Iso 9000
Iso 9000
Iso 9000
First phase:
In any country a business segment puts forward the need for a standard before its national standards institute. The latter
suggests this to the ISO. Once the necessity for an International standard has been acknowledged and officially approved,
the technological feasibility of the standard is defined. This stage is usually performed in teams consisting of professionals
from those countries that are interested in the particular standard.
Second phase:
Once the experts reach a conclusion on the technical parameters to be covered in the standard, the participating countries
discuss in detail the specifics pertaining to the standard. This is the consensus-building phase.
Final phase:
The final phase comprises of the endorsement of the final draft of the International Standard. This report is subsequently
made available in print as an ISO International Standard.
Many of the standards need regular reviews. Various factors contribute to make a standard obsolete: scientific
advancement, new techniques and equipment, changing trends in quality and safety procedures. To consider these issues,
ISO has stipulated that all ISO standards should be evaluated every five years.
Continue the tour:
The ISO 9000
Understanding > The ISO 9000
ISO 9000 is a well-known family of guidelines and standards developed by the ISO. ISO 9000 standards for a Quality
Management System handles the processes concerned with the design, development and delivery of a product or service.
The standard stipulates specifications for the control and assessment of a process for attaining quality performance.
The 1987 version of ISO 9000 standard, (originally published as BS5750 by the British Standards Institute) emphasised on
quality control by means of effective checking and corrective actions. Quality control (QC) is a management function that
controls the quality of raw materials, products, components, and services concerned with production and inspection
activities. It aims to prevent defects in the products or services.
The 1994 version of the ISO 9000 standard focused on quality assurance via preventive actions, and stipulated the need
for documented procedures. Quality assurance (QA) comprises all measures taken to ascertain that the standards and
procedures are in conformity and that the products or services meet the performance requirements.
An ISO 9000 certification indicates that the management is effectively controlling the processes that are ‘critical to quality’
with respect to the customer. ISO 9000 is not just about service or product quality; it's about quality in management.
These standards address aspects related to process management. This requires organisations to identify, document and
control processes ranging from executive management to the production of different items.
An organisation could be successfully certified to ISO 9000 if it adhered to the specifications of the standard. In order to be
certified, an organisation must submit to an accredited assessor’s examination. The assessor interviews staff members to
ensure that they are aware of their roles and responsibilities in complying with the ISO 9000 standard. The assessor also
examines the organisation's paperwork to check on ISO 9000 compliance. When all issues are addressed, the organisation
is deemed for certification.
ISO 9000:94 family is a set of international quality standards and guidelines that have become popular worldwide for their
role in setting up quality management systems within organisations.
In the past, organisations preferred to implement any of the three ISO 9000:94 requirement standards i.e. the ISO 9001,
ISO 9002 and ISO 9003. Moreover, there was a notion that ISO standards are applicable only in the manufacturing sector.
ISO in a move to change this perception drafted some more guidelines that cater to the requirements of the service sector,
small and medium scale industries and software companies. Given below is a list of ISO 9000:94 guidelines and standards.
ISO 8402, Quality management and quality assurance – Vocabulary. Defines the essential terms used in the ISO 9000
family, which is necessary for avoiding misinterpretations.
ISO 9000-1, Quality management and quality assurance standards – Part 1: Sets the guidelines for selection and use of
specific standards. Provides the scope for understanding and selecting the appropriate standards.
ISO 9000-2, Quality management and quality assurance standards –Part 2: Provides basic guidelines for the application
of ISO 9001, ISO 9002 and ISO 9003. Helps in interpreting ISO 9001, ISO 9002 and ISO 9003.
ISO 9000-3, Quality management and quality assurance standards –Part 3: Sets guidelines for the application of ISO
9001 1994 in the development, delivery, installation, and maintenance of computer software. Also provides a specific
interpretation of the requirements of ISO 9001 for computer software development applications.
ISO 9000-4, Quality management and quality assurance standards –Part 4: Provides guidance on how to plan, organise
and control resources to produce reliable and sustainable products.
ISO 9001, Quality systems – Model for quality assurance in design, development, production, installation and servicing.
This is a requirement standard used to ascertain the process capabilities for the design and development of the product or
service, as well as for installation and servicing.
ISO 9002, Quality systems – Model for quality assurance in production, installation and servicing.
This standard is used to ascertain process capabilities for production, installation and servicing (identical to ISO
9001except for design control requirement).
ISO 9003, Quality systems – Model for quality assurance in final inspection and testing. This is a requirement standard
used to control product or service through final inspection and testing.
ISO 9004-1, Quality management and quality system elements –Part 1: Guidelines for implementation. This optional
standard provides guidelines to implement a quality system to satisfy the customers’ and organisational requirements.
ISO 9004-2, Quality management and quality system elements –Part 2: Sets guidelines for services. This standard is
analogous to ISO 9004-1, but the guidelines are designed specifically to suit the requirements of the service sector.
ISO 9004-3, Quality management and quality system elements –Part 3: Sets guidelines for processed materials.
ISO 9004-4, Quality management and quality system elements –Part 4: Sets guidelines for quality improvement. Provides
guidelines for implementing continual quality improvement within the organisation using tools and techniques based on
information compilation and evaluation.
ISO 10005, Quality management –Sets guidelines for quality plans. This standard provides guidance on how to prepare
quality plans for the control of specific products, and projects.
ISO 10006, Sets guidelines to quality in project management
ISO 10007, Quality management –Sets guidelines for configuration management. Provides guidelines to ensure that a
complex product continues to work in the desired manner even when certain parts are modified.
ISO 10011-1, Sets guidelines for auditing quality systems – Part 1: Provides guidelines for auditing a quality system, and
verifying the system’s capability to achieve set quality goals. It can be used within the organisation or for auditing the
suppliers.
ISO 10011-2, Sets guidelines for auditing quality systems – Part 2: Qualification criteria for quality systems: auditors.
Provides guidance on the education, training, know-how, personal traits and management capabilities needed to carry out
an audit.
ISO 10011-3, Sets guidelines for auditing quality systems – Part 3: Management of audit programmes. Provides basic
guidelines for managing quality system audit programmes.
ISO 10012-1, Quality assurance requirements for measuring equipment – Part 1: It is a metrological confirmation system
for measuring equipment. Provides guidelines on the key characteristics of a calibration system to ensure that
measurements are done with the projected accuracy.
ISO 10012-2, Quality assurance for measuring equipment – Part 2:
Sets guidelines for control of measurement processes. Provides additional guidance on the application of statistical process
control whenever it is apt for achieving the objectives of Part 1.
ISO 10013, Sets guidelines for developing quality manuals. Provides guidelines for the setting up, organising and
controlling quality manuals customised to specific needs.
Continue the tour:
The ISO 9000:94 Quality System Elements
• The organisation should establish a quality policy and properly document it.
• The goals set to achieve quality performance must be in line with the overall organisational objectives.
• The quality policy should be communicated to all the departments of the organisation.
4.1.2. Organisation:
• An organisation should have a clear structure, in which individuals join together and play clearly defined roles,
acting in co-ordination to further the aims of the organisation.
4.1.2.1. Responsibility and authority:
• An authorised official who is competent to examine and control the procedures that have an influence on the
quality system should be selected.
• This person should be given the liberty to take necessary steps to ensure that the organisation controls quality
related processes in an effective manner.
4.1.2.2. Resources:
• The organisation should identify resources required for achieving the specifications of the quality policy.
• The organisation should appoint a management representative (on behalf of the organisation’s management).
• This representative is responsible for the proper deployment of the quality system.
• He should convey the status of the quality system to the top management.
4.1.3. Management review:
• The management should regularly assess the quality system in order to ascertain its consistency and efficiency.
4.2. Quality System:
4.2.1. General:
• Organisations should have a quality manual consisting of the functional aspects of this standard.
• The quality manual should comprise of the information pertaining to the work to be done in the quality system. It
should also explain how it should be done, who should do it, and under what circumstances.
4.2.2. Quality system procedures:
• The quality system procedures should be in line with the standard and quality policy.
• These procedures should be efficiently applied.
• The information pertaining to the procedures should be within the scope of the organisational activities.
4.3.1. General:
• The organisation must take steps to ensure that it identifies with the customer requirements.
• If the essential technical requirements for the items, materials, or services vary from that of the customer needs,
a systematic procedure for resolving the matter should be put in place.
• The ISO 9000 standard also recommends that mutual interactions be kept up with the customer during the entire
transaction.
• Organisations should lay down procedures for the assessment of the customer invoice.
4.3.2. Review:
The organisations must conduct a thorough assessment of the customer orders before taking them up.Therefore, the
management should ensure that:
• The customers' order is well interpreted (if it is orally conveyed) before taking up the order.
• The organisation has sufficient resources to fulfil the requirements of the customer.
4.4.1. General:
The organisation needs to lay down procedures to ensure that the design of the product suits the customer requirements.
4.5.1. General:
All documents relevant to the ISO 9000 standard should be managed by a system with relevant procedures laid down for
document assessment, improvement, approval and disposition. This also includes verifying documents used in design and
testing. The documents must be easily accessible.
• The concerned officials should assess, endorse review and approve all the documents that are utilised.
• The organisation must ensure that employees can easily access documents pertaining to them.
• Obsolete or incorrect documents must be removed from locations where there are chances of their inadvertent
usage.
4.5.3. Document changes:
• Documented modifications must be assessed and authorised by those who conduct the initial assessment, or by
an official who has the freedom to use the relevant and crucial information to enable a good evaluation.
• New modifications from the previous documents should be charted, when required.
4.6. Purchasing:
4.6.1. General:
• The organisation should have well laid down procedures to perform its purchasing activities. Only then can the
materials being supplied to the organisation suit the specific needs of the product.
• The organisation must evolve an effective purchasing system with complete documentation and records that
make sure that the purchased goods conform to the requirements.
4.6.2. Evaluation of subcontractors:
Assessment of a supplier must include an official documented assessment procedure. Review of subcontractors stipulates
that:
• The organisation must choose a contractor on the basis of his capacity to conform to quality requirements.
• An assessment of the quality system set up in the supplier’s organisation must be performed.
• The organisation must maintain accessible records of those vendors who conform to the standards.
• The organisation should lay down procedures so that the materials are individually traced from the time they are
supplied to the organisation till the customer accepts them.
• Depending on the customer needs, organisations may even require to provide component identification. The
organisation should have official documents and records in place to cater to the customers’ requirements.
4.9. Process Control:
Process control can be defined as the means by which the process is designed to be in line with the standards or
specifications.
• The organisation should execute operations under a controlled work environment that ensure that the quality of
the product is sufficient and in line with the documented specifications of ISO 9000 standard.
• The documents should stipulate the requirements for the machinery, location, reference standards, and quality
plans. They must also include the procedure for routine inspection during the production process.
• The equipment utilised by the employees must have proper operational guidelines. The instructions should be
evaluated regularly to see that they are in line with the other procedures.
4.10. Inspection and Testing:
4.10.1. General:
• There should be a detailed inspection and testing system to check whether customer needs are conformed to.
This should be promptly incorporated in the documents and records that are accessible to the employees.
• Attribute acceptance sampling plans should have zero defects as the benchmark.
• During emergencies where the material is utilised before inspection, it should be positively pinpointed and
documented in order to facilitate instant recall and replacement (if the set standards are not met).
4.10.3. In-Process Inspection and Testing:
• The organisations should inspect and test the product as required by the documented procedures.
• Emphasis should be laid on defect minimisation techniques such as SPC, visual management, mistake proofing.
• The organisation should perform final inspection and testing in accordance with the documented procedures. This
will help to establish the conformance of the finished product to the specified requirements.
• The Quality Plan for final inspection and testing stipulates that all specified inspection and tests have been
accomplished. The results should satisfy the specifications.
• No product should be shipped until all the procedures specified in the documented procedures have been
accomplished and the related information is approved officially.
4.10.4 Inspection and Test Records:
• The organisations should put in place records to ascertain whether a product has been tested or not.
• These records will show clearly whether the product has passed or failed the inspections conducted in accordance
to the requirements.
• If a product fails any inspection or test, the procedure for control of nonconforming product should be utilised.
• Records should clearly identify the officials who are in-charge of the despatching of the product.
• The organisation should have a system in place to ensure that the devices used for inspection and testing are
appropriately calibrated and managed.
• When using software to check the product’s conformance to the requirements, they should be periodically re-
examined for consistency.
• Records of calibration, authentication, and precision need to be easily accessible to the customers.
4.11.2. Control procedure:
• Choose the pertinent device for testing.
• Pinpoint those devices that can positively influence product quality.
• Calibrate such devices at regular intervals.
• Designate the current state of calibration.
• Put in place records providing the information for calibration.
• Make sure that the devices used for testing and inspection are properly maintained and regularly checked for
defects.
• Protect the equipment from modifications that could have a negative effect on calibration.
4.12. Inspection and Test Status:
• The organisation should designate the current state of inspection and testing of the products during the various
stages of the production process.
• This can be done using stamps, labels, tags, records, or diskettes.
4.13. Control of Nonconforming Product:
This clause defines the system to manage nonconforming product.
4.13.1. General:
• Products that do not meet the requirements should be restricted from inadvertent usage or installation.
• The organisation should lay down procedures to tackle product failures for e.g. preventing the product from being
delivered to the customer.
• These procedures should specify isolation of such products and the subsequent corrective actions.
4.13.2 Nonconforming product review and disposition:
The defective product should be assessed in compliance with the procedures laid down. This product may be:
• Modified to meet the specified requirements.
• Taken up again.
• Reassigned as a substitute for other purposes.
• Discarded.
• Returned to the supplier.
The products that are fixed and modified are re-examined in compliance with the procedures laid down.
4.14.1General:
The organisation should implement corrective and preventive actions taking into consideration consumer grievances,
service faults, audit results and quality documents. These measures should identify the causes of nonconformity and
establish remedial procedures to eliminate potential non-conformities. The organisation should take measures to ascertain
that all activities are executed with efficiency.
• Compilation of data relating to the products (that fail to meet a specified requirements) mentioned in the records.
Some of the means to source this information are consumer grievances, internal audits, quality documents and
service feedbacks. The purpose is to utilise the records to eliminate the causes of product failure.
• An analysis of the failure and its recording should be done.
• Establishing the steps to be taken to mend the defect i.e. efficiently carrying out the corrective action plan.
• Outlining a corrective action plan to deal with the root cause of product failure.
• Ensuring that the top management revaluates the preventive and corrective actions.
4.15. Handling, Storage, Packaging, Preservation, and Delivery:
4.15.1. General:
The organisation should lay down procedures to process, stock, pack and deliver products.
4.15.2. Handling:
• The handling of products should be such that the product is safe and uncontaminated.
• Training should be given to the employees in issues relating to the safe handling of products.
4.15.3. Storage:
• The organisation should define locations for stocking the materials in order to safeguard them from damage,
corrosion, accidental usage, or unintentional delivery to a customer.
• The organisation should set controls for receiving or delivering goods from the warehouse.
• Thorough assessment should be done to ensure degradable materials (items that deteriorate by exposure to air,
sunlight, heat, moisture and similar factors) are despatched before the expiry date.
4.15.4. Packaging:
• The packaging guidelines must be properly documented and protection techniques high- lighted. Also the material
used for packing should be appropriate.
• Employees must be provided adequate training in packaging techniques and in the use of packaging devices.
4.15.5. Preservation:
• Preservation includes activities taken to repair or treat damaged materials (retrospective) and prevent or delay
material becoming damaged (preventive preservation). The preservation procedure should be properly
documented. The material must be confined in a restricted area until they have been shipped to the customers.
4.15.6. Delivery:
• Delivery of the product is made in conformance to the prior agreement with the customers.
• Proper measures should be taken to facilitate undamaged shipment to the customer.
• The delivery procedure must be documented and the personnel should be adequately trained for the job.
4.16. Control of Quality Records:
The organisation should
• Preserve records that establish product conformity to the specifications.
• Define the warranty period i.e. the duration for the preservation of a record.
• Ensure that the records are easily accessible by the employees.
• Check whether the quality records provide information regarding the quality status of an item, process,
operation, or research activity.
• Quality records should be preserved in locations that are safe and easily accessible.
4.17. Internal Quality Audits:
• A training programme necessitates the systematic collection of information pertaining to the employee skills and
the requirements of the organisation. Organisations must encourage the workforce to accept training in relevant
areas.
• The organisation must provide ample resources to facilitate training so that the employees can upgrade their
skills.
• Procedures for the training activities should be in place.
4.19. Servicing:
• On the basis of the conditions set by the organisation and the agreement between customers and the
management the organisation should draft its service procedures.
• All these activities should conform to the ISO 9000 standard.
• The organisation should document procedures required to confirm compliance of the services to the set
standards.
4.20. Statistical Techniques:
• The organisation should evaluate the application of statistical tools and techniques in its QMS. The use of
statistical tools enables the organisation to effectively manage its process and product parameters.
4.20.2. Procedures:
• Once the organisation starts utilising statistical tools, it should simultaneously lay down procedures to ascertain
their proper application.
Implementation > Establishing ISO 9000 Quality Management System
Establishing ISO 9000 Quality Management System:
ISO 9000 family provides a basic structure to analyse and enhance organisations key activities - that are particularly
involved in establishing and maintaining quality.
The best known of the ISO 9000 family are the ISO 9001, ISO 9002 and ISO 9003 standards - each defining standards for
different aspects of an organisation.
For instance, while ISO 9001 specifies the model for quality assurance in design, development, production, installation and
servicing, ISO 9002 specifies standards for production, installation and servicing, and ISO 9003 is applicable for final
inspection and testing. Thus, before embarking on implementation every organisation should consider factors like
• The services and products it offers.
Regardless of the kind of standard adopted, organisations can go about their quality system implementation through the
following steps:
Step 1: Top management commitment:
The first step towards establishing a QMS in accordance with ISO 9000 series of standards is the commitment of the top-
management. Any measure taken towards the development of a QMS will be productive only when the top- management is
committed towards it.
The top-management must be convinced of the benefits of certification. They should realise how certification will help them
improve their systems and demonstrate a visible commitment to quality to customers.
The top management can demonstrate their commitment to the implementation and enhancement of the QMS by several
methods, some of which include:
• Developing effective strategies to communicate to their employees the importance of implementing the ISO 9000
QMS.
• Developing the organisation's quality policy and communicating it to all the employees.
• What is the current status of the organisation when compared to the required standards?
This may require modification of a particular system or procedure. Even after the system stabilises and starts functioning,
internal audits should be planned and performed as part of an ongoing strategy.
• Does it act as a clear guideline for establishing and evaluating the organisations quality
objectives and targets and the customer requirements?
4.1.2 Organisation:
• Does the organisation have a defined structure to explain the roles and responsibilities of
personnel in the organisation?
4.1.2.1 Responsibility and authority:
• Does the organisation have an established practice to define the responsibility and authority
of various employees? Is it well documented?
• Is there a practice that defines the various interactions between the personnel?
• Are there personnel responsible for managing non-conformance products and implementing
corrective actions?
4.1.2.2 Resources:
• Is there a defined practice to identify and provide the resources required? Do they include
trained personnel as an important resource?
4.1.2.3 Management representative:
• Is a management representative assigned to drive the QMS implementation and to update
the top management on its progress?
• Does the organisation conduct reviews on a periodic basis to inspect the sufficiency and
effectiveness of the QMS?
4.2 Quality system:
4.2.1 General:
• Does the organisation have a quality manual encompassing all the essentials of the ISO
9000:1994 standard?
• Does the quality manual define the system for documentation?
4.2.1 Quality system procedures:
• Are the defined quality system procedures, in line with the standard and the quality policy?
• Are the quality procedures regularly inspected for their compliance?
• Do the quality system procedures reflect the scope and depth of the activities of the
organisation?
• Does the organisation have in place procedures for amending a contract and are those
procedures clearly conveyed to the functions that need them?
4.3.4 Records:
• Are the changes made to the contract recorded? Are these records maintained?
4.4.1 General:
• Does the organisation have procedures laid out for managing the design and for testing the
ability of design to satisfy the customer needs?
• Is the nature of information that streams between those groups identified?Is this
information flow evaluated periodically?
• Does the organisation ensure the accessibility of the information such as standards,
procedures, material for reference and other documents?
• Are the various roles and responsibilities in document and data control effectively
entrusted?
• Is the mode of documentation (paper or electronic) decided upon?
4.6 Purchasing:
4.6.1 General:
• Is it ensured that the purchased product conforms to the listed requirement?
4.6.2 Evaluation of sub-contractor:
• Are the sub-contractors assessed and chosen based on their capability to conform to
requirements?
• Is the scope and depth of control exercised over the sub-contractor effectively defined?
• Is there a defined practice to trace the product through out its process cycle (receipt,
production, delivery and installation)?
• Plan and implement various processes required for production, installation and servicing?
• Is the control executed over the non-conforming product sufficient to stall the unintentional
use of the product?
• Does the organisation have defined processes to manage and examine the non-
conformance relative to the requirements?
4.15.3 Storage:
• Are appropriate storage areas provided?
• Are these locations safe such that they prevent damage or deterioration?
• Are there appropriate methods to deliver and despatch unused products from the storage
locations?
• Are the products examined at periodic intervals to identify deterioration?
4.15.4 Packaging:
• Is there a defined practice to effectively manage the activities involved in packing,
packaging and labelling?
4.15.5 Preservation:
• Are suitable methods used for preservation?
4.15.6 Delivery:
• Is product quality ensured even after final inspection and testing?
• Is there a provision for making delivery to customer destination if necessary?
• Does the organisation have a system for filing, storing and retrieving records?
• Do the records have predefined periods set for preservation before disposal?
• Does the organisation have established procedures for planning and conducting audits?
• Are the results of the audits recorded and reported for taking appropriate and adequate
action?
4.18 Training:
• Is there a process in place to analyse and identify training needs?
• Is relevant training provided to all the employees?
• Are records maintained of training provided?
4.19 Servicing:
• Is support for the product provided after it has been sold?
• Are suitable statistical techniques necessary for investigating process control and other
procedures identified?
• Are there documented instructions for applying these statistical techniques?
• The quality manual explains the quality policy, quality goals and targets. The organisational structure needed to
fulfil the ISO 9000 requirement.
• Process guides are documents that describe how an process is to be carried out.
• Work instructions are documents that specify how a job or activity is to be done.
• Describe the process route for every activity. Avoid following ISO 9000 clause by clause if it is inappropriate to
the organisations business.
• Integrate the quality manuals of other companies if found beneficial.
• Never start documentation without a plan.
Measurement, Analysis and Improvement > Elements Included
Quality of products or service is the major factor that determines the success or failure of any organisation. Therefore,
organisations must assure customers of their high standards in product quality. For this organisations need to initially
implement strong and effective techniques for measurement, analysis and improvement of the quality related activities.
ISO 9000 series of standards defines certain specifications for this purpose. Measurement, analysis and improvement are
an important part of both quality control and quality assurance systems. These initiatives are directly related to product
quality, where they take the form of testing or inspection measurements (ISO 9001 requirement 4.10), or relate indirectly
to initiatives that affect product quality, taking the form of process control measurements. (ISO 9000 requirement 4.9).
How can quality be measured and improved?
ISO 9000:1994 has some defined clauses to measure, analyse and improve the quality related activities in an organisation.
In most organisations, it is the quality manager who evaluates these measurement, analysis and improvement techniques.
The various clauses defined in ISO 9000:1994 for measurement, analysis and improvement are:
• 4.9 Process control.
• 4.10 Inspection and testing.
• 4.13 Control of non-conformity.
• 4.14 Corrective and preventive action.
• 4.17 Internal quality audits.
• 4.20 Statistical techniques.
The above clauses and the processes relevant to these clauses are explained below.
“In the 2000 version, there was no significant change in this, but monitoring, analysis and improvement, and the use of
appropriate statistical techniques were introduced.”
4.13 Control of non-conforming products:
The purpose of this element is to ensure that products that do not conform to required standards are prevented from
unintended use. This prevention, initially, requires organisations to identify the non-conforming product, which requires
measurement and analysis.
Control of non-conformance product thus directly or indirectly requires organisations to maintain defined procedures for
measurement and evaluation of the non-conforming products. Some aspects in this clause that relate to measurement and
analysis are:
Clause 4.13.1 specifies that the organisation need to identify and evaluate the non-conforming product.
Clause 4.13.2 specifies that the defective product should be assessed in compliance with the procedures laid down. These
products may be:
• Modified to meet the specified requirements.
• Taken up again.
• Reassigned as a substitute for other purposes.
• Discarded.
It also specifies that the products fixed and modified are re-examined in compliance with the laid down procedures.
Measurement, analysis and improvement are the basic functions involved in this.
“2000 version has no major change from this except that the production terms such as rework or repair are removed.”
4.14 Corrective and preventive action:
Corrective action refers to the initiatives taken to identify the causes of non-conforming products or services and
establishing necessary measures to reduce these occurrences.
Preventive action refers to the precautionary measures taken to prevent the occurrence of a problem or to reduce its
effect.
Both corrective and preventive actions are intended to improve the existing organisations quality processes.
Some of the aspects in this clause that relate to measurement, analysis or improvement are:
Clause 4.14.2 Corrective action requires that the organisation
• Establish necessary methods to effectively monitor the actions taken (Analysis and improvement).
Clause 4.14.3 Preventive action involves
• Analysis of the quality records and their recording.
• Establishing the steps to be taken to mend the defect i.e. efficiently carrying out the corrective action plan
(improvement).
• Setting a corrective action plan to deal with the root cause of product failure (measurement).
• Ensuring that the top management revaluates the preventive and corrective actions. (Measurement, analysis and
improvement).
“2000 version has focussed much more on “improvement” and has made it a continual process. Additional clauses such as
planning for continual improvement were added”.
4.17 Internal quality audits:
The purpose of this element is to help management determine if the implemented quality system is effective in achieving
required quality objectives. This is an evaluation technique organisations use to verify processes.
They collect the data from a variety of sources and crosscheck them for the purpose of Internal quality audits. This data is
analysed and loopholes identified. Management is required to take the necessary action on the loop holes discovered and
implement the suggestions of the audit team.
Some aspects of this clause that relate to measurement, analysis and improvement are:
• Planning and scheduling of audits (measurement and analysis).
• Recording results of audits to take up timely corrective action (Improvement).
“The 2000 version of this clause is similar to 1994 version, but it allows employees who have the responsibility and who
actually carry out the activity to conduct auditing. It necessitated that the procedure included the requirements for
ensuring the autonomy of the audit.”
4.20 Statistical techniques:
Statistical techniques involve measurement, analysis and improvement techniques. They ensure that systematic
approaches are used in quality improvement and control.
These techniques range from analysis of the markets to the measurement of the level of the follow-up service. The analysis
techniques must be appropriate to the situation and the data collected effectively utilised.
Aspects defined in this clause that relate to measurement, analysis or improvement are
Clause 4.20.1 Identification of need requires organisations to evaluate their systems to verify their appropriateness
(measurement and analysis).
Clause 4.20.2 Procedures are essential for ascertaining the proper application of the tools (improvement).
“In the 2000 version, statistical techniques are included in the measurement and monitoring of processes (Clause 8.2.3)
that require the processes to be continually improving”.
Tools Deployed > ISO 9000:1994 Tools
The tools applicable in the various stages of the ISO 9000:94 implementation process are :
Gap Analysis:
• Brainstorming Technique.
Document control:
Planning:
• PERT.
• Gantt Charts.
Process Control:
• Process Analysis.
• FMEA.
• Reliability Technique.
• Problem Analysis.
• CAD software.
• Simulation.
• Design of Experiment.
• Poka Yoke.
Delegation of responsibilities:
• Arrow Diagrams.
• Flowcharts.
• Control Charts.
• Pareto Charts.
• Histograms.
• Check Sheets.
• Scatter Diagrams.
• Individual Brainstorming: When you brainstorm on your own you do not have to worry about other people's
egos or opinions, and can therefore be creative and generate more ideas. However, the ideas you develop
individually may not be as effective since you do not have the experience of a group to help you.
• Group brainstorming: Group brainstorming can be very effective as it uses the experience and creativity of all
participants. The advantage here is that when an individual participant is saturated, another participant's
creativity and experience can take the idea to the next stage. Group brainstorming, therefore, tends to develop
ideas more in depth than individual brainstorming.
For effective brainstorming:
• Clearly define the problem to be solved, and lay out any conditions to be met.
• Encourage everyone to contribute and develop ideas, including the seemingly reserved members of the group.
• A single train of thought should not be followed for too long during a brainstorming.
• Ensure that one person documents all ideas generated during the session.
• The entire team conducts the inspection collectively. Any errors identified are listed and categorised.
• The team leader presents a textual document of the inspection conducted and evaluates the list of errors and
defects.
• The errors and defects are then rectified.
Advantages:
Early defect detection in a document through inspection enhances its quality and reduces subsequent modifications.
Back | Top
Quality Tools > Document Management System
What is it?
Document Management System (DMS) is a software solution that enables organisations to better manage their documents
that are in electronic or digital format. The objective of a DMS is to manage documents from their conception to the phase
out. It includes storing documents at identifiable locations and to be able to recover them swiftly and easily.
Implementation process:
• Initially, the organisation must assess the need for DMS in certain specific areas of the organisation such as
library service, storage facilities, the basic infrastructure and the work processes.
What is it?
Program Evaluation Review Technique is an organised network based method used for planning complex processes.
Network diagram is the essential element of network based planning approach. Network diagram is an outline drawing that
indicates all the activities in a sequence (i.e. the order in which they need to be accomplished to finish the project)
signifying their correlation.
PERT is an effective tool in the area of Project Management. This technique helps planning the duration of the project and
the various resources required.
Implementation Process:
• The job operations are sequenced in a manner pertinent to the order in which they need to be performed.
• The network diagram is laid out. Numbers represent the events and activities. An event is a particular time that
signifies the beginning and completion of an activity.
An activity can be a critical activity or a non-critical activity. A critical activity is one that if delayed can delay the project.
The delay of a non-critical activity does not affect the project’s deadlines/completion.
• Utilising the three time estimates, the expected/estimated time for each individual activity is determined.
1. Optimistic time (ot): It is the minimum possible time taken to accomplish an activity.
2. Most likely time (ml): It is the duration in which an activity can be performed taking into consideration
various likely problems.
3. Pessimistic time (pt): It is the maximum possible time in which an activity can be performed.
• The earliest starting times and latest finishing times are computed.
• Expected times, earliest starting times and latest finishing times are depicted on the network diagram.
• The Slack is computed. Slack is the additional time taken by a non-critical activity.
• Critical paths are pinpointed and noted on the network diagram. Joining the critical activities forms a critical path.
It is the longest path and takes the most amount of time. If the critical path specifies that the project cannot be
accomplished in the estimated time the finish date will have to be postponed.
• The job operations are sequenced in a manner pertinent to the order in which they need to be performed.
• The network diagram is laid out. Numbers represent the nodes (events) and activities. A node is a particular time
that signifies the beginning and completion of an activity.
• The earliest starting times and latest finishing times are depicted on the network diagram.
• Compute the total float for each activity. It is the extra time a non-critical activity can take without delaying the
project.
• Critical paths are identified and are noted on the network diagram. Joining the critical activities forms a critical
path. It is the longest path and takes the maximum time. If the critical path specifies that the project cannot be
accomplished in the estimated time the finish date will have to be postponed.
Advantages:
Critical path analysis is best applied for recurring projects wherein cost effectiveness is given priority. This ensures efficient
use of resources.
Quality Tools > Gantt Charts
What is it?
A Gantt chart is an effective tool used for planning and implementing complex projects.
It enables the project team to evaluate the total time needed to accomplish a project, estimate the resources required and
outline the sequence in which activities will have to be accomplished.
Implementation Process:
A complex project can be broken down into its individual activities.
Some of these activities can be started only when certain other activities are completed first. These activities contingent on
one another should be carried out emphasising the need to complete a task before starting the next one. These activities
are called sequential activities.
Some activities can be carried out at any time during the implementation of the project. They do not rely on the
completion of other activities and can be performed independent of other project activities. These activities are called
parallel activities.
Calculate approximately the time required to accomplish each activity and the dates indicating its beginning and its
completion.
Drawing a Gantt chart:
The Gantt chart is created with the horizontal axis indicating the total duration of the project, broken down into increments
(days, weeks, or months) and the vertical axis representing the various activities that constitute the project.
Each activity in the Gantt chart is signified using horizontal bars connecting the starting date and the date of completion of
each activity. These bars are also known as activity bars. Above the activity bars, specify the time taken to complete them.
Parallel horizontal bars should represent the parallel activities and horizontal bars in sequence indicating the sequential
activities.
Schedule the sequential activities. The path traced by each set of sequential activities is called a critical path.
Schedule the parallel activities such that they do not disturb the way of the critical path.
Determine the optimum amount of resources to be allocated for each activity. Carefully assess the project advancement
making use of the Gantt chart.
Advantages:
The Gantt chart has certain options that assist the project team such that:
• The names of the personnel who are in charge of each activity are included.
• Milestones and intermediary objectives of the project can be indicated.
• Filling the activity bar to the amount of work completed can indicate the status of the project.
Additional reading:
1. This article explains how to create a Gantt chart using MS Excel.
http://www.me.umn.edu/courses/me4054/assignments/gantt.html
2. This article presents the application of Gantt charts in daily life.
http://www.smartdraw.com/resources/examples/business/gantt.htm
Quality Tools > Skills Gap Analysis Technique
What is it?
The skills gap-analysis is a valuable technique to evaluate training requirements. It helps to provide personalised training.
Implementation process:
An in-depth analysis of the job of each employee is conducted to identify the variety of skills set needed to accomplish the
task successfully. The employees’ individual skills have to be compared against the skills required to perform the individual
jobs. Training has to be imparted wherever the skills of the employees fall short.
In this context it is important to understand the various skills that are involved. These skills can be classified into two
broad categories.
Technical skills: These include requisite knowledge to perform the tasks/jobs, occupational knowledge i.e. skills to
operate various equipments, familiarity of various processes etc.
Personal skills: The soft skills and personal skills such as communication skills or teamwork that improve the capability
to perform or accomplish the required job.
The people with identical roles or responsibilities or those needing similar skill sets in their job, have to be grouped
together. Key training objectives for each group has to then be identified and common training modules developed.
Advantages:
The technique enables the organisation to methodically assess the training requirements of its employees and develop
effective training strategies.
Quality Tools > Process Analysis
What is it?
The process analysis technique is used to assess processes or operations in order to make improvements. Processes can be
assessed for their effectiveness, efficiency or impact on external environment.
Implementation:
• Create a Block Diagram, with each block representing a stage of the process.
• Create a flowchart of all activities carried out in each stage.
• For each activity develop the list of inputs, outputs, and impacts along with relevant metrics.
• Evaluate each activity and identify areas of improvement.
• Generate an action plan to implement improvements.
Advantages:
Process analysis helps understand a process and develop ways to improve those activities that fall short of the set
requirements.
Best Practices > Constructing on a Good Foundation
ABC Ltd. is one of the first building contractors in Singapore to be registered to the ISO 9002 standards. From the time of
its registering to the standards in 1994, ABC had been committed to providing superior quality services while constantly
enhancing its quality system.
Introduction:
ISO 9000:1994 has defined quality as ``totality of characteristics of a product, process, organisation, person, activity or
system that influence them to satisfy stated or implied needs’’. In this context quality in construction can be defined as
conformity to the needs of all the people involved in construction, satisfying the needs of the client, legal and regulatory
compliances and needs of the society.
ISO 9000 in construction was the key: to attaining reliable performance levels, enhanced effectiveness and output, and
gaining a competitive advantage. ISO 9000 compliance was a prerequisite for companies in search of international
construction contracts.
Case study:
The present study explains how ABC Ltd. applied ISO 9000 QA standards aptly and minimised the generic human related
defects classified in three sub systems. These sub systems can be classified as Technical, Human Resource, and
Management sub systems.
ABC Ltd. is one of the first building contractors in Singapore to be registered to the ISO 9002 standards. From the time of
its registering to the standards in 1994, ABC had been committed to providing superior quality services while constantly
enhancing its quality system.
Quality system:
The organisation’s quality system stipulated responsibilities for each organisational unit and employee, in order to attain
quality within the scope of the organisation. It also controlled the operations among various departments to make sure
that the construction and civil engineering activities were carried out efficiently.
Even before the organisation got certified to ISO 9002 in 1994, the organisation established a quality improvement
programme called the ‘quality recipe’. It was a set of values and viewpoints that focus on modifying and enhancing the
mind-set of the workforce towards quality. ABC also emphasised on the PDCA (Plan-Do-Check-Act) cycle. Along with it is
the Methods-Materials-Steps-Sequence programme that was personally created by the Managing Director to remind his
employees to get involved in planning, monitoring and assessment so that a most favourable means to achieve quality was
put in place.
Soon after the ISO 9002 registration, all the quality management programmes initiated by ABC were amalgamated into a
single action plan towards quality improvement, structured in line with the ISO 9000 QMS.
External quality management experts guided the initial phase of the ISO 9000 implementation process. For the other
phases i.e. planning and documentation the top management delegated the responsibilities to its employees. Employees
involved in the implementation of the quality system were allowed to undergo training in this aspect. This would enable
them to educate the remaining staff on the quality system.
The half yearly assessment of the documents on quality management enabled ABC to identify defects in its operations.
Certain innovative features in the newly taken up projects were promptly incorporated.
The organisation had established comprehensive procedures to efficiently carry out the various aspects relating to the
three sub systems within the scope of ISO 9000 QMS. This was primarily done to minimise the defects in the construction.
Some of these are presented in detail.
Technical sub-system analysis:
This sub system consists of those elements that are concerned with procurement of projects and the ensuing
implementation process.
Procurement:
The top management made the choice of clients. This was complemented with the suggestions of the contract’s manager.
To ensure that building being constructed was of high quality and that the project was completed within the scheduled
duration and costs, the management utilised the documented procedures at each crucial phase of the project.
It was the motto of the organisation, to be dedicated to satisfying the client’s requirements for a venture and construct a
structure of high quality. In order to accomplish this, ABC introduced new techniques, novel practices and sophisticated
design features into building construction.
ABC also had in place additional design options within the scope of each project. Though it did not have the resources for
designing the buildings it managed to form business related associations with architectural and design experts to establish
alternative designs. Procedures for these were documented and incorporated into the quality system maintained as per the
requirements of the ISO 9002 standards.
Project planning:
Planning for all construction projects the organisation had taken up, was an elaborate procedure. Often the project director
and the managing director personally participated.
The key employees of the organisation visited the location where the building was to be constructed to evaluate the
necessity of additional machinery, and workforce. The duration required to carry out the project was determined taking into
consideration the assessment at the site. Problems identified were brainstormed. If the employees were not able to come
up with effective remedial measures, experts’ opinion was solicited.
Viable options for carrying out the project were put forward in order to consider the opinion of the client. Any
inconsistencies in the contract documents were communicated to the clients.
The complete construction procedure was established and the ease of use of the resources was established. The project
manager devised a quality plan with the help of his employees who were responsible for the on site operations. Pertinent
data for any new procedure or machinery to be used was collected and incorporated into the document for future
reference.
Execution and control of works:
Once a contract was authorised, the preparatory work done was assessed and modified as required. The resources were
assembled and organised with the help of a checklist to ensure every aspect is taken into consideration. If a group of
contractors had to carry out the project then care was taken to assign the phases of the project to individual contractors
appropriately. Moreover, emphasis was laid on harmonising the activities of various contractors.
The entire process from placing the order to buying raw materials and storing them was executed in agreement with the
set procedures. Key staff members directed their entire operation to ensure the material was not damaged. The sites
wherein the material was to be stocked were identified keeping in view how tasks were done, by whom, in what order and
how quickly. The possible impacts of the current processes were also used to determine the storage sites.
The organisation did not encourage overstocking of materials and made use of the JIT concept for the purpose. This
minimised the threat of damage to the materials. JIT (Just in time) is a concept in inventory management that ensure raw
materials are supplied to an organisation precisely when needed. This implies that the fresh stock must reach the site just
before the process actually starts. The purpose of JIT is to drastically reduce the storage of raw materials thus avoiding the
accumulation of the stock.
Once the building was completed, safety measures were implemented until the client took over the building. A team
proficient in more than one technique carried out the project. This was a consequence of the organisation’s principle to
consistently upgrade its employees’ abilities. With a view to generate an output high in quality ABC shuns contracting out a
part of its responsibilities to an external entity except when inevitable. ABC shoulders the responsibility for the results of
the projects it handles.
Supervisors and engineers were required to put in place a set of measurements within a process so the outcome of the
process adhered to the relevant specifications. This was especially done for the ‘critical to quality’ components of the
building ABC had identified through the evaluation of the projects it had executed previously.
Checklists for various phases of the project were utilised for evaluation during internal site quality audits. Procedures for
identifying the tasks that were not meeting the requirements, the subsequent correction done, re assessment, and the
analysis of the causes of non conformance were structured in the form of flowcharts for better know-how.
The management of the organisation extensively encourages the application of Value Engineering methodology. Value
Engineering in the context of construction was the assessment of construction procedures and/or materials to identify
those processes that can be performed by reducing unnecessary costs while conforming to the specifications, the design
features, the performance standards and safety criteria.
Human resource sub-system analysis:
In ABC this sub-system covers aspects such as the enhancement of the knowledge levels of the staff, and providing
constant encouragement and support to the staff.
Employing the staff:
The guidelines for recruitment were based on in -sourcing before out-sourcing. Every time there was a requirement of staff
internal candidates were considered first. The organisation’s policy was to make every employee proficient in various skills.
In addition to monetarily benefiting the organisation enhances the employee know-how thus enhancing his worth in the
organisation. The management resorted to out-sourcing as a last resort.
The recruitment of prospective employees was done on the basis of pre-determined criteria. The interview procedure
consists of filling up of forms to evaluate in detail the competency of each candidate for the post. These evaluation sheets
were integrated into the documented procedures on quality and enable the personnel to execute the interviews efficiently.
Training and Development:
The managing director personally focused on the training aspect of the employees. It was the policy of the organisation to
constantly impart training in order to upgrade employees’ skills. This also helps the employees to attain job competencies.
The training programme necessitates a systematic collection of information pertaining to the employees or the
requirements of the organisation. A good appraisal by the top management included a study of the extent to which the
organisation was able to meet certain specific requirements; the skill set the employees must possess to achieve these
requirements and the manner in which the training was to be imparted.
Senior employees and sometimes outside agencies conducted the training classes. The training emphasised on imparting
the knowledge of the three ISO management systems implemented. So that employees could go for training without any
difficulty the classes were held at the place where the project was being carried out. Technical skills training was imparted
by allowing the employees to get trained in certified training institutions.
ABC sponsors employees in the executive category aspiring to continue their higher studies. Provisions were set up to
enable them to handle their job and learning responsibilities. These employees are even sent for short-term courses to
develop specific skills as and when the need arose. This includes attending international symposiums on the innovative
practices in the area of construction engineering and management. Trips abroad to gain knowledge and expertise from
world-renowned contractors had been arranged earlier.
The employees who had attended these programmes were needed to present their learning to the top management. They
were also required to convey their opinions on the effectiveness of these programmes. This enabled the organisation to
assess the efficiency of the training programmes and implement improvements in its procedures wherever necessary.
Encouragement and support
Motivating the employees was a high priority in ABC. Events such as get-together of employees and their families were
held regularly to foster better relations between the employees. Employees were encouraged to express any problems they
encountered in their work by utilising the forms allocated for this purpose.
Management sub-system analysis
The important aspects covered in this sub-system are documentation management and generating awareness of crucial
information in the employees.
Comprehensive documented procedures
ABC’s policy to cope with ineffective communication across various departments was to prepare comprehensive documents
for all relevant procedures. The details of the employee performing the documentation and the location of the document
were incorporated within. Sets of flowcharts were drawn to describe the relevant procedures for various processes. The
employees who personally perform a process indicated the process flow in a flow chart, providing information critical to the
quality wherever necessary.
Checklists were used to identify the defects in the documents. The QES department of the organisation routinely checks
those procedures and checklists that were widely used in the entire organisation. A few modifications that may result from
the suggestions put forward by the clients are promptly noted, rectifications made and sent to the concerned clients.
To generate knowledge
The organisation regularly updated its employees on the accessibility to the information that was relevant and critical for
performing their jobs. A chart that contained crucial information on individual projects was put up in the premises of the
main office and at strategic places where projects were being executed.
Also each division of the organisation and every location where a project was being carried out possessed the latest copy of
the organisation’s quality system documents. These included the quality manual, procedures and work instructions. A quick
recourse to the documents as and when required was thus possible.
Conclusion:
It is thus obvious that the ISO 9002 QMS ABC had implemented was successful. It ensured that quality was sustained in
the construction. A holistic approach had been adopted towards the understanding and accomplishment of the needs of the
ISO 9000 standards to incorporate the other quality programmes. This had resulted in the development of a wide range of
policies, programs and procedures to ascertain the effectiveness and efficiency of all its operations.
Continue:
Moving Up The Ranks
1. Identifying the crucial areas of the plant totalled to 49 that need to be summarised and documented.
2. Identifying the experts in each of these functional areas and assigning the responsibility of drafting a procedure
encompassing activities like the method of conducting each process.
3. Developing a Business Management Systems Manual (BMSM) after interviewing each of the experts by the
BMSM representative and outlining an agenda for ARB to perform its daily activities.
4. Inspection and review of the drafts prepared for approval by the respective managers.
5. Preparing a “Roles and Responsibilities” Manual.
6. Placing the manual, roles and responsibilities and 49 identified procedures on website named BMIS (Business
Management Information System).
Audit:
External auditors (NSAI) were astonished to see the ARB’s drive for continuous enhancement. Very few areas were
noticed for possible improvement contrasting the expectation of large number of non-conformities. Thus the audit
resulted in a series of reforms and revisions instead of disciplinary remedial actions focussed at individual performance
as expected. Contradicting to the view of ARB as the bottom line of the business chain, the unit was cited as the “Most
improved” business unit.
Conclusion:
There were no supernatural activities involved in the two-month reformation process of the business. The success is
attributed to the visionary leaders in the plant always seeking internal and external channels to build solutions for
different business issues. Using the concept of continuous process improvement and implementing ISO 9000:1994 as a
value adding activity rather than as a non-conformance inspection tool, helped the plant in acquiring certification.
BMS (Business Management System) developed in ARB was thus included in every sector of the organisation as in
finance, sales and marketing, and the organisation’s operations. Dell ARB has moved from being under the eye of
suspicion to the spotlight of success. It proved that ISO 9000:1994 can in fact be a system of business enhancement
and not just a tool for traditional quality management.
Continue:
Aiming for Consistency in Practices
Best Practices >Aiming For Consistency In Practices
An insight into the efforts of a steel maker to improve consistency of practices through ISO 9002 implementation.
Advanced technology has helped steel makers to develop the best operating processes to melt, roll and ship steel. The
full impact of these processes can be realised, only if they are performed on a daily basis without any irregularities.
Companies today are working towards ensuring consistency in practices, with the aim of improving quality, productivity,
customer services and profitability.
Structural Metals Inc., (SMI) is the steel-making venture of Commercial Metals Co., (CMC) of Dallas. It accounts for 53%
of CMC’s annual sales of $2.25 billion. The annual production for the year 1999 was 7,50,000 tons. In order to ensure
consistency in its practices, SMI’s plant at Texas decided to work for the ISO 9002 quality management certification.
SMI’s employees were initially reluctant to accept its ISO programme, since it involved changes in procedures. Quality
meetings were conducted every week. The employees slowly but surely began to involve themselves in the company’s
programmes. Department managers and other employees also attended the weekly meetings. Production statistics,
quality issues, customer complaints and internal problems were discussed during these meetings. Mistakes commonly
committed by the employees were also discussed in a constructive manner. The main aim of these meetings was to
identify problems, and solve them before customers spotted them.
At first, the mill’s quality-systems manager attended a one- week ISO introduction class. A steering committee
comprising of eight department managers was formed to discuss the ISO process. In turn, these managers, along with
their key employees imparted ISO training to their department workers. One of the important requirements of the ISO
process was documentation of the work instructions, procedures and practices. The main cause of concern of the
department managers was the allocation of resources and time for documenting procedures. The shop-floor workers and
operators helped by documenting all the work instructions, which were later compiled and stored on a computer.
Documentation helped to develop consistency in practices. Earlier, it was observed that there were slight differences in
processes due to variations in operating procedures among workers. For example, each of the four members of the
rolling-mill department had different methods for redirecting “red tag” or non-conforming materials. After discussing the
procedures with the four workers, a standard method was evolved and documented. Similarly, in the melt shop, during
the melting process, different workers added alloys at different times. ISO helped to evolve a standardised procedure, by
eliminating variations from worker to worker. Although procedures were standardised, ISO gave workers the flexibility to
incorporate changes when required. Also, they had to record the diversions from standard procedures in their shift notes.
The results of the ISO programme were seen in the first year itself. In the first fiscal year after starting the programme,
SMI noticed that customer complaints had reduced by 23.5% and the final-chemistry non-conformance of its steel
dipped by 14%. This was a remarkable achievement, considering the fact that the company was still in the process of
ISO certification.
Auditing process:
SMI appointed teams to undertake the internal auditing programme. These teams, comprising three members had to
conduct audits of different departments, and evaluate the workers with regard to their responsibilities and functions. The
leader of the audit team then wrote a summary, which included strengths and opportunities for improvements. If the
auditors recorded any non-conformance or deviation, the concerned departments had to take up corrective actions and
document the same. The results of the internal audits were then submitted to Steel Related Industries (SRI), which was
the external auditor. SRI also conducted surveillance audits of SMI every six months.
The auditors were allowed to evaluate people from other departments, and this gave scope to cross-functional learning.
The internal audits helped team members to learn about procedures and functions of other departments. This enhanced
communication between departments.
The 17-member in-house team, which undertook the ISO 9002 Internal Auditing task for SMI, received the first
“Steelworkers of the Year” award from New Steel. This award honours the services of a team of plant floor steelworkers
whose quality, productivity, safety, profitability and problem-solving skills are a model for the entire steel industry. Within
two years of starting the ISO process, SMI found that external customer complaints had dropped by an amazing 74%,
and the final-chemistry non-conformance of its steel had reduced by 80%.
The ISO programme has also helped SMI in providing enhanced training to new employees. During the training process,
new employees study the ISO procedures stored on the computer and understand their job responsibilities. They also
gain a good understanding about the functions and procedures in individual departments.
ISO also brought about functional improvements in SMI’s sales department. Earlier, the sales department would
communicate only with a few departments to check if new customer requirements could be fulfilled. The introduction of
ISO brought in a stringent rule, that all department managers must be consulted while considering a new customer’s
request.
Being a paperless system, ISO enabled SMI’s workers to become more computer-literate. All the instructions, work rules
and procedures are now maintained on Lotus Notes software. This eliminated paper work.
SMI not only used ISO to improve consistency of its processes, but also for improving safety at the workplace. The
analyses of job safety, along with instructions to perform jobs safely are also documented and stored on the Lotus
software. In consequence, the number of shop-floor accidents at SMI has dipped to almost zero. Thus, ISO served as a
platform for developing consistency, improving quality, productivity and safety.
Case Studies > A Healthy QMS
The present case study outlines the implementation of ISO 9001 standards in a healthcare centre highlighting the need
for it. It thereby establishes that ISO 9001 can be implemented in any organisation irrespective of the services it caters
to.
Introduction:
Many organisations have got the ISO 9001 registration, which is a quality system standard implemented by organisations
worldwide. It is considered a good alternative to the other quality management systems.
ISO 9001standard is broad and flexible making it possible for each certificant to customise and adopt these standards
according to his requirements. Even health care institutes can register for ISO 9001 standards. They can thereby
generate effective practices in the design and health care services they provide. ISO 9000:1994 standards emphasis on
documenting the critical to quality procedures. This implies that hospitals can establish and document innovative
procedures to guarantee quality in their services.
Continue:
ISO 9000 - The Other Point Of View
Due to the increased awareness of ISO 9000 and its benefits, more and more customers are requiring organisations to
become certified. Certifying to ISO 9000 is voluntary under ISO rules, but has become necessary for many organisations
in order to retain their customers. The certification process to ISO 9000 standards however is a costly and time-
consuming affair, especially for small organisations.
A perceived drawback of the ISO 9000:1994 standards was that while ISO 9000 registered companies are certified to
have standardised quality procedures, that in no way ensured that the organisation produced quality products or
services. ISO 9000:94 registration ensured that a quality system is in place but provided no guarantee of customer
satisfaction or results. It did not address a company’s need for continuous improvement, evaluation, or performance
planning.
Given below is a study conducted on two organisations Tech Co, Systems Co, and System Co to study the impact ISO
9000:94 QMS implementation had on their organisational performance.
The issues that were common to the two organisations are discussed in detail.
Tech.Co:
'Tech. Co.' is a retailing and distribution organisation located in the UK. The organisation sells high technology products.
Tech. Co. decided to certify itself to ISO 9000. The registration process was completed in three years. The main motive
behind registration was that its customers (especially the government agencies) were insisting on the certification.
Tech.Co felt that not getting certified to the ISO standards might cause it to lose customers.
The organisation had seven product divisions and each unit had its own order processing function. After ISO 9000
certification Tech.Co standardised it’s the order processing procedures. Each division however continued to process its
own sales orders.
Registration to ISO 9000 led to the development of nine procedure manuals. It had one manual for each type of product,
one manual for quality and another for the warehouse. The manuals documented what should be done at each stage of
an order, and ensured that every thing had been taken care of.
Has ISO 9000 contributed to performance?
A tussle between Sales and Administration:
The sales administration manager felt that sales personnel considered themselves special. He was of the view that the
sales personnel displayed a careless attitude towards filling the forms with the required information. He therefore felt
that ISO 9000 would help control their activities. He was of the opinion that strict adherence to the procedures would
automatically make the sales personnel fall in line.
As a result, the sales personnel were asked to perform their jobs in strict accordance with the laid down procedures.
However, the way the sales personnel operated did not change. The differences between the sales people and the
administration remained the same and in fact got worse. This was because the former felt that the administration was
imposing restrictions on them in the name of procedures.
Complexity in pricing:
The next issue was that of pricing. The pricing of the products was a complex process. The sales personnel encountered
customers with different requirements. Thus they wanted the administration to be more flexible in pricing products
based on the customer requirements and circumstances.
The administrative staff on the other hand was asked to work in compliance with the new procedures. They therefore
adhered only to those prices and procedures that were recorded in the manual. Some of the requirements were not
available in the sales manual and therefore had to be constantly updated. Everyone’s energy was being spent on
documenting information but the real issue was being overlooked. The administration failed to realise that it was losing
customers due to its rigid pricing.
Customer Orders:
One of the ISO 9000 conditions was to record the customer orders. Management used these recorded manuals as
evidence, in case of differences between the customers and the organisation. This was however a wrong way to
approach a difference with the customer.
Take for instance a case when the customer wants to change his order. In such instances, customers expect their
suppliers to be kind, polite and accomodating. They do not expect the supplier to show them a paper document and
contest their request for a change in order. If they ask for a change in the order, it is the responsibility of the supplier as
far as possible, to make the change swiftly. However, the management at Tech Co. seemed to think otherwise. This
indifferent attitude of the organisation towards its customers led to a decline in its customer base.
Quarantine Procedure:
One of the ISO 9000 conditions was the handling of goods returned by the customers. As per ISO 9000 these goods
were to be quarantined till the official paperwork permitted reuse. The organisation found that the goods sent back in
less than fifteen days were not damaged even if subjected to unfavourable conditions.
As per ISO 9000, the storehouse in charge should verify the date on which the goods had been returned against the date
on which it was shipped to the customer. Those products that were found to be in condition (that were sent back in less
than fifteen days) were sent to the concerned authority for signature, as per the procedure. These authorities were
hardly found and when present did not consider signing the forms from the storehouse as priority.
Since Tech.Co’s goods were heat and light sensitive, the quarantine only delayed its reuse. Moreover, any re-testing done
at this stage further damaged the goods.
Actually there was no need to implement the 'quarantine' procedure. Except for some rare occasions, the organisation
had not faced any major issue with the goods returned prior to the registration. The organisation could in most occasions
reuse the product immediately after its return. If the organisation had worked as an integrated system, it would have
realised that customers often returned good products because it did not meet their specifications, rather than it being
defective. Tech. Co. had established a documented procedure on the basis of a rare occurrence, giving rise to new
problems. The consequence was losses to the organisation.
Conclusion:
ISO 9000 implementation had not improved the overall performance of Tech Co. Tech Co. was of the wrong notion that
implementing a quality system would automatically improve the organisation’s quality performance. The focus lay on
documenting each and every procedure, which was a time consuming, costly and tedious affair. The drawback of the
system was that the thinking level of the employees was confined to the scope of the written procedures. The result was
that ISO 9000 registration did more harm than good to Tech Co.
Systems Co:
'Systems Co' produces handling systems that are used in packaging and manufacturing operations and sets them up on
customer sites. Systems Co got registered to ISO 9000 QMS standards.
In order to get the certification, Systems Co took the assistance of a consultant agency. After many deliberations, it
finally selected a consultant who seemed to display an attitude that was practical and accommodating.
The case study focuses on the auditor’s (the consultant employed) perception of ISO 9000 quality standard and also
whether the action plans initiated by him, really enhanced the quality performance of the organisation.
The organisation management considered the auditor a capable person and the entire auditing procedure as a sort of
backing for the various processes.
The auditor as a part of his routine activity scrutinised several key matters of concern and then chose to focus on the
engineering and customer service areas of the business. The auditor intended to identify the elements that did not meet
the set standards and then set a deadline for corrective action.
Engineering:
In engineering, the auditor thoroughly examined the enquiry document. The document consisted of the information
pertaining to consumers. The auditor wanted to investigate:
• How Systems Co was ensuring that its customers were getting products that met their requirements?
• The procedures followed by Systems Co to properly channel the information.
• How any modifications were being incorporated.
All the time the auditor was referring to the set of manuals and procedures laid down in the document. He was blindly
adhering to the clauses laid down in the ISO 9000 quality standards. The auditor felt that controlling the process by
means of a set of procedures would prevent the employees from committing errors. He was not interested in finding
ways to actually improve the various activities in the department. This was contrary to the ‘quality thinking’ approach.
Quality thinking emphasises on continual enhancement that in turn necessitates initiation of certain action plans.
ISO 9000 standard, on the other hand emphaised that a system would be in line with the requirements, if all the
employees worked in adherence to the procedures. These procedures sometimes may not highlight issues that are
critical to quality (such as customer related issues and certain innovative techniques etc).
The major drawback of this standard is that it doesn’t emphasise on exploring the elements that appropriately fit into the
quality model. Blindly adhering to ISO 9000 resulted in the organisation relying on the auditor for implementing
corrective action. The auditor in turn strictly adhered to documentation, thus relegating the very thought of quality to the
backburner. The quality approach requires that actions are associated to the intent. If the intent of the present
organisation was quality, the procedures put in place to monitor and check this intent should have been enough to
update the management about the status of the quality performance.
Customer service:
It was a positive turn when the auditor emphasised on the significance of customer requirements to the organisation.
This was something novel. The auditor wanted to know the importance the organisation gave to customer service. This
implied:
• How effectively was the organisation utilising the results of the survey?.
• What were the means by which the organisation was trying to ascertain the needs of the customers?
The auditor emphasised on linking the customer survey information to the quality management system. This helped the
organisation to implement corrective actions so that the improved processes would be in line with the customer
requirements.
It would have been more helpful to the organisation if the auditor suggested better techniques to gather customer
related information. However his focus was only on the existing procedures and identifying loopholes, rather than
improving the system .
Had ISO 9000 been beneficial?
According to the quality manager, the ISO 9000 implementation was the point for the initiating other quality performance
activities. There is no doubt that ISO 9000:94 standard bring clarity of procedures, which in turn improves performance.
But if this required superfluous documentation and out of place controls, would it be of much use?
The organisation had spent a large amount of valuable time dismantling those elements of ISO 9000 that failed to serve
the purpose. Was it imperative to incur those extra costs and time? The answer would be no.
Systems Co claimed that the ISO 9000 registration was the driving force for the initiation of other quality related
activities. Instead of this, had Systems Co focussed on its customers as an inspiration it would have improved
performance in a shorter time.
Systems Co. was gradually transforming to being a customer-focused organisation. This commitment to customers would
have been thwarted by the ISO 9000 registration with its focus on documentation and compliance to procedures, had the
organisation not smartly evaded certain dysfunctional constraints of ISO 9000 standard.
Conclusion:
In each of the two cases we find proof of ISO 9000 registration being detrimental to the organisation’s quality
performance. In the first case, the harm done was obvious. In the second case it is relevant to make a note of how they
overlooked the dysfunctional aspects of the Standard.
The blind adherence to ISO 9000 quality standards had caused sub-optimisation in these organisations. More badly,
maximum efforts were diverted into setting up the ISO 9000 Standard, which could have been utilised to explore more
feasible ways of enhancing the quality and efficiency.
It was observed that external agencies (auditors) were instrumental in inciting the organisations to perform activities
that damaged the quality performance. Moreover, the registration to ISO 9000 involved both time and capital.
The philosophy of ISO 9000 is one of control. “Control” of processes or activities is done by compliance to procedures i.e.
the setting up of procedures that are presumed to influence the quality of the product. Many organisations assume that
documentation and control of procedures will 'avert' problems. There is however no proof to support this opinion. Such a
mindset results in people giving preference to procedures rather than intent. Thus, the certification to ISO 9000 quality
standard can result in zero knowledge. Zero knowledge resulting from the tendency to stop thinking and follow
procedures.
Online Navigators > Concept and Implementation
Given below are some online links that detail the different aspects related to ISO 9000:1994
1. ISO Online:
ISO (International Organisation For Standardisation) is a federation of several national standards bodies working
together to facilitate international trade. This link is to the official website of ISO. It clearly explains what ISO is, the
technical committees involved in developing the different ISO standards, duties performed by ISO, the benefits it brings
to society and the various standards it developed.
http://www.iso.ch/iso/en/ISOOnline.frontpage
2. ISO 9000 - An introduction:
ISO 9000 is a series of standards and guidelines for establishing a QMS in any kind of organisation. This document gives
a brief insight of what ISO is, guidelines for selection and use of ISO 9000, what ISO 9000 consists of, how it can be
useful for organisations in different businesses and the flow chart for implementing ISO 9000.
http://www.isoeasy.org/selusee.pdf
3. ISO 9000 Documentation:
One of the most intimidating aspects of ISO 9000 is the documentation. Documentation was often found inadequate or
ineffective or even absent in many organisations. This page gives a detailed explanation of the five areas that need to be
addressed by organisations in order to develop an effective quality system, with less paper work. The five areas included
are process definition, structure, tools, format/grammar, and flexibility.
http://www.cavendishscott.com/articles/Documentation.htm
4. ISO 9000 Process Documents:
This document is a collection of ISO 9000 process documents. Also downloads for the documentation of the various
aspects involved in ISO 9000:1994 QMS are provided.
http://www.isoeasy.org/iso_9000_process_documents.htm
5. Implementation:
This PDF provides an elaborate explanation of the various steps involved in the certification process of ISO 9000:1994
standards.
http://www.dkminc.com/documents/pway_iso.pdf
6. Gap analysis:
Gap analysis is a tool used for evaluation of the organisation’s existing quality management system. This tool is a
template of questions that help organisations identify those organisational functions that fall short of the required
standards.
This document provides links to two questionnaires used for the gap analysis. The first is for a mini gap analysis while
the other assists in-depth review of the organisations systems.
http://www.realquality.com/gap.htm
7. Elements of ISO 9000:1994:
Successful implementation of any standard depends on the way it is understood. This site gives a clear explanation of
ISO 9000 series, elements in it, the meaning, purpose and elaboration of all the 20 clauses in the series.The explanation
is comprehensive and extremely informative.
http://www.realquality.com/elements.htm
8. Benefits of implementation of ISO 9000:
This document outlines the benefits that companies large, medium, and small enterprises could accrue by implementing
ISO 9000. This document is prepared based on an in-depth study of a number of Spanish organisations.
http://www.sii.org.il/WebFiles/topicsQW/m10.pdf
9. ISO 9000 Advice:
This document is a guide to ISO 9000. Questions such as what is quality, what is quality assurance, why is it necessary?
This document is an arsenal of advice and guidance on ISO9000 and associated registration.
http://www.quality.co.uk/isoadvic.htm
10. Choosing a trainer:
Successful organisations have well-trained and skilled employees. However, there are many a cases where employees do
not have the required knowledge and skills for new assignments. Thus choosing a trainer could be a daunting task. This
document could help to make a more knowledgeable decision when trying to select the best training solution for an
organisation.
http://asia.bsi-global.com/Quality/BSI_Practical_Guide_for_Choosing_a_Trainer.pdf
11. ISO 9000 differences for businesses in the service industry:
ISO 9000 is in general, considered applicable only to manufacturing industries. But it can be applied to the same level of
efficiency in the service industry as in the manufacturing industry. This document explains the differences in
implementation in the service industry compared to the manufacturing industries.
http://www.dardenneassociates.com/iso9000/index.htm
12. Purchasing ISO standards and documents:
All ISO standards and documents are copyrighted by the International ISO organisation and must be purchased from one
of the local ISO member bodies in your country. The sale of these documents provides part of the ISO organisation's
funding. This document provides the list of all such ISO members who sell the standards and documents.
http://www.iso.org/iso/en/aboutiso/isomembers/MemberDetailPage.MemberDetail?MEMBER=address
Continue the tour:
Online links for Additional Reading
Online Navigator > Additional Reading
Following are some online links that could help for Additional Reading in ISO 9000:1994.
1. ISO 9000:1994 Guidelines:
This website gives details about the various guidelines in the ISO 9000:1994 series.
http://praxiom.com/iso-9000-1994.htm
2. ISO 9000:1994 Sample Pages:
This website provides free downloads useful in implementing the different clauses of ISO 1994 version. It helps in the
preparation of quality manual.
http://www.iso9000commerce.com/htm/sample1994.htm
3. ISO 9000 consultants:
This page symbolises a directory of consultants experienced in assisting organisations to develop ISO 9000 quality
management systems, and achieve ISO 9000 Registration.
http://www.isoeasy.org/Referral%20Network.htm
4. FAQ’s:
This document provides answers to the frequently asked questions and thereby gives a clear picture of ISO 9000 series
and the certification process of various standards involved in it.
http://honeywellaircraftlandingsystems.com/working_at_als/new_hire_orientation/nhorientation/policies/ISO 9000.pdf
5. Sample quality manual:
This document provides a sample quality manual of an organisation that has implemented ISO 9000.
http://www.quality.co.uk/example/manual.htm
6. Sample Design procedure:
The document explains at length the various activities involved in the system design procedure of ISO 9000. A flow chart
to explain the same is also given in the document.
http://www.quality.co.uk/example/op10ades.htm