TABLE OF CONTENT
SECTION
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
DOC.No
INT-01 Rev.1 DEF-01 FC-01 Rev.1 PR-001 GR-01 Rev.3 FEE-01 Rev.1 DRG-01 Rev.4 DCS-01 Rev.2 ARC-01 Rev.4 FM-001 FM-001A APPENDIX A APPENDIX B APPENDIX C ST-001 SIT-01 Rev.1 FM-002 INTRODUCTION DEFINITIONS
DESCRIPTION
BUILDING PERMIT APPLICATION FLOW CHART PROJECT RECORD SHEET GENERAL REQUIREMENT FEE SCHEDULE DRAWINGS REQUIRED TO OPTAIN A PERMIT APPLICABLE DESIGN CODES AND STANDARDS ARCHITECTURAL APPROVAL (SUBMISSION REQUIREMENT) REQUEST FOR ARCHITECTURAL APPROVAL ARCHITECTURAL CHECKLIST CAR PARK CALCULATION TABLE SANITARY FITTINGS CALCULATION TABLE GROSS FLOOR AREA CALCULATION TABLE STRUCTURAL SUBMISSION CHECKLIST TEMPORARY FENCE, SITE PREPARATION AND MOBILIZATION REQUEST OF TEMPORARY FENCE, SITE PREPARATION & MOBILISATION PERMIT EXCAVATION PERMIT REQUEST FOR EXCAVATION PERMIT FOUNDATION AND SUBSTRUCTURE PERMIT REQUEST FOR FOUNDATION AND SUBSTRUCTURE PERMIT STRUCTURAL APPROVAL (SUBMISSION REQUIREMENT) REQUEST FOR STRUCTURAL APPROVAL REQUIREMENTS FOR STRUCTURAL ENGINEERING SUBMISSION PERMIT REVISION, EXPIRATION, AND RENEWAL PROCESS MUNICIPAL INSPECTION PROCESS BUILDING COMPLETION CERTIFICATE
18 19 20 21 22 23 24 25 26 27
SIT-02 Rev.1 FM-004 STR-01 Rev.1 FM-003 STR-02 Rev.1 FM-005 APPENDIX S EXP-01 IN-01 Rev.1 BCC-01 Rev.1
ABU DHABI MUNICIPALITY BUILDING PERMITS DIRECTORATE INTRODUCTION DOCUMENT NO 1.0 INTRODUCTION INT-01 Rev. 1 Date 6/25/2007
The manual is a collection of procedural guidelines, application forms, worksheets and forms used by the Building Permits Directorate (BPD). The intent is that many of these individual sections will be available as handouts at the Building Permits Directorate. When all of these documents are assembled in sequential order into a larger bound document they comprise the complete policy manual for Building Permits Directorate. The policies and procedures manual have been developed to clearly define the processes in place at the BPD. This manual will be revised from time to time as improvements are made to the processes or as new rules and regulations are determine. The Abu Dhabi Municipality reserves the right to change the policies and procedures at any time. 2.0 FORMAT OF THE MANUAL
The manual is a collection of procedural guidelines and application forms used by the BPD. Developers, designers and contractors are to ensure that they are familiar with these procedures and strictly adhere to their conditions. Submittals that do not adhere to the requirements of these documents will not be processed.
3.0
To simplify the process, Abu Dhabi Municipality has agreed to these types of permits and plan approvals: A. Temporary Fence, Site Preparation and Mobilization Permit (SIT-01). B. Excavation Permit (SIT-02). C. Building Permit a. Architectural Approval (ARC-01 Rev.2). b. Structural Approval (STR-02 Rev.1). c. Foundation & Sub-Structure Permit (STR-01 Rev.1). D. Building Completion Certificate. Refer to (BCC-01).
INT-01-Rev.1
Page 1 of 1
ABU DHABI MUNICIPALITY BUILDING PERMITS DIRECTORATE DEFINITIONS Document No DEF-01 Rev. 0 Date 9/21/2006
DEFINITIONS ADM BPD Consultant Contractor Abu Dhabi Municipality. Building Permit Directorate. Any Architect or Engineer registered through Abu Dhabi Municipality. Any Contractor registered through Abu Dhabi Municipality.
__________________________________________________________________
DEF-01
Page 1 of 1
FLOW CHART
Date 07/11/2007
Colored Site layout Plan and Artist's Impression of Project A copy of the Approved Affection Plan A copy of Official Trade License
If all in order, project coordinator gives instruction for consultant to proceed with the relevant permit application and full design submission.
______________________________________________________________
FC-01
Page 1 of 1
Department of Municipalities & Agriculture Abu Dhabi Municipality Building Permits Directorate Phone 678-8888 Fax 677-2003
...........
.. .
Note : Consultant to provide a colored site layout plan and artist's impressions of the project described herein.
DEVELOPER / OWNER : CONTACT NAME : MOBILE NO : PROJECT MANAGER : CONTACT NAME : MOBILE NO : CONSULTANT : CONTACT NAME : MOBILE NO : OFFICIAL USE EMAIL: EMAIL: EMAIL:
. .................... ...
. .................... ...
. .................... ...
SIGNATURE : _______________________________
DATE : _______________
PR-001
GENERAL REQUIREMENTS
Document No 1.0 INTRODUCTION: GR-01 Rev. 3 Date 6/24/2008
The following is a list of general requirements applied to all submittals. Consultants, Contractors and Architects are required to provide all essential information and to comply with these requirements prior to submitting any drawings. 2.0 General Requirements: 2.1 Comprehensive approved Master Plan Report / Project Summary Report 2 copies of A3 size report and an electronic copy of the same shall be submitted. The report should outline and explain the following aspects of the proposal with supporting drawings and relevant illustrations: Design Concept & Intent Site Accessibility Car Parking Provision Life Safety MEP Concept Sustainability & Efficiency Utility & Services Statement Vertical Transportation Waste Management Landscaping & Greening Occupancy/Population Density Zoning & Land Use Traffic & Transportation Public & Handicap Amenities Structural Concept Utility & Services Wind Effect Assessment Day lighting Assessment Environmental Assessment Faade Lighting Strategy Faade Maintenance Schedule of Areas
The summary report shall include but not limited to the above mentioned. The consultant should by all means include additional information deem important that will facilitate the authority's approval. 2.2 Each developer shall have control on building design to achieve their master plan guidelines. Therefore, preliminary and final architectural drawings for building permit should bear the "No Objection" from the relevant developer before the submission to ADM. Approved Development Master Plan / Site Plan a copy of colored A1/A0 size print approved by Town Planning Department (scale 1:500 to 1:1000) shall be submitted, to include but not limited to the following information:
2.3
___________________________________________________________________
GR-01-Rev.2 Page 1 of 3
GENERAL REQUIREMENTS
Document No GR-01 Rev. 3 Date 6/24/2008 Public Amenities Occupancy / Population Density Service Corridor Retaining Structures Boundary Wall Plot Limit & Number Land Use, Zoning & Phasing Ingress & Egress Points Service Access Way Landscaping 2.4 2.5 Topography Existing & Proposed Levels Set-out Coordinates Utility Buildings Tunnels & Bridges
No objection letters from appropriate Authorities. (see BCC-01) Appointment letters 2.5.1 Appointment letter for Architects / Consultants. 2.5.2 Appointment letter for Contractor. 2.5.3 All appointment letters shall be signed and sealed by the owner / developer. Official valid trade licences from. 2.6.1 Consultants. 2.6.2 Contractors and Sub-Contractors. Applicable forms signed and sealed by owner, Consultant and or contractor. Applicable fees. Developers will bear the responsibility of clearing their sites during and after construction completion. Electronic format of all submitted drawings. Hard copies of drawings. (see DRG-01-Rev.4)
2.6
General notes: The following are general notes that all submittals shall comply with. 3.1 3.2 3.3 3.4 3.5 3.6 3.7 Consultants and Contractors shall adhere and comply with the applicable design codes & standards. (see DCS-01-Rev.2) Documents are clear and legible. Documents are in a sequential order and signed and sealed by the appropriate Consultant. Application form fully completed. All timelines in this procedure are subject to work load. If authority's comments are not clear, a scheduled appointment can be arranged with the respective municipality engineers/architects. Appendix S Requirements for Structural Engineering Submission shall also be referred to when preparing structural related submittals.
___________________________________________________________________
GR-01-Rev.2 Page 2 of 3
GENERAL REQUIREMENTS
Document No GR-01 Rev. 3 Date 6/24/2008
4.0
Time-line Schedule for Approvals: Category Document No. ARC-01 Rev.4 SIT-01 First Review 10 days 1 day Second Review 5-10 days -
Architectural Approval Temporary Fence, Site Preparation & Mobilization Approval Site Excavation Approval Foundation & Sub-Structure Approval Structural Approval END OF PROCEDURE
5 days 10 days
___________________________________________________________________
GR-01-Rev.2 Page 3 of 3
FEE SCHEDULE
Document No 1.0 INTRODUCTION FEE-01 Rev. 1 Date 6/25/2007
This document outlines the fee structure that are to be implemented within the Building Permits Directorate at Abu Dhabi Municipality. 2.0 FEE SCHEDULE PERMIT FEE SCHEDULE Fees in AED 2000 100 500 500 500 200 INSURANCE SCHEDULE Fees in AED 10000 10000 1000 Unit Notes Unit Per/floor Notes
TABLE 1.4.10A
Type of Permit Construction of a new building Demolition of a building Issue a final certificate Additions Maintenance works Permit renewal TABLE 1.4.10B
Type of Permit Insurance Building Demolition New erection work Additions to existing buildings END OF THE PROCEDURE
___________________________________________________________________
FEE-01-Rev1 Page 1 of 1
This section explains in detail the drawings and documents that are required for various permits issued by the Building Permits Directorate. Applicants shall be aware that there may be changes over time. 2.0 SCALE AND LEGIBILITY OF DRAWINGS
The following scales should be adopted: Key / Location Plan Landscape Plan Site Plan Plans, Elevations, Sections Detail Designs 1:10,000 1: 500 to 1: 1,000 1: 500 to 1: 1,000 1: 100 to 1: 200 1: 20 to 1: 50
If any other scale is used, prior approval must be obtained from the Building Permits Directorate of Abu Dhabi Municipality Please note that the lettering on drawings must be readable and allow for reductions to be made. To accomplish this, lettering on a full size drawing must be easily readable. 3. DRAWING SUBMISSION REQUIREMENT 3.1. All drawings accompanying any application for approval shall be prepared, stamped and signed by the Qualified Consultant, who holds a valid trade license and registered with the Abu Dhabi Municipality. All drawings shall 3.2.1. Be produced in DWF format on a cd-rom complete with casing and project labels. for initial approval and review. 3.2.2. Be produced in 3 sets of paper prints and properly packaged in the prescribed box-files and clearly labeled. The drawings must reflect the final revision / correction, demonstrating full compliance with all authority comments for final building permit approval. 3.2.3. Be accompanied by a drawing list for each set of drawings. 3.2.4. Be produced in a clear, legible manner and following the drawing numbering according to the Building Permits Directorate:
3.2.
___________________________________________________________________
Section 7-DRG-01-Rev4 Page 1 of 5
A000 A010 (10 series ie. 10-99) A100 (100 series ie. 100-199) A200 (200 series ie. 200-299) A300 (300 series ie. 300-399) A400 (400 series ie. 400-499) - S100 (100 series ie. 100-199)
3.2.5. Bear a title block in accordance to the format set out by the Building Permits Directorate, and reserve a space for authority's comments/signature/stamp at the bottom right corner of the title block (see DRG-01A) 3.2.6. Be fully annotated with appropriate notations and symbols. All dimensions shall be in metric (mm) 3.2.7. Demarcate clearly the new building works from the existing building by suitable annotation and markings. 3.2.8. Delineate clearly the different phasing of building works within the development by suitable annotation and markings. 3.2.9. Delineate clearly the building works to be deleted, demolished or removed by suitable annotation and markings. 3.2.10 Be numbered serially where the first plan is numbered as 1 of 'n' and the last plan as 'n' of 'n'. ( 'n' being the total number of pages of the relevant plans) 3.3. All building plans shall, where applicable, consist of or contain the following: 3.3.1. Gross Floor Area (GFA) Summary Drawing Sheet consisting a) Key plans (scaled-down plans) of all floors / storeys / levels showing clear mark-up of GFA within the proposed development(s). b) Summary tabulation of area that summarizes all floors as per declaration form FM-001A-Appendix C (Gross Floor Area Calculation Table) to be completed by Consultant.
___________________________________________________________________
Section 7-DRG-01-Rev4 Page 2 of 5
___________________________________________________________________
Section 7-DRG-01-Rev4 Page 3 of 5
___________________________________________________________________
Section 7-DRG-01-Rev4 Page 4 of 5
___________________________________________________________________
Section 7-DRG-01-Rev4 Page 5 of 5
___________________________________________________________________
Section 7a-DRG-01A Page 1 of 1
In addition to Abu Dhabi Municipality, Building Regulations and Guidelines, the following list of design codes and standards would be acceptable. 2.0 THE RECOGNIZED CODES
All new construction in Abu Dhabi after April 1st, 2006 should conform to one of the model codes listed hereafter: International Building Code, 2006 edition Published by the International Code Council www.iccsafe.org Building Regulations and Guidelines Green Book Municipality of Abu Dhabi 1994 Edition The following table provides a list of acceptable design codes and standards: Applicable Standards BSI
British Standards Institution
Comments Overall Construction Concrete Construction Structural Steel Works Uniform Building Code for Seismic Design
ACI
AISC
It is crucial that the designer does not design a building using two different international codes. The designer should decide well in advance the code he intends to use and ensure that the same is used throughout the design and construction phase. If it became necessary to combine the two international standards, for example the Contractor may have to use steel produced to the British Standards for the design to AISC standards, the design consultant should carefully verify that the substitution will not have an adverse effect on the integrity of the structure designed and shall submit approval letter to BPD prior to job commencement. 4.0 MIXING OF CODE PROVISIONS
Mixing of different code provisions is not allowed unless an application for alternate materials and methods is submitted with the drawings and/or specifications for approval. END OF PROCEDURE ___________________________________________________________________
DCS-01-Rev.2 Page 1 of 1
ARCHITECTURAL APPROVAL
Document No 1.0 INTRODUCTION ARC-01 Rev. 4 24/06/2008
This section explains in detail the scope of the architectural approval. It elucidates on the procedures required by the Municipality to carry out an unbiased and uniform architectural assessment as part of the Municipality aim to better serve each development application. A complete set of architectural drawings in approved DWF format as described in DRG-01-Rev 4 shall be submitted for the initial architectural approval. 2.0 PURPOSE
The purpose of this review is to ensure that the building complies with applicable code as outlined in DCS-01-Rev.2 3.0 APPLICATION FORM & CHECKLIST
The Consultant is to complete the following forms and checklists at the beginning of Stage 2 Preliminary Planning & Concept Approval : a) Application form ( FM-001 ) Request for Architectural Approval b) Architectural Checklist ( FM-001A ) Planning & Building Design c) Declaration & Calculation Forms (FM-001A Appendix) : (i) FM-001A Appendix A-CP-Rev1 (Car Park Calculation Table) (ii) FM-001A Appendix B-SF-Rev1 (Sanitary Facilities/Fitting Calculation Table) (iii) FM-001A Appendix C-GFA (Gross Floor Area Calculation Table) 4.0 DOCUMENTS REQUIRED
The following documents are the minimum requirement for architectural approval: 4.1 4.2 4.3 4.4 4.5 GFA Summary Drawing Sheet (see DRG-01-Rev4) Exterior elevations (in color). Perspectives exploring all sides of building (in color). Design narrative and building use. Floor plan. 4.5.1 Basement Plan if applicable. 4.5.2 Ground floor plan. 4.5.3 Mezzanine floor plan. 4.5.4 Typical floor plan. 4.5.5 Penthouse plans if applicable. 4.5.6 Roof Plan. Sections and details.
4.6
See DRG-01-Rev 4 for additional drawings, formats and more specific information on detailed drawings. 5.0 APPROVAL BY OTHER AUTHORITIES:
Page 1 of 3
___________________________________________________________________
Section 9-ARC-01-Rev4
ARCHITECTURAL APPROVAL
Document No ARC-01 Rev. 4 24/06/2008
In addition to the authorities described in BCC-01 item 6.0, other relevant authority approval may be required by the Building Permits Directorate where applicable. Subject to the type, location and complexity of the development, the Building Permits Directorate will advise the consultant accordingly. 6.0 PROJECT PRESENTATION:
Depending on the complexity of the development and dynamic nature of the design, the Building Permits Directorate will inform the project team ie. consultants, engineers, project manager to prepare a project presentation for the concerned members from the Municipality. The project team is expected to deliver a comprehensive and concise project summary with emphasis on the following aspects of the proposal: a) b) c) d) e) f) g) h) i) j) k) l) m) Design concept and planning strategy Land use, zoning and phasing Population density Project mobilization date and expected completion date Site accessibility vehicular and pedestrian Car parking zoning and management Life safety strategy Logistics and waste management Environmental and sustainability strategy Landscaping Wind impact assessment (if applicable) Design for building security (if applicable) Handicap and public amenities provision
The project team is not required to go in-depth into specialized and technical details, and should limit the presentation to less than 30 minutes and commit 15 minutes for Question & Answer. Once the municipality is satisfied, the consultants can then proceed to submit the developed design drawings for approval. In addition to the responsibility of the consultant / designer to comply with the applicable codes and standards described in DCS-01-Rev.2, the onus of ensuring quality, safety and compliance to the Master Plan guidelines shall remain the responsibility of the developer. (see GR-01-Rev.2, item 2.2 )
7.0
___________________________________________________________________
Section 9-ARC-01-Rev4 Page 2 of 3
ARCHITECTURAL APPROVAL
Document No ARC-01 Rev. 4 24/06/2008
The municipality will process the architectural approval or issue a clear correction list / commented drawings within Ten (10) working days of receiving complete submittal as per 4.0 Documents Required for approval. If the Municipality deems the submittal as incomplete and issues the authority comments (via email and/or return of commented drawings). The Municipality will refer to this issuance as the First Correction". The applicant should respond to the corrections requested within 30 days (45 days for large projects) to avoid permit application expiration. Once the corrected documents are resubmitted, the municipality will have 10 working days to perform a 2nd review. If documents still have corrections to be made the municipality will issue a "Second Correction" and so forth up to a maximum of 3 reviews. If the same non-compliance persists after the 3rd review or resubmission, the Building Permits Directorate reserves the right to cancel the application and the applicant shall make a fresh submission and pay the applicable fees to the municipality unless the Consultant can provide valid reasons for extension. END OF PROCEDURE
___________________________________________________________________
Section 9-ARC-01-Rev4 Page 3 of 3
Department of Municipalities & Agriculture Abu Dhabi Municipality Building Permits Directorate Phone 678-8888 Fax 677-2003
Area
Sector
Plot
Office Use:
FM-001
Rev 0
Department of Municipalities & Agriculture Abu Dhabi Municipality Building Permits Directorate Phone 678-8888 Fax 677-2003
Planning Consideration
Complied plot Remarks
Proposed building structure(s) are within boundary in accordance with Affection Plan.
Proposed building(s) achieve required setback distances from plot boundaries and building-tobuilding distances, in accordance with local codes and/or Master Plan development control regulation (if applicable) Traffic impact study (if applicable) specific to the development shall be submitted to Roads Department to obtain approval. Environmental impact study (if applicable) specific to the development shall be submitted to Environmental Agency Department to obtain approval. Provision of adequate ingress and egress points for both private and public vehicles. Provision of service & fire-fighting access way (approved by Civil Defense Department) to be clearly annotated on site plan. Provision of on-site/off-street car/bus/coach parking facilities and calculation/analysis sheet for the development(s). In compliance with local/international standards or the Master Plan development control regulation (if applicable) Refer Appendix A: Car Parking Calculation Table Provision of adequate refuse collection/disposal area(s) with appropriate waste management strategy. Provision of electrical substation and other utility service spaces as required by service authorities. Outline of future and/or other proposed phased building(s) within the plot boundary. Provision of public amenities (ie landscaped garden, plazas, toilets, footpaths, handicap facilities, prayer rooms, car parking, taxi pick-up area, etc. Location of plant rooms, refuse centre, loading docks, back-of-house facilities and other utility structures (ground or roof top level) shall be aesthetically screened from the general public and be provided with a dedicated ingress/egress access.
4 5 6
8 9 10 11
12
FM-001A
Rev 0
Department of Municipalities & Agriculture Abu Dhabi Municipality Building Permits Directorate Phone 678-8888 Fax 677-2003
Habitable space(s) shall meet local/international standards in terms of sizes, ceiling/floor height, ventilation and daylight requirements. Provision of adequate exit/escape passageway, fire/smoke-stop lobby, firemen lifts and escape staircases, fire control room shall meet Civil Defense requirement and/or comply with approved international fire codes. Provision of adequate handicap facilities and barrierfree accessibility for special needs people (disabled) shall meet international barrier-free codes. Provision of adequate sanitary facilities/public amenities shall meet occupancy needs in accordance to local/international standards or Master Plan development control regulation (if applicable) Refer Appendix B: Sanitary Fittings Calculation Table Internal/external horizontal circulation elements (ie driveways, ramps, corridors, stairs) shall meet local/international standards. Internal/external vertical circulation elements (ie staircases, lifts) shall meet local/international standards. Plot fencing/boundary wall shall be within plot boundary and designed to comply with local standards Vehicular and pedestrian ramps shall meet the minimum gradient/slope in accordance to local/international standards. Provision of protective/safety barriers (ie railings, parapet walls) along trafficable platforms/public accessible routes shall meet local/international standards. Proposed building projections beyond plot limits (ie shading devices, balcony, terrace, signage & billboards) shall comply with local codes and shall subject to further review by relevant authorities. Rev 0
10
FM-001A
Department of Municipalities & Agriculture Abu Dhabi Municipality Building Permits Directorate Phone 678-8888 Fax 677-2003
11
Proposed basement space(s) shall be limited to nonhabitable usage for services (ie workshops, car parking, MEP rooms). All basement levels shall be adequately ventilated and achieves minimum headroom of 2.4m from finished floor level. Ensure the wind effect at pedestrian levels are within the comfort level (to be verified by Wind Tunnel Test), otherwise, adequate wind-breaking features shall be provided to meet the required comfort levels. Proposed building faade and embellishments shall not contradict the local culture. Ensure adequate day lighting for all habitable spaces within the development, and complying to local and/or international standards. Ensure adequate ventilation for both habitable and non-habitable spaces within the development, and complying to local and/or international standards. Provision of minimum of 1.0m wide pedestrian sidewalks or pavement at building(s) perimeter. The sidewalk/pavement shall be minimum 150mm above the surrounding road/street levels. The internal ground level of all buildings shall achieve a minimum of 450mm above the surround road/street levels. The total number & sizes of tread(T) and riser(R), shall be indicated at the start of each flight of staircase. Minimum tread(T) size shall be 280mm. Minimum riser(R) size shall be 100mm and not more than 180mm.
12
13
14
15
16
17
18
FM-001A
Rev 0
CAR PARKING CALCULATION TABLE Project Title : Project description Use of building(s) detailing number of floor of building(s), and number of basement levels per building. Location : Precinct/District - Sector number Plot number (as per Affection Plan ) (a)
Phase
(b)
Description of Land Use
(c)
Parking Rate
(d)
Parking Spaces Required for Proposed Development
Square meters multiply parking rate, by land use type, aggregated to total
(e)
Total Parking Spaces Provided by Proposed Development
Number of spaces to be provided as an element of the proposed development.
(f)
Parking Excess (Shortfall)
(g)
Drawings of Existing Parking Spaces
(h)
Drawings of Proposed Development Parking Facilities
Refer approved parking rates from Roads Department Refer IBC section 1106 for accessible parking rates
Yes / No
Yes / No
Reasons for Waiver : Supporting documents shall be submitted to substantiate the shortfall / under provision of the required car parking spaces / facilities in the proposed development Subject to the approval of the Authority.
Date : _____________
2. 3.
The development description shall describe the intensity of each land use. For large development whose precise mix of uses is not known at the time of preliminary architectural review application, an estimated mix of land uses shall be established as the basis of car park computation & analysis. The applicant shall follow-up with the final & updated car park analysis table during the final building permit application, ensuring sufficient parking supply to meet all of the parking demand generated by the proposed development. The local car parking rates (Roads Department) shall be adopted as the basis for car parking computation. Alternatively, the consultant shall adopt the car parking standards/rates set out in the approved Master Plan Development Control Package issued by the Developer (if applicable)
SANITARY FACILITIES CALCULATION TABLE Project Title : Project description Use of building(s) detailing number of floor of building(s), and number of basement levels per building. Location (a)
Descriptionof Land Use & Expected Occupancy
Square meters by land use type & occupancy within the space
: Precinct/District - Sector number Plot number (as per Affection Plan ) (b)
Sanitary Appliances Requirement based on International Code (ie International Plumbing Code-Chapter 4)
WB WC UR SH Stating the rates and requirements as per codes.
(c)
Male
(d)
Excess / Shortfall (+/-)
(e)
Female
(e)
Excess / Shortfall (+/-)
(f)
Disabled Prv Req
(g)
Excess / Shortfall (+/-)
(h)
Baby / Toddler Changing Room) Prv Req
(k)
Excess / Shortfall (+/-)
Prv
Req
Prv
Req
Legend : WB=Wash Basin, WC=Washing Cistern, UR=Urinals, SH=Showers, Prv=Provided, Req=Required Reasons for Waiver : Supporting documents shall be submitted to substantiate the shortfall / under provision of the required sanitary facilities in the proposed development Subject to the approval of the Authority.
Date : _____________
The development description shall describe the intensity of each land use. For large development whose precise mix of uses is not known at the time of preliminary architectural review application, an estimated mix of land uses shall be established as the basis of sanitary facilities computation & analysis. The applicant shall follow-up with the final & updated sanitary facilities calculation table during the final building permit application, ensuring sufficient sanitary appliances to meet all of the amenities demand generated by the proposed development. The latest IBC 2006 sanitary appliances rates/requirement shall be adopted as the basis for sanitary facilities calculation if no local standards can satisfy the current program. Alternatively, the consultant shall adopt the sanitary facilities/appliance standards/rates set out in the approved Master Plan Development Control Package issued by the Developer (if applicable)
GROSS FLOOR AREA* CALCULATION TABLE ( To be submitted in conjunction with the Gross Floor Area Summary Drawing Sheet ) Project Title : Project description Use of building(s) detailing number of floor of building(s), and number of basement levels per building. Location : Precinct/District - Sector number Plot number (as per Affection Plan)
Declaration by Consultant
I/We hereby certify that the information and the calculation given above is correct and all digital data representing the development is drawn to scale for the above proposal.
____________________________________________
*Gross Floor Area (GFA) includes all covered areas in a building or structure (below & above grade) measured from the external sides of the building,
inclusive of all circulation corridors, staircases, service/utility rooms, stores, amenities, lobby, balconies (enclosed on 3 sides). It excludes all mechanical floor and car parking floors.
Department of Municipalities & Agriculture Abu Dhabi Municipality Building Permits Directorate Phone 678-8888 Fax 677-2003
Traffic impact study approved by Road Section, if applicable for the project. Approved site plan. Service clearance for site. (NOC) Copy of receipt from architectural section of Building Permit Directorate confirming submittal of architectural drawings to the Directorate. Soil investigation report. Shoring layout. Shoring sections and details. Detailed calculations for shoring from specialist and approved by the consul tant. Depth of excavation.
5 6 7 8 9
ST-001
Rev 0
Department of Municipalities & Agriculture Abu Dhabi Municipality Building Permits Directorate Phone 678-8888 Fax 677-2003
Completion of requirements for enabling works as applicable. Design philosophy and design criteria. Foundation / substructure complete details. plans with
Calculations for column loads by tributary area method and by approved computer software. Columns and shear wall layout showing reactions from the most critical load combinations. (Design load) Detailed design calculations for proposed foundation, including columns and shear walls, as well as basement retaining walls, at foundation level. Schedule of columns with reinforcement and sizes and sections. Structural framing (Schematic design) for all floors showing the assumed sizes of structural elements. An electronic copy of the structural 3D model for the lateral stability analysis. The study should include all structural elements and all the applied loads. Wind tunnel study if required.
10
ST-001
Rev 0
Department of Municipalities & Agriculture Abu Dhabi Municipality Building Permits Directorate Phone 678-8888 Fax 677-2003
S/no.
Item
Complied
Remarks
11
Piling plan as applicable, showing the reactions from the most critical load combinations (Service loads). Brief specifications and applicable notes for the foundation & piles, presented on drawings. Pile design by specialist and approved by the consultant. Piling details showing pile length, reinforcement details, pile size and capacity, cut off & toe levels. Proposed location of tower crane within the approved plot area This check list should cover the latest Abu Dhabi Municipality requirements for structural Section submissions.
12
13
14
15
16
ST-001
Rev 0
Department of Municipalities & Agriculture Abu Dhabi Municipality Building Permits Directorate Phone 678-8888 Fax 677-2003
Final structural drawings. Detailed design calculations. Schedule of columns with reinforcement and sizes and detailed sections. Detailed sectional plans and elevations for shear walls showing all dimensions and reinforcement. Schedule of beams, with reinforcement and sizes, including typical beam elevation and sections. General notes for structural elements. Plans, sections and details of swimming pools, reinforced concrete water tanks, and significant architectural features. Plan & section for staircases showing all dimensions and steel reinforcement.
ST-001
Rev 0
Before starting any new construction project on any site you must first build an approved site fence around the property for protection of the site and the public. 2.0 WORK ALLOWED UNDER THIS PERMIT
The purpose of this type of permit is to allow the applicant or owner to begin construction while the full working drawings for the project are still being reviewed. The scope of construction under this permit will only include site preparation, grading, and construction of the perimeter fence. The applicant may not pour concrete or drive piling for the foundation under this permit. 3.0 APPLICATION FORM
Application form at the Building Permits Directorate (See FM-002) to be completed and submitted. 4.0 DOCUMENTS REQUIRED
To obtain the fence permit, refer to the general requirements GR-01 Rev2 and you will also need to submit the following documents: 4.1 4.2 4.3 4.4 4.5 4.6 Site plan showing limits of fence construction with the overall dimensions. Fence Elevations. Sections and details showing anchorage, material, color, design, etc. Specifications. Letter from contactor and consultants summarizing safety measures on site during construction. Location & details of site office, if available.
See DRG-01 Rev2 for drawing formats and more specific information on drawings. See Appendix S for more detail submission requirements. 5.0 APPROVAL OF THIS PERMIT TYPE
After completing all steps the Building Permits Directorate will inspect and verify that the fences are erected properly, as per requirement. 6.0 CONSTRUCTION OF THE FENCE
___________________________________________________________________
SIT-01-Rev1 Page 1 of 3
Some projects are too big and might require large staging areas. In this event, a large storage area might translate into constructing a temporary fence on an adjacent property (see diagram below). Consultants and/or contractors are required to submit written approval from plot 2 owner / developer, explicitly allowing them to construct such a fence on his property. Plot #1 Plot #2
Proposed Fence
All projects or new constructions need to obtain their temporary fence prior to obtaining any other building permits. 8.0 TIMELINE FOR REVIEW The review teams will complete their review and approve the permit or they will provide a clear correction list within less than one (1) working day of receiving the complete submittal as per 4.0 Documents Required , for review. If the Municipality deems the submittal incomplete and or issues a First Correction List, the Municipality will refer to the first review of the project the as first review . The applicant should respond to the corrections requested within six months to avoid permit application expiration.
___________________________________________________________________
SIT-01-Rev1 Page 2 of 3
9.0
Once the full building permit is issued, the Temporary fence, site preparation and mobilization permit phase will be terminated, although temporary fencing should remain until the end of the project (final completion certificate). END OF PROCEDURE
___________________________________________________________________
SIT-01-Rev1 Page 3 of 3
Department of Municipalities & Agriculture Abu Dhabi Municipality Building Permits Directorate Phone 678-8888 Fax 677-2003
Area
Sector
Plot
Office Use:
FM-002
Rev 0
EXCAVATION PERMIT
Document No 1.0 INTRODUCTION SIT-02 Rev. 1 Date 7/03/2007
Site fence has to be erected and approved by ADM inspector before the contractor can submit for excavation permit. 2.0 WORK ALLOWED UNDER THIS PERMIT
The purpose of this type of permit is to allow the applicant or owner to begin excavation of the site while the full working drawings for the project are still being reviewed. The scope of construction under this permit will only include excavation, dewatering, shoring and soil compaction. The applicant may not pour concrete or drive piling for the foundation under this permit. 3.0 APPLICATION FORM
Please obtain an application form from the Building Permits Directorate (See FM004) to be completed. 4.0 DOCUMENTS REQUIRED
Following documents have to be submitted. 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 Traffic impact study approved by the roads section. Approved site plan Service clearance for site Soil investigation report Shoring layout Shoring section and details Detailed calculations for shoring from specialist and approved by consultant Depth of excavation
See DRG-01 Rev2 for drawing formats and more specific information on drawings. See Appendix S for more detail submission requirements. 5.0 TIMELINE FOR REVIEW
The review teams will complete their review and approve the excavation permit or they will provide a clear correction list within One (1) working day of receiving complete submittal as per 4.0 Documents Required , for review. If the Municipality deems the submittal incomplete and/or issues a First Correction List, the Municipality will refer to the first review of the project the first review . The applicant should respond to the corrections requested within six months to avoid permit application expiration. ___________________________________________________________________
SIT-02-Rev1 Page 1 of 2
EXCAVATION PERMIT
Document No SIT-02 Rev. 1 Date 7/03/2007
6.0
Once the full building permit is issued this excavation permit phase will be terminated END OF PROCEDURE
___________________________________________________________________
SIT-02-Rev1 Page 2 of 2
Department of Municipalities & Agriculture Abu Dhabi Municipality Building Permits Directorate Phone 678-8888 Fax 677-2003
Area:
Sector:
Plot:
Office Use:
FM-004
Rev 0
Structural concept design must be approved prior to submitting to foundation and pile permit. ADM reserve the right of granting this type of permit based on project size. 2.0 WORK ALLOWED UNDER THIS PERMIT The scope of construction works under this permit will only include foundation and piling works. Other works, such as basement construction, shall not commence under this permit. 3.0 APPLICATION FORM
The Applicant must complete the Standard Application Form (FM-003), Request for Foundation and Piling Permit and submit to the BPD. 4.0 DOCUMENTS REQUIRED
The following documents need to be submitted together with the application: 4.1 4.2 4.3 4.4 4.5 4.6 Completion of requirements for enabling works as applicable Design philosophy and design criteria Foundation \ Substructure Plans with complete details Calculation for column loads by tributary area method and approved by computer software Columns and shear wall layout showing reactions from the most critical load combinations ( Design load ) Detailed design and drawings for proposed foundation, including columns and shear walls, as well as basement retaining walls, at foundation level Schedule of columns with reinforcement and sizes and sections. Structural framing (Schematic design) for all floors showing the assumed sizes of structural elements. An electronic copy of the structural 3D model for the lateral stability analysis. The study should include all structural elements and all the applied loads. Wind tunnel study if required. Piling plan as applicable, showing the reactions from the most critical load combinations ( Service loads )
4.10 4.11
___________________________________________________________________
STR-01-Rev1
Page 1 of 2
Brief specifications and applicable notes for foundation & piles, presented on drawings. Pile design by specialist and approved by the consultant Piling details showing pile length, reinforcement details, pile size and capacity, cut off & toe levels. Proposed location of tower crane within the approved plot area
Refer to Section GR-01 Rev2 for drawing formats and other information required to be shown on the drawings. See Appendix S for more detail submission requirements. 5.0 REQUESTS FOR INSPECTIONS
The Contractor must submit their request for inspection to the Building Permits Directorate at least 2 working days prior to the commencement of the piling works, foundation casting, pile load testing or any other works that required such an inspection. 6.0 TIMELINE FOR REVIEW
The review teams will complete their review and approve the submittal or they will provide a clear correction list within five (5) working days of receiving the complete submittal, as per Section 4.0, Documents Required, for review. If the Municipality deems the submittal incomplete, and/or issues a First Correction List, the Municipality will refer to the first review of the project as the "first review" After the re-submission of the amended document to the Municipality, the review teams will have 5 working days to perform the 2nd review. The reviewing process will continue until all requirements have been complied with and the design approved by the Municipality. 7.0 END OF THIS PERMIT PHASE
Once the full building permit is issued, this permit for Foundation and Piling Works shall be terminated automatically.
END OF PROCEDURE
___________________________________________________________________
STR-01-Rev1
Page 2 of 2
Department of Municipalities & Agriculture Abu Dhabi Municipality Building Permits Directorate Phone 678-8888 Fax 677-2003
Area
Sector
Plot
Office Use:
FM-003
Rev 0
1.0
INTRODUCTION
The purpose of this type of permit is to allow the applicant to proceed with a full scale construction after all other requirements are met.
2.0
APPLICATION FORM
The Applicant must complete the (FM-005) form, and submit to the BPD along with the necessary documents.
3.0
DOCUMENTS REQUIRED
The permit application process is very much the same as for a normal review and the permit process, since the applicant must also obtain a full building permit for the project to be allowed to proceed. 3.1 3.2 3.3 3.4 3.5 3.6 3.7 Final structure drawings. Detailed design calculations Detailed sectional plans and elevations for shear walls showing all dimensions and reinforcement Schedule of beams, with reinforcement and sizes, including typical beam elevation and sections General notes for structural elements Plans, sections and details of swimming pools, reinforced concrete water tanks, and significant architectural features Plan and section for staircases showing all dimensions and steel reinforcement
See DRG-01 Rev3 for drawing formats and more specific information on the drawings. See Appendix S for more detail submission requirements. If the plans are acceptable, a letter stating this approval is sent back to the project coordinator's office center. This letter will be placed into the project file at the BPD.
___________________________________________________________________
STR-02-Rev1 Page 1 of 2
4.0
Once the Municipality is satisfied that the review is acceptable, it will issue a full structural permit allowing the applicant to proceed with construction of the structural system.
5.0
The review teams will complete their review and approve the submittal or they will provide a clear correction list within twenty one (21) working days of receiving the complete submittal, as per Section 4.0, Documents Required, for review. If the Municipality deems the submittal incomplete, and/or issues First Correction List, the Municipality will refer to the first review of the project the "first review". The applicant should ensure to respond to each item listed in the Structural Engineer's review. If the comments are unclear, a meeting can be scheduled between the applicant and the engineer who reviewed the plan. The applicant should respond to the corrections requested within six months to avoid permit application expiration. Once the corrected plans are submitted back to the Municipality, the review team will have 10 working days to perform a second review. If corrections have been made, the plans will be approved. If further corrections are needed, the Municipality will issue a Second Correction List.
END OF PROCEDURES
___________________________________________________________________
STR-02-Rev1 Page 2 of 2
Department of Municipalities & Agriculture Abu Dhabi Municipality Building Permits Directorate Phone 678-8888 Fax 677-2003
Area
Sector
Plot
Office Use:
FM-005
Rev 0
January 2007
APPENDIX S
APPENDIX S
ABU DHABI MUNICIPALITY REQUIREMENTS FOR STRUCTURAL ENGINEERING SUBMISSIONS TABLE OF CONTENTS
1. PILING ... .................................................................................................................................. ..1 1.1 Geotechnical Report ...................................................................................................1 1.2 Information to be Shown on Drawings ... ......................................................................2 1.2.1 Shoring ............................................................................................................. ..2 1.2.2 Piling ... ...........................................................................................................2 1.3 Calculations... ......................................................................................................... .2 1.3.1 Application Codes ... .........................................................................................3 2. SUPERSTRUCTURE ............................................................................................................... .4 2.1 2.2 2.3 2.4 2.5 2.6 General Requirements ... ............................................................................................ ..4 Design Checklist .........................................................................................................4 Additional Foundation Requirements ..............................................................................6 Additional Vertical Element Requirements ... ............................................................... ..7 Additional Horizontal Element Requirements............................................................... .8 Modelling of Superstructure and Specialist Design Considerations... ..........................9
APPENDIX S
January 2007
Page i
APPENDIX S
1.
Detailed geotechnical investigation reports shall be submitted with the structural drawings for every project by the consultant. The consultant shall ensure that the required amount of boreholes are carried out to the required depth by the geotechnical engineer, to the requirements of the nominated Code of Practice for site investigations. Geotechnical investigation reports are to contain, but not be limited to, the following information as applicable: Parameters for the geotechnical design of piles Assessment of geotechnical conditions of pile construction and installation Potential for ground heave, damage to adjacent structures or neighbouring piles Vibration effects and potential for damage to adjacent structures Near surface conditions for lateral load design Spring stiffness of vertical and lateral soil (varying with depth), as required for design purposes (for piles and rafts) Allowable bearing capacity of the founding material Allowable shaft adhesion Recommendations for reasonable footing systems Short term and long term design parameters, in particular for retaining walls Allowable and tieback restraint parameters for shoring design Potential for slope instability Potential for liquefaction and design requirements and/or ground improvement techniques to overcome the phenomenon Assessment of site conditions on pile durability (sulphates, chlorides, PH in soil and water) Groundwater level, dewatering requirements and possible affect on surrounding buildings Earthquake ground classification factor in accordance to the requirements of the Uniform Building Code Excavation of soil and rock Porosity of the soil for possible concrete aggression Any other comments relevant to design and construction as may be revealed by the investigation and testing Subsequent to completion of soil investigation works and all necessary laboratory testing, the consultant must submit documents certifying that: All soil investigation works and laboratory works have been witnessed by a qualified representative of the consultant All works have been carried out in accordance with the nominated Code of Practice for site investigations. Proper equipment and tools, duly calibrated, have been used by qualified and experienced personnel during all soil investigation and testing works, and that the test results have been reviewed and approved by the consultant.
APPENDIX S
January 2007
Page 1
APPENDIX S
1.2
1.2.1
1.2.2
Piling
Piling plan showing pile length, reinforcement, legend for pile capacity, pile testing cut-off levels etc. Pile caps layout including column and shear wall location with dimensions Pile caps sections showing raft thickness and bottom level at raft in relation to Datum Structural framing (general arrangements) for all floors including column locations, floating column location if any, beams, slabs etc. including the load transfer mechanism
1.3
Calculations
Design philosophy, complete design criteria and assumptions Column load calculation by area method Column load calculation by analytical method Stability analysis for wind and seismic loads including drift and check for human comfort criteria is to be enclosed Loads on columns, shear walls including wind and seismic moments are to be marked in the drawing of pile copy layout for critical load cases Pile reactions for all critical load cases Modulus of sub grade reaction and seismic parameters approved by geotechnical investigation consultant Pile capacity calculation by specialised piling contractor A soft copy of the structural model including all the structural elements shall be submitted on CD, together with the above mentioned calculations Each drawing shall be signed by design engineer
APPENDIX S
January 2007
Page 2
APPENDIX S
1.3.1
Application Codes
Dead and Live Loads BS 6399:1996 Part-1 BS 6399: 1988 Part-3 Adopted dead and live loads shall satisfy the recommendations of Abu Dhabi Municipality Seismic Loads UBC 97 Volume 2, Division 3V Zone 2A Wind Load ASCE -7-02 Chapter 6 Shall be based on basic wind speed of 40 m/sec Reliable wind tunnel study reflecting climatic site conditions where it look provision is not applicable Serviceability Limits All buildings shall be designed to limit maximum drift under 50 year wind load to 1/500 of building height All buildings shall be designed to limit inter story drift to 1/500 of the height and no more than 10 year under serviceability 10 year wind 38m/sec Adequate provisions shall be adopted to eliminate risk and damage to nonstructural elements due to inter story drift, creek, shrinkage, etc. Wind induced vibration due to 10 year wind shall be limited to 15mg for residential and hotel building and 20mg for office towers
APPENDIX S
January 2007
Page 3
APPENDIX S
2.
The requirements of the Abu Dhabi Municipality Building Regulations and Guidelines for Structural Design -1994 shall be applicable unless superseded with this document. Design of the superstructure and foundations shall be based on the requirements of the latest and relevant British, American or Australian Standards and the Uniform Building Code for earthquake loads for Zone 2A. Structural design of all projects submitted to the Municipality for approval, shall ensure that the work is carried out by licensed and qualified consultants, with structural engineers having the necessary qualifications and experience. Design philosophy, complete design criteria and assumptions shall be submitted. Whenever requested by the Structural Engineering Section of the Buildings Directorate, detailed design calculations based on the above stated Codes of Practice shall be submitted. Consultants shall ensure that structures are economically designed (as appropriate), and must ensure that designs and details are buildable. All Stage Two drawings shall be accompanied by a letter of guarantee from the certifying consultant and shall clearly identify the primary designer responsible for the design.
2.2
Design Checklist
Consultants submitting structural drawings for approval must ensure they have designed the foundations and the superstructure in accordance with the following general checklist: Fire Rating Requirements Structural adequacy Integrity Insulation Durability Requirements Corrosion resistance Chemical attack resistance Crack control Waterproofing
APPENDIX S
January 2007
Page 4
APPENDIX S
Loading Requirements Dead loads Live load (including any pattern load and heavy load/compactus requirements) Wind load Earthquake loads Earth pressures Water pressures Buoyancy loads Ground movements and differential foundation settlements. Dynamic effects/vibration resonance loads Thermal loads Creep Moisture variation (shrinkage and swelling) Expansion loads Axial shortening of columns Pre-stress (hyperstatic reactions) Impact and breaking loads Fatigue Construction loads Serviceability requirements Deflections/sag (including allowance long term creep and shrinkage effects) Hogging (especially for post tensioned beams and cantilever back spans) Axial shortening/extension Rotation due to torsional effects Crack control (minimum pre stress level for post tensioned concrete) Allowance for articulation of masonry wall as required Allowance for brittle finishes Stability Requirements Overturning and uplift Buoyancy Sliding Strength Requirements Flexural strength (including minimum strength requirements) Beam shear strength (including minimum strength requirements) Punching shear strength Torsional strength. Bearing strength Anchor strength for post tensioned beams Foundation strength Pre stress levels within acceptable limits Detailing Requirements Tendon placement priority over reinforcement Tendon/reinforcement clash at columns etc. Penetrations through slabs and beams Set downs, steps and sloping surfaces
APPENDIX S
January 2007
Page 5
APPENDIX S
2.3
Buildings with basements require approval of all basement floor plans from the Town Planning Department of the Buildings Directorate and all concerned Service Departments. The submitted drawings shall clearly indicate the distance to the outer face of any permanent or temporary training system. (i.e. diaphragm walls, secant pile walls, contiguous pile walls etc.) from the inner face of the basement walls. Ground anchors supporting retaining systems for excavations, shall not extend into adjacent plots or into areas of highly concentrated utilities and service lines in all circumstances, clearances shall be obtained from the relevant service departments. Pile foundations together with shallow foundations shall not be permitted to support the same superstructure, unless isolated. Foundations calculations shall (if required by the Municipality) address the design issues of stability, durability. Serviceability and ultimate general requirements are: Stability Overturning and uplift Buoyancy Sliding. Slope stability Durability Corrosion resistance Chemical attack resistance Crack control if required Serviceability Deflections/sag including allowance long term creep and shrinkage effects) Axial shortening (in particular for piles) Rotation of footings Bearing stress Ultimate Punching shear Beam shear Flexural strength Torsional strength Anchor strength *Geotechnical reports shall be submitted to the requirements of Part 1, Piling.
APPENDIX S
January 2007
Page 6
APPENDIX S
2.4
Load calculation by tributary area method and moment shear factor method should accompanied by plan drawings indicating the tributary areas. The use of software to calculate column reactions is permitted, although should be accompanied by hand calculations using the prior mentioned methods. Calculations must show if columns are short or slender, according to the code provision. All column design must be accompanied by moment interaction diagrams taking into account slenderness effects. Additional bending moments due to column beam/slab joints must be included in calculations, including any secondary effects (hyper static reactions) from unbalanced posttensioning reactions.
APPENDIX S
January 2007
Page 7
APPENDIX S
2.5
Edge beams around a radius and general torsionally loaded beams must allow for additional longitudinal reinforcement and stirrups. All stirrups must be closed to ensure adequate torsional resistance is achieved. Slabs modelled using the finite element method must clearly indicate all assumptions considered to predict deflections, and must ensure that full moment connections are not modelled where they can develop into pinned connections. Transfer slabs must be limit deflections to span/1000 to ensure that elements and partitions on above floors do not crack. Include: All plans and sections relevant to the project for all structural elements Class and, where appropriate, grade designation of concrete Exposure classification Reference number and date of issue of applicable design standard Fire rating (if not specified on architectural drawings) Loading (superimposed dead load and live load to all slab plans and wind and earthquake loads) Grade and type of reinforcement and tendons General notes Concrete cover to reinforcement The finish and method of control for unformed surfaces Class of formwork for the surface finish Curing procedure and duration The force required in each tendon, the maximum jacking force to be applied and the order in which the tendons are to be stressed The location and details of planned construction or movement joints connections and splices, and the method to be used for their protection The minimum period of time before stripping of forms and removal of shores Any constraints on construction assumed in the design Any special protective coatings Characteristic compressive strength at 28 days Characteristic flexural strength if required Characteristic indirect tensile strength if required Mean 7 days strength Other early age strength Slump of concrete. Cement type Maximum aggregate size Water/cement ratio Maximum 56 day shrinkage Density if required. Maximum water soluble acid (chloride ion) if required Maximum sulphate content (SO3) if required Temperature range at point of discharge if required Testing requirements if required Project assessment of concrete production if required
APPENDIX S
January 2007
Page 8
APPENDIX S
2.6
Stability analysis for wind and seismic loads including drift The following criteria applies (and should be corrected pending a wind tunnel test): Maximum drift for a 50 year return period less than height/500 Maximum inter-story drift less than height/500 with a serviceability wind of 38m/sec. Wind Tunnel Testing The following serviceability requirements shall be adopted in the absence of accurate wind tunnel testing for buildings: Maximum root means square (rms) acceleration for a 5 year return period less than 5 milli-gs, or Maximum peak acceleration for a 5 year return period as specified in the table below. Period Peak Acceleration (milli-g)# 1 7.0 2 10.2 3 12.0 4 13.5 5 14.5 6 15.5 7 16.6 8 17.4 9 18.6 10 19.2 # Note: For office buildings, peak accelerations maybe 20% higher. Specialist Design Considerations Towers which have a natural frequency of less than 1Hz or height more than or equal to twice the least plan dimension or are irregular vertically such as weak stories, transfer slabs, transfer girders etc should carry out the following:. Require dynamic analysis using response spectrum method for seismic load Columns should be designed and studied due to shortening and creep where required Wind tunnel test required when the code provision is not applicable An electronic copy of the structural 3D-Model including all structural elements, must be submitted together with the abovementioned calculations, clearly stating all methodology All joints shall be seismically detailed (as required) Framed building must ensure that plastic hinges develop in the beams and not the columns to prevent entire collapse in an overload condition. It is therefore required that the column is stiffer than the adjoining beam.
APPENDIX S
January 2007
Page 9
1.0
INTRODUCTION:
Building Permits will expire if the related projects have not shown any progress for significant durations of time. A re-application for a building permit is required If applicants allow these permits to expire and Fees will have to be paid again. 2.0 PERMIT EXPIRATION:
The following table summarizes the length of inactivity allowed between each project milestone that would cause a permit to expire. Days until Expiration 365
Item 1
Milestone Description From the time a project receives an architectural review approval to the time the applicant must re-apply for a building permit or apply for a site preparation permit From the time a project receives a site preparation permit to the time when the applicant must re-apply for the same construction permit. Time from the Building Permits Directorate approval until the time the applicant collects his permit and pays his fees From the time that a permit is paid for and granted to the time when work actually begins on the job site From the time when construction activity on a job site terminates to the time it commence again. REQUEST FOR EXTENSION OF TIME
60
3 4 5
60 90 180
3.0
The applicant, prior to the expiration of their permit, can apply for a time extension by writing a letter to the Building Permits Directorate stating the reason for an extension. Only one extension of a building permit per project will be granted. 4.0 REVISION TO CURRENT PERMITS
It is the responsibility of the applicant to notify the Building Department about any changes to the project design or configuration. All modifications have to be revised and submitted to ADM for approval.
___________________________________________________________________
EXP-01 Page 1 of 2
5.0
Once a permit has expired, the applicant has to re-apply from the beginning of the application process. Municipality employees will endeavor to minimise the time delay that re-applying may cause, but make no guarantees. It is clearly the responsibility of the applicant to ensure that their permits do not expire. END OF PROCEDURE
___________________________________________________________________
EXP-01 Page 2 of 2
Department of Municipalities & Agriculture Abu Dhabi Municipality Building Permits Directorate Phone 678-8888 Fax 677-2003
SPECIAL CONDITIONS:
Area: Owner/Developer:
Sector:
Plot:
PASS
FAIL
DATE:
INSPECTOR:
Office Use:
FIN-001
Rev 0
This document outlines the general process adopted for inspection requests and performing inspection. This document defines ways of submission of an inspection / re-inspection request. It highlights mandatory hold points, where Municipality clearance is required prior to proceeding with construction activities (i.e., it indicates when to submit an Inspection Request). This document discusses the Inspection Request form, such as reports and/or certificates, which typically result from an inspection. This document is intended for use by Contractors, after issuance of a Building Permit. 2.0 MAKING AN INSPECTION REQUEST
The contractor or the owner may request an Inspection / re-inspection by B P D. Upon receipt of the request, the Inspection Request Desk will schedule the inspector. The inspector is normally mobilized if the provided request is received prior to 1:00 PM of any working day. The Municipality will perform all inspection within two working days. If the inspector can not be mobilized within a two days from receipt of the request, the Inspection Request Desk will inform the Contractor by fax of the next earliest available date. Emergency inspections for routine work, as determined by the Building Official, and in addition to the written request described above, shall be requested by telephone number: 678-8888. 3.0 HOLD POINTS
The following table provides a guideline to the time to call for an inspection. The Municipality Inspector may allow deviation from the standard inspection process if there is a sufficient reason or site condition(s) that allow for an adjustment, without causing adverse effects to the design of the buildings or structure. Note that at the Building Permit issuance stage, the Contractor is advised on the hold points applicable to the project in question and these are clearly listed on the Project Inspection Card. This card must be kept at the job site.
IN-01
Page 1 of 4
07/11/2006
IN-01
Final Inspection
5.0
When a municipal inspector visits a job site an inspection report (FIN-001) will be generated. If the inspection is cancelled, the BPD inspector will indicate that it was cancelled and by whom. The inspection report is a two-part carbon form, so that the inspector can leave one copy with the superintendent and sends one copy back to the BPD office. If inspections result in a written request by the inspector to make corrective measures on the job site, then it is the responsibility of the contractor to take corrective actions and schedule for a re-inspection for that particular hold point. the inspector will clearly indicate the nature of the problem and what is expected to be done for a correction. 6.0 STOP WORK NOTICES
In case the contractor has created an unsafe condition as per ADM HSE rules and regulations on the project, or is not co-operating with the inspection department, a stop work order will be issued. This will terminate all work at the job site and may be enforced by local police. This is an extreme step and can not happen without the approval of the Director of the Building Permits Directorate. 7.0 FINAL INSPECTIONS BY MUNICIPALITY
Upon completion of all the work on a project the contractor can call for a final inspection to be done by the BPD. After having finals by all other authorities. This inspection can generally be scheduled within five (2) working days.
IN-01 Page 3 of 4
If the project is not yet ready for a final a correction list will be created on the Inspection Report form (FIN-001) and a copy will be given to the contractor. A reinspection will be performed upon compliance with inspector's correction report. 8.0 SAFE ACCESS TO SITE
The Contractor shall ensure safe access to the Municipality Engineer on site. The inspector may reject to carry out any inspection if deemed lacking sufficient safety measures. In such a case, the visit will be accounted for in the inspection log. The Contractor will then be asked to resubmit a second request for inspection. END OF PROCEDURE
IN-01
Page 4 of 4
1.0
INTRODUCTION
Prior to occupying any new building or any renovated or remodeled portion of an existing structure, the owner / applicant must obtain a Building Completion Certificate for the subject space. 2.0 PERMIT ON FILE WITH THE BUILDING PERMITS DIRECTORATE
This process assumes that the applicant has a valid permit from the Building Permits Directorate which has not expired. If either of these conditions does not apply, the applicant should meet with the Building Permits Directorate and obtain or renew a building permit. A copy of this permit must accompany a certificate of occupancy. 3.0 WHAT MUST BE COMPLETED BEFORE FILING FOR A CERTIFICATE OF OCCUPANCY
All interior and exterior work of buildings, including life-safety systems, exiting components, ventilation, sanitation, habitability, occupancy and accessibility; completed electrical, plumbing and mechanical systems, including roof-mounted equipment and site hook-ups. All specialty work provided by special inspection agencies, including soils, excavation, fireproofing, steel and concrete and final letters from associated agencies must be completed and on file with the Building Permits Directorate office; all deferred submittal items must be completed and on file with the office, including manufactured roof/floor trusses, stairs, elevators, etc. The Building Inspector will determine whether all phases of the building systems are ready to be signed off. 4.0 FINAL INSPECTIONS BY BUILDING PERMITS DIRECTORATE
Prior to applying for a Certificate of Occupancy, the applicant should pass a final inspection on the project. Upon successful completion of the final inspection, the applicant can apply to the Building Permits Directorate for a Certificate of Occupancy. 5.0 APPLY FOR THE COMPLETION CERTIFICATE
Please complete the application form for a certificate of completion, obtained from the Building Permits Directorate and submit same to the Building Permits Directorate, along with a copy of the successful final inspection noted on the project inspection card. Any approval letters from other authorities (this varies by project type) should also accompany your application.
_________________________________________________________________
BCC-01
Page 1 of 2
6.0
Depending on the type of project you are building various agencies will need to sign off on your project before you can obtain from the Building Permits Directorate. Your project coordinator can assist you with a list of agencies as follow: 1. 2. 3. 4. 5. 6. 7. 7.0 Civil Defense ADDC Water ADDC Electricity ADSSC Civil Aviation Adnoc Etisalat TEMPORARY BUILDING COMPLETION CERTIFICATE
Temporary Building Completion Certificates are sometimes issued when certain phases of a project are completed. Hence, it permits the tenants to occupy portions of the project that has been completed. Sign off approval for the whole project is still required. As is the case of a building permit, the temporary Building Completion Certificate has an expiration date. If the temporary Building Completion Certificate is allowed to expire, a notice of violation may be issued to the permit holder. END OF PROCEDURE
_________________________________________________________________