipo Empotrable, Color Blanco, Tipo Rectangular Estándar.
Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
12 R_un/dia 6 R_EQ: 6 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 12 CAPATAZ INSTRUMENTISTA HH 0.1 0.133
1 12 OFICIAL INSTRUMENTISTA HH 1 1.333
1 12 OPERARIO INSTRUMENTISTA HH 1 1.333
1 12

Descripción Materiales Unidad Cantidad


2 12 Toma RJ 45 Doble UND 1
2 12 CINTA AISLANTE SUPER 33 DE 3M UND 0.05
2 12
2 12
2 12
2 12
2 12
2 12
2 12
2 12
2 12 % Mater.Consum. s/Mat %Mat
2 12 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 12 MULTIMETRO DIGITAL H-M 1 1.333
3 12
3 12
3 12
3 12
3 12
3 12
3 12
3 12
3 12
3 12 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 12
4 12
4 12
4 12

Suministro De Toma Ethernet Simple RJ45, CAT5. Tipo Empotrable, Color Blanco, Tipo Rectangular Estándar.
Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
13 R_un/dia 6 R_EQ: 6 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 13 CAPATAZ INSTRUMENTISTA HH 0.1 0.133
1 13 OFICIAL INSTRUMENTISTA HH 1 1.333
1 13 OPERARIO INSTRUMENTISTA HH 1 1.333
1 13

Descripción Materiales Unidad Cantidad


2 13 Toma RJ 45 Doble UND 1
2 13 CINTA AISLANTE SUPER 33 DE 3M UND 0.05
2 13
2 13
2 13
2 13
2 13
2 13
2 13
2 13
2 13 % Mater.Consum. s/Mat %Mat
2 13 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 13 MULTIMETRO DIGITAL H-M 1 1.333
3 13
3 13
3 13
3 13
3 13
3 13
3 13
3 13
3 13
3 13 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 13
4 13
4 13
4 13

Suministro De Toma Corriente Universal Doble Con Tierra (Para Enchufe Plano Y Redondo), Tipo Empotrable, Co
Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
14 R_un/dia 6 R_EQ: 6 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 14 CAPATAZ INSTRUMENTISTA HH 0.1 0.133
1 14 OFICIAL INSTRUMENTISTA HH 1 1.333
1 14 OPERARIO INSTRUMENTISTA HH 1 1.333
1 14

Descripción Materiales Unidad Cantidad


2 14 Tomacorriente doble+ LT Ticino Mod. Euro UND 1
2 14 CINTA AISLANTE SUPER 33 DE 3M UND 0.05
2 14
2 14
2 14
2 14
2 14
2 14
2 14
2 14
2 14 % Mater.Consum. s/Mat %Mat
2 14 % Mater.Consum. s/MO %MO 5%
Descripción Equipos Unidad Cuadrilla Cantidad
3 14 MULTIMETRO DIGITAL H-M 1 1.333
3 14
3 14
3 14
3 14
3 14
3 14
3 14
3 14
3 14
3 14 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 14
4 14
4 14
4 14

Suministro De Tapa Ciega De PVC Para Caja Empotrable, Color Blanco, Tipo Rectangular Estándar, Incluye Perno
Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
15 R_un/dia 8 R_EQ: 8 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 15 CAPATAZ INSTRUMENTISTA HH 0.1 0.100
1 15 OFICIAL INSTRUMENTISTA HH 1 1.000
1 15 OPERARIO INSTRUMENTISTA HH 1 1.000
1 15

Descripción Materiales Unidad Cantidad


2 15 Tapa ciega p/tomacorriente PVC UND 1
2 15 Tornillo M5x25 UND 2
2 15
2 15
2 15
2 15
2 15
2 15
2 15
2 15
2 15 % Mater.Consum. s/Mat %Mat
2 15 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 15
3 15
3 15
3 15
3 15
3 15
3 15
3 15
3 15
3 15
3 15 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 15
4 15
4 15
4 15

Suministro De Toma Telefónica RJ11, Tipo Empotrable, Color Blanco, Tipo Rectangular Estándar.
Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
16 R_un/dia 6 R_EQ: 6 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 16 CAPATAZ INSTRUMENTISTA HH 0.1 0.133
1 16 OFICIAL INSTRUMENTISTA HH 1 1.333
1 16 OPERARIO INSTRUMENTISTA HH 1 1.333
1 16

Descripción Materiales Unidad Cantidad


2 16 Toma RJ 11 empotrada UND 1
2 16 CINTA AISLANTE SUPER 33 DE 3M UND 0.05
2 16
2 16
2 16
2 16
2 16
2 16
2 16
2 16
2 16 % Mater.Consum. s/Mat %Mat
2 16 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 16 MULTIMETRO DIGITAL H-M 1 1.333
3 16
3 16
3 16
3 16
3 16
3 16
3 16
3 16
3 16
3 16 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 16
4 16
4 16
4 16

Reubicación De Tomacorrientes Y Puntos Ethernet De Pared A Interior Escritorio


Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
17 R_un/dia 4 R_EQ: 4 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 17 CAPATAZ INSTRUMENTISTA HH 0.1 0.200
1 17 AYUDANTE INSTRUMENTISTA HH 2 4.000
1 17 OFICIAL INSTRUMENTISTA HH 1 2.000
1 17 OPERARIO INSTRUMENTISTA HH 1 2.000

Descripción Materiales Unidad Cantidad


2 17 caja rectangular p/interruptor simple, caja pesada UND 1
2 17 Tubería PVC SAP 0.75" dia. x 3 m Und. 0.5
2 17 Tubería PVC SAP 0.75" Unión Und. 1
2 17 Tubería PVC SAP 0.75" curva Und. 0.25
2 17 Cemento Portland tipo I (bolsa 42.5 Kg) Bolsa 0.018
2 17 Arena Fina m3 0.00255
2 17 Disco 7" Corte de concreto Und. 0.125
2 17 Cable Ethernet UTP FSTP m 0.5
2 17 Cable unipolar 1x1/C, tipo THW, calibre 6 mm2, 0.6kV (ilumm 2
2 17 Tornillo M5x25 UND 2
2 17 % Mater.Consum. s/Mat %Mat
2 17 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 17 AMOLADORA CHICA H-M 1 2.000
3 17 TALADRO MANUAL H-M 0.5 1.000
3 17
3 17
3 17
3 17
3 17
4 17
4 17

Fabricación Y Montaje De Bayonetas Para Conexión De Bandeja Principal, Con Cada Tablero Neumático 1920-LC
Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
18 R_un/dia 1.5 R_EQ: 1.5 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 18 CAPATAZ INSTRUMENTISTA HH 0.1 0.533
1 18 OFICIAL INSTRUMENTISTA HH 1 5.333
1 18 OPERARIO INSTRUMENTISTA HH 1 5.333
1 18 SOLDADOR HH 1 5.333

Descripción Materiales Unidad Cantidad


2 18 Canal UNISTRUT 1 5/8"x 1 5/8"x 3m. Modelo: P1000 10¨PG,UND 0.16666667
2 18 ABRAZADERA STRUT DE 1" UL m 0.5
2 18 Soldadura KG 1.2
2 18 Disco 4.5" de Corte Fe Und. 0.33333333
2 18 Disco 4.5" de Desbaste Und. 0.33333333
2 18
2 18
2 18
2 18
2 18
2 18 % Mater.Consum. s/Mat %Mat
2 18 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 18 AMOLADORA CHICA H-M 1 5.333
3 18 MAQUINA DE SOLDAR ELECTRICA H-E 0.5 2.667
3 18 TALADRO MANUAL H-M 0.5 2.667
3 18 ANDAMIOS CERTIFICADOS H-M 2 10.667
3 18
3 18
3 18
3 18
3 18
3 18
3 18 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 18
4 18
4 18
4 18

Fabricación y montaje de Curva Vertical Ext.200 X 100mm Para Cada Tablero Neumático 1920-LCB-4XX.
Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
19 R_un/dia 1.5 R_EQ: 1.5 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 19 CAPATAZ INSTRUMENTISTA HH 0.1 0.533
1 19 OFICIAL INSTRUMENTISTA HH 1 5.333
1 19 OPERARIO INSTRUMENTISTA HH 1 5.333
1 19 SOLDADOR HH 1 5.333

Descripción Materiales Unidad Cantidad


2 19 Canal UNISTRUT 1 5/8"x 1 5/8"x 3m. Modelo: P1000 10¨PG,UND 0.16666667
2 19 Pernería XBT - Hilti, para aclajes de tuberías, tableros men KG 0.25
2 19 Soldadura KG 0.25
2 19 Disco 4.5" de Corte Fe Und. 2
2 19 Disco 4.5" de Desbaste Und. 2
2 19
2 19
2 19
2 19
2 19
2 19 % Mater.Consum. s/Mat %Mat
2 19 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 19 AMOLADORA CHICA H-M 1 5.333
3 19 MAQUINA DE SOLDAR ELECTRICA H-E 0.5 2.667
3 19 TALADRO MANUAL H-M 0.5 2.667
3 19
3 19
3 19
3 19
3 19
3 19
3 19
3 19 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 19
4 19
4 19
4 19
Suministro e instalación de soporte de 3mts de largo, para acometidas de confirmaciones en válvulas neumátic
Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
20 R_un/dia 3 R_EQ: 3 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 20 CAPATAZ INSTRUMENTISTA HH 0.1 0.267
1 20 OFICIAL INSTRUMENTISTA HH 3 8.000
1 20 OPERARIO INSTRUMENTISTA HH 1 2.667
1 20 SOLDADOR HH 1 2.667

Descripción Materiales Unidad Cantidad


2 20 Acero Perfil C4x7.25 (4x1.721"x20p) UND 0.5
2 20 ABRAZADERA STRUT DE 1" UL m 3
2 20 Acero Plancha 1/2p (4'x8') UND 0.2
2 20 Pernos Hilti 1/2" x 4" Und 4
2 20 Canal UNISTRUT 1 5/8"x 1 5/8"x 3m. Modelo: P1000 10¨PG,UND 0.25
2 20 Soldadura KG 0.35
2 20 Acetileno KG 0.1
2 20 Oxígeno M3 0.1
2 20 Disco 4.5" de Corte Fe Und. 1
2 20
2 20 % Mater.Consum. s/Mat %Mat
2 20 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 20 AMOLADORA CHICA H-M 1 2.667
3 20 EQUIPO DE CORTE Y SOLDEO (OXI-ACET) H-M 0.5 1.333
3 20 MAQUINA DE SOLDAR ELECTRICA H-E 0.5 1.333
3 20 TALADRO MANUAL H-M 0.5 1.333
3 20
3 20
3 20
3 20
3 20
3 20
3 20 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 20 Transp. carga a Marcona Kg 100.000
4 20
4 20
4 20
Suministro y montaje de abrazaderas de dos piezas para 2, 4, 6, 8 y 16 tubing de 8mm, en material de Acero Ino
Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
21 R_un/dia 0.08 R_EQ: 0.08 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 21 CAPATAZ INSTRUMENTISTA HH 0.1 10.000
1 21 OFICIAL INSTRUMENTISTA HH 1 100.000
1 21 OPERARIO INSTRUMENTISTA HH 2 200.000
1 21

Descripción Materiales Unidad Cantidad


2 21 Abrazadera p/tubing 2 x30 x100 mm Und. 90
2 21 Abrazadera p/tubing 2 x30 x200 mm Und. 50
2 21 Abrazadera p/tubing 2 x30 x300 mm Und. 50
2 21 Abrazadera p/tubing 2 x30 x400 mm Und. 15
2 21 Abrazadera p/tubing 2 x30 x425 mm Und. 20
2 21 Perno Galv.3/8"x 1" exag. Unid. 605
2 21 Tuerca Galv.3/8" Unid. 605
2 21 Arandela plana Galv.3/8" Unid. 1210
2 21 Arandela presión Galv.3/8" Unid. 605
2 21 Disco 4.5" de Corte Fe Und. 8
2 21 % Mater.Consum. s/Mat %Mat
2 21 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 21 AMOLADORA CHICA H-M 1 100.000
3 21 TALADRO MANUAL H-M 1 100.000
3 21 ANDAMIOS CERTIFICADOS H-M 0.25 25.000
3 21
3 21
3 21
3 21
3 21
3 21
3 21
3 21 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 21
4 21
4 21
4 21

Suministro e instalación de manómetros de 2 1/2" de caratula, marca WIKA, modelo 232.50, 200psi, conexión i
Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
22 R_un/dia 4 R_EQ: 4 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 22 CAPATAZ INSTRUMENTISTA HH 0.1 0.200
1 22 OFICIAL INSTRUMENTISTA HH 1 2.000
1 22 OPERARIO INSTRUMENTISTA HH 1 2.000
1 22

Descripción Materiales Unidad Cantidad


2 22 Manómetro .25"dia <200#- WIKA Und. 1
2 22 Tubería inox 304 Tee 0.5" un 1
2 22 Tubería inox 304 codo 0.5" un 0.33333333
2 22 Tubería inox 304 niple 0.5"x 1.5" um 2
2 22 Tubería inox 304 niple 0.5"x 3" un 0.33333333
2 22 Tuberíainox 304 reduc. bushing 0.5"-0.25" un 1
2 22 Cinta Teflón 1/2" Rollo 0.2
2 22 Pegamento OATEY 1/4 Gal 0.1
2 22 VALVULA AGUJA INOX 316 - 1000 # - 1/2" UND 1
2 22
2 22 % Mater.Consum. s/Mat %Mat
2 22 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 22
3 22
3 22
3 22
3 22
3 22
3 22
3 22
3 22
3 22
3 22 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 22
4 22
4 22
4 22

Suministro e instalación de dos cajas de empalme en poste


Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
23 R_un/dia 0.5 R_EQ: 0.5 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 23 CAPATAZ INSTRUMENTISTA HH 0.1 1.600
1 23 AYUDANTE INSTRUMENTISTA HH 3 48.000
1 23 OFICIAL INSTRUMENTISTA HH 2 32.000
1 23 OPERARIO INSTRUMENTISTA HH 1 16.000

Descripción Materiales Unidad Cantidad


2 23 Caja de Empalme FO p/poste Unid. 1
2 23 Abrazaderas, arandelas, conectores, amarres preformados, KgG 0.5
2 23
2 23
2 23
2 23
2 23
2 23
2 23
2 23
2 23 % Mater.Consum. s/Mat %Mat
2 23 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 23 Escalera telescópica (12 m) H-E 1 16.000
3 23 MULTIMETRO DIGITAL H-M 1 16.000
3 23 MANLIFT TELESCOPICO H-M 0.6 9.600
3 23
3 23
3 23
3 23
3 23
3 23
3 23
3 23 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 23 Fusionado de F.O. x terminal punto 24.000
4 23
4 23
4 23

Suministro de cables de alimentación y señal para instrumento y gabinete RIO (Shogesa-Captación)


Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
24 R_un/dia 0.5 R_EQ: 0.5 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 24 CAPATAZ INSTRUMENTISTA HH 0.1 1.600
1 24 AYUDANTE INSTRUMENTISTA HH 3 48.000
1 24 OFICIAL INSTRUMENTISTA HH 2 32.000
1 24 OPERARIO INSTRUMENTISTA HH 1 16.000

Descripción Materiales Unidad Cantidad


2 24 CABLE PODER 3/C # 12AWG + T (GREEN) m. 200
2 24 CABLE PODER 3/C # 14AWG + T (GREEN) m. 200
2 24 CABLE INSTRU.APANT.1X2X16AWG m 400
2 24
2 24
2 24
2 24
2 24
2 24
2 24
2 24 % Mater.Consum. s/Mat %Mat 17%
2 24 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 24 Escalera telescópica (12 m) H-E 1 16.000
3 24 PORTACARRETE H-E 3 48.000
3 24 CAMION GRUA - 12TON H-M 1 16.000
3 24
3 24
3 24
3 24
3 24
3 24
3 24
3 24 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 24
4 24
4 24
4 24

Desmontaje Y Reubicación De Bandeja Tipo Solida 400x100mm En Zona De Filtros De Arena, Incluye Reubicació
Tipo Partida Recurso m/día MO -- Unidad --- Cant Unit.
25 R_un/dia 5 R_EQ: 5 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 25 CAPATAZ INSTRUMENTISTA HH 0.1 0.160
1 25 OFICIAL INSTRUMENTISTA HH 2 3.200
1 25 OPERARIO INSTRUMENTISTA HH 1 1.600
1 25 SOLDADOR HH 1 1.600
Descripción Materiales Unidad Cantidad
2 25 BROCA DIAMANTADA UND 0.025
2 25 Disco 4.5" de Corte Fe Und. 0.1
2 25 Disco 4.5" de Desbaste Und. 0.1
2 25 Soldadura KG 0.06
2 25
2 25
2 25
2 25
2 25
2 25
2 25 % Mater.Consum. s/Mat %Mat
2 25 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 25 AMOLADORA CHICA H-M 1 1.600
3 25 MAQUINA DE SOLDAR ELECTRICA H-E 1 1.600
3 25 TALADRO MANUAL H-M 1 1.600
3 25 ANDAMIOS CERTIFICADOS H-M 2 3.200
3 25
3 25
3 25
3 25
3 25
3 25
3 25 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 25
4 25
4 25
4 25

Sumin. E Instal. Tuberías PVC 1" emb. - Sandfilters


Tipo Partida Recurso m/día MO -- Unidad --- Cant Unit.
26 R_un/dia 30 R_EQ: 30 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 26 CAPATAZ INSTRUMENTISTA HH 0.1 0.027
1 26 OPERARIO INSTRUMENTISTA HH 1 0.267
1 26 OFICIAL INSTRUMENTISTA HH 1 0.267
1 26 AYUDANTE INSTRUMENTISTA HH 1 0.267

Descripción Materiales Unidad Cantidad


2 26 Tubería PVC SAP 1" x 3 m Und. 0.33333333
2 26 Tubería PVC SAP 1" curva Und. 0.5
2 26 Tubería PVC SAP 1" Unión Und. 0.33333333
2 26 Abrazaderas, arandelas, conectores, amarres preformados, KgG 0.15
2 26 Pegamento OATEY 1/4 Gal 0.06
2 26
2 26
2 26
2 26
2 26
2 26 % Mater.Consum. s/Mat %Mat
2 26 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 26 TALADRO MANUAL H-M 0.25 0.067
3 26
3 26
3 26
3 26
3 26
3 26
3 26
3 26
3 26
3 26 % Herramienas Manuales s/MO %MO 5%

Descripción Sub Partidas Unidad Cantidad


4 26 Excavación manual de zanja terreno semi rocoso (0.5 x0.6 m 1.000
4 26 Relleno de canalización m 1.000
4 26 Cobertura losa concreto Fc=100 Kg/cm2 (a=0.5m/ e=0.1 m)m 1.000
4 26

Suministro de fibra óptica monomodo, tipo ADSS, 24 hilos, vano de 200 mts.
Tipo Partida Recurso m/día MO -- Unidad --- Cant Unit.
27 R_un/dia 1 R_EQ: 1 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 27
1 27
1 27
1 27

Descripción Materiales Unidad Cantidad


2 27 Fibra óptica 24 hilos monomodo tipo ADSS m 1
2 27
2 27
2 27
2 27
2 27
2 27
2 27
2 27
2 27
2 27 % Mater.Consum. s/Mat %Mat
2 27 % Mater.Consum. s/MO %MO

Descripción Equipos Unidad Cuadrilla Cantidad


3 27
3 27
3 27
3 27
3 27
3 27
3 27
3 27
3 27
3 27
3 27 % Herramienas Manuales s/MO %MO

Descripción Sub Partidas Unidad Cantidad


4 27
4 27
4 27
4 27

MONTAJE Y DESMONTAJE DE TUBERIA RGS 4 Y BANDEJA ELECTRICA EN CELDA NUEVA 1900-AH-000 (modificac
Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
153 R_un/dia 0.33333 R_EQ: 0.33333 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 153 CAPATAZ ELECTRICISTA HH 0.1 2.400
1 153 OPERARIO ELECTRICISTA HH 1 24.000
1 153 OFICIAL ELECTRICISTA HH 2 48.000
1 153 AYUDANTE ELECTRICISTA HH 2 48.000

Descripción Materiales Unidad Cantidad


2 153 Tubería Conduit Galvanizada RGS 4"Ø por 3m de longitud Aea 4.000
2 153 Canal UNISTRUT 1 5/8"x 1 5/8"x 3m. Modelo: P1000 10¨PG,UND 0.500
2 153 Curva Conduit Galvanizada RGS 4"Ø X 90º ANSI C80.1 UND 4.000
2 153 Disco 4.5" de Corte Fe Und. 1.000
2 153 TUBERÍA CONDUIT RGS 4" (Union roscada) Und 2.000
2 153 Abrazaderas, arandelas, conectores, amarres preformados, KgG 0.250
2 153
2 153
2 153
2 153
2 153 % Mater.Consum. s/Mat %Mat
2 153 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 153 AMOLADORA CHICA H-M 1 24.000
3 153 TALADRO MANUAL H-M 1 24.000
3 153 ANDAMIOS CERTIFICADOS H-M 4 96.000
3 153 MEGOHMETRO H-M 0.25 6.000
3 153
3 153
3 153
3 153
3 153
3 153
3 153 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 153 Construcción soporte p/ductos Un 3.000
4 153 Desmontaje de bandeja existente Glb 1.000
4 153 Cableado en celda nueva 1800 AH-000 Shougesa m 20.000
4 153

INSTALACION DE CABLE SECO N2XSY 1C-3X150MM2, 6/10KV, EN INTERIOR DE EDIFICIO DE SHOUGESA HASTA P
Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
154 R_un/dia 40 R_EQ: 40 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 154 CAPATAZ ELECTRICISTA HH 0.1 0.020
1 154 OPERARIO ELECTRICISTA HH 3 0.600
1 154 OFICIAL ELECTRICISTA HH 3 0.600
1 154 AYUDANTE ELECTRICISTA HH 3 0.600

Descripción Materiales Unidad Cantidad


2 154
2 154
2 154
2 154
2 154
2 154
2 154
2 154
2 154
2 154
2 154 % Mater.Consum. s/Mat %Mat
2 154 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 154 CAMION GRUA - 12TON H-M 1 0.200
3 154 PORTACARRETE H-E 2 0.400
3 154 MEGOHMETRO H-M 0.25 0.050
3 154
3 154
3 154
3 154
3 154
3 154
3 154
3 154 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 154
4 154
4 154
4 154

INSTALACION DE BATERIAS EN SALA E HOUSE 1910-ER-100 (BANCO DE 25 BATERÍAS)


Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
155 R_un/dia 0.5 R_EQ: 0.5 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 155 CAPATAZ ELECTRICISTA HH 0.1 1.600
1 155 OFICIAL ELECTRICISTA HH 2 32.000
1 155 OPERARIO ELECTRICISTA HH 2 32.000
1 155

Descripción Materiales Unidad Cantidad


2 155 BROCA P/DEMOLICIONES UND 0.250
2 155 TERMINAL DE COMPRESION DE 10mm2 UND 50.000
2 155 Cable unipolar 1x1/C, tipo THW, calibre 10 mm2, 0.6kV (il m 15.000
2 155
2 155
2 155
2 155
2 155
2 155
2 155
2 155 % Mater.Consum. s/Mat %Mat
2 155 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 155 Cizalla de Palanca H-E 0.5 8.000
3 155 TALADRO MANUAL H-M 1 16.000
3 155 MULTIMETRO DIGITAL H-M 1 16.000
3 155 PRENSATERMINAL H-M 0.25 4.000
3 155
3 155
3 155
3 155
3 155
3 155
3 155 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 155
4 155
4 155
4 155

INSTALACION DE TERMINACIONES TIPO BOTA SF6, EN SALAS ELECTRICAS 1920-ER-100A/1920-ER-100B


Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
156 R_un/dia 2 R_EQ: 2 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 156 CAPATAZ ELECTRICISTA HH 0.1 0.400
1 156 OPERARIO ELECTRICISTA HH 2 8.000
1 156 OFICIAL ELECTRICISTA HH 2 8.000
1 156

Descripción Materiales Unidad Cantidad


2 156
2 156
2 156
2 156
2 156
2 156
2 156
2 156
2 156
2 156
2 156 % Mater.Consum. s/Mat %Mat
2 156 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 156 AMOLADORA CHICA H-M 1 4.000
3 156 TALADRO MANUAL H-M 1 4.000
3 156 PRENSATERMINAL H-M 1 4.000
3 156 MEGOHMETRO H-M 1 4.000
3 156 MULTIMETRO DIGITAL H-M 1 4.000
3 156 TORQUIMETRO H-E 0.5 2.000
3 156
3 156
3 156
3 156
3 156 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 156
4 156
4 156
4 156

INSTALACION DE BATERIAS EN SALAS ELECTRICAS


Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
157 R_un/dia 0.5 R_EQ: 0.5 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 157 CAPATAZ ELECTRICISTA HH 0.1 1.600
1 157 OFICIAL ELECTRICISTA HH 2 32.000
1 157 OPERARIO ELECTRICISTA HH 2 32.000
1 157

Descripción Materiales Unidad Cantidad


2 157 BROCA P/DEMOLICIONES UND 0.250
2 157 TERMINAL DE COMPRESION DE 10mm2 UND 50.000
2 157 Cable unipolar 1x1/C, tipo THW, calibre 10 mm2, 0.6kV (il m 15.000
2 157
2 157
2 157
2 157
2 157
2 157
2 157
2 157 % Mater.Consum. s/Mat %Mat
2 157 % Mater.Consum. s/MO %MO 5%
Descripción Equipos Unidad Cuadrilla Cantidad
3 157 Cizalla de Palanca H-E 0.5 8.000
3 157 TALADRO MANUAL H-M 1 16.000
3 157 MULTIMETRO DIGITAL H-M 1 16.000
3 157 PRENSATERMINAL H-M 0.25 4.000
3 157
3 157
3 157
3 157
3 157
3 157
3 157 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 157
4 157
4 157
4 157

INSTALACION DE BARRAS DE CU EN SALAS ELECTRICAS


Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
158 R_un/dia 9 R_EQ: 9 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 158 CAPATAZ ELECTRICISTA HH 0.1 0.089
1 158 OPERARIO ELECTRICISTA HH 2 1.778
1 158 OFICIAL ELECTRICISTA HH 1 0.889
1 158 AYUDANTE ELECTRICISTA HH 2 1.778

Descripción Materiales Unidad Cantidad


2 158 Disco 4.5" de Corte Fe Und. 0.100
2 158
2 158
2 158
2 158
2 158
2 158
2 158
2 158
2 158
2 158 % Mater.Consum. s/Mat %Mat
2 158 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 158 TALADRO MANUAL H-M 1 0.889
3 158 AMOLADORA CHICA H-M 1 0.889
3 158 ANDAMIOS CERTIFICADOS H-M 2 1.778
3 158
3 158
3 158
3 158
3 158
3 158
3 158
3 158 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 158
4 158
4 158
4 158

INSTALACION DE UPS EN SALA E HOUSE 1910-ER-100


Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
159 R_un/dia 0.3 R_EQ: 0.3 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 159 CAPATAZ ELECTRICISTA HH 0.1 2.667
1 159 OPERARIO ELECTRICISTA HH 2 53.333
1 159 OFICIAL ELECTRICISTA HH 2 53.333
1 159 AYUDANTE ELECTRICISTA HH 1 26.667

Descripción Materiales Unidad Cantidad


2 159 TERMINAL DE COMPRESION DE 4mm2 UND 6.000
2 159 Cable unipolar 1x1/C, tipo THW, calibre 4 mm2, 0.6kV (ilumm 10.000
2 159
2 159
2 159
2 159
2 159
2 159
2 159
2 159
2 159 % Mater.Consum. s/Mat %Mat
2 159 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 159 CAMION GRUA - 12TON H-M 0.25 6.667
3 159 TALADRO MANUAL H-M 0.25 6.667
3 159
3 159
3 159
3 159
3 159
3 159
3 159
3 159
3 159 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 159
4 159
4 159
4 159

INSTALACION DE UPS EN SALAS E HOUSE 1920-ER-100/100A/100B


Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
160 R_un/dia 0.3 R_EQ: 0.3 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 0 CAPATAZ ELECTRICISTA HH 0.1 2.667
1 0 OPERARIO ELECTRICISTA HH 2 53.333
1 0 OFICIAL ELECTRICISTA HH 2 53.333
1 0 AYUDANTE ELECTRICISTA HH 1 26.667

Descripción Materiales Unidad Cantidad


2 0 TERMINAL DE COMPRESION DE 4mm2 UND 6.000
2 0 Cable unipolar 1x1/C, tipo THW, calibre 4 mm2, 0.6kV (ilumm 10.000
2 0
2 0
2 0
2 0
2 0
2 0
2 0
2 0
2 0 % Mater.Consum. s/Mat %Mat
2 0 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 0 CAMION GRUA - 12TON H-M 0.25 6.667
3 0 TALADRO MANUAL H-M 0.25 6.667
3 0
3 0
3 0
3 0
3 0
3 0
3 0
3 0
3 0 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 0
4 0
4 0
4 0

INSALACION DE POSTE METALICO 3.0 M PARA MONTAJE DE LUMINARIA EN ZONA DE ESTANQUE


Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
161 R_un/dia 5 R_EQ: 5 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 161 CAPATAZ ELECTRICISTA HH 0.1 0.160
1 161 AYUDANTE ELECTRICISTA HH 2 3.200
1 161 OFICIAL ELECTRICISTA HH 1 1.600
1 161 OPERARIO ELECTRICISTA HH 1 1.600

Descripción Materiales Unidad Cantidad


2 161 ABRAZADERA STRUT DE 3/4" UL m 2.000
2 161 Canal UNISTRUT 1 5/8"x 1 5/8"x 3m. Modelo: P1000 10¨PG,UND 2.000
2 161 Disco 4.5" de Corte Fe Und. 0.500
2 161 BROCA DIAMANTADA UND 0.100
2 161
2 161
2 161
2 161
2 161
2 161
2 161 % Mater.Consum. s/Mat %Mat
2 161 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 161 AMOLADORA CHICA H-M 1 1.600
3 161 TALADRO MANUAL H-M 1 1.600
3 161 CAMION GRUA - 12TON H-M 0.25 0.400
3 161
3 161
3 161
3 161
3 161
3 161
3 161
3 161 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 161
4 161
4 161
4 161

REUBICACION DE CANALIZACION ELECTRICA DE ILUNINACION EN TANQUE QUIMICO


Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
162 R_un/dia 1 R_EQ: 1 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 162 CAPATAZ ELECTRICISTA HH 0.1 0.800
1 162 AYUDANTE ELECTRICISTA HH 1 8.000
1 162 OFICIAL ELECTRICISTA HH 2 16.000
1 162 OPERARIO ELECTRICISTA HH 1 8.000

Descripción Materiales Unidad Cantidad


2 162 BROCA DIAMANTADA UND 0.500
2 162 Disco de corte 1/8" x 7" AC. Negro pza 2.000
2 162 Soldadura KG 0.500
2 162
2 162
2 162
2 162
2 162
2 162
2 162
2 162 % Mater.Consum. s/Mat %Mat
2 162 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 162 ANDAMIOS CERTIFICADOS H-M 2 16.000
3 162 AMOLADORA CHICA H-M 1 8.000
3 162 TALADRO MANUAL H-M 1 8.000
3 162 MULTIMETRO DIGITAL H-M 1 8.000
3 162 DOBLADORA HIDRAULICA H-E 1 8.000
3 162 MAQUINA DE SOLDAR ELECTRICA H-E 0.25 2.000
3 162
3 162
3 162
3 162
3 162 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 162
4 162
4 162
4 162

DESCONEXIONADO Y CONEXIONADO DE CABLES DE MEDIA TENSION, EN BORNERAS DE MOTORES DE BOMBAS


Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
163 R_un/dia 4 R_EQ: 4 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 163 CAPATAZ ELECTRICISTA HH 0.1 0.200
1 163 OFICIAL ELECTRICISTA HH 2 4.000
1 163 OPERARIO ELECTRICISTA HH 1 2.000
1 163

Descripción Materiales Unidad Cantidad


2 163
2 163
2 163
2 163
2 163
2 163
2 163
2 163
2 163
2 163
2 163 % Mater.Consum. s/Mat %Mat
2 163 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 163 MULTIMETRO DIGITAL H-M 1 2.000
3 163 MEGOHMETRO H-M 1 2.000
3 163
3 163
3 163
3 163
3 163
3 163
3 163
3 163
3 163 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 163
4 163
4 163
4 163

DESCONEXIONADO Y CONEXIONADO DE CABLES DE HITER, EN BORNERAS DE MOTORES DE BOMBAS DE CAPTA


Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
164 R_un/dia 8 R_EQ: 8 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 164 CAPATAZ ELECTRICISTA HH 0.1 0.100
1 164 OPERARIO ELECTRICISTA HH 1 1.000
1 164 OFICIAL ELECTRICISTA HH 1 1.000
1 164

Descripción Materiales Unidad Cantidad


2 164
2 164
2 164
2 164
2 164
2 164
2 164
2 164
2 164
2 164
2 164 % Mater.Consum. s/Mat %Mat
2 164 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 164 MULTIMETRO DIGITAL H-M 1 1.000
3 164 MEGOHMETRO H-M 1 1.000
3 164
3 164
3 164
3 164
3 164
3 164
3 164
3 164
3 164 % Herramienas Manuales s/MO %MO 5%
Descripción Servicios Unidad Cantidad
4 164
4 164
4 164
4 164

SUMINISTRO E INSTALACIÓN DE TUBERIA FLEXIBLE (RECUBIERTO CON PVC) Ø 6" TIPO LIQUID TIGHT
Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
165 R_un/dia 20 R_EQ: 20 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 165 CAPATAZ ELECTRICISTA HH 0.1 0.040
1 165 OPERARIO ELECTRICISTA HH 1 0.400
1 165 OFICIAL ELECTRICISTA HH 1 0.400
1 165 AYUDANTE ELECTRICISTA HH 1 0.400

Descripción Materiales Unidad Cantidad


2 165 Tubería Flexible de 6" m 1.000
2 165 Abrazaderas, arandelas, conectores, amarres preformados, KgG 0.200
2 165 BROCA DIAMANTADA UND 0.010
2 165 Disco 4.5" de Corte Fe Und. 0.050
2 165 Disco 4.5" de Desbaste Und. 0.050
2 165 Unión Universal de Fe Galvanizado 6" UL UND 1.000
2 165
2 165
2 165
2 165
2 165 % Mater.Consum. s/Mat %Mat
2 165 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 165 TALADRO MANUAL H-M 1 0.400
3 165 AMOLADORA CHICA H-M 1 0.400
3 165 ANDAMIOS CERTIFICADOS H-M 1 0.400
3 165
3 165
3 165
3 165
3 165
3 165
3 165
3 165 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 165
4 165
4 165
4 165

SUMINISTRO E INSTALACION DE CONECTOR RECTO HERMÉTICO LIQUID TIGHT Ø6" PARA T/FLEXIBLE PVC. INCLU
Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
166 R_un/dia 5 R_EQ: 5 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 166 CAPATAZ ELECTRICISTA HH 0.1 0.160
1 166 OPERARIO ELECTRICISTA HH 1 1.600
1 166 OFICIAL ELECTRICISTA HH 1 1.600
1 166

Descripción Materiales Unidad Cantidad


2 166 Conector Recto hermético Liquid Tight de 6 UND 1.000
2 166 Disco 4.5" de Corte Fe Und. 0.200
2 166 Disco 4.5" de Desbaste Und. 0.200
2 166
2 166
2 166
2 166
2 166
2 166
2 166
2 166 % Mater.Consum. s/Mat %Mat
2 166 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 166 AMOLADORA CHICA H-M 1 1.600
3 166 ANDAMIOS CERTIFICADOS H-M 1 1.600
3 166
3 166
3 166
3 166
3 166
3 166
3 166
3 166
3 166 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 166
4 166
4 166
4 166

SUMINISTRO Y MONTAJE DE CABLE DE COBRE AISLADO COLOR VERDE 70 MM2, PARA CONEXIONES EXTERNAS
Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
167 R_un/dia 15 R_EQ: 15 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 167 CAPATAZ ELECTRICISTA HH 0.1 0.053
1 167 OPERARIO ELECTRICISTA HH 1 0.533
1 167 OFICIAL ELECTRICISTA HH 1 0.533
1 167 AYUDANTE ELECTRICISTA HH 1 0.533

Descripción Materiales Unidad Cantidad


2 167 Cable unipolar color verde tipo THHN/THWN, calibre 70 mm2
m 1.500
2 167 Molde para soldadura tipo Tipo CC-2, cable-cable 120mm UND 1.000
2 167 Carga para soldadura exotermica Nº 90 cadweld UND 1.000
2 167
2 167
2 167
2 167
2 167
2 167
2 167
2 167 % Mater.Consum. s/Mat %Mat
2 167 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 167
3 167
3 167
3 167
3 167
3 167
3 167
3 167
3 167
3 167
3 167 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 167
4 167
4 167
4 167
SUMINISTRO DE CABLE DE COBRE, 70 MM2, CON FORRO AISLANTE DE POLIETILENO COLOR VERDE. INCLUYE SU
Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
168 R_un/dia 15 R_EQ: 15 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 168 CAPATAZ ELECTRICISTA HH 0.1 0.053
1 168 OPERARIO ELECTRICISTA HH 1 0.533
1 168 OFICIAL ELECTRICISTA HH 1 0.533
1 168 AYUDANTE ELECTRICISTA HH 1 0.533

Descripción Materiales Unidad Cantidad


2 168 Cable unipolar color verde tipo THHN/THWN, calibre 70 mm2
m 1.500
2 168 Molde para soldadura tipo Tipo CC-2, cable-cable 120mm UND 1.000
2 168 Carga para soldadura exotermica Nº 90 cadweld UND 1.000
2 168
2 168
2 168
2 168
2 168
2 168
2 168
2 168 % Mater.Consum. s/Mat %Mat
2 168 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 168
3 168
3 168
3 168
3 168
3 168
3 168
3 168
3 168
3 168
3 168 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 168
4 168
4 168
4 168

INSTALACIÓN DE BUS BAR DE PUENTE GRÚA DE 5TON., INCLUYE INSTALACIÓN DE SOPORTES DE BUS BAR
Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
169 R_un/dia 6 R_EQ: 6 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 169 CAPATAZ ELECTRICISTA HH 0.1 0.133
1 169 OPERARIO ELECTRICISTA HH 1 1.333
1 169 OFICIAL ELECTRICISTA HH 2 2.667
1 169 AYUDANTE ELECTRICISTA HH 2 2.667

Descripción Materiales Unidad Cantidad


2 169 Disco 4.5" de Corte Fe Und. 0.100
2 169 BROCA DIAMANTADA UND 0.100
2 169
2 169
2 169
2 169
2 169
2 169
2 169
2 169
2 169 % Mater.Consum. s/Mat %Mat
2 169 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 169 TALADRO MANUAL H-M 1 1.333
3 169 AMOLADORA CHICA H-M 1 1.333
3 169 ANDAMIOS CERTIFICADOS H-M 4 5.333
3 169 MEGOHMETRO H-M 0.5 0.667
3 169 MULTIMETRO DIGITAL H-M 0.5 0.667
3 169
3 169
3 169
3 169
3 169
3 169 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 169
4 169
4 169
4 169

INSTALACION DE BUS BAR PUENTE GRUA .ZONA DE BOMBAS


Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
170 R_un/dia 10 R_EQ: 10 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 170 CAPATAZ ELECTRICISTA HH 0.1 0.080
1 170 OPERARIO ELECTRICISTA HH 1 0.800
1 170 OFICIAL ELECTRICISTA HH 1 0.800
1 170 AYUDANTE ELECTRICISTA HH 1 0.800

Descripción Materiales Unidad Cantidad


2 170 Disco 4.5" de Corte Fe Und. 0.100
2 170
2 170
2 170
2 170
2 170
2 170
2 170
2 170
2 170
2 170 % Mater.Consum. s/Mat %Mat
2 170 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 170 TALADRO MANUAL H-M 1 0.800
3 170 AMOLADORA CHICA H-M 1 0.800
3 170 ANDAMIOS CERTIFICADOS H-M 2 1.600
3 170
3 170
3 170
3 170
3 170
3 170
3 170
3 170 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 170
4 170
4 170
4 170

APOYO A SALA ELECTRICA VENDOR 1910-ER-100


Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
171 R_un/dia 0.8 0.8 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 171 CAPATAZ ELECTRICISTA HH 0.5 5.000
1 171 OFICIAL ELECTRICISTA HH 2 20.000
1 171 OPERARIO ELECTRICISTA HH 2 20.000
1 171 AYUDANTE ELECTRICISTA HH 1 10.000

Descripción Materiales Unidad Cantidad


2 171 BROCA DIAMANTADA UND 0.200
2 171 Disco 4.5" de Corte Fe Und. 0.250
2 171 Disco 4.5" de Desbaste Und. 0.250
2 171
2 171
2 171
2 171
2 171
2 171
2 171
2 171 % Mater.Consum. s/Mat %Mat
2 171 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 171 AMOLADORA CHICA H-M 1 10.000
3 171 TALADRO MANUAL H-M 1 10.000
3 171 ANDAMIOS CERTIFICADOS H-M 4 40.000
3 171
3 171
3 171
3 171
3 171
3 171
3 171
3 171 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 171
4 171
4 171
4 171

APOYO A SALA ELECTRICA VENDOR 1920-ER-100


Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
172 R_un/dia 0.8 R_EQ: 0.8 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 172 CAPATAZ ELECTRICISTA HH 0.5 5.000
1 172 OFICIAL ELECTRICISTA HH 2 20.000
1 172 OPERARIO ELECTRICISTA HH 2 20.000
1 172 AYUDANTE ELECTRICISTA HH 1 10.000

Descripción Materiales Unidad Cantidad


2 172 BROCA DIAMANTADA UND 0.200
2 172 Disco 4.5" de Corte Fe Und. 0.250
2 172 Disco 4.5" de Desbaste Und. 0.250
2 172
2 172
2 172
2 172
2 172
2 172
2 172
2 172 % Mater.Consum. s/Mat %Mat
2 172 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 172 AMOLADORA CHICA H-M 1 10.000
3 172 TALADRO MANUAL H-M 1 10.000
3 172 ANDAMIOS CERTIFICADOS H-M 4 40.000
3 172
3 172
3 172
3 172
3 172
3 172
3 172
3 172 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 172
4 172
4 172
4 172

APOYO A SALA ELECTRICA VENDOR 1920-ER-100A


Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
173 R_un/dia 0.8 R_EQ: 0.8 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 173 CAPATAZ ELECTRICISTA HH 0.5 5.000
1 173 OFICIAL ELECTRICISTA HH 2 20.000
1 173 OPERARIO ELECTRICISTA HH 2 20.000
1 173 AYUDANTE ELECTRICISTA HH 1 10.000
Descripción Materiales Unidad Cantidad
2 173 BROCA DIAMANTADA UND 0.200
2 173 Disco 4.5" de Corte Fe Und. 0.250
2 173 Disco 4.5" de Desbaste Und. 0.250
2 173
2 173
2 173
2 173
2 173
2 173
2 173
2 173 % Mater.Consum. s/Mat %Mat
2 173 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 173 AMOLADORA CHICA H-M 1 10.000
3 173 TALADRO MANUAL H-M 1 10.000
3 173 ANDAMIOS CERTIFICADOS H-M 4 40.000
3 173
3 173
3 173
3 173
3 173
3 173
3 173
3 173 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 173
4 173
4 173
4 173

APOYO A SALA ELECTRICA VENDOR 1920-ER-100B


Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
174 R_un/dia 0.8 R_EQ: 0.8 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 174 CAPATAZ ELECTRICISTA HH 0.5 5.000
1 174 OFICIAL ELECTRICISTA HH 2 20.000
1 174 OPERARIO ELECTRICISTA HH 2 20.000
1 174 AYUDANTE ELECTRICISTA HH 1 10.000

Descripción Materiales Unidad Cantidad


2 174 BROCA DIAMANTADA UND 0.200
2 174 Disco 4.5" de Corte Fe Und. 0.250
2 174 Disco 4.5" de Desbaste Und. 0.250
2 174
2 174
2 174
2 174
2 174
2 174
2 174
2 174 % Mater.Consum. s/Mat %Mat
2 174 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 174 AMOLADORA CHICA H-M 1 10.000
3 174 TALADRO MANUAL H-M 1 10.000
3 174 ANDAMIOS CERTIFICADOS H-M 4 40.000
3 174
3 174
3 174
3 174
3 174
3 174
3 174
3 174 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 174
4 174
4 174
4 174

#N/A
Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
R_un/dia R_EQ: Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 0
1 0
1 0
1 0

Descripción Materiales Unidad Cantidad


2 0
2 0
2 0
2 0
2 0
2 0
2 0
2 0
2 0
2 0
2 0 % Mater.Consum. s/Mat %Mat
2 0 % Mater.Consum. s/MO %MO

Descripción Equipos Unidad Cuadrilla Cantidad


3 0
3 0
3 0
3 0
3 0
3 0
3 0
3 0
3 0
3 0
3 0 % Herramienas Manuales s/MO %MO

Descripción Servicios Unidad Cantidad


4 0
4 0
4 0
4 0

SUMINISTRO Y MONTAJE DE POSTE GALVANIZADO EN CALIENTE DE 6" -4"ø DE 12 METROS INC. PERNOS DE AN
Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
175 R_un/dia 5 R_EQ: 5 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 175 TOPOGRAFO HH 0.5 0.800
1 175 OPERARIO ELECTRICISTA HH 2 3.200
1 175 OFICIAL ELECTRICISTA HH 2 3.200
1 175 AYUDANTE ELECTRICISTA HH 2 3.200

Descripción Materiales Unidad Cantidad


2 175 Poste de AG 12 m (6-4"dia) Unid. 1.000
2 175
2 175
2 175
2 175
2 175
2 175
2 175
2 175
2 175
2 175 % Mater.Consum. s/Mat %Mat
2 175 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 175 MARTILLO NEUMATICO 24 kg CON CINCEL Y ACCESORIOS H-E 1 1.600
3 175 GRUA 25 TON H-E 1 1.600
3 175 PICO/ PALA / BUGUIE H-E 2 3.200
3 175 ESTACION TOTAL H-E 0.5 0.800
3 175 CAMABAJA H-M 0.25 0.400
3 175
3 175
3 175
3 175
3 175
3 175 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 175 Transp. carga a Marcona Kg 336.000
4 175
4 175
4 175

CONSTRUCCION DE PEDESTALES DE CONCRETO DE 1.40Mx0.55M, PARA POSTE METALICO


Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
176 R_un/dia 2 R_EQ: 2 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 176 TOPOGRAFO HH 1 4.000
1 176 AYUDANTE HH 1 4.000
1 176 OFICIAL HH 1 4.000
1 176 OPERARIO HH 2 8.000

Descripción Materiales Unidad Cantidad


2 176 Cemento Portland tipo V (bolsa 42.5 Kg) Bolsa 3.748
2 176 Arena Gruesa m3 0.212
2 176 Piedra chancada 1/2" m3 0.318
2 176 Aditivo cementicio Z1 Kg 2.623
2 176 Acero Estructural 1/2" Kg 46.912
2 176 Sikagrout 212 (30 Kg) (2.13 Kg/l) Bolsa 1.074
2 176 Sika Anchor Fix (p/anclaje) 300 cc pote 0.250
2 176 MADERA TRIPLAY (12 MM - 2 USOS)(2.4 x 1.2 m) UND 1.222
2 176 Gasolina 90 oct GL 0.500
2 176 Tubería PVC SAP 1" x 3 m Und. 1.000
2 176 % Mater.Consum. s/Mat %Mat
2 176 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 176 TROMPO 7CF H-M 1 4.000
3 176 PICO/ PALA / BUGUIE H-E 1 4.000
3 176 Cizalla de Palanca H-E 1 4.000
3 176 AMOLADORA CHICA H-M 1 4.000
3 176 ESTACION TOTAL H-E 1 4.000
3 176
3 176
3 176
3 176
3 176
3 176 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 176
4 176
4 176
4 176

SUMINISTRO, INSTALACION, FLECHADO Y CONEXIONADO DE CONDUCTOR AUTOPORTANTE, MULTICONDUCTO


Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
177 R_un/dia 150 R_EQ: 150 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 177 CAPATAZ ELECTRICISTA HH 0.25 0.013
1 177 OPERARIO ELECTRICISTA HH 2 0.107
1 177 OFICIAL ELECTRICISTA HH 5 0.267
1 177 AYUDANTE ELECTRICISTA HH 5 0.267

Descripción Materiales Unidad Cantidad


2 177 Cable multipolar, tipo N2XY, calibre 3x25mm2 + T - 1kV m 1.000
2 177
2 177
2 177
2 177
2 177
2 177
2 177
2 177
2 177
2 177 % Mater.Consum. s/Mat %Mat
2 177 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 177 GRUA 25 TON H-E 0.25 0.013
3 177 PORTACARRETE H-E 1 0.053
3 177 MEGOHMETRO H-M 0.5 0.027
3 177 POLEAS H-M 1 0.053
3 177 RANA PARA TENSAR CABLE H-E 1 0.053
3 177 TECLE 1.5 TON H-E 1 0.053
3 177
3 177
3 177
3 177
3 177 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 177 Transp. carga a Marcona Kg 0.900
4 177
4 177
4 177

SUMINISTRO, INSTALACION Y CONEXIONADO DE REFLECTOR DE VAPOR DE SODIO SON-T, 250W, USOS EXTERIO
Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
178 R_un/dia 2 R_EQ: 2 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 178 CAPATAZ ELECTRICISTA HH 0.1 0.400
1 178 AYUDANTE ELECTRICISTA HH 1 4.000
1 178 OFICIAL INSTRUMENTISTA HH 1 4.000
1 178 OPERARIO ELECTRICISTA HH 2 8.000

Descripción Materiales Unidad Cantidad


2 178 reflector industrial hermético, IP65, con lámparas de vapor UND 1.000
2 178 Canal UNISTRUT 1 5/8"x 1 5/8"x 3m. Modelo: P1000 10¨PG,UND 0.250
2 178 ABRAZADERA STRUT DE 3/4" UL m 1.000
2 178 Disco 4.5" de Corte Fe Und. 0.250
2 178 BROCA DIAMANTADA UND 0.050
2 178
2 178
2 178
2 178
2 178
2 178 % Mater.Consum. s/Mat %Mat
2 178 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 178 AMOLADORA CHICA H-M 1 4.000
3 178 TALADRO MANUAL H-M 1 4.000
3 178 CAMION 5 TM H-M 0.25 1.000
3 178
3 178
3 178
3 178
3 178
3 178
3 178
3 178 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 178
4 178
4 178
4 178

SUMISTRO, MONTAJE Y CONEXIONADO TABLERO DE ACERO INOXIDABLE USO EXTERIOR DE 500x600x200mm, C


Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
179 R_un/dia 2 R_EQ: 2 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 179 CAPATAZ ELECTRICISTA HH 0.1 0.400
1 179 OPERARIO ELECTRICISTA HH 2 8.000
1 179 OFICIAL ELECTRICISTA HH 1 4.000
1 179

Descripción Materiales Unidad Cantidad


2 179 SOPORTE METALICO kg 23.536
2 179 Tablero de Iluminación, 230Vac, trifásico, con celda fotovol UND 1.000
2 179
2 179
2 179
2 179
2 179
2 179
2 179
2 179
2 179 % Mater.Consum. s/Mat %Mat
2 179 % Mater.Consum. s/MO %MO 5%
Descripción Equipos Unidad Cuadrilla Cantidad
3 179 TALADRO MANUAL H-M 0.25 1.000
3 179 TORQUIMETRO H-E 0.25 1.000
3 179
3 179
3 179
3 179
3 179
3 179
3 179
3 179
3 179 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 179 Transp. carga a Marcona Kg 40.000
4 179
4 179
4 179

CONSTRUCCION DE BASE DE CONCRETO PARA MONTAJE TABLERO DE ACERO INOXIDABLE USO EXTERIOR DE 40
Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
180 R_un/dia 2 R_EQ: 2 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 180 CAPATAZ HH 0.1 0.400
1 180 AYUDANTE HH 1 4.000
1 180 OFICIAL HH 1 4.000
1 180 OPERARIO HH 2 8.000

Descripción Materiales Unidad Cantidad


2 180 Cemento Portland tipo V (bolsa 42.5 Kg) Bolsa 0.425
2 180 Arena Gruesa m3 0.024
2 180 Piedra chancada 1/2" m3 0.036
2 180 Acero Estructural 3/8" Kg 0.896
2 180 Acero Estructural 1/2" Kg 3.038
2 180 Aditivo cementicio Z1 Kg 0.297
2 180 MADERA TRIPLAY (12 MM - 2 USOS)(2.4 x 1.2 m) UND 0.208
2 180 Pernos Hilti 1/2" x 4" Und 4.000
2 180 Gasolina 90 oct GL 0.400
2 180
2 180 % Mater.Consum. s/Mat %Mat
2 180 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 180 TROMPO 7CF H-M 1 4.000
3 180 PICO/ PALA / BUGUIE H-E 1 4.000
3 180 TALADRO MANUAL H-M 1 4.000
3 180
3 180
3 180
3 180
3 180
3 180
3 180
3 180 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 180
4 180
4 180
4 180

SUMINISTRO DE FERRETERÍA ELECTRICA PARA ALUMBRADO EXTERIOR


Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
181 R_un/dia R_EQ: Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 181
1 181
1 181
1 181

Descripción Materiales Unidad Cantidad


2 181 Acero Angulo 2"x1/4 x 6 m Pza 6.000
2 181 Abrazadera Und. 6.000
2 181 Perno Coche 5/8" x 38 mm UND 18.000
2 181 Acero Espárrago 1/2" c/tuercas x 500 mm UND 9.000
2 181 Soldadura KG 0.500
2 181 PINTURA PARA TUBERIAS GLN 0.794
2 181 Disco 4.5" de Corte Fe Und. 1.000
2 181 Abrazadera Und. 48.000
2 181 CINTA AISLANTE SUPER 33 DE 3M UND 12.000
2 181 CINTA VULCANIZANTE SCOTCH 23 UND 12.000
2 181 % Mater.Consum. s/Mat %Mat 5%
2 181 % Mater.Consum. s/MO %MO

Descripción Equipos Unidad Cuadrilla Cantidad


3 181
3 181
3 181
3 181
3 181
3 181
3 181
3 181
3 181
3 181
3 181 % Herramienas Manuales s/MO %MO

Descripción Servicios Unidad Cantidad


4 181
4 181
4 181
4 181

SUMINISTRO DE FERRETERÍA ELECTRICA PARA ALUMBRADO EXTERIOR


Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
182 R_un/dia 16 R_EQ: 16 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 182
1 182
1 182
1 182

Descripción Materiales Unidad Cantidad


2 182 Caja de paso inox 200x200 mm Un. 8.000
2 182 Capuchón termoretráctil p/ter. cables CTC-20/7.5 Und. 24.000
2 182 Conector perforante p/derivación p/cond. Cu 4-35 mm2 Und. 60.000
2 182 Unión tubular "C" Cu estañado P/cable 4-10 mm2 Und. 120.000
2 182 Perno Ojo AG 5/8"x14" c/Tuercas+arandela Kit 5.000
2 182 Grapa cónica p/fin de línea Cable 10-50 mm2 Und. 8.000
2 182 Tuerca Ojo AG 5/8" c/tuercas+arandela Und. 8.000
2 182 Perno gancho AG 5/8"x14" c/tuercas+arandela Und. 9.000
2 182 Mordaza de susp. Al p/cable 10 mm2 Und. 9.000
2 182 Arandela cuadrada curva AG 2.25"x 3/16" hueco 5/8" Pza. 30.000
2 182 % Mater.Consum. s/Mat %Mat 5%
2 182 % Mater.Consum. s/MO %MO

Descripción Equipos Unidad Cuadrilla Cantidad


3 182
3 182
3 182
3 182
3 182
3 182
3 182
3 182
3 182
3 182
3 182 % Herramienas Manuales s/MO %MO

Descripción Servicios Unidad Cantidad


4 182
4 182
4 182
4 182

INSTALACION DE CLAVOS DE A°G°, EN POSTES DE MADERA 55'


Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
183 R_un/dia 100 R_EQ: 100 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 183 CAPATAZ ELECTRICISTA HH 0.1 0.008
1 183 AYUDANTE ELECTRICISTA HH 2 0.160
1 183 OFICIAL ELECTRICISTA HH 2 0.160
1 183
183
183 Descripción Materiales Unidad Cantidad
2 183
2 183
2 183
2 183
2 183
2 183
2 183
2 183
2 183
2 183
2 183 % Mater.Consum. s/Mat %Mat
2 183 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 183 Escalera telescópica (12 m) H-E 2 0.160
3 183 ARNES DE LINIERO HE 2 0.160
3 183
3 183
3 183
3 183
3 183
3 183
3 183
3 183
3 183 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 183
4 183
4 183
4 183

INSTALACION DE LISTONES DE 50X19MMX2.7M, EN POSTES DE MADERA 55'


Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
184 R_un/dia 8 R_EQ: 8 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 184 CAPATAZ ELECTRICISTA HH 0.1 0.100
1 184 OFICIAL ELECTRICISTA HH 2 2.000
1 184
1 184
184
184 Descripción Materiales Unidad Cantidad
2 184 Clavo de madera 4" Kg 0.125
2 184
2 184
2 184
2 184
2 184
2 184
2 184
2 184
2 184
2 184 % Mater.Consum. s/Mat %Mat
2 184 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 184
3 184
3 184
3 184
3 184
3 184
3 184
3 184
3 184
3 184
3 184 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 184
4 184
4 184
4 184

SUMINISTRO Y MONTAJE DE POSTE DE CONCRETO ARMADO CENTRIFUGADO DE 12/300/165/345


Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
185 R_un/dia 4 R_EQ: 4 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 185 TOPOGRAFO HH 0.25 0.500
1 185 AYUDANTE ELECTRICISTA HH 2 4.000
1 185 OFICIAL ELECTRICISTA HH 2 4.000
1 185 OPERARIO ELECTRICISTA HH 2 4.000

Descripción Materiales Unidad Cantidad


2 185 Poste concreto h=12m, 345 dia. base Und 1.000
2 185 Concreto1 m3 1.500
2 185 Piedra Grande (6"-8") m3 1.500
2 185
2 185
2 185
2 185
2 185
2 185
2 185
2 185 % Mater.Consum. s/Mat %Mat
2 185 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 185 GRUA 25 TON H-E 1 2.000
3 185 PICO/ PALA / BUGUIE H-E 1 2.000
3 185 RETROEXCAVADORA 0.8 M3 H-M 0.25 0.500
3 185 ESTACION TOTAL H-E 0.25 0.500
3 185
3 185
3 185
3 185
3 185
3 185
3 185 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 185 Transp. carga a Marcona Kg 486.000
4 185
4 185
4 185

SUMINISTRO Y CONSTRUCCIÓN DE BANCO DE DUCTOS ENTERRADO, INCLUYE SUMINISTRO DE TUBERÍAS PVC S


Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
186 R_un/dia 20 R_EQ: 20 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 186 CAPATAZ ELECTRICISTA HH 0.1 0.040
1 186 AYUDANTE ELECTRICISTA HH 1 0.400
1 186 OFICIAL ELECTRICISTA HH 1 0.400
1 186 OPERARIO ELECTRICISTA HH 2 0.800

Descripción Materiales Unidad Cantidad


2 186 Tubería PVC 1.5" x 5 m Pza 0.200
2 186 Tubería PVC SAP 1.5" Unión Und. 0.200
2 186 Disco 4.5" de Corte Fe Und. 0.067
2 186 Cinta reflectiva (33 m) rollo 0.030
2 186 Pegamento OATEY 1/4 Gal 0.010
2 186 Gasolina 90 oct GL 0.050
2 186
2 186
2 186
2 186
2 186 % Mater.Consum. s/Mat %Mat
2 186 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 186 AMOLADORA CHICA H-M 1 0.400
3 186 PICO/ PALA / BUGUIE H-E 2 0.800
3 186 ZARANDA H-E 1 0.400
3 186 PLANCHA APISONADORA H-E 1 0.400
3 186 RETROEXCAVADORA 0.8 M3 H-M 1 0.400
3 186 CAMION 5 TM H-M 0.25 0.100
3 186
3 186
3 186
3 186
3 186 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 186
4 186
4 186
4 186

SUMINISTRO, INSTALACION Y CONEXIONADO DE REFLECTOR DE VAPOR DE SODIO SON-T, 250W, USOS EXTERIO
Tipo Partida Recurso Un/día MO -- Unidad --- Cant Unit.
187 R_un/dia 2 R_EQ: 2 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 187 CAPATAZ ELECTRICISTA HH 0.1 0.400
1 187 AYUDANTE ELECTRICISTA HH 1 4.000
1 187 OFICIAL INSTRUMENTISTA HH 1 4.000
1 187 OPERARIO ELECTRICISTA HH 2 8.000

Descripción Materiales Unidad Cantidad


2 187 reflector industrial hermético, IP65, con lámparas de vapor UND 1.000
2 187 Canal UNISTRUT 1 5/8"x 1 5/8"x 3m. Modelo: P1000 10¨PG,UND 0.250
2 187 ABRAZADERA STRUT DE 3/4" UL m 1.000
2 187 Disco 4.5" de Corte Fe Und. 0.250
2 187 BROCA DIAMANTADA UND 0.050
2 187
2 187
2 187
2 187
2 187
2 187 % Mater.Consum. s/Mat %Mat
2 187 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 187 AMOLADORA CHICA H-M 1 4.000
3 187 TALADRO MANUAL H-M 1 4.000
3 187 CAMION 5 TM H-M 0.25 1.000
3 187
3 187
3 187
3 187
3 187
3 187
3 187
3 187 % Herramienas Manuales s/MO %MO 5%
Descripción Servicios Unidad Cantidad
4 187
4 187
4 187
4 187
o De PVC En El Exterior (20 Mil) Incluye Soporte, Curvas Y Accesorios
$ unit. Sub Total $
osto unitario USD 28.538 28.538
Precio U$ Parcial U$
7.44 0.744
5.78 5.780
5.26 5.260

11.784
Precio U$ Parcial U$
5.00 5.000
1.53 1.530
2.00 2.000
1.13 2.260
1.69 3.380
15.00 0.150
3.00 0.090
3.00 0.090
14.00 0.700
0.63 0.063
15.26 0.000
11.78 0.589
15.852
Precio U$ Parcial U$
0.66 0.165
0.59 0.147

11.78 0.589
0.901
Precio U$ Parcial U$

0.000
o De PVC En El Exterior (20 Mil) Incluye Soporte, Curvas Y Accesorios
$ unit. Sub Total $
osto unitario USD 25.698 25.698
Precio U$ Parcial U$
7.44 0.744
5.78 5.780
5.26 5.260

11.784
Precio U$ Parcial U$
4.55 4.550
1.53 1.530
2.00 2.000
0.76 0.760
1.52 1.520
0.56 1.120
3.00 0.090
3.00 0.090
14.00 0.700
0.63 0.063
12.42 0.000
11.78 0.589
13.012
Precio U$ Parcial U$
0.66 0.165
0.59 0.147

11.78 0.589
0.901
Precio U$ Parcial U$

0.000

y accesorios
$ unit. Sub Total $
osto unitario USD 51.592 51.592
Precio U$ Parcial U$
7.44 0.372
5.78 2.890
5.26 2.630
4.28 2.140
8.032
Precio U$ Parcial U$
35.74 11.913
32.00 6.400
51.66 1.033
2.11 0.528
62.46 14.990
1.05 0.525
15.00 0.150
3.00 0.060
3.00 0.060
4.66 0.093
35.75 0.000
8.03 0.402
36.154
Precio U$ Parcial U$
1.63 3.260
0.66 0.083
0.59 0.294
60.00 3.000
2.94 0.368

8.03 0.402
7.406
Precio U$ Parcial U$

0.000

y accesorios
$ unit. Sub Total $
osto unitario USD 51.592 51.592
Precio U$ Parcial U$
7.44 0.372
5.78 2.890
5.26 2.630
4.28 2.140
8.032
Precio U$ Parcial U$
35.74 11.913
32.00 6.400
51.66 1.033
2.11 0.528
62.46 14.990
1.05 0.525
15.00 0.150
3.00 0.060
3.00 0.060
4.66 0.093
35.75 0.000
8.03 0.402
36.154
Precio U$ Parcial U$
1.63 3.260
0.66 0.083
0.59 0.294
60.00 3.000
2.94 0.368

8.03 0.402
7.406
Precio U$ Parcial U$

0.000

as Y Accesorios
$ unit. Sub Total $
osto unitario USD 51.592 51.592
Precio U$ Parcial U$
7.44 0.372
5.78 2.890
5.26 2.630
4.28 2.140
8.032
Precio U$ Parcial U$
35.74 11.913
32.00 6.400
51.66 1.033
2.11 0.528
62.46 14.990
1.05 0.525
15.00 0.150
3.00 0.060
3.00 0.060
4.66 0.093
35.75 0.000
8.03 0.402
36.154
Precio U$ Parcial U$
1.63 3.260
0.66 0.083
0.59 0.294
60.00 3.000
2.94 0.368

8.03 0.402
7.406
Precio U$ Parcial U$

0.000

$ unit. Sub Total $


osto unitario USD 62.760 62.760
Precio U$ Parcial U$
7.44 0.248
4.28 1.427
5.26 1.753
5.78 1.927
5.355
Precio U$ Parcial U$
19.06 3.812
3.19 1.595
2.38 0.476
3.00 0.150
14.00 0.840

6.87 0.000
5.35 0.268
7.141
Precio U$ Parcial U$
0.59 0.196
0.66 0.110

5.35 0.268
0.574
Precio U$ Parcial U$
21.12 21.119
12.05 12.047
16.53 16.526

49.691

$ unit. Sub Total $


osto unitario USD 59.842 59.842
Precio U$ Parcial U$
7.44 0.248
4.28 1.427
5.26 1.753
5.78 1.927
5.355
Precio U$ Parcial U$
4.76 1.587
1.63 0.815
1.69 0.563
3.00 0.150
14.00 0.840

3.96 0.000
5.35 0.268
4.223
Precio U$ Parcial U$
0.59 0.196
0.66 0.110

5.35 0.268
0.574
Precio U$ Parcial U$
21.12 21.119
12.05 12.047
16.53 16.526

49.691

$ unit. Sub Total $


osto unitario USD 57.610 57.610
Precio U$ Parcial U$
7.44 0.198
4.28 1.141
5.26 1.403
5.78 1.541
4.284
Precio U$ Parcial U$
1.69 0.563
1.69 0.845
1.69 0.563
3.00 0.150
14.00 0.840

2.96 0.000
4.28 0.214
3.176
Precio U$ Parcial U$
0.59 0.157
0.66 0.088

4.28 0.214
0.459
Precio U$ Parcial U$
21.12 21.119
12.05 12.047
16.53 16.526

49.691

$ unit. Sub Total $


osto unitario USD 57.610 57.610
Precio U$ Parcial U$
7.44 0.198
4.28 1.141
5.26 1.403
5.78 1.541
4.284
Precio U$ Parcial U$
1.69 0.563
1.69 0.845
1.69 0.563
3.00 0.150
14.00 0.840

2.96 0.000
4.28 0.214
3.176
Precio U$ Parcial U$
0.59 0.157
0.66 0.088

4.28 0.214
0.459
Precio U$ Parcial U$
21.12 21.119
12.05 12.047
16.53 16.526

49.691

$ unit. Sub Total $


osto unitario USD 10.827 10.827
Precio U$ Parcial U$

0.000
Precio U$ Parcial U$
1.69 0.563
1.69 0.845
1.69 0.563
50.00 7.500
14.00 0.840
10.31 0.516
0.00 0.000
10.827
Precio U$ Parcial U$

0.00 0.000
0.000
Precio U$ Parcial U$

0.000

$ unit. Sub Total $


osto unitario USD 14.934 14.934
Precio U$ Parcial U$

0.000
Precio U$ Parcial U$
19.06 3.812
3.19 1.595
2.38 0.476
50.00 7.500
14.00 0.840
14.22 0.711
0.00 0.000
14.934
Precio U$ Parcial U$

0.00 0.000
0.000
Precio U$ Parcial U$

0.000

Rectangular Estándar.
$ unit. Sub Total $
osto unitario USD 38.130 38.130
Precio U$ Parcial U$
7.44 0.992
5.26 7.013
5.78 7.707

15.712
Precio U$ Parcial U$
19.11 19.113
8.00 0.400
19.51 0.000
15.71 0.786
20.299
Precio U$ Parcial U$
1.00 1.333

15.71 0.786
2.119
Precio U$ Parcial U$

0.000

po Rectangular Estándar.
$ unit. Sub Total $
osto unitario USD 38.130 38.130
Precio U$ Parcial U$
7.44 0.992
5.26 7.013
5.78 7.707

15.712
Precio U$ Parcial U$
19.11 19.113
8.00 0.400

19.51 0.000
15.71 0.786
20.299
Precio U$ Parcial U$
1.00 1.333

15.71 0.786
2.119
Precio U$ Parcial U$

0.000

dondo), Tipo Empotrable, Color Blanco, Tipo Rectangular Estándar.


$ unit. Sub Total $
osto unitario USD 31.017 31.017
Precio U$ Parcial U$
7.44 0.992
5.26 7.013
5.78 7.707

15.712
Precio U$ Parcial U$
12.00 12.000
8.00 0.400

12.40 0.000
15.71 0.786
13.186
Precio U$ Parcial U$
1.00 1.333

15.71 0.786
2.119
Precio U$ Parcial U$

0.000

ular Estándar, Incluye Pernos De Sujeción.


$ unit. Sub Total $
osto unitario USD 16.262 16.262
Precio U$ Parcial U$
7.44 0.744
5.26 5.260
5.78 5.780

11.784
Precio U$ Parcial U$
2.20 2.200
0.55 1.100

3.30 0.000
11.78 0.589
3.889
Precio U$ Parcial U$
11.78 0.589
0.589
Precio U$ Parcial U$

0.000

ar Estándar.
$ unit. Sub Total $
osto unitario USD 29.417 29.417
Precio U$ Parcial U$
7.44 0.992
5.26 7.013
5.78 7.707

15.712
Precio U$ Parcial U$
10.40 10.400
8.00 0.400

10.80 0.000
15.71 0.786
11.586
Precio U$ Parcial U$
1.00 1.333
15.71 0.786
2.119
Precio U$ Parcial U$

0.000

$ unit. Sub Total $


osto unitario USD 56.586 56.586
Precio U$ Parcial U$
7.44 1.488
4.28 17.120
5.26 10.520
5.78 11.560
40.688
Precio U$ Parcial U$
3.23 3.230
2.35 1.175
0.56 0.560
0.44 0.110
7.10 0.128
11.71 0.030
2.48 0.310
3.50 1.750
0.80 1.600
0.55 1.100
9.99 0.000
40.69 2.034
12.027
Precio U$ Parcial U$
0.59 1.177
0.66 0.660
0.000

Tablero Neumático 1920-LCB-4XX.


$ unit. Sub Total $
osto unitario USD 149.638 149.638
Precio U$ Parcial U$
7.44 3.968
5.26 28.053
5.78 30.827
5.78 30.827
93.675
Precio U$ Parcial U$
32.00 5.333
7.09 3.545
4.66 5.592
3.00 1.000
3.00 1.000

16.47 0.000
93.67 4.684
21.154
Precio U$ Parcial U$
0.59 3.139
2.94 7.840
0.66 1.760
1.63 17.387

93.67 4.684
34.809
Precio U$ Parcial U$
0.000

ático 1920-LCB-4XX.
$ unit. Sub Total $
osto unitario USD 141.779 141.779
Precio U$ Parcial U$
7.44 3.968
5.26 28.053
5.78 30.827
5.78 30.827
93.675
Precio U$ Parcial U$
32.00 5.333
30.00 7.500
4.66 1.165
3.00 6.000
3.00 6.000

26.00 0.000
93.67 4.684
30.682
Precio U$ Parcial U$
0.59 3.139
2.94 7.840
0.66 1.760

93.67 4.684
17.422
Precio U$ Parcial U$
0.000

iones en válvulas neumáticas, hecho de perfil estructutal tipo "C", de 100mm x 50mm, galvanizado, incluye plancha de fijación de 250mm
$ unit. Sub Total $
osto unitario USD 229.177 229.177
Precio U$ Parcial U$
7.44 1.984
5.26 42.080
5.78 15.413
5.78 15.413
74.891
Precio U$ Parcial U$
85.58 42.790
7.09 21.272
72.10 14.420
2.11 8.443
32.00 8.000
4.66 1.631
11.77 1.177
4.95 0.495
3.00 3.000

101.23 0.000
74.89 3.745
104.972
Precio U$ Parcial U$
0.59 1.569
0.90 1.200
2.94 3.920
0.66 0.880

74.89 3.745
11.314
Precio U$ Parcial U$
0.38 38.000

38.000
m, en material de Acero Inoxidable 316, incluye pernos de sujeción y arandelas plana y de presión
$ unit. Sub Total $
osto unitario USD 6698.190 6698.190
Precio U$ Parcial U$
7.44 74.400
5.26 526.000
5.78 1156.000

1756.400
Precio U$ Parcial U$
8.61 774.900
10.86 543.000
12.67 633.500
17.21 258.150
20.34 406.800
1.44 871.200
0.88 532.400
0.28 338.800
0.36 217.800
3.00 24.000
4600.55 0.000
1756.40 87.820
4688.370
Precio U$ Parcial U$
0.59 58.850
0.66 66.000
1.63 40.750

1756.40 87.820
253.420
Precio U$ Parcial U$

0.000

o 232.50, 200psi, conexión inferior 1/4", case: acero inoxidable 316, incluye uniones "T", niple, reducción Bushing, válvula aguja de 1/2" en
$ unit. Sub Total $
osto unitario USD 108.017 108.017
Precio U$ Parcial U$
7.44 1.488
5.26 10.520
5.78 11.560

23.568
Precio U$ Parcial U$
18.60 18.600
0.98 0.980
0.74 0.247
0.71 1.420
0.96 0.320
2.90 2.900
0.63 0.126
14.00 1.400
56.10 56.100

82.09 0.000
23.57 1.178
83.271
Precio U$ Parcial U$

23.57 1.178
1.178
Precio U$ Parcial U$

0.000

$ unit. Sub Total $


osto unitario USD 5990.718 5990.718
Precio U$ Parcial U$
7.44 11.904
4.28 205.440
5.26 168.320
5.78 92.480
478.144
Precio U$ Parcial U$
350.00 350.000
50.00 25.000

375.00 0.000
478.14 23.907
398.907
Precio U$ Parcial U$
1.00 16.000
1.00 16.000
60.00 576.000

478.14 23.907
631.907
Precio U$ Parcial U$
186.74 4481.760

4481.760

esa-Captación)
$ unit. Sub Total $
osto unitario USD 5147.157 5147.157
Precio U$ Parcial U$
7.44 11.904
4.28 205.440
5.26 168.320
5.78 92.480
478.144
Precio U$ Parcial U$
7.17 1433.700
2.38 476.000
2.28 910.000

2819.70 465.499
478.14 23.907
3309.106
Precio U$ Parcial U$
1.00 16.000
7.50 360.000
60.00 960.000

478.14 23.907
1359.907
Precio U$ Parcial U$

0.000

e Arena, Incluye Reubicación De Soportes Soldados.


$ unit. Sub Total $
osto unitario USD 53.342 53.342
Precio U$ Parcial U$
7.44 1.190
5.26 16.832
5.78 9.248
5.78 9.248
36.518
Precio U$ Parcial U$
15.00 0.375
3.00 0.300
3.00 0.300
4.66 0.280

1.25 0.000
36.52 1.826
3.081
Precio U$ Parcial U$
0.59 0.942
2.94 4.704
0.66 1.056
1.63 5.216

36.52 1.826
13.744
Precio U$ Parcial U$

0.000

$ unit. Sub Total $


osto unitario USD 64.759 64.759
Precio U$ Parcial U$
7.44 0.198
5.78 1.541
5.26 1.403
4.28 1.141
4.284
Precio U$ Parcial U$
1.69 0.563
1.69 0.845
1.69 0.563
50.00 7.500
14.00 0.840

10.31 0.000
4.28 0.214
10.526
Precio U$ Parcial U$
0.66 0.044

4.28 0.214
0.258
Precio U$ Parcial U$
21.12 21.119
12.05 12.047
16.53 16.526

49.691

$ unit. Sub Total $


osto unitario USD 5.700 5.700
Precio U$ Parcial U$

0.000
Precio U$ Parcial U$
5.70 5.700
5.70 0.000
0.00 0.000
5.700
Precio U$ Parcial U$

0.00 0.000
0.000
Precio U$ Parcial U$

0.000

VA 1900-AH-000 (modificación acometida de cables en celda nueva 1910-AH-000)


$ unit. Sub Total $
osto unitario USD 4398.512 4398.512
Precio U$ Parcial U$
7.44 17.856
5.78 138.720
5.26 252.480
4.28 205.440
614.496
Precio U$ Parcial U$
104.00 416.000
32.00 16.000
58.00 232.000
3.00 3.000
36.36 72.720
50.00 12.500

752.22 0.000
614.50 30.725
782.945
Precio U$ Parcial U$
0.59 14.124
0.66 15.840
1.63 156.480
2.50 15.000

614.50 30.725
232.169
Precio U$ Parcial U$
619.39 1858.177
595.43 595.426
15.76 315.299

2768.902

CIO DE SHOUGESA HASTA POSTE P1


$ unit. Sub Total $
osto unitario USD 25.400 25.400
Precio U$ Parcial U$
7.44 0.149
5.78 3.468
5.26 3.156
4.28 2.568
9.341
Precio U$ Parcial U$
0.00 0.000
9.34 0.467
0.467
Precio U$ Parcial U$
60.00 12.000
7.50 3.000
2.50 0.125

9.34 0.467
15.592
Precio U$ Parcial U$

0.000

$ unit. Sub Total $


osto unitario USD 547.482 547.482
Precio U$ Parcial U$
7.44 11.904
5.26 168.320
5.78 184.960

365.184
Precio U$ Parcial U$
30.00 7.500
1.32 66.000
2.60 39.000
112.50 0.000
365.18 18.259
130.759
Precio U$ Parcial U$
0.24 1.920
0.66 10.560
1.00 16.000
1.20 4.800

365.18 18.259
51.539
Precio U$ Parcial U$

0.000

00A/1920-ER-100B
$ unit. Sub Total $
osto unitario USD 128.900 128.900
Precio U$ Parcial U$
7.44 2.976
5.78 46.240
5.26 42.080

91.296
Precio U$ Parcial U$
0.00 0.000
91.30 4.565
4.565
Precio U$ Parcial U$
0.59 2.354
0.66 2.640
1.20 4.800
2.50 10.000
1.00 4.000
2.34 4.680

91.30 4.565
33.039
Precio U$ Parcial U$

0.000

$ unit. Sub Total $


osto unitario USD 547.482 547.482
Precio U$ Parcial U$
7.44 11.904
5.26 168.320
5.78 184.960

365.184
Precio U$ Parcial U$
30.00 7.500
1.32 66.000
2.60 39.000

112.50 0.000
365.18 18.259
130.759
Precio U$ Parcial U$
0.24 1.920
0.66 10.560
1.00 16.000
1.20 4.800

365.18 18.259
51.539
Precio U$ Parcial U$

0.000

$ unit. Sub Total $


osto unitario USD 29.851 29.851
Precio U$ Parcial U$
7.44 0.661
5.78 10.276
5.26 4.676
4.28 7.609
23.221
Precio U$ Parcial U$
3.00 0.300

0.30 0.000
23.22 1.161
1.461
Precio U$ Parcial U$
0.66 0.587
0.59 0.523
1.63 2.898

23.22 1.161
5.169
Precio U$ Parcial U$

0.000

$ unit. Sub Total $


osto unitario USD 1207.301 1207.301
Precio U$ Parcial U$
7.44 19.840
5.78 308.267
5.26 280.533
4.28 114.133
722.773
Precio U$ Parcial U$
0.48 2.850
0.50 5.000

7.85 0.000
722.77 36.139
43.989
Precio U$ Parcial U$
60.00 400.000
0.66 4.400
722.77 36.139
440.539
Precio U$ Parcial U$

0.000

$ unit. Sub Total $


osto unitario USD 1207.301 1207.301
Precio U$ Parcial U$
7.44 19.840
5.78 308.267
5.26 280.533
4.28 114.133
722.773
Precio U$ Parcial U$
0.48 2.850
0.50 5.000

7.85 0.000
722.77 36.139
43.989
Precio U$ Parcial U$
60.00 400.000
0.66 4.400
722.77 36.139
440.539
Precio U$ Parcial U$

0.000

E ESTANQUE
$ unit. Sub Total $
osto unitario USD 132.631 132.631
Precio U$ Parcial U$
7.44 1.190
4.28 13.696
5.26 8.416
5.78 9.248
32.550
Precio U$ Parcial U$
1.91 3.828
32.00 64.000
3.00 1.500
15.00 1.500

70.83 0.000
32.55 1.628
72.456
Precio U$ Parcial U$
0.59 0.942
0.66 1.056
60.00 24.000
32.55 1.628
27.625
Precio U$ Parcial U$

0.000

$ unit. Sub Total $


osto unitario USD 262.529 262.529
Precio U$ Parcial U$
7.44 5.952
4.28 34.240
5.26 84.160
5.78 46.240
170.592
Precio U$ Parcial U$
15.00 7.500
3.55 7.100
4.66 2.330

16.93 0.000
170.59 8.530
25.460
Precio U$ Parcial U$
1.63 26.080
0.59 4.708
0.66 5.280
1.00 8.000
1.00 8.000
2.94 5.880
170.59 8.530
66.478
Precio U$ Parcial U$

0.000

DE MOTORES DE BOMBAS DE CAPTACION


$ unit. Sub Total $
osto unitario USD 44.497 44.497
Precio U$ Parcial U$
7.44 1.488
5.26 21.040
5.78 11.560

34.088
Precio U$ Parcial U$

0.00 0.000
34.09 1.704
1.704
Precio U$ Parcial U$
1.00 2.000
2.50 5.000
34.09 1.704
8.704
Precio U$ Parcial U$

0.000

RES DE BOMBAS DE CAPTACION


$ unit. Sub Total $
osto unitario USD 16.462 16.462
Precio U$ Parcial U$
7.44 0.744
5.78 5.780
5.26 5.260

11.784
Precio U$ Parcial U$

0.00 0.000
11.78 0.589
0.589
Precio U$ Parcial U$
1.00 1.000
2.50 2.500

11.78 0.589
4.089
Precio U$ Parcial U$

0.000

O LIQUID TIGHT
$ unit. Sub Total $
osto unitario USD 329.648 329.648
Precio U$ Parcial U$
7.44 0.298
5.78 2.312
5.26 2.104
4.28 1.712
6.426
Precio U$ Parcial U$
280.84 280.840
50.00 10.000
15.00 0.150
3.00 0.150
3.00 0.150
30.14 30.139

321.43 0.000
6.43 0.321
321.750
Precio U$ Parcial U$
0.66 0.264
0.59 0.235
1.63 0.652

6.43 0.321
1.473
Precio U$ Parcial U$
0.000

PARA T/FLEXIBLE PVC. INCLUYE SUMINISTRO DE CONSUMIBLES


$ unit. Sub Total $
osto unitario USD 260.169 260.169
Precio U$ Parcial U$
7.44 1.190
5.78 9.248
5.26 8.416

18.854
Precio U$ Parcial U$
234.68 234.680
3.00 0.600
3.00 0.600

235.88 0.000
18.85 0.943
236.823
Precio U$ Parcial U$
0.59 0.942
1.63 2.608

18.85 0.943
4.492
Precio U$ Parcial U$
0.000

RA CONEXIONES EXTERNAS (MECHAS)


$ unit. Sub Total $
osto unitario USD 117.324 117.324
Precio U$ Parcial U$
7.44 0.397
5.78 3.083
5.26 2.805
4.28 2.283
8.567
Precio U$ Parcial U$
10.80 16.200
85.00 85.000
6.70 6.700

107.90 0.000
8.57 0.428
108.328
Precio U$ Parcial U$

8.57 0.428
0.428
Precio U$ Parcial U$

0.000
COLOR VERDE. INCLUYE SUMINISTRO DE CONSUMIBLES
$ unit. Sub Total $
osto unitario USD 117.324 117.324
Precio U$ Parcial U$
7.44 0.397
5.78 3.083
5.26 2.805
4.28 2.283
8.567
Precio U$ Parcial U$
10.80 16.200
85.00 85.000
6.70 6.700

107.90 0.000
8.57 0.428
108.328
Precio U$ Parcial U$

8.57 0.428
0.428
Precio U$ Parcial U$

0.000

OPORTES DE BUS BAR


$ unit. Sub Total $
osto unitario USD 52.044 52.044
Precio U$ Parcial U$
7.44 0.992
5.78 7.707
5.26 14.027
4.28 11.413
34.139
Precio U$ Parcial U$
3.00 0.300
15.00 1.500

1.80 0.000
34.14 1.707
3.507
Precio U$ Parcial U$
0.66 0.880
0.59 0.785
1.63 8.693
2.50 1.667
1.00 0.667

34.14 1.707
14.398
Precio U$ Parcial U$

0.000

$ unit. Sub Total $


osto unitario USD 18.043 18.043
Precio U$ Parcial U$
7.44 0.595
5.78 4.624
5.26 4.208
4.28 3.424
12.851
Precio U$ Parcial U$
3.00 0.300

0.30 0.000
12.85 0.643
0.943
Precio U$ Parcial U$
0.66 0.528
0.59 0.471
1.63 2.608

12.85 0.643
4.249
Precio U$ Parcial U$

0.000

$ unit. Sub Total $


osto unitario USD 413.065 413.065
Precio U$ Parcial U$
7.44 37.200
5.26 105.200
5.78 115.600
4.28 42.800
300.800
Precio U$ Parcial U$
15.00 3.000
3.00 0.750
3.00 0.750

4.50 0.000
300.80 15.040
19.540
Precio U$ Parcial U$
0.59 5.885
0.66 6.600
1.63 65.200

300.80 15.040
92.725
Precio U$ Parcial U$

0.000

$ unit. Sub Total $


osto unitario USD 413.065 413.065
Precio U$ Parcial U$
7.44 37.200
5.26 105.200
5.78 115.600
4.28 42.800
300.800
Precio U$ Parcial U$
15.00 3.000
3.00 0.750
3.00 0.750

4.50 0.000
300.80 15.040
19.540
Precio U$ Parcial U$
0.59 5.885
0.66 6.600
1.63 65.200

300.80 15.040
92.725
Precio U$ Parcial U$

0.000

$ unit. Sub Total $


osto unitario USD 413.065 413.065
Precio U$ Parcial U$
7.44 37.200
5.26 105.200
5.78 115.600
4.28 42.800
300.800
Precio U$ Parcial U$
15.00 3.000
3.00 0.750
3.00 0.750

4.50 0.000
300.80 15.040
19.540
Precio U$ Parcial U$
0.59 5.885
0.66 6.600
1.63 65.200

300.80 15.040
92.725
Precio U$ Parcial U$

0.000

$ unit. Sub Total $


osto unitario USD 413.065 413.065
Precio U$ Parcial U$
7.44 37.200
5.26 105.200
5.78 115.600
4.28 42.800
300.800
Precio U$ Parcial U$
15.00 3.000
3.00 0.750
3.00 0.750

4.50 0.000
300.80 15.040
19.540
Precio U$ Parcial U$
0.59 5.885
0.66 6.600
1.63 65.200

300.80 15.040
92.725
Precio U$ Parcial U$

0.000

$ unit. Sub Total $


osto unitario USD 0.000 0.000
Precio U$ Parcial U$

0.000
Precio U$ Parcial U$
0.00 0.000
0.00 0.000
0.000
Precio U$ Parcial U$

0.00 0.000
0.000
Precio U$ Parcial U$

0.000

METROS INC. PERNOS DE ANCLAJE DE 900mm x 3/4"ø


$ unit. Sub Total $
osto unitario USD 1760.514 1760.514
Precio U$ Parcial U$
7.44 5.952
5.78 18.496
5.26 16.832
4.28 13.696
54.976
Precio U$ Parcial U$
1367.00 1367.000
1367.00 0.000
54.98 2.749
1369.749
Precio U$ Parcial U$
5.00 8.000
92.00 147.200
2.00 6.400
8.70 6.960
92.00 36.800

54.98 2.749
208.109
Precio U$ Parcial U$
0.38 127.680

127.680

$ unit. Sub Total $


osto unitario USD 322.591 322.591
Precio U$ Parcial U$
7.44 29.760
4.12 16.480
5.06 20.240
5.56 44.480
110.960
Precio U$ Parcial U$
6.80 25.485
13.01 2.761
15.88 5.056
1.25 3.279
0.90 42.220
31.00 33.290
16.38 4.095
18.40 22.489
3.47 1.735
1.69 1.690
142.10 0.000
110.96 5.548
147.649
Precio U$ Parcial U$
3.08 12.320
2.00 8.000
0.24 0.960
0.59 2.354
8.70 34.800

110.96 5.548
63.982
Precio U$ Parcial U$

0.000

ORTANTE, MULTICONDUCTOR DE COBRE 0.6/1.0KV, CAI-S 3x25+1x10MM2


$ unit. Sub Total $
osto unitario USD 17.098 17.098
Precio U$ Parcial U$
7.44 0.099
5.78 0.617
5.26 1.403
4.28 1.141
3.260
Precio U$ Parcial U$
11.29 11.290
11.29 0.000
3.26 0.163
11.453
Precio U$ Parcial U$
92.00 1.227
7.50 0.400
2.50 0.067
2.50 0.133
0.50 0.027
0.50 0.027

3.26 0.163
2.043
Precio U$ Parcial U$
0.38 0.342

0.342

ON-T, 250W, USOS EXTERIOR SIMETRICO, 230V (33000 LUM)


$ unit. Sub Total $
osto unitario USD 247.522 247.522
Precio U$ Parcial U$
7.44 2.976
4.28 17.120
5.26 21.040
5.78 46.240
87.376
Precio U$ Parcial U$
95.00 95.000
32.00 8.000
1.91 1.914
3.00 0.750
15.00 0.750

106.41 0.000
87.38 4.369
110.783
Precio U$ Parcial U$
0.59 2.354
0.66 2.640
40.00 40.000

87.38 4.369
49.363
Precio U$ Parcial U$

0.000

RIOR DE 500x600x200mm, CON CAÍDA A UNA AGUA, PARA ILUMINACION EXTERIOR


$ unit. Sub Total $
osto unitario USD 2074.299 2074.299
Precio U$ Parcial U$
7.44 2.976
5.78 46.240
5.26 21.040

70.256
Precio U$ Parcial U$
2.58 60.817
1918.00 1918.000

1978.82 0.000
70.26 3.513
1982.330
Precio U$ Parcial U$
0.66 0.660
2.34 2.340

70.26 3.513
6.513
Precio U$ Parcial U$
0.38 15.200

15.200

DABLE USO EXTERIOR DE 400x600x200mm, PARA ILUMINACION EXTERIOR


$ unit. Sub Total $
osto unitario USD 136.777 136.777
Precio U$ Parcial U$
7.15 2.860
4.12 16.480
5.06 20.240
5.56 44.480
84.060
Precio U$ Parcial U$
6.80 2.888
13.01 0.313
15.88 0.573
0.90 0.806
0.90 2.734
1.25 0.372
18.40 3.833
2.11 8.443
3.47 1.388

21.35 0.000
84.06 4.203
25.554
Precio U$ Parcial U$
3.08 12.320
2.00 8.000
0.66 2.640

84.06 4.203
27.163
Precio U$ Parcial U$

0.000

$ unit. Sub Total $


osto unitario USD 974.066 974.066
Precio U$ Parcial U$

0.000
Precio U$ Parcial U$
31.38 188.280
6.90 41.400
0.23 4.140
1.20 10.800
4.66 2.330
43.51 34.532
3.00 3.000
6.90 331.200
8.00 96.000
18.00 216.000
927.68 46.384
0.00 0.000
974.066
Precio U$ Parcial U$
0.00 0.000
0.000
Precio U$ Parcial U$

0.000

$ unit. Sub Total $


osto unitario USD 754.835 754.835
Precio U$ Parcial U$

0.000
Precio U$ Parcial U$
40.00 320.000
2.00 48.000
1.88 112.800
0.47 56.400
3.69 18.450
8.92 71.360
2.41 19.280
4.79 43.110
1.41 12.690
0.56 16.800
718.89 35.945
0.00 0.000
754.835
Precio U$ Parcial U$
0.00 0.000
0.000
Precio U$ Parcial U$

0.000

$ unit. Sub Total $


osto unitario USD 1.945 1.945
Precio U$ Parcial U$
7.44 0.060
4.28 0.685
5.26 0.842

1.586
Precio U$ Parcial U$

0.00 0.000
1.59 0.079
0.079
Precio U$ Parcial U$
1.00 0.160
0.25 0.040
1.59 0.079
0.279
Precio U$ Parcial U$

0.000

$ unit. Sub Total $


osto unitario USD 12.553 12.553
Precio U$ Parcial U$
7.44 0.744
5.26 10.520

11.264
Precio U$ Parcial U$
1.30 0.163

0.16 0.000
11.26 0.563
0.726
Precio U$ Parcial U$
11.26 0.563
0.563
Precio U$ Parcial U$

0.000

/300/165/345
$ unit. Sub Total $
osto unitario USD 971.300 971.300
Precio U$ Parcial U$
7.44 3.720
4.28 17.120
5.26 21.040
5.78 23.120
65.000
Precio U$ Parcial U$
190.77 190.770
183.00 274.500
25.00 37.500

502.77 0.000
65.00 3.250
506.020
Precio U$ Parcial U$
92.00 184.000
2.00 4.000
40.00 20.000
8.70 4.350
65.00 3.250
215.600
Precio U$ Parcial U$
0.38 184.680

184.680

NISTRO DE TUBERÍAS PVC SCH40 Ø 1 1/2".


$ unit. Sub Total $
osto unitario USD 37.629 37.629
Precio U$ Parcial U$
7.44 0.298
4.28 1.712
5.26 2.104
5.78 4.624
8.738
Precio U$ Parcial U$
14.84 2.968
1.69 0.338
3.00 0.201
9.39 0.282
14.00 0.140
3.47 0.174

4.10 0.000
8.74 0.437
4.539
Precio U$ Parcial U$
0.59 0.235
2.00 1.600
0.20 0.080
5.00 2.000
40.00 16.000
40.00 4.000
8.74 0.437
24.352
Precio U$ Parcial U$

0.000

ON-T, 250W, USOS EXTERIOR SIMETRICO, 230V (33000 LUM)


$ unit. Sub Total $
osto unitario USD 247.522 247.522
Precio U$ Parcial U$
7.44 2.976
4.28 17.120
5.26 21.040
5.78 46.240
87.376
Precio U$ Parcial U$
95.00 95.000
32.00 8.000
1.91 1.914
3.00 0.750
15.00 0.750

106.41 0.000
87.38 4.369
110.783
Precio U$ Parcial U$
0.59 2.354
0.66 2.640
40.00 40.000

87.38 4.369
49.363
Precio U$ Parcial U$

0.000
ncha de fijación de 250mm x 250mm x 12mm (espesor) y 4 pernos hilti de 1/2" x 4" de largo por perfil.
g, válvula aguja de 1/2" en acero inoxidable 316.
Excavación manual de zanja terreno semi rocoso (0.5 x0.6 m)
Tipo Partida Recurso n/día MO -- Unidad --- Cant Unit.
6.1 R_un/dia 8 R_EQ: 8 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 6.1 CAPATAZ HH 0.1 0.100
1 6.1 OFICIAL HH 2 2.000
1 6.1
1 6.1

Descripción Materiales Unidad Cantidad


2 6.1
2 6.1
2 6.1
2 6.1
2 6.1
2 6.1
2 6.1
2 6.1
2 6.1
2 6.1
2 6.1 % Mater.Consum. s/Mat %Mat
2 6.1 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 6.1 PICO/ PALA / BUGUIE H-E 2 2.000
3 6.1 ZARANDA H-E 1 1.000
3 6.1 MARTILLO NEUMATICO 24 kg CON CINCEL Y ACCESORI H-E 1 1.000
3 6.1
3 6.1
3 6.1
3 6.1
3 6.1
3 6.1
3 6.1
3 6.1 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 6.1
4 6.1
4 6.1
4 6.1
Relleno de canalización
Tipo Partida Recurso m/día MO -- Unidad --- Cant Unit.
6.2 R_un/dia 16 R_EQ: 16 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 6.2 CAPATAZ HH 0.1 0.050
1 6.2 OFICIAL HH 2 1.000
1 6.2
1 6.2

Descripción Materiales Unidad Cantidad


2 6.2 Gasolina 90 oct GL 0.25
2 6.2 Agua p/concreto m3 0.1
2 6.2
2 6.2
2 6.2
2 6.2
2 6.2
2 6.2
2 6.2
2 6.2
2 6.2 % Mater.Consum. s/Mat %Mat
2 6.2 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 6.2 PICO/ PALA / BUGUIE H-E 2 1.000
3 6.2 ZARANDA H-E 1 0.500
3 6.2 PLANCHA APISONADORA H-E 1 0.500
3 6.2
3 6.2
3 6.2
3 6.2
3 6.2
3 6.2
3 6.2
3 6.2 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 6.2
4 6.2
4 6.2
4 6.2

Cobertura losa concreto Fc=100 Kg/cm2 (a=0.5m/ e=0.1 m)


Tipo Partida Recurso m/día MO -- Unidad --- Cant Unit.
6.3 R_un/dia 30 R_EQ: 30 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 6.3 CAPATAZ HH 0.1 0.027
1 6.3 OFICIAL HH 2 0.533
1 6.3 OPERARIO HH 2 0.533
1 6.3 AYUDANTE HH 4 1.067

Descripción Materiales Unidad Cantidad


2 6.3 Gasolina 90 oct GL 0.1
2 6.3 Agua p/concreto m3 0.01
2 6.3 Cemento Portland tipo V (bolsa 42.5 Kg) Bolsa 0.2857142857
2 6.3 Arena Gruesa m3 0.0242715828
2 6.3 Piedra chancada 1/2" m3 0.040452638
2 6.3
2 6.3
2 6.3
2 6.3
2 6.3
2 6.3 % Mater.Consum. s/Mat %Mat
2 6.3 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 6.3 PICO/ PALA / BUGUIE H-E 2 0.533
3 6.3 ZARANDA H-E 1 0.267
3 6.3 TROMPO 7CF H-M 1 0.267
3 6.3
3 6.3
3 6.3
3 6.3
3 6.3
3 6.3
3 6.3
3 6.3 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 6.3
4 6.3
4 6.3
4 6.3

Construcción soporte p/ductos


Tipo Partida Recurso m/día MO -- Unidad --- Cant Unit.
153.1 R_un/dia 1 R_EQ: 1 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 153.1 CAPATAZ HH 0.1 0.800
1 153.1 OFICIAL HH 2 16.000
1 153.1 OPERARIO HH 2 16.000
1 153.1 AYUDANTE HH 1 8.000

Descripción Materiales Unidad Cantidad


2 153.1 Gasolina 90 oct GL 0.75
2 153.1 Agua p/concreto m3 0.01
2 153.1 Cemento Portland tipo V (bolsa 42.5 Kg) Bolsa 0.6194690265
2 153.1 Arena Gruesa m3 0.0350828188
2 153.1 Piedra chancada 1/2" m3 0.0526242282
2 153.1 Acero Estructural 1/2" Kg 4.1832
2 153.1 Acero Estructural 3/8" Kg 1.176
2 153.1 MADERA TRIPLAY (12 MM - 2 USOS)(2.4 x 1.2 m) UND 0.5
2 153.1 BROCA DIAMANTADA UND 0.1
2 153.1
2 153.1 % Mater.Consum. s/Mat %Mat
2 153.1 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 153.1 PICO/ PALA / BUGUIE H-E 1 8.000
3 153.1 ZARANDA H-E 1 8.000
3 153.1 TROMPO 7CF H-M 1 8.000
3 153.1 Rotomartillo demoledor Bosch H-E 1 8.000
3 153.1 CAMION 5 TM H-M 1 8.000
3 153.1
3 153.1
3 153.1
3 153.1
3 153.1
3 153.1 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 153.1
4 153.1
4 153.1
4 153.1

Desmontaje de bandeja existente


Tipo Partida Recurso m/día MO -- Unidad --- Cant Unit.
153.2 R_un/dia 0.5 R_EQ: 0.5 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 153.2 CAPATAZ ELECTRICISTA HH 0.1 1.600
1 153.2 OPERARIO ELECTRICISTA HH 1 16.000
1 153.2 OFICIAL ELECTRICISTA HH 2 32.000
1 153.2 AYUDANTE ELECTRICISTA HH 2 32.000

Descripción Materiales Unidad Cantidad


2 153.2 Disco 4.5" de Corte Fe Und. 1
2 153.2 BROCA DIAMANTADA UND 0.1
2 153.2
2 153.2
2 153.2
2 153.2
2 153.2
2 153.2
2 153.2
2 153.2
2 153.2 % Mater.Consum. s/Mat %Mat
2 153.2 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 153.2 AMOLADORA CHICA H-M 1 16.000
3 153.2 TALADRO MANUAL H-M 1 16.000
3 153.2 ANDAMIOS CERTIFICADOS H-M 4 64.000
3 153.2 Escalera telescópica (12 m) H-E 1 16.000
3 153.2
3 153.2
3 153.2
3 153.2
3 153.2
3 153.2
3 153.2 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 153.2
4 153.2
4 153.2
4 153.2

Cableado en celda nueva 1800 AH-000 Shougesa


Tipo Partida Recurso m/día MO -- Unidad --- Cant Unit.
153.3 R_un/dia 20 R_EQ: 20 Costo unitario USD
Descripción MO Unidad Cuadrilla Cantidad
1 153.3 CAPATAZ ELECTRICISTA HH 0.1 0.040
1 153.3 OPERARIO ELECTRICISTA HH 2 0.800
1 153.3 OFICIAL ELECTRICISTA HH 2 0.800
1 153.3 AYUDANTE ELECTRICISTA HH 2 0.800

Descripción Materiales Unidad Cantidad


2 153.3
2 153.3
2 153.3
2 153.3
2 153.3
2 153.3
2 153.3
2 153.3
2 153.3
2 153.3
2 153.3 % Mater.Consum. s/Mat %Mat
2 153.3 % Mater.Consum. s/MO %MO 5%

Descripción Equipos Unidad Cuadrilla Cantidad


3 153.3 ANDAMIOS CERTIFICADOS H-M 3 1.200
3 153.3
3 153.3
3 153.3
3 153.3
3 153.3
3 153.3
3 153.3
3 153.3
3 153.3
3 153.3 % Herramienas Manuales s/MO %MO 5%

Descripción Servicios Unidad Cantidad


4 153.3
4 153.3
4 153.3
4 153.3
m
$ unit. Sub Total $
o unitario USD 21.119 21.119
Precio U$ Parcial U$
7.15 0.715
5.06 10.120

10.835
Precio U$ Parcial U$

0.00 0.000
10.84 0.542
0.542
Precio U$ Parcial U$
2.00 4.000
0.20 0.200
5.00 5.000

10.840.542
9.742
Precio U$ Parcial U$

0.000
m
$ unit. Sub Total $
o unitario USD 12.047 12.047
Precio U$ Parcial U$
7.15 0.358
5.06 5.060

5.418
Precio U$ Parcial U$
3.47 0.868
6.20 0.620

1.49 0.000
5.42 0.271
1.758
Precio U$ Parcial U$
2.00 2.000
0.20 0.100
5.00 2.500

5.42 0.271
4.871
Precio U$ Parcial U$

0.000

m
$ unit. Sub Total $
o unitario USD 16.526 16.526
Precio U$ Parcial U$
7.15 0.191
5.06 2.699
5.56 2.965
4.12 4.395
10.249
Precio U$ Parcial U$
3.47 0.347
6.20 0.062
6.80 1.943
13.01 0.316
15.88 0.642

3.31 0.000
10.25 0.512
3.822
Precio U$ Parcial U$
2.00 1.067
0.20 0.053
3.08 0.821

10.250.512
2.454
Precio U$ Parcial U$

0.000

Un
$ unit. Sub Total $
o unitario USD 619.392 619.392
Precio U$ Parcial U$
7.15 5.720
5.06 80.960
5.56 88.960
4.12 32.960
208.600
Precio U$ Parcial U$
3.47 2.603
6.20 0.062
6.80 4.212
13.01 0.456
15.88 0.836
0.90 3.765
0.90 1.058
18.40 9.200
15.00 1.500

23.69 0.000
208.60 10.430
34.122
Precio U$ Parcial U$
2.00 16.000
0.20 1.600
3.08 24.640
0.50 4.000
40.00 320.000

208.60 10.430
376.670
Precio U$ Parcial U$

0.000

Glb
$ unit. Sub Total $
o unitario USD 595.426 595.426
Precio U$ Parcial U$
7.44 11.904
5.7892.480
5.26
168.320
4.28
136.960
409.664
Precio U$ Parcial U$
3.00 3.000
15.00 1.500

4.50 0.000
409.66 20.483
24.983
Precio U$ Parcial U$
0.59 9.416
0.66 10.560
1.63 104.320
1.00 16.000

409.66 20.483
160.779
Precio U$ Parcial U$

0.000

m
$ unit. Sub Total $
o unitario USD 15.765 15.765
Precio U$ Parcial U$
7.44 0.298
5.78 4.624
5.26 4.208
4.28 3.424
12.554
Precio U$ Parcial U$

0.00 0.000
12.55 0.628
0.628
Precio U$ Parcial U$
1.63 1.956

12.55 0.628
2.584
Precio U$ Parcial U$

0.000
1 MANO DE OBRA t $
1 ALBAÑIL HH 5.56
1 AYUDANTE HH 4.12
1 AYUDANTE ELECTRICISTA HH 4.28
1 AYUDANTE INSTRUMENTISTA HH 4.28
1 AYUDANTE MECANICO HH 4.28
1 AYUDANTE1 HH 4.28
1 CAPATAZ HH 7.15
1 CAPATAZ ELECTRICISTA HH 7.44
1 CAPATAZ INSTRUMENTISTA HH 7.44
1 CAPATAZ MECANICO HH 7.44
1 OFICIAL HH 5.06
1 OFICIAL ELECTRICISTA HH 5.26
1 OFICIAL INSTRUMENTISTA HH 5.26
1 OFICIAL MECANICO HH 5.26
1 OFICIAL1 HH 5.26
1 Operador de Bote HH 9.00
1 OPERARIO HH 5.56
1 OPERARIO ELECTRICISTA HH 5.78
1 OPERARIO INSTRUMENTISTA HH 5.78
1 OPERARIO MECANICO HH 5.78
1 OPERARIO1 HH 5.78
1 PEON CIVIL HH 4.12
1 Rescatista HH 9.00
1 RIGGER HH 5.26
1 SOLDADOR HH 5.78
1 TOPOGRAFO HH 7.44
2 MATERIALES t $
2 % Mater.Consum. s/Mat %Mat
2 % Mater.Consum. s/MO %MO
2 Abrazadera Und. 6.90
2 Abrazadera p/tubing 2 x30 x100 mm Und. 8.61
2 Abrazadera p/tubing 2 x30 x200 mm Und. 10.86
2 Abrazadera p/tubing 2 x30 x300 mm Und. 12.67
2 Abrazadera p/tubing 2 x30 x400 mm Und. 17.21
2 Abrazadera p/tubing 2 x30 x425 mm Und. 20.34
2 ABRAZADERA STRUT DE 1" UL m $7.09
2 Abrazadera Strut de 2" Un $1.05
2 ABRAZADERA STRUT DE 3/4" UL m $1.91
2 Abrazaderas, arandelas, conectores, amarres preformados, KG 50.00
2 Acero Angulo 2"x 3/16" x 6 m UND 24.04
2 Acero Angulo 2"x1/4 x 6 m Pza 31.38
2 Acero Angulo 3"x 1/4" x 6 m UND 47.11
2 Acero Angulo 4"x1/2 x 6 m Pza 51.29
2 Acero Angulo 4"x3/8 x 6 m Pza 95.70
2 Acero barra lisa 1/2" dia.x 1 m m 0.96
2 Acero Espárrago 1/2" c/tuercas x 500 mm UND 1.20
2 Acero Espárrago 3/4" c/tuercas x 900 mm UND 3.42
2 Acero Estructural TON 900.00
2 Acero Estructural 1" Kg 0.90
2 Acero Estructural 1/2" Kg 0.90
2 Acero Estructural 3/8" Kg 0.90
2 Acero Estructural X Kg 1.10
2 Acero Perfil C4x5.4 (4x1.584"x20p) UND 63.74
2 Acero Perfil C4x7.25 (4x1.721"x20p) UND 85.58
2 Acero Perfil C6x13 (6x2.157"x20p) UND 113.32
2 Acero Perfil C6x8.2 (6x2.157"x20p) UND 81.90
2 Acero Perfil C9x20 (9x2.648"x20p) Pza 199.76
2 Acero Perfil W4x13 (4.16x4.06) UND 153.45
2 Acero Perfil W6x20 (6.2x6.02"x20p) UND 174.34
2 Acero Perfil W6x9 (5.9x3.942) UND 106.24
2 Acero Perfil W8x31 (x20p) UND 539.91
2 Acero Perfil X Liviano Kg 1.10
2 Acero Placa 2"x 3/16" m 3.00
2 Acero Placa 2"x1/4" m 3.04
2 Acero Placa 3"x1/4" m 4.56
2 Acero Placa 4"x 3/8" m 8.37
2 Acero Plancha 1/2p (4'x8') UND 72.10
2 Acero plancha 1/4" (4'x8') m2 34.44
2 Acero plancha A36 3/8" (4'x8') m2 51.66
2 Acero Plancha galvanizada (1.9 mm x 1200 x 2400) UND 68.820
2 Acero Plancha TR4 m2 17.430
2 Acero Tubo rect.4"(100) x 2"(50) e=3m x 6 m Pza 46.858
2 Acero tubo sch 40 1" m 2.740
2 Acero tubo sch 40 1.25" m 4.564
2 Acero tubo sch 40 1.5" m 4.210
2 Acero Tubo Sch 40 1.5" Codo LR pza. 4.000
2 Acero tubo sch 40 2" m 7.270
2 Acetileno KG 11.77
2 Adaptador Tubo a Caja PVC de 1" (Tipo Sombrero) UND 1.30
2 Adaptador Tubo a Caja PVC de 2" (Tipo Sombrero) UND 1.60
2 Adaptador Tubo a Caja PVC de 3" (Tipo Sombrero) UND 5.47
2 Adaptador Tubo a Caja PVC de 3/4" (Tipo Sombrero) UND 0.96
2 Adaptador Tubo a Caja PVC de 4" (Tipo Sombrero) UND 10.94
2 Adaptador Tubo a Caja PVC de 6" (Tipo Sombrero) UND 24.08
2 Aditivo cementicio Z1 Kg 1.25
2 Agua p/concreto m3 6.20
2 Angulo de Acero Galvanizado de 3" x 3" x 1/4" x 20' UND 36.32

2 Arandela cuadrada curva AG 2.25"x 3/16" hueco 5/8" Pza. 0.56


2 Arandela plana Galv.3/8" Unid. 0.28
2 Arandela Plana gr8 M20 (68u) Kg 4.73
2 Arandela presión Galv.3/8" Unid. 0.36
2 Arandela Presión gr8 M20 % 11.29
2 Arandela Presión gr8 M22 % 16.37
2 Arena Fina m3 11.71
2 Arena Gruesa m3 13.01
2 Bandeja metálica Bayoneta 400x100 galv. Pza. 39.00
2 Bandeja metálica Curva lisa 200x100 galv. Und. 32.50

Bandeja metálica recta tipo perforada (ranurada)


galvanizado en caliente dimensiones: A=200mm,
2 H=150mm, L=3000mm con tapa UND 130.00

Bandeja metálica recta tipo perforada (ranurada)


galvanizado en caliente dimensiones: A=300mm,
2 H=150mm, L=3000mm con tapa UND 150.00

Bandeja metálica recta tipo perforada (ranurada)


galvanizado en caliente dimensiones: A=450mm,
2 H=150mm, L=3000mm con tapa UND 180.00

Bandeja metálica recta tipo perforada (ranurada)


galvanizado en caliente dimensiones: A=600mm,
2 H=150mm, L=3000mm con tapa UND 210.77

Bandeja metálica recta tipo perforada (ranurada)


galvanizado en caliente dimensiones: A=900mm,
2 H=150mm, L=3000mm con tapa UND 266.24
2 Barra colectorade Cu c/pernos tipo Panduit Un. 85.00
2 base metalica UND 100.00
bases metalicas, incluye borneras de conexión y tierra,
2 placas metalicas, etc ea 25.00
2 bateria UND 20.53
2 Bentonita bolsa de 30kg. UND 9.000
2 Bisagra sold.6"x5/8" 3 alas pza 2.120

Bonding Jumper de Bandejas Porta cables. (Incluye


suministro de materiales de fijación, Terminales,
2 pernería, etc.) UND 23.00
2 BROCA DIAMANTADA UND 15.00
2 BROCA HSS TITANIO und 12.45
2 BROCA P/DEMOLICIONES UND 30.00
2 CABLE CONTROL 12/C #14AWG m $3.16
2 CABLE CONTROL 3/C #14AWG m $6.43
2 CABLE CONTROL 5/C #14AWG und. $2.43
2 CABLE CONTROL 7/C #14AWG und. $2.43
2 CABLE CONTROL 9/C #14AWG m. $6.63
2 Cable Cu 120 mm2 m $9.86
2 Cable Cu 35 mm2 m $2.88
2 Cable Cu 70 mm2 m $5.63
Cable de Acero tipo Cooperweld, calibre 6/16" (5 hilos N° 7), para
2 retenidas m 5.20
CABLE DE ATERRAMIENTO TIPO 1/0 AWG 600V, COLOR
2 VERDE Y AMARILLO m 2.48
2 Cable de baja tensión tipo ZR-YJV, 0.6/1 kV, 1c-(3x25mm2 + 1x16mm2) m 22.000
2 Cable de baja tensión tipo ZR-YJV, 0.6/1 kV, 1c-(3x35mm2 + 1x16mm2) m 24.000
2 Cable de baja tensión tipo ZR-YJV, 0.6/1 kV, 1c-(3x35mm2 + 2x16mm2) m 29.000
2 Cable de baja tensión tipo ZR-YJV, 0.6/1 kV, 1c-2x16mm2. Incluye sum m 5.000
2 Cable de baja tensión tipo ZR-YJV, 0.6/1 kV, 1c-2x2.5mm2. Incluye su m 1.500
2 Cable de baja tensión tipo ZR-YJV, 0.6/1 kV, 1c-3x10mm2. Incluye sum m 6.200
2 Cable de baja tensión tipo ZR-YJV, 0.6/1 kV, 1c-3x120mm2. Incluye su m 33.000
2 Cable de baja tensión tipo ZR-YJV, 0.6/1 kV, 1c-3x16mm2. Incluye sum m 7.520
2 Cable de baja tensión tipo ZR-YJV, 0.6/1 kV, 1c-3x185mm2. Incluye su m 45.000
2 Cable de baja tensión tipo ZR-YJV, 0.6/1 kV, 1c-3x25mm2. Incluye sum m 10.370
2 Cable de baja tensión tipo ZR-YJV, 0.6/1 kV, 1c-3x35mm2. Incluye sum m 18.180
2 Cable de baja tensión tipo ZR-YJV, 0.6/1 kV, 1c-3x4mm2. Incluye sumi m 3.510
2 Cable de baja tensión tipo ZR-YJV, 0.6/1 kV, 1c-3x50mm2. Incluye sum m 22.630
2 Cable de baja tensión tipo ZR-YJV, 0.6/1 kV, 1c-3x6mm2. Incluye sumi m 4.160
2 Cable de baja tensión tipo ZR-YJV, 0.6/1 kV, 1c-3x70mm2. Incluye sum m 31.790
2 Cable de baja tensión tipo ZR-YJV, 0.6/1 kV, 1c-3x95mm2. Incluye sum m 43.950
2 Cable de baja tensión tipo ZR-YJV, 0.6/1 kV, 1c-4x10mm2. Incluye sum m 7.610
2 Cable de baja tensión tipo ZR-YJV, 0.6/1 kV, 1c-4x16mm2. Incluye sum m 11.080
2 Cable de baja tensión tipo ZR-YJV, 0.6/1 kV, 1c-4x2.5mm2. Incluye su m 2.100
2 Cable de baja tensión tipo ZR-YJV, 0.6/1 kV, 1c-4x35mm2. Incluye sum m 22.980
2 Cable de baja tensión tipo ZR-YJV, 0.6/1 kV, 1c-4x4mm2. Incluye sumi m 3.930
2 Cable de baja tensión tipo ZR-YJV, 0.6/1 kV, 1c-4x50mm2. Incluye sum m 38.600
2 Cable de baja tensión tipo ZR-YJV, 0.6/1 kV, 1c-4x6mm2. Incluye sumi m 5.070
2 Cable de baja tensión tipo ZR-YJV, 0.6/1 kV, 1c-5cx16mm2. Incluye su m 12.300
2 Cable de baja tensión tipo ZR-YJV, 0.6/1 kV, 1c-5x4mm2. Incluye sumi m 4.100
2 Cable de baja tensión tipo ZR-YJV, 0.6/1 kV, 1c-5x6mm2. Incluye sumi m 6.010
2 Cable de baja tensión, con apantallamiento, tipo WDZC-YJYP-0.6/1 k m 110.000
2 Cable de baja tensión, con apantallamiento, tipo WDZC-YJYP-0.6/1 k m 40.000

4.30
2 CABLE DE COMUNICACIÓN ETHERNET STP 8CX22AWG m.
2 Cable de control 12x14 AWG, XLPE/PVC, low voltage power, unshield m 7.800
2 Cable de control tipo ZR-JYPVP, shield, 500 V, 1c-2(2x1.5mm2). Inclu m 4.200
2 Cable de control tipo ZR-KYJV, 500 V, 1c-5x1.5mm2. Incluye suministr m .
2 Cable de control tipo ZR-KYJVP, 500V, 1c-12x1.5mm2. Incluye suminis m 3.900
2 Cable de control tipo ZR-KYJVP, 500V, 1c-15x1.5mm2. Incluye suminis m 5.400
2 Cable de control tipo ZR-KYJVP, 500V, 1c-15x2.5mm2. Incluye suminis m 8.100
2 Cable de control tipo ZR-KYJVP, 500V, 1c-7x1.5mm2. Incluye suminist m 3.370
2 Cable de control tipo ZR-KYJVP, 500V, 1c-7x2.5mm2. Incluye suminist m 3.400
2 Cable de control tipo ZR-KYJVP, 500V, 1c-8x1.5mm2. Incluye suminist m 4.890

CABLE DE INSTRUMENTACION 1 PAR x 16 AWG.


BLINDAJE GRAL DE CINTA AL/POL + CONDUCTOR DE 5.40
2 DRENAJE, PVC/PVC, 300 V, 105°C, PLTC, UL m.
2 Cable Ethernet UTP FSTP m 3.500
2 CABLE FIBRA OPTICA MULTIMODO OM1, 12 HILOS m. 6.63
2 CABLE FIBRA OPTICA MULTIMODO OM1, 6 HILOS m 14.63

4.49
2 CABLE FIBRA OPTICA TIPO ADSS MONOMODO, 24 HILOS m
2 CABLE INSTRU.APANT.12X2X16AWG m 3.13
2 CABLE INSTRU.APANT.12X3X16AWG m 6.06
2 CABLE INSTRU.APANT.1X2X16AWG m 2.28
2 CABLE INSTRU.APANT.2X2X16AWG m 2.38
2 CABLE INSTRU.APANT.4X2X16AWG m 8.34

2 Cable multipolar, tipo N2XY, calibre 3x10mm2 + T - 1kV m 4.50

2 Cable multipolar, tipo N2XY, calibre 3x16mm2 + T - 1kV m 7.00

2 Cable multipolar, tipo N2XY, calibre 3x25mm2 + T - 1kV m 11.29

2 Cable multipolar, tipo N2XY, calibre 3x35mm2 + T - 1kV m 12.00

2 Cable multipolar, tipo N2XY, calibre 3x50mm2 + T - 1kV m 17.00

2 Cable multipolar, tipo N2XY, calibre 3x70mm2 + T - 1kV m 25.00


Cable multipolar, tipo TOXFREE, calibre 3x120mm2 +
2 3G16mm2 - 1kV m 59.00
Cable multipolar, tipo TOXFREE, calibre 3x150mm2 +
2 3G16mm2 - 1kV m 78.00
Cable multipolar, tipo TOXFREE, calibre 3x16mm2 +
2 3G6mm2 - 1kV m 10.50
Cable multipolar, tipo TOXFREE, calibre 3x240mm2 +
2 3G50mm2 - 1kV m 125.00
Cable multipolar, tipo TOXFREE, calibre 3x35mm2 +
2 3G6mm2 - 1kV m 20.00

Cable multipolar, tipo TOXFREE, calibre 3x6mm2 +


2 3G6mm2 - 1kV m 4.50
Cable multipolar, tipo TOXFREE, calibre 3x70mm2 +
2 3G10mm2 - 1kV m 36.00

2 Cable multipolar, tipo XHHW calibre 3x12mm2 + T, 0.6kV m 5.80

2 Cable multipolar, tipo XHHW calibre 3x14mm2 + T, 0.6kV m 6.08


Cable multipolar, tipo XHHW o THHN/THWN, calibre
2 3x16mm2 + T, 0.6kV m 6.30
Cable multipolar, tipo XHHW o THHN/THWN, calibre
2 3x25mm2 + T, 0.6kV m 11.50
2 CABLE N2XSEYRY 3x240mm2+3x50mm2, 6/10kV m 86.21
Cable para aterramiento 2/0 AWG c/aislamiento 600V
2 color amarillo m 8.57
2 Cable para RTDs 4 triadas 18AWG +shield, XLPE/XL - CPE, 300V, UL Ty m 6.860
2 Cable para RTDs 8 triadas 18AWG +shield, XLPE/XL - CPE, 300V, UL Ty M 10.200
Cable para suministro electrico 3C x #12 AWG+T (Incluye
2 suministro de Accesorios) ea 3.12
2 CABLE PATCH CORD STP CAT CAT 5E, LONG. 5 M m. 9.32
2 CABLE PODER 3/C # 12AWG + T (GREEN) m. 7.17
2 CABLE PODER 3/C # 14AWG + T (GREEN) m. 2.38
2 CABLE PODER 3/C # 8AWG + T (GREEN) m. 17.82
2 CABLE PROFIBUS DP, 300V, 3079A m. 21.59
Cable tipo N2XY para control 12Cx4mm2 (0.6kV) -
2 Instalacion sobre bandeja m 7.40
Cable tipo N2XY para control 14Cx4mm2 (0.6kV) -
2 Instalacion sobre bandeja m 9.80
Cable tipo N2XY para control 19Cx4mm2 (0.6kV) -
2 Instalacion sobre bandeja m 12.00
Cable tipo N2XY para control 5Cx4mm2 (0.6kV) -
2 Instalacion sobre bandeja m 3.40
Cable tipo N2XY para control 7Cx4mm2 (0.6kV) -
2 Instalacion sobre bandeja m 4.50
Cable unipolar 1x1/C, tipo THW, calibre 10 mm2, 0.6kV
2 (iluminacion y tomacorrientes) m 2.60
Cable unipolar 1x1/C, tipo THW, calibre 4 mm2, 0.6kV
2 (iluminacion y tomacorrientes) m 0.50
Cable unipolar 1x1/C, tipo THW, calibre 4 mm2, color
2 verde (iluminacion y tomacorrientes) m 0.50
Cable unipolar 1x1/C, tipo THW, calibre 6 mm2, 0.6kV
2 (iluminacion y tomacorrientes) m 0.80
2 cable unipolar 1x1/C, tipo XHHW o THHN/THWN, calibre 12 AWG, 0.6kV m 0.740
Cable unipolar color verde tipo THHN/THWN, calibre 10
2 mm2, 0.6 kV (SPAT superficial) m 1.50
Cable unipolar color verde tipo THHN/THWN, calibre 120
2 mm2, 0.6 kV (SPAT superficial) m 12.30
Cable unipolar color verde tipo THHN/THWN, calibre 16
2 mm2, 0.6 kV (SPAT superficial) m 1.90
Cable unipolar color verde tipo THHN/THWN, calibre 35
2 mm2, 0.6 kV (SPAT superficial) m 4.30
Cable unipolar color verde tipo THHN/THWN, calibre 70
2 mm2, 0.6 kV (SPAT superficial) m 10.80
2 Cable unipolar, tipo N2XSY, calibre 240mm2, 6/10kV m 27.00
2 cable unipolar, tipo N2XSY, calibre 300mm2, 6/10kV m 35.01
2 cable unipolar, tipo N2XSY, calibre 3x120mm2, 6/10kV m 36.58

2 Cable unipolar, tipo N2XSY, calibre 3x95mm2, 6/10kV m 37.00


2 Cable unipolar, tipo N2XSY, calibre 70mm2, 6/10kV m 16.00
2 Cable unipolar, tipo N2XSY, calibre 95mm2, 6/10kV m 18.00
2 Cable unipolar, tipo N2XY, calibre 120mm2, 1kV m 11.00
2 Cable unipolar, tipo N2XY, calibre 185mm2, 1kV m 16.00
2 Cable unipolar, tipo N2XY, calibre 240mm2, 1kV m 21.00
2 Cable unipolar, tipo N2XY, calibre 70mm2, 1kV m 7.00
2 Cable ZR -KYJ V-0.6/1k V 2x1,5mm2 M 0.940
2 cable ZR-JYPVP-500V 2x3X1.5mm2 M 5.000
2 cable ZR-JYPVP-500V 3x3X1.5mm2 M 6.000
2 cable ZR-KYJVP-500V 10x1.5mm2 o similar. M 3.500
2 cable ZR-KYJVP-500V 19x1.5mm2 o similar. M 7.000
2 Cable ZR-KYJVP-500V 2x1,5mm2. M 1.000
2 cable ZR-KYJVP-500V 2x2x1,5mm2 o similar. M 4.300
2 Cable ZR-KYJVP-500V 4x1,5mm2. m 1.280
2 Cable ZR-YJV-0.6/1kV 3x1,5mm2. M 2.070
2 Cable ZR-YJV-0.6/1kV 3x2,5mm2 o similar. M 5.890

2 cable, tipo N2XSEYRY, calibre calibre 3x150mm2+3x50mm2, 6/10kV m 76.21


Cables de comunicaciones PROFIBUS DP 1p X 18AWG.
2 -40°C TO + 105°C. Para MCC 480Vac m 4.10
2 cables de fibra optica monomodo de 12 hilos m 2.10
2 caja condulet RGS tipo "LB" de Ø 1", SCH 40 UND 7.70
2 caja condulet RGS tipo "LB" de Ø 2", SCH 40 UND 25.93
2 caja condulet RGS tipo "LB" de Ø 3", SCH 40 UND 85.74
2 caja condulet RGS tipo "LB" de Ø 3/4", SCH 40 UND 4.82
2 caja condulet RGS tipo "LB" de Ø 4", SCH 40 UND 169.29
2 caja condulet RGS tipo "LB" de Ø 6", SCH 40 UND 253.94
2 caja condulet RGS tipo "LL" de Ø 1", SCH 40 UND 7.70
2 caja condulet RGS tipo "LL" de Ø 2", SCH 40 UND 25.93
2 caja condulet RGS tipo "LL" de Ø 3", SCH 40 UND 85.74
2 caja condulet RGS tipo "LL" de Ø 3/4", SCH 40 UND 4.82
2 caja condulet RGS tipo "LL" de Ø 4", SCH 40 UND 169.29
2 caja condulet RGS tipo "LL" de Ø 6", SCH 40 UND 253.94
2 caja condulet RGS tipo "LR" de Ø 1", SCH 40 UND 7.70
2 caja condulet RGS tipo "LR" de Ø 2", SCH 40 UND 25.93
2 caja condulet RGS tipo "LR" de Ø 3", SCH 40 UND 85.74
2 caja condulet RGS tipo "LR" de Ø 3/4", SCH 40 UND 4.82
2 caja condulet RGS tipo "LR" de Ø 4", SCH 40 UND 169.29
2 caja condulet RGS tipo "LR" de Ø 6", SCH 40 UND 253.94
2 caja condulet RGS tipo "T" de Ø 1", SCH 40 UND 8.08
2 caja condulet RGS tipo "T" de Ø 2", SCH 40 UND 27.22
2 caja condulet RGS tipo "T" de Ø 3", SCH 40 UND 90.02
2 caja condulet RGS tipo "T" de Ø 3/4", SCH 40 UND 5.06
2 caja condulet RGS tipo "T" de Ø 4", SCH 40 UND 177.75
2 caja condulet RGS tipo "T" de Ø 6", SCH 40 UND 266.63
2 CAJA CONDULET TIPO "C" DE 1" UL m. 3.59
2 CAJA CONDULET TIPO "C" DE 3/4" UL m. 4.22
2 CAJA CONDULET TIPO "LB" DE 1" UL m. 6.73
2 CAJA CONDULET TIPO "LB" DE 3/4" UL und. 27.78
2 Caja de Empalme FO p/poste Unid. 350.00
2 Caja de paso inox 200x200 mm Un. 40.00
2 caja de registro UND 11.00
caja metálica, e= 1/8", arenado y pintado a 9 mills
2 (incluye suministro e instalación de soportería KG 5.00
2 caja rectangular p/interruptor simple, caja pesada UND 3.23
Canal (ASTM A36) Tipo "C" de 4" x 5.4 Lbs/pie x 6m
2 (incluye arenado y pintado 9 mils) UND 60.35
2 CANAL G.C. (ASTM A36) TIPO "C" DE 4" m. 3.03

3.23
2 CANAL STRUT RANURADO 1 5/8" X 1 5/8" Y ACCESORIOS m.
Canal UNISTRUT 1 5/8"x 1 5/8"x 3m. Modelo: P1000
2 10¨PG, incluye abrazaderas y accesorios UND 32.00

Canal Unistrut 1-5/8 "x 1-5/8" (sección) x 3 m (largo),


espesor 2.7mm; modelo: P1000 ; Serie “HS” (diámetros
de agujeros 9/16” y 1 -7/8), galvanizado por inmersión
en caliente (Hot Galvanized) norma ASTM A123, espesor
2 de galvanizados de 2.6 mil KG 5.00
2 Captafaro (p/guardavía) UND 6.60
2 Capuchón termoretráctil p/ter. cables CTC-20/7.5 Und. 2.00
2 Carga para soldadura exotermica Nº 150 cadweld UND 9.500
2 Carga para soldadura exotermica Nº 250 Cadweld UND 14.000
2 Carga para soldadura exotermica Nº 90 cadweld UND 6.700
2 Carga para soldadura por autofusión UND 8.40
2 Caucho NR perfil lona doble 9 mm x 1 m2 UND 36.10
2 Caucho NR perfil lona doble 9 x 150 mm x 1 m UND 9.50
2 Caucho Water Stop (Chema) 6" x 25 m Rollo 110.00
2 Cemento conductivo GEO-GEM de 25 kg UND 30.000
2 Cemento conductivo tipo ERICO GEM UND 64.00
2 Cemento Portland tipo I (bolsa 42.5 Kg) Bolsa 7.10
2 Cemento Portland tipo V (bolsa 42.5 Kg) Bolsa 6.80
2 Cerrojo picaporte Pza 3.70
2 CINTA AISLANTE SUPER 33 DE 3M UND 8.00
2 Cinta Masking Tape (1.5" x60 Yd) UND 13.40
2 Cinta reflectiva (33 m) rollo 9.39
2 Cinta Teflón 1/2" Rollo 0.63
2 CINTA VULCANIZANTE SCOTCH 23 UND 18.00
2 Clavo de madera 4" Kg 1.30
2 Comprende abrazaderas, pernos, grilletes, arandelas, flejes kg 2.30
2 concreto m3 120.00
2 Concreto1 m3 183.00
Conductor de Cu desnudo, temple blando 120 mm2
2 (Sistema de puesta a tierra superficial) m 9.50
Conductor de Cu desnudo, temple blando 35 mm2
2 (Sistema de puesta a tierra superficial) m 2.80
Conductor de Cu desnudo, temple blando 70 mm2
2 (Sistema de puesta a tierra superficial) m 5.50
2 Conector cable a varilla marca BURNDY UND 25.000
2 Conector curvo hermético Liquid Tight de 1/2" Un 1.520
2 Conector perforante p/derivación p/cond. Cu 4-35 mm2 Und. 1.880

6.48
2 CONECTOR PROFIBUS DP, SUBCON PLUS PROFIB/SC2 m.
2 Conector Recto hermético Liquid Tight de 0.5 UND 0.760
2 Conector Recto hermético Liquid Tight de 0.75 UND 1.130
2 Conector Recto hermético Liquid Tight de 1 UND 9.000
2 Conector Recto hermético Liquid Tight de 1 1/2 UND 11.000
2 Conector Recto hermético Liquid Tight de 2 UND 13.000
2 Conector Recto hermético Liquid Tight de 3 UND 13.000
2 Conector Recto hermético Liquid Tight de 4 UND 15.000
2 Conector Recto hermético Liquid Tight de 6 UND 234.680
2 CONTRASTE ANALIZADOR DE PH m 5.04
CONTRASTE POSICIONADOR ELECTRONEUMATICO TIPO 5.04
2 DARDO m.
2 CONTRASTE SENSOR DE NIVEL TIPO SONAR und 4.28
2 CONTRASTE SENSOR DE TEMPERATURA m 3.03
2 CONTRASTE SENSOR TRANSMISOR TIPO VORTEX m 3.50
2 CONTRASTE SENSOR ULTRASONICO m 4.06
2 CONTRASTE SWITCH DE FLUJO TIPO ROTAMETRO und. 29.63
2 CONTRASTE TRANSMISOR DE DENSIDAD NUCLEAR und. 20.32
2 CONTRASTE TRANSMISOR DE VIBRACION und. 22.96
CONTRASTE TRANSMISOR INDICADOR DE FLUJO 23.04
2 MAGNETICO und.
2 CONTRASTE TRANSMISOR INDICADOR DE PRESION m. 21.50

21.87
2 CONTRASTE TRANSMISOR INDICADOR DE TEMPERATURA m.
2 CONTRASTE VALVULA DE CONTROL ON/OFF und 8.00
2 CONTRASTE VALVULA DE NIVEL ON/OFF m 4.56
2 CONTRASTE VALVULA SOLENOIDE m 2.25
2 crucetas metalicas tipo NPB2-PRISBEAM II, modelo CRT-97 UND 35.00
2 curva " 90º horizontal, para bandeja tipo perforada (ra UND 65.00
2 curva " 90º horizontal, para bandeja tipo perforada (ra UND 74.88

curva " 90º horizontal, para bandeja tipo perforada


(ranurada), dimensiones: A=450mm x H=150 mm con
2 tapa galvanizado en caliente UND 94.81

curva " 90º horizontal, para bandeja tipo perforada


(ranurada), dimensiones: A=600mm x H=150 mm con
2 tapa galvanizado en caliente UND 114.92

curva " 90º vertical exterior, para bandeja tipo perforada


(ranurada), dimensiones: A=200mm x H=150 mm con
2 tapa galvanizado en caliente UND 47.50

curva " 90º vertical exterior, para bandeja tipo perforada


(ranurada), dimensiones: A=300mm x H=150 mm con
2 tapa galvanizado en caliente UND 51.28

curva " 90º vertical exterior, para bandeja tipo perforada


(ranurada), dimensiones: A=450mm x H=150 mm con
2 tapa galvanizado en caliente UND 63.97

curva " 90º vertical exterior, para bandeja tipo perforada


(ranurada), dimensiones: A=600mm x H=150 mm con
2 tapa galvanizado en caliente UND 76.77
2 curva " 90º vertical exterior, para bandeja tipo perfora UND 92.29
2 curva " 90º vertical interior, para bandeja tipo perfora UND 47.50
2 curva " 90º vertical interior, para bandeja tipo perfora UND 51.28
2 curva " 90º vertical interior, para bandeja tipo perfora UND 63.97
2 curva " 90º vertical interior, para bandeja tipo perfora UND 76.77
2 curva " 90º vertical interior, para bandeja tipo perfora UND 92.29
2 curva 90 horizontal, para bandeja tipo perforada (ranur UND 145.93

2 Curva Conduit Galvanizada RGS 0.5"Ø X 90º ANSI C80.0 UND 3.50

2 Curva Conduit Galvanizada RGS 1"Ø X 90º ANSI C80.1 UND 4.32

2 Curva Conduit Galvanizada RGS 1.5"Ø X 90º ANSI C80.1 UND 8.00

2 Curva Conduit Galvanizada RGS 2"Ø X 90º ANSI C80.1 UND 13.00

2 Curva Conduit Galvanizada RGS 3"Ø X 90º ANSI C80.1 UND 31.35

2 Curva Conduit Galvanizada RGS 3/4"Ø X 90º ANSI C80.1 UND 2.57

2 Curva Conduit Galvanizada RGS 4"Ø X 90º ANSI C80.1 UND 58.00

2 Curva Conduit Galvanizada RGS 6"Ø X 90º ANSI C80.1 UND 237.50
2 descargador equipotencial UND 100.00
2 Detergente Sapolio (2Kg) Bolsa 5.35
2 Disco 4.5" corte Inox Und. 3.69
2 Disco 4.5" de Corte Fe Und. 3.00
2 Disco 4.5" de Desbaste Und. 3.00
2 Disco 7" Corte de concreto Und. 2.48
2 Disco 9" segmentado Corte de Concreto Und. 24.06
2 DISCO DE CORTE 1/8" X 4 1/2" AC. NEGRO pza 3.00
2 Disco de corte 1/8" x 7" AC. Negro pza 3.55
2 DISCO DE CORTE DE 4 1/2" DIAMANTADO pza 36.00
2 Disco de desbaste 1/4" x 7" AC. Negro pza 3.55
2 DISCO DE DESBASTE 4 1/2" AC. NEGRO pza 3.00
Electrodo de puesta a tierra, de cobre temple duro, de
2 ¾"ø x 3 m de largo. UND 80.00
2 ESCOBILLA CIRCULAR DE FIERRO und 4.84
2 Esponja 3M Scotch Brite pza 0.34
2 Esponja Topex pza 2.48
2 Extintor Clase C UND 180.00
2 Fibra de vidrio Kg 2.00
2 Fibra Optica - Adaptador p/caja SUN-SC OM4-AD pza 0.43

2 Fibra Optica - Conector Patch cord SUN-SC3M-OM4-SX3P pza 2.50

2 Fibra Optica - Conector Pigtrail (SUN SC1M OM4 SX0.9P) pza 1.03

2 Fibra Optica - Distribuidor box SUN-ODN-OP-DS-16SC pza 19.58


2 Fibra Optica - Manga termoenc.40mm SUN-PS SF40 pza 0.10
2 Fibra óptica 24 hilos monomodo tipo ADSS m 5.70
2 FILTRADO DE ACEITE GLB 800.00
2 fotocelda, para sistema de iluminacion exterior UND 11.40
2 Fusión de terminación de cable de fibra optica para 24 hil GLB
2 fusionado e instalación de terminales PTO 22.000
2 gabinete metalico autosoportado ea 408.50
2 Gas Argón 80% Botella 66.46
2 Gasolina 90 oct GL 3.47
2 Grapa cónica p/fin de línea Cable 10-50 mm2 Und. 8.92
Grapa para fijación de Tubería a Bandeja F.G 1"Ø -
2 Acero inoxidable UND 31.09
Grapa para fijación de Tubería a Bandeja F.G 2"Ø -
2 Acero inoxidable UND 59.94
Grapa para fijación de Tubería a Bandeja F.G 3"Ø -
2 Acero inoxidable UND 116.05
Grapa para fijación de Tubería a Bandeja F.G 3/4"Ø -
2 Acero inoxidable UND 24.47
Grapa para fijación de Tubería a Bandeja F.G 4"Ø -
2 Acero inoxidable UND 139.26
Grapa para fijación de Tubería a Bandeja F.G 6"Ø -
2 Acero inoxidable UND 167.11
2 Grating FV-15 SM m2 135.00
2 Guardavía W x 3.8 m e=3/32" Pieza 40.42
2 Hub Mayer de 1" Ø UL UND 2.56
2 Hub Mayer de 2" Ø UL UND 4.61
2 Hub Mayer de 3" Ø UL UND 15.63
2 Hub Mayer de 3/4" Ø UL UND 2.07
2 Hub Mayer de 4" Ø UL UND 31.26
2 Hub Mayer de 6" Ø UL UND 68.76

2 Incluye accesorios (soportes, brazos, pernos y rotulado) KG 5.00


2 Interruptor doble - Superficial 250V 10A UND 40.00
2 Interruptor unipolar - superficial 250V 10A UND 35.00
2 interruptor unipolar 220 VAC, 15 A UND 30.40
2 interruptor unipolar 220 VAC, 15 Asimple -Ticino UND 2.13
2 Juction Box 300x200 UND 70.00
2 Jumper de 120 mm2 UND 8.17
2 Jumper de 35 mm2 UND 5.93
2 Jumper de 70 mm2 UND 6.83
2 Kit empalme Condulet 2" Un 62.46
2 LADRILLO CORTAFUEGO UND 4.275
2 LADRILLOS Y SELLOS CORTAFUEGO KG 48.75
Lámpara con indicador de emergencia 1x28W, V=220V
2 (Duración de batería 60 min). UND 21.59
Lámpara fluorescente 1x28W, 220VAC , IP65, para
2 sistema de iluminacion exterior UND 43.00
Lámpara fluorescente 1x36W, 220VAC , IP65, para
2 sistema de iluminacion exterior UND 21.90
Lámpara fluorescente 1x70W, 220VAC , IP65, para
2 sistema de iluminacion exterior UND 45.00

2 Lámpara fluorescente 2x36W hermética Indiko - Philips UND 25.03


Lámpara fluorescente 2x36W, 220VAC , IP65, para
2 sistema de iluminacion exterior UND 27.08
Lámpara fluorescente 3x18W, 220VAC , IP65, para
2 sistema de iluminacion exterior UND 85.90
Lámpara fluorescente 3x36W, 220VAC , IP65, para
2 sistema de iluminacion exterior UND 110.45

Lámpara tipo LED, a prueba de polvo y agua AC220V,


80W Incluye accesorios para montaje (soportes, pernos,
2 varillas) UND 65.00
Losa Colaborante Deck AD 730 Gage 20 (e=0.909) ancho
2 900 mm) 0.9 m2 19.93

2 Losa Colaborante Perno conector NS 750/400 (3/4"x4") % 116.17


Losa Colaborante Tope Borde 180/240 (20+180+40) x 2.5
2m UN 14.24
2 Losa Colaborante Tope Cierre 75/150 (20+75+55) x 2.5 m UN 10.68
luminaria de emergencia 2x20W, con lámparas de luz
2 halógena UND 45.00
2 luminaria industrial hermética, tipo LED, IP65, 2x36W UND 73.000
2 Madera Shihuahuaco (pie tablar) pt 2.585
2 MADERA TORNILLO (1.5"x8"x48") UND 6.770
2 MADERA TRIPLAY (12 MM - 2 USOS)(2.4 x 1.2 m) UND 18.400
2 Mallade alambre 12, trenzada 2"x 2" m2 2.100
2 Manómetro .25"dia <200#- WIKA Und. 18.600
MARCADOR TERMOCONTRAIBLE SIMILAR SHRINKMARK
2 DE TYCO ROLL 71.25
2 Molde para soldadura por autofusión UND 180.00
2 Molde para soldadura por autofusión tipo XBM-2Q2Q de CADWELD o si UND 180.000
2 Molde para soldadura tipo Tipo CC-2, cable-cable 120mm2 a 70mm2 UND 85.000
2 Molde para soldadura tipo Tipo CC-2, cable-cable 120mm2. UND 83.000
2 MOLDE, TIPO CS-23, CABLE 4/0AWG - SUPERFICIE UND 83.000
2 Mordaza de susp. Al p/cable 10 mm2 Und. 1.410
2 Oxígeno M3 4.95
2 Panel Calaminón (Canaleta) e=0.4mm x 3m pza 18.18
2 Panel Calaminón (Cumbrera) e=0.4mm x 3m pza 12.12
2 Panel Calaminón (Zócalo / Esquinero) e=0.4mm x 3m pza 12.12
2 Panel Calaminón TI Aluzinc e=0.5 mm m2 10.09
2 Panel Calaminón TI Fibra vidrio e=1.6mm m2 22.34
2 Panel fibra de vidrio 0.6 x 0.9 m x 4 mm UND 37.80
2 Parrilla Metálica Grating m2 84.90
2 Pegamento OATEY 1/4 Gal 14.00

Pernería XBT - Hilti, para aclajes de tuberías, tableros


2 menores, bandejas, tuberias y accesorios en general KG 30.00
2 Perno coche 3/8" + Tk+ Arandela UND 0.59
2 Perno Coche 5/8" x 38 mm UND 0.23
2 Perno Galv.3/8"x 1" exag. Unid. 1.44
2 Perno Galvanizado gr10.9 M20x60 % 101.00
2 Perno Galvanizado gr10.9 M20x95 % 153.50
2 Perno Galvanizado gr10.9 M22x90 % 205.30
2 Perno gancho AG 5/8"x14" c/tuercas+arandela Und. 4.79
2 Perno Ojo AG 5/8"x14" c/Tuercas+arandela Kit 3.69
2 Pernos Fixer 3/8 x 3" Und 1.21
2 pernos galvanizados (2mil de espesor) en general, para sopor KG 6.89
2 PERNOS Grado 8.8 de 5/8" X 2 1/2" (Cantidad = 65) und 2.40

2 PERNOS Grado 8.8 de 5/8" X 2 3/4" (Cantidad = 1125) und 2.65


2 Pernos Hilti 1/2" x 4" Und 2.11
2 Pernos inox con arandela y tuerca UND 2.50
2 Piedra chancada 1/2" m3 15.88
2 Piedra Grande (6"-8") m3 25.00
2 PIGTAIL m 6.25
2 Pintura (Barniz marino - Tekno) Gl 11.74
2 Pintura (Diluyente Thiner) GLN 6.650
2 PINTURA BASE - 3 MILLS Gal 21.500
2 Pintura contraincendio, A60-Q GLN 55.000
2 Pintura Epóxica (Diluyente estándar Sherwin) GLN 13.000
2 Pintura Epóxica JET 70 GLN 28.670
2 Pintura Epóxica Jethane 650 GLN 51.300
2 Pintura Epóxica Macroepox 646 Sherwin (72%) GLN 66.000
2 PINTURA PARA TUBERIAS GLN 43.51
2 PINTURA POLIAMIDA EPOXI - 5 MILLS Gal 45.80
2 PINTURA POLIURETANO ALIFATICO - 2 MILLS Gal 36.90
2 PLACA METALICA DE IDENTIFICACION DE EQUIPOS UND 1.71
2 PLANCHA A-36 1/16" Pl 25.45
2 PLANCHA A-36 1/2" Pl 184.50
2 PLANCHA A-36 5/8" Pza 245.98
2 Plancha de Acero Galvanizado de 1.20 x 2.40 x 1/4" UND 92.21
2 Plancha de Acero Galvanizado de 1.20 x 2.40 x 3/8" UND 142.50
2 Plancha de Acero Inoxidable de 0.5 x 0.8 x 1/4" UND 150.00
2 Plancha de Acero Inoxidable de 0.6 x 1.2 x 3/8" UND 240.00

2 Platina de Acero Galvanizado de 2" x 1/4" x 1/4" x 20' UND 21.96


2 Polímero Un 600.00
2 Poste UND 1,000.00
2 Poste concreto h=12m, 345 dia. base Und 190.77
2 Poste de AG 12 m (6-4"dia) Unid. 1,367.00
2 Poste Delineador (1.2 m) UND 18.46
2 PRUEBAS A TRANSFORMADOR GLB 6,000.00
2 pruebas OTDR PTO 20.000
Receptaculo - Doble 250V 20A 2P+T (Duracion de
2 bateria 60min) UND 38.00
reflector 250W, 220VAC, IP 65, para sistema de
2 iluminacion exterior UND 104.50
reflector 400W, 220VAC, IP 65, para sistema de
2 iluminacion exterior UND 164.50
reflector industrial hermético, IP65, con lámparas de
2 vapor de sodio 100W, luz amarilla UND 70.00
reflector industrial hermético, IP65, con lámparas de
2 vapor de sodio 150W, luz amarilla UND 71.25
reflector industrial hermético, IP65, con lámparas de
2 vapor de sodio 200W, luz amarilla UND 95.00
2 Reflector industrial hermético, tipo LED, IP65, 150W UND 250.000
2 Remaches 3/16" % 7.570
2 RESINA + CATALIZADOR Kg 10.000
2 Resina Acelerante (Naftenato de Co 6%) Kg 8.800
2 Resina Catalizador (Peróxido Butanox) Kg 4.700
2 Resina Disolvente (Monómero) Kg 2.100
2 Resina Isoftálica (Palatal A400) Kg 3.800
2 Resina Poliester Kg 6.280
2 SELLO CORTAFUEGO UND 15.960
2 Seteo de Reles. UND 450.00
2 Sika Anchor Fix (p/anclaje) 300 cc pote 16.38
2 Sika Boom (sellador) 750 cc pote 10.50
2 Sika Sikadur 31 (1.7 Kg -> 1 m2 x 1 mm) Kg 18.49
2 Sikagrout 212 (30 Kg) (2.13 Kg/l) Bolsa 31.00
2 SILICONA TUBO SELLADOR 10 ONZ/283GRS BLANCA (0.3 l) UND 7.120

Sistema de ducto de barras en 0.46kV, incluye: barras de


cobre plateadas, aisladores, pernos de acero inoxidable y
2 ductos metalicos. ea 617.50
2 Soldadura KG 4.66
2 SOLDADURA 7018 Kg 10.00
2 Soldadura Inox 308 1/8" Kg. 20.95
2 SOPORTE INSTRUMENTO m 1.75
2 SOPORTE METALICO kg 2.58

soporte para bandejas incluye perfil, varillas y perneria


2 en general (incluye arenado y pintado a 9 mils) KG 6.50
2 Soporte para luminaria (pernos y varillas) ea 20.00
2 Soporte, curvas y accesorios ea 16.00
soporteria metálica en general (incluye arenado y
2 pintado a 9 mils) KG 6.50
Suministro de Tablero para corriente estabilizada AC
2 120V UND 389.00
2 Suministro, Tendido, instalación y conexionado de Cable de control ti M 7.200
2 Tablero de Distribucion General 110VAC, 18KA und 1,131.000
2 Tablero de Distribucion General 220VAC, 18KA und 1,435.000
2 Tablero de Distribucion General 460VAC, 18KA und 1,835.000
2 Tablero de Iluminación, 230Vac, trifásico, con celda fotovoltaica, IP-67 UND 1,918.000
tablero luminoso de salida de emergencia, tipo led
2 (Incluye soportería) UND 41.61
2 Tablero para operación de 120 VAC UND 650.00
2 Tacha Reflectiva - 3 M UND 2.00
2 Tapa ciega p/tomacorriente PVC UND 2.20
2 Terminación 8.7/15 kV interior UND 350.000
2 Terminación rápidas autocontraible tipo QT-III, tensión de operación kit 780.000
2 terminaciones autocontraibles unipolares, tipo QT-III, t UND 466.00
2 terminaciones autocontraibles unipolares, tipo QT-III, t UND 206.00
2 terminaciones autocontraibles unipolares, tipo QT-III, t UND 454.00
2 terminaciones autocontraibles unipolares, tipo QT-III, t UND 504.00
2 TERMINAL DE COMPRESION DE 10mm2 UND 1.320
2 TERMINAL DE COMPRESION DE 120mm2 UND 3.800
2 TERMINAL DE COMPRESION DE 16mm2 UND 0.855
2 TERMINAL DE COMPRESION DE 240mm2 UND 6.200
2 TERMINAL DE COMPRESION DE 25mm2 UND 1.140
2 TERMINAL DE COMPRESION DE 35mm2 UND 1.226
2 TERMINAL DE COMPRESION DE 4mm2 UND 0.475
2 TERMINAL DE COMPRESION DE 50mm2 UND 1.520
2 TERMINAL DE COMPRESION DE 6mm2 UND 0.523
2 TERMINAL DE COMPRESION DE 70mm2 UND 2.375
2 terminales, pernería, compound, etc. ea 14.00
2 THINNER ACRILICO Gal 5.75
2 Tierra de chacra m3 25.00
2 Toma RJ 11 empotrada UND 10.40
2 Toma RJ 45 Doble UND 19.11
2 Toma RJ 45 Simple UND 9.26
2 Tomacorriente bipolar industrial 120 VAC, 15 A UND 11.59
2 Tomacorriente bipolar industrial 220 VAC, 15 A UND 9.79
2 Tomacorriente doble+ LT Ticino Mod. Euro UND 12.00
2 Tomadatos RJ45 - Ticino Und. 17.18
2 Tornillo M5x25 UND 0.55
2 Transformador de 100kVA, 460/230-120Vac, para Centro de Control UND 9,300.000
2 Transformador de aislamiento para 120Vac, red estabilizadas, para Cen UND 8,500.000
2 TRAPO INDUSTRIAL Kg 1.550
2 TRAY CABLE 14 AWG 25C XLP/PVC 600V m 14.13
2 Tubería Acero Galvanizada (Codo) 4"Ø e=3 mm UND 10.000
2 Tubería Acero Galvanizada 4"Ø e=3 mm x 6m UND 72.270
2 Tubería Conduit Galvanizada Flex. Forrada PVC 0.5"Ø m 1.700
2 Tubería Conduit Galvanizada Flex. Forrada PVC 0.75"Ø m 2.220
2 Tubería Conduit Galvanizada Flex. Forrada PVC 1"Ø m 3.430
2 Tubería Conduit Galvanizada Flex. Forrada PVC 1.5"Ø m 5.650
2 Tubería Conduit Galvanizada Flex. Forrada PVC 2"Ø m 7.950
2 Tubería Conduit Galvanizada RGS 0.5"Ø por 3m de longitud ANSI C80 ea 10.800
Tubería Conduit Galvanizada RGS 1 1/2"Ø por 3m de longitud ANSI
2 ea 25.800
C80.1
Tubería Conduit Galvanizada RGS 1"Ø por 3m de longitud ANSI
2 ea 15.856
C80.1
Tubería Conduit Galvanizada RGS 2"Ø por 3m de longitud ANSI
2 ea 35.739
C80.1
Tubería Conduit Galvanizada RGS 3"Ø por 3m de longitud ANSI
2 ea 71.497
C80.1
Tubería Conduit Galvanizada RGS 3/4"Ø por 3m de longitud ANSI
2 ea 11.077
C80.1
Tubería Conduit Galvanizada RGS 4"Ø por 3m de longitud ANSI
2 ea 104.000
C80.1
Tubería Conduit Galvanizada RGS 6"Ø por 3m de longitud ANSI
2 ea 142.500
C80.1
2 TUBERÍA CONDUIT RGS 1" UL m 8.38
2 TUBERÍA CONDUIT RGS 2" UL m 16.00
2 TUBERÍA CONDUIT RGS 3/4" UL m 17.92
2 TUBERÍA CONDUIT RGS 4" (Union roscada) Und 36.36
2 Tubería Flexible de 0.5" m 4.55
2 Tubería Flexible de 0.75" m 5.00
2 Tubería Flexible de 1 m 3.000
2 Tubería Flexible de 1 1/2 m 5.000
2 TUBERIA FLEXIBLE DE 1" UL m 35.33
2 Tubería Flexible de 2 m 7.000
2 Tubería Flexible de 3 m 7.000
2 TUBERIA FLEXIBLE DE 3/4" UL m 5.42
2 Tubería Flexible de 4 m 15.000
2 Tubería Flexible de 6" m 280.840
2 Tubería galv. codo 0.5" un 0.440
2 Tubería galv. niple 0.5"x 1.5" un 0.380
2 Tubería galv. niple 0.5"x 3" un 0.530
2 Tubería galv. niple 1.5"x 1" un 2.500
2 Tubería galv. reduc. bushing 0.5"-0.25" un 2.790
2 Tubería galv. reduc. bushing 2-1.5" un 4.000
2 Tubería galv. Tee 0.5" un 0.660
2 Tubería HPE 32" corrugada copla pza 15.000
2 Tubería HPE 32" corrugada x 6 m pza 150.000
2 Tubería inox 304 codo 0.5" un 0.740
2 Tubería inox 304 niple 0.5"x 1.5" um 0.710
2 Tubería inox 304 niple 0.5"x 3" un 0.960
2 Tubería inox 304 Tee 0.5" un 0.980
2 Tubería PVC 1.5" codo Un 1.800
2 Tubería PVC 1.5" x 5 m Pza 14.840
2 tubería PVC de Ø 0.5", SCH 40 (NIPLE 1") ea 0.210
2 tubería PVC de Ø 1", SCH 40 (codo LR) ea 1.020
2 tubería PVC de Ø 1", SCH 40 (curva SAP) ea 0.580
2 tubería PVC de Ø 1", SCH 40 (incluye abrazaderas) ea 4.703
2 tubería PVC de Ø 1", SCH 40 (reducción 1"-0.5") ea 0.760
2 tubería PVC de Ø 1", SCH 40 (Tee) ea 1.000
2 tubería PVC de Ø 1", SCH 80 (incluye abrazaderas) ea 15.000
2 tubería PVC de Ø 1.5", SCH 40 (incluye abrazaderas) ea 15.000
2 tubería PVC de Ø 2", SCH 40 (codo LR) ea 2.500
2 tubería PVC de Ø 2", SCH 40 (curva SAP) ea 2.800
2 tubería PVC de Ø 2", SCH 40 (incluye abrazaderas) ea 9.985
2 tubería PVC de Ø 2", SCH 40 (reducción 2"-1.5") ea 2.800
2 tubería PVC de Ø 2", SCH 40 (Tee) ea 0.800
2 tubería PVC de Ø 3", SCH 40 (incluye abrazaderas) ea 19.969
2 tubería PVC de Ø 4", SCH 40 (incluye abrazaderas) ea 34.656
2 tubería PVC de Ø 6", SCH 40 (incluye abrazaderas) ea 50.000
2 Tubería PVC SAP 0.75" curva Und. 0.440
2 Tubería PVC SAP 0.75" dia. x 3 m Und. 2.350
2 Tubería PVC SAP 0.75" Unión Und. 0.560
2 Tubería PVC SAP 1" curva Und. 0.660
2 Tubería PVC SAP 1" Unión Und 1.220
2 Tubería PVC SAP 1" x 3 m Und. 2.660
2 Tubería PVC SAP 1.5" curva Und. 1.630
2 Tubería PVC SAP 1.5" dia.x 3 m Und. 4.760
2 Tubería PVC SAP 1.5" Unión Und. 1.690
2 Tubería PVC SAP 2" curva Und. 3.190
2 Tubería PVC SAP 2" dia.x 5 m Und. 19.060
2 Tubería PVC SAP 2" Unión Und. 2.380
2 Tubería PVC SAP 3" curva Und. 9.360
2 Tubería PVC SAP 3" dia.x 3 m Und. 15.020
2 Tubería PVC SAP 3" Unión Und. 2.780
2 Tubería PVC SEL 0.75" curva Und. 0.160
2 Tubería PVC SEL 0.75" dia.x 3 m Und. 0.780
2 Tubería PVC SEL 0.75" Unión Und. 0.220
2 Tubería PVC SEL 1" curva Und. 0.280
2 Tubería PVC SEL 1" dia.x 3 m Und. 1.810
2 Tubería PVC SEL 1" Unión Und. 0.220
2 Tubería PVC SEL 1.5" curva Und. 1.380
2 Tubería PVC SEL 1.5" dia.x 3 m Und. 3.440
2 Tubería PVC SEL 1.5" Unión Und. 1.220
2 Tubería PVC SEL 2" dia.x 3 m Und. 4.910
2 Tubería PVC SEL 2" Unión Und. 1.220
2 Tubería PVC SEL 3" dia.x 3 m Und. 5.730
2 tubería PVC SEL Ø 3/4" Curva UND 0.150
2 tubería PVC SEL Ø 3/4" Tubo 3m UND 0.710
2 tubería PVC SEL Ø 3/4" Unión UND 0.110
2 Tuberíainox 304 reduc. bushing 0.5"-0.25" un 2.900
2 TUBO DE ACERO RED Ø1" x 6M pza 18.000
2 Tubo PVC 1" (Red. Bushing -1/2") Un 2.000
2 Tubo PVC 1" (Red. Bushing -3/4") Un 2.000
2 Tubo PVC 1" (Unión Mixta) Un 1.530
2 Tuerca 5/8"+arandela UND 0.160
2 Tuerca Bushing Aislada de 1" c/ Línea Tierra UL UND 2.34
2 Tuerca Bushing Aislada de 2" c/ Línea Tierra UL UND 4.13
2 Tuerca Bushing Aislada de 3" c/ Línea Tierra UL UND 8.94
2 Tuerca Bushing Aislada de 3/4" c/ Línea Tierra UL UND 2.00
2 Tuerca Bushing Aislada de 4" c/ Línea Tierra UL UND 13.41
2 Tuerca Bushing Aislada de 6" c/ Línea Tierra UL UND 24.14
2 Tuerca Galv.3/8" Unid. 0.88
2 Tuerca galv.gr8 M20 % 40.50
2 Tuerca galv.gr8 M22 % 40.94
2 Tuerca Ojo AG 5/8" c/tuercas+arandela Und. 2.41
2 Unión "T" 90º horizontal, para bandeja tipo perforada ( UND 74.40
2 Unión "T" 90º horizontal, para bandeja tipo perforada ( UND 84.65
2 Unión "T" 90º horizontal, para bandeja tipo perforada ( UND 109.14
2 Unión "T" 90º horizontal, para bandeja tipo perforada ( UND 130.97
2 Unión "T" 90º horizontal, para bandeja tipo perforada ( UND 175.05
2 Unión "X" 90º horizontal, para bandeja tipo perforada ( UND 100.80
2 Unión "X" 90º horizontal, para bandeja tipo perforada ( UND 110.27
2 Unión "X" 90º horizontal, para bandeja tipo perforada ( UND 131.07
2 Unión "X" 90º horizontal, para bandeja tipo perforada ( UND 165.00
2 Unión "X" 90º horizontal, para bandeja tipo perforada ( UND 230.00
2 Unión tubular "C" Cu estañado P/cable 4-10 mm2 Und. 0.47
2 Unión Universal de Fe Galvanizado 1" UL UND 2.39
2 Unión Universal de Fe Galvanizado 2" UL UND 8.04
2 Unión Universal de Fe Galvanizado 3" UL UND 12.06
2 Unión Universal de Fe Galvanizado 3/4" UL UND 2.13
2 Unión Universal de Fe Galvanizado 4" UL UND 17.68
2 Unión Universal de Fe Galvanizado 6" UL UND 30.14
2 VALVULA AGUJA INOX 316 - 1000 # - 1/2" UND 56.10
2 VARILLA ROSCADA 3/8" x 3mts UND 5.81
2 VIGA W 6 x 25 pza 280.00
2 Vinil Brillante (0.6 x 45m) Rollo 641.68
2 Vinil Reflec.Gr.Ing. (0.61 x 45.7 m) - 3M Rollo 100.00
2 Yeso Kg 1.00
3 EQUIPOS t $
3 % Herramienas Manuales s/MO %mo
3 Acero Plancha 3/16" (4'x8') Kg 0.69
3 AMOLADORA CHICA H-M 0.59
3 ANDAMIOS - 2 cuerpos H-M 2.15
3 ANDAMIOS CERTIFICADOS H-M 1.63
3 ARNES DE LINIERO HE 0.25
3 Balde 20 l HE 0.07
3 Bomba de succión H-M 5.00
3 Bote de apoyo H-M 60.00
3 Brocha 4" (6 dd) HE 0.14
3 CAMABAJA H-M 92.00
3 CAMION 5 TM H-M 40.00
3 CAMION GRUA H-M 50.00
3 CAMION GRUA - 12TON H-M 60.00
3 CAMION HIAB - 5 TON H-M 40.00
3 CAMIONETAS PICK UP DOBLE CABINA 4 X 4 H-M 8.17
3 Carretilla Boogie 3cf H-E 0.05
3 CERCO PERIMETRICO H-E 1.25
3 Cizalla de Palanca H-E 0.24
3 COMBI H-M 8.50
3 COMPRESORA 250 P.C.M. H-M 12.00
3 COMPRESORA NEUMATICA H-E 27.42
3 COMPRESORA NEUMATICA CAMPBELL 1HP 8 Gal 125 psi H-E 0.78
3 Cortadora de concreto - Dynamic H-E 1.47
3 DOBLADORA HIDRAULICA H-E 1.00
3 EQUIPO DE ARENADO H-M 6.79
3 EQUIPO DE CORTE Y SOLDEO (OXI-ACET) H-M 0.90
3 EQUIPO DE PINTURA AIRLESS H-M 4.88
3 EQUIPO DE PINTURA AIRLESS O DEVILB H-E 5.88
3 EQUIPO DE TERMOFUSIÓN 2"-8" H-M 35.00
3 EQUIPO DE TERMOFUSIÓN 8"+ H-M 54.36
3 Equipo p/seteo relé (HW) Glb 1,000.00
3 Equipo p/seteo relé (SW) Glb 800.00
3 EQUIPOS DE COMUNICACIÓN (RADIOS MOTOROLA) H-M 2.00
3 Escalera telescópica (12 m) H-E 1.00
3 Escoba + Recogedor HE 0.40
3 Escobilla de metal HE 0.09
3 Escobilla de ropa HE 0.03
3 ESMERIL ELECTRICO FRONTAL DE MANO H-E 0.74
3 ESTACION TOTAL H-E 8.70
3 Extractor de Aire H-M 15.00
3 FIBRA OPTICA - PROBADOR OTDR (SUN OT 520) H-E 5.10
3 FIBRA OPTICA - SELLADORA CABLES (SUN OT 520) H-E 2.32
3 FIBRA OPTICA - TOOLKIT CONEXIONADO (SUN TK 120P) H-E 0.75
3 FUSIONADORA DE FO H-E 37.50
3 GATA HIDRÁULICA STOKA HE 0.20
3 GRUA 25 TON H-E 92.00

3 GRUA 30 TON (Pluma 28 m) Terex Mod. RT230 - Gruas y Maniobras Dia 1,366.67
3 GRUA 60 TN HE 130.00
3 GRUA 80 TON H-E 124.00
3 GRUA DE 50 TON H-M 92.00
3 GRUA DE 500 TON H-M 750.00
3 GRUPO ELECTRÓGENO 10KW H-E 5.25
3 HORNO DE ELECTRODOS H-E 0.88
3 IMPRESORA DE TAGS H-E 3.60
3 IMPRESORA DE TAGS H-E 3.60
3 LLAVE ALLEN 3-24 JGO. H-E 0.14
3 LLAVE MIXTA JGO H-E 0.24
3 Luminaria H-M 3.00
3 MAN LIFT Día 1,066.67
3 MANLIFT TELESCOPICO H-M 60.00
3 Maq. Soldar TIG/MIG H-E 4.92
3 MAQUINA DE SOLDAR ELECTRICA H-E 2.94
3 MARTILLO NEUMATICO 24 kg CON CINCEL Y ACCESORIOS H-E 5.00
3 MEGOHMETRO H-M 2.50
3 Montacargas liviano HE 30.00
3 MONTACARGAS PESADO H-M 40.00
3 MOVILIDAD H-M 100.00
3 MULTIMETRO DIGITAL H-M 1.00
3 MULTIMETRO DIGITAL H-M 1.00
3 NIVEL TOPOGRAFICO H-E 1.80
3 OTDR Pto. 37.50
3 PICO/ PALA / BUGUIE H-E 2.00
3 Pistola de Silicona HE 0.03
3 PLANCHA APISONADORA H-E 5.00
3 POLEAS H-M 2.50
3 PORTACARRETE H-E 7.50
3 PRENSATERMINAL H-M 1.20
3 RANA PARA TENSAR CABLE H-E 0.50
3 REFLECTOMETRO OPTICO H-E 37.50
3 Reloj comparador H-E 0.11
3 RETROEXCAVADORA 0.8 M3 H-M 40.00
3 Rodillo de pintor 9" epox (6 dd) H-E 0.08
3 Rotomartillo demoledor Bosch H-E 0.50
3 Sierra Circular 7" - Makita H-E 0.15
3 TABLERO DE ALIMENTACIÓN ELÉCTRICA H-E 2.25
3 TALADRO A BATERIA HILTI X-BT 4000-A H-M 2.50
3 TALADRO MAGNETICO H-M 1.50
3 Taladro Magnético - De Walt Und 1.23
3 TALADRO MANUAL H-M 0.66
3 TALADRO MANUAL1 H-M 1.53
3 TARRAJA ELECTRICA H-E 1.00
3 TECLE 1.5 TON H-E 0.50
3 TEODOLITO (Alq. X día) H-E 30.77
3 TIJERA DE HOJALATERO H-E 0.05
3 TORQUIMETRO H-E 2.34
3 TROMPO 7CF H-M 3.08
3 Vibrador de Concreto (1gl/día) HE 2.35
3 WINCHA PASACABLE H-M 0.24
3 WINCHE H-E 3.20
3 ZARANDA H-E 0.20
4 Servicios t $
4 Alquiler puntales (x día) Pza 0.1
4 Arenado estruct. (x Kg) Kg 0.2
4 Arenado estruct. (x m2) m2 9
4 Bombeo de concreto he 50
4 Diseño letrero he 6.2
4 Fabricación de estructura Liviana (< 30 Kg/m) ton 1318.99
4 Fabricación de estructura Mediana (<30-60> Kg/m) ton 1248.19
4 Fabricación de estructura Pesada (> 60 Kg/m) ton 1157.01
4 Fabricación e Instalación de Soporte m 1.998
4 Fusionado de F.O. x terminal punto 186.74
4 Fusionado, inst. terminales y pruebas OTDR m 136.74
4 Galvanizado perfiles Kg 0.45
4 Habilitacion de planchas A-36 ton 1096.32
4 Habilitado de estructura metalica (no incluye prearmado n ton 838
4 Montaje de estructura Liviana (< 30 Kg/m) ton 1016.2
4 Montaje de estructura Mediana (<30-60> Kg/m) ton 973.28
4 Montaje de estructura Pesada (> 60 Kg/m) ton 914.88
4 Montaje de planchas A-36 ton 736.51
4 Pintura de estructuras y tuberías de acuerdo a las ET de m2 13.475
4 Prearmado de estructura metalica (No incluye habilitado n ton 672
4 Provision de accesorios de tuberia HDPE Ø 900,700,600,5 und
4 Provision de accesorios de tuberia PE con esqueleto de ace und
4 Provisión de clip de anclaje para parrilla metalico tipo P1 G und 7
4 Provisión de estructura Liviana (< 30 Kg/m) ton 1039.3
4 Provisión de estructura Mediana (<30-60> Kg/m) ton 1045
4 Provisión de estructura Pesada (> 60 Kg/m) ton 1119.1
4 Provisión de pernos estructurales ASTM A325 (Incluye aran Kg 8.037
4 Provisión de pernos estructurales ASTM A490 (Incluye aran kg 8.9965
4 Provisión de Plancha Metalica A36 ton 1000
4 Provision de tuberia Q235-B, DN150 m 158
4 Provision de tuberias 316 L Ø 150, Ø125 m 250
4 Provision de tuberias acero al carbono Ø 8", 5" m 168
4 Provision de tuberias FRP Ø 100 m 28.05
4 Provision de tuberias FRP Ø 1000 m 312.6
4 Provision de tuberias FRP Ø 200 m 33.3
4 Provision de tuberias FRP Ø 250 m 35.7
4 Provision de tuberias FRP Ø 350 m 57
4 Provision de tuberias FRP Ø 400 m 68.25
4 Provision de tuberias FRP Ø 450 m 84.9
4 Provision de tuberias FRP Ø 500 m 95.4
4 Provision de tuberias FRP Ø 600 m 133.95
4 Provision de tuberias FRP Ø 70 m 26
4 Provision de tuberias FRP Ø 700 m 172.95
4 Provision de tuberias FRP Ø 800 m 213.6
4 Provision de tuberias HPDE Ø 25 SDR 11 m 1.8
4 Provision de tuberias HPDE Ø 32 SDR 11 m 2.4
4 Provision de tuberias HPDE Ø 400 SDR 11 m 124.2
4 Provision de tuberias HPDE Ø 450 SDR 11 m 195.2
4 Provision de tuberias HPDE Ø 50 SDR 11 m 3.04
4 Provision de tuberias HPDE Ø 700 SDR 11 m 240
4 Provision de tuberias HPDE Ø 80 SDR 11 m 9.92
4 Provision de tuberias PE con esqueleto de acero Ø 1000 m 820
4 Provision de tuberias PE con esqueleto de acero Ø 200 m 180
4 Provision de tuberias PE con esqueleto de acero Ø 250 m 210
4 Provision de tuberias PE con esqueleto de acero Ø 300 m 240
4 Provision de tuberias PE con esqueleto de acero Ø 350 m 270
4 Provision de tuberias PE con esqueleto de acero Ø 400 m 310.5
4 Provision de tuberias PE con esqueleto de acero Ø 450 m 488
4 Provision de tuberias PE con esqueleto de acero Ø 500 m 530
4 Provision de tuberias PE con esqueleto de acero Ø 600 m 570
4 Provision de tuberias PE con esqueleto de acero Ø 700 m 600
4 Provision de tuberias PE con esqueleto de acero Ø 900 m 710
4 Pruebas de Operatividad glb 15
4 Pruebas Eléctricas Celda 1910 AH-0000 - Shougesa Pack 4600
4 Pruebas Eléctricas E-House 1910 ER100 Pack 17100
4 Pruebas Eléctricas E-House 1920 ER100 Pack 18400
4 Pruebas Eléctricas E-House 1920 ER100 A/B Pack 6900
4 Rolado Plancha 1/2" UND 30
4 Seteo de Relés Und 450
4 Soldeo de estructuras metálicas (No incluye armado) m 61
4 Transp. carga a Marcona Kg 0.38
4 Transporte Carga a Toromocho Kg 0.45
4 Transporte Carga a Toromocho (carga completa) Kg 0.1
4 Tratamiento superficial SSPC-SP-5 m2 3.85