Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
Skip to main content
This study identified major factors behind delay in large irrigation projects in Ethiopia. The study focused on irrigation schemes that are owned and are being financed by government entities like Ministry of Water, Irrigation and... more
    • by 
    •   3  
      Project ManagementTime OverrunsCost Overrun
    • by 
    •   3  
      Construction IndustryIndiaTime Overruns
In Kurdistan region of Iraq (KRI) there are lots of construction projects including the finalized and under construction works. These projects take a tremendous role in progressing the economy and all sectors of the country. The buildings... more
    • by 
    •   3  
      Construction ManagementTime OverrunsCost Overrun
The study aims at identifying the factors affecting time overrun in public construction projects Saudi Arabia from consultants’ viewpoint. To do so, 70 consultants working in public construction completed a structured questionnaire survey... more
    • by 
    •   7  
      Lean ConstructionPublic HealthTime OverrunsDelay
We consider the supplier's strategic choice on delivery time in a public procurement setting as the result of the firm's opportunistic behavior on the optimal investment timing when production costs are uncertain. We model the supplier's... more
    • by 
    •   3  
      Construction ProcurementPublic ProcurementTime Overruns
Abstract- Nowadays, highway construction suffers from delay and cost overruns, which causes traffic problems, changes of design, poor planning, disputes, cost overruns, poor safety practices and time delays. Researchers in developed... more
    • by 
    •   2  
      Time OverrunsCauses of Delay