Cost Estimating
3,952 Followers
Recent papers in Cost Estimating
This article presents the results of a study of the accuracy of cost estimates in public building projects in Nigeria. Data were collected from a sample of 40 completed building projects with initial cost values of between N3.00m –... more
It's a key topics selective for Estimating & Costing. useful for Undergraduate Technical Students of Civil Engineering.
Construction cost management is the most important function for project success, and the construction project performance is generally expressed in terms of cost and its variance from the budget. However, it has not been effectively used... more
Construction cost estimation importance can be better defined with its application in Bid and project management system. Cost estimation in project management is the procedure to predict the cost and additional funds which are essential... more
A strategy for adaptive control and energetic optimization of aerobic fermentors was implemented, with both air flow and agitation speed as manipulated variables. This strategy is separable in its components: control, optimization,... more
A large proportion of the Nigerian government's expenditure on capital project delivery involves civil engineering works, with greater emphasis on roadworks to create access for the conduct of economic activities by citizens. Most of the... more
One of the major challenges for software, nowadays, is software cost estimation. It refers to estimating the cost of all activities including software development, design, supervision, maintenance and so on. Accurate cost-estimation of... more
Abstract Reinforced concrete multi-story buildings are commonly used in residential, commercial, and administrative projects; therefore, selecting the optimum structural system with minimum cost is the top priority of the structural... more
Terminal users face a variety of costs associated with the container terminal and those that are harder to quantify should not be ignored for they might represent a larger component of the overall costs associated with using a particular... more
The objective of this study is to develop early cost estimating models for road construction projects using multiple regression techniques, based on 131 sets of data collected in the West Bank in Palestine. As the cost estimates are... more
One of the major challenges for software, nowadays, is software cost estimation. It refers to estimating the cost of all activities including software development, design, supervision, maintenance and so on. Accurate cost-estimation of... more
Construction cost management is the most important function for project success, and the construction project performance is generally expressed in terms of cost and its variance from the budget. However, it has not been effectively used... more
In this paper we are presenting our research findings on how effective neural networks are at forecasting and estimating preliminary project costs. We have shown that neural networks completely outperform traditional techniques in such... more
Le modifiche apportate al processo esecutivo dalla Legge 132 del 6 agosto 2015, con la possibilità di un abbattimento del 25% sul prezzo base d’asta ed equivalente ribasso in caso di asta deserta, portano a dover rivedere il concetto di... more
Contractors have to bid competitively for most of their work and at the same time deal with risks and uncertainties connected with bid submission. This paper examines the factors involved in tender pricing and how they relate to each... more
This paper presents the results of a 2012 life cycle cost (LCC) study of hybrid Reusable Booster Systems (RBS) conducted by NASA Kennedy Space Center (KSC) and the Air Force Research Laboratory (AFRL). The work included the creation of a... more
The New York State Department of Transportation (NYSDOT) Consultant Management Bureau’s primary responsibilities are to negotiate staffing hours/resources with engineering design consultants, and to monitor the consultant's costs.... more
... Because forming schedule manually is very costly and time consuming the scheduler cannot perform several schedule alternative to evaluate time integrated cost that indicate the timing of capital needs for the design decisions and... more
Contractors have to bid competitively for most of their work and at the same time deal with risks and uncertainties connected with bid submission. This paper examines the factors involved in tender pricing and how they relate to each... more
Pre-tender cost estimating of office building projects requires extensive knowledge and expertise. Due to the lack of design information in the early design stages, it is extremely difficult for cost engineers or quantity surveyors to... more
Ownership of the U.S. rail industry is divided between eight Class I railroads (those with more than $258.5 million in annual revenue) and about 550 regional and short-line railroads. The eight large railroads own about 70 percent of the... more
... 1992; Isom 1995). Weather impact was also reported to be one of the main factors causing delays and cost overruns on other types of construction projects (Baldwin et al. 1971; Koehn and Meilhede 1981; Laufer and Cohenca 1990; Moselhi... more
Contract incentives have traditionally been used as a means of aligning the goals of the contracting agency with those of the contractor. One area in which contract incentives are used is highway construction and refurbishing. The use of... more
Abstract Reinforced concrete multi-story buildings are commonly used in residential, commercial, and administrative projects; therefore, selecting the optimum structural system with minimum cost is the top priority of the structural... more
Abstract: The objective of this paper is to analyze the effects that vehicle volumes and lane closure lengths have on road user costs (RUCs) in rural freeway work zones. A methodology has been developed in this paper for estimating RUCs... more
Estimation is the first step in the project development process. Information technology provides an efficient platform for estimators to obtain quotations and specifications for their bid estimates. However, in practice, project overhead... more
Reinforced concrete multi-story buildings are commonly used in residential, commercial, and administrative projects; therefore, selecting the optimum structural system with minimum cost is the top priority of the structural designer.... more