Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
124 views

INTRODUCTION The Patnode Substation Is Being Constructed For The

The Patnode Substation is being constructed to connect a 219MW wind farm consisting of 73 wind turbines each rated at 3.0MW. The New York Power Authority will operate the Patnode Substation once completed. This document outlines the criteria used by TRC to develop protective relay settings for the Patnode Substation, excluding line protection settings. A separate document covers the criteria for relay settings at the wind farm's collector substation.

Uploaded by

Mohamed Wahid
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
124 views

INTRODUCTION The Patnode Substation Is Being Constructed For The

The Patnode Substation is being constructed to connect a 219MW wind farm consisting of 73 wind turbines each rated at 3.0MW. The New York Power Authority will operate the Patnode Substation once completed. This document outlines the criteria used by TRC to develop protective relay settings for the Patnode Substation, excluding line protection settings. A separate document covers the criteria for relay settings at the wind farm's collector substation.

Uploaded by

Mohamed Wahid
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

INTRODUCTION The Patnode Substation is being constructed for the

interconnection of Horizon Wind Energys Marble River Wind Farm which consists
of 73 wind turbine generators (WTGs) each with a nominal rating of 3.0MW for a
total generation capacity of 219MW. Patnode Substation will be operated by NYPA
when complete. TRC is providing protective relay settings for all relays other than
those for line protection at Patnode Substation. This document provides the
criteria used by TRC to complete the relay settings. A separate document
provides the relay setting criteria for the Marble River Wind Farm collector
substation.

You might also like