Two Way Slab: Check For Shear

This document provides details for the design of a two-way concrete slab with span lengths of 19.25 feet in both directions. The slab thickness is 6 inches with a minimum reinforcement of #3 bars spaced at 7 inches. At ultimate loading, the slab is checked for shear capacity and moment capacity in both directions. Reinforcement amounts are calculated and spacing is determined to satisfy code requirements at service and ultimate loads.

Uploaded by

sancloud
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views

Two Way Slab: Check For Shear

This document provides details for the design of a two-way concrete slab with span lengths of 19.25 feet in both directions. The slab thickness is 6 inches with a minimum reinforcement of #3 bars spaced at 7 inches. At ultimate loading, the slab is checked for shear capacity and moment capacity in both directions. Reinforcement amounts are calculated and spacing is determined to satisfy code requirements at service and ultimate loads.

Uploaded by

sancloud
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

TWO WAY SLAB

SPAN (LaXLb)
SLAB THICK
d=
m

19.25
6 IN
5.25 in
1

f'c =

3000 psi

fy =

60 ksi

19.25 FT

s
Hmin

0.5
6

Hmax

case 1
case 2
LOADING

CASE

SELF WT
FINISHES
PARTITION
LIVE

0.075
0.036
0.04
0.06

ksf
ksf
ksf
ksf

case 3
case 4

Lb=

19.25ft
case 5
La= 19.25ft

DISCONT
case 6

WUD
WUL
WU(D+L)

0.1812 ksf
0.096 ksf
0.2772 ksf

CONT
case 7
case 8

At Ultimate
case 9

check for shear


at Shorter direction
Vu=
Ca*W*La
2
Ca=
Vu=

0.38

(by 2way shear cofficient)

2.027718 kip

at longer direction
Vu=

Cb*W*Lb
Cb =

Vu=

0.62

3.308382 kip

Vc =

2*0.75 (f'c^0.5)*b*d

Vc =

5.175978168 kip
Vu < Vc

ok

(+)VE R/F
At Longer Span (Lb)
At Ultimate
At Service
Lb =

19.25 ft

Lb =

19.25 ft

wdl =

0.151 ksf

Cbd

0.021

wdl =

0.1812 ksf

Cbd =

0.021

wll =

0.06 ksf

Cbl

0.027

wll =

0.096 ksf

Cbl =

0.027

Mu =

1.775364938

=
Asb(used)

Mu =

2.370562 k-ft/ft

0.85
0.198920441

0.9

Asb(used)

Asb(min)

0.13 sq in

Ab=
spacing =

0.11 sq in
6.635818784

0.115778 sq in/ft

in

PROVIDE

H3@7" C/C

At Shorter Span (La)


At Ultimate
At Service

La =

19.25 ft

wdl =

0.151 ksf

Cad =

0.022

wdl =

0.1812 ksf

Cad

0.022

wll =

0.06 ksf

Cal =

0.031

wll =

0.096 ksf

CaL

0.031

Cb =

0.056

Mu =

1.920254875 k-ft/ft

=
Asa(used)

La =

Mu =
=

0.85
0.215154608 sq in/ft

Asa(used)

Asa(min) =

19.25 ft

2.5800044 k-ft/ft
0.9
0.1260075 sq in/ft

0.11 sq in

Ab=
spacing =

0.11 sq in
6.135123078 in
PROVIDE

H3@7" C/C

(-)VE R/F
At Longer Span (Lb)
At Ultimate
At Service
Lb =

19.25 ft

Wser =

0.211 ksf

Mu =

Cb =

0.056

WU(D+L) =

4.3785665 k-ft/ft

=
Asa(used)

Lb =

Mu =
=

0.85
0.490595686 sq in/ft

Asa(used)

Asa(min) =

0.13 sq in

Ab=

0.11 sq in

spacing =

2.690606617 in
PROVIDE

H3@4"C/C

19.25 ft

0.2772 ksf
5.7523158 k-ft/ft
0.9
0.2809434 sq in/ft

At Shorter Span (La)

At Service

At Ultimate

La =

19.25 ft

Wser =

0.211 ksf

Mu =
=
Asa(used)

La =
Ca =

0.038

WU(D+L) =

2.971170125 k-ft/ft

Mu =
=

0.85
0.332904216 sq in/ft

Asa(min) =
Ab=
spacing =

Asa(used)

0.1296 sq in
0.11 sq in
3.965104489 in
PROVIDE

H3@4"C/C

19.25 ft
0.2772 ksf
3.9033572 k-ft/ft
0.9
0.1906402 sq in/ft

Ca =

0.038