Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
29 views

Spread Sheet Model

The document contains summaries of several spreadsheet models, including product mix, transportation, staffing, and assignment problems. Key details provided include variable cells and constraints for a product mix problem, cost matrix and shipment details for a transportation problem, shift details and minimum staffing requirements for a staffing problem, and job time details and machine assignments for an assignment problem.

Uploaded by

Jessica Varma
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views

Spread Sheet Model

The document contains summaries of several spreadsheet models, including product mix, transportation, staffing, and assignment problems. Key details provided include variable cells and constraints for a product mix problem, cost matrix and shipment details for a transportation problem, shift details and minimum staffing requirements for a staffing problem, and job time details and machine assignments for an assignment problem.

Uploaded by

Jessica Varma
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 9

Microsoft Excel 15.0 Sensitivity Report Worksheet: [SPREAD SHEET MODEL.

xlsx]PRODUCT MIX Report Created: 22-01-2014 08:48:09

Variable Cells Cell Name $E$7 UNITS PRODUCED HARD $F$7 UNITS PRODUCED MILD $G$7 UNITS PRODUCED SOFT Constraints Cell Name $H$13 I1 TOTAL UNITS USED $H$14 I2 TOTAL UNITS USED $H$15 I3 TOTAL UNITS USED Final Shadow Constraint Allowable Allowable Value Price R.H. Side Increase Decrease 100 10 100 100 100 200 0 400 1E+30 200 0 0 50 1E+30 50 Final Reduced Objective Allowable Allowable Value Cost Coefficient Increase Decrease 50 0 20 1E+30 8 0 -20 30 20 1E+30 0 -60 40 60 1E+30

SPREAD SHEET MODEL - PRODUCT MIX PROBLEM FOR CHOCLATE INDIA LTD.

HARD PROFIT/UNIT UNITS PRODUCED TOTAL PROFIT 20 50 1000

MILD 30 0

SOFT 40 0

INPUT I1 I2 I3

No. OF UNITS 2 5 4 4 0 3

10 0 15

LEGEND Input Values Decision Variables (pdt mix) Objective function value (Profit)

T MIX PROBLEM FOR CHOCLATE INDIA LTD.

DATA RANGES USED profits =Sheet1!$E$6:$G$6 units =Sheet1!$E$7:$G$7

TOTAL UNITS USED 100 <= 200 <= 0 <=

AVAILABLE 100 400 50

SPREAD SHEET MODEL - TRANSPORTATION PROBLEM

PLANTS P1 P2

COST MATRIX WAREHOUSES W1 W2 40 60 70 75

PLANTS P1 P2 TOTAL DEMAND REQUIRMENT

SHIPMENT WAREHOUSES W1 W2 80 0 20 60 100 60 = = 100 100

TOTAL SUPPLY 80 80 = =

TOTAL COST

9100

NSPORTATION PROBLEM

CAPACITY 80 80

SPREAD SHEET MODEL - STAFFI

SHIFT # WORKERS

6am-2pm 10am-6pm 2pm-10pm 6pm-2am 10pm-6am 12 11 14 4 16

TOTAL # WORKERS

57

TIME 6am-10am 10am-2pm 2pm-6pm 6pm-10pm 10pm-2am 2am-6am

6am-2pm 1 1 0 0 0 0

SHIFT 10am-6pm 2pm-10pm 6pm-2am 10pm-6am 0 0 0 0 1 0 0 0 1 1 0 0 0 1 1 0 0 0 1 1 0 0 0 1

D SHEET MODEL - STAFFING PROBLEM

2am-10am 0

2am-10am TOTAL # WORKERS 1 12 0 23 0 25 0 18 0 20 1 16

>= >= >= >= >= >=

MIN. REQUIRED 12 17 25 18 20 16

SPREAD SHEET MODEL

MACHINES M1 M2 M3 M4

JOBS(TIME TAKEN) J1 J2 12 28 8 6 12 30 19 21

J3 13 16 14 32

MACHINES M1 M2 M3 M4 Total # Machines REQUIRMENT TOTAL TIME

J1 0 0 1 0 1 = 1 50

ASSIGNMENT J2 J3 0 1 1 0 0 0 0 0 1 = 1 1 = 1

SPREAD SHEET MODEL - ASSIGNMENT PROBLEM

J4 14 10 18 19

NT J4 0 0 0 1 1 = 1 TOTAL # JOBS 1 1 1 1 = = = = REQUIRMENT 1 1 1 1

You might also like