Introduction
Pile foundations are extensively used to support the
substructures of bridges, buildings and other structures
Foundation cost represents a major portion
Design of Pilecaps
ACECOMS, AIT
L >> (b, h)
Footing
L
(b, L) >> h
Use Beam/Slab Flexural and
Shear Theory
h
b
Pile-cap
b <=> h <=> L
L
b
Design of Pilecaps
ACECOMS, AIT
ACECOMS, AIT
Design of Pilecaps
ACECOMS, AIT
Important Observations
Pile cap acts as a 3D elastic solid.
Beam/slab theory can not be used for all cases
Design of Pilecaps
ACECOMS, AIT
Important
Observations
Design of Pilecaps
ACECOMS, AIT
ACECOMS, AIT
ACECOMS, AIT
Where
Q M yx Mx y
Pp
n x2 y2
Mx, M y
Design of Pilecaps
Ad 2
ACECOMS, AIT
Design of Pilecaps
ACECOMS, AIT
Practical Considerations
In a practical case of a four- pile symmetrical group centrally
loaded, each pile. Will carry one-fourth of the vertical load
regardless of cap rigidity (or thickness). With a fifth pile directly
under the load, cap rigidity will be a significant factor. The
structural design of pile caps is only minimally addressed in
the literature. But the following may be used as a guide:
Bending moments are taken at the same sections as for
reinforced-concrete footings and defined in Art. 15-4 of the ACI
Code
Pile caps must be reinforced for both positive and negative
bending moments. Reinforcement should be placed so there is a
minimum cover of 75 mm for concrete adjacent to the soil. Where
piles extend into the cap only about 75 mm the bottom
reinforcement should be 75 mm above the pile top in case of
concrete cracking around the pile head.
Design of Pilecaps
ACECOMS, AIT
Practical Considerations
.Pile caps should extend at least 150mm beyond the outside face
of exterior piles and preferably 250mm. When piles extend into
the cap more than 75 mm the bottom rebars should loop around
the pile to avoid splitting a part of the cap from pile head
moments and shears.
.When pile heads are assumed fixed they should extend into the
pile cap at least 300 mm. The minimum thickness of pile cap
above pile heads is 300 mm ( required by ACI 318 Art15-7 )
.Some kind of tension connectors should be used on the pile
heads if the piles are subjected to tension forces.
Design of Pilecaps
ACECOMS, AIT
4 '
Vc 2 fc bo d
c
sd '
Vc 2
fc bo d
bo
Direct Shear
Vc 4 fc' bo d
Vu
vu
bo d
vu
Design of Pilecaps
Vu v Mu1c v Mu 2c
bo d
J c1
J c2
ACECOMS, AIT
vmax
5 N / mm2 min
1.5M t
Veff Vt 1
Vt x
1.5Mt
Veff Vt 1.25
Vt x
vmax
Design of Pilecaps
0.8 fcu
V
uo d
V
ud
ACECOMS, AIT
edge column
corner column
Mv M v v (1 f )
Design of Pilecaps
ACECOMS, AIT
Naveed Anwar
ACECOMS, AIT
Design of Pilecaps
ACECOMS, AIT
a=1.6
P=10,000 kN
d=1.4
d=1.4
h=1.6
d=1.4
L=2.5
h=1.6
L=2.5
1
T
T
= tan-1 d/0.5L
= 48 deg
= 0.5P/tan
= 4502 kN
Design of Pilecaps
T
T
= tan-1 d/0.5(L-d1)
= 68.5 deg
= 0.5P/tan
= 1970 kN
ACECOMS, AIT
a2
a2
P4
P2
P3
d
L2
L1
Main members
Secondary members
Design of Pilecaps
ACECOMS, AIT
Tie-Strut Model
d
L/d =1
L/a =0.5
L
L/d =2
L/a =1
L/d = 3
L/a = 1.5
L/d = 4
L/a = 2
L/d = 5
L/a = 2.5
L/d = 6
L/a = 3
Design of Pilecaps
ACECOMS, AIT
Tie-Strut Model
Tension in Bottom Chord
Angle = 18 De g
Angle = 34 De g
Angle = 45 De g
Angle = 64 De g
Design of Pilecaps
ACECOMS, AIT
General
MSTM is created using the basic assumptions of the Space Truss
Theory and the Tie-Strut approach with appropriate modifications.
MSTM gives more realistic results taking into account the
Uses actual dimensions of the column and its location.
The stiffness of the piles, ratios the dimensions of the pile cap.
Assumptions
The concrete in the pile cap is assumed to resist no direct tension.
All tension is resisted by the reinforcement. The reinforcement in a
particular zone can be lumped together as a single Tie.
All compression is resisted by the concrete.
The columns axial loads and moments are assumed to be
transferred to the pile cap at the corners of the equivalent
rectangular column section
Design of Pilecaps
ACECOMS, AIT
Construction of Model
Design of Pilecaps
ACECOMS, AIT
Design of Pilecaps
ACECOMS, AIT
Design of Pilecaps
ACECOMS, AIT
Application of MSTM
P
D
P
P
P
L1
P
1
L2 < (3D + b)
a2
a2
P
4
P
d
L1
L2
Main members
Secondary members
Design of Pilecaps
ACECOMS, AIT
Application of MSTM
L1
a
L2
D
D
L1
4- Pile
Design of Pilecaps
ACECOMS, AIT
Application of MSTM
L1
b
b
a
L2
5- Pile
D
D
L1
Design of Pilecaps
ACECOMS, AIT