Sondir c2
Sondir c2
Sondir c2
(m)
1
0.00
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
Hambatan
Konus (HK)
(kg/cm)
2
0
0
5
20
19
30
30
60
75
165
Jumlah hambatan
Pelekat (JHP)
(kg/cm')
6
0
0
12
62
112
192
262
392
612
1012
Muka Tanah
Jauh Kedalaman
Hambatan
Setempat
(HS=HP/10 (kg/cm')
7
0
0
0.6
2.5
2.5
4
3.5
6.5
11
20
HK
0
0
5
20
19
30
30
60
75
165
JHP
0
0
12
32
51
81
111
171
246
411
Kedalaman
0.00
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
HK*25
0
0
125
500
475
750
750
1500
1875
4125
500
1000
1500
0.00
0.20
0.40
0.60
0.80 (m)
KEDALAMAN
1.00
1.20
: Datar
:1.80 m
1.40
: Darat
1.60
1.80
2.00
JH
P
JHP
2000
2500
IK HASIL PENYONDIRAN
HK
1500
2000
2500
3000
HK
JHP
3500
4000
4500