Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
Skip to main content
    • by 
    •   105  
      Civil EngineeringRussian StudiesInformation TechnologyResearch Methodology
    • by 
    •   6  
      Impact AnalysisProgramming of Public WorksCAUSES OF DELAYS AND COST OVERRUNS OF CONTRUCTION PROJECTSDelay
This paper describes the methodology and results obtained after productivity improvement work conducted on two consecutive building construction jobs. The first one was used to evaluate production rates and productivity, current... more
    • by 
    •   121  
      Civil EngineeringArchitectureResearch MethodologyProject Management
The Oracle Primavera® P6™ Project Management (PM) module is comprehensive, scalable, multiproject planning and control software, built on Oracle or Microsoft® SQL databases for organization-wide project management. The PM module can stand... more
    • by 
    •   7  
      Project ManagementProject Risk ManagementConstruction Project ManagementOracle
Project delays often occur due to the dynamic and complex nature of the construction industry and would lead to claims and disputes between contracting parties. Once a project exceeds the period contractually required to complete a... more
    • by 
    • Construction Project Schedule
    • by 
    •   4  
      Time ManagementCauses and Effect of Delay in the Construction ProjectMaster Production ScheduleConstruction Project Schedule
    • by 
    •   105  
      Civil EngineeringRussian StudiesInformation TechnologyResearch Methodology
A construction schedule must satisfy multiple project objectives that often conflict with each other. While several earlier approaches attempted to generate optimal schedules in terms of several criteria, most of their optimization... more
    • by 
    • Construction Project Schedule
Many projects suffers time and cost overruns due to improper planning, scheduling and execution works that results in several issues like delay in providing facilities, development, reduction in quality of construction and making the... more
    • by 
    • Construction Project Schedule
    • by 
    •   7  
      PlanningConstruction schedulingCauses and Effect of Delay in the Construction ProjectCAUSES OF DELAYS AND COST OVERRUNS OF CONTRUCTION PROJECTS
The construction project schedule is one of the most important tools for project managers in the Architecture, Engineering, and Construction (AEC) industry that makes them able to track and manage the time, cost, and quality (a.k.a.... more
    • by  and +1
    •   4  
      Genetic AlgorithmsBuilding Information ModelingConstruction Project ScheduleStability Relations
من قديم الأزل و الحضارات يقوم الإنسان بالإبداع و إنشاء المشروعات الضخمة و الفريدة من نوعها ، والتي من الممكن أن يقضي بها السنوات بل القرون لينتج مشروعاً فريداً من نوعه ، وبالإضافة إلى الوقت الذي استهلك في القيام بالمشروع ، فإن المعضلة... more
    • by 
    •   6  
      Quantity SurveyingProject Risk ManagementConstruction Project ManagementQUANTITY SURVEYING AND CONSTRUCTION MANAGMENT
Construction target monitoring became one of the key concerns of the construction field. Computer vision based monitoring methods like 2D image, video and 3D laser scan methods have difficulties in meeting real-time and data objectivity... more
    • by 
    •   15  
      Computer NetworksObject Recognition (Pattern Recognition)Construction Project ManagementWireless Sensor Networks
Reworks due to activities overlapping have both direct and indirect effects on the performance of construction projects. To reduce the impact of reworks there is a need to understand their basic reason for their existence. This paper aims... more
    • by 
    •   6  
      AhpConstruction Project ScheduleIaeme IjcietFast Tracking
The emerging concept of lean construction is considered from an overtly critical perspective. It is contended that the current debate is based on a highly selective interpretation of the available literature. The extent to which methods... more
    • by 
    •   11  
      Project ManagementQuantity SurveyingConstruction ManagementConflict Resolution
This paper describes a system that combines a 2D digital board that shows dynamically in rows and columns arranged in a special layout, starting and finishing dates of subcontractors work linked to the fourth dimension, time, coming from... more
    • by 
    •   138  
      ManagementCivil EngineeringInformation TechnologyKnowledge Management
The construction industry is one of the most important activities that contribute towards the economic growth of any nation. However, the sector has been experiencing problems of cost and time overruns. Thus, the paper aims at developing... more
    • by 
    • Construction Project Schedule
    • by 
    •   11  
      Project ManagementQuantity SurveyingConstruction ManagementConflict Resolution
    • by 
    •   8  
      Computer ScienceGenetic AlgorithmsBuilding Information ModelingGenetic Algorithm
Reworks due to activities overlapping have both direct and indirect effects on the performance of construction projects. To reduce the impact of reworks there is a need to understand their basic reason for their existence. This paper aims... more
    • by 
    •   7  
      AHP green supply managementConstruction Project ScheduleInternational Journal of Civil Engineering and Technology (IJCIET)Iaeme Ijciet