Code For Sustainable Homes - Technical Guide
Code For Sustainable Homes - Technical Guide
Code For Sustainable Homes - Technical Guide
Technical guide
April 2008
www.communities.gov.uk
community, opportunity, prosperity
Code for Sustainable Homes
Technical Guide
April 2008
April 2008
Department for Communities and Local Government
Changes to the Technical Guidance
A list of changes between this version (April 2008) and the previous version (October
2007) of the Code for Sustainable Homes Technical Guidance is published as a
separate document. In addition to this, where the assessment criteria have changed
or special cases amended, these have been back highlighted in grey within the text of
this document.
Copyright in the contents, the cover, the design and the typographical arrangement rests with the Crown.
This document/publication is value added. If you wish to re-use this material, please apply for a Click-Use
Licence for value added material at www.opsi.gov.uk/click-use/system/online/pLogin.asp , or by writing to the
Office of Public Sector Information, Information Policy Team, Kew, Richmond, Surrey, TW9 4DU.
E-mail: licensing@opsi.gov.uk
Foreword
Environmental issues are becoming increasingly important and there is an associated
increase in public awareness. There is generally less awareness of the contribution
that good building design can make to reducing pollution and improving the
environment.
Scientific evidence shows that climate change resulting from carbon dioxide emissions
associated with energy use is both real and already underway. At the same time we
need to build much more housing to accommodate an increasing population, and
changing lifestyles. If all the necessary housing were to be built by 2050, experts
predict that up to one-third of the total housing stock is still yet to be built.
This technical guidance sets out the requirements for the Code, and the process for
achieving a Code assessment. It aims to make gaining a Code assessment as simple,
transparent and rigorous as possible, inspiring confidence in Code assessors, home
builders, product manufacturers and consumers.
Department for Environment, Food and Rural Affairs. Summary of responses to the consultation on the draft climate change
bill from 13 March 2007 to 12 June 2007. DEFRA, London. October 2007.
| Code for Sustainable Homes
Acknowledgements
The Code for Sustainable Homes Technical Guide has been drafted by the
BREEAM Centre at the Building Research Establishment (BRE) under contract to the
Department for Communities and Local Government.
Code for Sustainable Homes |
Contents
Foreword 3
Acknowledgements 4
Preface 7
5 Generic Definitions 31
Acronyms 36
Category 2: Water 97
Indoor Water Use 97
External Water Use 111
| Code for Sustainable Homes
References 280
Preface
The Code for Sustainable Homes (the Code) is an environmental assessment
method for rating and certifying the performance of new homes. It is a national
standard for use in the design and construction of new homes with a view to
encouraging continuous improvement in sustainable home building. The Code is
based on EcoHomes© (Yates et al, 2004). It was launched in December 2006 with
the publication of Code for Sustainable Homes: A step-change in sustainable home
building practice (Communities and Local Government, 2006). The Code became
operational in April 2007 in England, and having a Code rating for new build homes
mandatory, from 1st May 2008. This mandatory requirement comes into effect for all
developments where a local authority has received a building notice, initial notice or
full plans application after 1st May 2008. Developments where a local authority had
received these stages on or before 30 April 2008 will be exempt.
Code service providers are licensed organisations offering all or part of the range
of Code services including assessor training; registration and monitoring; quality
assurance of assessments; certification; investigation and resolution of complaints;
and maintenance of records (BRE Global, 2007). At the time of publishing Stroma Ltd
is the only other organisation licensed to provide all Code services although several
others are in discussions with BRE Global. For further information about Code service
providers can be found at www.communities.gov.uk/thecode.
The Code for sustainable homes covers nine categories of sustainable design including:
Each category includes a number of environmental issues, see Table 3.1. Each issue is
a source of impact on the environment which can be assessed against a performance
target and awarded one or more credits. Performance targets are more demanding
than the minimum standard needed to satisfy Building Regulations or other
legislation. They represent good or best practice, are technically feasible, and can be
delivered by the building industry. Homes have already been built to Code level 4 and
above by the industry.
• Rating dwellings on a scale from Level 1 to level 6, where level 6 is the highest
• Assessing individual dwellings instead of groups of dwellings
• Establishing minimum mandatory standards for CO2 emission rates, indoor
water use, materials, waste and surface water run-off, for achieving even the
lowest level of the Code
• Demanding higher minimum mandatory standards for CO2 emission rates and
indoor water use, to achieve Levels 2 to 6 of the Code
• Requiring compliance with the Lifetime Homes criteria to achieve Level 6 of the
Code
• Assessing dwellings at both the design (DS) and post construction (PCS) stage
• Awarding final Code certificates after the post construction assessment has
been carried out
• For dwellings which do not achieve the minimum Code rating, a certificate is
issued which shows a summary of the performance achieved, but does not
show a rating from 1 to 6
• For dwellings which are not assessed, a nil-rated certificate is issued.
From 1st May 2008 it is mandatory for a Code sustainability certificate or a nil rated
Certificate (where an assessment has not taken place) to be included in the Home
Information Pack as information to prospective purchasers of properties in England.
This would apply to all new homes that are marketed for sale, although a nil rated
certificate of non-assessment can be downloaded from www.bre.co.uk,
www.stroma.com or www.homeinformationpacks.gov.uk.
Code for Sustainable Homes |
Front Back
This Home
It is not assessed against the Code for Sustainable Homes. The Code sets higher
standards for a range of environmental sustainability features, than current Building
Regulations. It covers issues such as energy/carbon dioxide emissions, water efficiency
and the use of materials.
As this home is not assessed against the Code for Sustainable Homes it can not be
certified to meet the enhanced environmental performance standards set out in the Code.
The energy performance of this home will be shown on the Energy Performance
Certificate.
NIL RATED
---------------------------------------------- ----------------------------------------------
Developer Date
Rating system:
Nil rating: A home that has not been designed and built to meet the standards
set out in the Code for Sustainable Homes. It has therefore not been formally
assessed against the Code and has a ‘Nil rating’.
1-6 star rating: A home that has been designed and built to the sustainability
standards set out in the Code for Sustainable Homes. A 1 star home is entry
level and a 6 star home being a highly sustainable, zero carbon home.
Part One
Part Two
Categories Issue
Surface Water Run-off Management of Surface Water Runoff from developments (M)
Flood risk
Mandatory minimum performance standards are set for some issues. For
four of these, a single mandatory requirement is set which must be met,
whatever Code level rating is sought. Credits are not awarded for these
issues. Confirmation that the performance requirements are met for all four
is a minimum entry requirement for achieving a level 1 rating. The four
un-credited issues are:
The final issue with a mandatory requirement for Level 6 of the Code is:
• Lifetime Homes.
Tables 1.2 and 1.3 below illustrate how for the creditable mandatory issues
the minimum mandatory standards increase with increasing rating levels. For
CO2 emissions there are increased mandatory minimum standards for each
increase in Code Level.
Code for Sustainable Homes | 13
Table 1.2 : Code Levels for Mandatory Minimum Standards in CO2 Emissions
Level 1 (H) 10
Level 2 (HH) 18
Level 3 (HHH) 25
Level 4 (HHHH) 44
For Indoor water use there are increased mandatory minimum standards at
Code levels 1, 3 and 5.
Table 1.3: Code Levels for Mandatory Maximum Standards in Indoor Water Consumption
Level 5 (HHHHH) 80
Level 6 (HHHHHH) 80
The environmental impact categories within the Code are not of equal
importance. Their relative value is conveyed by applying a consensus-based
environmental weighting factor (see details below) to the sum of all the
raw credit scores in a category, resulting in a score expressed as percentage
points. The points for each category add up to 100, see Table 1.4.
Table 1.4 shows how weightings are applied across all Code categories of
environmental impact to adjust the relative values of credits within different
categories. Within each category, credits are awarded for achieving specified
degrees of performance. The weighting factors show the contribution made
by each category to the total performance recognised and rewarded by the
Code. The total available contribution is expressed as 100 per cent. The
weighting of each category is expressed as a fraction of this, such that the
sum of all the category contributions equals 100 per cent.
It is very important to note that weightings apply at the category level and
not for individual credits to avoid rounding errors. For instance for the Energy
and CO2 emissions category, 36.4 per cent weighted contribution divided
by 29 credits equals 1.2551724 expressed to seven decimal places, but 1.26
when expressed to two decimal places.
Total – 100.0% –
Table 1.5: Summary of environmental impact categories, issues, credits and weighting
continued
16 | Code for Sustainable Homes
Table 1.5: Summary of environmental impact categories, issues, credits and weighting
Water
Indoor Water Use 5
External Water Use 1
Materials
Environmental Impact of Materials 15
Responsible Sourcing of Materials – Basic Building Elements 6
Responsible Sourcing of Materials -Finishing Elements 3
Waste
Storage of non-recyclable waste and recyclable household waste 4
Construction Site Waste Management 2
Composting 1
Pollution
Global Warming Potential of Insulants 1
NOx Emissions 3
Management
Home User Guide 3
Considerate Constructors Scheme 2
Construction Site Impacts 2
Security 2
continued
Code for Sustainable Homes | 17
Table 1.5: Summary of environmental impact categories, issues, credits and weighting
Ecology
Ecological value of site 1
Ecological enhancement 1
Protection of ecological features 1
Change in ecological value of site 4
Building footprint 2
• It should begin with a check that the four mandatory issues for which no
credits are awarded have been achieved
• The mandatory credits for CO2 emissions and for internal water use should
be checked and confirmed at the minimum values required to meet the
Code level sought
• The remaining tradable credits should be checked and confirmed so that
they too contribute to the required Code level.
If any of the standards for the four non-creditable issues are not met, then a
zero rating will result, regardless of the other credits achieved, including the
creditable mandatory issues.
If all the non-creditable mandatory standards are met, but one or other of
the creditable mandatory issues fails to reach the minimum for a higher
required level, the rating achieved will be determined by the lowest level
which all the mandatory issues meet. Achieving a high performance in one
category of environmental impact can sometimes result in a lower level
of performance for another. It is therefore impossible to achieve a Total
percentage points score of 100.
18 | Code for Sustainable Homes
The rounded percentage points scores for each category are then summed
to arrive at the Total percentage points score for the dwelling. The total
percentage point score must be rounded down to the nearest whole
number.
Figure 1.3: Scoring System for the Code for Sustainable Homes
• Waste
Mandatory Standards
• Materials
• Water Surface Run-off
• Water
Credits per category total
• Waste
Tradable Credits
Level 1
• Materials Total Level 2
• Surface Water Run-off percentage Level 3
points Level 4
• Pollution score Level 5
• Health and Wellbeing Level 6
• Management
• Ecology
Categories
The Code Level is then derived from the total percentage points according to
Table 4.4. Each Code Level is represented on the certificate by an equivalent
number of Stars from 1 to 6.
Table 1.6: Relationship between Total percentage points score and Code Level
It is important to note that the total percentage points scores set out in the
document ‘Code for Sustainable Homes – A step-change in sustainable home
building practice’ (Department for Communities and Local Government,
December 2006) are rounded to one decimal place. The Report Submission
Tool (available for assessors from the Code service provider) must be used to
determine an accurate score for an assessment.
6 Aspirational standard based on zero carbon emissions for the dwelling and high performance
across all environmental categories
*Note: Although the Code is closely related to the EcoHomes© standard, it is not possible to make a direct
comparison between the two. This is due to the mandatory standards in the Code and to varying performance
standards in some areas.
20 | Code for Sustainable Homes
• Assessor training
• Registration and monitoring
• Quality assurance of assessments
• Certification
• Investigation and resolution of complaints
• Maintenance of records.
BRE Global currently does not carry out assessments and provides clear
separation between the roles of training and assessor qualifications to
avoid potential conflicts of interest. Under the terms of its agreement with
Community and Local Government, BRE Global will licence:
www.breeam.org/filelibrary/CSH_Guidance_Notes_for_Prospective_Service_
Providers.pdf
This document sets out the basic requirements for organisations wishing to
carry out these activities. Any organisation wishing to offer these services
would have to operate to the same high standards that BRE Global are
required to do under its contract with Communities and Local Government
and with mechanisms that clearly demonstrate the avoidance of conflicts of
interest.
22 | Code for Sustainable Homes
There are two options for organisations wishing to offer some or all of these
services:
BRE Global will maintain a central database in which all the assessed
dwellings will be registered, regardless of the organisation providing the
Code assessment. This will allow statistics to be reported to Community
and Local Government. Sub-licensees will be supplied with the necessary
formatting and access rights to lodge their registrations. The precise nature
of this database and its controls are under development. Where necessary
interfaces with databases in other organisations can be developed. A fee will
be charged at BRE Global commercial rates for time spent on this activity.
The appointed Code assessor registers the development formally with the
Service provider as early as possible. This registration is valid for a maximum
of five years between expiry of the Technical Guide version at registration
and submission of the Design stage report. So far there is no time limit on
the delivery of the associated Post construction stage or Final certificates for
the development. This enables the version of the Code to be set such that
even if the Code is updated (say every six months), the Code version used will
remain the same across the site.
The assessment process for these two stages is very similar. Evidence is
collated and used as the basis for the assessor to determine how many
credits are to be awarded for each issue. A summary report is submitted to
the Code service provider for quality assurance and certification.
24 | Code for Sustainable Homes
Client with
development
site
Mandatory
requirement for
CSH rating
CSH Service
provider Training
CSH
& Licensing
Assessment or No CSH Download “nil-rated”
nil-rated certificate Assessment certificate
required
CSH assessment
Choose
Licensed a CSH service
Assessors provider and
assessor
DS evidence gathered
DS report submitted to
CSH service provider for
DS certification
TO PCS
(Optional)
CSH service provider
performs QA checks on
DS report
Areas where DS
assessment failed QA Fail QA Pass/Fail
are corrected
QA Pass
PCS assessment
evidence gathered
The licensed organisation has responsibility for the assessment and the Code
assessor has responsibility for producing the report. It is possible for different
licensed organisations to undertake the DS and PCS assessments for a
particular site. Code assessors are required to make DS assessment evidence
available to the Post Construction assessor where this is the case.
• To assess the design specifications (i.e. before construction begins) for
each individual dwelling to determine the Design stage or Interim rating
• To award (subject to quality assurance) a Design stage or Interim
certificate.
The assessor will also be able to calculate, at this initial design stage
assessment, any site related credits. Therefore details of final landscaping and
ecological enhancement measures will also need to be known.
The assessor should work closely with the design team to:
When the assessor is satisfied with the performance under the Code,
they shall submit the assessment report to the Service provider for quality
assurance and to receive Design stage or Interim Code certification. The
report shall contain documentary evidence that performance requirements
are being met, with a clear audit trail linking such evidence to all specification
clauses, drawings, reports and other evidence. The Service provider may issue
a standard report format for the assessor to complete.
Code for Sustainable Homes | 27
If there has been no prior DS assessment then the full assessment shall be
completed against the As Built dwelling(s).
• An appropriate number of site visits for each development site (at least
once per site). The appropriate number of site visits is dependent on the
particular situation. It is the assessor’s responsibility to determine the
necessary number of site visits required to satisfy themselves that the
assessment properly reflects the dwelling
• Every different specification for each issue shall be reviewed and evidence
recorded to confirm that it complies with the requirements for PCS
assessment
For a large or phased development, there are some issues that will not be
complete when a Post Construction Stage Assessment for the first dwelling(s)
is submitted to the Service provider. These could include some ecology
credits or community based facilities for instance. It is possible to certify the
first dwellings without certain issues actually being complete. The details
of these exceptions are contained within the relevant issues, but are also
highlighted in Table 3.1 below. This is not meant to be a comprehensive list.
Its purpose is to provide guidance to assessors for the sort of exceptions that
are acceptable.
28 | Code for Sustainable Homes
Energy and CO2 Ene 1: As Built Part L1A compliance checklist for each energy type. Only
emissions Dwelling emission rate checklists relating to energy types covered by the PCS assessment
are required. There may be different energy types in a later phase
of the development.
Ene 2: As Built Part L1A compliance checklist for each energy type. Only
Building fabric checklists relating to energy types covered by the PCS assessment
are required. There may be different energy types in a later phase
of the development.
Ene 5: White goods may not be fitted due to security risk until just prior
Energy labelled white to handover to new residents. Orders must be in place.
goods
Ene 6: External light fittings may be in place but may not have bulbs
External lighting until handover. This is acceptable.
Ene 8: Cycle storage Some cycle storage may not be in place in later stages of the
development as this would form part of the “externals” and be
the last of the finishes installed.
Water Wat 1: Communal grey or rainwater systems may not be installed yet
Indoor water use but should be operational before more than 60 per cent of the
dwellings are completed/certified.
Surface Water Sur 1: Management of Specific infiltration measures, such as soakaways do not need
Run-off Surface Water Runoff to be designed, but their location need to be planned and a
from developments programme for their construction finalised which indicates that
they will be operational before more than 60 per cent of the
dwellings are completed/certified.
continued
Code for Sustainable Homes | 29
Waste Was 1: Storage of non- Local authority collection schemes, kitchen waste collection
recyclable waste and schemes and private recycling scheme operators will need to
recyclable household be operational by the time 60 per cent of the development is
waste complete.
Pollution Pol 2: A communal heating system (e.g. CHP, District Heating etc.)
NOx emissions intended as the primary heating energy source for the dwelling
may not be complete. The facility should be planned and a
programme for its installation finalised which indicates that it will
be operational before more than 60 per cent of the dwellings are
completed/certified. Alternatively where the facility is designed to
serve off site users it must be fully operational within a period of
18 months of assessment.
Ecology Eco 1: Ecological value It will not be possible to check that all features outside of the
of site construction zone have been undisturbed until construction
complete.
Eco 2: Ecological Features are often not in place until the whole site is complete or
enhancement until the appropriate planting season. A design and programme
is required demonstrating that all such enhancement works
will be completed normally within a single annual cycle from
completion of construction works on the final dwellings on the
site.
The Department for Communities and Local Government website will always
contain the latest version at www.communities.gov.uk.
Code for Sustainable Homes | 31
5 Generic Definitions
Approximate The adjusted value of each credit according to the weighting
weighted assigned to the category which it belongs to. By dividing the
value of a weighting (expressed as a percentage contribution) by the number
credit of credits for each category, we arrive at an adjusted value
(Point) for each credit. For instance within the Energy and CO2
category, 36.4 per cent contribution to the total, divided by the 29
credits available, means that each credit in this category is worth
1.26 points. Assessors must avoid using adjusted credit values in
calculating Code rating levels because they generate errors due to
rounding.
Assessor See Code Assessor and Licensed Assessor
BRE Building Research Establishment
BRE Global BRE Global Limited (part of the BRE Group) is an independent third
Ltd. party approvals body offering certification of fire, security and
sustainability products and services to an international market. For
more information see http://www.bre.co.uk/global.
BREEAM Building Research Establishment Environmental Assessment
Method. A suite of environmental assessment rating tools designed,
operated and owned by BRE, first launched in 1990.
Carbon An invisible odourless gas which is the by product of energy
dioxide generated from fossil fuels including gas, oil and coal. It is a
significant contributor to global warming and climate change.
Category Headline name for a group of related environmental issues for
assessment against defined performance requirements in the code
for sustainable homes.
Communities UK Government Department responsible for Communities and
and Local Local Government; owners of the CSH.
Government
Code See Code for Sustainable Homes
Code See Licensed Assessor
Assessor
Code A suite of tools made available for use by the Service provider to
calculator enable assessors to calculate performance levels and credits for
tools award under various issues.
Code for Government owned environmental assessment method for
Sustainable certifying and rating new homes in England. It was launched in
Homes December 2006.
32 | Code for Sustainable Homes
Acronyms
AC Alternating Current
ACoP Approved Code of Practice
ACPO Association of Chief Police Officers
AD L1A Approved Document L1A
ADE Approved Document E
ALO Architectural Liaison Officer
ANC Association of Noise Consultants
AWTC Association of Wildlife Trust Consultancies
BERR Business Enterprise and Regulatory Reform
BRE Building Research Establishment
BREEAM Building Research Establishment Environment Assessment Method
BS British Standard
BSRIA Building Services Research and Information Association
CABE Commission for Architecture and the Built Environment
CCS Considerate Constructors Scheme
CEH Centre for Ecology and Hydrology
CFL Compact Fluorescent Lamp
CH4 Methane
CHP Combined Heat and Power
CIBSE Chartered Institution of Building Services Engineers
CIE Commission Internationale de l’Eclairage
CIRIA Construction Industry Research and Information Association
CITES Convention on International Trade in Endangered Species of Wild
Fauna and Flora
CIWEM Chartered Institution of Water and Environmental Management
CO2 Carbon Dioxide
CoC Chain of Custody
Code Code for Sustainable Homes
CPDA Crime Prevention Design Advisor
CPET Central Point of Expertise on Timber
CSA Canadian Standards Association
CSH Code for Sustainable Homes
DC Direct Current
DEFRA Department of Environment, Food and Rural Affairs
DER Dwelling Emission Rate
Code for Sustainable Homes | 37
Aim
To limit emissions of carbon dioxide (CO2) to the atmosphere arising from the
operation of a dwelling and its services.
Assessment Criteria
Credits are awarded based on the percentage improvement in the Dwelling Emission
Rate (DER), (estimated carbon dioxide emissions in kg per m2 per annum arising
from energy use for heating, hot water and lighting for the actual dwelling), over
the Target Emission Rate (TER) (the maximum emission rate permitted by Building
Regulations), for the dwelling where DER and TER are as defined in AD L1A 2006
Edition of the Building Regulations. Credits are awarded in accordance with the table
below. Note that to reach Level 6 (zero carbon) there are additional requirements.
Criteria
>10% 1 Level 1
>14% 2
>18% 3 Level 2
>22% 4
>25% 5 Level 3
>31% 6
>37% 7
>44% 8 Level 4
>52% 9
>60% 10
>69% 11
>79% 12
>89% 13
>100% 14 Level 5
‘Zero Carbon Home’ as defined below 15 Level 6
Default Cases
None
Code for Sustainable Homes | 41
*Full worksheet, dated with energy *Full amended worksheet, dated with
assessor name, registration number and energy assessor name, registration
address of development, prepared at number and dwelling address, prepared
plans approval stage at construction completion stage, if
different from Design Stage
Copy of plans, elevations and sections
as designed and construction details Evidence that the build form is as
sufficient to check building details described in the As Built SAP worksheet.
This will cover the final construction
Where Design and Build contracts or materials and accompanying list of
similar contractual arrangements mean specifications (including heating, hot
SAP calculations cannot be produced water service and ventilation systems)
at this stage, the specification can be and be in the form of purchase orders,
allowed as evidence of intent. photographs or specification clauses
with letter of conformity.
OR
Definitions
Accredited Energy A person registered by an Accredited SAP service
Assessor/Part L provider licensed by Communities and Local Government
‘Competent person’ in respect of the calculation of CO2 emission rates of
buildings .
AD L1A The Building Regulations for England and Wales
Approved Document L1A: Conservation of Fuel and
Power in New Dwellings (2006).
As- Built SAP 2005 An output of SAP 2005 software summarising all
Worksheet relevant As Built construction data and the emissions
calculated by SAP 2005 for the dwelling As Built.
Assessor Site This is a report prepared by the Code assessor during
Inspection Report a Post Construction Stage Assessment and issued as
evidence with the assessment.
Building Regulations Checklist illustrated in AD L1A Appendix A. This is also
Compliance Checklist provided as an output of SAP 2005 software detailing
a dwelling’s performance against a set of key criteria.
Assessed on a ‘PASS’ or ‘FAIL’ basis, all criteria must be
met for the dwelling to meet full AD L1A compliance.
This document may be sent to Building Control at design
stage to demonstrate L1A compliance and again at
completion. The DER that is to be used for Code levels
1 to 5 and the TER that is to be used for all Code Levels
should be taken from this Checklist.
DER The Dwelling Emission Rate is the estimated carbon
dioxide emissions per m2 for the building, as designed,
for energy in use for heating, hot water and lighting.
This is calculated using the SAP method, and is defined
in AD L1A of the Building Regulations. The DER is shown
on the Building Regulations Compliance Checklist.
N.B. The DER is determined by using the assumed
amount of dedicated energy efficiency lighting of 30
per cent. This means that the DER should be used for
all Code Levels from 1 to 5. However, for Code Level 6,
the Design Stage SAP 2005 Worksheet, CO2 emissions
figure, (SAP Line 109), should be used as this accounts
for the actual number of dedicated energy efficient
lighting that will be installed.
Design Stage SAP 2005 An output of SAP 2005 software summarising all
Worksheet * relevant design stage construction data and the
emissions calculated by SAP 2005 for the dwelling as
designed.
44 | Code for Sustainable Homes
Utilities Location Maps This is a map provided by a utility company which will
show the location of locally available services such as
mains gas and electricity.
If the development has a choice of services and no
clear justification for the choice of fuel is provided,
the measured improvement of DER over TER must be
reassessed using a base case property with mains gas as
the primary fuel.
Zero Carbon Home Where net carbon dioxide emissions resulting from
ALL energy used in the dwelling are zero or better.
This includes the energy consumed in the operation
of the space heating/cooling and hot-water systems,
ventilation, all internal lighting cooking and all electrical
appliances, these are now dealt with under Section 14
SAP 2005 extension for SDLT. The calculation can take
account of contributions from onsite renewable/low
carbon installations. Zero Carbon homes with the Code
can also take advantage of the allowance with Section
14 to omit the requirement for secondary heating where
applicable.
Off-site renewable contributions can only be used where
these are directly supplied to the dwellings by private
wire arrangement.
Dwellings must meet the minimum mandatory energy
requirements for Level 5. This means that emissions as
calculated by SAP, including the contribution from any
special cases, should be zero or better.
A ‘zero carbon home’ is also required to have a Heat
Loss Parameter (covering walls, windows, air tightness
and other building design issues) of 0.8 W/ m2K or
less, and net zero carbon dioxide emissions from use of
appliances and cooking in the homes (i.e. on average
over a year). SAP does not contain any provision for
energy consumption of appliances but is likely to be
updated to do so in due course. Until SAP is updated,
the appliances and cooking element of the qualification
will be calculated using the formula in the calculation
procedures to approximate the average appliance and
Code for Sustainable Homes | 47
Assessment Methodology
Design Stage
• Confirm that the SAP 2005 Worksheets and Building Regulation Compliance
Checklist are from an accredited energy assessor/Part L ‘competent person’.
• Documentation provided by a non-authorised SAP 2005 energy assessor/Part L
‘competent person’ must have been verified by Building Control and evidence
of this must be supplied before any assessment can take place.
• Confirm that each Energy Type or Group meets full Building Regulations
compliance using the relevant Compliance Checklist: Design Stage. Note: All
criteria must ‘PASS’.
• Calculate the percentage improvement in DER over TER for each Energy Type,
using the methodology detailed in the Calculation Procedures section below.
• When creating the base case TER for calculating percentage improvement
the most appropriate fuel use available for the development must be used.
To demonstrate that this has been carried out, the choice of services to the
development must be supported by drawings indicating the location of utility
services, such as mains gas and electricity, in the vicinity of the proposed site.
If there is a choice of services and there is no clear justification for the choice of
fuel selected to service the development, or if no justification is provided, the
measured improvement of DER over TER must be reassessed using a base case
property with mains gas as the primary fuel.
• Where buildings contain multiple flats/apartments, averaging may be carried
out in accordance with the criteria in the Definitions section.
• For dwellings with energy systems not currently covered under SAP 2005 such
as large scale wind power and / or systems please refer to Special Cases.
• Level 6: Where the dwelling exceeds the percentage improvement of DER
over TER of 100 per cent, calculate the total carbon emissions (including that
required for appliances and cooking), as for ‘zero carbon home’ below (see
Calculation Procedures). Confirm that all renewables comply with the definitions
above. Confirm that the heat loss parameter requirements are not exceeded.
48 | Code for Sustainable Homes
Calculation Procedures
All of the SAP line number references stated in the following calculation procedures
refer to the actual SAP line numbers as detailed in SAP 2005: The Governments
Standard Assessment Procedure for energy rating of dwellings. The SAP 2005
document can be found at http://projects.bre.co.uk/sap2005/
There are a number of spreadsheet tools provided which will assist in the calculation
of the emissions from the dwelling and percentage improvement of DER over TER.
These will be distributed from Code Service Providers and can also be found at
http://projects.bre.co.uk/sap2005/stamp-duty-land-tax.html. However the calculation
can be carried out manually as set out in this section, Calculation Procedures.
Use the Code Energy Calculation Tool to enter the floor area, DER, TER and HLP for
each Energy Type. Where a building contains multiple dwellings and the averaging
option has been selected, state which Energy Types belong to the same Energy
Group.
Use Table 1.2 in Checklists and Tables to calculate the total predicted CO2 emissions
for Code Levels 1–5 and use Table1.3 in Checklists and Tables to calculate the total
predicted CO2 emissions for Code Level 6 dwellings.
Figures used for the calculations of the total predicted CO2 emissions are based on
the output from SAP 2005 worksheets.
% reduction Level
>10 1
>18 2
>25 3
>44 4
>100 5
If the percentage reduction is >100 and in addition the criteria for zero carbon
homes are met, Level 6 is awarded for Ene 1.
Table : Cat 1.2 Total Dwelling CO2 Emissions for Code Levels 1 – 5
Table : Cat 1.3 Total Dwelling CO2 Emissions for Code Level 6
__ For Code levels 1–5 (Table : Cat 1.2); The DER will be used as the combined
figure for the heating, hot water, lighting, pumps and fans
[1]. For Code Level 6 (Table: Cat 1.3); Please follow the procedure set out in SAP
Section 14 to obtain the dwellings Net CO2 emissions. This can be found at:
http://projects.bre.co.uk/sap2005/stamp-duty-land-tax.html
Where TFA is the Total Floor Area and N is the Number of Occupants
[2]. Mechanical cooling is currently not dealt with under SAP 2005. If mechanical
cooling is specified, it will need to be estimated separately. Contact your
Code Service Provider for further guidance.
[3]. The CO2 emissions factor to be used for electricity displaced from the grid is
0.568 kgCO2/kWh (SAP 2005).
[4]. Where energy and LZC technologies service other users (e.g. mixed use
developments), both the thermal and electrical output should be allocated
between all users in relation to their proportional net floor area.
If the SAP 2005 SDLT calculator is used then these figures can be found in
line ZC 6.
Special Cases
Photovoltaic (PV) panels in buildings with multiple dwellings
In the case of a building containing more than one dwelling, eg a block of flats,
then:
a) if the PV output goes to particular individual flats, the annual output is
credited to the flats concerned
b) otherwise, the total electricity generated is divided amongst all the flats in the
block in proportion to their net floor area including cases where the PV arrays
serve only communal areas.
In case b) there will usually be a single inverter for the total PV array and the
electricity generated will be fed to the landlord supply and/or the distribution
system for the flats (with provision for the export of electricity generated in excess
of instantaneous demand).
52 | Code for Sustainable Homes
Large-scale wind turbines over 50 kW and some other more unusual renewable
systems are not currently dealt with under SAP 2005.
For wind power, it is suggested that the calculation method which can be found
on the GreenSpec website (http://www.greenspec.co.uk/html/energy/windturbines.
html) should be used. However, the wind speed should be replaced by the one
calculated using the standard that has been developed for the Microgeneration
Certification Scheme. This guidance can be found in document MIS3003 (Appendix
B) and can be accessed via the website www.ukmicrogeneration.org.
For some other types of renewables please refer to the SAP Appendix Q website
(see http://www.sap-appendixq.org.uk). This provides guidance on how to
incorporate the energy performance of new technologies as well as evaluating
advanced versions of existing technologies so that they can be included in SAP
assessments.
Background
CO2 has a direct environmental impact and is a major greenhouse gas, contributing
to climate change. The credit scale relates to the operational energy requirements of
the home under standard occupancy assumptions – rather than actual energy use. It
should be noted that the actual energy consumption may be markedly different, as
a range of user-specific issues will affect it, such as the hours of operation of space
heating, type and size of household, use of white goods, etc.
The following Energy Saving Trust standards can give an indication of what is
required to meet certain Mandatory Levels for this Issue.
• Level 1: Good Practice Standard – 10 per cent improvement of DER over TER
• Level 3: Best Practice Standard – 25 per cent improvement of DER over TER.
The Code for Sustainable Homes does not intend to reward technologies that work
against the objectives of the scheme. Hence, the future revisions to the Code will be
aligned with revisions to Part L of the Building Regulations; minimum standards of
fabric performance and air tightness are also likely to be introduced.
54 | Code for Sustainable Homes
Aim
To future proof the energy efficiency of dwellings over their whole life by limiting
heat losses across the building envelope.
Assessment Criteria
Credits are awarded based on the Heat Loss Parameter (HLP) for each dwelling,
in accordance with the table below:
Criteria
<1.30 1
<1.10 2
Default Cases
None
AND AND
AND
OR
Definitions
Accredited Energy Refer to Ene 1
Assessor/Part L
‘Competent Person’
Heat Loss Parameter The total fabric and ventilation heat losses from the
(HLP) dwelling divided by the total floor area (W/m2K).
Assessment Methodology
Design Stage
• Confirm that the Design Stage SAP 2005 Worksheets and Building Regulation
Compliance Checklist are from an Accredited Energy Assessor/Part L
‘Competent Person’.
• Documentation provided by a Non-Accredited Energy Assessor/Part L
‘Competent Person’ must be verified by Building Control. Evidence of this must
be supplied before any assessment can take place.
• Confirm that the SAP 2005 Worksheets are the correct version, i.e. Design
Stage.
• Take the relevant HLP figure(s) from box 38 of the SAP 2005 Worksheet for
each Energy Type and award credits accordingly.
• Where buildings contain multiple flats/apartments, the Code Energy Calculator
Tool or other appropriate calculations can be used to carry out averaging of HLP
figures in accordance with the Energy Averaging criteria stated in the Definitions
section.
Calculation Procedures
See Ene 1
Special Cases
None
Background
This credit assesses the thermal performance of the building envelope on its own.
Although innovative systems for provision of services to the building may reduce the
energy consumption, it is the building envelope that can have the most significant
long-term effect, as the envelope is unlikely to be radically altered during its life,
other than where extensions are added.
The Heat Loss Parameter is a statistic that combines the impact of both external
surface area, insulation value of construction and airtightness. Rewarding a lower
value for Heat Loss Parameter encourages the design of efficient built form such as
flats and terraces as well as increased levels of insulation and airtightness.
Further information on reducing the energy use in buildings to the point at which
almost no energy is used in heating, known as the ‘PassivHaus’ concept can be found
in the References and Other Sources of Information sections.
58 | Code for Sustainable Homes
Aim
To encourage the provision of energy efficient internal lighting, thus reducing the
CO2 emissions from the dwelling.
Assessment Criteria
Credits are awarded for the provision of fixed dedicated energy efficient internal light
fittings as follows:
Criteria
Credits
Where >40% of fixed internal fittings are dedicated and energy efficient. 1
Where >75% of fixed internal fittings are dedicated and energy efficient. 2
Default Cases
None
Code for Sustainable Homes | 59
OR
Definitions
Dedicated Energy Fittings that comprise the lamp, base, control gear,
Efficient Light Fittings and an appropriate housing, reflector, shade or
diffuser. The fitting must be dedicated in that it must
be capable of only accepting lamps having a luminous
efficacy greater than 40 lumens per circuit Watt. The
fixing must be permanently fixed to the ceiling or
wall. A light fitting may contain one or more lamps.
Habitable Rooms For the purpose of this issue the following should be
considered habitable rooms:
Pin Based Compact A type of fluorescent lamp that plugs into a small
Fluorescent Lamp (CFL) dedicated lighting fixture. CFLs have a longer
rated life and use less electricity than conventional
incandescent light bulbs. Conventional Bayonet or
Screw (Edison) CFL fittings are not acceptable under
the Code.
Assessment Methodology
Design Stage
• Check that the energy efficient light fittings to be supplied are dedicated fittings
and that the luminous efficacy is greater than 40 lumens per circuit Watt
• Express the quantity of fixed dedicated energy efficient light fittings within
habitable rooms as a percentage of the total number of fixed light fittings
within habitable rooms.
Calculation Procedures
None
Special Cases
Any fitting that consumes less than 5 W may be excluded from this issue. This is to
allow for the specification of innovative light sources, such as LEDs.
Background
The Building Regulations England and Wales, Part L1A requires fixed dedicated
energy efficient light fittings to be installed in the most frequented locations in the
dwelling to a number not less than one per 25m2 floor area or one per four fixed
light fittings.
62 | Code for Sustainable Homes
Under SAP 2005, 30 per cent of the internal lighting is assumed to be low energy
by default. The Code for Sustainable Homes requires a greater amount of fixed low
energy light fittings to be installed for additional credits to be awarded. All internal
fixed light fittings are assessed in this Issue.
Aim
To provide a reduced energy means of drying clothes.
Assessment Criteria
Credits are awarded based on the provision for drying space for each dwelling type in
accordance with the table below:
Criteria
Credits
Where space with posts and footings or fixings capable of holding 4m+ of drying line for 1–2 1
bed dwellings, and 6m+ of drying line for 3+ bed dwellings, is provided for drying clothes.
The space (internal or external) should be secure.
Default Cases
None
64 | Code for Sustainable Homes
Definitions
Internal Drying Space A heated space with adequate, controlled ventilation,
complying with Building Regulations Approved
Document F Ventilation 2006.
OR
Assessment Methodology
Design Stage
• Check that internal or external drying spaces are to be provided and are of
adequate and secure provision.
• Confirm the location and type of the drying fixings/footings or posts.
Calculation Procedures
None
66 | Code for Sustainable Homes
Special Cases
None
Background
This credit Issue was introduced to encourage the drying of clothes ‘naturally’ rather
than using a tumble dryer. It has become increasingly common practice to include
a place for a tumble dryer without necessarily attempting to design in a space for
natural drying. This Issue is especially important for those dwellings without a large
garden.
Ventilation for indoor spaces supplied with drying fixings should conform to the
recommendations of Energy Savings Trust and will depend on the air tightness
strategy.
Code for Sustainable Homes | 67
Aim
To encourage the provision or purchase of energy efficient white goods, thus
reducing the CO2 emissions from appliance use in the dwelling.
Assessment Criteria
Credits are awarded where information is provided relating to the provision of
energy efficient white goods, or where energy efficient white goods are supplied in
accordance with the criteria in the table below for each dwelling:
Criteria
Credits
Where the following appliances are provided and have an A+ rating under the EU Energy 1
Efficiency Labelling Scheme:
Where the following appliances are provided and have an A rating under the EU Energy 1
Efficiency Labelling Scheme:
• Where washer-dryers or tumble dryers are not provided, information on the EU Energy
Labelling Scheme is provided to each dwelling where this is the case
Note: Where washer dryers are provided it is not necessary to provide a washing machine to
obtain this credit
If no (or not all) white goods are provided but information on the EU Energy Efficiency 1
Labelling Scheme of efficient white goods is provided to each dwelling where this is the case
Default Cases
None
68 | Code for Sustainable Homes
Definitions
EU Energy Efficiency The EU energy label rates products from A (the most
Labelling Scheme efficient/least energy used) to G (the least efficient/most
energy used). For refrigeration, the scale now goes up to
A++. By law, the label must be shown on all refrigeration
and laundry appliances, dishwashers, electric ovens and
light-bulb packaging at point of sale.
Assessment Methodology
Design Stage
• Check that the specification for white goods meets the credit requirements or
that information as detailed is to be provided.
Calculation Procedures
None
Special Cases
None
70 | Code for Sustainable Homes
Background
For a typical new (Part L 2006) semi-detached dwelling, the CO2 emissions from lights
and appliances will make up about 43 per cent of the total CO2 emissions. Emissions
from lights and appliances (including cooking) are now higher than both space and
water heating emissions. In such a typical semi, space heating would account for
26 per cent of the CO2 emissions, water heating 22 per cent and cooking 9 per cent.
The choice of appliances will therefore play an important role in terms of reducing
total CO2 emissions. Up to 190kg per year of CO2 can be saved by each household for
choosing an energy efficient fridge freezer compared to a more ‘traditional’ model.
This equates to a monetary saving of around £35 a year.
Lights and appliances represent the area of greatest growth in residential energy use.
Over the past 30 years energy use for lights and appliances has increased at around
2 per cent per annum.
There is increasing likelihood that when occupants choose their own white goods
they will consider the energy consumed during use, especially for products of equal
cost. To encourage them to do so, the developer must provide information to help
the occupier to select the most energy-efficient and cost-effective appliances, where
no white goods are provided.
Code for Sustainable Homes | 71
Aim
To encourage the provision of energy efficient external lighting, thus reducing CO2
emissions associated with the dwelling.
Assessment Criteria
Where all external lighting within the development is provided by dedicated energy
efficient fittings, as follows:
Criteria
Credits
Space Lighting
Where all external space lighting, including lighting in the common areas, is provided by 1
dedicated energy efficient fittings.
Note: Statutory safety lighting is not covered by this requirement
Security Lighting
Where all security light fittings are designed for energy efficiency and are adequately 1
controlled such that:
All burglar security lights have:
Default Cases
If no security lighting is installed, then the security lighting credit can be awarded by default, 1
provided all the conditions of the first issue covering space lighting have been met.
Dual lamp luminaires with both space and security lamps can be awarded both credits 2
provided they meet the above criteria for energy efficiency
72 | Code for Sustainable Homes
OR
OR
Definitions
Control systems A method for controlling the external lighting to ensure
that it will not operate unnecessarily during daylight
hours or when a space is unoccupied.
Dedicated energy Fittings that comprise of the lamp, base, control gear
efficient light fittings and an appropriate housing, reflector, shade or diffuser.
The fitting must be dedicated in that it must be capable
of only accepting lamps having a luminous efficacy
greater than 40 lumens per circuit Watt.
Tubular fluorescent and compact fluorescent lighting
fittings (CFLs) would typically meet this requirement.
Light fittings for GLS tungsten lamps with bayonet cap
or Edison screw bases, or tungsten halogen lamps would
not comply.
Metal Halide Lamp Metal halide lamps are a type of high intensity discharge
lamp. They can be specified in varied environments.
These lamps combine good colour rendering with high
luminous efficacy and long life.
Movement Detecting A type of motion detector that uses infra red radiation to
Devices (PIR) detect movement and switches lighting on.
Pin Based Compact A type of fluorescent lamp that fits into a dedicated
Fluorescent Lamp lighting fixture. CFL’s have a longer rated life and use
(CFL) less electricity than conventional incandescent light
bulbs. Conventional Bayonet or Screw (Edison) fitting
CFLs are not acceptable under the Code.
Time switch A switch with an inbuilt clock which will allow lighting to
be switched on and off at programmed times.
Tubular Fluorescent A type of fluorescent lamp that is named after its shape.
Lamp (TFL) These lamps have their own range of dedicated fittings
and have a longer rated life and use less electricity than
conventional incandescent light bulbs.
Assessment Methodology
Design Stage
• For houses, fittings serving the following areas should be included in the
assessment of space and security lighting:
External door, front porch, steps/pathways, patio, garage, garden, carports and
any other outbuildings.
• For flats, fittings serving the following areas should be included in the
assessment of space lighting:
Communal lobbies, main external entrances, internal entrance porches, external
steps and pathways.
These areas should be equipped with dedicated fluorescent fittings (or other
efficient luminaires like SON or metal halide) and should be controlled by a time
clock or daylight sensor.
• Hallways, landings, stairwells, internal corridors and garages should be equipped
with dedicated fluorescent fittings that are controlled by push button time
switches/PIR sensors or equivalent.
• Specific communal rooms (laundries, cycle and other storage spaces etc) should
be equipped with dedicated fluorescent fittings and manual switching or
occupant sensors.
Calculation Procedures
None
Code for Sustainable Homes | 75
Special Cases
Where a site is redeveloped and existing external lighting remains, the lighting that
is retained has to comply with the requirements of the issue. Replacement of the
fittings may be necessary.
Any fitting that consumes less than 5 W may be excluded from this issue. This is to
allow for the specification of innovative light sources, such as LEDs.
Background
The requirement is to provide energy efficient lighting that is adequately controlled to
minimise energy consumption.
Intruder security lighting for domestic use is normally fitted with halogen or bright
tungsten luminaires. Whilst these are not particularly energy efficient, there are few
alternatives. In view of this, the main objective is to ensure that appropriate wattage
fittings are installed to avoid over-specification.
The current Building Regulations in England, Part L1A 2006, requires fixed external
lighting i.e. lighting fixed to an external surface of the dwelling, to be either fixed
low energy light fittings or, for security lighting, max 150 W with PIR and daylight
cut off sensors. However, garage lighting, lighting on outbuildings, security lighting,
feature lighting or lighting in communal areas in blocks of flats is not covered. In
addition, this type of lighting is not included in the SAP calculation and associated
DER, which is why this component of external lighting is covered under by the Code
for Sustainable Homes.
76 | Code for Sustainable Homes
Aim
To reduce carbon emissions and atmospheric pollution by encouraging local energy
generation from renewable sources to supply a significant proportion of the energy
demand.
Assessment Criteria
Credits are awarded based on the percentage reduction in total carbon emissions
that result from using Low or Zero Carbon (LZC) Energy Technologies for each
dwelling using the calculation method detailed in Calculation Procedures, with credits
awarded as detailed below:
Criteria
Credits
Where energy is supplied from local renewable or low carbon energy sources funded under
the Low Carbon Building Programme (or similar), or is designed and installed in a manner
endorsed by a feasibility study prepared by an independent energy specialist
AND
There is a 10 per cent reduction in carbon emissions as a result of this method of supply. 1
OR
There is a 15 per cent reduction in carbon emissions as a result of this method of supply. 2
Default Cases
None
Code for Sustainable Homes | 77
For LZC technologies and fuels not For LZC technologies and fuels not
currently covered by SAP 2005 and Land currently covered by SAP 2005 and Land
Duty Stamp Tax relief tools: Duty Stamp Tax relief tools:
Definitions
Accredited external These are renewable energy schemes located offsite
renewables which:
• Are accredited renewables (as defined by the
Energy Act 2004). These will be Renewable Energy
Guarantee of Origin (REGO) certified
• Create new installed generation capacity, designed
to meet the loads of the dwelling (i.e. not just units
of carbon)
• Are additional to capacity already required under the
Renewables Obligation
Note: Some ESCO’s achieve these requirements.
Life cycle impact This is the requirement to look at the carbon balance
of each technology over its whole life. This encourages
people to not just consider the savings or emissions
over its operational life but also the savings or emissions
over the whole life of the technology (from ‘cradle
to grave’), therefore reflecting the fact that different
technologies have different life spans.
Low or Zero Carbon The following Low and Zero Carbon Emission
Technologies Technologies may be considered:
• Solar:
Solar Hot Water
Photovoltaics
• Water:
Small scale hydro power
• Wind:
Wind turbines
• Biomass:
Biomass single room heaters/stoves
Biomass boilers
Biomass community heating schemes where the
majority of heating comes from biomass
• Combined Heat and Power (CHP) and micro CHP for
use with the following fuels:
natural gas
biomass
sewerage gas and other biogases
• Community heating, including utilising waste heat
from processes such as large scale power generation
where the majority of heating comes from waste heat
Code for Sustainable Homes | 81
• Heat Pumps:
Ground source heat pumps (GSHP)
Geothermal heating systems
• Other:
Fuel cells using hydrogen generated from any of the
above ‘renewable’ sources.
‘Standard’ case SAP Please note that the ‘Standard’ case SAP worksheet
worksheet is to be produced separately to the ‘Actual’ SAP
worksheet.
In order to facilitate the production of a ‘Standard’ case
SAP worksheet, the ‘Standard’ case worksheet can
be submitted as a document with a Draft status from
commercially available SAP software.
The ‘Standard’ case includes the minimum space and
water heating services as set out in the Domestic
Heating Compliance Guide, and are as follows:
• Primary Heating Fuel (space & water) – Mains Gas
• Boiler: SEDBUK 86 per cent, room-sealed, fanned
flue
• Secondary space heating: Electric heater assumed
• Cylinder volume: 150 litres
• Maximum permitted cylinder loss: 2.62kWh/day
• Primary Pipework: Insulated
• Space Heating Control: Programmer, roomstat, and
TRV’s
• Hot water Control: Boiler interlock, cylinder
thermostat, separate water control
All other input values for the Standard case SAP
calculation will be the same as for the actual dwelling.
The standard case’s emissions (i.e. the DER) shall equal
the Target Emissions Rate (TER) for the actual dwelling.
Whole life cost The whole-life costs of a facility are the costs of
acquiring it
(including consultancy, design and construction costs,
and equipment), the costs of operating it and the
costs of maintaining it over its whole life through to its
disposal; i.e. the total ownership costs.
These costs include internal resources and departmental
overheads, where relevant; they also include risk
allowances as required; flexibility (predicted alterations
for known change in business requirements, for
example), refurbishment costs and the costs relating to
sustainability and health and safety aspects.
Code for Sustainable Homes | 83
Assessment Methodology
Design Stage
• Calculate the total reduction in carbon emissions resulting from using LZC
technologies using Table Cat:1.4.
• Provided that there is a direct supply to the dwelling when there is a demand,
any surplus electricity from a local LZC source may be exported to the National
Grid. The exported electricity may be included in this calculation as if it were
consumed within the dwelling/development.
• Confirm that renewables are accredited.
Calculation Procedures
Use Table Cat 1.4 in Checklists and Tables to calculate the percentage reduction in
CO2 emissions.
Figures used for the calculations of the percentage of energy provided by LZC
technologies are based on the output from SAP 2005 worksheets.
Systems assessed with Section 12a of SAP Systems assessed with Section 12b of SAP KWh/year Carbon emissions Emissions Kg
supplied factor (from SAP 2005) CO2/year
– individual heating systems – community heating systems with CHP
– community heating without CHP – heat recovered from power stations
(A) (B) (C)=(A)3(B)
1 CO2 emissions from heating and hot water from CO2 emissions from heating and hot water from [1]
Standard case SAP Worksheet Standard case SAP Worksheet
84 | Code for Sustainable Homes
2 CO2 emissions for fans and pumps from Standard CO2 emissions for fans and pumps from Standard [1]
case SAP Worksheet case SAP Worksheet
[SAP Line 108] [SAP Line 114*]
3 CO2 emissions from lighting from Standard case CO2 emissions from lighting from Standard case [1]
SAP Worksheet SAP Worksheet
[SAP Line 109] [SAP Line 116* ]
5 Code Level 6 only – CO2 emissions from appliances and cooking [3]
7 CO2 emissions for fans and pumps from As Built CO2 emissions for fans and pumps from As Built
SAP Worksheet SAP Worksheet
[SAP Line 108] [SAP Line 114*]
8 Reduction in CO2 emissions for pumps and fans from LZC systems in As Built dwelling [4]
(2 – 7)
9 CO2 reduction from Electricity generated by LZC CO2 reduction from Electricity generated by LZC [6] [5]
technologies considered in SAP 2005 technologies considered in SAP 2005
[SAP Line 110* – SAP line 118*] [SAP Line 117* – SAP line 118*]
continued
Table : Cat 1.4: LZC Contribution and CO2 Savings
Systems assessed with Section 12a of SAP Systems assessed with Section 12b of SAP KWh/year Carbon emissions Emissions Kg
supplied factor (from SAP 2005) CO2/year
– individual heating systems – community heating systems with CHP
– community heating without CHP – heat recovered from power stations
(A) (B) (C)=(A)3(B)
10 CO2 reduction from Electricity generated by LZC technologies not considered in SAP 2005. [6] [5]
[(SDLT calculator Line ZC 6 ) 3 (SAP Line5)] [7]
11 CO2 reduction from Hot Water generated by LZC technologies considered in SAP 2005 [5]
[SAP Line 50] [6]
[1] Air-Heating hot water lighting, pumps and fans from SAP 2005 Worksheet
[2] Air-conditioning is currently not dealt with under SAP 2005. If air-
conditioning is specified, it will need to be estimated separately. Contact the
scheme operator who will provide further information on how to proceed.
[5] Carbon emissions factor (SAP 2005) to be used. The most common are listed
below. Please see SAP table 12 for further details.
[6] Where renewable sources service other users (e.g. mixed use developments).
The outputs should be allocated between all users in proportion to their net
floor area.
[7] As determined in a separate feasibility study. The common LZC technologies
not yet considered in SAP 2005 include:
If the SAP 2005 SDLT calculator is used then these figures can be found in
line ZC 6.
The energy generated from any renewable energy must first of all be made
available to all of the dwellings. For example, where electricity is generated from
LZC technologies the energy requirements of the dwelling, dwellings or communal
areas must first be satisfied before any surplus generation can be exported to the
national grid.
The excess CO2 savings generated from the energy supply from an initial or earlier
phase of the development cannot be used to contribute towards the emissions of a
later phase of the development.
Special Cases
Photovoltaics in buildings with multiple dwellings
In the case of a building containing more than one dwelling, eg a block of flats,
then:
a) if the PV output goes to particular individual flats, the annual output is credited
to the flats concerned
b) otherwise, the total electricity generated is divided amongst all the flats in the
block in proportion to their net floor area.
In case b) there will usually be a single inverter for the total PV array and the
electricity generated will be fed to the landlord supply and/or the distribution
system for the flats (with provision for the export of electricity generated in excess
of instantaneous demand).
Background
The use of zero and low emission energy sources will not only lead to reduced
emissions of greenhouse gases and other pollutants, but will also help to conserve
the finite global fossil fuel resources and develop a market for such technologies.
The government has set a target that 20 per cent of energy in the UK should be
generated from renewable sources by 2020. The greater the number of individual
buildings that obtain 10 per cent or more of their energy from renewable sources,
the easier this target will be to achieve.
This credit rewards energy efficient design in addition to the inclusion of renewable
energy technology. Supplying energy efficient buildings with 10 per cent of their
energy demand from zero or low carbon sources will be easier than for less energy
efficient buildings since their total demand is lower.
88 | Code for Sustainable Homes
Aim
To encourage the wider use of bicycles as transport by providing adequate and secure
cycle storage facilities, thus reducing the need for short car journeys.
Assessment Criteria
Credits are awarded where adequately sized, safe, secure, convenient and weather-
proof cycle storage is provided for each dwelling in accordance with the following
criteria:
Criteria
Credits
Where either individual or communal cycle storage is provided that is adequate, safe, secure,
convenient and weather-proof (as defined in Relevant Definitions below) for the following
number of cycles:
Studios or 1 bedroom dwellings – storage for 1 cycle for every two dwellings 1
2 and 3 bedroom dwellings –- storage for 1 cycle per dwelling
4 bedrooms and above –- storage for 2 cycles per dwelling
OR
Studios or 1 bedroom dwellings – storage for 1 cycle per dwelling 2
2 and 3 bedroom dwellings – storage for 2 cycles per dwelling
4 bedrooms and above – storage for 4 cycles per dwelling
Default Cases
None
Code for Sustainable Homes | 89
AND
* or a letter of instruction to a
contractor/supplier or a formal letter
from the developer to the Code assessor
giving the specific undertaking
90 | Code for Sustainable Homes
Definitions
Adequately sized Cycle The minimum storage area required to store cycles
storage on the floor, defined by the New Metric Handbook
which includes space to allow the cycles to be moved
independently.
• 1 cycle: 2m long 3 0.75m wide
• 2 cycles: 2m long 3 1.5m wide
• 4 cycles: 2m long 3 2.5m wide
OR
Where a proprietary storage or hanging system is
provided, the space requirements are flexible but
the system must allow each cycle to be removed
independently and meet all other criteria.
Where cycle storage is provided in a shed a minimum
of 1m2 is required for garden tools (in addition to the
above dimensions). The shed should be set on a concrete
foundation and secure fixing needs to be provided.
Where cycle storage is provided in a garage, adequate
space must be provided to store both the bicycle(s) and
the car(s) at the same time.
For double garages, it must be assumed that each
garage space is occupied by a car. Storage areas above
should be added to the typical minimum garage sizes
below:
• 2.4m 3 4.9m for a single garage; and
• 5m 3 5.2m for a double garage
Convenient access Easy and direct access from/to the dwelling(s) and from/
to the cycle store to a public right of way.
Access from the store to public right of way through the
dwelling is not acceptable i.e. where cycles are stored in
a shed in the back garden in a mid-terraced home and
there is no back garden gate.
Communal cycle store(s) should be located within 100m
(from the front door or the main entrance to a block of
flats).
If for strategic reasons outside the control of the
developer the store cannot be located within the
required distance, exceptions to the rule may be
allowed. Full details must be provided and BRE the Code
Service Provider consulted prior to awarding credits.
Code for Sustainable Homes | 91
Secure Fixing A steel fixing set in concrete (or similar solid foundations/
hardstanding) to manufacturer’s instructions, which
allows both the wheel and frame to be locked securely.
An example of a secure fixing would be the ‘Sheffield’
type frame.
Assessment Methodology
Design Stage
• Check that the proposed cycle store provided is of sufficient size, convenient,
secure and weather-proof.
92 | Code for Sustainable Homes
Calculation Procedures
None
The provision of for folding cycles stored within the dwelling, would not achieve the
credit. Folding cycles would be a temporary provision whereas the provision of cycle
storage is a permanent feature.
Special Cases
None
Background
The majority of all car journeys made are less than five miles. One viable alternative
for those journeys is the bicycle. This will not only reduce air/noise pollution and
provide more space on the streets, but also improve the health and fitness of the
cyclist. In order to make cycling a practical alternative, people need somewhere
convenient and safe to store their bicycles when they are at home. The Code
therefore encourages the developer to provide such a space.
Code for Sustainable Homes | 93
Aim
To reduce the need to commute to work by providing residents with the necessary
space and services to be able to work from home.
Assessment Criteria
Credits are awarded on the basis of the provision of space and services that enable a
room to be used effectively as a home office.
Criteria
Credits
Where sufficient space and services (as defined below) have been provided which allow the 1
occupants to set up a home office in a suitable quiet room.
Default Cases
None
94 | Code for Sustainable Homes
Definitions
Adequate Ventilation In all cases the room must have an openable window
with an openable casement of a minimum of 0.5m2.
A room with only an external door will not meet the
minimum requirements for adequate ventilation.
Sufficient services The following services must be provided in the suitable
room intended as a home office:
Sufficient space This is defined as the minimum size (1.8m wall length)
to allow a desk, chair and filing cabinet or bookshelf to
be installed, with space to move around the front and
side of the desk, use the chair appropriately and operate
the filing cabinet safely, (the 1.8m wall size requirement
can, in some circumstances, be altered if drawings can
prove that a desk can be fitted in any other type of
arrangement, i.e. alcove or similar, fulfilling all the above
criteria).
Assessment Methodology
Design Stage
• Check that the drawings and specification provide the required services
described above.
Calculation Procedures
None
96 | Code for Sustainable Homes
Special Cases
None
Background
The number of self-employed people is increasing, as is the number of people who
work from home. Many job functions can readily be performed remotely, so it is quite
feasible for individuals to work from home (or elsewhere) on either a full or part time
basis. Currently there are 1.1 million people in the UK who have such non-traditional
work patterns. Information from social trends indicates that 29 per cent and 24
per cent of employed men and women respectively have, at some time, worked
from home. The benefits of working from home include reductions in transport
movements, increased time available for the home worker and greater opportunity to
participate within community activities.
Working from home for many people requires a telephone line as well as a
connection to the internet for data transference and even video conferencing. Two
telephone points or broadband will enable residents to use the telephone and the
computer at the same time.
Code for Sustainable Homes | 97
Category 2: Water
Issue ID Description No. of credits Mandatory
available Elements
Wat 1 Indoor water use 5 Yes
Aim
To reduce the consumption of potable water in the home from all sources, including
borehole well water, through the use of water efficient fittings, appliances and water
recycling systems.
Assessment Criteria
Up to 5 credits are available for performance which reduces the amount of
potable water used in the dwelling. There are minimum mandatory performance
requirements for achieving all levels of the Code. The minimum mandatory
requirements begin at level 1 increasing at level 3 and again at level 5. Credits are
available for all the indoor potable water performance levels required in the Code.
They are awarded according to the predicted average water consumption calculated
using the Code Water Calculator (see Calculation Procedures). The table below gives
the details.
Criteria
Default Cases
None
98 | Code for Sustainable Homes
• Location, details and type of appliances As design stage, but As Built versions
/ fittings that use water in the dwelling of drawings and specifications
including any specific water reduction including confirmation action
equipment with the capacity / flow was taken to avoid microbial
rate of equipment. This should include contamination.
confirmation that the hot and cold
water system will be designed to avoid OR
the risk of microbial contamination in
line with best practice. A letter from the developer confirming
the installed fittings and equipment,
• Location, size and details of any detailing their flow rates (including
rainwater and greywater collection whether flow restrictors have been
systems in the dwelling installed), capacity and other technical
specifications including confirmation
* or a letter of instruction to a contractor/ action was taken to avoid microbial
supplier or a formal letter from the contamination.
developer to the assessor giving a specific
undertaking AND
AND EITHER
OR
Definitions
Potable water Drinking quality water that is taken from a connection
to the main water supply in the dwelling, which may be
from the public water supply or from a private supply
such as from groundwater via a borehole.
Code Water Calculator A software tool which calculates the average water
consumption in litres per person per day from average
use factors based on WRc (Water Research Centre)
report, CP187, P6832, March 2005. This enables a
comparison to be made between a range of different
water fittings and appliances.
Rainwater recycling The appropriate collection and storage of rain from
hard outdoor surfaces for use instead of potable
water in WCs and/or washing machines. In some cases
rainwater could also be used to contribute towards
Wat 2 for irrigation and possibly large water consuming
fittings such as hot tubs or swimming pools. In such
cases, reference should be made to the relevant
definition for sufficient size, as set out in Wat 2.
Greywater recycling The appropriate collection, treatment and storage
of used shower, bath and tap water for use, instead
of potable water, in WCs and/or washing machines.
Greywater recycling systems normally collect used
shower, bath and tap water and recycle this for toilet
flushing.
Water reduction Fittings such as flow restrictors may be fitted in taps,
equipment showers and delayed inlet valves may be fitted in WCs.
100 | Code for Sustainable Homes
Dual Flush Cisterns Dual flush cisterns have the facility to provide part flush
volume for liquids and full flush volume for solids and
paper.
Flow Restrictors Flow restrictors contain precision-made holes or filters
to restrict flow and reduce the outlet flow and pressure.
They are typically fitted within the console of the tap or
shower heads, to pipework or at the mains inlet to the
dwelling.
Delayed Inlet Valves Delayed inlet valves prevent water entering the WC
cistern until it has completely emptied enabling a
precise volume of water to be discharged independent
of water pressure.
Ion Exchange Water Ion exchange water softeners remove the agents
Softeners causing hard water by passing water from the mains
through a resin. The resin must be regenerated
regularly. Regeneration may occur either at set time
intervals, or when a given volume of water has passed
through the resin. The water consumed during
regeneration depends on both hardness of the water
(this varies geographically) and the efficiency of the
water softener.
Assessment Methodology
Design Stage
The following list covers the main steps a Code assessor needs to address when
assessing internal water use.
• Calculate the water consumption for each dwelling using the water calculation
tables in Calculation Procedures or the Code Water Calculation Tool, available
from the Code service provider.
Note: Water consumption per person per day is highly variable. The water use
per person per day depends on the variation in the performance of appliances
and fittings. The Code Water Calculation Tool assumes a standard usage
pattern for each person (WRc, CP187, P6832, March 2005) determined by
typical water consumption by specified appliances and fittings.
• Where an appliance or fitting is not specified, assume the following building
regulations (Water Supply (Water Fittings) Regulations 1999) or default fittings:
– Regular taps for kitchen sink and wash hand basins (12 litres/minute)
– High flow shower (14 litres/minute)
– Standard bath (225 litre capacity to overflow)
– Typical use washing machine (49 litre/use)
Code for Sustainable Homes | 101
on the energy label. Photographic/site visit evidence is required for the Post
Construction Stage.
• Communal washing machines should also be included in the calculations by
assuming that each home has a washing machine installed, (i.e. 0.34 uses
per day per person). Exact water usage figures can be used in the Code
Water Calculation Tool, provided they are supported by the manufacturer’s
information (Design Stage) or photographic evidence (Post Construction Stage)
otherwise typical domestic figures can be used.
Calculation Procedures
Calculate the water consumption for each type of dwelling in accordance with the
tables and guidance below.
1
here no bidet is specified the proportion should be entered as zero.
W
2
Note the flow rate figure used in the calculation is either:
• 2/3 of the full flow rate declared by the manufacturer for each individual tap, or the full flow rate to the break
point for taps such as two-stage mixer taps
• Where the shower head delivers a range of flow rates, the average flow rate can be assumed
3
The number of uses per day for the bath and shower is set at the default of both a shower and bath being
provided at 0.6 uses for the shower and 0.4 uses for the bath. The number of uses per day can be amended
in the table where only either the bath or shower is provided with 1.0 use per day for the respective fitting
provided.
4
Please refer to the details below the notes for column 7 of the calculation procedure for details of how to
calculate the litres per use of the water softener. Where no water softener is provided, the proportion should be
entered as zero.
Code for Sustainable Homes | 105
Column [2] details the unit or flow rate of the installation type from manufacturers’
information or from default figures.
Column [3] relates to the capacity or flow rate of the installation type from
manufacturers’ information or from default figures where fittings have not been
specified.
For dual flush WC’s, the capacity of the cistern for both full and part flush should be
entered and then combined to predict the consumption (per person per day) for that
fitting. For example, a 6/4 dual flush WC would be calculated as follows:
Total 22.36
Where manufacturers’ information from the energy labels for specified dishwashers
and washing machines indicates lower water consumption than the ‘typical’ figure
(given in the table), the actual consumption can be entered.
Column [4] relates to the ratio per use and is based on the following:
WC: For dual flush WCs a flushing ratio of 1(full flush):2(part flush) is assumed. (This
equates to an average of 0.33 full flushes and 0.67 partial flushes per use).
Wash Hand Basin and Kitchen Sink Taps: The 0.67 factor for wash hand basin taps
and kitchen sink taps assumes the average time the taps are used is 40 seconds.
Shower: The factor 5.0 assumes an average shower lasts for five minutes.
Bath: The factor of 0.40 assumes that a typical bath involves filling a bath to 40 per
cent of its overflow capacity taking account of displacement and average use.
106 | Code for Sustainable Homes
Washing Machine, Dishwasher, Bidet and Water Softener: A factor of 1.0 is used for
these fittings as there is no volume or capacity per use factor required.
Column [5] refers to the proportion of each type of fitting supplied. For example, if
only one type of toilet is installed, the proportion of fittings throughout the house
should be 1 (100%). If two types of toilet are supplied (in a home with a total of two
WCs), the proportion for each type of toilet is 0.5 (representing 50 per cent each). In
this instance an additional row would need to be added to the above table.
Similarly, for wash hand basin or kitchen sink taps where there is a separate hot and
cold tap, the proportion for each tap is 0.5 with the total consumption for the wash
hand basin assumed as 50 per cent from each tap. For example where there is a 6
litre/minute and 4 litre/minute tap (maximum flow rate) provided on a wash hand
basin, here is how the consumption is calculated, including taking into consideration
the 2/3 of flow rate rule as detailed in the assessment procedure:
Total 17.66
Column [6] number of times the fitting is used per person per day (a constant).
Column [7] by multiplying together the capacity/flow rate (in litres or litres/minute),
the use factor, the proportion, and the number of uses per day, the total use for each
fitting per person per day is given in column [7] as follows:
Capacity or Flow rate [3] 3 Use Factor [4] 3 proportion [5] 3 number of uses per
day [6] = [7]
The water consumption figures for each fitting (litres/person/day) are then added
together to give the total predicted water consumption in (litres/person/day).
This final predicted water consumption is an estimate of how much water would
typically be used (per occupant per day), given the flow rates and capacities of the
water consuming devices specified. This is unlikely to equal actual consumption,
which is highly dependent on personal behaviour.
Code for Sustainable Homes | 107
Table : Cat 2.2 Calculation of total potable water needed from the mains, for internal use, taking
into account any grey – or rainwater recycling
Collection of Bath, shower and hand- Percentage of used water Greywater used
greywater washing basin usage [1] (normally bath, shower and [3] (l/person/day)
for WC (l/person/day) taps) to be recycled [2] (%)
flushing and
Washing →
Machines:
(a) (b) b (g)
a −
100
Final Water
Total Water Consumption
required from the (l/person/day)
mains:
→
f − g − h
Table 2 Notes
|1| Include only usage of these fittings from which water will be recycled. If
other sources, please amend as appropriate.
|3| The amount of greywater claimed for re-use must be equal to or less than
the amount of water required by the fittings using greywater. In some cases
additional capacity may be required from mains supply and this will be
indicated in the Code Water Calculation Tool.
|4| This is predominantly for rainwater recycling systems providing water for
internal use. Where the volume of rainwater collected is sufficiently in excess
of the internal demand, this may also be considered for Wat 2 – External
Potable Water Use. In this case reference should be made to the relevant
definition of sufficient size set out in Wat 2.
|5| The rainwater collection area is the area the rainwater is collected from. If the
water is collected from the roof, the collection area = the effective roof area
(BS EN 12056-3:2000).
|6| For the average rainfall in the UK see the map of Mean Annual Rainfall in
the UK in Checklist and Tables. It is recommended that site specific rainfall
figures should be used based on the average rainfall for the site. Site specific
figures can be obtained by contacting the Met Office.
|7| If no exact figures for the collection of rainwater can be provided, assume
60 per cent of the rainwater is collected for re-use. The following formula
should be used to determine the percentage of rainwater collected per
person. The number of occupants is determined by the number of bedrooms
in a dwelling with 2 occupants assumed for the master bedroom and 1
occupant for each additional bedroom.
* Where exact figures are to be used for the percentage collected, these
should be calculated in accordance with Guidance from BSRIA Technical Note
TN 7/2001 and CIRIA C539 Best Practice Guidance. The percentage collected
is dependent on the volume of tank, run-off coefficient, evaporation and
also losses due to filtration and overflow. Further guidance on the sizing of
rainwater systems is due to be published in BS8515 due in December 2008.
|8| The volume of rainwater collected per person per day is calculated from the
volume collected in m3 per year (e) + (d) + (e) which is then converted into
litres/person/day by multiplying by 1000 to convert to litres and dividing by
365 to convert to days.
This volume collected per person per day is then deducted from the total
predicted use of the fittings to use rainwater which cannot be greater than
the volume required by these fittings. In some cases, the volume of rainwater
collected may be less than the demand of the fittings supplied which may
require additional top-up from mains. In other cases the volume collected for
internal use may be greater than the demand which may indicate that excess
water is available for other fittings or for external use to contribute to Wat 2.
These cases will be indicated in the Code Water Calculation Tool.
Code for Sustainable Homes | 109
• The credit will not be awarded where requirements for provision of better than
typical practice white goods have only been set within tenancy agreements. It
is unlikely such a requirement would be enforced.
• The Code recognises only fixed fittings and fixtures such as dual-flush WCs
and flow restrictors. Devices which can be retrofitted to WCs such as cistern
displacement and flushing reduction are not recognised by the Code. Such
devices may provide reduced water use in existing dwellings, but they can be
easily removed.
Special Cases
Where an instantaneous water heater is specified / intended, problems may occur
when low flow rate taps are fitted as such systems vary in their trigger flow rates. In
such cases, confirmation should be sought that the specified fittings are compatible.
Background
Climate change may result in increased variability in weather patterns increasing both
the risk of flooding and extended dry spells. Water consumption is likely to become
an increasing national problem. Water is becoming more scarce at the same time as
population and demand for water is increasing., the development of practical ways to
reduce water demand is very important.
In the South East of England, water demand exceeds the volume licensed for
abstraction, with the shortfall being met from ground water. 20 per cent of the UK’s
water is used domestically with over 50 per cent of this used for flushing WC’s and
washing (source: Environment Agency). Most of which comes from drinking quality
standard or potable water.
The amount of potable water used within the dwelling can be reduced by using fixed
fittings which reduce water use in WC’s, taps and showers. Further reductions could
be achieved by installing greywater or rainwater collection and treatment systems.
Aim
To encourage the recycling of rainwater and reduce the amount of mains potable
water used for external water uses.
Assessment Criteria
One credit is awarded for providing a system to collect rainwater for use in irrigation
as follows:
Criteria
Credits
Where a correctly specified and sufficient sized system to collect rainwater for external/internal 1
irrigation use has been provided to a dwelling with a garden, patio or communal garden space
(examples of such systems include rainwater butts and central rainwater collection systems)
Default Cases 1
If no individual or communal garden spaces are specified or if only balconies are provided, the
credit can be awarded by default
112 | Code for Sustainable Homes
OR
AND
AND EITHER
OR
Definitions
Garden An area where irrigation is required, normally an
external space but may be an internal atrium. This may
be a private or communal space.
Mains potable water Drinking quality water that is taken from a connection
to the main water supply in the dwelling.
System to collect The collection and storage of rain from hard surfaces
rainwater (typically roofs) in order to replace the use of potable
mains water for external irrigation/watering.
Central rainwater A system which will collect and store rainwater for use
collection system across the development. This could be a large storage
tank or other form of surface water system.
Assessment Methodology
Design stage
• Check that the specifications and capacity of storage complies with the
assessment Criteria.
Calculation Procedures
1. Where rainwater is collected for irrigation for individual gardens, the size
requirements are calculated based on the number of bedrooms as defined
above in the definition of sufficient size. Once this has be determined, it
should then be confirmed whether the garden provided is made up entirely
of hard spaces or is provided as a terrace or patio. The size required may then
be adjusted and this should be in compliance the definition of sufficient size
defined above.
2. Where rainwater is collected for irrigation in communal gardens, the size
requirement are based on the size of communal garden provided in m2 as
detailed in the definition of sufficient size above. The size requirements can
be adjusted where the garden comprises of hard landscaping or where the
planting requires minimal water as defined in the definition of sufficient size.
3. Where rainwater is colleted for internal use and external use, the Code Water
Calculator or calculation procedures of Wat 1 must be used to determine
whether there is sufficient volume collected for external use. Sufficient volume
to meet the requirements of this issue can be demonstrated where there the
demand of internal fittings which are to be using rainwater are met and where
the excess water collected for external use of sufficient volume as defined in the
definition of sufficient size.
which should be assessed as a bath under the previous issue, Wat 1. Where such
water features are present, credits can be awarded only where they use appropriately
treated water from 100% rainwater or 100% greywater and all other criteria for this
issue are met.
Special Cases
None
Background
Water is an increasingly scarce resource and more and more homes have metered
water supplies with householders having to pay for any water they use.
The simplest and most cost-effective system for rainwater collection is the water butt.
More complex central collection communal systems (using the same principles as the
water butt) are available for all sizes of home or development.
Collection of rainwater for use in the dwelling, e.g. for WC flushing, is covered in
Category 2: Wat 1 – Potable Water.
Code for Sustainable Homes | 117
Category 3: Materials
Issue ID Description No. of credits Mandatory
available Elements
Mat 1 Environmental Impact of Materials 15 Yes
Aim
To encourage the use of materials with lower environmental impacts over their
lifecycle.
Assessment Criteria
There is a mandatory requirement with no available credits to achieve a Green Guide
rating of between A+ and D for at least three of the following five elements of the
building envelope:
• Roof
• External Walls
• Internal Walls (including separating walls)
• Upper and Ground Floors (including separating floors)
• Windows
Between 1 and 15 credits are available depending on the Green Guide ratings and
relative distributions of different materials across the five main elements of the
building envelope. The method for determining the credits to award for any given
situation is described in the calculation procedure below.
Assessment Criteria
Mandatory Credits
Where at least three of the following five key elements achieve a relevant All Levels
Green Guide rating from the 2008 version of The Green Guide of A+ to D:
• Roof
• External Walls
• Internal Walls (including separating walls)
• Upper and Ground Floors (including separating floors)
• Windows
Where the Code Mat 1 Calculator Tool is used to assess the number of credits 1 – 15
awarded for the five key elements described above
Default Cases
None
118 | Code for Sustainable Homes
OR
OR
Definitions
Building Envelope For the purpose of this issue, building envelope is
defined as the overall superstructure of the particular
building. Each building envelope may contain single or
multiple dwellings.
Code Mat 1 Calculator This is a tool developed for calculating the credit score
Tool for this issue.
The Green Guide This is a rating system for the embodied environmental
impacts of construction products and materials. It is
based on extensive quantitative data for materials,
which has been translated into simple environmental
profiles for building elements. An A+ to E rating
represents the assessed life cycle environmental impact,
with A+ rated specifications having the lowest overall
environmental impact. It is used to assess the major
building elements. The Green Guide will soon be
available in book form and on line.
120 | Code for Sustainable Homes
Assessment Methodology
Design Stage
The assessor must begin by confirming that for each building envelope; at least
three mandatory building elements have achieved a rating of A+ to D. This applies to
100% of the area for each element.
The Green Guide indicates ratings for a number of building element specifications
and gives guidance on the appropriate section to use, depending on the building
type. Where an exact match to a specification cannot be found in the Green Guide,
the assessor is likely to be able to find a similar specification. Specifications which
address a function which is not typical for the element, e.g. security, severe exposure,
unusual loading or structural conditions, should refer to the Code Service Provider
for guidance. If in doubt, or if no similar specification is available, the assessor should
contact the Code Service Provider for a bespoke rating.
The number of credits to be awarded for each building envelope must be calculated
using the method described in the Calculation Procedure.
Calculation Procedure
Design Stage
Credits are awarded on the basis of the rating in the Green Guide as follows:
A+ Rating 3
A Rating 2
B Rating 1
C Rating 0.5
D Rating 0.25
E Rating 0
Where there is more than one specification for an element (e.g. more than one type
of external wall), the credits are awarded for that element, depending on the area
weighted Green Guide rating of each specification. For the purpose of this issue any
doors with a large expanse of glazing, such as patio doors, should be assessed as
windows. Similarly glazed areas of conservatories and rooflights should be assessed
as windows.
Code for Sustainable Homes | 121
The Code Mat 1 Calculator Tool allows up to four different specification types per
element.
Where there is a close match to a specification in the Green Guide details should be
entered for the specification and Green Guide Rating in the appropriate columns.
Where a specification does not have a close Green Guide match, the assessor
should contact their Code Service Provider for a bespoke rating. A description of
the specification and the bespoke rating must then be entered into the Code Mat 1
Calculator Tool and a note made in the assessment report to indicate the source of
the bespoke rating.
The percentage area of each specification type for each element should be calculated
and entered in the ‘Percentage’ column. This will calculate the total credits to be
awarded. The Green Guide rating for each assessed element must be input to the
Code Mat 1 Calculator Tool.
Ensure that the documentary evidence provided meets the requirements as stated in
the post construction section of Information Required to Demonstrate Compliance.
Special Cases
For Mixed Use developments, contact the Code Service Provider for advice on
how to proceed. The following principles will form the basis of guidance given:
• Where dwellings are located over non-domestic accommodation (eg retail or
car parking), the lowest residential floor should be assessed as the ‘ground
floor’ using the ‘upper floor’ ratings in the Green Guide.
• If the external walls, internal walls and/or windows are located over non-
domestic accommodation, only those that relate to the dwellings need to be
included in the assessment.
• Where non-domestic accommodation is located between the dwellings and
the roof, the roof must be assessed as it is protecting the dwellings below.
If the roof is directly above a commercial use (e.g. a restaurant or office) the
equivalent commercial rating for the roof must be used as opposed to the
ratings for domestic roofs. Roof areas to parts of the building not containing
dwellings can be omitted from the assessment.
Background
The production, use and disposal of building materials accounts for significant
quantities of energy and resources, both internationally and within the UK. The
Green Guide provides a simple tool to aid specifiers in considering the environmental
implications of their choices. The Green Guide and the publication BRE methodology
for environmental profiles of construction materials, components and buildings
(Howard et al, 1999), are based on life cycle assessment (LCA), an approach which
measures and assesses a range of environmental impacts from “cradle to grave”. The
Green Guide uses LCA data gathered from the majority of UK construction products’
trade associations.
The Green Guide applies a weighting system to calculate a summary score on a scale
from A+ to E, with A+ rated specifications having the lowest overall environmental
impact. It is these summary Green Guide ratings that the Code considers for the
five key elements above. Building Materials and components are presented in
their typical, As Built elemental form. They are compared on a like-for-like basis,
as specifications that fulfil similar functions. The specifications are compared over
a 60-year environmental profiling study period. Included in this is any repair and
maintenance over the 60-year study period, and impacts relating to an assumed
dismantling/demolition of the building at the end of its life which may occur at any
point after 60 years.
Code for Sustainable Homes | 123
Aim
To recognise and encourage the specification of responsibly sourced materials for the
basic building elements.
Assessment criteria
Points are awarded where materials used in key building elements are responsibly
sourced according to the following criteria:
Criteria
Credits
Where 80% of the assessed materials in the following Building Elements are responsibly 1–6
sourced:
a) Frame
b) Ground floor
c) Upper floors (including separating floors)
d) Roof
e) External walls
f) Internal walls (including separating walls)
g) Foundation/substructure (excluding sub-base materials)
h) Staircase
Additionally, 100% of any timber in these elements must be legally sourced
Default Cases
None
AND
A letter of intent to use suppliers who For materials certified through the EMS
can provide an EMS certificate (or route, Key Process stage evidence must
equivalent) for the recycling process also be provided
must be provided
For materials certified through the For materials certified through the EMS
EMS route, a letter of intent to use route, any one of the following must be
suppliers who can provide an EMS provided as appropriate:
certificate (or equivalent) for the key
process and/or extraction stages of • Copy of the ISO 14001 certificate
their product must be provided. • Copy of the EMAS certificate
• For small companies confirmation
that the company EMS is structured
in compliance with BS 8555:2003 (or
equivalent) and the EMS has completed
phase audits one to four as outlined in
BS 8555. This can be found in company
documentation demonstrating the
process and typical outputs from phase
four audits such as an EMS manual/
paperwork and guidance to staff.
Where independent certification exists
to demonstrate these phases, it can be
used as evidence
Certified timber requires a letter Certified timber requires a copy of the
of intent to use suppliers capable certification document or Chain of
of providing certification to the Custody (CoC) certificate (as appropriate)
level required for the particular tier
claimed. This could be demonstrated Where any non-certified timber is used,
by a commitment to use a specific written confirmation from the supplier/s
scheme(s) confirming that:
OR
Definitions
Assessed Materials The following materials are assessed in the calculation of
points:
Glass
Building Elements For the purpose of this issue, the assessed Building
Elements are defined below:
a) Frame
b) Ground floor
c) Upper floors (including separating floors)
d) Roof (structure and cladding, including any loft
boarding)
e) External walls (including external cladding)
f) Internal walls (including internal partitions and
separating walls)
g) Foundation/substructure
h) Staircase (includes the tread, rises and stringers)
Chain of Custody (CoC) This is a process used to maintain and document the
chronological history of the evidence/path for products
from forests to consumers. Wood must be tracked from
the certified forest to the finished product. All the steps,
from the transporting wood from the forest to a sawmill
until it reaches the customer must maintain adequate
inventory control systems that allow for separation and
identification of the certified product. Chain of custody
certification ensures that a facility has procedures in
place to track wood from certified forests and avoid
confusing it with non certified wood. Chain of custody
is established and audited according to relevant forest
certification systems rules.
Key Processes These are the final major aspects of processing that are
carried out. There may be a single process or multiple
processes requiring assessment, depending on the end
product. The requirements for each of the assessed
materials are detailed in Table 3.2: EMS Requirements.
Legally Sourced Timber All timber must come from a legal source. Legally
sourced means that harvesting and all relevant activities
are carried out in line with relevant forest management
laws and codes of practice in the product’s country
of origin, and also throughout its subsequent supply
chain. Relevant documentation demonstrating the
above should either be provided or made available on
request subject to the availability of such materials in
the country concerned. See Information Required to
Demonstrate Compliance for further details.
Re-used Materials Materials diverted from the waste stream and used
again without further processing, or with minor
processing that does not alter the nature of the material
(e.g. cleaning, cutting, fixing to other materials).
Supply Chain EMS This covers all of the major aspects of processing and
extraction involved in the supply chain for the end
product.
Tier levels The Tier levels are graded in a scale to reflect the
rigour of the certification scheme used to demonstrate
responsible sourcing, forming the basis for awarding
Points (all as detailed in Table Cat 3.1).
Assessment Methodology
Design Stage
• Where a construction make-up is not specified within the Code Mat 2
Calculator Tool, confirm construction details of elements using the specification
and drawings, or similar (see Information Required to Demonstrate
Compliance). Obtain a breakdown of volumes and/or percentages of materials
for each element present.
• Obtain the relevant confirmation of tier certification for design stage (see
Information Required to Demonstrate Compliance) for all* materials, from all
sources/suppliers.
* The following exclusions apply:
Material groups not included in the list in Definitions (e.g. insulation materials,
fixings, adhesives, additives)
Materials that account for less than 10% by volume of an element may also be
excluded (e.g. screws). However, if certification has been provided for materials
in this category, it may be beneficial to include them in the calculation (e.g. if a
material type accounting for 9% is placed in a higher tier than other materials
used to make up the element).
• Assign a tier level to each material based on the level of certification provided
(see Table : Cat 3.1: Tier Levels and Compliance and Information Required to
Demonstrate Compliance).
• Follow the Calculation Procedure outlined below. It is recommended that the
Code Mat 2 Calculator Tool is used to assess the number of points and credits
to be awarded.
• Ensure all timber is legally sourced and that none of the species to be used are
identified on the CITES list.
Code for Sustainable Homes | 131
Notes:
1. For any other materials which do not fit into the assessed materials or the
exclusion, please refer back to the Code Service Provider who will identify the
relevant key processes and supply chain process/processes.
2. MDF, chipboard, OSB and cement bonded particle are all considered as timber
and therefore must be assessed based as timber material.
3. Where a mix of virgin and recycled timber is used, only the virgin timber needs
to be assessed. Credits can then be awarded based on the certification schemes
they are under. Slate is classed as stone and is therefore considered as an
assessed material.
Calculation Procedures
Points and Credits for this issue should be calculated using the Code Mat 2 Calculator
Tool. The tool will calculate the total number of points taking into account the
scenarios mentioned above. It will also state the associated number of credits. A copy
of the output from the tool should be included with the assessment report.
Elements should be entered as present or not present and the tool will calculate the
range of points required to achieve a number of credits in accordance with Table: Cat
3.3. A minimum of 5 elements must be assessed. This is the minimum number
of elements assumed by the calculator tool. Where fewer are indicated the calculator
will award zero credits and flag an error message as it does at other stages if there is
non-compliance with any of the criteria.
If 80% of an assessed element is compliant with a single tier, the full score available
for that Tier will apply.
If 80% of an element is compliant over a number of tiers, the calculator will first
review the percentage compliant with the highest tier and apportion a score to
that. If less than 80% is compliant, it will review the percentage of the element in
the next highest tier and apportion a score to that. This will continue until the 80%
requirement has been met.
1 Legality & responsible sourcing 3 Certification FSC, CSA, SFI with CoC,
scheme PEFC, Re-used Materials
Note:
Where any timber is used, it must be legally sourced. Where evidence cannot be provided to demonstrate legal
sourcing for any element, no points can be awarded for the Responsible Sourcing Issue.
Where in situ concrete is used, certification of the manufacture of the cement as the primary process,
extraction of the aggregate and limestone used to make the cement as well as supply chain processes to be
provided.
Brick (including clay tiles and other Product Manufacture Clay Extraction
ceramics)
Resin based composites and Composite product manufacture • Glass fibre production
materials (including GRP and
• Polymer production
polymeric render)
In situ Concrete (including ready Ready mixed concrete plant • Cement production
mix and cemetitious mortars and
• Aggregate extraction and
renders)
production
continued
134 | Code for Sustainable Homes
Metals (steel, aluminium etc) Metal Product manufacture – e.g. Metal production:
cladding production, steel section
• Steel: Electric arc furnace or
production
Basic oxygen furnace process,
• Aluminium, ingot production,
• Copper: ingot or cathode
production.
Virgin timber Timber from certified sources • Timber from certified sources
Cement Bonded Particle Board Due to the significant cement • Cement production
content, in addition to requiring
• Timber from certified sources
timber certification, the key
supply chain process must also be
considered to obtain the relevant
tier for timber certification.
Production of Cement Bonded
Particleboard
Products with lower % of recycled Product manufacture • Supply chain process(es) for any
content virgin material in the relevant
product type above.
• Recycled input by default
Any other product Key processes is likely to be 1 or 2 main inputs with significant
product manufacture production or extraction impacts
should be identified
Excluded products:
insulation materials, fixings, N/A N/A
adhesives, additives
Credits available
6 4 3 2
Using an EMS for new timber does not demonstrate timber certification and
therefore does not qualify for points.
The statement of intent from British Gypsum does not comply with the requirements
stated within the Technical Guidance.
136 | Code for Sustainable Homes
Special Cases
If an element is made up primarily of a material not specified in this issue (e.g. straw
bales), please contact the Code Service Provider for guidance on how to proceed.
Background
Up to 6 credits are awarded for responsible sourcing of materials through auditable
third party certification schemes.
This means that the consequences and impacts of using materials must be considered
from the point at which they are mined or harvested in their raw state, through
manufacture and processing, through use, reuse and recycling, until their final
disposal as waste with no further value.
Aim
To recognise and encourage the specification of responsibly sourced materials for the
finishing elements.
Assessment criteria
Credits are awarded on the basis of the requirements in the table below:
Criteria
Credits
Where 80% of the assessed materials in the following Finishing Elements are responsibly 1–3
sourced:
a) Stair
b) Window
c) External & internal door
d) Skirting
e) Panelling
f) Furniture
g) Fascias
h) Any other significant use
Additionally, 100% of any timber in these elements must be legally sourced
Default Cases
None
138 | Code for Sustainable Homes
AND
Trade information or a letter from the A receipt or letter from the supplier,
developer is acceptable which includes material quantities, is
acceptable
Code for Sustainable Homes | 139
A letter of intent to use suppliers who For materials certified through the EMS
can provide an EMS certificate (or route, Key Process stage evidence must
equivalent) for the recycling process also be provided
must be provided
For materials certified through the EMS For materials certified through the EMS
route, a letter of intent to use suppliers route, any one of the following must be
who can provide an EMS certificate provided as appropriate:
(or equivalent) for the process and/or
extraction stages of their product must • Copy of the ISO 14001 certificate
be provided. • Copy of the EMAS certificate
• For small companies confirmation
that the company EMS is structured
in compliance with BS 8555:2003
(or equivalent) and the EMS has
completed phase audits one to four
as outlined in BS 8555. This can be
found in company documentation
demonstrating the process and typical
outputs from phase four audits such
as an EMS manual/paperwork and
guidance to staff. Where independent
certification exists to demonstrate
these phases, it can be used as
evidence
Certified timber requires a letter of Certified timber requires a copy of
intent to use suppliers capable of the certification document or Chain
providing certification to the level of Custody (CoC) certificate (as
required for the particular tier claimed. appropriate).
This could be demonstrated by a
commitment to use a specific scheme(s) Where any non-certified timber is used,
written confirmation from the supplier/s
confirming that:
OR
Definitions
Finishing Elements For the purpose of this issue, the assessed Finishing
Elements are defined below:
Assessment Methodology
Design Stage
• Where a construction make-up is not specified within the Code Mat 2
Calculator Tool, confirm construction details of elements using the specification
and drawings, or similar (see Information Required to Demonstrate
Compliance). Obtain a breakdown of volumes and/or percentages of materials
for each element present.
• Obtain the relevant confirmation of tier certification for design stage (see
Information Required to Demonstrate Compliance) for all* materials, from all
sources/suppliers.
* The following exclusions apply:
Material groups not included in the list in Definitions (e.g. insulation
materials, fixings, adhesives, additives)
Materials that account for less than 10% by volume of an element may
also be excluded (e.g. screws). However, if certification has been provided
for materials in this category, it may be beneficial to include them in the
calculation (e.g. if a material type accounting for 9% is placed in a higher tier
than other materials used to make up the element).
• Assign a tier level to each material based on the level of certification provided
(see Table : Cat 3.1: Tier Levels and Compliance and Information Required to
Demonstrate Compliance).
• Follow the Calculation Procedure outlined below.
• Ensure all timber legally sourced and that none of the species to be used are
identified on the CITES list.
Notes:
1. For any other materials which do not fit into the assessed materials or the
exclusion, please refer back to the Code Service Provider who will identify the
relevant key processes and supply chain process/processes.
2. MDF, chipboard, OSB and cement bonded particle are all considered as timber
and therefore must be assessed based as timber material.
3. Where a mix of virgin and recycled timber is used, only the virgin timber needs
to be assessed. Credits can then be awarded based on the certification schemes
they are under. Slate is classed as stone and is therefore considered as an
assessed material.
• Obtain the relevant confirmation of tier certification for Post Construction Stage
(see Information Required to Demonstrate Compliance) for all materials, from all
sources/suppliers.
• Confirm and/or re-assign a tier level to each material based on the level of
certification provided (see Table : Cat 3.1: Tier Levels and Compliance and
Information Required to Demonstrate Compliance).
• Adjust the design stage Mat 3 Calculator Tool accordingly to include any revised
information following the calculation procedure used at design stage.
• Ensure there is evidence to demonstrate that the timber is legally sourced and
that none of the species to be used are identified on the CITES list.
Calculation Procedures
Credits for this issue should be calculated using the Code Mat 3 Calculator Tool.
The tool will calculate the total number of points taking into account the scenarios
mentioned above. It will also state the associated number of credits. A copy of the
tool should be included with the assessment report.
Elements should be entered as present or not present and the tool will calculate the
range of points required to achieve a number of credits in accordance with Table 3.3.
The calculator is programmed to flag up error messages at stages where there is non
compliance with the criteria which should assist with assessing this issue.
If 80% of an assessed element is compliant with a single tier, the full score available
for that Tier will apply.
If 80% of an element is compliant over a number if tiers, the calculator will first
review the percentage compliant with the highest tier and apportion a score to
that. If less than 80% is compliant, it will review the percentage of the element in
the next highest tier and apportion a score to that. This will continue until the 80%
requirement has been met.
Credits available
3 2 1
Using an EMS scheme for new timber does not demonstrate timber certification and
therefore does not qualify for any points.
Special Cases
If an element being considered is made up primarily of a material not specified in this
issue, please contact the Code Service Provider for further guidance.
Background
Up to 6 credits are awarded for responsible sourcing of materials through auditable
third party certification schemes.
This means that the consequences and impacts of using materials must be considered
from the point at which they are mined or harvested in their raw state, through
manufacture and processing, through use, reuse and recycling, until their final
disposal as waste with no further value.
Aim
To design housing developments which avoid, reduce and delay the discharge of
rainfall to public sewers and watercourses. This will protect watercourses and reduce
the risk of localised flooding, pollution and other environmental damage.
Assessment Criteria
Mandatory Elements must be achieved. Up to 2 credits are available for further
improving management of rainfall runoff.
Criteria
Credits Mandatory
Elements
Ensure that the peak rate of runoff into watercourses is no greater for the None All Levels
developed site than it was for the pre-development site (see definition). This
should comply with the Interim Code of Practice for Sustainable Drainage
systems (SUDS) (CIRIA, 2004), or for at least the 1 year and 100 year return
period events.
For sites of less than 200ha, the calculation of Greenfield runoff rates should
be in accordance with Flood estimation for small catchments (Marshall and
Bayliss, 1994) and any subsequent updates.
For sites of 200ha and more, the calculation of Greenfield runoff rates
should be in accordance with the Flood estimation handbook (Centre for
ecology and hydrology, 1999) and any subsequent updates.
An allowance for climate change should be made in accordance with
current best practice (PPS25, 2006).
Ensure that the additional predicted volume of rainwater discharge caused
by the new development, for a 1 in 100 year event of 6 hour duration
including an allowance for climate change (PPS25, 2006), should be
reduced using infiltration and/or made available for use in the dwelling as a
replacement for potable water use in non-potable applications such as WC
flushing or washing machine operation.
• the pre-development site’s estimated mean annual flood flow rate (Qbar);
or
• 2l/s/ha;or
• a minimum flow rate (litres per second), based on good practice
guidelines to prevent easy blockage, by ensuring the outlet throttle is not
too small.
If rainwater is discharged to a public sewer or adopted surface water sewer,
flow rate requirements will be defined by the Sewerage undertaker.
2 credits are available for using SUDS to improve water quality of the 2
rainwater discharged or for protecting the quality of the receiving waters by:
1. Ensuring no discharge to the watercourse for rainfall depths up to 5mm
(follow guidance in the Interim Code of Practice for Sustainable Drainage
systems (SUDS) (CIRIA, 2004).
or
2. Establish agreements for the ownership, long term operation and
maintenance of all sustainable drainage elements used
Default Cases:
Credits can be awarded by default if the site discharges rainwater directly to a tidal estuary or the sea, because
compliance with discharge flow rate requirements will not be required.
Copy of the consultant’s report detailing Confirmation from the consultant that
the design specifications, calculations the requirements of this credit have
and drawings to support the additional been achieved.
credits.
Where different from the Design
Where detailed designs are not available stage: copies of as-built designs and
at this stage, the specifications need to calculations and drawings to support
clearly state the essential design criteria. the credits.
Definitions
Annual flood The estimated probability of a flood of given magnitude
probability occurring or being exceeded in any year. Expressed as a
chance of 1-in-100 or 1 per cent.
Annual flow rate The estimated probability of a flow rate of a given
probability magnitude occurring or; being exceeded in any year.
Expressed as, for example a chance of 1-in-100, or
1 per cent.
Appropriately A hydrological consultant or engineer.
qualified consultant
Catchment The area contributing surface water flow to a point
on a drainage or water course. It can be divided into
sub-catchments.
Flood probability The estimated probability of a flood of given magnitude
occurring or being exceeded in any specified time
period. For example, the 100-year flood has a 1%
chance of occurring in any given year.
Flood risk An expression of the combination of the flood
probability and the magnitude of the potential
consequences of the flood.
Flood risk Assessment A study to assess the risk of a site flooding, and to
(FRA) assess the impact that any changes or development
on the site will have on flood risk on the site and
elsewhere.
148 | Code for Sustainable Homes
Section 102 or 104 A section within the Water Industry Act 1991
permitting the adoption of a sewer, lateral drain or
sewage disposal works by a sewerage undertaker.
Sometimes referred to as S102 or S104.
Section 106 TCPA 1990 A section within the Town and Country Planning
Act 1990 that allows a planning obligation to a local
planning authority to be legally binding.
Section 106 WIA 1991 A key section of the Water Industry Act 1991, relating
to the right of connection to a public sewer.
• holding ponds
• swales
• reed beds
• permeable paving – in areas where local geological
and
Surface Water Runoff Water flow over the ground surface to a drainage
system. This occurs if the ground is impermeable, is
saturated or if the rainfall is particularly intense.
Assessment Methodology
Design Stage
• Check that an appropriately qualified consultant has been appointed
• Check that the Flood Risk assessment (FRA) and consultants report contain all
information needed to cover the mandatory requirements.
• Where credits are sought: Check that the FRA and consultants reports contain
all information needed to comply with either 1. Ensuring there is no discharge
to the watercourse for rainfall depths up to 5mm; or 2. Treating rainwater
using SUDS to improve its quality before discharge, and establish agreements
for the ownership, long term operation and maintenance of all the sustainable
drainage elements.
• Where design and build or similar contracts are used, detailed designs may
not be available at this stage. Due to the nature of this issue, it is critical in all
cases that the design criteria are clearly stated at this stage and that either the
specification reflects this or other written confirmation is provided to show
intent.
• The assessor is not required to perform any calculations as these will be
provided by the design team.
Calculation Procedures
None
Special Cases
For derelict sites which have no runoff to sewers or watercourses, provided the site
has derelict for five years or less, the pre-development discharge can be calculated for
the previous site’s use.
If the site has been derelict for over five years, then the undeveloped site must be
treated as a greenfield site in order to award credits. For sites of less than 200ha, the
calculation of Greenfield runoff rates should be in accordance with Flood estimation
for small catchments (Marshall and Bayliss, 1994) and any subsequent updates.
For sites of 200ha and more, the calculation of Greenfield runoff rates should be in
accordance with the Flood estimation handbook (Centre for ecology and hydrology,
1999) and any subsequent updates
An allowance for climate change should be made in accordance with current best
practice (PPS25, 2006).
Background
Around five million people, in two million properties, live in flood risk areas in
England and Wales. The Government’s Foresight report estimated that currently
80,000 properties also have a very high likelihood of flooding from surface water
runoff (10% annual chance), causing on average £270 million of damage each year.
Changes in climate, such as more severe storms will increase these risks (Environment
Agency website www.environment-agency.gov.uk/yourenv/eff) meaning the
associated costs could increase to several billion.
The main intention of this issue is to reduce the overall discharge of rainwater from
impervious hard landscaped surfaces and roofs within the development. In housing
developments, this can be usually be done by designing Sustainable Drainage Systems
(SUDS), which might include specifying rainwater recycling, pervious paving for all
hard surfaces in the development, the use of green roofs, soakaways or other systems
that help reduce surface water loads.
Code for Sustainable Homes | 155
Aim
To encourage housing development in low flood risk areas, or to take measures to
reduce the impact of flooding on houses built in areas with a medium or high risk of
flooding.
Assessment Criteria
Up to 2 credits are awarded where the assessed dwelling is located either in an area
of low annual probability of flooding, or where a Flood Risk Assessment (FRA) shows
that appropriate measures have been taken to ensure safe access and escape routes
and flood resilient and resistant construction.
Criteria
Credits
EITHER 2
2 credits are available for developments situated in Zone 1 – low annual probability of flooding
(as defined in PPS25 – ‘Planning and Flood Risk’) and where the site specific Flood Risk
Assessment (FRA) indicates that there is low risk of flooding from all sources.
OR
1 credit is available for developments situated in Zones 2 and 3 – medium and high annual 1
probability of flooding where the finished ground floor level of all habitable parts of dwellings
and access routes to the ground level and the site, are placed at least 600mm above the
design flood level of the flood zone.
The Flood Risk Assessment (FRA) accompanying the planning application must demonstrate
to the satisfaction of the local planning authority and statutory body that the development
is appropriately flood resilient and resistant, including safe access and escape routes where
required, and that any residual risk can be safely managed.
Default Cases
None
156 | Code for Sustainable Homes
A Flood Risk Assessment (prepared For low flood risk areas, no further
according to good practice guidance as evidence is needed, provided the basis
outlined in Development and Flood Risk: on which the Flood Risk Assessment
A practice guide companion to PPS25) provided at design stage has not
which shows that there is a low risk of changed. This should be confirmed by
flooding from all sources. the developer, or As Built details need
to be supplied.
For medium (Zone 2) or high (Zone
3) flood risk areas: For medium (Zone 2) or high
(Zone 3) flood risk areas:
A Flood Risk Assessment (prepared
according to good practice guidance as As for design stage and if significant
outlined in Development and Flood Risk: time has passed since the Flood
A practice guide companion to PPS25) Risk Assessment was carried out,
confirmation that the basis of the Flood
Where applicable Risk Assessment has not been changed.
AND EITHER
OR
Definitions
Also see definitions in SUR 1
Design flood level The maximum estimated water level during the design
storm event. The design flood level for a site can be
determined through either known historical data or
modelled for the specific site.
Flood resistant Buildings that prevent the entry of water or minimise the
construction amount of water that may enter a building where there
is flooding outside.
High annual probability An area where the chance of river flooding in any year
of flooding (Zone 3) is > 1% (1 in 100) and a 1 in 200 or greater chance of
flooding from the sea (>0.5%).
Medium annual An area where the chance of river flooding in any year is
probability of flooding 1% (1 in 100) or less but greater than 0.1% (1 in 1000)
(Zone 2) and between a 1 in 200 and 1 in 1000 chance of sea
flooding (0.5% – 0.1%).
Residual Risk The risk which remains after all risk avoidance, reduction
and mitigation measures have been implemented.
Assessment Methodology
Design Stage
• The assessor should confirm that a Flood Risk Assessment has been carried out.
This is necessary to ensure that other sources of flooding (other than river and
sea) are also a low risk. For small developments in low flood risk areas, this will
be a relatively brief report.
• If the development is in Zone 1 and the Flood Risk Assessment shows low
risk overall, 2 credits can be awarded. It should be noted that the Flood map
accessible from the Environment Agency website only gives a rough estimation
of flood risk and isn’t used for planning submission. A Flood Risk Assessment
requires contact with the local planning authority to discuss the site and benefit
from information available.
• If the development is in Zone 2 or 3, the assessor should check that the Flood
Risk Assessment submitted with the planning application has demonstrated
to the relevant authorities that the development is appropriately designed as
detailed in the criteria. If the evidence shows the finished floor levels and all
access routes comply with the criteria and that any residual risks can be safely
managed, one credit can be awarded.
• For developments in Zones 2 and 3, the assessor should check the Flood Risk
Assessment as above and check to see that the As Built plans confirm the
correct levels of the floors and access routes above the design flood levels.
• Where applicable, check that the specified flood protection measures have been
designed and built according to the recommendations of the consultant.
Calculation Procedures
None
Credits will also be withheld if flood defence schemes considered for this issue would
reduce the performance of functional flood plains elsewhere.
Special Cases
The flood risk for a site may be downgraded to a lower flood risk category as a result
of existing flood defence installations. In such circumstances, a credit can be awarded
where the following conditions are met:
[1]. Where new flood defences have to be, or have been constructed to minimise
the risk of flooding to the site and its locality.
[3]. The Environment Agency confirms that, as a result of such defences, the risk
of a flood event occurring is reduced to low or medium risk (as appropriate
to the credit levels set in the Code). If firm confirmation is not provided then
the credit cannot be awarded.
Background
Flooding in the United Kingdom is increasing due to development on areas prone
to flooding and more extreme weather patterns brought about by global warming.
Other reasons have to do with increased rainwater discharge from hard surfaces and
from some agricultural land.
160 | Code for Sustainable Homes
Coastal flooding is increasing as sea levels rise as a result of global warming. Other
sources of flooding include rivers, land/overland flow, groundwater aquifers and
sewers. Sewer flooding is a major cause of flooding in urban areas.
Floods are now on average nearly twice as frequent as they were 100 years ago. Over
seven percent of the land area of England and Wales is at risk from flooding and
around five million people, in two million properties, live in flood risk areas in England
and Wales (Environment Agency website www.environment–agency.gov.uk/
yourenv/eff).
The Meteorological Office predicts a very significant increase in rainfall over the
next century as a result of climate change. This will lead to increased incidences of
flooding unless action is taken to reduce the impact. New developments can play a
significant role by designing to reduce their own impact on flooding and by going
beyond this to assist in reducing the overall flood risk.
The public are becoming increasingly aware of the devastating effects of flooding and
so will demand more information from developers about flood risk and protection
when purchasing homes.
Code for Sustainable Homes | 161
Category 5: Waste
Issue ID Description No. of credits Mandatory
available Elements
Was 1 Storage of non-recyclable waste and 4 Yes
recyclable household waste
Aim
To recognise and reward the provision of adequate internal and external storage
space for non-recyclable waste and recyclable household waste.
Assessment Criteria
The first issue of non-recyclable waste storage sets a mandatory performance
requirement with no available credits. This requirement must be met if a Code rating
is to be achieved. Adequate internal space and adequate external space are defined
in the definitions section.
Credits are awarded for the provision of storage space for household and recycling
waste, in accordance with the criteria below.
Care should be taken to make sure that facilities are accessible to disabled people.
Criteria
Credits Mandatory
Elements
Default Cases
None
Code for Sustainable Homes | 163
OR
Definitions
Adequate External Refers to outdoor space supplied for storing non-
Space recyclable waste and recyclable materials. External
recycling bins should be located on level hard standing
and must be covered and within a reasonable distance
of the external door to the dwelling / block of flats.
Adequate Internal Refers to indoor space supplied for storing non-
Space recyclable waste and recyclable materials. Internal
recycling bins should be located in a dedicated non
obstructive position. This should be in a cupboard in
the kitchen, close to the non-recyclable waste bin,
or located adjacent to the kitchen in a utility room or
connected garage.
Free-standing recycling bins placed directly on the floor
or in a cupboard do not comply.
Automated Waste Some companies now offer a fully automated
Collection System underground system, for the collection, sorting and
transportation of waste. Such systems allow for waste
separation at source, for different types of waste and
from multiple locations, with enhanced hygienic,
occupational health and safety standards. They can also
reduce the use of transport by refuse lorries, reducing
nuisance and CO2 emissions.
Local Authority The Local Authority is responsible for regular collection
Collection Scheme of waste from the dwelling. This includes the collection
of residual waste (waste not intended for recycling or
composting) and in many cases recyclable household
waste.
Code for Sustainable Homes | 165
Recyclable Materials For the purpose of this issue, the space needs to be
compatible with the range of recyclable collection
provided by the Local Authority, at least three of the
following recyclable materials waste must be collected:
• Paper
• Cardboard
• Glass
• Plastics
• Metals (tins and cans)
• Textiles (clothes and shoes)
Assessment Methodology
Design Stage
• Check the minimum capacity required for internal and external waste and
recycling storage based on the criteria set out above.
• Check the types of recyclable waste and level of separation in operation for the
locality, now and in the medium term.
• Check if the space available is adequate for storage of these bins and is
accessible to disabled people (Checklist Was 1).
Calculation Procedures
None
166 | Code for Sustainable Homes
Table : Cat 5.1: Supplementary Information Sheet for Was 1 – Storage of non-recyclable waste and
storage of recyclable household waste
Development Name:
Dwelling Reference
NUMBER OF BEDROOMS:
TOTAL VOLUME:
SPACE PROVIDED
Demonstrate (through the use of drawings) how the space allowed for waste storage has been sized to
accommodate the maximum requirements between: volume of storage from the Local Authority or minimum
from the BS 5906. Checklist Was 1 below lists some of the more important elements of BS 5906:2005, but
it is only an indication of the full requirement. Depending on circumstances, other provisions may also be
necessary.
ACCESSIBILITY
1) Access routes:
Should be direct, free from obstructions, have a firm,
slip resistant surface and allow easy manoeuvring of a
wheelchair.
If, the provision of a raised threshold is unavoidable,
this should be of a height not more than 15 mm, with
adequate and timely warning that there is a change in
level.
* the previously mentioned standards and guidance requirements always supersede this checklist
Special Cases
Credits can be awarded for developments in areas not yet covered by the Local
Authority recyclable waste collection scheme where a written statement from the
Local Authority can be provided stating when the collection will commence (this date
must be within one year of the completion date of the dwelling).
Background
“It has been established that nearly 36 million tonnes of municipal waste was
generated in the UK in 2004/05. A total of 30 million tonnes of this was collected
from households, which is approximately half a tonne of household waste per
person. Waste from homes is generally collected by Local Authorities through regular
waste collections or recycling schemes. There must be adequate storage provision for
waste to enable its appropriate management.” Cited from www.wasteonline.com
The legal requirements are set out in the Household Waste Recycling Act (2003). The
size, type and number of containers may be set out by the waste collection authority
using their powers in section 46 of the Environmental Protection Act 1991.
With the development and publication of the Waste Strategy for England (2007)
“higher national targets, than in 2000, have been set for recycling and composting of
household waste – at least 40% by 2010, 45% by 2015 and 50% by 2020”.
Code for Sustainable Homes | 169
Aim
To promote reduction and effective management of construction related waste by
improving on performance which meets the Site Waste Management Plan (SWMP)
regulations.
Assessment Criteria
Management of waste on the construction site must comply with the criteria below:
Criteria
Credits Mandatory
Elements
Default Cases
For a development where the cost of construction is less than £300,000, this
element will be awarded by default.
Default Cases
None
170 | Code for Sustainable Homes
AND
Definitions
Best practice Best practice relating to the mandatory element is
compliance with DEFRA’s guidance on Site Waste
Management Plans.
Cost of Construction Currently this cost includes labour and materials only
and refers itself to the contract sum only, excluding
VAT.
Bricks (170102*)
Concrete (170101*)
Insulation (170604*)
Packaging (15018*)
Timber (170201*)
Electrical and electronic equipment (1602*)
Canteen/office/adhoc
Oils
Asphalt and tar (1703*)
Tiles and ceramics (170103*)
Inert (1705*)
Metals (1704*)
Gypsum (170802*)
Plastics (170203*)
Floor coverings (soft)
Furniture (200307*)
Code for Sustainable Homes | 173
Liquids
Soils (1705*)
Hazardous
Architectural Features
Other/Mixed**
Assessment Methodology
Design Stage
• Complete Checklist 2a, Mandatory Requirements to confirm that a SWMP
is being used and that the content of the SWMP is sufficient to meet the
mandatory requirements for this issue.
• Use Checklist 2d, to identify all the waste groups to be monitored.
• Complete Checklist 2b to confirm the obligation to reduce site waste.
• Complete Checklist 2c to confirm the obligation to divert waste from landfill
(reuse, recycle, compost or otherwise recover)
• Complete Checklist 2d, to identify waste categories for materials to be reduced,
sorted and diverted from landfill.
Calculation Procedures
None
Confirmation that SWMP includes procedures for monitoring site waste and target setting to
promote resource efficiency (Adapted from DEFRA, 2008).
Checklist Was.2c Commitment to Sorting and diverting from landfill Contribute Waste.
Procedures and commitments for sorting and diverting from landfill site construction waste.
Complete Checklist Was 2a and Was 2b plus :
Actions identified to monitoring, reduce, sorting and diverting from landfill site construction waste
(fill in where applicable, i.e. waste groups arising on housing project)
Complete Checklists Was 2a, Was 2b and Was 2c
continued
Code for Sustainable Homes | 177
Actions identified to monitoring, reduce, sorting and diverting from landfill site construction waste
(fill in where applicable, i.e. waste groups arising on housing project)
Complete Checklists Was 2a, Was 2b and Was 2c
Special Cases
None
Background
Waste management on site can have significant impacts especially at a local level.
From April 2008, SWMP is a legal requirement for all construction projects exceeding
£300,000 (DEFRA, 2008).
178 | Code for Sustainable Homes
Over 100 million tonnes of construction and demolition waste is generated in the
UK annually and an estimated 13 million tonnes of unused building materials are
discarded as waste (see www.smartwaste.co.uk). To promote greater construction
resource efficiency “the Government is considering in conjunction with the
construction industry, a target to halve the amount of construction, demolition and
excavation wastes going to landfill by 2012 as a result of waste reduction, re-use and
recycling” (DEFRA, 2007).
Guidance on waste minimisation is available from DEFRA, BRE, WRAP, Envirowise and
others (referenced below). SMARTWaste plan is a site waste management planning
tool (see www.smartwaste.co.uk) which monitors construction and demolition
waste, including the amount and type generated and segregation/recycling rates.
It also calculates Environmental Performance Indicators (EPIs). The system identifies
opportunities for re-use and recycling and the location of suitable facilities for this via
BREMAP, an online geographical information system.
Targets
Targets are specific to individual projects. For guidance on setting targets, refer to the
Construction Industry KPI Pack (www.constructionexellence.org.uk).
A Site Waste Management Plan is an important tool for managing site construction
waste. Data obtained from monitoring site construction waste can be used to
check performance against benchmarks and the effectiveness of any solutions
implemented.
Two Environmental performance indicators are typically used for waste generated
from the construction process; waste generated in m3 per 100m2 of floor area and
waste generated in m3 per £100,000 of project value. Constructing Excellence and
SMARTWaste produce annual benchmarks for these KPIs; these are still evolving.
Benchmarks are being developed for different types of construction and waste.
Details of these are shown on the SMARTWaste website at www.smartwaste.co.uk.
This system automatically calculates the Environmental performance indicators for
a project from the waste data collected and input into the system. Environmental
performance indicators have been used to benchmark waste minimisation for a
number of schemes, including Greenwich Millennium Village and Chiswick Park
where waste reduction by 50% was achieved.
Code for Sustainable Homes | 179
Aim
To encourage developers to provide the facilities to compost household waste,
reducing the amount of household waste sent to landfill.
Assessment Criteria
Credits are awarded where home composting facilities are provided in houses
with gardens or Local Authority kitchen waste collection/communal/community
composting service in other dwelling types. The composting facilities should be
suitable for normal domestic, green/garden, food and other compostable household
waste, as outlined below. All facilities should be accompanied by information
explaining how they work.
Criteria
Credits
Default Cases
None
180 | Code for Sustainable Homes
Definitions
Automated Waste Some companies now offer a fully automated
Collection System underground system, for the collection, sort and
transport of waste. It allows for waste separation at the
source, for different types of waste and from multiple
locations, with enhanced hygienic, occupational
health and safety standards. It also reduces the use of
waste transport by lorries, reducing nuisance and CO2
emissions, from the fossil fuel consumption.
AND
AND
Assessment Methodology
Design Stage
• Confirm the intention to provide composting bins or communal composting
service or kitchen waste collection service as appropriate.
• Check the accessibility (fill in Checklist Was 1) and size of the storage.
Note: It is acceptable for the bin to be beside other recycling bins in a communal
collection site as long as it is clearly identifiable as being connected to a licensed
community scheme.
Calculation Procedures
None
Special Cases
Existing and proposed community schemes are acceptable under this issue as long
as they comply with all the specifications in the technical guide.
184 | Code for Sustainable Homes
Background
Composting at home is one of the easiest, most effective and environmentally
friendly ways of recycling organic waste. Organic waste in a landfill site degrades
to form leachate and methane gas. Leachate is a toxic liquid, which can pollute
water and soil. Methane is explosive and is also a green house gas (27 times more
powerful than carbon dioxide). Over 30 per cent of household waste can be diverted
from landfill by composting, which avoids the production of methane and does not
contaminate water supplies.
Additionally, there can be a community composting system to serve the needs of flats
or dwellings which do not have an external area to install a composting bin, or if the
local authority does not provide this service. In order to find more guidance on how
to set up a community composting scheme see references and further information.
Code for Sustainable Homes | 185
Category 6: Pollution
Issue ID Description No. of credits Mandatory
available Elements
Pol 1 Global Warming Potential (GWP) of 1 No
Insulants
Aim
To reduce global warming from blowing agent emissions that arise from the
manufacture, installation, use and disposal of foamed thermal and acoustic insulating
materials.
Assessment Criteria
Criteria
Credits
Credits are awarded where all insulating materials in the elements of the dwelling listed below 1
only use substances that have a GWP < 5 (manufacture AND installation):
• Roofs: including loft access
• Walls: internal and external including lintels and all acoustic insulation
• Floors: including ground and upper floors
• Hot water cylinder: pipe insulation and other thermal stores
• Cold water storage tanks: where provided
• External doors
Default Cases
None
186 | Code for Sustainable Homes
AND OR
** The blowing agents listed in Table 6.2 are deemed to satisfy this credit since their
GWP is known to be sufficiently low to justify this. All are currently believed to have a
GWP of less than 5.
Code for Sustainable Homes | 187
Definitions
Blowing agents Any material used to produce a cellular structure in
either a plastic or other foam insulation used in either
manufacture or installation.
Deemed to satisfy The blowing agents listed in Table 6.2 are deemed
to satisfy this credit since their GWP is known to be
sufficiently low to justify this. All are currently believed
to have a GWP of less than 5.
Assessment Methodology
Design Stage
• Complete Checklist Table : Cat 6.1 Pol 1 for all elements.
• Check drawings and specification clauses for all materials identified.
• For foamed materials, or propellants used to spray or inject insulation, provide
manufacturer’s/installer’s documentation confirming that their product either
uses blowing agents ‘deemed to satisfy’ the requirement from Table 6.2 in
isolation or uses a blowing agent or blend of blowing agents which can be
shown to have a GWP of less than 5.
188 | Code for Sustainable Homes
Calculation Procedures
None
Foamed polyethylene
Table : Cat 6.2: Blowing Agents deemed to satisfy the credit and believed to have a GWP of less
than 5
Air
Isobutene
Checklist Pol 1: GWP of Insulants
Element Proposed Unfoamed [U]/ Manufacturer Product Name GWP Name of GWP of Reference
Insulation Foamed [F]/ (if foamed) Blowing Agent Blowing to literature
Materials Installed Using Used (where Agent confirming GWP
Propellants [P] installed using (if present) (if foamed or
a propellant) installed using a
propellant)
Roofs
Roof Type 1
Roof Type 2
Loft Access
Walls
External Walls
Internal Walls
Doors
Lintels
Thermal and
Acoustic Insulation
Floors
Ground Floor
Upper Floors
Basement
Foundations
continued
Code for Sustainable Homes | 189
Checklist Pol 1: GWP of Insulants
Element Proposed Unfoamed [U]/ Manufacturer Product Name GWP Name of GWP of Reference
Insulation Foamed [F]/ (if foamed) Blowing Agent Blowing to literature
Materials Installed Using Used (where Agent confirming GWP
Propellants [P] installed using (if present) (if foamed or
a propellant) installed using a
propellant)
190 | Code for Sustainable Homes
Thermal Stores
Pipe Insulation
Other Thermal
Stores
Note: The manufacturing process of insulating materials changes regularly. Because of this, this document does not include a complete list of insulating materials that comply and
manufacturers should be approached for up-to-date information on their products.
Code for Sustainable Homes | 191
Special Cases
None
Background
Global warming potential (GWP) is a relative measure of how effective a gas is at
absorbing infra-red radiation compared to CO2. The GWP measures the total energy
absorbed by 1 kg of released gas over a hundred years, relative to CO2, (which is
given a GWP of 1.0). The main greenhouse gases being emitted today are carbon
dioxide from the burning of fossil fuels, methane (from agriculture) and nitrous
oxide (from agriculture). The Kyoto Protocol has set limits on six specific gases that
contribute towards global warming. These are carbon dioxide, methane, nitrous
oxide, hydrofluorocarbons, perfluorocarbons and sulphur hexafluoride. The table
below shows the GWP for each of these gases.
Gas GWP
Aim
To reduce the emission of nitrogen oxides (NOX) into the atmosphere.
Assessment Criteria
Credits are awarded on the basis of NOX emissions arising from the operation of
space heating and hot water systems for each dwelling, in accordance with the table
below:
Criteria
Dry NOX level (mg/kWh) Boiler class (BS EN 297: 1994) Credits
<100 4 1
<70 5 2
<40 – 3
Default Cases 3
Where all space heating and hot water energy requirements are fully met by systems which do
not produce NOX emissions.
Notes
1. No credits may be awarded for open flue heating or hot water systems.
2. Alternative Approaches:
There are many possible alternative systems which can potentially achieve this credit
and are beyond the scope of low NOX boiler systems.
An example solution might include the use of Mechanical Ventilation with Heat
Recovery (MVHR), super insulation, and Photovoltaic powered electric top up heating.
Whilst Biomass systems are recognised as low carbon systems, they can produce
a significant amount of NOX and so may not achieve this credit; however they can
score highly in the Energy section of the Code. Biomass systems are also recognised
as reducing the impact of fossil fuel depletion by employing a renewable combustion
fuel source.
Code for Sustainable Homes | 193
Definitions
The As -Built – As defined in Ene 1
SAP 2005 Worksheet
Boiler class An indication of a boiler’s NOX emissions. Boilers are
classified on a scale of 1 to 5, with 1 indicating high
NOX emissions through to relatively low NOX emissions
for a class 5.
Boiler class (BS EN 297: The relevant British Standard that defines and classifies
1994) boilers based on their NOX emissions. Applies to boilers
fitted with atmospheric burners of nominal heat input
not exceeding 70 kW.
Design Stage - As defined in Ene 1
SAP 2005 Worksheet
Dry NOX The NOX emissions (mg/kWh) resulting from the
combustion of a fuel at 0% excess oxygen levels.
If electricity is sourced from the national grid, the
emissions are approximately 1200mg/kWh.
Assessment Methodology
Design Stage
• Use Table : Cat 6.3 to estimate average NOX emissions.
• Using the specification document or equivalent, determine the specification and
NOX emissions of all heating systems in the dwelling. If a secondary space and /
or water heating system supplies less than 8% of the dwelling’s combined total
space heating and hot water demand, it can be ignored.
• Confirm that the emissions stated are those estimated under normal operating
conditions, i.e. dry NOX levels. If the mains electricity, assume 1200mg/KWh
supplied.
• If the figures are not stated in dry NOX and/or in mg/kWh as required, apply
any necessary conversion/correction factors required to convert the NOX
figure(s) stated for the heating system/s accordingly. (See sections A & B in the
Calculation Procedures section below for guidance.)
• Where applicable, calculate the average NOX emissions using the methodology
detailed in section C of the Calculation Procedures section and Table : Cat 6.3
below.
• Where the heating system has not been commissioned at the time of a Post
Construction Stage assessment, a contractual commitment must be in place to
ensure that the heating system will be servicing the dwelling within 18 months
of the dwelling being completed.
Calculation Procedures
A: Conversion Factors
Manufacturers should be asked to supply dry NOX emissions data in mg/kWh. Where
this is not possible the assessor may use the following conversion factors to convert
figures in mg/m3, ppm or wet NOX. It should be noted that these conversion factors
assume worst-case efficiencies and are likely to give a conservative answer. This could
have the effect of lowering the number of credits achieved.
This Issue’s criteria are based on dry NOx values – almost all manufacturers will quote
emissions in dry NOx. However if wet NOX figures are supplied, these should be
converted to dry NOx. This can be done by multiplying the wet NOX figure by 1.75.
The greater the amount of excess oxygen in the flue gases at the time of
measurement, the more ‘diluted’ the NOX. It is therefore important to convert any
emission rate back to 0% excess oxygen. For the purpose of this assessment, use
the following conversion factors for the most frequently used rates supplied by
manufacturers:
3% 3 1.17
6% 3 1.40
15% 3 3.54
where x = % excess O2 (NOT excess air) and 20.9 is the percentage of O2 in the air.
196 | Code for Sustainable Homes
C: Calculating the average NOX emissions for dwellings with more than one
heating/hot water system
Where heat and hot water is provided by more than one system in a dwelling (i.e.
there is a ‘main’ and ‘secondary’ system) it may be necessary to calculate the total
NOX emissions for the combined systems. For the purposes of this assessment, this is
only necessary when the secondary system satisfies more than 8% of the dwelling’s
combined total space heating and hot water demand. Where this is not the case
the secondary system can be discounted; although including a low NOX secondary
system which supplies under 8% of the demand can in practice lower the average
NOX figure and in such cases the secondary system can be included. If it supplies over
8%, then its dry NOX levels must be taken account of by calculating the average NOX
emissions for both systems running in parallel.
The calculation procedure on how to calculate average dry NOX levels, is detailed
below in Table : Cat 6.3 of the Checklists and Tables section below.
If a solar hot water system is installed then the energy it contributes (SAP box 50)
must be added to the total energy demand figures from SAP boxes (85, 86a & 85a)
since these figures have the solar input deducted. Adding in this figure to the total
demand will reduce the average NOX emission figure appropriately for a domestic
solar hot water supply.
There is a Pollution Calculator Tool which allows the calculation of average NOX
emissions for individual dwellings. This simplifies the procedure in Table : Cat
6.3 below by allowing an assessor to enter the data for multiple heating systems
including solar hot water, thus producing an average for the dwelling also
incorporating the 8% rule discussed above in this section.
X = (A – B)/C
Where:
Note: This is the NOX emitted by the CHP system per unit of electricity generated and
should be obtained from the supplier.
Code for Sustainable Homes | 197
Where data is provided in different units or at a level of excess oxygen above zero,
the manufacturer/supplier should be asked to convert this to comply with this Issue’s
requirements; alternatively the assessor may correct these using the factors above.
B = NOX emissions per unit of electricity supplied from the grid (mg/kWh).
Note: this should be assumed to be 1200mg/kWhelec
The above methodology determines the net NOX emissions from CHP generated
electricity compared to central generation of electricity and allocates this amount to
the heat production. Where X is calculated to be negative it should be assumed to be
zero.
Where the CHP system operates in conjunction with other heat sources, the general
approach outlined under the Checklists and Tables section below should be used to
calculate the average NOx emissions.
Special Cases
In the case of a District Heating System, the dry NOX rating figure in mg/kWh for
the heating system should be used to assess the credit. In practice, this figure may
be very high, therefore preventing achievement of the credit. However, it cannot
be scaled down based on the number of dwellings since the same amount of
NOX will be produced in supplying 1 kWh whether or not the system services one
dwelling or 100 dwellings.
In the case of heat pump based heating systems, then the electricity used by the
pumps and fans specifically for such systems must be included when calculating
the average NOX emissions for the dwelling. The electricity required for such
pumps and fans should be added to the total heating and hot water demand in
kWh. If grid electricity is the source, then please use the figure of 1200 mg/kWh,
otherwise evidence of the LZC electricity source and relevant NOX figure (if any) is
required.
Any zero NOX emission energy source which directly contributes to the total space
heating and hot water energy supply can be added to the total space heating
and hot water energy demand from SAP in order to further reduce the average
figure for NOX emissions. An example of this might include on-site wind power
generation directly linked into secondary electrical space heating.
Where wood burning heating systems are employed, please use the
manufacturer’s NOX figures. If these are not available please contact Code
Technical Support.
For any other system not covered, or for clarification on how to estimate dry NOX
levels, please contact Code Technical Support.
Code for Sustainable Homes | 199
Background
Nitrogen oxides (NOX) are emitted from the burning of fossil fuels and contribute
to both acid rain and to global warming in the upper atmosphere. NOX formation,
which is highly temperature dependent, arises when combusting natural gas. NOX
are believed to aggravate asthmatic conditions, react with the oxygen in the air
to produce ozone, which is also an irritant and eventually form nitric acid when
dissolved in water. When dissolved in atmospheric moisture the result is acid rain
which can damage both trees and entire forest ecosystems.
Burners in domestic heating systems are a significant source of low-level NOX, while
power stations (and therefore electric heating) are a significant source of NOX in the
upper atmosphere. The amount of NOX emissions varies from product to product.
This credit rewards developers who include low-NOX boilers, use low NOX fuels or
other low NOX systems, such as renewables, in their schemes.
200 | Code for Sustainable Homes
Aim
To improve the quality of life in homes through good daylighting and to reduce the
need for energy to light the home.
Assessment Criteria
Credits are awarded for the dwelling meeting the criteria below:
Criteria
Credits
Default Cases
None
Code for Sustainable Homes | 201
Definitions
Angle of visible
b
sky
Wall u
H
Window a
Hw/2 Tw/2 D
Obstruction
Where:
And: u = 90 – a – b
H
tan a = —
D
With:
Tw
tan b = —–
Hw
Average daylight The average daylight factor is the average indoor illuminance
factor (from daylight) on the working plane within a room, expressed
as a percentage of the simultaneous outdoor illuminance on a
horizontal plane under an unobstructed CIE Standard Overcast
Sky.
Where:
R = 0.5
It is advised that this default figure for the angle of visible sky
is used with caution; the methodology detailed in the angle of
visible sky definition should be preferred for more accuracy.
Daylight factor The daylight factor is the ratio between the illuminance (from
daylight) at a specific point on the working plane within a
room, expressed as a percentage of the illuminance received
on an outdoor unobstructed horizontal plane. This is based on
an assumed overcast sky, approximated by the ‘CIE overcast
sky’.
No-sky line The no-sky line divides those areas of the working plane
which can receive direct light from the sky, from those
which cannot. It is important as it indicates how good the
distribution of daylight is in a room. Areas beyond the no-sky
line will generally look gloomy.
Section
Obstruction
No-sky line x
h
d
xh
d = —–
y
Where:
Assessment Methodology
Design Stage
• Verify that the evidence provided demonstrates that all the Assessment Criteria
have been met.
Code for Sustainable Homes | 205
• Carry out a reasonableness check on provided average daylight factor and no-
sky line calculations.
Calculation Procedures
Calculations are to be supplied by the developer/design team.
1. Calculation procedure for daylight factor and typical values are detailed in
Littlefair (1998)
− The average daylight factor formula can be used to model daylighting
conditions in any simple rectangular room with a continuous external
obstruction or none. Where external obstructions are of complex geometry
and cannot be approximated by a continuous object, it is advised to use
methodology in Littlefair (1998). Individual trees can be ignored.
− More complex room geometries can be modelled using computer simulation
software, physical scale modelling or advanced manual calculations.
− Where there are two types of room which form part of the same large space,
for example, an open plan kitchen-dining room, calculate as one room as
there is no solid partition present to block the distribution of the daylight.
Credits will then be awarded on the basis of the average daylight factor of
the whole space. For example, if the space is used as a kitchen, a living room
and a dining room, the same average daylight factor will be used when
assessing all these areas against the levels set out above.
2. Plotting of the no-sky line or estimating the percentage of the working plane
that receives direct light from the sky can be done using the methodology
detailed in the Relevant Definitions section. It must be understood that this
methodology will underestimate the actual percentage of the working plane
that receives direct light from the sky because obstructions are unlikely to
be infinite. Where obstructions are not horizontal, parallel to the window or
considered infinite, refer to Littlefair (1998) for a more accurate methodology
3. It is acceptable that daylighting calculations are carried out in selected
dwellings when the reasoning behind selection of dwellings (or rooms) clearly
demonstrates that the rooms in the dwellings for which the calculations are not
provided will perform better than those backed up by the calculations.
206 | Code for Sustainable Homes
Special Cases
Sun pipes: As a general rule, sun pipes should be treated as roof lights i.e. if there
are no obstructions use a u of 180°. There are a wide range of light pipes on the
market, with different reflective linings and some include lenses/mirrors etc. If no
transmission factor is stated use T = 0.5 for a 1m length pipe and T = 0.25 for a 2m
length pipe.
Background
In addition to reducing the need for artificial lighting and in some cases contributing
to winter heating requirements, research has shown that the main impact of good
daylighting design is on human beings. Adequate access to daylight will contribute
to the health and wellbeing of dwelling occupants by providing them with a pleasant
living environment.
The quality and quantity of natural light in an interior depends both on the design of
the interior environment (size and position of windows, depth and shape of rooms,
colours of internal surfaces) and the design of the external environment (obstructing
buildings and objects).
BS 8206 describes good practice in daylighting design and presents criteria intended
to enhance the wellbeing and satisfaction of people in buildings, recognising that
the aims of good lighting go beyond achieving minimum illumination for task
performance.
The Code awards credits for meeting the minimum average daylight factor suggested
by BS 8206-2. The British Standard, together with further guidance given in Littlefair
(1998), is widely accepted as the authoritative guidance for use in daylighting the UK.
Code for Sustainable Homes | 207
Aim
To ensure the provision of improved sound insulation to reduce the likelihood of
noise complaints from neighbours.
Assessment Criteria
Credits are awarded for achieving higher standards of sound insulation than those
given in Approved Document E of the Building Regulations and demonstrating it by
either using pre-completion testing or Robust Details as follows:
Criteria
Credits
Where:
• airborne sound insulation values are at least 3dB higher 1
• impact sound insulation values are at least 3dB lower
OR
• airborne sound insulation values are at least 5dB higher
• impact sound insulation values are at least 5dB lower
OR 3
• airborne sound insulation values are at least 8dB higher
• impact sound insulation values are at least 8dB lower
than the performance standards set out in the Building Regulations for England and Wales, 4
Approved Document E (2003 Edition, with amendments 2004).
This can be demonstrated through EITHER
a programme of pre-completion testing based on the Normal programme of testing described
in Approved Document E for every group or sub-group of houses or flats that demonstrates
that the performance standard or standards above are achieved.
OR
use of constructions for all relevant building elements that have been assessed and approved
by Robust Details Limited (RDL), and found to achieve the performance standards stated above
and to register all relevant dwellings with RDL.
Default cases
Detached dwellings 4
Attached dwellings where separating walls or floors only occur between non habitable rooms 3
208 | Code for Sustainable Homes
Definitions
Approved Document E The Building Regulations for England and Wales
Approved Document E: Resistance to the Passage of
Sound, 2003 edition incorporating 2004 amendments.
Groups and Sub-groups As defined in the Building Regulations for England and
Wales Approved Document E: Resistance to the Passage
of Sound, Section 1 (paragraphs 1.11 – 1.17). In addition
to this, where there are steps or staggers greater than
300mm between dwellings, dwellings without steps/
staggers should be treated as a different sub-group to
those with step/staggers. This is because the presence of
steps/staggers is likely to improve performance.
Habitable room For the purpose of this issue, habitable rooms include
any room where individuals will sit or lie down and
require a reasonably quiet environment to concentrate
or rest. Such rooms are bedrooms, living rooms, dining
rooms, studies as well as kitchen-dining and kitchen-
living rooms.
Assessment Methodology
Design Stage
• Verify that the evidence provided demonstrates that all the Assessment Criteria
have been met.
• For compliance through sound insulation testing:
a). Confirm there is a clear distinction between any groups and sub-groups
on the development, and that there is a commitment made to conduct
a program of pre-completion testing, as set out in ADE. Identification of
specific plots to be tested should be undertaken by the building control
body when construction is nearing completion. In addition confirm that
there is a commitment to conduct remediation work should any test fail.
b). Confirm that the Compliant Test Body that will carry out pre-completion
testing is accredited by UKAS (or a European equivalent) or is covered
by a ‘deemed to satisfy’ scheme. If a Compliant Test Body has yet to be
appointed, a commitment to employ one that fulfils one of the criteria will
be sufficient. Lists of acoustic consultants by geographical location can
be found at: www.ioa.org.uk and www.association-of-noise-consultants.
co.uk.
c). Confirm that evidence of the potential for the construction to meet the
relevant performance standards has been provided (e.g. design statement
from an acoustic consultant with appropriate experience in building
acoustics).
• For compliance using Robust Details:
a). Confirm that the Robust Detail(s) specified can achieve the sound insulation
levels required for the number of Credits sought (see Table 1 – Credit
Summary – Improvements on Approved Document E under Checklists and
Tables below). This information is available on the Robust Details website
(www.robustdetails.com).
Calculation Procedures
None
212 | Code for Sustainable Homes
1 +3 –3
3 +5 –5
4 +8 –8
The dwellings in a group or sub-group that have been tested are awarded credits
appropriate to their measured performance. Other dwellings in the group or sub-
group that were not tested are awarded the same number of credits as the lowest
performing separating walls or floors in the same group or sub-group that was
tested.
For the purposes of the two paragraphs above, the performance of the lowest
performing separating wall or floor must be clearly identified by the Compliant Test
Body.
Special Cases
Testing should be between habitable rooms on the ground floor and at higher
storey levels if applicable. If there are no habitable rooms with separating walls or
floors no testing is needed. In such cases 3 credits can be awarded by default, to
allow for the small amount of sound nuisance that can occur in such cases.
In addition, it is considered good acoustic design not to have habitable rooms on
one side of a separating wall or floor and non-habitable rooms on the other side.
have been tested this will be considered to be equivalent to the requirements in ADE,
and credits will be awarded as appropriate.
Note: No more than two airborne and two impact sound insulation tests should be
undertaken between a pair of houses or flats i.e. a maximum of two airborne sound
insulation tests should be carried out on any separating wall and a maximum of two
airborne and two impact tests on any separating floor. These tests must be carried
out between different pairs of rooms.
Background
One of the most common causes for disputes between neighbours is noise.
Environmental Health Officers in England and Wales received nearly 6000 noise
complaints per million people in 2003/2004 from domestic premises. This accounts
for 75% of all noise complaints received.
To ensure that the design intent for sound insulation is achieved on site, sound
insulation testing is covered by Regulation 20A of the Building Regulations (2000) or
Regulation 12A of the Approved Inspector Regulations (2000). The normal way of
satisfying Regulation 20A or 12A is to implement a programme of sound insulation
testing, called pre-completion testing, according to the guidance set out in Section
1: Pre-completion testing, Approved Document E (2003 Edition with amendments
2004). This guidance describes the normal programme of testing, based on at least
one set of tests for every 10 houses, flats or rooms for residential purposes in a group
or sub-group.
From 1st July 2004, Robust Details have been introduced as an alternative to pre-
completion testing for demonstrating compliance with Part E. Robust details have
been developed for separating wall and floor constructions. These have been
tested in the field against the performance standards in Approved Document E.
The constructions are described in guidance produced by Robust Details Ltd (www.
robustdetails.com). Not all RDs are able to meet levels of performance above ADE
requirements in accordance with the Code criteria. Information on compliance is
available from RDL on this issue if in doubt.
Aim
To improve the occupiers’ quality of life by providing an outdoor space for their use,
which is at least partially private.
Assessment Criteria
Criteria
Credits
Where outdoor space (private or semi-private) has been provided that is: 1
• of a minimum size that allows all occupants to sit outside
• allows easy access to all occupants, including wheelchair users
• accessible only to occupants of designated dwellings
Default Cases
None
216 | Code for Sustainable Homes
* or a letter of instruction to a
contractor/supplier or a formal letter
from the developer to the assessor
giving a specific undertaking
Definitions
Accessible only The space must be designed in a way that makes it
to occupants of clear that the space is only to be used by occupants of
Designated dwellings designated dwelling(s). This could be achieved by using
the buildings themselves, fencing, planting or other
barrier to seal off the space.
Easy access by all Access for wheelchair users should conform to BS8300
occupants Design of buildings and their approaches to meet the
needs of disabled people – Code of practice.
Code for Sustainable Homes | 217
• a private garden
• a communal garden or courtyard
• balconies
• roof terraces
• patios
Assessment Methodology
Design Stage
• Measure the area of the outdoor space and check it is of sufficient size for the
number of bedrooms.
Calculation Procedures
None
Conservatories and other enclosed areas do not comply with the criteria.
Special Cases
None
Background
The provision of secure private space is an effective way to improve the quality of the
occupier’s life. The adaptability of private space serves as a multi-purpose area and
can be utilised by any occupant, for example, as a secure playing space for children,
for horticultural purposes, or simply as a convenient place for fresh air.
‘It seems important that the open space directly connected to dwellings should be
demonstrably private, no matter what tenure arrangements apply, and that the
territorial rights of the occupiers should be clearly marked.
Gardens and balconies are popular but only if they are a reasonable size. A flat
located near the centre of a city may be preferred to a house with a garden away
from the centre, even for a proportion of families with older children, especially if a
usable balcony is available.’
‘Intuitively, we all understand the benefits of open space: a walk, a breath of fresh
air, a change of scene. We know we feel better for it and research from Japan goes
to show that good neighbourhood green spaces promote longer life expectancy for
local people.’
Aim
To encourage the construction of homes that are accessible and easily adaptable to
meet the changing needs of current and future occupants.
Assessment Criteria
For a Level 6 assessment achievement of the Lifetimes Homes criteria is a mandatory
requirement.
Criteria
Credits
Where all principles of Lifetime Homes, applicable to the dwelling being assessed, have been 4
complied with.
Default Cases
None
Definitions
Lifetime Homes Developed by Habinteg Housing Association, the Helen
Hamlyn Foundation and the Joseph Rowntree Foundation
in the early 1990’s. The scheme involves the incorporation
of 16 design features that together create a flexible
blueprint for accessible and adaptable housing in any
setting.
Assessment Methodology
Design Stage
• Confirm that the developer/designer has completed the Lifetime Homes
checklist and that all the elements will be met.
Calculation Procedures
None
1). Where there is car The general provision for a car parking Usually only houses
parking adjacent to space is 2400mm width. If an additional – all dwellings that have a
the home, it should be 900mm width is not provided at the parking space within the
capable of enlargement to outset, there must be provision (e.g. designated plot boundary
attain 3300mm width a grass verge) for enlarging the overall for that particular dwelling
width to 3300mm at a later date
continued
Code for Sustainable Homes | 221
2). The distance from the It is preferable to have a level approach. All forms of dwelling
car parking space to the However, where the topography – all parking spaces, for any
home should be kept to a prevents this, the following table type of dwelling, whether
minimum and should be highlights the maximum gradients that space is within the
level or gently sloping dependent on the distance* boundary or not
<5m 1:12
5–10m 1:15
>10m 1:20
3). The approach to all See specification and dimensional As standard 2 above.
entrances should be level requirements of standard 2 above for
or gently sloping the definition of gently sloping
4). All entrances should: The threshold upstand (any vertical All forms of dwelling –
change in level at the threshold) should
a). be illuminated 4a). All entrances to
not exceed 15mm
dwellings and all communal
b). have level access over
entrances to blocks of
the threshold and
dwellings
c). have a covered main
4b). All entrances to
entrance
dwellings, all communal
entrances to blocks of
dwellings and all associated
communal doors
4c). Main entrances
to dwellings and main
entrances to blocks of
dwellings
5). Communal stairs Minimum dimensions for communal Flats and maisonettes
should provide easy stairs; – any dwelling approached
access and where homes Uniform rise not more than 170mm via a communal stair and/or
are reached by a lift, it a passenger lift. If a lift is
Uniform going not less than 250mm
should be fully accessible provided, the communal
Handrails extend 300mm beyond top stairs must still conform to
and bottom step the requirements stated in
Handrail height 900mm from each the Specification column.
nosing
continued
222 | Code for Sustainable Homes
The clear opening width of the front All front doors to all
door should be 800mm dwellings and communal
entrance doors to blocks of
dwellings
7). There should be A turning circle of 1500mm diameter or All forms of dwelling
a space for turning a a 1700mm x 1400mm ellipse is required
wheelchair in dining
areas and living rooms
and adequate circulation
space for wheelchairs
elsewhere
continued
Code for Sustainable Homes | 223
10). There should be; The drainage provision for a future 10a). All dwellings except
shower should be provided in all houses/maisonettes, with
a). a wheelchair accessible
dwellings two or more storeys, that
entrance level WC, with
have 2 or less bedrooms
b). drainage provision Dwellings of three or more bedrooms or
on one level; (i.e. applicable to all flats
enabling a shower to be
regardless of number of
fitted in the future The WC must be fully accessible. A bedrooms, and houses /
wheelchair user should be able to close maisonettes with 3 or more
the door from within the closet and bedrooms).
achieve side transfer from a wheelchair
to at least one side of the WC. There 10b). All forms of
must be at least 1100mm clear space dwelling
from the front of the WC bowl. The Note: these facilities will
shower provision must be within the be required within the
closet or adjacent to the closet bathroom of all flats if not
provided elsewhere in the
Dwellings of two or fewer bedrooms; flat
In small two-bedroom dwellings where
the design has failed to achieve the
above fully accessible standard WC,
the Part M standard WC will meet this
requirement
11). Walls in bathrooms Wall reinforcements should be located All forms of dwelling
and toilets should between 300 and 1500mm from the
be capable of taking floor
adaptations such as
handrails
12). The design should There must be a minimum of 900mm All dwellings with 2 or
incorporate; clear distance between the stair wall (on more storeys –
which the lift would normally be located)
a). provision for a future 12a). this criterion relates
and the edge of the opposite handrail/
stair lift to private stairs within
balustrade. Unobstructed ‘landings’ are
individual dwellings only
b). a suitably identified needed at the top and bottom of the
space for a through-the- stairs
floor lift from the ground
to the first floor, for
example to a bedroom
next to a bathroom
13). The design should Most timber trusses today are capable All forms of dwelling
provide a reasonable of taking a hoist and tracking.
route for a potential hoist Technological advances in hoist design
from a main bedroom to mean that a straight run is no longer a
the bathroom requirement
14). The bathroom Although there is not a requirement for All forms of dwelling
should be designed to a turning circle in bathrooms, sufficient
incorporate ease of access space should be provided so that a
to the bath, WC and wheelchair user can use the bathroom
wash basin
continued
224 | Code for Sustainable Homes
15). Living room window People should be able to see out of the All forms of dwelling
glazing should begin at window whilst seated. Wheelchair users
800mm or lower and should be able to operate at least one
windows should be easy window in each room
to open/operate
16). Switches, sockets, This applies to all rooms including the All forms of dwelling
ventilation and service kitchen and bathroom
controls should be at
a height usable by all
(i.e. between 450 and
1200mm from the floor)
Developer Confirmation
By entering a ‘YES’ against the criteria above, I confirm that all dwellings of this specification type on the
ENTER SITE NAME site meet the stated criteria.
Signature:
Date:
Print Name:
*Providing there are top, bottom and intermediate landings of not less than 1.2m excluding the swing of doors
and gates.
Special Cases
None
Background
The Lifetime Homes concept was developed by Habinteg Housing Association, the
Helen Hamlyn Foundation and the Joseph Rowntree Foundation in the early 1990’s.
The resultant 16 design criteria aim to produce homes that are accessible to a wide
range of occupants and able to be easily adapted to meet the changing needs of a
household.
Code for Sustainable Homes | 225
Lifetime Homes will be suitable for older people and for the vast majority of disabled
people, as well as non-disabled people; they will have a wider market of potential
buyers and residents, most likely increasing their value and the ease with which they
can be re-sold.
“The Chartered Institute of Housing in Northern Ireland & the Joseph Rowntree
Foundation conducted a comparative study into the cost of meeting Building
Regulations and Lifetime Home standards. The additional cost of building Lifetime
Homes ranged from £165 to a maximum of only £545 per dwelling, depending on
the size, layout and specification of the property. In addition, Lifetime Homes bring
about many savings and cost benefits in adaptations and flexibility in use as well as
increasing the marketability of the property.”
226 | Code for Sustainable Homes
Category 8: Management
Issue ID Description No. of credits Mandatory
available Elements
Man 1 Home User Guide 3 No
Aim
To encourage and reward provision of guidance enabling occupants to understand
and operate their home efficiently and make the best use of local facilities.
Assessment Criteria
Credits are awarded for the provision of a simple user guide which covers information
relevant to the ‘non-technical’ tenant/owner on the operation and environmental
performance of their home, as follows:
Criteria
Credits
A Home User Guide, compiled using Checklist Man 1 Part 1 together with information that the 2
guide is available in alternative accessible formats
Where the guide also covers information relating to the site and its surroundings, compiled 1
using Checklist Man 1 Part 2
Default Cases
None
Code for Sustainable Homes | 227
Definitions
Alternative The home user guide should be provided in an appropriate
formats for home format for users. This might include translation into foreign
user guide languages, braille, large print or audio cassette/CD.
Assessment Methodology
Design Stage
• Check confirmation that the guide assembled with the Checklist Man 1 will be
supplied to all homes.
• Check whether additional local information from the Checklist Man 1 will also
be provided.
Calculation Procedures
None
continued
Code for Sustainable Homes | 229
d. Recycling and • Information about the Local Authority collection scheme (if applicable)
Waste
• If the home is not covered by a Local Authority collection scheme, details
and location of communal recycling bins/skips/facilities
• Information on the location and use of any recycling bins
• Information on the location and use of any compost bins
• Information on WRAP which can offer guidance on recycling and
sustainable waste disposal
h. Provision of • Include details of the procedure for obtaining a copy of the guide in
Information in alternative formats, including foreign languages, Braille, large print or audio
Alternative Formats cassette / CD. It should include the contact details of the person/organisation
responsible for producing the guide
continued
230 | Code for Sustainable Homes
a. Recycling and • Information on what to do with waste not covered by the standard weekly
Waste Local Authority collection scheme for example fridges/freezers, computer
equipment, batteries and other potentially hazardous equipment. In some
areas the Local Authority will collect these items. If this is the case, details
and information of such a collection should be provided
• Information and location of local recycling facilities and waste tips
b. Sustainable • Details of SUDS within the site boundary including an overview of the
(Urban) Drainage reasons and benefits behind their use (eg prevention of localised flooding)
Systems (SUDS) and advice on maintenance and operation
c. Public Transport • Details of local public transport facilities including maps and timetables and
the location of nearby bus stops and/or train/tube stations
• Details of cycle storage and cycle paths in the area including, if available,
cycle path network maps for the whole town/local area
• Details of car parking and information on available park and ride, car
sharing schemes and/or car pools/car hire in the area
• Details on how to get to local amenities in the area by public transport or
cycling
d. Local amenities • The location of food shops, post boxes, postal facilities, bank/cash points,
pharmacies, schools, medical centres, leisure centres, community centres,
places of worship, public houses, children’s play areas, outdoor open access
public areas
• Other local amenities such as places of interest/cultural value, areas of
beauty / wildlife / conservation / allotments etc.
continued
Code for Sustainable Homes | 231
Developer Confirmation
By entering a ‘YES’ against the criteria above, I confirm that all dwellings of this specification type
on the ENTER SITE NAME site meet the stated criteria.
Signature:
Date:
Print Name:
Special Cases
It is acceptable for Home User Guides to be provided on the internet or CD. Where
this is the case all occupants:
• Must be given a hard copy of the Home User Guide contents page and a letter
explaining the benefits of using the guide
• Must be given a contact number and address of where they can get a hard
copy of the Home User Guide if they request this. These contact details must
remain current for at least 12 months from handover
A system must be in place to provide hard copies of the Home User Guides to
occupants on request.
Background
It is likely that without provision of adequate information and guidance the dwelling
may be used inappropriately, leading to the dissatisfaction of occupants and the
waste of resources.
232 | Code for Sustainable Homes
Aim
To recognise and encourage construction sites managed in an environmentally and
socially considerate and accountable manner.
Assessment Criteria
Credits are awarded where there is a commitment to comply with best practice site
management principles as follows:
Criteria
Credits
Where there is a commitment to meet Best Practice under a nationally or locally recognised 1
certification scheme such as the Considerate Constructors Scheme
Where there is a commitment to go significantly beyond Best Practice under a nationally or
2
locally recognised certification scheme such as the Considerate Constructors Scheme
Default Cases
None
Code for Sustainable Homes | 233
Definitions
Best practice Achieving a score of at least 3 in every section, and a
total score between 24 and 31.5, of the Considerate
Constructors Scheme’s Code of Considerate Practice
indicates that a site is being managed in accordance
with best practice.
• Considerate
• Environmentally Aware
• Site Cleanliness
• Good Neighbour
• Respectful
• Safe
• Responsible
• Accountable
Assessment Methodology
Design Stage
• Where the site is being assessed using the Considerate Constructors Scheme,
confirm contractor’s commitment as set out in the Assessment Criteria.
• Where the site is being assessed using an alternative scheme, the details of the
alternate scheme should be checked to confirm that it covers equivalent items.
This is done by completing Checklist Man.2 – Compliance with an Alternative
Scheme under Checklists and Tables (This checklist is 12 pages long and is
available from the Code Service Provider). This checklist sets out a number
of mandatory items and a wider range of issues equivalent to those in the
Considerate Contractors Scheme. In addition to the mandatory issues:
Calculation Procedures
None
Checklist Man.2 – Compliance with an Alternative Scheme for the compliance with
other locally and nationally recognised schemes is available from the Code Service
Provider on request.
236 | Code for Sustainable Homes
Special Cases
None
Background
Aim
To recognise and encourage construction sites managed in a manner that mitigates
environmental impacts.
Assessment Criteria
Credits are awarded where there is a commitment and strategy to operate site
management procedures on site as follows:
Criteria
Credits
Where there are procedures that cover 2 or more of the following items: 1
Monitor, report and set targets for CO2 production or energy use arising from site activities
Monitor and report CO2 or energy use arising from commercial transport to and from site
Monitor, report and set targets for water consumption from site activities
Adopt best practice policies in respect of air (dust) pollution arising from site activities
Adopt best practice policies in respect of water (ground and surface) pollution occurring on
the site
80% of site timber is reclaimed, re-used or responsibly sourced
Where there are procedures that cover 4 or more of the items listed above. 2
Default Cases
None
238 | Code for Sustainable Homes
Relevant Definitions
None
Assessment Methodology
Design Stage
• Check that there is a firm commitment to adhere to Checklist Man 3 –
Construction Site Impacts under Checklists and Tables.
• Where at least two items fully meet the checklist criteria, award one credit;
where at least four items fully meet the checklist criteria, award two credits.
Calculation Procedures
None
a. Commitment to monitor, report and set targets for CO2 production of energy use arising from site
activities
* Targets for energy consumption during the construction process should be set using DTI’s Environmental KPI
benchmarks. These documents do not specify targets but facilitate projects in setting appropriate targets (see
references section of main credit for further details).
Note: The Code does not require targets to be met but is encouraging the process of setting, monitoring and
reporting against targets.
b. Commitment to monitor and report on CO2 or energy arising from commercial transport to and
from the site
continued
240 | Code for Sustainable Homes
c. Commitment to monitor, report and set targets for water consumption arising from site activities
* Targets for water consumption during the construction process should be set using DTI’s Environmental KPI
benchmarks. These documents do not specify targets but facilitate projects in setting appropriate targets (see
References and Further Information for details).
Note: The Code does not require targets to be met but is encouraging the process of setting, monitoring and
reporting targets.
continued
Code for Sustainable Homes | 241
d. Commitment to adopt best practice policies in respect of air (dust) pollution arising from site
activities
Note: Further information can be obtained from DTI/BRE publications ‘Control of Dust from Construction and
Demolition Activities’ and Pollution Control Guide Parts 1–5 provide good practice guidelines on construction
related pollution (see References and Further Information for details).
e. Commitment to adopt best practice policies in respect of water (ground and surface) pollution
occurring on the site
Source: National Atmospheric Emissions Inventory for 2003 developed by Netcen (2005). UK Greenhouse Gas
Inventory for 2003 developed by Netcen (2005), Digest of UK Energy Statistics DTI 2004 and carbon factors for
fuels from UKPIA (2004)
Size of car and distance units Total units Units x kg CO2 Total kg
travelled per unit CO2
km x 0.16
km x 0.22
km x 0.18
Source: NAEI (Netcen, 2005) based on data from DfT combined with factors from TRL as functions of average
speed of vehicle derived from test data under real world testing cycles
Size of car and distance units Total units Units x kg CO2 Total kg
travelled per unit CO2
km x 0.17
Source: NAEI (Netcen, 2005) based on data from DfT combined with factors from TRL as functions of average
speed of vehicle derived from test data under real world testing cycles.
Code for Sustainable Homes | 243
Diesel 2.63
LPG 1.49
Diesel 2.63
LPG 1.49
Source: Guidelines for Company Reporting on Greenhouse Gas Emissions, DEFRA. Continuing Survey of Road
Goods Transport 2001.
Special Cases
None
Background
Construction sites are responsible for significant impacts, especially at a local level.
These arise from disturbance, pollution and waste. Impacts such as energy and water
use are also significant (although minor in relation to the overall impacts of the
building).
Pollution
Construction has the potential for major pollution, largely through pollution to air
(through dust emission), and to water (via watercourses and ground water). BRE
publishes guidance on construction site dust management, whilst the Environment
Agency publishes guidance on water pollution control measures. There are significant
statutory requirements in this area under environmental health legislation and the
Environmental Protection Act. The Environment Agency and local Environmental
Health Officers police these issues.
244 | Code for Sustainable Homes
Energy
Energy management on site has been a key focus for the Construction
Confederation, and they have published specific guidance (referenced) to help
achieve this. Monitoring and reporting at site level are the key factors in raising
awareness of the impacts of energy consumption. Whilst total energy is frequently
monitored, this information is predominantly used to feedback into the tendering
process and is seldom used to seek improvements on the site in question.
Targets
Targets are requested under the Code to promote the process of setting, monitoring
and achieving targets. However, the Code does not set targets, as these are project
specific. For guidance on setting targets refer to DTI’s Construction Industry KPI Pack,
this series of documents guides the reader through how to set targets for their own
projects.
Code for Sustainable Homes | 245
Aim
To encourage the design of developments where people feel safe and secure;
where crime and disorder, or the fear of crime, does not undermine quality of life or
community cohesion.
Assessment Criteria
Credits are achieved by complying with Section 2 – Physical Security from ‘Secured by
Design New Homes’, as follows:
Criteria
Credits
Where an Architectural Liaison Officer (ALO) or Crime Prevention Design Advisor (CPDA) 2
from the local police force is consulted at the design stage and their recommendations are
incorporated into the design of the dwelling (an actual Secured by Design Certificate is not
required).
Default Cases
None
246 | Code for Sustainable Homes
Definitions
Architectural The Architectural Liaison Officer (ALO) is a specialist crime
Liaison Officer prevention officer, trained at the Home Office Crime
(ALO) Reduction College, who deals with crime risk and designing
out crime advice for the built environment. In addition to
physical security measures, the officer will consider defensible
space, access, crime and movement generators, all of which
can contribute to a reduction in crime and disorder.” taken
from www.securedbydesign.com
Crime Prevention Crime Prevention Design Advisors (CPDAs) are to use good
Design Advisor design to make it as difficult as possible for criminals to
(CPDA) benefit from either access or cover within built environments.
For further information see http://www.thamesvalley.police.
uk/reduction/designoutcrime/index.htm.
Office of the Office of the Deputy Prime Minister. On 5th May 2006 the
Deputy Prime responsibilities of ODPM transferred to the Department for
Minister (ODPM) Communities and Local Government.
Code for Sustainable Homes | 247
Assessment Methodology
Design Stage
• Check that an ALO/CPDA has been appointed and that the developer confirms
their advice will be followed.
Calculation Procedures
None
Special Cases
None
Background
“Safety and security are essential to successful, sustainable communities. Not only
are such places well-designed, attractive environments to live and work in, but they
are also places where freedom from crime, and from the fear of crime, improves the
quality of life.
‘Secured by Design’ is a free certification scheme run by the police, who provide an
Architectural Liaison Officer to give advice to a developer.
The ‘Secured by Design’ award does not signify that premises are crime proof,
but that they have been subjected to a minimum standard of security that, in the
experience of the police service and other agencies, can significantly reduce the risk
of crime. Local conditions may require additional or alternative measures.
Code for Sustainable Homes | 249
Category 9: Ecology
Issue ID Description No. of credits Mandatory
available Elements
Eco 1 Ecological Value of Site 1 No
Aim
To encourage development on land that already has a limited value to wildlife, and
discourage the development of ecologically valuable sites.
Assessment Criteria
Credits are awarded where the site is defined as land of inherently low ecological
value in accordance with the following criteria:
Criteria
Credits
Where the development site is confirmed as land of inherently low ecological value 1
EITHER
By meeting the criteria for low ecological value (using Checklist Eco 1 – Land of Low Ecological
Value under Checklists and Tables below)
OR
By being confirmed by a Suitably Qualified Ecologist
OR
Where an independent ecological report of the site, prepared by a Suitably Qualified Ecologist,
confirms that the construction zone is of low or insignificant ecological value
AND
Any land of ecological value outside the construction zone but within the development site will
remain undisturbed by the construction works.
Default Cases
None
250 | Code for Sustainable Homes
Definitions
Construction Zone The construction zone includes any land used for
buildings, hard standing, landscaping, site access and
any land where construction work is carried out (or land
is being disturbed in any other way), plus a 3m boundary
in either direction around these areas. It also includes
any areas used for temporary site storage and buildings.
If it is not known exactly where buildings, hard standing,
site access, temporary storage and buildings will be
located it must be assumed that the construction zone is
the development site.
Low Ecological Value Land defined as having low ecological value using
Checklist Eco 1 OR defined by a Suitably Qualified
Ecologist to have low or insignificant ecological value.
Assessment Methodology
Design Stage
• Where using Checklist Eco 1 – Land of Low Ecological Value, verify that the
answer to all questions in Section 1 is ‘No’ and that ‘Yes’ has been answered to
at least one question in Section 2.
• Where a Suitably Qualified Ecologist has been appointed, confirm that the
ecologist’s report verifies that the construction zone is of low or insignificant
value and that any land of ecological value outside of the construction zone will
remain undisturbed by the construction works.
• Confirmation must also be provided that the ecologist meets the definition of a
Suitably Qualified Ecologist, as defined above or where the ecologist does not
fully meet the requirements of a Suitably Qualified Ecologist that the report is a
Verified Ecological Report.
Calculation Procedures
None
General Information: In order for the development to be defined as ‘land of low ecological value’, the
assessor must answer NO to all of the questions in Section 1 and YES to any of the question in Section 2.
Instruction: Criteria 1.1–1.5 can be used to determine the presence of existing ecological features across the
site. If YES is recorded against any question in Section 1 then the site cannot be defined as having land of low
ecological value and the credit cannot be awarded. If NO is recorded against all the questions in Section 1 then
proceed to Section 2.
1.1 Does the site contain any trees or hedges above 1m high or with a trunk
YES NO
diameter greater than 100mm?
1.2 Are there any ponds, streams or rivers on, or running through the site? YES NO
1.3 Is there any marsh or other wetland present on the site? YES NO
1.4 Are there any meadows or species-rich grassland present on the site? YES NO
1.5 Is there any heath land, consisting of heather and/or scrub present on the site? YES NO
Instruction: In addition to answering NO to all the questions in Section 1, if YES is recorded against one or
more of the questions in Section 2, the development site can be defined as having land of low ecological value
and the credit can be awarded. (The assessor MUST check that these agree with the site drawings.)
2.1 Does the development site consist of land which is entirely within the floor plan/s
YES NO
of existing building/s or building/s demolished within the past two years?
2.2 Does the development site consist of land which is entirely covered by other
constructions such as sporting hard surfaces, car parking or such constructions YES NO
which have been demolished within the past two years?
2.3 Does the development site consist of land which is contaminated by industrial or
YES NO
other waste to the extent that it would need decontamination before building?
2.4 Does the development site consist of land which is a mixture of either existing
YES NO
building, hard surfaces and/or contaminated land?
2.5 Does 80% of the land within the development site comply with statements 2.1,
2.2 or 2.3 and the remaining 20% of the ground area of the building extend into
YES NO
land which has been either; used for single-crop arable farming for at least five
years, OR consists of regularly cut lawns and sports fields.
Code for Sustainable Homes | 255
Special Cases
Areas of high ecological importance can be omitted from the construction zone if
the Suitably Qualified Ecologist is satisfied that they will not be disturbed by actions
on site. Confirmation from the Suitably Qualified Ecologist is required in writing
including details of the features and their locations. At the Post Construction Stage,
confirmation that these areas were not affected by site activities is required from the
Suitably Qualified Ecologist.
Background
Wherever possible there is a benefit in development being restricted to land that
already has a limited value to wildlife. The ecological value of a site is affected
by previous uses and the presence of ecological features such as trees, hedges,
watercourses, wetlands, meadows, etc. Therefore, the re-use of existing sites will help
to slow down the destruction of natural habitats and the wildlife they support, as
well as preventing loss of land used for agriculture, parkland, etc.
Wherever homes are constructed, there is always a risk that however environmentally
benign the building or development itself is, it may present a threat to local ecology
or areas of natural beauty. The principle here is to minimise the damage to existing
local ecology and then, where possible, to enhance it.
Aim
To enhance the ecological value of a site.
Assessment Criteria
Where there is a commitment to enhance the ecological value of the development
site in accordance with the following criteria:
Criteria
Credits
Where a Suitably Qualified Ecologist has been appointed to recommend appropriate ecological 1
features that will positively enhance the ecology of the site.
AND
Where the developer adopts all key recommendations and 30% of additional
recommendations.
Default Cases
None
Code for Sustainable Homes | 257
• Clearly outlines the key and additional Plans showing both proposed and
recommendations implemented recommendations
• Confirms that the ecologist made a Where the whole site has not been built
site visit prior to the commencement out and:
of initial site preparation works ideally
• New ecological features have not
at RIBA stage B
been added;
AND
OR
Specification clause or other
• Where features are being added at a
confirmation* detailing:
later date in an appropriate planting
• How the key recommendations and season.
30% of additional recommendations
All such enhancement works must be
will be incorporated into the design
completed within a single annual cycle
• The planting schedule of any species from completion of construction works
to be incorporated from Suitably on the final dwellings on the site
Qualified Ecologists recommendations
The assessor must provide confirmation
*drawings or a letter of instruction to that there is either a contract in place or
a contractor/supplier or a formal letter a letter confirming when the planting
from the developer to the Code assessor will be complete, which must be within
giving the specific undertaking 18 months from completion.
258 | Code for Sustainable Homes
Definitions
Recommendations Recommendations are defined as measures adopted to
enhance the ecology of the site, which may include:
Assessment Methodology
Design Stage
• The assessor must confirm that a Suitably Qualified Ecologist has been
appointed to provide a report detailing key and additional recommendations for
enhancing the ecology of the site and that:
a) the report has been prepared using the ‘Code for Sustainable Homes
Ecology Report Template’ and it is recommended that this is carried out at
RIBA stage B
b) the ecologist meets all the requirements as stated in the definition of a
Suitably Qualified Ecologist
c) the Suitably Qualified Ecologist has confirmed that all UK and EU law in
respect of protected species has been complied with and that any key and
additional recommendations are beyond the requirements of such laws
d) the ecologist made a site visit prior to the commencement of initial site
preparation works
e) the ecologist’s recommendations are based on the existing site ecology,
determined from the site visit
f) the site visit was made at appropriate times of year when plant and animal
species were evident
Code for Sustainable Homes | 259
Where there has been no site visit prior to initial site preparation, this is only
acceptable where the credit for Eco1 – Ecological Value of the Site has been
achieved, and evidence provided to achieve Eco 1 has been passed on to
the Ecologist as a basis for the ecological report. This evidence must be in
accordance with the Information Required to Demonstrate Compliance as
detailed in Eco 1.
Calculation Procedures
None
Where enhancement has been made to an area/areas outside of the site boundary
and unconnected to the site and no enhancement has been made within the site
boundary, the credit cannot be awarded.
Special Cases
None
Background
In many cases it is possible to improve the ecological value of the site. However, this
requires careful consideration of the existing and neighbouring features in addition
to careful selection of plant species and habitats. This is an area of specialist expertise
and requires input from experts at both site master planning and detailed design
stages. Preferably ecological advice should be sought at initial site inspection in prior
to planning order to get advice on code issues to give the best head start and to
maximise the potential benefits to enhancing biodiversity.
Code for Sustainable Homes | 261
Aim
To protect existing ecological features from substantial damage during the clearing of
the site and the completion of construction works.
Assessment Criteria
Where there is a commitment to maintain and adequately protect features of
ecological value during site preparation and construction works in accordance with
the following criteria:
Criteria
Credits
Where all existing features of ecological value on the development site potentially affected by 1
the works, are maintained and adequately protected during site clearance, preparation and
construction works.
Default Cases
The credit can be awarded by default where the site has been classified as having low
ecological value in accordance with Eco 1 – Ecological Value of the Site AND no features of
ecological value have been identified.
If a Suitably Qualified Ecologist has confirmed a feature can be removed due to insignificant
ecological value or where an arboriculturalist has confirmed a feature can be removed due to
poor health/condition (e.g. diseased trees which require felling, either for health and safety
and/or conservation reasons), the credit can be achieved provided all other features are
adequately protected in accordance with the ecologist’s recommendations.
262 | Code for Sustainable Homes
AND EITHER
Definitions
Ecological Features As defined for Eco 1 – Ecological Value of Site.
Protection of natural The provision of physical barriers to prevent damage to
areas existing natural areas. Natural areas include meadows,
species rich grassland, heath land consisting of heather
and/or scrub, marshes and wetlands, ponds streams
and rivers. If such areas are remote from site works or
storage, construction activity should be prevented in
their vicinity.
Protection of trees and Where trees and hedges have been protected
hedges in accordance with BS5837 ‘Trees in Relation to
Construction’. This standard requires the development
of a Tree Protection Plan which involves the erecting
of physical barriers to prevent damage to existing
trees, with an exclusion area around the trees. It also
looks at defining a Root Protection Area and requires
consideration to be made where compulsory work is
required within the Root Protection Area.
Assessment Methodology
Design Stage
• Confirm that a report has been prepared on ecological features in accordance
with the Information Required to Demonstrate Compliance, together with
details of ecological protection to be carried out prior to the start of any
preliminary construction or preparation works (e.g. site clearance or the erection
of temporary site facilities).
• Where there are no ecological features to protect and the credit is being
awarded by default, evidence provided must demonstrate this and that Eco 1
– Ecological Value of the Site has also been awarded.
• The assessor must check that the developer/client has confirmed compliance
with all current EU and UK legislation relating to protected species and habitats
applicable to the development site. This is in addition to the protection of
ecological features as set out above.
264 | Code for Sustainable Homes
Calculation Procedures
None
Where ecological features (as defined above) have not been protected, credits
cannot be awarded. This applies even where the developer/client has confirmed a
commitment to comply with all current EU and UK legislation relating to protected
species and habitats applicable to the development site.
Special Cases
None
Background
Construction sites often contain existing ecological features that need to be protected
from damage (both direct and indirect). Such damage can be caused by impacts,
fires, pollution, soil compaction, changes in the water table, etc. Steps need to be
taken to minimise the risk of such damage.
Protecting the ecological features on site can ensure that the local ‘wild’ areas are
sustained. Maintaining native species can lead to reduced maintenance and reduced
risk of liabilities under wildlife legislation, as well as increasing and maintaining the
aesthetic qualities of a development.
Good practice dictates that ecological features need to be linked to reach their full
potential, therefore links to features external to the site should be made whenever
possible. Knowledge of existing species movements, and predictions of potential new
species movements, is required to fully integrate and support ecological features and
their associated species.
Code for Sustainable Homes | 265
Aim
To reward steps taken to minimise reductions and to encourage an improvement in
ecological value.
Assessment Criteria
Credits are awarded where the resulting change in ecological value is as follows:
Criteria
Credits
The ecological value before and after development is measured, and the overall change in
species per hectare is:
• Minor negative change: between –9 and –3 1
• Neutral: between –3 and +3 2
• Minor enhancement: between +3 and +9 3
• Major enhancement: greater than +9 4
Default Cases
None
AND EITHER
OR
Definitions
Suitably Qualified As defined for Eco l – Ecological Value of Site.
Ecologist (SQE)
Derelict Land The ecological value of derelict sites (Table : Cat 9.3,
Checklists and Tables) is time dependent; a linear
scale has been used to determine intermediate values
between zero ecological value at 1 year from dereliction/
demolition to a value at 30 years based on marginal
upland figures. This presents a worst case figure which
can be amended on the advice of a Suitably Qualified
Ecologist.
Marginal upland Areas that are on the periphery of upland and are
dominated by mixtures of low-intensity agriculture,
forestry and semi-natural vegetation.
‘Wildlife’ garden Garden planting that uses native species and those that
planting* have a known attraction or benefit to local fauna, based
on the advice of a suitably qualified ecologist.
Assessment Methodology
Design Stage
• Calculate the change in ecological value of the development site by comparing
the estimated diversity of plant species before and after construction using the
method described in Calculation Procedures below.
Calculation Procedures
Before Development
1. Select the most appropriate Landscape Type from Table : Cat 9.3 (Checklists
and Tables) using the descriptions provided in Definitions. This will be based
on the typology of the land surrounding the site and is likely to be the same
throughout the development. In some cases however, it may differ, such as
Code for Sustainable Homes | 269
Table : Cat 9.2a : Calculation of the Ecological Value of the Site Before Development
After Development
1. Repeat steps 1–2 above.
2. Enter the following details into Table : Cat 9.2b: the name of each Plot Type,
plot area and number of species per Plot Type (from Table : Cat 9.3, Checklists
and Tables). Follow the prompts to calculate the total average number of
species after development.
3. Where a Suitably Qualified Ecologist has been appointed, an ecological site
survey has been conducted and new habitat types/planting schemes have
been recommended, their areas and number of species per habitat type can be
entered directly into Table : Cat 9.2b.
Where new habitats are to be created or floral species are to be planted as part
of a landscape design, only those species which are native or have a known
attraction to local wildlife can be included in the calculations based on the
advice and recommendations of a Suitably Qualified Ecologist.
Where ‘extensive green roofs’ are designed by a Suitably Qualified Ecologist,
add this area to ‘wildlife garden’ Plot Type and subtract the area from ‘Building’
Plot Type.
The species value figures in Table : Cat 9.3 (Checklists and Tables) are figures
given for an existing, well-established site. It takes many years before the
ecological value of a specific landscape type is established naturally. It is
therefore not possible to assume that, for example, a newly developed urban
parkland has between 13.8 and 17.6 species just after construction without the
expert knowledge of a Suitably Qualified Ecologist. However, if the homes are
to be built on an existing urban parkland and part of the site is left undisturbed,
the ecological value of that part of the site can be assumed unchanged. If an
urban parkland is being created on part of the site the number of species on
this part of the site will need to be confirmed by a Suitably Qualified Ecologist
(taken from the actual number of indigenous species being planted) rather than
assuming that the new parkland will immediately have a species value of 11.6
(assuming fertilisers are going to be used).
Code for Sustainable Homes | 271
Table : Cat 9.2b : Calculation of the Ecological Value of the Site After Development
n
∑ 1(AreaPlotTypeN 3 SpeciesPlotTypeN)
SpeciesBeforeDevelopment =
TotalSiteArea
n
∑ 1(AreaPlotTypeN 3 SpeciesPlotTypeN)
SpeciesAfterDevelopment =
TotalSiteArea
The actual number of species may be used to replace any of the figures in Table : Cat
9.3 below, provided that a Suitably Qualified Ecologist has been appointed and has
reported actual species values in accordance with the Calculation Procedure above.
Table : Cat 9.3 : Average Number of Species per Landscape and Vegetation Plot Type for Existing Habitats
Arable Pastoral Marginal Upland Existing Urban Industrial Industrial Industrial Industrial
Upland Building/ Mosaic Derelict Derelict Derelict Derelict
Hard Land Land Land Land
Landscaped <1 year <10 years <20 years >30 years
Areas
Hard Landscaping 0 0 0 0 0 0 0 0 0 0
Buildings 0 0 0 0 0 0 0 0 0 0
‘ – ‘ insufficient data to produce national averages, as not all vegetation plot types are found in all landscape types. Values are data from: DEFRA “Digest of Environmental
Statistics” No. 20. HMSO, 1998
tbe: To be evaluated by a Suitably Qualified Ecologist – otherwise assume 0
Code for Sustainable Homes | 273
274 | Code for Sustainable Homes
Special Cases
None
Background
Any development of land will potentially affect its ecological value. This section of the
Code is designed to reward steps taken to minimise reductions in ecological value
and to encourage improvement. This is done by comparing the value of a site before
and after development and making a direct comparison in terms of plant species
(which is used as a proxy for biodiversity). The method takes account of the local
landscape type and the different habitats that exist to calculate an average value for
the site.
In the KPI approach both the vegetation groups marked * above, and derelict
urban/industrial land with a more diverse number of species, fall into the category of
‘ecologically valuable habitat’. This makes it possible to also use the figures derived
for this credit, to determine the project’s KPI score.
Code for Sustainable Homes | 275
Aim
To promote the most efficient use of a building’s footprint by ensuring that land and
material use is optimised across the development.
Assessment Criteria
Credits are awarded where the ratio of combined net internal floor area of all
dwellings on the site to their footprint (as measured by the total net internal ground
floor area) is as follows:
Criteria
Credits
For houses, where the Net Internal Floor Area: Net Internal Ground Floor Area ratio is greater 1
than or equal to 2.5:1
OR
For blocks of flats, where the Net Internal Floor Area: Net Internal Ground Floor Area is greater
than or equal to 3:1
OR
For a combination of houses and flats, a ratio of Total Net Internal Floor Area: Total Net
Internal Ground Floor Area of all houses and flats (i.e. the Site Wide Footprint to Floor Area
ratio) is greater than the area weighted average of the two target ratios above (see calculation
procedures)
For houses, where the Net Internal Floor Area: Net Internal Ground Floor Area ratio is greater 2
than or equal to 3:1
OR
For block of flats, where the Net Internal Floor Area: Net Internal Ground Floor Area is greater
than or equal to 4:1
OR
For a combination of houses and flats, a ratio of total Net Internal Floor Area: Total Net
Internal Ground Floor Area of all houses and flats (i.e. the Site Wide Footprint to Floor Area
ratio) is greater than the area weighted average of the two target ratios above (see calculation
procedures)
Default Cases
None
276 | Code for Sustainable Homes
Definitions
Habitable Space The definition of a habitable space is a heated space, typically
occupied for greater than 30 minutes throughout the day
with safe access by a permanent stairway or other means of
entrance which complies with the requirements of relevant
national Building Regulations AND where the space is
‘finished’ with floor, walls, lighting and electric sockets.
Net Internal Floor The area of all habitable spaces. This includes the area
Area taken up by halls, stairwells, cupboards, internal partitions,
habitable loft spaces and basements.
For flats, the floor area includes the party walls and
separating walls to common areas.
Net Internal Ground Also referred to as the Building Footprint, this is the area of
Floor Area land that is taken up by the permanent foundations of the
dwelling (including any other outbuildings with permanent
foundations that are associated with the dwelling), within
the external walls of the building.
This is measured for this Issue, as the total net internal floor
area of the ground floor, excluding the area taken up by the
external walls.
Other Occupied Other occupied spaces include retail, office spaces and other
Space non domestic spaces which are occupied for greater than 30
minutes throughout the day.
Assessment Methodology
Design Stage
• Verify that the evidence provided demonstrates that all the Assessment Criteria
have been met.
• Calculate the Floor Area: Footprint ratio for each type of dwelling. Note that
any outbuildings such as permanent garages and cycle stores need to be taken
into account in the footprint area.
Calculation Procedures
1. Where there is a mixture of houses and flats, to calculate the area weighted
target ratio for the site, use the following formula:
2. The site wide ratio should then be calculated using the following formula and
assessed against the above target ratio. Credits can be awarded where the ratio
calculated using the following formula is greater than the target area weighted
ratio as described in point 1 above.
( )
Total NIFA of all dwellings
Site wide footprint
= 3 100
to Floor Area ratio Total NIGFA of all dwellings
Where:
NIFA = Net Internal Floor Area
NIGFA = Net Internal Ground Floor Area
Code for Sustainable Homes | 279
Special Cases
None
Background
Land available for development will become increasingly expensive as land resources
come under pressure with the potential loss of urban parkland, allotments,
agricultural land and the pressure on more valued ecological sites such as salt
marshes. Use of ‘greenfield’ sites is already being limited and developers are likely to
experience opposition from the local community. To make best use of the available
land and other resources, including materials and energy, it is important to ensure
effective use of the building footprint by maximising the usable space. This issue is
further emphasised by the current growth targets for new build housing which will
require an increasing amount of land and therefore the more efficient this land is
used the lower the impact on land use and ecology.
280 | Code for Sustainable Homes
References
BRE Global. Code for sustainable homes – provision of scheme management services:
Guidance notes for prospective service providers. BRE Global, Garston. December
2007. Available from www.breeam.org/filelibrary/CSH_Guidance_Notes_for_
Prospective_Service_Providers.pdf
BRE. The government’s standard assessment procedure for energy rating of dwellings
(SAP 2005, version 9.80). Published on behalf of DEFRA by BRE, Garston, Watford.
October 2005. Available from www.bre.co.uk/sap2005
Ene 1
Building Research Establishment Ltd. The Government’s Standard Assessment
Procedure for Energy Rating of Dwellings, 2005 Edition.
SAP 2005: the Governments Standard Assessment Procedure for Energy ratings of
Dwellings, SAP 2005 edition, DEFRA, 2005 (available at www.bre.co.uk)
Ene 2
Building Research Establishment Ltd. The Government’s Standard Assessment
Procedure for Energy Rating of Dwellings, 2005 Edition
PassivHaus: www.passivhaus.org.uk
Ene 3
Communities and Local Government. Approved Document L1A Conservation of fuel
and power (New dwellings) (2006 edition). CLG, London, 2006. Available from www.
planningportal.gov.uk/approveddocuments
Ene 4
Chartered Institution of Building Services Engineers (CIBSE): Low Carbon Consultants
and Energy Assessors, by CIBSE Certification Ltd (in http://www.cibse.org/)
Ene 5
EST helps you find energy efficient products and gives you information on the EU
energy efficiency labelling scheme.
http://www.energysavingtrust.org.uk/myhome/efficientproducts/recommended/
index.cfm
http://www.energysavingtrust.org.uk/energy_saving_products/other_energy_labels/
the_eu_energy_label/
282 | Code for Sustainable Homes
Ene 6
BS 5266 Emergency Lighting
Communities and Local Government. Approved Document L1A and L1B Conservation
of fuel and power (New dwellings) (2006 edition). CLG, London, 2006. Available
from www.planningportal.gov.uk/approveddocuments
Ene 7
Department for Business Enterprise and Regulatory Reform (BERR) Low Carbon
Buildings Programme available at http://www.berr.gov.uk/energy/sources/sustainable/
microgeneration/lcbp/page30472.html
Ene 8
Architectural Press. New Metric Handbook – Planning and Design Data
Wat 1
BS EN 12056-3 – Gravity drainage inside buildings – Roof drainage, layout and
calculations (2000)
CIRIA Publication C539, 2001: Rainwater and Greywater Use in Buildings – Best
Practice Guidance
EN200:1992 Sanitary tapware. General technical specifications for single taps and
mixer taps (nominal size 1/2) PN 10. Minimum flow pressure of 0.05 MPa (0.5 bar)
Increasing the Value of Domestic Wateruse Data for Demand Management Summary
Report P6805, CP187, March 2005
Mat 1
BRE Environmental Profiles www.bre.co.uk/envprofiles
Mat 2
British Standards Institution , Environmental management systems – Guide to the
phased implementation of an environmental management system including the use
of environmental performance evaluation BS 8555 London BSI2003
Mat 3
Central Point of Expertise on Timber (CPET) available at http://www.proforest.net/cpet
Sur 1
BRE Digest 365 – Soakaway design 1991 (BRE)
BS EN 752-4 – Drain and sewer systems outside buildings – Hydraulic design and
environmental considerations (1998)
Centre for ecology and hydrology. Flood estimation handbook. 5 Volumes. National
Environmental Research Council. ISBN 0 94854094X. 1999. Available from www.nwl.
ac.uk
CIRIA. Interim Code of Practice for Sustainable Drainage systems (SUDS). CIRIA,
London. 2004. Available to download from www.ciria.org.uk/suds/icop.htm
Environment Agency website: Your environment > Environmental Facts and Figures >
Climate > Flooding. See www.environment-agency.gov.uk
Foresight Future Flooding website: Previous Projects > Flood and Coastal Defence >
Index. See www.foresight.gov.uk
Lancaster JW, Preene M, and Marshall. Development and flood risk – guidance for
the construction industry. CIRIA Report C624. CIRIA, London. 2004. Available from
www.ciriabooks.com
Code for Sustainable Homes | 285
Marshall DCW and Bayliss AC. Flood estimation for small catchments. IOH Report
No.124. Institute of hydrology, Wallingford (1994). Currently out of print. Available
to download from http://www.ceh.ac.uk/products/publications/documents/
IH124FLOODESTIMATIONSMALLCATCHMENTS.PDF
PPS 25 (Planning Policy Statement 25), “Development and flood risk”, ODPM (2006)
The SUDS Manual – 2007 (CIRIA C697) This replaces C522 and includes revised and
rationalised elements of C523 and C609
Sur 2
See applicable references in Sur 1
BS EN 752-4: 1998, “Drain and sewer systems outside buildings – Part 4: Hydraulic
design and environmental considerations”, British Standard Institute (1998)
PPS 25 (Planning Policy Statement 25), “Development and flood risk”, ODPM (2006)
Was 1
British Standards Institution, Design of buildings and their approaches to meet the
needs of disabled people – Code of practice BS 8300 London. BSI. 2001
British Standards Institution. Code of Practice for Storage and On-Site Treatment of
Solid Waste from Buildings. British Standard BS 5906. London. BSI. 2005
Was 2
BRE: SMARTWaste Plan (Site waste management planning tool), SMARTStart, waste
benchmarks/EPIs and guidance: Reduction of Site Construction Waste, Recycling
and Reuse of materials: A Site Guide and A Project Management Guide: www.
smartwaste.co.uk
DEFRA (Department of Environment, Food and Rural Affairs), Non Statutory Guidance
for Site Waste Management Plans: www.defra.gov.uk/constructionwaste
DEFRA: Site Waste Management Plans Regulations 2008 (2008/314 in the following
website: http://www.opsi.gov.uk/si/si2008/uksi_20080314_en_1#l1g5)
Site Waste Management Plans, Guidance for Construction Contractors and Clients,
Voluntary Code of Practice, DTI, 2004
DEFRA (Department of Environment, Food and Rural Affairs), Waste Strategy for
England 2007, available at http://www.defra.gov.uk/ENVIRONMENT/waste/strategy/
strategy07/pdf/waste07-strategy.pdf
WRAP: SWMP templates for standard, good and best practice details and registration
for download available at: www.wrap.org.uk/construction
WRAP: The Requirements suite for setting SWMPs early within projects (client
summary and waste minimisation and management guidance for delivering on the
requirements): www.wrap.org.uk/construction
Was 3
British Standards Institution, Design of buildings and their approaches to meet the
needs of disabled people – Code of practice BS 8300 London. BSI. 2001
Code for Sustainable Homes | 287
British Standards Institution. Code of Practice for Storage and On-Site Treatment of
Solid Waste from Buildings. British Standard BS 5906. London. BSI. 2005
Pol 1
National Atmospheric Emissions Inventory, UK Emissions of Air Pollutants 1970–2003,
DEFRA (2005)
Pol 2
British Standards EN 297:1994. A1:1995, A2:1996, A3:1996, A5:1998 and A6:2003
Gas-fired central heating boilers, page 42, table 14, section 3.6.2
Hea 1
BRE IP 23/93:BRE Information paper 23/93 measuring daylight
P.J.Littefair, Site layout planning for daylight and sunlight: a guide to good practice
(1998)
BRE IP4/92. Site layout for sunlight and solar gain (1992), BRE
Hea 2
Association of Noise Consultants (ANC). www.association-of-noise-consultants.co.uk/
British Standards Institution, Sound insulation and noise reduction for buildings
– Code of practice BS 8233 London.1999
Hea 3
Architectural Press. New Metric Handbook – Planning and Design Data, Section 2.09,
(1999)
288 | Code for Sustainable Homes
British Standards Institution, Design of buildings and their approaches to meet the
needs of disabled people – Code of practice BS 8300 London. BSI. 2001
Hea 4
Habinteg Housing Association available at http://www.habinteg.org.uk/
Meeting Part M and designing Lifetime Homes 1.0 Edited by Caitriona Carroll, Julie
Cowans and David Darton www.jrf.org.uk/bookshop/details.asp?pubID=181
Man 1
Direct. Gov. Public service information and services online www.direct.gov.uk
Man 2
Considerate Constructors Scheme www.ccscheme.org.uk
Man 3
“Construction Site Transport”, April 2003. Measures for traffic movements and
distances, BRE and DTI. www.bre.co.uk/pdf/constructiontraffic.pdf
Control of Dust from Construction and Demolition Activities; BRE (Feb 2003) Pollution
Control Guide Parts 1–5; BRE (2003)
NAEI (Netcen, 2005) based on data from DfT combined with factors from TRL as
functions of average speed of vehicle derived from test data under real world testing
cycles
NAEI (Netcen, 2005) based on data from DfT combined with factors from TRL as
functions of average speed of vehicle derived from test data under real world testing
cycles.
Man 4
Safer Places – The Planning System & Crime Prevention, ODPM www.communities.
gov.uk
Eco 1
Association of Wildlife Trust Consultancies (AWTC) – Please contact the current
chairman of the Association who will provide details of your local advisor.
www.awtc.co.uk/contact.htm
The Landscape Institute (LI) – The Chartered Institute of the UK for Landscape
Architects, 33 Great Portland Street, W1W 8QG www.l-i.org.uk
Eco 3
Pollution Prevention Guideline (PPG05): Works in, near, or liable to effect
watercourses www.environment-agency.gov.uk
Eco 4
Construction Industry Key Performance Indicators www.kpizone.com
C. Pout, ‘CO2 emission figures for policy analysis’, BRE, July 2005
Matt Batey and Christine Pout, Delivered Energy Emission Factors for 2003 (BRE File
library December 2005) from BNXS01: Carbon Emission Factors for UK Energy Use
from Market Transformation programme
www.mtprog.com/ApprovedBriefingNotes/PDF/MTP_BNXS01c_2007August13.pdf
Ene 2
Specific EST guidance available from www.energysavingtrust.org.uk/housing
Ene 3
Specific EST guidance (available from www.est.org.uk/housing)
Guidance from the Energy Saving Trust on energy efficient lighting available from
www.energysavingtrust.org.uk/energy_saving_products/types_of_energy_saving_
recommended_products/energy_saving_light_bulbs
Ene 4
Good practice Guide 268 Energy efficient ventilation of dwellings-a guide for
specifiers (2006) available from www.feta.co.uk/rva/downloads/GPG268%20-%20En
ergy%20efficient%20ventilation%20in%20dwellings.pdf
Ene 5
Energy Saving Trust (EST) http://www.energysavingtrust.org.uk/
Ene 6
Energy Efficiency Best Practice and Housing (EEBPH)
www.est.org.uk/housingbuildings/professionals/
292 | Code for Sustainable Homes
Ene 7
Chartered Institution of Building Services Engineers (CIBSE): Low Carbon Consultants
and Energy Assessors, by CIBSE Certification Ltd (in www.cibse.org/)
Office of the Deputy Prime Minister (ODPM), Planning for Renewable Energy A
companion Guide to PPS22, HMSO (2004) available at www.turbineservices.co.uk/
Downloads/PlanningforrenewableenergyAcompanionguidetoPPS22PDF2622Kb_
id1143915.pdf
Office of the Deputy Prime Minister (ODPM), Planning Policy Statement 22:
Renewable Energy, HMSO (2004) available at
www.communities.gov.uk/documents/planningandbuilding/rtf/155631.rtf
Ene 8
Cycling England, The national body charged with co-ordinating the development of
cycling across England, includes design guidance, examples, best practice etc.
www.cyclingengland.co.uk
Cyclists Touring Club, CTC, the UK’s National Cyclist’s Organisation www.ctc.org.uk
Department for Communities and Local Government; Better places to live by design:
a companion guide to PPG3 (2001)
Ene 9
Better places to live by design: a companion guide to PPG3 (2001)
Wat 1
BRE IP 1/04, ‘Drainage design for buildings with reduced water use’
Environment Agency: Assessing The Cost Of Compliance With The Code For
Sustainable Homes WRc Ref: UC7231
HMSO, 1999, Water Supply, (Water Fittings) Regulations, 1999. Statutory Instruments
Office of the Deputy Prime Minister, Housing Quality Indicators Form (version 2),
www.odpm.gov.uk/housingqualityindicators
Wat 2
UK Rainwater Harvesting Association (UKRHA) www.ukrha.org
Water UK www.water.org.uk
Mat 2
Building Research Establishment Ltd. Certification of Forest Products (1999)
Department for Environment, Food and Rural Affairs. The Environment in Your Pocket
(2001)
Friends of the Earth Briefing Sheet – The UK’s Footprint: The UK Timber Industry and
its Impact on the World’s Forest (2000)
Saving the Wood, Building for a Future Magazine (Autumn 2001) ProForest
ww.ProForest.net
WWF www.panda.org
294 | Code for Sustainable Homes
Mat 3
Building Research Establishment Ltd. Certification of Forest Products (1999)
Department for Environment, Food and Rural Affairs. The Environment in Your Pocket
(2001)
Friends of the Earth. Briefing Sheet – The UK’s Footprint: The UK Timber Industry and
its Impact on the Worlds Forest (2000)
Friends of the Earth/Flora and Fauna International Good Wood Guide (2002)
www.goodwoodguide.com
ProForest www.ProForest.net
WWF www.panda.org
Sur 1
BRE Digest 365 – Soakaway design 1991 (BRE)
BS EN 752-4 – Drain and sewer systems outside buildings – Hydraulic design and
environmental considerations (1998)
The SUDS Manual – 2007 (CIRIA C697) This replaces C522 and includes revised and
rationalised elements of C523 and C609.
Sur 2
Approved Document H Drainage and waste Disposal ODPM (2002)
Code for Sustainable Homes | 295
Development and flood risk, guidance for the construction industry, Lancaster et. al,
CIRIA (2004).
ODPM. PPS 25 (Planning Policy Statement 25), “Development and flood risk”
A practice guide companion to PPS25, (2006). Available from
www.communities.gov.uk
Standards for the repair of buildings following flooding, C623, CIRIA (2005)
Was 1
Department of Environment Food and Rural Affairs (DEFRA)
www.defra.gov.uk/environment/waste/
Was 3
British Standards Institution, Design of buildings and their approaches to meet the
needs of disabled people – Code of practice BS 8300 London. BSI. 2001
British Standards Institution. Code of Practice for Storage and On-Site Treatment of
Solid Waste from Buildings. British Standard BS 5906. London. BSI. 2005
Compost Information Sheet. 2005: Composting and disposing of garden and kitchen
waste. www.wasteonline.org.uk
Pol 1
Defra, Environmental statistics www.defra.gov.uk/environment/statistics/globatmos/
gagginvent.htm
Pol 2
Defra, National Emission Ceilings Directive: National Strategy to Combat Acidification,
Eutrophication and Ground-level Ozone,
Nitrogen Dioxide in the United Kingdom. Defra, (2004) Summary report also available
on the National Atmospheric Emissions Inventory website at www.naei.org.uk
Hea 1
BR 288. Designing buildings for daylight. James Bell and Bill Burt (1995)
Man 1
Coach Information/Enquiries www.nationalexpress.co.uk
Sustrans www.sustrans.org.uk
Man 2
Considerate Builders Scheme www.westminster.gov.uk/Business/
businessandstreettradinglicences/highways/considerate_builders.cfm
Man 3
COPERT II Computer programme to Calculate Emissions from Road Transport
– Methodology and Emissions Factors. Technical report No 6, 1999
Good Practice Guide (GPG) 273 – Computerised Routing and Scheduling for Efficient
Logistics http://reports.eea.eu.int/TEC06/en
NERA Report on lorry track and environmental costs – DETR 1999 www.dft.gov.uk
Man 4
British Standards Online (PAS24-1 and BS7950)
www.bsonline.bsi-global.com/server/index.jsp
Guide to Security Standards for Doors and Windows (May 2002) prepared with the
support of LPCB, Secured by Design and BSIA, and is available from
www.securedbydesign.com/pdfs/standards_doors_2002.pdf
Eco 1
British Standard BS5837: 2005 ‘Trees in relation to Construction’
www.bsi-global.com
RSPB Good Practice Guide for Prospective Developments – Available from the RSPB.
www.rspb.org.uk
Eco 2
Biodiversity By Design, TCPA (2004)
Ecology and the Code – guidance for ecologists and assessors, 2007
Eco 3
Environmental good practice on site (CIRIA C502) Environmental good practice
– Working on site (CIRIA C503) Working with wildlife site guide (CIRIA C567) 2005
www.ciria.org.uk
Eco 4
Building greener – guidance on the use of green roofs, green walls and
complementary features on buildings (C644). CIRIA, 2007
Eco 5
CIRIA www.ciria.org.uk
The Government’s ambition for the Code is that it becomes the single national
standard for the design and construction of sustainable homes, and that it drives
improvements in home building practice.
This Technical Guide sets out the requirements for the Code, and the process for
achieving a Code assessment. It aims to make gaining a Code assessment as simple,
transparent and rigorous as possible, inspiring confidence in Code assessors, home
builders, product manufacturers and consumers.
RIBA Publishing
15 Bonhill Street
London
EC2P 2EA
Tel: 020 7256 7222
Fax: 020 7374 2737
Email: sales@ribabookshops.com
Website: www.ribabookshops.com ISBN 978-1-85946-313-0
Price: £40