This paper describes the methodology and results obtained after productivity improvement work conducted on two consecutive building construction jobs. The first one was used to evaluate production rates and productivity, current... more
This paper describes the methodology and results obtained after productivity improvement work conducted on two consecutive building construction jobs. The first one was used to evaluate production rates and productivity, current construction methods, potentials and lacks of construction equipment, current construction planning methodology, and existing tools to asses productivity. These are briefly discussed in this paper. The second job was preplanned based on the experience and detailed documentation obtained in the first one. Work was conducted in order to “design” construction methods in detail, develop a detailed production planning based on the construction methods developed, select crew components and select their specific tasks, and design communication and control tools. Although the second job’s schedule and budget were originally calculated using standard methods (i.e. historical production rates), new schedule and budget were calculated based on the preplanning effort. Construction performance was measured against these values.
Planning 2 Key Questions 3 Problem Arensa 4 Benefits of Planning 5 Tempora mutantur (Times are changing 6 Basic Parameters of Planning 7 Three Principles of... more
Planning 2
Key Questions 3
Problem Arensa 4
Benefits of Planning 5
Tempora mutantur (Times are changing 6
Basic Parameters of Planning 7
Three Principles of Planning 8
Good Planning 8
Essential Components of Planning 9
Failure Modes 10
Application Fields of Planning 10
Planning Methods 11
Analytic Planning Methods 11
Evaluative Planning Methods 12
Prognostic Planning Methods 12
Heuristic Planning Methods 12
Forecasting Tools 13
Requirements of Project Planning 14
Project Organization 14
Amandement Procedure 15
Quality Assurance 15
Documentation 15
Process Organization 15
Success Factors 18
Error Options 18
Project Planning 19
Project Planning Methods for Economic Calculations 19
Project Planning Methods for Project Progress 21
Network Planning Techniques 22
Project Planning Tools 23
Portfolio Analyses 24
Interface Management 26
A complete definition of the scope of a project upfront during early stages ensures smooth and successful implementation during the project execution. This research identifies and prioritises project scope definition elements for public... more
A complete definition of the scope of a project upfront during early stages ensures smooth and successful implementation during the project execution. This research identifies and prioritises project scope definition elements for public buildings in Saudi Arabia. Elements that could significantly contribute to complete project scope definition package at pre-project planning stage are identified and their interrelationship determined and prioritised. Using the Project Definition Rating Index (PDRI) as a basis, the study uses analytical network process (ANP) technique based on data obtained from project managers who have been involved in public sector projects in Saudi Arabia. Data collection and analysis was conducted in three steps. The first step involved identification of scope definition elements while the second involved an investigation into interrelationships among the elements. In the third step, ANP was used to determine the weight of the elements’ importance in terms of contribution to project scope definition completeness. Finally, Pareto analysis was used to prioritise and assess the distribution pattern of the elements. The outcome from this research is the prioritisation of project scope definition elements for public building projects in Saudi Arabia. The prioritised list developed indicates the importance of project scope definition elements. It should help project management teams identify elements to consider when evaluating project scope definition for completeness at the pre-project planning stage.
This paper addresses issues related to planning within the pre-contract phase of shipbuilding projects – issues that will facilitate lean execution of later construction phases. In the existing literature on Front End Loading (FEL) there... more
This paper addresses issues related to planning within the pre-contract phase of shipbuilding projects – issues that will facilitate lean execution of later construction phases. In the existing literature on Front End Loading (FEL) there can be identified a certain gap with regards to application of FEL in shipbuilding industry, which this paper attempts to partially fill. The first part of this paper reviews literature on the concept of FEL (also referred to as Pre-Project Planning, Early Project Planning, Feasibility Analysis). The literature review focuses on application of the FEL approach in different project-oriented industries, with major attention paid to application of FEL in megaprojects and building projects. Based on this study of theoretical concepts and experiences of their use, an adequate FEL concept tailored to shipbuilding industry is proposed in the second part of the paper. The paper also features the analysis of opportunities of transition and adaptation of some...
A complete definition of the scope of a project upfront during early stages ensures smooth and successful implementation during the project execution. This research identifies and prioritises project scope definition elements for public... more
A complete definition of the scope of a project upfront during early stages ensures smooth and successful implementation during the project execution. This research identifies and prioritises project scope definition elements for public buildings in Saudi Arabia. Elements that could significantly contribute to complete project scope definition package at pre-project planning stage are identified and their interrelationship determined and prioritised. Using the Project Definition Rating Index (PDRI) as a basis, the study uses analytical network process (ANP) technique based on data obtained from project managers who have been involved in public sector projects in Saudi Arabia. Data collection and analysis was conducted in three steps. The first step involved identification of scope definition elements while the second involved an investigation into interrelationships among the elements. In the third step, ANP was used to determine the weight of the elements’ importance in terms of co...