Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
29 views2 pages

Installation Instructions: ISO 9001 ISO 9001

Download as pdf or txt
Download as pdf or txt
Download as pdf or txt
You are on page 1/ 2

Installation Instructions

ce

ISO 9001
Q

an

5. Roll ends are simply


butted together. No lateral
overlap.

ua

ur

4. Press Swellseal 3V / 8V
firmly into the glue.

3. Unroll the Swellseal


3V / 8V in the middle of the
joint.

ss

2. dry: apply a 3 cm wide


strip of neoprene glue in
the middle of the joint.
wet: apply a 3 cm wide strip
of Swellseal Mastic WA in
the middle of the joint.

lit

1. Remove dust, dirt and


loose parts by brushing
firmly.

The provided information is the result of study and experience. All details are given in good faith, but are in no case to be considered as a warranty, nor make
us assume any responsibility, even in case of detraction of third partys rights.
v. 05072004-01

Industriepark 8 B-2220 Heist-op-den-Berg Belgium


Tel.: +32 (0)15 24 93 60 Fax: +32 (0)15 24 80 72
Email: conchem@deneef.net www.deneef.net

You might also like