I. GENERAL
1. PROJECT DATA
2. EXISTING PHOTOS
3. SCOPE OF WORK
4. TIME SCHEDULE
5. ORGANISATION CHART
6. MAN EQUIPMENT LIST
II. SITE MANAGEMENT
1. PREPARATION WORKS
2. MANAGEMENT OF PROJECT EXECUTION
3. SAFETY PLAN
III. CONSTRUCTION METHOD
1. SUBSTRUCTURE WORKS
2. UPPER STRUCTURE WORKS
3. ARCHITECTURE WORKS
4. MECHANICAL & ELECTRICAL WORKS
ADHI KARYA (Persero), tbk
Divisi Konstruksi I
Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051
Beyond Construction
2. PROJECT LOCATION
3. OWNER
4. CONSTRUCTION MANAGEMENT
: PT. JAYA CM
5. CONSULTANTS
: 1.
2.
3.
4.
5.
6. QUANTITY SURVEYOR
: EC HARRIS
: 24 MONTHS
8. MILESTONES
START
TOPPING OFF
COMPLETION DATE
MAINTENANCE
Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051
Beyond Construction
TOTAL
109.643,02 m
Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051
Beyond Construction
Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051
Beyond Construction
STRUCTURE
RAINFORCEMENT
CONCRETE
RAINFORCEMENT CONCRETE
ROOF
RAINFORCEMENT BAR
RAINFORCEMENT
CONCRETE
Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051
Beyond Construction
EXCAVATION
SUB STRUCTURE
UPPER STRUCTURE
ARCHITECTURE
PLUMBING
Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051
Beyond Construction
ITEMS OF WORK
1. PRELIMINARIES
2. PODIUM
2.1.
2.2.
2.3.
2.4.
2.5.
3.
SUBSTRUCTURE
FRAME
UPPER FLOOR
STAIRS
WINDOWS & EXTERNAL DOORS
TOWER B
2.6.
2.7.
2.8.
2.9.
4.
BASIC FINISHING
PLUMBING INSTALLATION
SEWAGE TREATMENT PLAN
DEEP WELL
TOWER C
3.1. FRAME
3.1. FRAME
3.3. STAIRS
3.3. STAIRS
3.4. ROOF
3.4. ROOF
Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051
Beyond Construction
PREPARATION WORK
Any several thing to be attention to this work for exemple :
2.1. Lay Out Temporary Facility Project
2.2. Planning of Traffic Project Management
2.3 Planning of Project Execution
2.4 Safety and Health ( K3).
Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051
Beyond Construction
WASHING BAY
POMPA
KENDARAAN PROYEK
KENDARAAN PROYEK
PAGAR PROYEK
KELUAR
MASUK
PAGAR PROYEK
PINTU KELUAR / MASUK PROYEK
POMPA
500
BATU KALI
5000
WASHING BAY
POTONGAN 1
4000
WASHING BAY
POTONGAN 2
Divisi Konstruksi I
Cover area
beban 4 Ton
TC.3
TC 1
: H3.36B
Jib
= 50 M
Kap ujung
= 3,6 Ton
33 M
TC 2 & TC 3 : FO23B
PH 1
Jib
= 50 M
Kap ujung
= 2,3 Ton
PB.2
PB.1
PH 4
PH 2
PASSANGER HOIST:
TC.1
TC.2
33 M
PB 1 : R = 16m
PB 2 : R = 24m
Divisi Konstruksi I
= 40 TON
JIB 45
= 25 M
TYPE
= TELESCOPIC
LANTAI 1
TOWER
C
TOWER
B
Divisi Konstruksi I
CATATAN :
LANTAI 1
Jalan kerja
LT.1
TOWER
B
B1
B2
B3
Pipa support 2 mutu tinggi
dengan kapasitas 1 tiang = 1
ton, dipasang dari B1 s/d B3
dengan jarak 1,5 M
Divisi Konstruksi I
TOWER
C
TOWER
B
Divisi Konstruksi I
KET :
R = RESERVOIR INDUK
K
T = TORN
P = POMPA
K = KRAN
K
T
K
K
Lt. Typical
K
K
K
K
T
Lt. Dasar
R
PAM EXISTING / SUMUR JET PUMP
K
K
Basement
K
K
Divisi Konstruksi I
KET :
PL
G = GENSET
SK
PI = PANEL INDUK
SK
PL = PANEL LANTAI
SK
SK = STOP KONTAK
PL
SK
SK
Lt. Typical
SK
PL
SK
SK
SK
PL
SK
SK
SK
Lt. Dasar
PI
PL
SK
Basement
SK
SK
Divisi Konstruksi I
Legend :
Taffic arrow
Temporary Road and
parking
Guard House
In Coming project vehicle through
main gate G1 and
out with G2
TOWER
C
TOWER
B
IN
G1
OUT G2
Divisi Konstruksi I
P1
P2
P3
P4
P13
P5
P6
P11
P14
P7
P8
P17
P15
P18
P12
P10
P16
Divisi Konstruksi I
WE
TO
C.1
TOWER B
C.2
B.1
B.2
Divisi Konstruksi I
PM
QC
PODIUM B
AREA 2
TOWER
C
TOWER
B
Produck Project
Manager (PPM)
Produck Project
Manager (PPM)
TOWER B
TOWER C
PODIUM B
PODIUM C
SUPERVISOR
SUPERVISOR
LABOUR
LABOUR
AREA 1
PODIUM C
Divisi Konstruksi I
Divisi Konstruksi I
TERMINAL
2500
Pipe 2
CHECKER PLATE
WF 10
hinge
Safety
Net
plywood 12MM
HARMONIKA mesh
LIFTING HOOK
SLING
LIFTING HOOK
Safety
Net
Safety
Net
SLING
Safety
Net
Safety
Safety
Deck
Net
Safety
Net
Safety
PIPE SUPPORT
RAILLING D16
Terminal
CHECKER PLATE
WF 10
Net
Safety
Net
NOTE : Terminal capacity 2 Ton
2500
Divisi Konstruksi I
CONSIST OF :
3.1. EARTH WORKS
3.2. SUB STRUCTURE WORKS (MASS POND)
3.3. UPPER STRUCTURE WORKS
3.4. ARCHITECTURE WORKS
3.5. MEP WORK ( PLUMBING WORK)
Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051
Beyond Construction
= work days
~ 25 work days
Galian Tahap I :
1. Area jalan kerja
2. Area Pondasi TC 2 & Tc 3
II
Temporary
ramp
Divisi Konstruksi I
4200
TOWER AREA
GROUND FLOOR
EL+2750
PODIUM AREA
BSM- 2
EL+5850
3100
3100
BSM- 1
EL+2750
2500
BSM- 3
EL+2750
MATFOUNDATION TOWER C
12000
AS TC
TOWER AREA
AS Z.B
GROUND FLOOR
EL+2750
CAPPING BEAM
EL+10000
TC- 1
BSM- 1
EL+2750
EL VAR.
BSM- 2
EL+5850
2500
1:
3100
10400
3100
4200
BSM- 3
EL+2750
MATFOUNDATION TOWER B
4000
4000
8000
AS 21
1000
AS 22
5000
1000
TC. FOUNDATION
Divisi Konstruksi I
Temporary
ramp
Divisi Konstruksi I
1:2
Terassiring
Bsmt.3 Elev
Cont. Pile
With Ground
Anchor
1:2
PLESTER
KAMPROT
Cont. Pile
With Ground
Anchor
Terassiring
Divisi Konstruksi I
Keterangan :
- Sumur dewatering yang digunakan
= 6 ttk dengan kedalaman 32 M
( D1 s/d D6 )
R1
D6
- Kapasitas pompa = 2 PK
- Sumur Recharge = 2 ttk ( R1 & R2 )
D4
D5
- Penempatan
berada
di
( lihat gbr )
D2
sumur
dalam
dewatering
basement
= Sumur Dewatering
= Sumur Recharge
D3
D1
R2
Divisi Konstruksi I
DETAIL DEWATERING
GALIAN TANAH
Sumur Recharge
Selokan
Pipa naik
Pipa naik
5m
Dasar galian
1m
Submersible pump
SD
SD
Sumur 20 cm
Divisi Konstruksi I
Divisi Konstruksi I
Coring
Drilling
Fabrikasi
Installasi & Grouting
Stressing
1. Coring
2. Drilling
5
3. Adukan Grouting&Fabrikasi Kabel
2
1
4
3
4. Installasi Kabel
5. Stressing
Ilustrasi Pemasangan
Divisi Konstruksi I
Beyond Construction
Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050-Fax. (021)
72788051
NO
ITEM
2008
2009
2010
VOLUME JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY
1
2
3
4
5
6
7
8
9
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
I SUB STRUKTUR
TOWER B & C
45 hr
- Mass Foundation
- Basement 3, 2, 1
- Ground Floor s/d Lt. 10
- Lt. 11 s/d Lt. 20
- Lt. 21 s/d Lt. 35
26 hr
60 hr
70 hr
118 hr
120 hr
II PODIUM
- Basement 3
- Basement 2
- Basement 1
- Ground Floor
III FAADE BANGUNAN
- GF s/d Lt. 9
- Lt. 10 s/d 18
- Lt. 19 s/d 27
- Lt. 28 s/d 31
Divisi Konstruksi I
ATAP
LT. 35
271
264
274
267
277
270
LT. 34
257
260
263
LT. 33
250
253
256
250
253
ROOF
LT. 32
243
246
249
243
246
LT. 32
LT. 31
236
239
242
236
239
LT. 31
LT. 30
229
232
235
229
232
LT. 30
LT. 29
222
225
228
222
225
LT. 29
LT. 28
215
218
221
215
218
LT. 28
LT. 27
208
211
214
208
211
LT. 27
LT. 26
201
204
207
201
204
LT. 26
LT. 25
194
197
200
194
197
LT. 25
LT. 24
187
190
193
187
190
LT. 24
LT. 23
180
183
186
180
183
LT. 23
LT. 22
173
176
179
173
176
LT. 22
LT. 21
166
169
172
166
169
LT. 21
LT. 20
159
162
165
159
162
LT. 20
LT. 19
152
155
158
152
155
LT. 19
LT. 18
145
148
151
145
148
LT. 18
LT. 17
138
141
144
138
141
LT. 17
LT. 16
131
134
137
131
134
LT. 16
LT. 15
124
127
130
124
127
LT. 15
LT. 14
117
120
123
117
120
LT. 14
LT. 13
110
113
116
110
113
LT. 13
LT. 12
103
106
109
103
106
LT. 12
LT. 11
96
99
102
96
99
LT. 11
LT. 10
89
92
95
89
92
LT. 10
LT. 9
82
85
88
82
85
LT. 9
LT. 8
75
78
81
75
78
LT. 8
LT. 7
68
71
74
68
71
LT. 7
LT. 6
61
64
67
61
64
LT. 6
LT. 5
54
57
60
54
57
LT. 5
LT. 4
47
50
53
47
50
LT. 4
LT. 3
40
43
46
40
43
LT. 3
LT. 2
33
36
39
33
36
LT. 2
GROUND FLOOR
26
29
32
26
29
BS 1
19
22
25
19
22
BS 1
BS 2
12
15
18
12
15
BS 2
3
TOWER C
BS 3
PODIUM
3
TOWER B
BS 3
Divisi Konstruksi I
PEMBAGIAN ZONE
TOWER B AND TOWER C ARE
DIVEDED INTO 2 & 3 SECTIONS
TOWER B = 2 SECTIONS = B1 & B2
TOWER C = 2 SECTIONS = C1, C2 & C3
PODIUM = 8 SECTIONS.
ZONE 3
ZONE 2
WE
TO
C.1
ZONE 4
PODIUM
ZONE 3
C.2
ZONE 4
TOWER B
B.1
C.3
B.2
ZONE 1
ZONE 1
ZONE 2
Divisi Konstruksi I