Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050-Fax. (021) 72788051

Download as pdf or txt
Download as pdf or txt
You are on page 1of 39

STRUCTURE

ARCHITECTURE

ME

Beyond Construction

Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050-Fax. (021)
72788051

TABLE OF CONTENTS
I. GENERAL
1. PROJECT DATA
2. EXISTING PHOTOS
3. SCOPE OF WORK
4. TIME SCHEDULE
5. ORGANISATION CHART
6. MAN EQUIPMENT LIST
II. SITE MANAGEMENT
1. PREPARATION WORKS
2. MANAGEMENT OF PROJECT EXECUTION
3. SAFETY PLAN
III. CONSTRUCTION METHOD
1. SUBSTRUCTURE WORKS
2. UPPER STRUCTURE WORKS
3. ARCHITECTURE WORKS
4. MECHANICAL & ELECTRICAL WORKS
ADHI KARYA (Persero), tbk
Divisi Konstruksi I

Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

Beyond Construction

I.1. PROJECT DATA


I.1.1. GENERAL DATA
1. PROJECT NAME

: PAKUBUWONO DEVELOPMENT PROJECT TOWER B & TOWER C

2. PROJECT LOCATION

: KEBAYORAN BARU SOUTH JAKARTA

3. OWNER

: PT. BONA WIDJAJA GEMILANG

4. CONSTRUCTION MANAGEMENT

: PT. JAYA CM

5. CONSULTANTS

: 1.
2.
3.
4.
5.

6. QUANTITY SURVEYOR

: EC HARRIS

7. TIME OF WORK EXECUTION

: 24 MONTHS

8. MILESTONES

PT. AIRMAS ASRI (ARCHITECTURE)


DAVY SUKAMTA & PARTNERS (STRUCTURE)
PT. HANTARAN PRIMA MANDIRI (MECHANICAL/ELECTRICAL)
INSADA (INTERIOR)
INTARAN DESIGN (LANDSCAPE)

START
TOPPING OFF

: APRIL 01, 2008


: MAY 15,2009

COMPLETION DATE
MAINTENANCE

: APRIL 15, 2010


: APRIL 15, 2011

ADHI KARYA (Persero), tbk


Divisi Konstruksi I

Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

Beyond Construction

I.1.2. DATA AREA


Tower C 50.571,60 m (32Lt)

Tower B 33.733,70 m (35Lt)

Podium 25.337,72 m (3Lt)

TOTAL

109.643,02 m

ADHI KARYA (Persero), tbk


Divisi Konstruksi I

Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

Beyond Construction

I.2. EXISTING PHOTOS

ADHI KARYA (Persero), tbk


Divisi Konstruksi I

Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

Beyond Construction

I.1.3. STRUCTURE DATA


FOUNDATION

BORED PILE (By Other)

STRUCTURE

RAINFORCEMENT
CONCRETE

RAINFORCEMENT CONCRETE

ROOF

RAINFORCEMENT BAR

RAINFORCEMENT
CONCRETE

ADHI KARYA (Persero), tbk


Divisi Konstruksi I

Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

Beyond Construction

EXCAVATION
SUB STRUCTURE
UPPER STRUCTURE
ARCHITECTURE
PLUMBING

ADHI KARYA (Persero), tbk


Divisi Konstruksi I

Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

Beyond Construction

ITEMS OF WORK
1. PRELIMINARIES

2. PODIUM
2.1.
2.2.
2.3.
2.4.
2.5.

3.

SUBSTRUCTURE
FRAME
UPPER FLOOR
STAIRS
WINDOWS & EXTERNAL DOORS

TOWER B

2.6.
2.7.
2.8.
2.9.

4.

BASIC FINISHING
PLUMBING INSTALLATION
SEWAGE TREATMENT PLAN
DEEP WELL

TOWER C

3.1. FRAME

3.1. FRAME

3.2. UPPER FLOOR

3.2. UPPER FLOOR

3.3. STAIRS

3.3. STAIRS

3.4. ROOF

3.4. ROOF

3.5. EXTERNAL WALLS

3.5. EXTERNAL WALLS

3.6. WINDOWS & EXTERNAL DOORS

3.6. WINDOWS & EXTERNAL DOORS

3.7. BASIC FINISHING

3.7. BASIC FINISHING

3.8. PLUMBING INSTALLATION

3.8. PLUMBING INSTALLATION

ADHI KARYA (Persero), tbk


Divisi Konstruksi I

Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

Beyond Construction

PREPARATION WORK
Any several thing to be attention to this work for exemple :
2.1. Lay Out Temporary Facility Project
2.2. Planning of Traffic Project Management
2.3 Planning of Project Execution
2.4 Safety and Health ( K3).

ADHI KARYA (Persero), tbk


Divisi Konstruksi I

Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

Beyond Construction

WASHING BAY

POMPA

PIPA AIR BUANGAN


DARI WASHING BAY

POS JAGA / KEAMANAN

PINTU KELUAR / MASUK PROYEK

DETAIL DENAH WASHING BAY


DENAH WASHING BAY

KENDARAAN PROYEK
KENDARAAN PROYEK
PAGAR PROYEK

KELUAR

MASUK
PAGAR PROYEK
PINTU KELUAR / MASUK PROYEK

POMPA

JL JEND. GATOT SUBROTO


BESI SIKU / GRIL

BESI SIKU / GRIL


500

500
BATU KALI

5000

WASHING BAY

POTONGAN 1

PIPA AIR BUANGAN


DARI WASHING BAY

4000

WASHING BAY

POTONGAN 2

ADHI KARYA (Persero), tbk


Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

Divisi Konstruksi I

2.1.A. LOCATION OF TOWER CRANE, PLACING BOOM & PASSANGER HOIST


NOTE:
TOWER CRANE:

Cover area
beban 4 Ton
TC.3

TC 1

: H3.36B

Jib

= 50 M

Kap ujung

= 3,6 Ton

Kap pangkal = 12 Ton

33 M

TC 2 & TC 3 : FO23B

PH 1

Jib

= 50 M

Kap ujung

= 2,3 Ton

Kap pangkal = 10 Ton


40 M

PB.2

PH 1 & 2 = 2 CABINS @ MAX. 2X1000 KG

PB.1
PH 4
PH 2

PASSANGER HOIST:

TC.1

PH 3 & 4 = 2 CABINS @ MAX. 2X1000 KG


PLACING BOOM

TC.2

33 M

PB 1 : R = 16m
PB 2 : R = 24m

ADHI KARYA (Persero), tbk


Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

Divisi Konstruksi I

2.1.B. LAY OUT MOBIL CRANE


MOBIL CRANE :
KAP

= 40 TON

JIB 45

= 25 M

TYPE

= TELESCOPIC

LANTAI 1
TOWER
C
TOWER
B

ADHI KARYA (Persero), tbk


Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

Divisi Konstruksi I

2.1.C. LAY OUT JALAN KERJA PADA LT. DASAR

CATATAN :

JALAN KERJA YANG DI


SUPPORT DENGAN
PIPA PD.8

UNTUK AREA LANTAI DASAR YANG


DI GUNAKAN UNTUK JALAN KERJA
PADA LANTAI BASEMENT DIPASANG
PIPA SUPPORT PD 8
: JALAN KERJA ( disesuaikan
dengan leveling lantai )

LANTAI 1

Gambar plat perkuatan jalan kerja


TOWER
C

Jalan kerja
LT.1

TOWER
B

B1

B2
B3
Pipa support 2 mutu tinggi
dengan kapasitas 1 tiang = 1
ton, dipasang dari B1 s/d B3
dengan jarak 1,5 M

ADHI KARYA (Persero), tbk


Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

Divisi Konstruksi I

2.1.D. TEMPORARY DRAINAGE


Legend :
: Temporary Drainage
: Box Control 400 x 400
w/ sump pump 2 PK

TOWER
C
TOWER
B

ADHI KARYA (Persero), tbk


Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

Divisi Konstruksi I

2.1.E. TEMPORARY WATER FOR WORK


Lt. Atap

KET :

R = RESERVOIR INDUK
K

T = TORN

P = POMPA
K = KRAN

K
T

K
K

Lt. Typical

K
K

K
K
T
Lt. Dasar

R
PAM EXISTING / SUMUR JET PUMP

K
K
Basement

K
K

ADHI KARYA (Persero), tbk


Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

Divisi Konstruksi I

2.1.F. TEMPORARY ELECTRICAL FOR WORK


Lt. Atap

KET :

PL

G = GENSET

SK

PI = PANEL INDUK

SK

PL = PANEL LANTAI

SK

SK = STOP KONTAK
PL

SK
SK

Lt. Typical

SK

PL

SK
SK
SK

PL

SK
SK
SK
Lt. Dasar

PI

PL
SK

Basement

SK
SK

ADHI KARYA (Persero), tbk


Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

Divisi Konstruksi I

2.2. PLANNING OF TRAFFIC MANAGEMENT

Legend :
Taffic arrow
Temporary Road and
parking
Guard House
In Coming project vehicle through
main gate G1 and
out with G2

TOWER
C
TOWER
B

IN

G1
OUT G2

ADHI KARYA (Persero), tbk


Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

Divisi Konstruksi I

2. 3. PLANNING OF PROJECT EXECUTION


2.3.1. SECTION OF WORK - BASEMENT FL
PODIUM (BASEMENT 3 TO GROUND
FLOOR) IS DIVIDED INTO 18
SECTIONS + P1 to P18

P1
P2
P3
P4
P13

P5

P6

P11
P14

P7
P8

P17

P15
P18

P12
P10

P16

ADHI KARYA (Persero), tbk


Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

Divisi Konstruksi I

2.3.2. SECTION OF WORK - TOWER B & C


TOWER B AND TOWER C ARE
DIVEDED INTO 2 SECTIONS
TOWER B = 2 SECTIONS = B1 & B2
TOWER C = 2 SECTIONS = C1 & C2

WE
TO

C.1
TOWER B

C.2

B.1
B.2

ADHI KARYA (Persero), tbk


Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

Divisi Konstruksi I

2.3.3. SUPERVISORY WORKING ZONE

PM
QC
PODIUM B

AREA 2

TOWER
C
TOWER
B

Produck Project
Manager (PPM)

Produck Project
Manager (PPM)

TOWER B

TOWER C

PODIUM B

PODIUM C

SUPERVISOR

SUPERVISOR

LABOUR

LABOUR

AREA 1
PODIUM C

ADHI KARYA (Persero), tbk


Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

Divisi Konstruksi I

2. 4 PLANING HEALTH AND SAFETY PLAN


2.4.1. LAY OUT OF SAFETY DECK
Legend :
: Temporary project fence
: Safety Deck
(Around building)

ADHI KARYA (Persero), tbk


Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

Divisi Konstruksi I

2.4.2. SAFETY DECK, SAFETY NET & MATERIAL TERMINAL


SAFETY DECK

TERMINAL

2500

Pipe 2
CHECKER PLATE

WF 10
hinge

Safety
Net

plywood 12MM

HARMONIKA mesh
LIFTING HOOK

SLING

LIFTING HOOK

Safety
Net
Safety
Net

SLING

Safety
Net
Safety
Safety
Deck
Net
Safety
Net
Safety

PIPE SUPPORT
RAILLING D16

Terminal
CHECKER PLATE
WF 10

Net
Safety
Net
NOTE : Terminal capacity 2 Ton

2500

ADHI KARYA (Persero), tbk


Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

Divisi Konstruksi I

CONSTRUCTION WORK COVERING

CONSIST OF :
3.1. EARTH WORKS
3.2. SUB STRUCTURE WORKS (MASS POND)
3.3. UPPER STRUCTURE WORKS
3.4. ARCHITECTURE WORKS
3.5. MEP WORK ( PLUMBING WORK)

ADHI KARYA (Persero), tbk


Divisi Konstruksi I

Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

Beyond Construction

III.1. EARTH WORKS


3.1.A. EXCAVATION METHOD STAGE.1
Excavators : 4 units
Production cap. : 360 m3/day/unit
Volume of excavation : 36.000 M3
Duration of work :
= 36.000 / (4 x 360 )

= work days
~ 25 work days
Galian Tahap I :
1. Area jalan kerja
2. Area Pondasi TC 2 & Tc 3
II

3. Area MAT Foundation tower C


& tower B
Galian Tahap II :
Area Podium
Critical Work Ground
Anchor (section No. II)

Cont. Pile With Ground


Anchor

Temporary
ramp

ADHI KARYA (Persero), tbk


Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

Divisi Konstruksi I

Critical Work Ground Anchor

4200

TOWER AREA
GROUND FLOOR
EL+2750

PODIUM AREA

BSM- 2
EL+5850

GALIAN TANAH TAHAP I

3100

GALIAN TANAH TAHAP II

3100

BSM- 1
EL+2750

2500

BSM- 3
EL+2750

MATFOUNDATION TOWER C

12000

AS TC
TOWER AREA

AS Z.B
GROUND FLOOR
EL+2750

CAPPING BEAM
EL+10000

TC- 1

BSM- 1
EL+2750

EL VAR.

CRITICAL WORK GROUND ANCHOR & CAPPING BEAM


( LIHAT METHODE GROUND ANCHOR & CAPPING BEAM )
RENCANA ANCHOR GROUND

BSM- 2
EL+5850

2500

1:

3100

10400

3100

4200

PRIORITAS GALIAN MATFOUNDATION TOWER AREA


SECTION - 1

BSM- 3
EL+2750

MATFOUNDATION TOWER B
4000

4000
8000

AS 21

ADHI KARYA (Persero), tbk


Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

1000
AS 22

5000

1000
TC. FOUNDATION

PRIORITAS GALIAN MATFOUNDATION TOWER AREA


SECTION - 2

Divisi Konstruksi I

3.1.B. EXCAVATION METHOD STAGE.2 ( AFTER POURING MASS POND )

Temporary
ramp

ADHI KARYA (Persero), tbk


Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

Divisi Konstruksi I

3.1.C. TERASSIRING METHOD ( W/ DRAIN FOR WATER RIVER INFILTRATION )

1:2

Terassiring

Bsmt.3 Elev

Cont. Pile
With Ground
Anchor

1:2

PLESTER
KAMPROT

Sumpit & Gutter


W / Sum pump
to drain to river

Cont. Pile
With Ground
Anchor

Terassiring

ADHI KARYA (Persero), tbk


Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

Divisi Konstruksi I

3.1.D. DEWATERING METHOD

Keterangan :
- Sumur dewatering yang digunakan
= 6 ttk dengan kedalaman 32 M
( D1 s/d D6 )

R1
D6

- Kapasitas pompa = 2 PK
- Sumur Recharge = 2 ttk ( R1 & R2 )
D4

D5

- Penempatan
berada
di
( lihat gbr )

D2

sumur
dalam

dewatering
basement

= Sumur Dewatering
= Sumur Recharge
D3

D1

R2

ADHI KARYA (Persero), tbk


Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

Divisi Konstruksi I

DETAIL DEWATERING
GALIAN TANAH
Sumur Recharge

Selokan
Pipa naik

Pipa naik
5m

Dasar galian

1m

Submersible pump
SD

SD
Sumur 20 cm

ADHI KARYA (Persero), tbk


Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

Divisi Konstruksi I

PEKERJAAN PENUTUPAN SUMUR DEWATERING


Setelah sumur Dewateing tidak digunakan kembali. Maka lubang sumur tersebut hars segera ditutup.
Penghentian pekerjaaan dewatering dilaksanakan setelah beban up lift akibat air tanah telah seimbang
dengan berat konstruksi, Adapaun konstruksi penutuoan sumur sbb;

ADHI KARYA (Persero), tbk


Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

Divisi Konstruksi I

Pekerjaan ground anchor meliputi 5 tahapan pekerjaan, yaitu :


1.
2.
3.
4.
5.

Coring
Drilling
Fabrikasi
Installasi & Grouting
Stressing

1. Coring
2. Drilling

5
3. Adukan Grouting&Fabrikasi Kabel

2
1

4
3

4. Installasi Kabel
5. Stressing

Ilustrasi Pemasangan

ADHI KARYA (Persero), tbk


Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

Divisi Konstruksi I

Beyond Construction

Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050-Fax. (021)
72788051

MILESTONE THE PAKUBUWONO VIEW

NO

ITEM

2008
2009
2010
VOLUME JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY
1
2
3
4
5
6
7
8
9
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

I SUB STRUKTUR
TOWER B & C
45 hr
- Mass Foundation
- Basement 3, 2, 1
- Ground Floor s/d Lt. 10
- Lt. 11 s/d Lt. 20
- Lt. 21 s/d Lt. 35

26 hr
60 hr
70 hr
118 hr
120 hr

II PODIUM
- Basement 3
- Basement 2
- Basement 1
- Ground Floor
III FAADE BANGUNAN
- GF s/d Lt. 9
- Lt. 10 s/d 18
- Lt. 19 s/d 27
- Lt. 28 s/d 31

ADHI KARYA (Persero), tbk


Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

Divisi Konstruksi I

ATAP
LT. 35

271
264

274
267

277
270

LT. 34

257

260

263

LT. 33

250

253

256

250

253

ROOF

LT. 32

243

246

249

243

246

LT. 32

LT. 31

236

239

242

236

239

LT. 31

LT. 30

229

232

235

229

232

LT. 30

LT. 29

222

225

228

222

225

LT. 29

LT. 28

215

218

221

215

218

LT. 28

LT. 27

208

211

214

208

211

LT. 27

LT. 26

201

204

207

201

204

LT. 26

LT. 25

194

197

200

194

197

LT. 25

LT. 24

187

190

193

187

190

LT. 24

LT. 23

180

183

186

180

183

LT. 23

LT. 22

173

176

179

173

176

LT. 22

LT. 21

166

169

172

166

169

LT. 21

LT. 20

159

162

165

159

162

LT. 20

LT. 19

152

155

158

152

155

LT. 19

LT. 18

145

148

151

145

148

LT. 18

LT. 17

138

141

144

138

141

LT. 17

LT. 16

131

134

137

131

134

LT. 16

LT. 15

124

127

130

124

127

LT. 15

LT. 14

117

120

123

117

120

LT. 14

LT. 13

110

113

116

110

113

LT. 13

LT. 12

103

106

109

103

106

LT. 12

LT. 11

96

99

102

96

99

LT. 11

LT. 10

89

92

95

89

92

LT. 10

LT. 9

82

85

88

82

85

LT. 9

LT. 8

75

78

81

75

78

LT. 8

LT. 7

68

71

74

68

71

LT. 7

LT. 6

61

64

67

61

64

LT. 6

LT. 5

54

57

60

54

57

LT. 5

LT. 4

47

50

53

47

50

LT. 4

LT. 3

40

43

46

40

43

LT. 3

LT. 2

33

36

39

33

36

LT. 2

GROUND FLOOR

GROUND FLOOR (PODIUM)

26

29

32

26

29

BS 1

19

22

25

19

22

BS 1

BS 2

12

15

18

12

15

BS 2

3
TOWER C

BS 3

PODIUM

3
TOWER B

BS 3

ADHI KARYA (Persero), tbk


Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

Divisi Konstruksi I

PEMBAGIAN ZONE
TOWER B AND TOWER C ARE
DIVEDED INTO 2 & 3 SECTIONS
TOWER B = 2 SECTIONS = B1 & B2
TOWER C = 2 SECTIONS = C1, C2 & C3
PODIUM = 8 SECTIONS.
ZONE 3

ZONE 2

WE
TO

C.1

ZONE 4

PODIUM
ZONE 3

C.2
ZONE 4

TOWER B

B.1

C.3

B.2

ZONE 1
ZONE 1
ZONE 2

ADHI KARYA (Persero), tbk


Jl. Iskandarsyah Raya No. 65 A-B Jakarta Selatan 12160 Telp. (021) 72788050 Fax. (021) 72788051

Divisi Konstruksi I

You might also like