ASQ Six Sigma
ASQ Six Sigma
ASQ Six Sigma
Requiremen
ts:
Convenienc
e
and speed
Crosby’s Definition of Quality
Guilds:
uDeveloped strict rules for
1 2 0 0
products and services.
uUsed stamps to identify
flawless goods.
Quality Evolution: Product Orientation
1 2
trades into specialized tasks;
inspectors guaranteed quality.
uTaylor system increased
productivity; inspection
departments found defects.
0 0
Quality Evolution: Process Orientation
1 2 0 0
uDeveloped strict rules for
products and services.
uQuality became relevant for
process, not just product.
Quality Evolution: Wartime
1 2
uThe military developed a
sampling inspection system
and trained suppliers. 0 0
Quality Evolution: Total Quality Movement
uDeveloped in response to
Japanese quality movement.
1 2 0 0
uFocused on improving all
processes through people
who used them.
W. Edwards Deming
Quality keys:
• Understanding
customer needs
• Process
improvement
• Statistical analysis
• Expertise of workers
• PDCA cycle
•
Joseph M. Juran
Quality keys:
• Features that
satisfy customers
• Freedom from
deficiencies
• Juran Trilogy®
– Quality planning
– Quality control
– Quality
improvement
Kaoru Ishikawa
Quality keys:
• Company-wide
participation
• Quality control circles
• Advanced statistical
methods and tools
• Nationwide quality
control promotion
Armand V. Feigenbaum
Quality keys:
Quality keys:
• Quality should be
designed in.
• Quality should
minimize
deviations from a
target.
• DOE optimizes
performance.
Philip Crosby
Quality keys:
• Conformance to
requirements
• Prevention
• Zero Defects
• Price of
nonconformance
•
Total Quality Management
1 Customer relationships
2 Continuous improvement
3 Company-wide participation
Customer Definitions
1
Levels of Customer Satisfaction
1
• Expected quality
• Desired quality
• Excited quality
Customer Feedback
1
• A well-known
model for
continuous
process
improveme
nt is the
Plan-Do-
Check-Act
A
cycle.
Company-Wide Participation
3
• Tangible • Intangible
– Increase in – Customer
earnings goodwill
– Decrease in – Alignment
waste between
– Increase in business
productivity activities
W. Edwards Deming on Quality
Employees Organizations
Customers
Suppliers Society
Benefits to Employees
Pride in products and
services
Job satisfaction
Improved communications
Streamlined work
processes
Happier customers
Strong customer
relationships
Greater job
security/benefits
Benefits to Organizations
Quality Studies and Standards
Publication Sales
Department Department Customer
Benefits to Customers
• Increased choices.
• Improved goods
and services.
• Expectations met or
exceeded.
Benefits to Suppliers
• Achievement of performance requirements
• Streamlined processes
• Efficient communication
Product safety
Process Management
= + + + ...
Y f(x1, x2, x3 …)
Process output (Y) is a function of (f) the inputs (Xs).
Understanding and controlling this relationship is a major
aspect of Six Sigma projects.
Focus on Variation
• Sigma (σ) refers to standard deviation, a measure of process
variation (smaller is better).
• Process Sigma is the number of units of standard deviations
between the process center and the closest specification
limit (larger is better).
• A Six Sigma process has six standard deviations (short term)
between the target and the closest specification limit.
6 Sigma
Sources of Variation
Desig
n
Materi $ Process
Capabil
al
ity
Measurem
ent
System
Harvesting the Fruit of Six Sigma
Sweet Fruit
Design for Manufacturability
Bulk of Fruit
ta
da
Process Characterization
s
and Optimization
ou
nu
nti
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -4 σ Wall - Must Improve Internally
Co
4 σ Wall - Must Improve Internally
D is c r e t e
d a ta
----------------------------------
3 σ Wall - Demand improvement
3 σ Wall - Demand improvement
Ground Fruit
Logic and Intuition
f (X) Y
• Y •X1 . . . XN
• Dependent •Independent
• Output •Input-Process
• Effect •Cause
• Symptom •Problem
•Control
• Monitor
Would you control shooter or target to get the Gold
Medal at Olympics
Six Sigma Defines Problems Statistically
uEffect uInputs,
uSymptom
process
uCause
uAble to
Monitor uProblem
uControllable
99% Good (3.8 Sigma) 99.99966% Good (6 Sigma)
20,000 lost articles of mail per hour Seven articles lost per hour
Unsafe drinking water for almost One unsafe minute every seven
15 minutes each day months
desired performance.
understood.
•
Project Selection is Critical
• High leverage projects lead to largest $$ Savings
• Large returns justify the investment in time and
effort
• Developing a Lean Six Sigma culture depends
upon successful projects having significant
business impact
• Black Belt training depends on completion of a
meaningful project within ~ 6 months
• Future Projects are frequently identified through
initial projects
•
Lean Six Sigma Project Criteria
• Aligned with business objectives and plans
– Voice of Customer/ Critical to Satisfaction (CTS)
– Quality (CTQ) / Cost (CTC) / Delivery (CTD)
• Consistent with principles of Six Sigma
– Elimination of process defects
– Reduction of variation
• Concentrates on significant issues/opportunities
..... not “problem of the day”
• Justify the investment
•
Project Selection
“The best Six Sigma projects begin not inside
the business but outside it, focused on the
question — how can we make the customer
more competitive? What is critical to the
customer’s success? … One thing we have
discovered is that anything we do to make the
customer more successful inevitably results in a
financial return to us.”
Jack Welch
Address to the General Electric
annual meeting April 23, 1997
What is Customer Satisfaction?
• A comparison of expectation to
experience
• A matter of degree
• A result of a good match between
supply and demand
• A predictor of repeat business
•
Customer Needs Translated into
“Critical To” (CT) Characteristics
Customer needs are translated into product, service or deliverable
requirements in terms of quality, delivery and cost. The “Y” of Y=f(X).
Typical Critical to Characteristics
Faster
Deployment
Stakeholder
Satisfaction
Repeatable
High probability
of success
S. Criteria Weight
No.
1 Aligned with core objectives 10
Higher 2 High probability of success 10
returns 3 Data Availability 8
4 Pain area 8
5 Process Improvement 7
6 Higher returns 8
7 Repeatable 6
Process
Ease of 8 Faster Deployment 5
Improvement
implementation 9 Stakeholder Satisfaction 7
10 Ease of implementation 6
Data Availability
Project Selection Matrix Diagram
3 Data Availability
4 Pain area
5 Process Improvement
6 Higher returns
7 Repeatable
8 Faster Deployment
9 Stakeholder Satisfaction
10 Ease of implementation
1 6 3
0
Selected Project
Factors that Improve Project Success
• Dedicated Black Belt
• Champion phase reviews
• Black Belt has knowledge of
process/product to be improved
• Historic data
• Clearly defined deliverables
• Committed process owners (skin in the
game) with the authority to modify the
process
•
Project Metrics – Success Criteria
Primary Metric
Secondary Metric(s)
8
Project Charter
Traditionally created by LSS Champion
Specifies details of a project including:
1.Scope
2.Responsibilities
3.Benefits
4.Schedule
5.Success criteria
Plant Availability
Suppliers Inputs Process Outputs Customers UI Earned
Coal Internal Plant Load factor
Coal Field Power
Water -Plant Mgmt Heat Rate
Rihand Dam Effluent
Suppliers
Air
Process Ash
-Corp Mgmt AUXILLIARY POWER
-
Power -Employee CONSUMPTION
Steam
Manpower Preferred Employer
CO2 External
Lubricants R&R
-Cent.Gov.
Maintenance Man : MW Ratio
-Ministry
Services Lead Time
-State Gov.
Spares and Manpower Utilization
-Shareholders
Consumables Quality System
-Contractors
Social Responsibility
-Suppliers
Maintenance Cost
-PAPs
Overhead Expenses
-Labour
Environment ENERGY EFFICIENCY
Boiler
DM Water Used
Turbine Safety aspect
COAL Generator Training of manpower
Cycle Time
AIR STEAM GRID In process idle stock
Air Emission quality
WATER Noise level
Collecting VoC
• Who is a customer?
• What does the customer need?
– Gathering the Voice of the Customer
– Define customer requirements
• How do the customers prioritize their needs?
• How are customer needs translated into CTQs?
uGenerally
a less intense exercise for DMAIC projects than for
DFSS projects
uMore likely to be based on information that is already
available internally for DMAIC projects than for DFSS projects
Who Is a Customer?
Process
Customer
–
Questions to Find Voice of the Customer
• What are the elements of your business that are
the most critical, from the perspective of your
top or best customers? What are their relevant
needs?
• What data has been collected to understand the
customer requirements?
• How do you operationally define the defect from
the perspective of the customer? Under what
conditions does it occur?
Voice of the Customer Concerns
• Real vs. stated needs
• Perceived needs
• Intended vs. actual usage
• Internal customers vs. external customers
• Effectiveness vs. efficiency needs
• Change over time
Determining Customer Requirements
• Use verbatim comments from customers to
help determine the key customer
requirements
– We often receive many verbal comments
from our customers.
– We need to look for ways to probe for
deeper meaning behind the comments in
order to translate these comments into
what the customer actually requires.
•
Tools for Gathering Voice of the Customer
Unsolicited data from customers
– Complaints
– Field reports
– Trade journals
– Benchmarking
– Internal research
• Requirements documents
• Contracts
• Customer observation
• Be a customer
•
Tools for Gathering VOC
Solicited data from customers
– Interviews
– Focus groups
– Surveys
– Market research
•
Determining Customer Requirements
• Review customer verbatim comments and
comparative data
• If possible, probe for deeper understanding
• Convert into terms of process performance
• Describe the actual customer requirement
– Write the requirement, not the solution
– Use measurable terms
– Identify performance targets
– Be concise
Define Phase Review
• The purpose of the define phase is to identify and
launch a project.
• VOC should be reflected in the project charter
especially in the project success criteria.
• The Black Belt and Champion should review and
agree on the details of the project charter and
SIPOC.
• A common cause of project failure is poorly
defined or projects with excessive scope. This
review is an opportunity to mitigate that risk.
VOC ( Voice of Customer )
D M A I C
HOW ?
Arrest Pro.Deviation
Improve Processes
Systems
Competitor
Ranking ( 1-5 )
Replace with
Worse
Better
eff. pro
Same
Better
CustomerNeed
Customer Needs
WHAT ?
In problem solving
Tool Role they Play
Problem
Stratification Identify and segregate
different sources of the
problem
•
Tool
Role they Play
•
DATA GATHERING
Data Collection
What is Data ?
Quantitative Qualitative
•Measurable •Subjective assessment
e.g. :Length, e.g. :Score in a
Temperature beauty contest
•Countable
e.g. :Number of
defects
Population, Sample and Data
Action
Random
X
Population Sampl Measurement
Data
Sampling e / Observation
Action
A Saying
q When you see the data, doubt it
q When you see the measuring instrument, doubt
it.
q When you see the chemical analysis, doubt it.
q Three Categories
q
1 False Data
2 Mistaken Data
3 No Data available
How to Collect Data?
qDefine the purpose (Follow 5W 1H approach).
qDefine the period for data collection.
qDefine the Stratification.
qDesign the check sheet and assess
Measurement
System Capability.
Purpos
e
Be Clear on What, Where, When, Why, Who
and How the data should be generated
STRATIFICATION
Stratification
Workers
Material
Machines
Time
Defect
Environment
Product Region
Folder Files
Machine
Machine A A Machine BB
Machine
N = 450
N = 450 N= N 450
= 450
D = 12D = 12 D =D 1118
= 118
P% =P%2.7= 2.7 P%== 26.2
P% 26.2
COMBINED
N = 900
D = 130
P% = 14.4
Blister Defect
UCL
CL
Pinhole Defect
UCL
C
L
All Defects UC
L
CL
CHECKSHEET
Check sheet
1 2 3 4 5 6 A B C D………P Q R
Material Machining
Defect Defect
Line Chart
25
21
15 15
15 14
13 13
11 11 11
10 10
10 8
6
5
5 4
3 3
2
0
1 2 3 4 5 6 7 8 9 10
Week Number
600 422
257
358
Component bar
500
336 281 317 29 9
400 2 44
300 221
2 75
chart
200 435
375 321 348
2 63 285 307 29 4
100 201
1 33
0
1 2 3 4 5 6 7 8 9 10
W eek N umb er
Pie Chart for
Customer returned watches
G
F 5%
E 3%
•A – Glass Broken
4%
D
6%
•B - Stop A
43%
•C - Mvt. Trouble
C
12%
•D - Defective Dial
•E - Regulation
B
•G - Others
Control Chart
X- Bar and R Chart
2854
UCL=2853
Sample Mean
2849 Mean=2849
2844 LCL=2844
Subgroup 0 5 10 15 20 25
UCL=16.41
15
Sample Range
10
R=7.76
5
0 LCL=0
Radar Chart on ISO 9001-1994
Implementation
1
20 80 2
19 70 3
60
18 50 4
40
30
17 5
20
10
16 0 6 Series 1
15 7
14 8
13 9
12 10
11
Gantt Chart for Construction
Activity
Weeks
Type of work 1 2 3 4 5 6 7 8 9 10 11 12
Foundation work
Frame work
Dry-walling
Exterior touch up
Sheetrock work
Plumbing
Electrical wiring
Fit Fixtures
Paint interior wall
Interior touch up
Inspection delivery
Cum Percentage
60
30
40
20
30
Customer Complaints 10 20
10
0 0
Fish not Vegetable Bread Cashier Meat not Eggs rotten
fresh wilted Stale Rude Fresh
Pareto Principle
74.7 80
40 70
Outstanding Value
Cum Percentage
60
51.7
30
50
40
20
30
10 20
10
0 0
E D C A B F H G O
Branches
Pareto Diagram for Production Stoppage
100
B.Intermediate conveyor 40 80
C.Power failure 35 70
No. of stoppages
Cumulative %
25 50
E.Dryer drum coupling pin
20 40
F.B P full press problem
15 30
G.Dryer preventive
10 20
H.Nip roller
5 10
I.Rotary comb tripped
0 0
J.Comber jamming A B C D E F G H I J K L MN O P Q R S
L.Fire
M.Accumulation
O.Fan tripping
P.Chain problem
Pareto Analysis of Complaints at a Laundry
160 75 80
140 70
60
No. of complaints
120 60
100 50
80 35 40
60 30
40 20
20 10
0 0
Late Missing or Fading Stains Creased Buttons Stretched
delivery wrong colours Missing or torn
items
Brain Storming
vDefer evaluation
vFantasize freely
vGenerate quantity
vBuild on ideas
•
Defer Evaluation
Fantasize Freely
v Define problem
v Gather members for discussion
v Conduct Brainstorming
v Group causes into 4M’s
v Man, Material, Machine, Method
v For each cause, ask, “What goes wrong
that produces the effect”.
v Identify major causes
Cause and Effect Diagram for high petrol consumption
Spark plugs
Impatience Heavy
Poor Bad Contacts
Craze Life
anticipation attitude
Body Technical
Wrong Poor details
skill Shape
Always gears Fuel mix
late Lack of Inexperience Carburetor
Wrong High H.P
awareness
Riding on culture Engine
clutch
Cylinders
High Petrol
Consumptio
Spurious n
Crossings
Restrictions Spares Impurities
Traffic Incorrect
One way Tyres Inferior Octane no.
No turn
Frequent Petrol
Circuitous Faulty
stops Negligence pressure
Road Speed Breakers Additives
Ignorance
Potholes Irregular Low pressure Incorrect viscosity
Poor servicing
Clogged Oil
condition
False filters
Steep economy Not changed
Maintenanc Low level
Road Materials
e
Cause & Effect Diagram
PROCESS MATERIALS
PERSONNEL EQUIPMENTS
Uses of C & E Diagram
25 24
20 19
17
Frequency
15
12
11
10 9
6
5 3
2
0
1 .7 7 6 1 .8 6 8 1 .9 6 2 .0 5 2 2 .1 4 4 2 .2 3 6 2 .3 2 8 2 .4 2 2 .5 1 2
C o n s u m p ti o n ( K W h )
HISTOGRAM
Histogram
• centre ( mean)
• width (spread-variation)
• over all shape
v
30
25 24
20 19
17
Frequency
15
12
11
10 9
6
5 3
2
0
1 .7 7 6 1 .8 6 8 1 .9 6 2 .0 5 2 2 .1 4 4 2.23 6 2 .3 2 8 2 .4 2 2 .5 1 2
C o n s u m p ti o n ( K W h )
Histogram Construction
vSelect a sample of min. 50
vRecord the measurements.
vDetermine the range.
vDecide the no. of classes.
vDivide range into no. of classes
vDetermine boundary or class limits.
vPrepare frequency distribution.
vConstruct histogram (GRAPH).
Data on Metal Block thickness (in mm)
3.56 3.46 3.48 3.50 3.42 3.43 3.52 3.49 3.44 3.50
3.48 3.56 3.50 3.52 3.47 3.48 3.46 3.50 3.56 3.38
3.41 3.37 3.47 3.49 3.45 3.44 3.50 3.49 3.46
3.46
3.55 3.52 3.44 3.50 3.45 3.44 3.48 3.46 3.52 3.46
3.48 3.48 3.32 3.40 3.52 3.34 3.46 3.43 3.30 3.46
3.59 3.63 3.59 3.47 3.38 3.52 3.45 3.48 3.31 3.46
3.40 3.54 3.46 3.51 3.48 3.50 3.68 3.60 3.46 3.52
3.48 3.50 3.56 3.50 3.52 3.46 3.48 3.46 3.52 3.56
3.52 3.48 3.46 3.45 3.46 3.543.54 3.48 3.49 3.41
3.41 3.45 3.34 3.44 3.473.47 3.41 3.38 3.54 3.47
Class no.
Histogram for Metal Block Thickness
45
40 37
35 33
30
Frequency
25
20
15
9 10
10
5 3 3 3
1 1
0
3.3 3.35 3.4 3.45 3.5 3.55 3.6 3.65 3.7
Thickness (in mm)
Histogram for Bearing Thickness
45
41
40
35
31
29
30
Frequency
25 22
20 18 17
15 12
9
10
5
5 3
0
5.24 5.28 5.32 5.36 5.4 5.44 5.48 5.52 5.56 5.6
Thickness (in mm)
Histogram for Energy Consumption
30
25 24
20 19
17
Frequency
15
12
11
10 9
6
5 3
2
0
1.776 1.868 1.96 2.052 2.144 2.236 2.328 2.42 2.512
Consumption(KWh)
Types of Histograms
Bell shaped
Symmetrical shape with a peak in middle
representing a normal histogram
30 –
25 24
20 19
17
15
Frequency
12
11
10 9
6
5 3
2
0
1 . 7 7 6 1 .8 6 8 1 .9 6 2 .0 5 2 2 . 1 4 4 2 . 2 3 6 2 . 3 2 8 2 .4 2 2 .5 1 2
C o n s u m p tio n( K W h)
Skewed to Left & Right
Skewed to Left
Caused by centering the process toward high end of the
tolerance
Skewed to Right
Caused by centering the process toward low end of the
tolerance..
Bimodal & Truncated
After
Histogram Uses
vCommon Causes
---Chance Causes Of Variation
vSpecial Causes
--- Assignable Cause Of Variation
Common Cause
vConsists of combined effect of several sources of
uncontrollable variation inherent to a process.
vCollective influence of common cause variation
defines natural process fluctuation and is known
as Chance causes of variation.
vProcess output is predictable
vProcess is said to be in Statistical Control
v
v
Special Cause
vVariation has a large impact on performance.
vDetermination of source of impact makes cause
"assignable." and is termed as
assignable cause of variation.
vIf they exist, process or key characteristic is
said to be "out-of-control".
vOut-of-control process is not predictable
Process Behavior
vIt tells whether process is under control?
vIs it producing defect free output?
v
Process out
----process under Of control
control or
LS US LSL USL
L L
30
25 24
20 19
17
15
Frequency
12
11
10 9
6
5 3
2
0
1 .7 7 6 1 .8 6 8 1 .9 6 2 .0 5 2 2 . 1 4 4 2 . 2 3 6 2 . 3 2 8 2 .4 2 2 .5 1 2
C o n s u m p ti o n ( K W h )
1050
1045
1040
Severed Length (mm)
1035
1030
1025
1020
1015
1010
1005
1000
5 5.5 6 6.5 7 7.5 8 8.5 9
Conveyor Speed (cm/sec)
Uses:
vControl Purpose
vReplacing a destructive test by a
non-destructive test
vStudy of Cause & Effect
relationship
vProcess Optimization
v
•
Process Mapping
About This Module…
\DataFile\ProcessT.ppt
Six Sigma, A Quest for Process Perfection
Attack Variation and Meet Goals
What We Will Learn …
1.The importance of process maps and the character of
the product and process parameters.
2.The when, why and where to use process maps.
3.
4.The x’s & y’s and X’s & Y’s and Y=f(x,X).
5.
6.What to measure and control.
7.
8.The need for process maps prior to FMEA’s, Gage
Studies, DOE’s and SPC.
9.
10.When the process map is completed.
11.
12.How to use the tool for your process.
Extending
Extending Flow
FlowCharts
Chartsto
to Process
ProcessMapping
Mapping
Process Management
Basic
Process
Model
Resources
• People
• Equipment
System • Material
• Money
• Time
Feedback
Cycle Time
• Establish ownership.
• Verify and describe the purpose of the
process.
• Define the process, boundaries, and
interfaces.
• Organize and train the process
improvement team.
Principles of Process Management
Process - Level #2
Process - Level #3
Select
Selectthe
theappropriate
appropriateprocess
processlevel.
level.
Product and Process Parameters
Inputs STEP OF
PROCESS Outputs
Process Parameters, x’s
y = f(x)
Remember the 6 M’s
◆Man (People)
◆Machine (Equipment)
Product Parameters, y’s
◆Method (Procedures)
KEY for (x’s)
◆Material Process Parameters
N Noise Parameters
◆Measurement C Controllable
Process Parameters
S SOP Parameters
◆Mother Nature (Environment) CR Critical Parameters
Why List the Parameters?
Defects
TO REDUCE DEFECTS!
◆The x’s and X’s are the sources of variation in your process.
◆Variation causes defects.
◆The x’s must be under control to prevent defects.
◆The root cause of a defect is variation of the x’s!
◆The y’s and Y’s are the measured results of the process
and include the failure modes of the process.
◆Defects are also outputs of a process step.
What Are We Measuring?
Measure the x’s, not the Y’s !
X’s _________
Inputs ?
x’s _________
Process Parameters
?
Process Step Outputs
y’s _________ ?
Process Outputs
Y’s _________ ?
We
Wecannot
cannot control
controlwhat
what we
wedon’t
don’t
measure!
measure!
Is Workmanship an x?
X’s Y’s
INPUT OUTP
PROCESS
S UTS
Process Parameters, x’s
WORKMANSHIP ??
y = f(x)
OPERATOR ??
✚
6 M’s reminders:
◆Man (People)
◆Machine (Equipment) Product Parameters, y’s
◆Method (Procedures) ◆DEFECT FREE OUTPUT
◆Material
◆DEFECTS IN PROCESS OUTPUT
◆Measurement
◆Machine
(People)
(Equipment)
N y = f(x)
◆Method (Procedures) N
◆Material
N
◆Measurement
◆Mother
N Product Parameters, y’s
Nature (Environment)
C
C
S
Identifying Product & Process Parameters
The following may be helpful to identify process
parameters that have a potential effect on the product
parameters and process output:
◆Brainstorming
Remember the 6 M’s
◆Literature review ◆Man (People)
◆Machine (Equipment)
◆Operators manuals ◆Method (Procedures)
◆Work Instructions ◆Material
◆Measurement
◆Operator experience ◆Mother Nature (Environment)
◆Customer / supplier input
◆Engineering knowledge
◆Scientific theory
Completeness Checks
Inputs Step of the Process
Outputs
Process Parameters, x’s y = f(x)
Are there y’s for every x in this step?
Product Parameters , y’s
Is there a “good” type of y for every x ? ◆Good
Is there a “bad” type of y for every x ? ◆Bad = Defects
Are x’s here that impact downstream y’s? ◆Good Rejected = Defect
Does the map have input of extended team? ◆Bad Accepted = Defect
◆Horror Stories: What has
happened in the past that
caused disasters?
Remember the 6 M’s
◆Success Stories: What
◆Man (People) outputs of this step thrilled
KEY for (x’s)
Process Parameters ◆Machine (Equipment) the customer(s)?
N
C
Noise Parameters
Controllable
◆Method (Procedures) ◆Are there x’s for each y in
S
Process Parameters
SOP Parameters ◆Material this step?
CR Critical Parameters
◆Measurement ◆Are upstream x’s changing
◆Mother Nature (Environment)
y’s of this step? How?
Wave Solder Process
FLUX
INPUT LOAD IN LOAD ON TO
FLUX AIR
FIXTURE CONVEYOR PREHEAT
KNIFE
T T
POT
AIR S
P UT
#1 #2 #3 KNIFE SOLDER E
C
T
I
Y’s
❑Solder Temp ✖Workmanship
OR
NE
Boards:
❑Temp - Zone 2 ❑Temp - Zone 3 ✖Position W
❑Temp -Zone 1 ✖Ht of Pot/Position Stds O
•Accepted
✖Temp - Zone 1 ✖Temp - Zone 1 ✖Dist to board R
✖Temp - Zone 2
K
✖Solder Pot Angle ✖Samples
•Rejected
✖Temp -Zone 3 ✖Temp - Zone 2 ✔Temp ✖Lighting
✖Temp - Zone 3 ✖Exit Point •Scrap
✖Time in Preheat 2 ✖Time in Preheat 3 ✔Angle ✖Magnification
✖Time in Preheat 1 ✖Amount of dross
✖Response time of ✔Air Pressure
✖Resp time of heater ✖Resp time of heater heater ✔Solder Pump Speed ✖Prod/Dmnd/Sch
✚Stability of temp ✚Temp Dist ✖Census/Inspection
✚Stability of temp ✚Stability of temp ✔Solder Height Staffing
✚Distance to board ✚Dist to board ✚Distance to board ✔Solder Pump Pressure ✖Inspection Sample
✚Temp distribution . (%)
.
✚Temp distribution ✚Temp. Distribution ✔Choke bar setting/adj
✚Fixture warp ✚Fixture warp ✚Fixture warp ✔Solder contact ✚Eyesight
✚Rail warp ✚Rail warp ✚Inspector Variation
✚Rail warp ✔Solder type
✔Solder tin content
✔Solder Contam Solder Distribution
✔Baffle qual, hole wear, Coverage on board
bent condition, clean Solder Appearance
✔Board Deflection Solder joint Quality
y’s
Board Temp Board Temp Board Temp Product
Flux Condition Flux Condition Flux Condition Paramenters
Flux Activated Flux Activated Flux Activated
Flux Solvent drive off Flux Solvent drive off Flux Solvent drive off Excess Pressure Solder Appearance
Thermal Shock Thermal Shock Thermal Shock ⇒Solder Bridging Solder Joint
KEY for (x’s)
⇒ Board Warping ⇒ Board Warping ⇒ Board Warping Process ⇒Insufficient solder/Opens Quality/Defects
Excess Heat Excess Heat Excess Heat Parameters Insufficient Pressure Open Solder Joints
⇒ Excess Solder ⇒ Excess Solder ⇒ Excess Solder ✚Noise Parameters ⇒Solder Bridging Good Boards
⇒ Poor Fillets ⇒ Poor Fillets ⇒ Poor Fillets ✖Controllable Process Temp Too Low Dirty Boards
⇒ Excess flow thru ⇒ Excess flow thru ⇒ Excess flow thru Parameters ⇒Solder Bridging Scrap Boards
✔SOP Parameters
Inadequate Heat Inadequate Heat Inadequate Heat qCritical Parameters Temp Too High Hot Boards
⇒ Solder splatter ⇒ Solder splatter ⇒ Solder splatter ⇒Insufficient Solder/Opens Damaged Components
⇒ Trapped Gas ⇒ Trapped Gas ⇒ Trapped Gas ⇒Damage Board Lifted Components
⇒ Solder Bridges ⇒ Solder Bridges ⇒ Solder Bridges Angle Too Steep
⇒ Poor flow thru ⇒ Poor flow thru ⇒ Poor flow thru ⇒Insufficient Solder/Opens
(plated thru holes) (plated thru holes) (plated thru holes) Angle Too Shallow
⇒Solder Bridging
The Importance of Questions
Noise Parameters:
◆What are they?
◆Are they impossible or impractical to control?
◆How robust is the system to the noise?
◆
Controllable Parameters:
◆How are they monitored?
◆How often are they verified?
◆Are optimum target values known?
◆How much variation is there around the target
values?
◆How consistent are they?
◆
Identify/classify
measurements
taken on product
& process
parameters
Continue to
update & Classify/
Identify/classify
classify characterize Develop initial list
of process parameters upstream
process map! process
in-process
parameters along with current
operating conditions product
into 3 main
parameters
factors
rNoise factors
rStandard operating procedures
rControllable process parameters
Consider Every Process Step
1. What Process
feedback 5. What Customer
◆All work is a process
Requirements
◆All processes have
2. What Output
owners ◆Specifications
◆All processes can be 3. What Input 4. Who are Customers –Function
described as a verb –Reliability
and noun –Format
◆All processes can be 6. Who are ◆Cost
analyzed and Suppliers ◆Schedule
improved
◆Process owner’s
feedback
requirements on the 7. What
supplier Supplier
◆Specifications Requirements
◆Cost
◆Schedule
8. Process Controls/Dependencies
Procedures/Policies Training/Education Equipment/Facilities Quality Attitudes
Any written ◆Performance ◆Space required Personal attitude
document that skills ◆Processing which is less than
controls/impacts a ◆Certifications equipment the requirement
process
Causes of Process Map Failure
CONCERN RESPONSE
Requires extra effort - “We know the Initial payoff is team understands
process - lets just move forward” process -- team members are not
working on different set of
assumptions. Use experts to help
you through the mapping process
The process map just seems to Think about approaching the problem
grow and grow and grow hierarchically
Process Mapping Summary
What
Whatisisthe
thetool?
tool? When
Whendo
doyou
youapply
applythis
thistool?
tool?
◆◆Graphical method to illustrate ◆◆Always: to fully understand
Graphical method to illustrate Always: to fully understand
the
thedetails
detailsofofaaprocess
process process
process&&process
processflow
flow
◆◆ ◆◆Find where/when/how defects
Find where/when/how defects
What are
arebeing
beingcreated
Whatwill
willthe
thetool
toolidentify/show?
identify/show? created
◆◆All process steps, value-added ◆◆Define elements of cycle time
All process steps, value-added ◆
Define elements of cycle time
&&non
nonvalue-added
value-added
◆
What
Whatresults
resultscan
canyouyouexpect?
expect?
◆◆Input
Inputparameters
parameters(X (Xi,in )
i,in ) ◆◆Systems needing MSE’s
◆◆End
Systems needing MSE’s
Endproduct
productparameters
parameters(Y (Yi))
i ◆◆List of Factors for DOE’s
List of Factors for DOE’s
◆◆In-process parameters (x’s &
In-process parameters (x’s & ◆◆Find the hidden factory
Find the hidden factory
y’s)
y’s) ◆◆Opportunities for process
◆◆Characterization of all Opportunities for process
Characterization of all step
stepelimination
elimination(i.e.
(i.e.flow
flow
parameters
parameters improvement)
improvement)
◆◆Defect/data collection points
Defect/data collection points ◆◆Ways to re-layout the process
Ways to re-layout the process
◆◆Steps needing FMEA’s
Steps needing FMEA’s ◆◆Sources of variation reduced
Sources of variation reduced
◆◆Sources of variation identified
Sources of variation identified
Map Your Process
For the next session:
Extending
Extending Flow
FlowCharts
Chartsto
to Process
ProcessMapping
Mapping
Failure Modes and
Effects Analysis
FMEA
About This Module…
Failure Modes and Effects Analysis
Datafile/CopyFMEA.xls
Why Use FMEAs?
What is an FMEA?
Identify
critical product characteristics and process variables
Prioritize
product and process deficiencies in support of
downstream improvement actions
Help focus
on prevention of product and process problems
Benefits of FMEA’s
What is an FMEA?
E
u Reduces the amount of rework, repair and scrap.
A
u Documents and tracks actions taken.
Process - Level #2
Process - Level #3
1.Calculate RPN
7.
1.Determine Actions/Plan
9.
1.Take Action
Header Accessible
FMEA Form from
View
Header/Footer
What is an FMEA? in Excel
Workbook in
Excel
\DataFile\FMEAForm.xls
Cause -Failure Mode -Effect Continuum
What is an FMEA?
Effect (y’s)
Cause Failure
(x’s) Mode
The Cause and Effect Diagram Example
What is an FMEA?
Admin/Service Example First produced in 1950 by
Measurements Materials Manpower Professor Kaoru Ishikawa -
Also called the:
uIshikawa Diagram
uFish Bone Diagram
Measurement
Manpower Material
Reproducibility Repeatability
Inadequate Late
training Linearity
Wrong quantity
Stability
Lack of
experience Defective Calibration
Distractions
Defects
Too hot
Vague
Too humid
Not maintained Out of date
Datafile/Causeeffecte.igx
Copy Machine Example
What is an FMEA?
• Our process is copying
documents on a Xerox
model XC1045 copy
machine.
• First we will construct a
process map
• Then we will construct a cause
and effect diagram
• Finally we will complete an
FMEA
Process: Making A Copy
What is an FMEA?
Document set Number of Size selected Darkness set Correct Copies Copies
correctly copies selected correctly directly paper tray Right number
Glass clean correctly selected Right contrast
Right
orientation
Right size
Right paper
Legend
C Controllable
Cr Critical
N Noise
P Procedure
x Input
Step 1: Identify “Heavy Hitter” Process Step
The FMEA Process
uFrom the Process Map, identify the process step with the
most likelihood of having failure modes with significant
effects
F modes
uUsedefect data and/or team knowledge about failure
when selecting process steps
M uSignificant
rate, ...)
impact to the business? (COPQ, cycle time, fill
uFrom the Process Map, identify the y’s that are associated
with the process step being investigated
uAsthe y’s are the indications of a successful completion of
the process step, they are crucial as a basis for
determining failure modes
Step 3: Identify Failure Mode
The FMEA
Process
• Brainstorm failure modes for the selected process step :
– Identify the ways in which the process could fail to
generate
each of the expected “y’s”
• Eliminate “duplicates” from brainstorm list
• Are the failure modes from the same level of the process?
• Are the failure modes specific?
• Are the failure modes the most likely?
• Do the failure modes provide good coverage of the
process step?
• Have all y’s been considered?
Step 4: Identify Failure Effect/Rate Severity
The FMEA Process
Materials Manpower
Measurement
Wrong Size Selected wrong
Wrong Paper orientation
Selected Size
Copy Misaligned
Too Humid Document Moved
When Lid was Alignment Marking
Closed Unclear
Mother Method
Nature Machine
occurrence and
detection.
9: Determine Actions/Plan
Based on the causes found, determine actions that
will minimize the effect of each cause, in priority
order.
Steps 10 and 11
The FMEA Process
10: Recalculate RPN Based on Plan
uAssuming the actions are carried out successfully, reassign
severity, occurrence and detectability.
u
uPlace these new ratings in the “predicted” columns (ps, po & pd).
u
uAssign a rating from 1 to 5 for each action that will show the “risk”
associated with each action (5 being the greatest risk). Place the
rating in the “risk” column.
Note: When completing a Process FMEA, first assume the material is good and
the process is bad. Then assume that the process is good and the material is
bad. Lastly, review the process for safety considerations.
Design/Product FMEA
Types of FMEA
F •
• Helps identify the root causes of defects.
Establishes a priority for improvement activities.
M• Documents plan of action.
• Provides methodology to battle initial ground swell
E of defects.
A • Focuses effort on defects with highest $ impact.
• IS NOT PROACTIVE!
Scoring Criteria
Use actual
Types of FMEA defect
quantities
Correct
angle Ball flys Accurate Correct
straight measurement distance
± 2 inches recorded
Datafile/Catapultflow.igx
Complete the Diagram Below
FMEA
Exercise
Men
Method Material
Rubber Band Release consistency
Calculation procedure Angle measurement
Ball
Distance
Reproducibility
Mother nature
Machine Measure
Datafile/CatapultC&E.IGX
When To Update an FMEA?
FMEA Summary
An FMEA should be updated whenever a change is being
considered to a product’s:
u design
u application
u environment
u material
u product’s manufacturing or assembly process
Summary of Product/Process FMEA’s
FMEA
Summary
uWhat is the tool? uWhen do you apply this tool?
–Spreadsheet –When evaluating product for
– robustness (functionality,
uWhat produceability, reliability)
will the tool
identify/show? –During early stages of defect
reduction efforts to identify
–All product/process failure causes
modes, related effects,
causes, & methods of –When identifying key
controlling them process/product parameters and
evaluating methods for controlling
–Risk Priority Number them
(RPN) for action based
on failure severity, –
probability of uWhat results can you expect?
occurrence and –Learn to identify critical product/
detection capability process parameters
–Actions/plans to reduce –Achieve consensus on solutions
elements of RPN and methods of implementation
–Detailed product/process
understanding
Keys to Success
FMEA
Summary
uIdentify purpose...BE SPECIFIC!
u
uUnderstand effects...INVOLVE CUSTOMERS & SUPPLIERS!
u
uLink to the process map.
u
uUse to prioritize efforts, allocate resources.
u
uUse as a risk assessment/prioritization tool based on predicted impact.
u
uUse to build consensus on prioritization.
u
uEncourage creativity...TEAMWORK!
u
uPLAN!
u
uASK QUESTIONS!
Process FMEA Steps
What is an FMEA?
uSteps Completed Prior to FMEA:
–Charter Team
–Develop and Characterize Process Map
uFMEA Steps:
1.Identify “Heavy Hitter” Process Step
1.
1.Calculate RPN
7.
1.Determine Actions/Plan
9.
1.Take Action
FMEA Appendix
Key Definitions for FMEA
Severity is an assessment of how serious the effect of the potential failure mode is on the customer.
The customer in this case could be the next operation, subsequent operations, or the end user.
Occurrence is an assessment of the likelihood that a particular cause will happen and result in the
failure mode.
Detection is an assessment of the likelihood that the current controls (design and process) will detect
the cause of the failure mode, should it occur, thus preventing it from reaching your customer.
The customer in this case could be the next operation, subsequent operations, or the end user.
Current Controls (for both design and process) are the mechanisms which prevent the cause of the
failure mode from occurring, or detect the failure mode, should it occur, before the product
reaches your “customer.” For example, current controls include SPC, inspections, written
procedures, training, preventive maintenance and all other activities that ensure a smooth
running process.
Critical Characteristics are those items which affect customer safety and/or could result in non-
compliance to regulations and thus require controls to ensure 100% compliance. These are
usually process“settings” such as temperature, time, speed, etc.
Significant Characteristics are those items which require SPC and quality planning to ensure
acceptable levels of capability.
FMEA Appendix
Terminology
A. Process or Product Name – Description of Process or Product being analyzed.
B. Responsible – Name of Process Owner.
C. Prepared By - Name of Agent coordinating FMEA study.
D. FMEA Date – Dates of Initial and subsequent FMEA Revisions.
E. Process Step/Part Number – Description of individual item being analyzed.
F. Potential Failure Mode – Description of how the process could potentially fail to meet the
process requirements and/or design intent, i.e. a description of a non-conformance at that
G. Potential Failure Effects – Description of the effects of the Failure Mode upon the customer,
i.e. what the next user of the process or product would experience or notice.
H. SEV (Severity) – An assessment of the seriousness of the effect of the potential failure mode
I. Potential Causes – Description of how the failure could occur, described in terms of something
J. OCC (Occurrence) – Description of how frequently the specific failure cause is expected to
K. Current Controls – Description of process controls that either prevent, to the extent possible,
L. DET (Detection) – An assessment of the probability that the current controls will detect the
potential cause, or the subsequent failure mode.
M. RPN (Risk Priority Number) – The product of the Severity, Occurrence, and Detection
Rankings i.e., RPN = SEV * OCC * DET.
N. Actions Recommended – Actions to reduce any or all of the Occurrence, Severity or Detection
rankings.
O. Responsibility – Person or group responsible for the Recommended Action.
P. Actions Taken – Brief description of actual action and effective date.
Q. New SEVERITY Rating after corrective action.
R. New OCCURENCE Rating after corrective action.
S. New DETECTION Rating after corrective action.
T. Resulting new RPN after corrective action.
Introduction to Process Capability
About this Module
• Process capability enables the prediction of the
ability of any process to produce products and
services that meet their desired specifications.
• This module focuses on typical manufacturing
processes. Transactional and other
manufacturing processes are not discussed
here.
• The principles of process capability will be
introduced and Minitab will be used to calculate
process capabilities.
Learning Objectives
At the conclusion of this module participants
Inferential statistics
is the process of using information from a smaller set
of data (sample) to reach conclusions or inferences
about a larger group (population). Usually, we have
only sample information, not the entire population, and
must infer understanding of the population based on
our sample. We want these conclusions to be
mathematically correct.
Data Types
Definitions
Attribute
Yes - no
Good - bad
Accept - reject
Discrete
Multiples of whole units
Can not be meaningfully divided
Count or classification
Continuous
Can be meaningfully divided into finer and finer
increments of precision weight, length, voltage,
time
Measures of Central Tendency - Location
Definitions
∑ X , X , X ... X
population size (average) j
µ = Population mean= 1 1 2 3 j
X = Sample mean N
Population Samples
Size N n
Location Average (Mean) µ x
Dispersion: Variation
Variance σ 2 s2
Std dev σ s
Range R = XHi -XLo
x1 xn
X
x2
ˆ=∑
Maximum = 95
F
12
r 10 X=µ i=1
Xi
e
q 8
u n
e 6
n Variable X measurements:
c 4
y 75 80 75 65 70
2 85 70 70 85 70
60 80 80 80 65
0
50 60 70 80 90 100 110
80 75 75 70 85
70 75 75 75 85
Values of X 80 55 70 70 85
65 70 80 75 65
75 85 90 80 65
70 75 75 80 80
75 95 90 60 65
Measures of Variability - Variance =
Sigma Squared
Definitions
uSigma Squared is a measure of dispersion of the
population about the mean
uVariances are not in the units of interest; standard
deviations are in the units of interest
uVariances are additive; standard deviations are not
additive...
…so σ 1
2 +σ 2
2 + σ 3
2 is OK,
but, σ 1 +σ 2 + σ 3 is NOT OK
Measures of Variability – S. D. = Sigma
Definitions
Standard Deviation is a measure of dispersion of the
population about the mean
σ = the units of interest and is population standard
deviation
µ = population mean
N = total population
s = estimate of standard deviation
(
X1 µ
n = sample size −
2
+ ) (
X2 −µ 2
+ X3 −µ ) (
2
... X N −µ ) ( ) 2
σ (X )=
N
(X −X ) + (X
2
−X ) + (X
2
−X ) ...(X
2
−X ) 2
σ̂ = s = 1 2
n-1
3 n
Normal Distribution
Each curve shown here has: Therefore, the same % of
u An area of one the population is under each
u A mean of zero of the curves for n σ about
u A standard deviation of σ the mean.
Quantifying the Normal Distribution
Definitions
can be converted to a 2π
standard normal
distribution
The Standard Normal Transform
Definitions
X −µ
Z=
σ
Permits conversion of any data point (X) into a Z
value. This value allows us to look up the percentage
of the population that is above and below the data
point.
Sample Questions………
Q. A new iron ore mine is discovered. 10 Kg ore is
collected from each of 20 spots.
1.
LSL USL
Visualizing Process Capability
Process width
Specification
width
Quantifying Process Capability
If we assume the
Yield of a one sigma process 0.683
process is centered
on the target and
does not shift or drift
the yields would be.
Process Yield
Sigma
1 0.6826895
2 0.9544997
3 0.9973002
4 0.9999367
5 0.9999994
6 1
LS US
L L
The Standard Deviation
µ σ = Σ (X – X)2
1 Sigma - 68%
2 Sigma - 95%
n
3 Sigma - 99.73 %
1σ
p(d)
operation?
Calculating Yield – Example
2. What is the probability that he will take > 700 hrs?
3.
x − µ= (700 – 500) / 100 = 2
Z =
σ
Looking up z table, the corresponding value under the
Calculating Yield Example
Consider a process that has the following specification
limits: Lower Specification Limit (LSL) of -1 and a Upper
Specification Limit of 1. Data indicates the process is
centered on 0 with a standard deviation of 1. What is the
yield? Using tables or software to look up the
USL-X area under the curve when Z=1 we
ZUSL= find .8413. This means that 84.13% of
σ̂
the product has a value less than the
1-0
ZUSL= =1 upper specification limit.
1 Again using tables or software to look
LSL-X up the area under the curve when Z=-1
ZLSL= we find .1586. This means that
σ̂
-1-0 15.86% of the product has a value less
ZLSL= = −1 than the lower specification limit.
1
What if the Process Shifts?
Generally speaking, processes have been
-4 -3 -2 -1 0 1
Calculating Shifted Process Yield
addressed first.
80
Percent
50
20
5 The P value is
1
> .05 therefore
0.01
0.992 0.994 0.996 0.998 1.000 1.002 1.004 1.006 1.008
do not reject the
Caps assumption of
Worksheet: Bottle Caps.MTW
normality.
Using Minitab to Calculate Process Capability
Minitab Results
Process Capability of Caps
45 60 75 90 05 20 35 50
.99 .99 .99 .99 .00 .00 .00 .00
0 0 0 0 1 1 1 1
Observed Performance Exp. Within Performance Exp. Overall Performance
% < LSL 0.40 % < LSL 0.54 % < LSL 0.54
% > USL 0.67 % > USL 0.64 % > USL 0.65
% Total 1.07 % Total 1.18 % Total 1.19
Within
Target USL
LSL 0.995
Target 1 Overall
USL 1.005
Sample Mean 1.00006 Potential (Within) Capability
Sample N 750 Z.Bench 2.26
StDev(Within) 0.00198431 Z.LSL 2.55
StDev(Overall) 0.00198636 Z.USL 2.49
Cpk 0.83
Overall Capability
Z.Bench 2.26
Z.LSL 2.55
Z.USL 2.48
Ppk 0.83
Cpm 0.84
45 60 75 90 05 20 35 50
.99 .99 .99 .99 .00 .00 .00 .00
0 0 0 0 1 1 1 1
Observed Performance Exp. Within Performance Exp. Overall Performance
% < LSL 0.40 % < LSL 0.54 % < LSL 0.54
% > USL 0.67 % > USL 0.64 % > USL 0.65
% Total 1.07 % Total 1.18 % Total 1.19
45 60 75 90 05 20 35 50
.99 .99 .99 .99 .00 .00 .00 .00
0 0 0 0 1 1 1 1
Observed Performance Exp. Within Performance Exp. Overall Performance
% < LSL 0.40 % < LSL 0.54 % < LSL 0.54
% > USL 0.67 % > USL 0.64 % > USL 0.65
% Total 1.07 % Total 1.18 % Total 1.19
45 60 75 90 05 20 35 50
.99 .99 .99 .99 .00 .00 .00 .00
0 0 0 0 1 1 1 1
Observed Performance Exp. Within Performance Exp. Overall Performance
% < LSL 0.40 % < LSL 0.54 % < LSL 0.54
% > USL 0.67 % > USL 0.64 % > USL 0.65
% Total 1.07 % Total 1.18 % Total 1.19
or Z LSL .
Sample N
StDev(Within)
StDev(Overall)
750
0.00198431
0.00198636
Z.Bench 2.26
Z.LSL
Z.USL
2.55
2.49
Cpk 0.83
Overall Capability
Z.Bench 2.26
Z.LSL 2.55
Z.USL 2.48
Ppk 0.83
Cpm 0.84
45 60 75 90 05 20 35 50
.99 .99 .99 .99 .00 .00 .00 .00
0 0 0 0 1 1 1 1
Observed Performance Exp. Within Performance Exp. Overall Performance
% < LSL 0.40 % < LSL 0.54 % < LSL 0.54
% > USL 0.67 % > USL 0.64 % > USL 0.65
% Total 1.07 % Total 1.18 % Total 1.19
Within
normal then looking
Target USL
LSL 0.995
Target 1 Overall
USL 1.005
or Z LSL .
Sample Mean 1.00006 Potential (Within) Capability
USL Sample N
StDev(Within)
750
0.00198431
Z.Bench 2.26
Z.LSL 2.55
StDev(Overall) 0.00198636 Z.USL 2.49
Cpk 0.83
Overall Capability
Z.Bench 2.26
Z.LSL 2.55
Z.USL 2.48
Ppk 0.83
Cpm 0.84
5 0 5 0 5 0 5 0
994 996 997 999 000 002 003 005
0. 0. 0. 0. 1. 1. 1. 1.
Observed Performance Exp. Within Performance Exp. Overall Performance
% < LSL 0.40 % < LSL 0.54 % < LSL 0.54
% > USL 0.67 % > USL 0.64 % > USL 0.65
% Total 1.07 % Total 1.18 % Total 1.19
45 60 75 90 05 20 35 50
.99 .99 .99 .99 .00 .00 .00 .00
0 0 0 0 1 1 1 1
Observed Performance Exp. Within Performance Exp. Overall Performance
PPM < LSL 4000.00 PPM < LSL 5355.08 PPM < LSL 5395.59
PPM > USL 6666.67 PPM > USL 6432.04 PPM > USL 6478.48
PPM Total 10666.67 PPM Total 11787.12 PPM Total 11874.07
LSL 0.995
Within
Target 1 Overall
of PPL or PPU.
USL 1.005
Sample Mean 1.00006 Potential (Within) Capability
Sample N 750 Cp 0.84
StDev(Within) 0.00198431 CPL 0.85
StDev(Overall) 0.00198636 CPU 0.83
Cpk 0.83
Overall Capability
Pp 0.84
PPL 0.85
PPU 0.83
Ppk 0.83
Cpm 0.84
45 60 75 90 05 20 35 50
.99 .99 .99 .99 .00 .00 .00 .00
0 0 0 0 1 1 1 1
Observed Performance Exp. Within Performance Exp. Overall Performance
PPM < LSL 4000.00 PPM < LSL 5355.08 PPM < LSL 5395.59
PPM > USL 6666.67 PPM > USL 6432.04 PPM > USL 6478.48
PPM Total 10666.67 PPM Total 11787.12 PPM Total 11874.07
80
Percent
50
20
5
1
0.01
Do not
0.9950 0.9975 1.0000
Caps Drift
1.0025 1.0050
reject the
Worksheet: Caps Drift.MTW assumption
of normality.
Capability Analysis
Capability Analysis
Process Capability of Caps Drift
hart.
Sample Mean 0.999998 Potential (Within) Capability
Sample N 720 Z.Bench 4.76
StDev(Within) 0.00102066 Z.LSL 4.90
StDev(Overall) 0.00129055 Z.USL 4.90
Cpk 1.63
Overall Capability
Z.Bench 3.70
Z.LSL 3.87
Z.USL 3.88
Ppk 1.29
Cpm 1.29
1 ± .06 Inches
Process average
Design width
(.12 Inches)
80
Percent
50
20
5
1
0.01
9.8 9.9 10.0 10.1 10.2
Part A
Worksheet: Process Capability Exercise 1.MTW
Probability Plot of Part B
Normal
99.99
Mean 10.00
StDev 0.05647
N 750
99 AD 0.248
95 P-Value 0.752
80
Percent
50
5
1
assumption of 0.01
part.
Exercise 2 Process Capabilities
Exercise 2 Part A Process Capability
Process Capability of Part A
__
10.00 X=10.0009
9.95
LCL=9.9343
1 16 31 46 61 76 91 106 121 136
Sample
UCL=0.2441
0.2
Sample Range
4 _
R=0.1154
0.1 44
4
0.0 LCL=0
1 16 31 46 61 76 91 106 121 136
Sample
__
10.00 X=9.9996
9.95
5 5 LCL=9.9330
1 1
9.90 1 1 1
1 16 31 46 61 76 91 106 121 136
Sample
UCL=0.2441
0.2
Sample Range
4 _
R=0.1154
0.1 44
4
0.0 LCL=0
1 16 31 46 61 76 91 106 121 136
Sample
\DataFile\PurchOrd.mtw
\DataFile\PwrSuply.mtw
\DataFile\Conf-Int.mtw
\DataFile\OEack.mtw
What We Will Learn...
How
Population representative is
this sample?
Sample
Confidence Interval Symbols and
Definitions
Measure Population Sample
Use
Parameter Statistic
Z n ≥ 30
Mean µ X σ is known
t n < 30
Variance σ2 s2 χ 2
Standard
Deviation
σ s χ 2
Process ^
Capability
Cp Cp χ 2
^ F or
Proportion p p Z (approx)
α Typically
Alpha Risk
.05
Confidence Intervals (CI)
CI take the general form :
5
5
5
0
4
-4
-3
-2
-1
.
0.
1.
2.
3.
.
.
-2
-0
-3
-1
We can use Z
to
estimate t if
n ≥ 30
and σ is
known
STATISTICS FOR
EXPERIMENTERS-- BHH
Hypothesis Testing
About This Module…
Design:
Determine if two alternate design
changes are significantly different.
Manufacturing:
Determine if two different types of
material wear differently.
Administrative/Transactional / Service:
Determine if the change to a process
affected the cycle time.
Purposes of Hypothesis Testing
Action
Ho not rejected Ho rejected
State of Nature
Ho should not Type I or
Correct
be rejected producer’s risk
Decision
(Ho is true) α = P(Type I)
β α
X1 − X 2
t(α ,df ) = = -1.26
2 2
s s
1
+ 2
n1 n2
P = .112
P> .05 therefore fail to reject Ho.
Hypothesis Testing Decision Tree
Hypothesis Ho: P1=P2 Ha: P1 P2
Testing Minitab: Stat-Basic Stat-1or 2 proportions
ADMINISTRATIVE
MANUFACTURING
DESIGN
Correlation = 1 Correlation = - 1
12
10
8
6
4
2
0
0 2 4 6 8 10
Correlation = 0
Correlation Example
\DataFile\Correlat.mtw
Two test stations are used to measure power supply
voltage.
Is there a correlation?
Minitab: Stat>basic stat>correlation
Correlation of Station 1 and Station 2 = 0.959, P-Value = 0.000
?
Is this reasonable?
Are you comfortable with .959?
What does it mean to you?
How does the data actually look?
How would you find out?
Plot the Data
Graph>ScatterPlots
The Data
Scatterplot of Station 1 vs Station 2
9.4
9.3
9.2
were on the9.0diagonal
line, would8.9we have
perfect correlation?
8.8
8.7
8.6
8.5
8.6 8.8 9.0 9.2 9.4 9.6
Station 2
Worksheet: Correlat.MTW
9.3
R-Sq(adj) 91.5%
the preceding
9.2 one?
Station 1
9.1
9.0
8.9
8.8 What are the
8.7
implications?
8.6
8.6 8.8 9.0 9.2 9.4 9.6
Station 2
Worksheet: Correlat.MTW
What action
would you
Slide 225 was actual line – this is a take?
fitted line. Can be used for prediction.
Best Fit Line
Fitted Line Plot
Cases = 22.47 + 0.7546 Test Piece
100 S 11.5131
90
R-Sq
R-Sq(adj)
49.4%
47.7% By minimizing the
80
residual sum of
squares, we get a
Cases
60
form:
50
40
40 50 60 70 80 90 100 Yi = a + bX i
Test Piece
Worksheet: cases.MTW
\DataFile\Attribut mtw
\DataFile\Variable.mtw
What We Will Learn.
• Common causes.
• Special (assignable)
causes.
Common Causes
2) Monitor a process
Centerline =
X
Lower Control Limit LCL = X − 3Sw
Therefore 99.73% of points will be within the control limits
unless there is an assignable cause
Control Chart Selection Tree
Type of data
Discrete Variable
X Bar and R
Fixed or Variable Fixed Fixed or Variable IMR Chart
Fixed or
variable variable
X Bar and S
opportunity? opportunity?
Supplement
with EWMA if
CTQ is
P Chart
C Chart U Chart NP Chart sensitive to
small process
shifts
X and R Control Chart Formulae
& Constants
X Control Limits =X ± A 2R
R Upper Control Limit = D R
4
5 UCL=41.294
41
Sample Mean
__
40 X=40.000
6
39 6
LCL=38.706
1
1 1
38
1
5 10 15 20 25 30 35 40 45
Sample
UCL=4.743
4.5
Sample Range
3.0
_
R=2.243
1.5
0.0 LCL=0
5 10 15 20 25 30 35 40 45
Sample
Worksheet: Variable.MTW
TEST 5. 2 out of 3 points more than 2 standard deviations from center line (on
one side of CL).
Test Failed at points: 10, 17, 47
TEST 6. 4 out of 5 points more than 1 standard deviation from center line (on
one side of CL).
Test Failed at points: 7, 32, 34
* WARNING * If graph is updated with new data, the results above may no
* longer be correct.
StatGuide Interprets the Tests
Comparing the Suppliers
Xbar-R Chart of measure1, ..., measure5 Xbar-R Chart of measure1, ..., measure5
42 1 1
UCL=41.207 1
Sample Mean
41 5 UCL=41.384
Sample Mean
5
_
__
40 X=39.894 40 X=40.106
6
5 5 LCL=38.829
39 1
LCL=38.580 38 1
1 1
2 4 6 8 10 12 14 16 18 20 22 24 2 4 6 8 10 12 14 16 18 20 22 24
Sample Sample
UCL=4.816 UCL=4.683
Sample Range
Sample Range
4 4
_ _
2 R=2.278 2 R=2.214
0 LCL=0 0 LCL=0
2 4 6 8 10 12 14 16 18 20 22 24 2 4 6 8 10 12 14 16 18 20 22 24
Sample Sample
11 2
10
6
6 6
9
7/31/2006 8/4/2006 8/10/2006 8/16/2006 8/22/2006 8/28/2006 9/1/2006 9/7/2006 9/13/2006 9/19
Date
4.5
Sample Range
3.0
1.5
Detecting Gradual Process Drift
Xbar-R Chart of Stacked Data 1s
12
5 UCL=11.850
6 2
2
Sample Mean
2 2
11 2 2
_
_
X=10.568
10 6
6 6
LCL=9.286
9
4 8 12 16 20 24 28 32 36 40
Sample
UCL=4.699
4.5
Sample Range
3.0
_
R=2.222
1.5
0.0 LCL=0
4 8 12 16 20 24 28 32 36 40
Sample
Worksheet: Variable.MTW
The tests detect the process shift but it would have been
detected earlier if the control limits had been based on the
first 20 data points.
Detecting Gradual Process Drift
Minitab calculates control limits based on the entire data set be default.
Freezing control limits detects shifts earlier than using the entire data set
to calculate limits.
2 2
2 2 2 UCL=11.360
5 6 2 2
2
Sample Mean
11 6 2 2 2
6
__
X=10.112
10
9
LCL=8.864
4 8 12 16 20 24 28 32 36 40
Sample
4.5 UCL=4.575
Sample Range
3.0
_
R=2.164
1.5
0.0 LCL=0
4 8 12 16 20 24 28 32 36 40
Sample
Worksheet: Variable.MTW
Rational Subgrouping
•Usually consecutive units
•Must come from a single distinct population
•Within subgroup, variation should be white noise only
•Between subgroups should capture variation due to black noise
Process
Challenge
Philosophy
Liker Model - 4 Ps
1. Philosophy
• Long-term thinking even at expense of short-term
financial goals
2. Process
• Eliminate waste by focusing on flow, pull, workload
balance, error reduction, standardization, visual
controls, and jidoka or use of reliable, tested
technology/automation with mistake proofing and
human touch
3. People and Partners
• Respect, develop, and challenge people
4. Problem Solving
• Fix and prevent problems by continual learning, going
to place where problem occurs, getting hands dirty,
and making good decisions based on fact
What Is Lean?
Lean is a methodology
minimization WIP
Reduction
• Elimination of non- Quality
value-added Improvement
activities Space
Utilization
• Resulting in a more
“lean,”
competitive, agile,
and market-
responsive
Why the Emphasis on Lean Now?
• Global economy
• Pressure from customers for price reduction
• Fast-paced technological changes (e.g. Internet auctions)
• Continued focus on quality, cost, delivery
• Higher and higher expectations of customers
• Quality standards, such as QS-9000 (or TS 16949), the
new ISO 9000:2000
• Holding on to “Core Competencies,”outsourcing the rest
• Market-driven pricing: Customers expect better
performance at lower prices year after year
Evolution of Lean Across Markets
• Proven global concept since 1980s
• Transformed business processes across
many industries:
–Automotive
–Aerospace
• Other industries beginning to embrace
Lean concepts with excellent results:
–Construction
–Hospitals
–Pharmaceutical Manufacturing
–Service Organizations
Pricing Model
Costs Maintain Increase
Old Way
Increase Profits Price
Customers What
Demand If Costs can we do?
Stay the Profits
Lower
New Way Prices Same Decrease
3 hours
Cans Sheet Rolled Plate
• Introduction to Lean
7 Wastes of Lean
information etc.
•Just in case logic •Waiting for files or
•Unbalanced information
workload •Need a signature
•Unleveled •Customer reply to
scheduling a voice-mail or e-
•Unplanned mail
downtime •Someone is
•Needs not printing 50 copies
understood of a 70 page
report
Defects
knowledge, creativity
•Not utilizing •Lack of
Teams suggestions
•Organization •“That’s not my job”
structure attitude
•Poor hiring •Waiting for lead
practices from management
•Little investment in
training
Mura and Muri
• Mura (unevenness) – variation in operation,
wasted resources when quality, cost, or
delivery cannot be predicted
– Testing/inspection, Containment,
Rework, Returns, Overtime,
Unscheduled travel
• Muri (overdoing) – unnecessary or unreasonable
overburdening of people, equipment, or
systems when demand exceeds capacity or
tasks are not designed properly including
harmful, wasteful, or unnecessary tasks
Building Blocks of Lean
5
Continuous Improvement 2
Sustain Organize/Straighten
Discipline A place for
Waste everything
3
4
Clean/Sweep
Maintain/Standardize
Housekeeping /
Establish standards
Inspection
Workplace Scan
“Understand your Current State”
• Start with a workplace Scan
• Team Based Workplace Scan Display
Item _____________
– “30-day Rule” Reason _________
• Does the
carpenter walk
back to the
toolbox every
time a tool is
needed?
• Which waste is
this?
• What does the
carpenter do?
Proximity
• Typically, up to 60% of time is spent on
finding/collecting items needed.
• Minimize non-value activities
• Store as close as possible and within reach
• Layout and workstation design should
accommodate required materials
• Try to use the packaging from the supplier
or have the supplier change packaging
POUS Components
• Have the:
– Information
reach
•
POUS Workplace Zones
Blocks
transportation waste
Benefits of 5S
• Improved equipment reliability
• Superior quality
• Increased productivity
• Better workflow
• Enhanced Safety
• Reduced inventory
• More pleasant place to work
• Impress customers
•
Video
• Introduction to 5S
Building Blocks of Lean
park?
How to Apply Visual
• Use Signs, Lines, Examples
around
do your job
Visual Examples
Andon Lights
Display Panels
Range Markings
On Gauges
Shadow Boards
Standard Work
• Specific
• Measurable
• Repeatable
• Documented
Standard Work
Identifies value added versus non-value added
activities
• Reduce or eliminate non-value added activities
• Convert Internal Time to External Time,
wherever possible
• Continuous Improvement: once Standard Work
is established as a base and displayed at
workstations, operators monitor and
implement improvements
• Use as a training tool for new employees
• Created by input from the people who actually
work in the process
Philosophy of Standard Work
organization’s needs
Process Capacity Table
Times for: Process:
Changeover Analisys Chart
NVA = X
• Elapsed time
Seq Elapsed Element Internal External
No. Element Symbol Time Time Time Time Comments
1 Review work order for die number and material 600 600 300 Convert to External
2 Locate the die 1800 1200 300 Convert to External
• Element time 3
4
Locate material
Get tools
3000
3600
1200
600
300 Convert to External
300 Convert to External
5 Tagout machine 4500 900 60 Prepare Tags before
• Internal Time 6
7
Loosen bolts
Disconnect hoses
4980
5280
480
300
60
60
Use quick connects
Use quick connects
8 Remove die from press 5580 300 120 Position die cart
• External Time 9
10
Return die to Tool Room
Load die into press
6180
6480
600
300 90
300 Convert to External
Use positive stops
11 Align die 6960 480 0 Eliminate X
• Manual Time 12
13
Tighten bolts
Connect hoses
7440
7740
480
300
60
60
Use quick connects
Use quick connects
14 Position material 8340 600 300 Convert to External
• Transportation 18
19
Adjust die and press
Make sample piece
10800
10860
1200
60
0 Pre-adjust die
0 Eliminate
X
X
20 Return tools 11460 600 600 Convert to External
• Process Transport Process Inspection Storage Total Time 11460 750 2400 Page ____ of _____
• Inspection
• Storage
Use to identify bottlenecks Use to calculate the capacity of
• Machine
ID Description of Work Element Operation Operation Walking Start Manual Operation
Machine Operation
Walking
1 Manually load WC-1 12 32 0 1 44 0 0 12 32 0
2 Start WC-1, go to WC-2 3 0 2 2 5 44 49 3 0 2
3 Unload part, Load Part, Start Machine, go to WC-3 1 16 2 3 19 49 68 1 16 2
operations time
4 Unload part, f ile c orner, inspect to print 45 120 0 4 165 68 233 45 120 0
5 Load nex t part, s tart machine, go to WC-1 2 15 3 5 20 233 253 2 15 3
6 Fas ten parts A-1, and B-1 together, go to A S-2 23 41 2 6 66 253 319 23 41 2
7 Fas ten Housing and Base 42 0 0 7 42 319 361 42 0 0
• Walking
8 Pac kage generator 35 0 0 8 35 361 396 35 0 0
9 Load on c art 5 0 4 9 9 396 405 5 0 4
10 0 0 0 10 0 405 405 0 0 0
11 0 0 0 11 0 405 405 0 0 0
12 0 0 0 12 0 405 405 0 0 0
13 0 0 0 13 0 405 405 0 0 0
14 0 0 0 14 0 405 405 0 0 0
15 0 0 0 15 0 405 405 0 0 0
16 0 0 0 16 0 405 405 0 0 0
interactions
20 0 0 0 20 0 405 405 0 0 0
21 0 0 0 21 0 405 405 0 0 0
22 0 0 0 22 0 405 405 0 0 0
between machines
23 0 0 0 23 0 405 405 0 0 0
24 0 0 0 24 0 405 405 0 0 0
25 0 0 0 25 0 405 405 0 0 0
26 0 0 0 26 0 405 405 0 0 0
Allows to recalculate
Time PCS Rate Throughput per shif t = A vailable Time / Total Operating Time:
1 Work Flow Diagram
WC-1 WC-2 WC-3
2
operator work
3
4 AS-1
5 AS-1 AS-1
content as takt
Total Non-cyc lic Time:
time changes
Standard Work Sheet
Displayed at Workstations
B - Gene
Continuously reviewed and updated
Proce
Uses
• The Process Capacity Table can be used
to reduce changeover times
• The Work Combination Sheet can be
used for line balancing when creating a
cell
• The Standard Work Sheet can be used for
training and team development
•
Standard Work Examples
Adobe Acrobat
Adobe Acrobat Adobe Acrobat
Document
Document Document
Standard Work and Training
Questions to ask Operators about Standard Work
• How do you do this work?
• How do you know you are doing this work
correctly?
• How do you know there are no defects?
• What do you do if you have a problem?
•
If these questions cannot be answered
Productivity
Time Time
Benefits of Standard Work
• Standard documentation for all shifts
• Reductions in injuries and strain
• Employee ownership of process
• More pleasant working conditions; higher
morale
• Better than traditional time and motion
studies
• Reduced variability
Poka-yoke
• Error proof (mistake proof) takes away the
possibility of human error
• The term Poka-yoke was made popular by
Shigeo Shingo
• Fail-safe devices
• Low cost, highly reliable mechanisms
• Detects abnormal situations before they occur,
or
• Once they occur, will stop the equipment from
further production. The machine stoppage
makes the problem visible.
•
Other Poka-yoke Examples
• USB ports on computers
•
Benefits of Poka-yoke
• Gives immediate feedback for root cause
analysis & correction (and prevention for the
future).
• Failure Mode and Effect Analysis (FMEA) solution
can be Poka-yoke
• Some examples of Poka-yoke devices are:
sensors, counters, feelers, limit switches,
electric eyes, probes, automatic stops.
Building Blocks of Lean
Value Stream
Value Stream
Purpose of Value Stream Map
• Has customers’ perspective and focuses on meeting
customers’ wants and needs
• Starts with immediate customer and maps back to
receiving inputs from suppliers and shows how fits
into overall value stream
• Provides single view that is a complete, fact-based,
and time-based representation of stream of
activities
• Provides common language and view for analysis
• Shows how information triggers and supports
activities
• Shows time for activities and whether they add value
Elements of Value Stream Map
• Process steps
• Value-add classification for each step
• Information flow such as orders, requirements, schedules,
messages, approvals, specifications, kanban signals, shipping
information, standard procedures
• Box score of key operational metrics including cycle time, waiting
time, working time, conveyance time, distance traveled, items
per shift, items processed per hour,setup time, backlog/work-
in-process, amount of inventory between last step and
consumer, defects, cost information, resource availability and
active time, process variations
• Lead time is amount of time for one item to flow completely
through process, noted along bottom of flow
• Takt time showing customer demand rate, in upper right corner
of flow
Value Stream Analysis Steps
• Identify deliverable, value stream, and sponsor who has authority and
responsibility to allocate resources and make changes across
organization
• Identify customer and value from customer’s perspective as well as
regulatory, legal, and compliance requirements
• Draw visual representation of process current state, generally draw
steps starting at consumer’s view working back through steps to
sources of material and labor; flows from left to right with time, with
steps in order of occurrence
• Add metrics and observations like Takt time/throughput, cycle times,
defect rates, and inventory/work-in-process and information flows
to identify magnitude and frequency of waste
• Use lean principles to reduce or eliminate waste and reduce cycle
time
• Develop future state map, document steps of process that need to
happen, and prioritize and implement action plans to achieve future
state
Value Analysis Matrix Steps
• Structure value analysis matrix
• Number process steps on sub process map
• Have column for each process step
• Estimate time for each process step
• Place check in category for each process step,
either value-add or one of non-value-add
categories
• Total number of hours or number of checks for
each row
• Report percentages of value-add and non-
customer required
Value Analysis Matrix Example
Process Step 11 22 33 44 55 66 77 88 99 10
10 Total % Total
Time (Hours) 1212 1010 1 1 1010 2020 6 6 1010 1 1 1010 2020 100
100 100%
100%
Value - Add
Added √√ √√ 22 2%
2%
Internal Failure
Control/Inspection √√ 66 6%
6%
Prep/Set
Prep/Set-Up
- Up
Total 100
100 100%
100%
RFQ Creation Value Stream Map
Customer Meetings
C/T = 14 days
W/T = 2 days
VA/T = 1 day
Iterate
Assign Buyer Gather Verify Customer Consult with Manu- Create Preliminary
Requirements Requirements facturing Engineer RFQ
C/T = 3 days C/T = 14 days C/T = 14 days C/T = 5 days C/T = 5 days
W/T = 4 hours W/T = 2 days W/T = 2 days W/T = 2 days W/T = 2 days
VA/T = ~ 0 VA/T = 1 day VA/T = 1 days VA/T = 4 hours VA/T = 1 day
Revise
Review and
Triggering Approval Cycle
C/T = 5 days
Event W/T = 1 day Measurable
VA/T = ~ 0 Deliverable
Continue Continue As-Is Process
Create Final Review and
Release RFQ Cycle Time*:
RFQ Approval Cycle
C/T = Calendar Time
W/T = Work Time C/T = 5 days C/T = 5 days C/T = 2 days
C/T = 58 days
VA/T = Value-Add Time W/T = 2 days W/T = 1 day W/T = 1 day W/T = ~14 days
VA/T = 1 day VA/T = ~0 VA/T = 2 hours
VA/T = 5 days
Revise Assumes no revisions!
Sales Order Processing Value
Stream Map C/T = Calendar Time
W/T = Work Time
VA/T = Value-Add Time
Time Customer is On Telephone
Work Errors, waiting, transportation, movement
etc…..
Total Cycle Time
• Time that elapses from beginning to end of process
• Ultimate objective or goal of Lean processes is to reduce cycle
time by eliminating waste
Benefits of VSM
• Helps you visualize more than the single
process level
• Links the material and information flows
• Provides a common language
• Provides a blueprint for implementation
• More useful than quantitative tools
• Ties together lean concepts and techniques
4 Steps for VSM
1.Determine the Product Family
Hardcopy
Train Electronic
Cell
Boat
Person
Plane
Fun Current State Icons
?
?
?
Fa
x
o
&@#$%!
Current State Map Setup
Tips
•Use 11” x 17” paper, landscape
•Use pencil and eraser
•Draw by hand
•Don’t waste time putting it on a computer just to
make it look nice (non-value added time)
•Practice, practice, practice
Steps
•Customer
•Supplier
•Process
•Information flow
•Calculate process time and lead-time
Current State Map Setup
Custome
Supplier
r
informati Information Flow Area informati
on
on
• Formula
Takt Time = Time Available
Demand
Takt Time Calculation
Time available
Shift (8 hours) = 480 mins
Breaks (2 x10) - 20 mins
Lunch - 30 mins
Meetings - 5 mins
C/O - 5 mins
Total Time = 420 mins = 25,200 sec
Demand = 265 parts
Takt Time = 95 sec/part
Takt Time Calculation
• Takt Time = Demand Rate
– Goal: Produce to demand with no excess
capacity
• Takt Time = work time available number of
units sold
• Assume 5 people work, sell 500
units/week:
– TaktTime = (5 x 40 x 60) / 500 = 24
min/unit
– Set cycle time to match
personnel/operation
Exercise
8
7
6
5
4
3
2 A B C D E
1
0
Mon Tue W ed Thu Fri
1 Hour C/O – Half Batch Size
8
7
6
B D A C E
5
4
3
2
1 A C E B D
0
Mon Tue W ed Thu Fri
10 Minute C/O – Small Batch Size
8
7 E E E E E
6
5 D D D D D
4
3
C C C C C
2
1
B B B B B
0
Mon Tue Wed Thu Fri
A A A A A
10 Minute C/O – Many Different Small
Batches
8
7 B
6 D E
5
D C D
4 E F B
3 H
C C
2
1 B B
A H
0 G
Mon Tue Wed Thu Fri
A F G A B
I
Changeover Summary
Based on
C/0 Time Number of 40 hours per week
Number of Production
Changeovers Production Time
Runs Available
2 Hour 5 5 30 hours
1 Hour 10 10 30 hours
1. Preparation, after-
process 30% 5%
adjustments,
checking of 15%
material and tools
(30%)
2. Mounting, removing
50%
tools and parts
(5%)
3. Measurements, Typical proportions
settings and
calibrations (15%)
4. Trial runs and
Step 1. Separate Internal and
External Times
• Checklists
• Functional checks
Before
After
• Focus on Process.
• Focus on Elimination of Waste.
• Focus on Speed.
• Time improvement translates directly to
cost savings and customer satisfaction.
Kaizen Blitz Steps
1.Select specific area for improvement.
2.Define current situation in measurable
terms
3.Set aggressive goals (stretch goals).
4.Identify team members.
5.Conduct training on the first day of the
project.
6.Do it (in three to five days).
Step 1 – Select Project
• Value Stream Map
• Bottlenecks
• Customer or quality related issues
• Interdepartmental
• Long lead-times or setup times
• Competitive advantage
• Cost reduction or avoidance
Step 2 – Define Current State
• Video tape
• Time study
• Flowchart
• Historical information
• Observations and interviews
Step 3 – Identify Team Members
• Cross-functional teams (seven to ten persons)
• Hourly and salaried personnel
• Operators, engineers, supervisors, maintenance persons,
managers, technical experts, material handlers, quality
personnel, business support personnel, participants
from the outside
• Typically, Team Leader is person with clout and is the
highest stakeholder in the process. Ideally, the team
leader must possess leadership skills, open minds,
strong desire to succeed and some prior “Lean”
experience.
Step 4 – Set Aggressive Goals
• Define the purpose or objective and set stretch
goals.
• Goals should be clearly defined and quantifiable
(e.g., reduce machine set up time by 75%,
increase throughput by 40%, reduce floor
space by 30%).
• Emphasis should be on identifying and
eliminating waste, and then standardizing at
the improved level.
• Benchmark when possible
Step 5 – Conduct Training
• Select hands-on training that is compatible
with the project
• Do training on the first morning
• Provided by an internal or external expert
Step 6 – Do it!
• Perform in 3 to 5 days
Example 1 – Universal Joint QCO
•
3. Training in Lean
Training in Lean
5S Implementation Map
• Plan
– Identify 5S 8 9
7 8 8 9 9 10 13
Champions &
Teams 8 8 9 9
5 10
– Decide how to roll- 1 4 2
out to entire 1 4 3 11 1 1
5
organization 6 12 4 4
– Resources required
• Train
– Train just before
Kaizen
– Train-the-trainer
• Do
• Improve & Repeat
5. Kaizen Blitz
Select a Kaizen Blitz project
• Steering Committee
• Design Teams
• Champions
Lean Team Roles & Responsibilities
Design
Team HPT
Lean Steering Design
Committee Team
5S, Visual,
POUS Pull/Kanb
Design Cellular an
Team Design Design
Team Team
Champions Champions
Champions
Steering Committee
Champions
Momentum
• Have to build a
“critical mass” of
employees trained
in Lean and apply
principles
• Build “buy-in” and
get people
onboard
• “Bandwagon” affect
Organizational
Alignment
Dealing with Objections to Lean
• Put yourself in their shoes
• Help answer “WIIFM”
• Communicate, communicate, communicate
and then communicate some more!
• Create an “Elevator Speech”
•
Getting People on Board
Parad ise
Lean
! ?
Status Quo
Land
Lean Enterprise vs.
Lean Manufacturing