Application For: The HR Manager
Application For: The HR Manager
Application For: The HR Manager
The HR Manager,
SUB :Ref:-
Respected Sir, I, the undersigned, Mohd. Shahwaz Aftab have completed Deploma Electrical &Electronics & B.E in Electrical Engineering. I have first class along with more than Ten years include four year gulf experience in the field of Electrical Engineering. I would be obliged if you consider my candidature for the above mentioned post or any suitable position in your organization. I have enclosed my Curriculum Vitae for your favorable consideration. Waiting for a dogmatic reply in response to my application. Thanking You,
A Brief Introduction: 1 2 A dynamic result driven professional with 10years of experience in Engineering Construction Projects,and support to Commercial Operations. Proven abilities in swiftly ramping up projects. Skilled at building & managing high performance project teams for accomplishing improved resource effort.
Technical Qualification: 1). Diploma in Electrical & Electronics Engineering from Technical Board of Karnataka(Bangalore) in 2001. 2). Bachelor Of Engineering(Electrical) from AIEM. Knowledge Preview : Engineering Construction 1 Managing activities, following technical specifications, procurement, scheduling, progress monitoring, erection, installation & providing support to commissioning, site management and manpower planning. 2 Assigning resources to activities, defining team member roles & setting expectations. 3 Setting goals & objectives, guiding & supporting team members, and providing project performance feedback to higher authorities. 4 Ensuring execution of projects activities within time & budgetary parameters. Carrier Highlights Total Experience:
No
10 +Years
Position
Electrical Engineer
Organization
Al-seal cont. & trad. comp.(WLL) DOHA QATAR
From
1st JAN 2006
To
15th Sept 2009
Project
Lagoon plaza(zig zag twin tower) B+G+34 floor residential and commercial complex and Al-Majed tower(B+G+M+44+P) KHURSHANIA, DAMMAM, K.S.A. Delhi Metro Rail Corporation MC1B Under the Supervision of International Metro Civil Contractor, India. Mathura Refinery, UP, India
Al-seal cont. & trad. comp.(WLL) DOHA QATAR Larsen & Toubro Limited ECC Division
25thJUL 2001
30thDEC 2003
Supervisor
Worked as Electrical Engineer with Al-seal cont. & trad. Company W.L.L. DOHA-QATAR. Since January 2006 in Lagoon plaza residential and commercial complex west bay lagoon after finished transfer Al-Majed tower west bay area. Responsibilities Include: 1 Leading a team of Electrical Foremen for ongoing construction Project. 2 Installation Transformers, Switchgears, Control Panels,MV,SMV,EMV,ESMV,ATS and MCC panel, 3 Installation bus duct for transformar to MV panel and MV panel to SMV panel. 4 Cable Trays on pipe racks and inside substations. 5 Calculate of total load current and select the cable size and making load schedule. 6 Internal lightings inside substations, control building, plant interface buildings and security room. 7 External lightings in the pipe racks, street lights, security fencing lights. 9 . 9 Installation of Cable Trays inside Substations, Station Control Room(SCR). 10 Laying of underground cables for MV & LV power distribution. 11 Megrring of bus duct,cable,panale basbar and continity test. 12 Installation and making operational different lighting fixtures. On building, Platform Level, Concourse Level & also Undercraft Level. On street lighting poles, Inside Substation, Control Room and Office lighting with false ceiling. 13 Conduits & Cable Trays Installation for CCTV, P.A. system, Emergency central batteries system, fire alarm system, SMATV system and Telephone system. 14 Installation of HVAC units and ducting, Fire pump and fire fighting pipeing, Chilled water pump and control system. Plumbing and drainage system. 15 Conducting final inspection after installation of Electrical Equipments and systems. 16 Ensuring smooth functioning of construction activities Analysing project scope document and contractual requisites; implementing construction strategies to optimise budget and monitoring project schedule and progress. 17 Providing solutions to different construction related problems. 18 Bridging the gap between the drawings and constructions based on the actual site condition. Making shop drawing and cost control. 19 Providing guidance to subordinates for critical aspects of construction. 20 Generating Site Technical Queries and providing solutions in consultation with the client. 21 Maintaining Quality documents. 2). Al-Oasis Contracting And Trading Company. Responsibilities
High voltage underground cable laying
Worked in Delhi Metro Rail Project at Central Secretriat Station for International Metro Civil Contractor(IMCC) Delhi. Responsibilities 1 Overall responsibility for site work, installation. 2 Installation of temporary construction power and lighting network in consultation with the operation group. 3 Installation of Earth Mats for Main Earth Grid & Settelite Earthmate & also METs(Through 50x6 Copper Flat). 4 Installation of Cable Trays inside Substations, Station Control Room(SCR). 5 Providing primary and secondary supports to the routes of cable tray. 6 Laying of underground cables for HV & LV power distribution. 7 Installation Transformers, Switchgears, Control Panels and related accessories in the ASS. 8 Installation & Testing of Motors of different capacity and rating. 9 Installation and making operational different lighting fixtures On building, Platform Level, Concourse Level & also Undercraft Level. On street lighting poles, Inside Substation, Control Room and Office lighting with false ceiling. 10 Conduits & Cable Trays Installation for CCTV, P.A. system. 11 Installation of HVAC units and heavy duty blower for effective cooling and air flow. 12 Installation of Split AC & FCU. 13 Conducting final inspection after installation of Electrical Equipments and systems. As a Supervisor-- Process Control Technology PVT LTD 1 2 3 4 5 6 Installation of Cable Trays & Conduits. HV & LV Cable laying & also glanding + termination for it. Installation & supporting of Power & Distribution Transformer & DG sets. Installation, Testing & Commissioning of Area Light with Photo Cell. Installation of HT/LT Switchgear of different ratings. Adapting High Standard of safety & field quality assurance.
Computer Literacy: Packages: MS Office 2007(MS Word, MS Exel, MS Power Point) and Internet etc. Design Tools: Auto CAD 2007 Personal Dossier:
+91-9931839490, 91-
: : : :
Declaration:
I solemnly declare that the above furnished details are true to my best conscience and beleif. Date........................ Place: ...Mumbai.... Shahwaz Aftab) (Md.