The document discusses various types of losses that can occur across different production processes in a steel plant. It provides loss matrices to track losses for different equipment and identifies factors that can lead to losses.

The document mentions 16 major types of losses including equipment failure, setup/adjustment, tool change, start up, minor stoppages, speed, defect and rework, scheduled downtime, management, operating motion, line organization, logistics, measurement and adjustment, energy, die/jig/tool, and yield losses.

Factors like equipment failure, setup/adjustment times, tool changes, start up processes, line organization, logistics, and measurement can all contribute to losses depending on the specific production process or equipment being used.

16 Major Losses

Category Loss No Loss Name

1 Equipment Failure Loss

2 Setup / Adjustment Loss


7 Major
Losses 3 Tool Change Loss
that
impede 4 Start Up Loss
Overall
Equipment 5 Minor Stoppages
Efficiency
6 Speed Loss

7 Defect & Rework Loss

Losses
that
impede
8 Scheduled Downtime Loss
Equipment
Loading
Time

9 Management Loss

5 Major 10 Operating Motion Loss


losses that
impede 11 Line Organization Loss
Worker
Efficiency 12 Logistics Loss

13 Measurement & Adjustment Loss

3 Major 14 Yield Loss


losses that
impede
efficient 15 Energy Loss
use of
Production
subsidiary 16 Die,Jig & Tool Loss
resources
LOSS MATRIX
GROUP : ROLLING MILLS

Loss No Loss Name 4H1 4H2 4H3 6H 2H1 2H2

1 Equipment Failure Loss

2 Setup / Adjustment Loss X X X

3 Tool Change Loss

4 Start Up Loss X X X X X

5 Minor Stoppages

6 Speed Loss

7 Defect & Rework Loss

8 Schdeuled Downtime Loss

9 Management Loss

10 Operating Motion Loss

11 Line Organization Loss X X X X X X

12 Logistics Loss X X X X X

13 Measurement & Adjustment Loss

14 Energy Loss

15 Die,Jig & Tool Loss

16 Yield Loss
LOSS MATRIX
GROUP : TUBE MILLS

Loss No Loss Name TM 1 TM 2 TM 3 TM 4 TM 5

1 Equipment Failure Loss

2 Setup / Adjustment Loss

3 Tool Change Loss

4 Start Up Loss X X X X X

5 Minor Stoppages

6 Speed Loss

7 Defect & Rework Loss

8 Schdeuled Downtime Loss

9 Management Loss

10 Operating Motion Loss

11 Line Organization Loss X X X X X

12 Logistics Loss

13 Measurement & Adjustment Loss

14 Energy Loss

15 Die,Jig & Tool Loss

16 Yield Loss
LOSS MATRIX
GROUP : DRAW BENCHES

Loss No Loss Name E1E2E3C1C2D1D2D3D420T30T40T

1 Equipment Failure Loss X

2 Setup / Adjustment Loss

3 Tool Change Loss

4 Start Up Loss X X X X X X X X X X X X

5 Minor Stoppages

6 Speed Loss X X

7 Defect & Rework Loss X

8 Schdeuled Downtime Loss

9 Management Loss

10 Operating Motion LossX X X X X X X X X X X X

11 Line Organization Loss

12 Logistics Loss

13 Measurement & Adjustment Loss X

14 Energy Loss

15 Die,Jig & Tool Loss

16 Yield Loss
LOSS MATRIX
GROUP : SLITTERS
18 15 10 35 45
00 00 00 0 0
Loss No Loss Name 35" 10"12 1/2"15"
M M M M M
M M M M M
1 Equipment Failure Loss

2 Setup / Adjustment Loss

3 Tool Change Loss

4 Start Up Loss X X X X X X X X X

5 Minor Stoppages

6 Speed Loss

7 Defect & Rework Loss

8 Schdeuled Downtime Loss

9 Management Loss

10 Operating Motion Loss

11 Line Organization LossX X X X X X X X X

12 Logistics Loss X X X X X X X

13 Measurement & Adjustment Loss

14 Energy Loss

15 Die,Jig & Tool Loss

16 Yield Loss
LOSS MATRIX
GROUP : RHF FURNACES

600
600 3
KW 575
Loss No Loss Name RHF 1 RHF 2 KW T/H
Ne KW
Old r
w

1 Equipment Failure Loss

2 Setup / Adjustment Loss X X

3 Tool Change Loss X X X X X X

4 Start Up Loss

5 Minor Stoppages

6 Speed Loss

7 Defect & Rework Loss

8 Schdeuled Downtime Loss

9 Management Loss

10 Operating Motion Loss

11 Line Organization Loss X X X X X X

12 Logistics Loss

13 Measurement & Adjustment Loss X X X X X X

14 Energy Loss

15 Die,Jig & Tool Loss X X X X X X

16 Yield Loss
LOSS MATRIX
GROUP : BELL FURNACES
Narrow Wide
Loss No Loss Name
Width Width
1 Equipment Failure Loss

2 Setup / Adjustment Loss X X

3 Tool Change Loss X X

4 Start Up Loss

5 Minor Stoppages

6 Speed Loss

7 Defect & Rework Loss

8 Schdeuled Downtime Loss

9 Management Loss

10 Operating Motion Loss

11 Line Organization Loss X X

12 Logistics Loss

13 Measurement & Adjustment Loss X X

14 Energy Loss

15 Die,Jig & Tool Loss X X

16 Yield Loss
LOSS MATRIX
GROUP : PICKLING

Push
Wet
Loss No Loss Name Pull
Process
Pickling

1 Equipment Failure Loss

2 Setup / Adjustment Loss X

3 Tool Change Loss X

4 Start Up Loss

5 Minor Stoppages

6 Speed Loss

7 Defect & Rework Loss

8 Schdeuled Downtime Loss

9 Management Loss

10 Operating Motion Loss X X

11 Line Organization Loss X X

12 Logistics Loss

13 Measurement & Adjustment Loss X

14 Energy Loss

15 Die,Jig & Tool Loss X

16 Yield Loss
LOSS MATRIX
GROUP : CENTRALISED MECH. MAINT. CONTROL

Floor
DG Compr-
Loss No Loss Name Crane Move.
Sets essor
Equip.

1 Equipment Failure Loss

2 Setup / Adjustment Loss X X X X

3 Tool Change Loss X X X X

4 Start Up Loss X

5 Minor Stoppages

6 Speed Loss

7 Defect & Rework Loss X X X X

8 Schdeuled Downtime Loss

9 Management Loss

10 Operating Motion Loss X X X X

11 Line Organization Loss X X X X

12 Logistics Loss X X

13 Measurement & Adjustment Loss X X X X

14 Energy Loss

15 Die,Jig & Tool Loss X X X X

16 Yield Loss X X