During the building construction procedure, there are a variety of high-risk factors. So as to ha... more During the building construction procedure, there are a variety of high-risk factors. So as to have a negative impact on the project's productivity, performance, quality, and cost constraints. This study seeks to determine the project implementation risk factors, identify the most significant risks, and conduct risk assessments to anticipate all types of risk. This qualitative study employs a questionnaire, and the analysis is conducted by ranking the risk factors from most significant to least significant. SPSS was utilized to conduct a validity and reliability test on the questionnaire. From the results of the data analysis, it was determined that there were nine risk factor variables; the most influential risk was the quality of concrete that did not meet the specifications, with an average value of 3.87, and the risk with the highest risk category was erratic weather.
During the building construction procedure, there are a variety of high-risk factors. So as to ha... more During the building construction procedure, there are a variety of high-risk factors. So as to have a negative impact on the project's productivity, performance, quality, and cost constraints. This study seeks to determine the project implementation risk factors, identify the most significant risks, and conduct risk assessments to anticipate all types of risk. This qualitative study employs a questionnaire, and the analysis is conducted by ranking the risk factors from most significant to least significant. SPSS was utilized to conduct a validity and reliability test on the questionnaire. From the results of the data analysis, it was determined that there were nine risk factor variables; the most influential risk was the quality of concrete that did not meet the specifications, with an average value of 3.87, and the risk with the highest risk category was erratic weather.
Uploads
Papers by putri novaria mulyadi