Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
paper cover icon
Knowledge based-system for alternative design, cost estimating and scheduling

Knowledge based-system for alternative design, cost estimating and scheduling

Knowledge-Based Systems, 2002
Abstract
... Because forming schedule manually is very costly and time consuming the scheduler cannot perform several schedule alternative to evaluate time integrated cost that indicate the timing of capital needs for the design decisions and construction methods selection. ...

Tahir Burak Celik hasn't uploaded this paper.

Let Tahir Burak know you want this paper to be uploaded.

Ask for this paper to be uploaded.