160 villas - Gate House

DUBAI SILICON OASIS - 160 VILLAS

Activity ID

16-Feb-14 09:16

Activity Name

DSOA 160 villas - Gate House


DSOA.1 MATERIALS
DSOA.1.1 PREPARATION/SUBMITTALS
DSOA.1.1.1 CIVIL MATERIALS
DSOA.1.1.2 MEP MATERILAS
A1160

DUCTED INLINE FAN

A1070

HIGH RESOLUTION DAY & NIGHT CAMERAS

A1080

GATE BARRIER (MAGNETIC LOOP)

A1090

TAG READER

A1150

EXHAUST AIR LOUVER WITH WIRE MESH

DSOA.1.2 APPROVALS
DSOA.1.2.1 CIVIL MATERILAS
DSOA.1.2.2 MEP MATERILAS
A1170

DUCTED INLINE FAN

A1180

EXHAUST AIR LOUVER WITH WIRE MESH

A1120

HIGH RESOLUTION DAY & NIGHT CAMERAS

A1130

GATE BARRIER (MAGNETIC LOOP)

A1140

TAG READER

DSOA.4 SHOP DRAWINGS


DSOA.4.1 Preperation/Submittal
DSOA.4.1.2 FINISHES DRAWINGS
SDIF-001

P/S Internal Finishes Option Layout

SDRS-001

P/S Roof Slope Directions

SDBT-011

P/S Ext Light Fitting, Location on Elevation

SDEP-021

P/S External paint Colour Scheme layout

SDCL-001

P/S Cat Ladder Location & Details

SDBT-001

P/S Bathroom Tiling Layout, Wall Elevation

DSOA.4.1.1 MEP DRAWINGS


SDAC-001

P/S AC Works Shop Drawings

SDPD-001

P/S Plumbing Drainage Work Shop Draw-SubStr

SDEW-001

P/S Electrical Work Shop Darwings-SubStr

SDEWP-001

P/S Electrical Work Shop Darwings-SupStr

SDBW-001

P/S Builder Works Shop Drawings-supstr

SDBW-011

P/S Builder Works Shop Drawings-substr

SDBW-021

P/S Plumbing Drainage Work Shop Draw-SupStr

DSOA.4.2 Approval
DSOA.4.2.1 FINISHES DRAWINGS
A1190

Internal Finishes Option Layout

A1200

Roof Slope Directions

A1210

Ext Light Fitting, Location on Elevation

A1220

External paint Colour Scheme layout

A1100

Cat Ladder Location & Details

A1110

Bathroom Tiling Layout, Wall Elevation

DSOA.4.2.3 MEP DRAWINGS


A1000

AC Works Shop Drawings

A1010

P/S Plumbing Drainage Work Shop Draw-SubStr

A1020

P/S Electrical Work Shop Darwings-SubStr


Page 1 of 6

ARABTEC CONSTRUCTION L.L.C

160 villas - Gate House

DUBAI SILICON OASIS - 160 VILLAS

Original Remaining Schedule % Start


Duration Duration
Complete

Finish

16-Feb-14 09:16

Total
Float

0% 16-Feb-14

17-Feb-14

0% 16-Feb-14

17-Feb-14

0% 16-Feb-14

17-Feb-14

0%

0% 16-Feb-14

17-Feb-14

0% 16-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 16-Feb-14

17-Feb-14

0%

0% 16-Feb-14

17-Feb-14

0% 16-Feb-14

17-Feb-14

0% 16-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 16-Feb-14

17-Feb-14

0% 16-Feb-14

17-Feb-14

0% 16-Feb-14

17-Feb-14

0% 16-Feb-14

17-Feb-14

0% 16-Feb-14

17-Feb-14

0% 16-Feb-14

17-Feb-14

0% 16-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 16-Feb-14

17-Feb-14

0% 16-Feb-14

17-Feb-14

0% 16-Feb-14

17-Feb-14

0% 16-Feb-14

17-Feb-14

0% 16-Feb-14

17-Feb-14

0% 16-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0
0

0
0
0

Page 2 of 6

ARABTEC CONSTRUCTION L.L.C

160 villas - Gate House


Activity ID

DUBAI SILICON OASIS - 160 VILLAS

16-Feb-14 09:16

Activity Name
A1030

P/S Electrical Work Shop Darwings-SupStr

A1040

P/S Builder Works Shop Drawings-supstr

A1050

P/S Builder Works Shop Drawings-substr

A1060

P/S Plumbing Drainage Work Shop Draw-SupStr

DSOA.5 Construction of 3 Gate House


DSOA.5.3 Cluster (Q , M , N)
CA-00M

CAT LADDER

WA-00M

WATER METER CABNIET

AL-00M

ALUMINIUM DOORS & WINDOWS

DSOA.5.3.1 STRUCTURAL WORKS


PA-00M

PARPET WALL

DSOA.5.3.1.1 Excavation
EX-00M

EXCAVATION

DSOA.5.3.1.2 Foundation
BI-00M

BLINDING

FOO-00M

FOOTING

DSOA.5.3.1.3 Slab on Grade


ST-00M

STUB WALL

BA-00M

BACKFILLING

GS-00M

GROUND SLAB

DSOA.5.3.1.4 ROOF
CO-00M

COLUMNS

RS-00M

ROOF SLAB

DSOA.5.3.5 BLOCKWORK
BLO-00M

BLOCKWORK

DSOA.5.3.2 MEP WORKS


BAR-00M

GATE BARRIER ( REMOTE CONTROL OPERATED )

POL-00M

POLE FOR CCTV CAMREAS & REID TAG READER

GA-00M

GATE BARRIER ( MAGNETIC LOOP )

NPR-001

HIGH RESOLUTION DAY & NIGHT CAMERAS

PUM-001

SUBMERSIBLE WATER BOOSTER PUMP

DSOA.5.3.2.1 MEP 1st Fix


A1230

Condu.for Drainage Piping in SubStr.

A1240

Condu. in Structure (Grade slab).

A1250

Condu.& Fix Sw.Boxes in Blockwork.

A1260

Condu.for Drainage & Water Supply

A1270

High Level Drainage

DSOA.5.3.2.2 MEP 2nd Fix


REF-00M

REFREGERANT PIPES

FCU-00M

INSTALLTION OF FCU'S

WIR-001

WIRING WORKS

DSOA.5.3.2.3 MEP Final Fix


SA-00M10

Ins. of Light Fittings

SA-00M20

Electrical Accessories

SA-00M30

Inst of AC Unit

EXH-00M

Inst. of EXHAUST Fan

SA-00M

Inst. of sanitary Fittings & Wares

DSOA.5.3.3 EXTERNAL WORKS


Page 3 of 6

ARABTEC CONSTRUCTION L.L.C

160 villas - Gate House

DUBAI SILICON OASIS - 160 VILLAS

Original Remaining Schedule % Start


Duration Duration
Complete

Finish

16-Feb-14 09:16

Total
Float

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 16-Feb-14

17-Feb-14

0% 16-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 16-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 16-Feb-14

17-Feb-14

0% 16-Feb-14

17-Feb-14

0% 16-Feb-14

17-Feb-14

0% 16-Feb-14

17-Feb-14

0% 16-Feb-14

17-Feb-14

0% 16-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 16-Feb-14

17-Feb-14

0% 16-Feb-14

17-Feb-14

0% 16-Feb-14

17-Feb-14

0% 16-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0
0
0

0
0

0
Page 4 of 6

ARABTEC CONSTRUCTION L.L.C

160 villas - Gate House


Activity ID

DUBAI SILICON OASIS - 160 VILLAS

16-Feb-14 09:16

Activity Name
EXT-00M

INTERLOCK PAVING

GR-00M

GRC WORK

UGW-00M

UNDER GROUND WATER TANK

DSOA.5.3.4 FINISHES WORKS


DSOA.5.3.4.2 SKIRTING FINSHES
CER-00M

CERAMIC TILE SKIRTING

DSOA.5.3.4.1 FLOOR FINISHES


F04

COLOURED NON-SLIP CERAMIC TILES

DSOA.5.3.4.3 WALL FINISHES


INT-00M

INTERNAL PLASTER

EW01

PLASTER FOR EXTERNAL AREAS

EW02

EXTERNAL PAINT

W02

GLAZED,COLOURED,PATTERNED CERAMIC TILES ON SAND/CEMENT MORTAR

DSOA.5.3.4.4 CEILING FINISHES


GYP-00M

GYPSUM TILE SYSTEM WITH FINE LINE SUSPENSION (TOILET)

GYPO-00M

ORDINARY GYPSUM BOARD FALSE CEILING SYSTEM (LOBBY)

SPR-00M

SPRAY PLASTER

DSOA.5.1 Cluster Q
EX-00Q

EXCAVATION

FO-00Q

FOUNADATION

BI-00Q

BLINDING

FOO-00Q

FOOTING

BAR-00Q

GATE BARRIER ( REMOTE CONTROL OPERATED )

POL-00Q

POLE FOR CCTV CAMREAS & REID TAG READER

GA-00Q

GATE BARRIER ( MAGNETIC LOOP )

EXH-00Q

EXHAUST AIR LOUVER WITH WIRE MESH

REF-00Q

REFREGERANT PIPES

PA-00Q

PARPET WALL

CA-00Q

CAT LADDER

WA-00Q

WATER METER CABNIET

EXT-00Q

EXTERNAL PAVING

ST-00Q

STUB WALL

BA-00Q

BACKFILLING

GS-00Q

GROUND SLAB

CO-00Q

COLUMN

SA-00Q

Inst. of sanitary Fittings & Wares

GR-00Q

GRC WORK

AL-00Q

ALUMINIUM DOORS & WINDOWS

DSOA.5.2 Cluster N

DSOA.2 HANDING OVER


DSOA.2.1 Testing & commissioning
DSOA.2.2 Disinfection
DSOA.2.3 Snagging & Cleaning

Page 5 of 6

ARABTEC CONSTRUCTION L.L.C

160 villas - Gate House

DUBAI SILICON OASIS - 160 VILLAS

Original Remaining Schedule % Start


Duration Duration
Complete

Finish

16-Feb-14 09:16

Total
Float

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0% 17-Feb-14

17-Feb-14

0%

0%

0%

0%

0%

0
0

Page 6 of 6

ARABTEC CONSTRUCTION L.L.C