Civil & Structural Works: LPG Bottling Plant Rationalisation Study Exxon-Mobil - JTM, S'PORE
Civil & Structural Works: LPG Bottling Plant Rationalisation Study Exxon-Mobil - JTM, S'PORE
Civil & Structural Works: LPG Bottling Plant Rationalisation Study Exxon-Mobil - JTM, S'PORE
1 of 28
2 of 28
3 of 28
4 of 28
5 of 28
6 of 28
7 of 28
OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 1 of 2
63-INQ10-011-DC-01
BQ1008
1) PIT GEOMETRY LENGTH OF PIT WIDTH OF PIT DEPTH OF PIT WALL THICKNESS OF PIT BASE SLAB THICKNESS OF PIT PILING REQUIRED 2) CONCRETE CONC. VOLUME REQUIRED LEAN CONC. REQUIRED 3) REINFORCEMENT i) VERTICAL REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR ii) HORIZONTAL REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR iii) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR iv) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR TOTAL REBAR WEIGHT = = = = T 13 = = = = = = T 10 = = = = = = T 13 = = = = = = T 13 = = = 1.20 m 200 mm 51.00 nos. Bar 1.042 kg/m 0.064 Tons. 10.00 m 200 mm 6.00 nos. Bar 0.617 kg/m 0.037 Tons. 3.00 m 200 mm 11 nos. Bar 1.042 kg/m 0.034 Tons. 2.00 m 200 mm 16 nos. Bar 1.042 kg/m 0.033 Tons. 0.168 Tons. (Z-direction) (X-direction) = =
3 3.200 m 3 0.300 m
= = = = = =
fy =
2 460 N/mm
8 of 28
OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 2 of 2
63-INQ10-011-DC-01
BQ1008
4) EXCAVATION WORK ESTIMATED EXCAVATION DEPTH ESTIMATED EXCAVATION VOLUME 5) STRUCTURAL STEEL = = 0.85 m 3 10.20 m GRADE- S 275
UNIT WEIGHT OF MEMBER TOTAL LENGTH REQUIRED TOTAL STEEL WEIGHT REQUIRED
6) FRP GRATING
6.00 m2
(CONSTRUCTION OF NEW PIT_TYPE-P1) = = = = = = = 5 16.00 1.50 0.84 1.69 30.00 51.00 nos. m3 m3 Tons. tons. m2 m3
TOTAL NOS. OF PITS TOTAL CONC. VOLUME REQUIRED LEAN CONC. REQUIRED TOTAL REBAR WEIGHT TOTAL STEEL WEIGHT REQUIRED GREATING AREA REQUIRED TOTAL ESTIM'D EXCAVATION VOLUME Note: All excavation required hacking of ext'g concrete floor Assume all pits not clashing with ext'g ground beam.
9 of 28
OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 1 of 2
63-INQ10-011-DC-01
BQ1008
1) PIT GEOMETRY LENGTH OF PIT WIDTH OF PIT DEPTH OF PIT WALL THICKNESS OF PIT BASE SLAB THICKNESS OF PIT PILING REQUIRED 2) CONCRETE CONC. VOLUME REQUIRED LEAN CONC. REQUIRED 3) REINFORCEMENT i) VERTICAL REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR ii) HORIZONTAL REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR iii) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR iv) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR TOTAL REBAR WEIGHT = = = = T 13 = = = = = = T 10 = = = = = = T 13 = = = = = = T 13 = = = 1.20 m 200 mm 81.00 nos. Bar 1.042 kg/m 0.101 Tons. 16.00 m 200 mm 6.00 nos. Bar 0.617 kg/m 0.059 Tons. 5.00 m 200 mm 16 nos. Bar 1.042 kg/m 0.083 Tons. 3.00 m 200 mm 26 nos. Bar 1.042 kg/m 0.081 Tons. 0.325 Tons. (Z-direction) (X-direction) = =
3 6.200 m 3 0.750 m
= = = = = =
fy =
2 460 N/mm
10 of 28
OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 2 of 2
63-INQ10-011-DC-01
BQ1008
4) EXCAVATION WORK ESTIMATED EXCAVATION DEPTH ESTIMATED EXCAVATION VOLUME 5) STRUCTURAL STEEL = = 0.85 m 3 20.40 m GRADE- S 275
UNIT WEIGHT OF MEMBER TOTAL LENGTH REQUIRED TOTAL STEEL WEIGHT REQUIRED
6) FRP GRATING
15.00 m2
(CONSTRUCTION OF NEW PIT_TYPE-P2) = = = = = = = 2 12.40 1.50 0.65 1.69 30.00 40.80 nos. m3 m3 Tons. tons. m2 m3
TOTAL NOS. OF PITS TOTAL CONC. VOLUME REQUIRED LEAN CONC. REQUIRED TOTAL REBAR WEIGHT TOTAL STEEL WEIGHT REQUIRED GREATING AREA REQUIRED TOTAL ESTIM'D EXCAVATION VOLUME Note: All excavation required hacking of ext'g concrete floor Assume all pits not clashing with ext'g ground beam.
11 of 28
OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 1 of 2
63-INQ10-011-DC-01
BQ1008
1) PIT GEOMETRY LENGTH OF PIT WIDTH OF PIT DEPTH OF PIT NEW FLOOR SLAB THICKNESS 2) SAND BACKFILLING WORK SAND VOLUME REQUIRED 2) NEW CONCRETE CONC. VOLUME REQUIRED LEAN CONC. REQUIRED 3) NEW REINFORCEMENT i) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR ii) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR iii) DOWEL BAR LENGTH BAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR TOTAL REBAR WEIGHT = = = = T 13 = = = = = = T 13 = = = = = = T 13 = = = 3.00 m 150 mm 18 nos. Bar 1.042 kg/m 0.055 Tons. 2.50 m 150 mm 21 nos. Bar 1.042 kg/m 0.055 Tons. 200 mm 250 mm 44 nos. Bar 1.042 kg/m 0.009 Tons. 0.119 Tons. (Z-direction) = =
3 1.875 m 3 0.375 m
= = = =
3 5.63 m
GRADE- C 35
fy =
2 460 N/mm
(X-direction)
12 of 28
OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 2 of 2
63-INQ10-011-DC-01
BQ1008
II
BQ SUMMARY
TOTAL NOS. OF PITS TOTAL SAND VOLUME REQUIRED TOTAL CONC. VOLUME REQUIRED LEAN CONC. REQUIRED TOTAL REBAR WEIGHT
13 of 28
OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 1 of 2
63-INQ10-011-DC-01
BQ1008
1) PIT GEOMETRY LENGTH OF PIT WIDTH OF PIT DEPTH OF PIT NEW FLOOR SLAB THICKNESS 2) SAND BACKFILLING WORK SAND VOLUME REQUIRED 2) NEW CONCRETE CONC. VOLUME REQUIRED LEAN CONC. REQUIRED 3) NEW REINFORCEMENT i) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR ii) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR iii) DOWEL BAR LENGTH BAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR TOTAL REBAR WEIGHT = = = = T 13 = = = = = = T 13 = = = = = = T 13 = = = 4.00 m 150 mm 14 nos. Bar 1.042 kg/m 0.060 Tons. 2.00 m 150 mm 28 nos. Bar 1.042 kg/m 0.058 Tons. 200 mm 250 mm 48 nos. Bar 1.042 kg/m 0.010 Tons. 0.127 Tons. (Z-direction) = =
3 1.600 m 3 0.400 m
= = = =
3 6.40 m
GRADE- C 35
fy =
2 460 N/mm
(X-direction)
14 of 28
OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 2 of 2
63-INQ10-011-DC-01
BQ1008
II
BQ SUMMARY
TOTAL NOS. OF PITS TOTAL SAND VOLUME REQUIRED TOTAL CONC. VOLUME REQUIRED LEAN CONC. REQUIRED TOTAL REBAR WEIGHT
15 of 28
OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 1 of 2
63-INQ10-011-DC-01
BQ1008
1) PIT GEOMETRY LENGTH OF PIT WIDTH OF PIT DEPTH OF PIT NEW FLOOR SLAB THICKNESS 2) SAND BACKFILLING WORK SAND VOLUME REQUIRED 2) NEW CONCRETE CONC. VOLUME REQUIRED LEAN CONC. REQUIRED 3) NEW REINFORCEMENT i) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR ii) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR iii) DOWEL BAR LENGTH BAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR TOTAL REBAR WEIGHT = = = = T 13 = = = = = = T 13 = = = = = = T 13 = = = 6.00 m 150 mm 16 nos. Bar 1.042 kg/m 0.102 Tons. 2.30 m 150 mm 41 nos. Bar 1.042 kg/m 0.098 Tons. 200 mm 250 mm 66 nos. Bar 1.042 kg/m 0.014 Tons. 0.214 Tons. (Z-direction) = =
3 2.760 m 3 0.690 m
= = = =
3 11.04 m
GRADE- C 35
fy =
2 460 N/mm
(X-direction)
16 of 28
OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 2 of 2
63-INQ10-011-DC-01
BQ1008
II
BQ SUMMARY
TOTAL NOS. OF PITS TOTAL SAND VOLUME REQUIRED TOTAL CONC. VOLUME REQUIRED LEAN CONC. REQUIRED TOTAL REBAR WEIGHT
17 of 28
OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 1 of 2
63-INQ10-011-DC-01
BQ1008
1) PIT GEOMETRY LENGTH OF PIT WIDTH OF PIT DEPTH OF PIT NEW FLOOR SLAB THICKNESS 2) SAND BACKFILLING WORK SAND VOLUME REQUIRED 2) NEW CONCRETE CONC. VOLUME REQUIRED LEAN CONC. REQUIRED 3) NEW REINFORCEMENT i) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR ii) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR iii) DOWEL BAR LENGTH BAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR TOTAL REBAR WEIGHT = = = = T 13 = = = = = = T 13 = = = = = = T 13 = = = 7.20 m 150 mm 22 nos. Bar 1.042 kg/m 0.168 Tons. 3.20 m 150 mm 49 nos. Bar 1.042 kg/m 0.163 Tons. 200 mm 250 mm 83 nos. Bar 1.042 kg/m 0.017 Tons. 0.348 Tons. (Z-direction) = =
3 4.608 m 3 1.152 m
= = = =
3 18.43 m
GRADE- C 35
fy =
2 460 N/mm
(X-direction)
18 of 28
OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 2 of 2
63-INQ10-011-DC-01
BQ1008
II
BQ SUMMARY
TOTAL NOS. OF PITS TOTAL SAND VOLUME REQUIRED TOTAL CONC. VOLUME REQUIRED LEAN CONC. REQUIRED TOTAL REBAR WEIGHT
19 of 28
OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 1 of 1
63-INQ10-011-DC-01
BQ1010
BILL OF QUANTITY
LOCATION -
JT Terminal
1) PIT GEOMETRY LENGTH OF PIT WIDTH OF PIT 2) CONCRETE CONC. VOLUME REQUIRED 3) STRUCTURAL STEEL =
3 0.65 m
= =
UNIT WEIGHT OF MEMBER TOTAL LENGTH REQUIRED TOTAL STEEL WEIGHT REQUIRED
4) ANCHOR BOLT
= M 16 =
25 nos.
24.00 m2
(PIT UPGRADING OF OLD GRATING TO NEW FRP GRATING_FRP1) = = = = = M 16 = 1 0.65 1.89 24.00 nos. m3 tons. m2
TOTAL NOS. OF PITS TOTAL CONC. VOLUME REQUIRED TOTAL STEEL WEIGHT REQUIRED GRATING AREA REQUIRED SIZE OF ANCHOR BOLT REQUIRED ANCHOR BOLT REQUIRED
25.00 nos.
Note: Total steel weight cover greating supports and angle bar for recess. Anchor bolt should be Hilti-chenical anchor bolt
OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 1 of 1
63-INQ10-011-DC-01
BQ1010
BILL OF QUANTITY
LOCATION -
JT Terminal
1) PIT GEOMETRY LENGTH OF PIT WIDTH OF PIT 2) CONCRETE CONC. VOLUME REQUIRED 3) STRUCTURAL STEEL =
3 0.50 m
= =
UNIT WEIGHT OF MEMBER TOTAL LENGTH REQUIRED TOTAL STEEL WEIGHT REQUIRED
4) ANCHOR BOLT
= M 16 =
17 nos.
12.50 m2
(PIT UPGRADING OF OLD GRATING TO NEW FRP GRATING_FRP2) = = = = = M 16 = 1 0.50 0.98 12.50 nos. m3 tons. m2
TOTAL NOS. OF PITS TOTAL CONC. VOLUME REQUIRED TOTAL STEEL WEIGHT REQUIRED GRATING AREA REQUIRED SIZE OF ANCHOR BOLT REQUIRED ANCHOR BOLT REQUIRED
16.67 nos.
Note: Total steel weight cover greating supports and angle bar for recess. Anchor bolt should be Hilti-chenical anchor bolt
OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 1 of 1
63-INQ10-011-DC-01
BQ1010
BILL OF QUANTITY
LOCATION -
JT Terminal
1) PIT GEOMETRY LENGTH OF PIT WIDTH OF PIT 2) CONCRETE CONC. VOLUME REQUIRED 3) STRUCTURAL STEEL =
3 1.00 m
= =
UNIT WEIGHT OF MEMBER TOTAL LENGTH REQUIRED TOTAL STEEL WEIGHT REQUIRED
4) ANCHOR BOLT
= M 20 =
25 nos.
45.00 m2
(PIT UPGRADING OF OLD GRATING TO NEW FRP GRATING_FRP3) = = = = = M 20 = 1 1.00 5.06 45.00 nos. m3 tons. m2
TOTAL NOS. OF PITS TOTAL CONC. VOLUME REQUIRED TOTAL STEEL WEIGHT REQUIRED GRATING AREA REQUIRED SIZE OF ANCHOR BOLT REQUIRED ANCHOR BOLT REQUIRED
25.00 nos.
Note: Total steel weight cover greating supports and angle bar for recess. Anchor bolt should be Hilti-chenical anchor bolt
OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 1 of 2
63-INQ10-011-DC-01
BQ1012
1) TRENCH GEOMETRY UNIT LENGTH OF TRENCH WIDTH OF TRENCH DEPTH OF TRENCH WALL THICKNESS BASE THICKNESS 2) CONCRETE CONC. VOLUME REQUIRED LEAN CONC. REQUIRED 3) REINFORCEMENT i) VERTICAL REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR ii) HORIZONTAL REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR iii) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR iv) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR TOTAL REBAR WEIGHT = = = = T 10 = = = = = = T 10 = = = = = = T 13 = = = = = = T 13 = = = 0 60 m 0.60 150 mm 15 nos. Bar 0.617 kg/m 0.006 Tons. 2.00 m 150 mm 4 nos. Bar 0.617 kg/m 0.005 Tons. 0.70 m 150 mm 8 nos. Bar 1.042 kg/m 0.006 Tons. 1.00 m 150 mm 6 nos. Bar 1.042 kg/m 0.006 Tons. 0 022 Tons. 0.022 Tons (Z-direction) (X-direction) = =
3 0.260 m 3 0.035 m
= = = = =
fy =
2 460 N/mm
23 of 28
OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 2 of 2
63-INQ10-011-DC-01
BQ1012
4) EXCAVATION WORK ESTIMATED EXCAVATION DEPTH ESTIMATED EXCAVATION VOLUME 5) STRUCTURAL STEEL = = 0.60 m 3 0.46 m GRADE- S 275
UNIT WEIGHT OF MEMBER TOTAL LENGTH REQUIRED TOTAL STEEL WEIGHT REQUIRED
II BQ SUMMARY
(CONSTRUCTION OF NEW TRENCHES) = = = = = = 122 31.72 4.27 2.65 3.29 55.51 m m3 m3 Tons. tons. m3
TOTAL LENGTH OF TRENCH TOTAL CONC. VOLUME REQUIRED LEAN CONC. REQUIRED TOTAL REBAR WEIGHT TOTAL STEEL WEIGHT REQUIRED TOTAL ESTIM'D EXCAVATION VOLUME Note: All excavation required hacking of ext'g concrete floor Assume all threches not clashing with ext'g ground beam.
24 of 28
OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 1 of 2
63-INQ10-011-DC-01
BQ1011
1) TRENCH GEOMETRY UNIT LENGTH OF TRENCH WIDTH OF TRENCH DEPTH OF TRENCH WALL THICKNESS BASE THICKNESS NEW FLOOR SLAB THICKNESS 2) SAND BACKFILLING WORK SAND VOLUME REQUIRED 2) NEW CONCRETE CONC VOLUME REQUIRED CONC. LEAN CONC. REQUIRED 3) NEW REINFORCEMENT i) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR ii) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR iii) DOWEL BAR LENGTH BAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR TOTAL REBAR WEIGHT = = = = T 13 = = = = = = T 13 = = = = = = T 13 = = = 1.00 m 150 mm 4 nos. Bar 1.042 kg/m 0.004 Tons. 0.40 m 150 mm 8 nos. Bar 1.042 kg/m 0.003 Tons. 200 mm 200 mm 10 nos. Bar 1.042 kg/m 0.002 Tons. 0.009 Tons. (Z-direction) = =
3 0 100 m 0.100 3 0.020 m 3
= = = = = =
3 0.11 m
GRADE- C 35
fy =
2 460 N/mm
(X-direction)
25 of 28
OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 2 of 2
63-INQ10-011-DC-01
BQ1011
II
BQ SUMMARY
TOTAL LENGTH OF TRENCH TOTAL SAND VOLUME REQUIRED TOTAL CONC. VOLUME REQUIRED LEAN CONC. REQUIRED TOTAL REBAR WEIGHT
26 of 28
OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 1 of 2
63-INQ10-011-DC-01
BQ0922
1) PUMP FOUNDATION GEOMETRY LENGTH OF FOUNDATION WIDTH OF FOUNDATION FOUNDATION THICKNESS HEIGHT ABOVE GROUND HEIGHT UNDER GROUND CONTAINMENT KERB HEIGHT CONTAINMENT KERB THICKNESS CONTAINMENT LENGTH CONTAINMENT WIDTH CONTAINMENT FLOOR THICKNESS TOTAL CONTAINMENT PERIMETER 2) CONCRETE PUMP PLINTH CONC. VOLUME REQ'D CONTAINMENT CONC. VOLUME REQ'D LEAN CONC. REQUIRED 3) REINFORCEMENT i) REBAR LENGTH QTY. REBAR SIZE REBAR SPACING UNIT WEIGHT OF REBAR WEIGHT OF REBAR ii) REBAR LENGTH QTY. REBAR SIZE REBAR SPACING UNIT WEIGHT OF REBAR WEIGHT OF REBAR iii) REBAR LENGTH FOR KERB QTY. REBAR SIZE REBAR SPACING UNIT WEIGHT OF REBAR WEIGHT OF REBAR TOTAL REBAR WEIGHT = = = T 13 = = = = = = T 13 = = = = = = T 10 = = = = 2.20 m 6 nos. Bar 200 mm 1.042 kg/m 0.01 Tons. 1.60 m 12.00 nos. Bar 200 mm 1.042 kg/m 0.02 Tons. 0.2 m 50 nos. Bar 200 mm 0.617 kg/m 0.01 Tons. 0 04 Tons. 0.04 Tons (MAIN REBAR) (LONGITUDINAL) (MAIN) = = =
3 0.36 m 3 1.13 m 3 0.30 m
= = = = = = = = = = =
1.20 m 0.60 m 0.50 m 0.50 m 0.00 m 0.15 m 0.15 m 3.00 m 2.00 m 0.15 m 10.00 m GRADE- C 35 Containment
fy =
2 460 N/mm
27 of 28
OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 2 of 2
63-INQ10-011-DC-01
BQ0922
4) EXCAVATION WORK N.A. II BQ SUMMARY (PUMP FOUNDATION & CONTAINMENT) = = = = 1 1.49 0.30 0.04 nos. m3 m3 Tons.
TOTAL NOS. OF PUMP FOUND TOTAL CONC. VOLUME REQUIRED LEAN CONC. REQUIRED TOTAL REBAR WEIGHT
28 of 28