Jishu Hozen Master Plan Department: SWITCHYARD: 1 120 MVA Transformer No-01

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 6

D

Jishu Hozen Master Plan


Department : SWITCHYARD
Sl. No. Name of Machine

Category
(A/ B/C)

Step

1
120 MVA
TRANSFORMER NO01

A
2

121 MVA
TRANSFORMER NO02

122 MVA
TRANSFORMER NO03

123 MVA
TRANSFORMER NO04

124 MVA
TRANSFORMER NO-

Month
Aug-14
Sep-14
Oct-14
Nov-14
Dec-14
Jan-15
Feb-15
Mar-15
AprW W W W W W W W W W W W W W W W W W W W W W W W W
W1 W2 W3 W4 W5 W6 W7 W8 W9
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

124 MVA
TRANSFORMER NO05

125 MVA
TRANSFORMER NO06

Category description :
A = When machine stops and production stops
B = When machine stops and production / output reduces
C = When machine stops nither production stops / reduced
W = Week

Step 1 = Initial Cleaning to find out the defects and counter measure where possible
Step 2 = Counter measure for inaccessable area , forced detoriation and unsafe condition
Step 3 = Developing tentative standard, visual inspection point and opeartor checklist

Document No. : ANGL - TPM - JH - 6


Rev . No. : 0

r-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
Dec-15
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68