BOQ Evacuation Ajuy
BOQ Evacuation Ajuy
BOQ Evacuation Ajuy
SCOPE OF WORK
ITEM
1. Replacement of Ceiling Board and Repair of Ceiling Joist.
2. Repair of door facing.
3. Reblocking of old main door to concrete wall.
4. Reinstallation of electrical wirings,
panel board, ceiling lightings, ceiling fan
and service intrans cup.
5. Replacement of jalousie blade.
6. Painting of doors, ceiling and walls.
7. Installation of counter tops.
Bill of Quantities
Replacement od Ceiling Board and
Repair of Ceiling joist.
Lawaan Lumber 2x2x10
1/4 Marine Plywood 4x8
Common Wire Nail 1"
Common Wire Nail 2"
Common Wire Nail 3"
TOTAL
Replacement of Door Facing
1/4" Marine Plywood
Common Wire Nail 1"
Door Knob (Yale)
TOTAL
Reblocking of Old Main Door to
Concrete Wall
Concrete Hollow Block 4"
Cement
Sand
Deformed Steel Bar 10mm
Tie Wire Gauge 16
TOTAL
Reinstallation of Electrical Wirings,
Panel Board, Ceiling Lightings,
Ceiling Fan, Service Intrance Cup
Pin Light
G.E Energizer Bulb(9W)
Electrical Wire #14 (Royce)
Flixible Hose 1/2
PVC Clip 1/2"
Eletrical Tape (Armark)
Plate Assembly (National)
Wall Switch 3 Gans (National)
Utility Box 2x4
Junction Box 4x4
Insulator Spool 4"
TOTAL
Replacement of Jalousie Blade
Jalousie Blade 60 cm
QUANTITY
UNIT
6
17
2
1 1/2
1
Length
Sheet
Kls.
Kilo.
Kilo.
QUANTITY
2
1/2
1
UNIT
Sheet
Kilo.
Set
QUANTITY
UNIT
24
4
6
2
1/2
Pcs.
Bags
Bags
Length
Kilo.
QUANTITY
UNIT
6
6
70
70
40
2
1
3
2
6
1
Pcs.
Pcs.
Meters
Meters
Pcs.
Rolls
Pc.
Pc.
Pcs.
Pcs.
Pc.
QUANTITY
29
UNIT
Pcs.
TOTAL
Painting of Doors, Ceiling and Walls
Flatwall Enamel
Semi-Gloss Enamel
Gloss Latex white
Tinting Color Raw Sienna
Quick Dry Enamel (choco Brown)
Gloss Enamel Latex (Choco Brown)
Paint Roller w/ Pan 6"
Paint Roller w/ Pan 4"
Patching Compound
Paint Thinner
Putty Plate/Knife
Spatula
Paint Brush 4"
Sand Paper #100
Sand Paper #100
TOTAL
Installation of counter tops
Cement
Sand
Gravel
Concrete Hollow blocks 4"
Deformed Bars 10mm
G.I Plain sheet 0.4mm
TOTAL
Scaffolding Materials
Cocolumber 2x2x8'
Cocolumber 2x2x12'
Common Wire Nail 3"
Common Wire Nail 2 1/2"
Common Wire Nail 2"
TOTAL
QUANTITY
UNIT
4
4
4
4
2
2
1
1
2
4
1
1
2
4
4
Gals
Gals
Gals
Quartz
Liters
Liters
Pcs.
Pcs.
Kilo.
Bottles
Pair
Pc.
Pc.
Pcs.
Pcs.
QUANTITY
2
5
2
8
2
1
UNIT
Bags
Bags
Bags
Pcs.
Length
Sheet
QUANTITY
30
15
2
1
1/2
UNIT
Length
Length
kls.
Kilo.
Kilo.
QUANTITY
10
33
2
2
2
1 1/2
UNIT
Sheet
Length
Kls.
Kls.
Kls.
Kilo.
QUANTITY
UNIT
75
72
35
6
6
1
3
2
5
1
Meters
Meters
Pcs.
Pcs.
Pc.
Pcs.
Pcs.
Pcs.
Pcs.
Roll
QUANTITY
2
3
1
2
UNIT
Gals
Gals
Gals
Gals
Water Closet
Bill of Quantities
Installation of Ceiling
1/4' Marine Plywood
Lawaan Lumber 2x2x8'
Common Wire Nail 1"
Door knob (Yale)
TOTAL
Replacement of Floor Drain
Floor Drain 2"
TOTAL
Rewiring of Electrical Connection
Electrical Wire #14(solid) royce
Pin Light
G.E Energizer Bulb (Spiral) 9W
Flixible Hose 1/2"
PVC Clip 1/2"
Plate Assembly (1 Gang)
Wall Switch (National)
Utility Box 2x4
Junction Box 4x4
TOTAL
Cleaning Of floor Tiles and Water
Closet
Muriatic Acid
TOTAL
Clog Water Closet (Removed and Reinstalled)
Painting Of Door,Ceiling and Wall
this Activity, painting materials was
included at Barangay Hall Repair BOQ
QUANTITY
1
2
1/8
1
UNIT
Sheet
Length
Kilo.
Set
QUANTITY
1
UNIT
Pc.
QUANTITY
10
1
1
10
10
1
1
1
1
UNIT
Meters
Pc.
Pc.
Meters
Pcs.
Pc.
PC.
Pc.
Pc.
QUANTITY
UNIT
Bottles
SCOPE OF WORK
ITEM
1. Repair of Cr Door
2. Replacement of Floor Drain
3. Clog Water Closet
4. Rewiring of Electrical connection
5. Cleaning Of Floor Tiles and
6. Painting of Door, Ceiling and Wall
7. Replacement of Jalousie Blade
Water Closet
Bill of Quantities
Repair of Cr Door
1/4' Marine Plywood
Lawaan Lumber 2x2x8' (545)
Common Wire Nail 1"
Common Wire Nail 2"
Door knob (Yale)
TOTAL
Replacement of Floor Drain
Floor Drain 2" (Plastic)
TOTAL
Clog Water Closet (Removed reinstalled
Cleaning of Floor Tiles and Water
Closet
Muriatic Acid
TOTAL
Rewiring of Electrical Connection
Electrical Wire #14(solid) royce
Flixible Hose 1/2"
PVC Clip 1/2"
Plate Assembly (1 Gang)
Wall Switch (National)
Utility Box 2x4
Junction Box 4x4
TOTAL
Replacement of Jalousie Blade
Jalousie Blade 51 cm length
TOTAL
Painting Of Door,Ceiling and Wall
this Activity, painting materials was
included at Barangay Hall Repair BOQ
QUANTITY
1
2
1/8
1 1/2
1
UNIT
Sheet
Length
Kilo.
Kilo.
Set
QUANTITY
1
UNIT
Pc.
QUANTITY
UNIT
Bottles
QUANTITY
10
10
8
1
1
1
1
UNIT
Meters
Meters
Pcs.
Pc.
Pc.
Pc.
Pc.
QUANTITY
5
UNIT
Pcs.
SCOPE OF WORK
ITEM
1. Repair of Ceiling
2. Repair of Cr Door
3. Replacement of 2" Floor Drain (Plastic)
4. Installation of electrical Wirings and relocation of switch
5. Cleaning Of Floor Tiles and Water Closet
6. Replacement of Jalousie Blade
7. Painting of Wall Inside and Outside, ceiling and Door
Bill of Quantities
Repair of Ceiling
Minor Repair
Repair of Cr Door
1/4' Marine Plywood
Lawaan Lumber 2x2x8' s4s
Common Wire Nail 1"
Door knob (Yale)
TOTAL
Replacement of Floor Drain
Floor Drain 2 "
TOTAL
Installation of Electrical Wirings and
Relocation of Switch
Wall Switch (National)
Plate Assembly (1 Gang)
Electrical Wire #14(solid) royce
Utility Box 2x4
Pin Light
G.E Energizer Bulb (Spiral)
Junction Box 4x4
Flixible Hose 1/2"
PVC Clip 1/2"
TOTAL
Cleaning of Wall Tiles and Water
Closet
Muriatic Acid
Plunger
TOTAL
Painting Of Door,Ceiling and Wall
this Activity, painting materials was
included at Barangay Hall Repair BOQ
QUANTITY
UNIT
QUANTITY
1
2
1/8
1
UNIT
Sheet
Length
Kilo.
Set
QUANTITY
1
UNIT
Pc.
QUANTITY
UNIT
1
1
8
1
1
1
1
10
10
Pc.
Pc.
Metes
Pc.
Pc.
Pc.
Pc.
Meters
Pc.
QUANTITY
UNIT
3
1
Bottles
Pc.
LABOR COST
ITEM
1. Carpentry and Masonry Works
2. Electrical Works
3. Painting Works
Total Labor Cost
UNIT COST
UNIT COST
UNIT COST
TOTAL COST
TOTAL COST
TOTAL COST
-
UNIT COST
TOTAL COST
-
UNIT COST
TOTAL COST
-
UNIT COST
UNIT COST
UNIT COST
TOTAL COST
TOTAL COST
TOTAL COST
-
UNIT COST
TOTAL COST
-
UNIT COST
TOTAL COST
UNIT COST
GRAND TOTAL
TOTAL COST
-
UNIT COST
UNIT COST
TOTAL COST
TOTAL COST
-
UNIT COST
TOTAL COST
-
UNIT COST
TOTAL COST
-
GRAND TOTAL
UNIT COST
UNIT COST
UNIT COST
TOTAL COST
TOTAL COST
-
TOTAL COST
-
UNIT COST
UNIT COST
GRAND TOTAL
TOTAL COST
TOTAL COST
-
UNIT COST
TOTAL COST
UNIT COST
TOTAL COST
TOTAL COST
-
UNIT COST
UNIT COST
TOTAL COST
-
UNIT COST
TOTAL COST
-
GRAND TOTAL
QUANTITY
UNIT
10
14
1
3
1
1
1
2
1
5
Length
Sheet
Set
Kilos
Kilo
Kilo
Kilo
Pcs.
Pc.
Pcs.
Labor Cost
Repair of Ceiling Joist and Installation of Board.
Repair of Comfort Room And
Installation of Water Line.
Replacement of Corrugated G. I Sheet
8''
Marine Plywood 1/4''
Lawaan Lumber 2x2x8''
Floor Drain (Plastic)
PVC Pipe 2''
PVC Elbow 90 2''
Cement
Sand
Gravel
Door Knob (yale)
P.E. Pipes 1/2'' CDII
Faucet (Brass)
G.I. Coupling 1/2''
G.I. Elbow 90 1/2
Plastic Tee 1/2''
G.I. Nipple 1/2'' 6 Inches
G.I. Nipple 1/2'' 24 Inches
Teflone Tape 1/2''
Muriatic Acid
Lawaan Lumber 2x4 (Door Jamm)
TOTAL
QUANTITY
UNIT
4
1
6
1
1
2
3
4
2
1
22
1
1
1
1
1
1
1
2
1
Sheet
Sheet
Length
Pc.
Length
Pcs.
Bags
Bags
Bags
Set
Meters
Pc.
Pc.
Pc.
Pc.
Pc.
Pc.
Roll
Bottles
Set
Labor Cost
Repair of Comfort Room And Installation of Water line.
QUANTITY
UNIT
5
1
2
Sheet
Liter
Pair
Labor Cost
Replacement of ceiling Board and Sealant application and roofing (Brgy. Hall)
Installation of Electrical Wirings
and Ceiling Lightings
Electrical Wire #14 (Solid) Royce
Junction Box 4x4
Utility Box 2x4
Flixible Hose 1/2"
PVC Clip 1/2"
Pin Light
G.E Energizer Bulb (Spiral) 9W
Plate Assembly (National) 1 Gans
Plate Assembly (National) 2 Gans
Switch (National)
Electrical Tape (Armar)Big
TOTAL
QUANTITY
UNIT
120
10
5
1
40
8
8
3
2
8
2
Meters
Pcs.
Pcs.
Roll
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Roll
Labor Cost
Installation of Electrical Wirings and Ceiling Lightings.
Painting
Flatwall Enamel
Gloss latex
Flatwall Enamel
Semi-gloss Enamel
Gloss Enamel Latex (choco brown)
Paint Thinner
Paint Roller w/Pan 6"
Paint Roller w/Pan 4"
Putty plate/knife
Spatula
Patching Compound
Sand Paper #100
Sand Paper #400
TOTAL
QUANTITY
4
6
3
6
2
4
1
1
1
1
2
2
2
UNIT
Gals
Gals
Gals
Gals
Litters
Bottles
Pc.
Pc.
Pair
Pc.
Kls.
Pcs.
Pcs.
QUANTITY
25
10
2
2
1
UNIT
Length
Length
Kls.
Kls.
Kilo.
Labor Cost
Painting
Scaffolding Materials
Cocolumber 2x2x10'
Cocolumber 2x2x12'
Common Wire Nail 3"
Common Wire Nail 2 1/2"
Common Wire Nail 2"
TOTAL
Labor Cost
Repair of Comfort Room and Installation of Water Line
(BRGY. HALL)
UNIT COST
TOTAL COST
-
UNIT COST
TOTAL COST
-
UNIT COST
TOTAL COST
-
Brgy. Hall)
Php. 750.00
UNIT COST
TOTAL COST
-
UNIT COST
TOTAL COST
#NAME?
#NAME?
UNIT COST
TOTAL COST
-