Jishu Hozen Master Plan Department: SWITCHYARD: 1 120 MVA Transformer No-01
Jishu Hozen Master Plan Department: SWITCHYARD: 1 120 MVA Transformer No-01
Jishu Hozen Master Plan Department: SWITCHYARD: 1 120 MVA Transformer No-01
Category
(A/ B/C)
Step
1
120 MVA
TRANSFORMER NO01
A
2
121 MVA
TRANSFORMER NO02
122 MVA
TRANSFORMER NO03
123 MVA
TRANSFORMER NO04
124 MVA
TRANSFORMER NO-
Month
Aug-14
Sep-14
Oct-14
Nov-14
Dec-14
Jan-15
Feb-15
Mar-15
AprW W W W W W W W W W W W W W W W W W W W W W W W W
W1 W2 W3 W4 W5 W6 W7 W8 W9
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
124 MVA
TRANSFORMER NO05
125 MVA
TRANSFORMER NO06
Category description :
A = When machine stops and production stops
B = When machine stops and production / output reduces
C = When machine stops nither production stops / reduced
W = Week
Step 1 = Initial Cleaning to find out the defects and counter measure where possible
Step 2 = Counter measure for inaccessable area , forced detoriation and unsafe condition
Step 3 = Developing tentative standard, visual inspection point and opeartor checklist
r-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
Dec-15
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68