Jindal Steel & Power Limited

LDO Unloading Pump sizing:


A) Capacity selection of LDO unloading Pump for 6x135 MW CPP:
We have considered that the required LDO will be brought to the CPP fuel oil unloading
area in road tankers. The unloading system will be designed to unload LDO from two (2)
nos. road tankers sequentially one after another.
The capacity for each tanker is considered 13 m
3
The effective unloading time for each tanker considered 20 minutes
Hence, required capacity of unloading pumps comes out to be = (13 x 60)/20 m3/hr.
39 m3/hr.
Margin over required pump capacity considered 10%
So, design capacity of pumps (considering margin) 42.9 m3/hr.
Hence, selected LDO unloading pump capacity 45 m3/hr.
B) Capacity selection of LDO unloading Pumps for 5x180 TPH Process Boiler Plant:
We have considered that the required LDO will be brought to the fuel oil unloading
area dedicated for Process Boiler Plant in road tankers. The unloading system will be designed
to unload LDO from two (2) nos. road tankers sequentially one after another.
The capacity for each tanker is considered 13 m
3
The effective unloading time for each tanker considered 20 minutes
Hence, required capacity of unloading pumps comes out to be = (13 x 60)/20 m3/hr.
39 m3/hr.
Margin over required pump capacity considered 10%
So, design capacity of pumps (considering margin) 42.9 m3/hr.
Hence, selected LDO unloading pump capacity 45 m3/hr.
6x135 MW CPP + 5x180 TPH Process Boiler Plant at
Angul, Orissa
ATTACHMENT-1A
CONSIDERATION
1. Kinematic viscosity of LDO =7 Cst
2.LDO Storage Tank inlet nozzle elevation = 10.5 M
3. Flow through suction header = 45 m3/hr.
PIPE SIZE
(mm NB)
150 PIPE SIZE (mm
NB)
100
Pipe outer
Diameter
168.3 Pipe outer
Diameter
114.3
Pipe Thickness
(mm)
7.11 Pipe Thickness
(mm)
6.02
Pipe Inner
Diameter (mm)
154.08 Pipe Inner
Diameter (mm)
102.26
Suction Piping
Length (m)
70 Discharge
Piping Length
(m)
100
Flow, Q (m
3
/hr)
45
Flow, Q (m
3
/hr)
45
Density (kg/m
3
)
810
Density (kg/m
3
)
810
Viscosity (CS) 7 Viscosity (CS) 7
Reynolds No. 14756.24 Reynolds No. 22233.93
Darcy Friction
Factor
0.023 Darcy Friction
Factor
0.025
Velocity
(m/sec)
0.670 Velocity (m/sec) 1.522
Pressure Drop
(m) in st pipe
0.239351 Pressure Drop
(m) in st pipe
2.8864
Adding 10%
MARGIN ON
PRESSURE
DROP = (M)
0.26329 Adding 10%
MARGIN ON
PRESSURE
DROP = (M)
3.1750
Pr.loss due to
strainer(MLC)
1
TOTAL
SUCTION
HEAD LOSS
(ABSOLUTE)
(MLC)
1.2633 TOTAL
DISCHARGE
HEAD LOSS
(ABSOLUTE)
(MLC)
3.1750
PUMP HEAD CALCULATION
Total staic
Head to be
developped(by
differnce)in
MLC
10.5
= 14.938 MLC
TOTAL DYNAMIC HEAD (without bend & Fittings loss)=
Total Static head to be developed+Friction loss (suction+
discharge)
ATTACHMENT-1B
LDO UNLOADING PUMP (FOR CPP) TDH CALCULATION
SUCTION DISCHARGE
= 5%
of total
developed
head
= 15.685 MLC
= 5%
SELECTED TOTAL HEAD = 16.47 MLC
20 MLC
NOTE: Minimum wall thickness for steel piping shall be (i) Sch. 80 for pipe sizes up to 50 NB; (ii) Sch. 40
for pipe sizes above 50 NB but below 300 NB; and (iii) Sch. STD for pipe sizes 300 NB and above.
Bend & Fittings loss considered
Total Dynamic head (considering Bend & Fittings Loss)
Margin over estimated pumping head required