Operating Sequence
Operating Sequence
Operating Sequence
OPERATING SEQUENCE
The following flow chart pertains to typical operation of a Frame 6 gas turbine unit designed
for generator drive application. The differences from unit to unit (which are based on the
specific requirements of each unit) are not discussed here. Refer to the project or unit
specific documentation for more details.
Operational information includes startup and shutdown sequencing in the auto mode of
operation. This is intended to cover normal operation and assumes that initial startup,
calibration and checkouts have been completed and that the turbine is in the stand by mode
ready for operation with ac and dc power available for all equipment, and all annunciators
are cleared.
The following flow chart lists operator control system and machine actions or events in the
starting sequence of the gas turbine.
NORMAL START
“SHUTDOWN STATUS” }
“ Not Ready to Start” } Displays
“Off Cool Down” }
“ Off Select” }
“Auto Start” }
“ Startup Statust” } Displays
“ Shutdown Status” }
“ Off Select” }
All Trip functions are checked to be in the “ Not Tripped” and reset
“Start Select”
“ Sequence in Progress” displayed
“ Off Cool Down” goes off
“Starting “ displayed
“Ready to Start” goes off
“ Cranking” displayed
“ Starting” goes off
No
Crank
End of Sequence
Select?
No
No On Yes
Liquid ?
Fuel Stroke Reference (FSR) is set to Firing Value, which in turn is FSR
OUT for Gas and FQROUT for liquid
“ Firing” displayed
“Startup Control” displayed
“ Cranking” goes off
Flame is
Yes No
detected in 2 out
of 4 scanned
Turbine accelerates
Turbine reaches acceleration set point (14HA) at approximately 50% speed
Between 55 to 60% speed, diesel engine torque into turbine becomes low and the
jaw clutch disengages as detected by the limit switch (33CS) and the diesel engine
cool down timer starts. Diesel engine accelerating solenoid de-energizes and the
diesel engine will idle until the cool down timer times out (5 minutes)
Turbine accelerates further
Yes
Energize Atomizing Air
On Bypass valve Solenoid
Gas? (20AA)
Is Generator
Synchronizing End of Sequence
Selector in
AUTO
If Auto Synch permissives are OK, generator and lin are present an
dabove the minimums, the control system will modultae FSR to bring
the speed TNH to 100.3% of the station line frequency ande close the
generator breaker when the phase angle is OK
“Loading” displayed
“Speed control” displayed Pre-selected
load is
selected?
End of Sequence
Normal Shutdown
On Atomizing Air
Liquid bypass solenoid
de-energizes
Yes
No
On
Liquid
End of Sequence