Validation: Summary of The Building
Validation: Summary of The Building
For the validation of present work, the pushover curve obtained for Tyagarajar College of engineering, Madurai in the round robin exercise (experiment) conducted by Reactor Safety Division (RSD), of the Bhabha Atomic Research Centre (BARC), Mumbai, at Central Power Research Institute (CPRI), Bangalore.
VALIDATION CONTD..
VALIDATION CONTD..
Material Properties
10000
8000
6000
4000 2000 0 0 0.2 0.4
1X3 636x636 PUSHY 1X4636x636 PUSHY 1X7 636x636 PUSHY 1X10 636x636 PUSHY
-4000
8000 7000
9000 8000 7000 6000 5000 4000 3000 2000 1000 0.1 0.2 0.3 0 0 0.1 0.2 0.3 0.4
6000
1X3 556X556 PUSHY 1X4 556X556 PUSHY 1X7 556X556 PUSHY 1X10 556X556 PUSHY
4000 3000 2000 1000 0 -1000 -2000 0 0.05 0.1 0.15 0.2 0.25
1X3 474X474 PUSHX 1X4 474X474 PUSHX 1X7 474X474 PUSHX 1X10 474X474 PUSHX
5000 4000 3000 2000 1000 0 -1000 0 0.1 0.2 0.3 0.4
1X3 474X474 PUSHY 1X4 474X474 PUSHY 1X7 474X474 PUSHY 1X10 474X474 PUSHY
Roof Displacement (m) Roof Displacement (m) Push Y Curve for Column Size 474x474 mm