Unisem Advanced Technologies Sdn. BHD.: Non-Conformance Report (NCR)
Unisem Advanced Technologies Sdn. BHD.: Non-Conformance Report (NCR)
Unisem Advanced Technologies Sdn. BHD.: Non-Conformance Report (NCR)
MP15043
AUDIT DATE :
13-May-2015
AREA AUDIT :
Plating room
*CLAUSE
4.2.1
QS
AUDIT TYPE:
MPA
ESD
NON-CONFORMANCES/AREAS OF CONCERNS :
There is a lot running at BAL04 during audit, but could not find any details recorded in the logsheet,
ball placement accurancy and stencil conversion buyoff result on 13/05/2015.
MES ID: 1516015190000
Cust: ESL
AUDITOR
: _________________
AUDITEE
( Name: Joanne)
DATE ISSUED NCR
: ____________________
( Name: Amir )
5/19/2015
RESP.
upon checking the log sheet that the auditor refer is old logsheet, the correct log sheet was at the ma
WHY 2
QUESTION
WHY
ANSWER
WHY 3
QUESTION
WHY
ANSWER
WHY 4
QUESTION
WHY
ANSWER
WHY 5
QUESTION
WHY
ANSWER
* The last answer should lead to systemic/ technical issue. Human error is unacceptable.
CORRECTIVE ACTION (PERMANENT CORRECTIVE ACTION TO PREVENT RECURRENCE)
RESP.
Supervisor
From the checking the log sheet is been record on any lots run on machine, any how
the old log sheet is remove every week to avoid mis understood
Retention activity - to compile the log sheet by equipment and store at Unisem retention room
Amir
APPROVAL
DEPT. HEAD OF RESPONSIBLE PARTY
: ______________________
UTQS00-22/006B
( Name:
( Name:
TO BE COMPLETED BY AUDITOR
: ______________________
ACCEPTED BY
: ____________________
( Name:
VERIFIED BY
COMMENT
: ______________________
( Name:
DATE
* Please list out the ISO/TS clause or related in-house spec no.
** Please refer UMQS00-06 for the authorized approver of respective audit.
UTQS00-22/006B
PG. __ OF __
______________
mir )
COMPLETION DATE
COMPLETION DATE
22/05/2015
ww33
______________
UTQS00-22/006B
______________
)
UTQS00-22/006B