Kegiatan
: PengembanganSistemDistribusiAirMinum
Pekerjaan
Lokasi
SumberDana
TahunAnggaran
:
:
:
:
No.
I.
1
2
3
PengembanganJaringanPipaAirBersihKawasanKecamatanLhoksukonKab.AcehUtara(MA)
KabupatenAcehUtara
APBA
2016
UraianKegiatan
PEKERJAANPERSIAPAN
MobilisasidanDemobilisasi(DireksiKeet/sewa,Tenagakerja,Alat, 1,00
Bahan)
SettingOut
5.064,00
Administrasi(Dok.Kontrak,AsuransidanJaminan,ShopDrawing 1,00
danAsbuiltDrawing,Sitemanagement,Dok.Proyek,K3,Fasilitas
Sementara)
II. PENGADAANPIPADANACCESSORIES
1 PengadaanPipa
PipaPVC,S12,5RRJdia.150mm
PipaPVC,S12,5RRJdia.100mm
PipaPVC,S12,5RRJdia.75mm
2
PengadaanAccessories
TeeAllSocketPVCRRJdia.200x100mm
TeeAllSocketPVCRRJdia.150x75mm
BendAllSocketPVCRRJdia.150x90
FlangeSocketPVCdia.100mm
ReducerSocketPVCRRJdia.150x100mm
GiboultJointdia.200mm
GateValveCIdia.100mm
DopPVCdia.100mm
DopPVCdia.75mm
III. PEKERJAANPEMASANGANPIPA,ACESSORIESTERMASUK
FITTINGVALVEDANPENGETESAN
1 PekerjaanTanah
GalianTanahKeras
MengurugKembaliGalian
UruganTanahBekasGalianTermasukPerataandan
Pemadatan(stamper)
2
Volume
Satuan
Analisa
HargaSatuan
(Rp)
JumlahHarga(Rp)
Ls
Ditaksir
15.000.000,00
15.000.000,00
M'
Ls
AHSPPUT.04.1
Ditaksir
1.403,00
16.500.000,00
7.104.792,00
16.500.000,00
JumlahI
38.604.792,00
2.508,00
2.016,00
540,00
M'
M'
M'
Ditaksir
Ditaksir
Ditaksir
197.500,00
82.500,00
61.500,00
495.330.000,00
166.320.000,00
33.210.000,00
1,00
2,00
1,00
3,00
1,00
1,00
1,00
2,00
2,00
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Ditaksir
Ditaksir
Ditaksir
Ditaksir
Ditaksir
Ditaksir
Ditaksir
Ditaksir
Ditaksir
3.977.650,00
740.540,00
405.650,00
749.540,00
459.200,00
3.691.000,00
2.552.500,00
326.980,00
270.460,00
3.977.650,00
1.481.080,00
405.650,00
2.248.620,00
459.200,00
3.691.000,00
2.552.500,00
653.960,00
540.920,00
JumlahII
710.870.580,00
1.688,51
1.615,52
72,98
M3
M3
M3
AHSPPUA.2.3.1.4
AHSPPUA.2.3.1.9
AHSPPUT.14b
83.444,00
27.791,67
46.559,76
140.896.028,44
44.897.993,33
3.397.931,47
PemasanganPipaTermasukFittingdanValve
PipaPVC,S12,5RRJdia.150mm
PipaPVC,S12,5RRJdia.100mm
PipaPVC,S12,5RRJdia.75mm
PemasanganValvedia.200mm
PemasanganAccessoriesdia.50150mm
2.508,00
2.016,00
540,00
1,00
10,00
M'
M'
M'
Bh
Bh
AHSPPUA.8.4.1.4
AHSPPUA.8.4.1.3
AHSPPUA.8.4.1.2
AHSPPUA.8.4.3.2
AHSPPUA.8.4.3.15
15.691,75
14.035,75
12.448,75
227.625,25
14.116,25
39.354.909,00
28.296.072,00
6.722.325,00
227.625,25
141.162,50
KoneksidenganPipaEksisting
InterkoneksipipabarukePipaLamadia.200mm
InterkoneksipipabarukePipaLamadia.150mm
1,00
1,00
Bh
Bh
AHSPPUA.8.4.4.4
AHSPPUA.8.4.4.3
433.256,75
361.468,00
433.256,75
361.468,00
PengetesanPipa
PipaPVC,S12,5RRJdia.150mm
PipaPVC,S12,5RRJdia.100mm
PipaPVC,S12,5RRJdia.75mm
2.508,00
2.016,00
540,00
M'
M'
M'
AHSPPUA.8.4.5.4
AHSPPUA.8.4.5.3
AHSPPUA.8.4.5.2
2.603,60
2.028,60
1.798,60
6.529.828,80
4.089.657,60
971.244,00
JumlahIII
276.319.502,14
IV. PENGADAANDANPEMASANGANPIPAUNTUKPERLINTASAN
1 Pengadaan/PemasanganPerlintasanPipaSteeldia.150mmdan
AccessoriesL=15M
2 Pengadaan/PemasanganPerlintasanPipaSteeldia.150mmdan
AccessoriesL=612M
3 Pengadaan/PemasanganPerlintasanPipaSteeldia.100mmdan
Accessories,L=15M
1,00
Pkt
Lampiran1
76.450.954,05
76.450.954,05
1,00
Pkt
Lampiran2
39.705.895,16
39.705.895,16
1,00
Pkt
Lampiran3
27.708.233,19
27.708.233,19
JumlahIV
143.865.082,41
REKAPITULASI
I.
II.
III.
IV.
1
2
3
4
PEKERJAANPERSIAPAN
PENGADAANPIPADANACCESSORIES
PEKERJAANPEMASANGANPIPA,ACESSORIESTERMASUK
PENGADAANDANPEMASANGANPIPAUNTUKPERLINTASAN
38.604.792,00
710.870.580,00
276.319.502,14
143.865.082,41
JUMLAH
PPN10%
JUMLAHTOTAL
DIBULATKAN
1.169.659.956,55
116.965.995,65
1.286.625.952,20
1.286.625.000,00
TERBILANG
: SatuMilyarDuaRatusDelapanPuluhEnamJutaEnamRatusDuaPuluhLimaRibuRupiah
BandaAceh,04April2016
CV.LZBROTHER
MUHAMMADSHIDDIQ
WakilDirektur