A. Start-Up Requirements & Siteworks Mobilization & Demobilization
A. Start-Up Requirements & Siteworks Mobilization & Demobilization
A. Start-Up Requirements & Siteworks Mobilization & Demobilization
C. Columns
Description Quantity Unit Unit Cost Total
40 kgs. Portland Cement 20 bags 240.00 4,800.00
washed sand (passing 1/4" sieve) 2 cu.m. 650.00 975.00
gravel (passing 1" sieve) 3 cu.m. 1,100.00 2,750.00
16mmx6m deformed bars 25 Lengths 395.00 9,875.00
10mmx6m deformed bars 36 Lengths 145.00 5,220.00
Formworks & Scaffoldings 24 sqm 300.00 7,200.00