315 Flash Report ON Central Sector Projects (' 150 Crores and Above) January, 2012

Download as pdf or txt
Download as pdf or txt
You are on page 1of 144

315th FLASH REPORT

ON
CENTRAL SECTOR PROJECTS
(` 150 Crores and above)
January, 2012

NPCIL

Government of India
Ministry of Statistics and Programme Implementation
Infrastructure and Project Monitoring Division
Sardar Patel Bhavan, Sansad Marg
New Delhi-110001
Website: www.cspm.gov.in

Contents

Executive Summary

1 -5

Month wise list of completed projects Costing Rs. 150

6-12

Crore and Above During 2010-11


List of Delete Projects

13

Summary of Projects

14-24

Sector wise Trend and Graphicalf Analysis

25-37

Sector wise analysis of projects

38-67

Graph

68-78

Statewise Summary of All Ongoing Projects

79

List of Abbreviations

80-81

EXECUTIVE SUMMARY
The Flash Report for January, 2012 contains information on the status of the 555
Central Sector Infrastructure Projects, costing 150 Crores and above. During January, 2012, 9
projects (1 project of Railways, 4 projects each of Road Transport & Highways and
Telecommunication Sectors) have reported completion.

The online reporting of the implementation status of the ongoing projects from the
project authorities has improved considerably with majority of project authorities reporting
online during the current month. During January, 2012, 37 projects have reported additional
delays, vis--vis the date of completion reported in the previous month. The additional delays
are in the range of 1 to 18 months, in respect of projects relating to Railways, Road Transport
and Highways, Power, Petroleum, Shipping & Ports, Steel , Atomic Energy and
Telecommunication Sectors.

S. No.

Sector

Projects on

Additional

monitor

delays

1.

RAILWAYS

131

2.

ROAD TRANSPORT & HIGHWAYS

127

3.

POWER

96

4.

PETROLEUM

69

16

5.

COAL

51

6.

TELECOMMUNICATION

18

7.

SHIPPING & PORTS

25

8.

STEEL

16

9.

FERTILISERS

10.

CIVIL AVIATION

11.

ATOMIC ENERGY

12.

URBAN DEVELOPMENT

13.

WATER RESOURCES

14.

PETROCHEMICALS

555

36

Total

3.

The total original cost of implementation of the 555 projects was about

Crores and their anticipated completion cost is likely to be

713744.45

8, 34,456.40Crores, which

reflects an overall cost overrun of 16.9 %. The expenditure incurred on these projects till
Januaryr, 2012 is
4.

3, 63,343.03 Crores, which is 43.5 % of the revised cost of the projects.

Out of the 555 projects, 5 projects are ahead of schedule, 158 are on schedule, 233

projects are delayed and 85 projects have been sanctioned without any commissioning
schedule/date

Further, in case of 74 projects neither the year of commissioning nor the

tentative gestation period of the projects have been reported but subsequently in some of the
cases, the date of completion have been finalized.
5.

During the month under reference 233 projects are reporting delay. Out of 233 delayed

projects, 51 projects had overall delay in the range of 1 to 12 months, 45 projects had a delay in
the range of 13 to 24 months, 104 projects had a delay in the range of 25 to 60 months and 33
projects had a delay of 61 months and above.

6.

It may be noted that this Ministry monitors the cost & time overrun with respect to

original cost estimates (OCE) and not against the RCEs, as comparison against OCE reflect the
actual changes. If the time and cost overruns is measured against the revised estimates, the
calculated parameters will reflects only the unregularized RCEs due to which all time and cost
overrun will get regularized resulting in zero value.

This will not serve the purpose of

monitoring.
7.

The brief reasons for time overruns as reported by various projects implementing

agencies are inadequate mobilization by the contractors, law and order problems, delays in
engineering designs, change of scope delays in pre-project activity, Maoist problems and forest
and environment clearances etc. Brief reasons for cost overruns are mainly due to inflation,
fluctuation of exchange rate, higher tender value, change of scope etc.
8.

The Online Computerized Monitoring System (OCMS) owned by this Ministry

envisages monitoring of milestones drawn from the PERT Charts of the various infrastructure
projects. The project authorities have been regularly requested to enter the list of milestones
for each project, to facilitate better monitoring. However, not all the project agencies are
providing the list of milestones.

The Sector-wise details of additional delays are as under:i)

In the Shipping and Ports sector, 4 projects have reported additional delays in the

range of 3-7 months .Aquisition of two Nos.of 3060 DWT, Port Trust, and Acquisition of
two Nos. of 120 BP, AHTS, Shipping have reported additional delays of 3 months each .
Acquisition of two Nos. of 120 BP, Shipping has reported additional delay of 5 months and
Acquisition of 4 Nos. of Anchor Handling cum supply, Shipping has reported additional
delay of 7 months , however the project authorities have not reported any specific reason
for the delay .

ii)

In the Telecommunications sector, 5 projects have reported additional delays in the

range of 3 -13 months. Project-III of NIB-II of Messaging Storage, BSNL, Assam Telecom
Circle,Phase-V.1,2G and 3G,BSNL, GSM equipment of 1625K lines(2G) 325K (3G) and
GSM equipment of 1867000 lines (2G) 383000 Lines (3G),BSNL have reported additional
delays of 3 months each. GSM Equipment of 390K lines (2G) and 130K Lines (3G), BSNL
has reported an additional delay of 13 months. However, no reasons for delay have been
reported by the project authorities for all the projects.

iii)

In the Petroleum Sector, 16 projects have reported additional delays in the range

of 1-18 months. Karanpur Moradabad-Kashipur-Rudrapur Pipeline Project, GAIL, has


reported an additional delay of 1 months as the land owners are demanding for high
compensation, Heera Reconstruction, ONGC has an additional delay of 3 months due to
delay in revamping jobs and installation of revamped equipments, Neelam Reconstruction,
ONGC has an additional delay of 3 months due to contractual problems, Development of
C- Series Fields, ONGC has an additional delay of 13 months due to delay in drilling of
development wells, North Tapti Gas Field Development, ONGC has an additional delay of
16 months due to increased facility costs, Offshore Grid Interconnectivity Project in
Mumbai High, ONGC has an additional delay of 12 months due to contractual problems,
Development of B-46 cluster fields, ONGC has reported additional delay of 2 months due
to delay in New MHN Complex project, which is linked with this project, Kochi Kootanad
Bangalore Mangalore Pipeline project. Phase-II,GAIL has reported additional delay of 4
months due to delay in approval of BBC , BNPL Spurline, GAIL has reported additional
delay of 8 months due to stiff resistance from farmers and Dev. of B-193 Cluster Fields,
ONGC has reported additional delay of 18 months due to contractual problems . Branch

Pipeline from KSPL Viramgaon to Kandla, IOCL has reported additional delay of 2
months, Construction of Tanks and Blending facility at Vad, IOCL has reported additional
delay of 3 months, Development of SB-14 Fields, ONGC has reported additional delay of 4
months, 102 MW Wind Power Project, ONGC has reported additional delay of 10 months,
Mumbai High North Development, Phase-II, ONGC has reported additional delay of 12
months and Development of B-22 Cluster Fields, ONGC has reported additional delay of
13 months, however; no reason has been reported by the project authorities for delay in
these projects .

iv) In the Power Sector, 7 projects have reported additional delays in the range of 1-6
months. Two projects have reported an additional delay of 1 month each, one projects has
reported an additional delay of 6 months for which no reasons have been reported by the
project authority. The project, Barh STTP,Stage-1,NTPC has reported additional delay of 2
months due to delay in ordering of critical BOIs, Barh STTP,Stage-II,NTPC has reported
additional delay of 3 months due to delay in supply of equipments

by M/s BHEL,

Transmission system associated with Chamera-III,HEP,PGCIL has reported additional


delay of 3 months due to delay in generation work and Bongaigaon Thermal Power
Project,NTPC has reported additional delay of 6 months due to delay in TG erection work .

v) In the Atomic Energy Sectorr, Rajasthan Atomic Power Project-7 and 8, NPCIL has
reported an additional delay of 3 months due to Fukushima incident of Japan in March,
2011 .

vi) In Steel sector, Rebuilding of Coke Oven BatteryNo.1 and 2,SAIL has reported
additional delay of 1 month due to slow progress by the contractor .
Aquisition of two Nos.of

vii)

In the Road Transport and Highways Sector, 1 Project 2 laning of Mokama-

Munger, NHAI has reported additional of 10 months .However, no reason has been
reported by the project authority for the delay .

viii)

In Railways sector, Project Rail-cum-road bridge over river Brahmaputra


Bridge, NEFR has reported additional delay of 12 months due to delay in tendering
process .

The status as on 31.01.2012 in respect of projects costing

150 Crores and above in the

various sectors is indicated in the Report.

(Pankaj Jain)
Additional Secretary
Ministry of Statistics & Programme Implementation

EXECUTIVE SUMMARY

Sl.
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

Sector
Railways
Road Transport & Highways
Power
Petroleum
Coal
Shipping & Ports
Telecommunications
Steel
Fertilisers
Atomic Energy
Civil Aviation
Urban Development
Petrochemicals
Water Resources
Total

Projects on
Monitor
131
127
96
69
51
25
18
16
6
5
5
4
1
1
555

Projects
Additional
Delayed
1
1
7
16
0
4
5
1
0
1
0
0
0
0
36

ANNEXURE-I

Month wise List of Completed Project Costing Rs.

150

Crore and above during

2011-2012
Sl. No.

Project
Name

Original Cost
(Rs. Crore)

Original Date
Of
Commissioning

Cumulative
Expenditure
(Rs. Crore)

April,2011
Civil Aviation
1

Extension of Secondary Runway(K2)(AIRPORT AUTHORITY OF


INDIA LIMITED) - [N04000056]

230.00

01/2011

241.28

396.13

10/2009

106.22

605.40

12/2010

408.90

2,570.44

08/2010

1,896.00

Petroleum
2
3

SULTANPUR NEEMRANA PIPE LINE PROJECT (Spurline to


CJPL)(GAS AUTHORITY OF INDIA LIMITED) - [N16000049]
Guru Govind Singh Refinary Products Evacuation
Project(HINDUSTAN PETROLEUM CORPORATION LIMITED) [N16000076]
Power

Farakka STPP Stage-III(NATIONAL THERMAL POWER


CORPORATION) - [N18000016]
Railways

GUNTUR-GUNTAKAL-KALLURU(GL)(SCR)(SOUTH CENTRAL
RAILWAY) - [220100330]

458.45

555.49

323.36

03/2008

189.90

1,108.12

04/2011

1,238.88

213.35

09/2010

60.89

290.49

04/2010

346.80

Road Transport & Highways


6

MADURAI -KANIAKUMARI SECTION (NS-41/TN) NH-7,KM.80 TO


KM.120(NATIONAL HIGHWAYS AUTHORITY OF INDIA) [240106240]
Shipping & Ports

ACQUISITION OF 4 NOS. OF 115000 DWT CRUDE OIL


CARR(SHIPPING crp. of india) - [N25000032]
May,2011
Civil Aviation

CONSTRACTION OF RCC/PRE STRESSD CONCRETE BRIDGE


K3(AIRPORT AUTHORITY OF INDIA LIMITED) - [N04000068]
Power

TR. SYSTEM FOR STARTUP POWER TO DVC AND MAITHON


RB(POWER GRID CORPORATION OF INDIA LIMITED) [N18000037]

Month wise List of Completed Project Costing Rs.

150

Crore and above during

2011-2012
Sl. No.

Project
Name

Original Cost
(Rs. Crore)

Original Date
Of
Commissioning

Cumulative
Expenditure
(Rs. Crore)

Railways
10
11
12

DEOGHAR-DUMKA NEW BG LINE (DOUBL.)(ER)(EASTERN


RAILWAYS) - [220100264]
HAPUR-KANKATHER (LD),NR(NORTHERN RAILWAY) [220100278]
SHIMOGA-TALAGUPPA (SWR), GC(SOUTH WESTERN
RAILWAY) - [N22000056]

180.73

12/2006

352.32

106.64

03/2007

147.32

46.00

244.16

579.00

04/2009

765.90

230.00

06/2008

312.00

549.00

05/2010

815.00

2,591.80

12/2009

3,265.10

260.34

06/2008

184.25

803.70

06/2009

667.01

276.61

06/2011

199.16

175.00

538.69

205.73

07/2004

247.70

239.00

07/2005

317.60

565.00

07/2010

1,080.00

Road Transport & Highways


13
14
15

GONDE-VADAPE(THANE), NH-3, KM.440/000 TO


KM.539/500(NATIONAL HIGHWAYS AUTHORITY OF INDIA) [240106262]
NAGAON BYPASS (NH-37)(NHAI)(NATIONAL HIGHWAYS
AUTHORITY OF INDIA) - [240106289]
KALGHAT-MP/MAHARASHTRA BORDER KM 16.684.70(NATIONAL HIGHWAYS AUTHORITY OF INDIA) [N24000119]
June,2011
Petroleum

16

CAPACITY EXP. CUM MODERNISATION PH-II(BHARAT


PETROLEUM CORPORATION LIMITED) - [N16000080]
Power

17
18
19

KOTESWAR TRANSMISSION SYSTEM (PGCIL)(POWER GRID


CORPORATION OF INDIA LIMITED) - [180100256]
EAST-WEST TRANSNISSION CORRIDOR STRENGTHNING
SCHEME(POWER GRID CORPORATION OF INDIA LIMITED) [260100100]
TRANSMISSION SYSTEM ASSOCIATED WITH KORBA III
GENE(POWER GRID CORPORATION OF INDIA LIMITED) [N18000059]
Railways

20

VILLUPURAM-KATPADI (GC)(SR)(SOUTHERN RAILWAY) [220100251]


Road Transport & Highways

21
22
23

PURNEA-GOYAKOTA SEC.(EW) (NS & EW-PH-I) KM.419KM.447, NH-31(NATIONAL HIGHWAYS AUTHORITY OF INDIA) [240103191]
MEHSI TO KOTWA (LMNHP-II), PH.II, KM.480 TO KM.440, NH28(NATIONAL HIGHWAYS AUTHORITY OF INDIA) - [240106223]
BANGLORE - HOSKOTE MUDBOGAL SECTION NH-4(NATIONAL
HIGHWAYS AUTHORITY OF INDIA) - [N24000106]
July,2011

Month wise List of Completed Project Costing Rs.

150

Crore and above during

2011-2012
Sl. No.

Project
Name

Original Cost
(Rs. Crore)

Original Date
Of
Commissioning

Cumulative
Expenditure
(Rs. Crore)

Steel
24

REBUILDING OF COKE OVEN BATTERY NO-6 (BSP)(STEEL


AUTHORITY OF INDIA LIMITED (SAIL)) - [N12000054]

172.78

01/2010

131.95

900.92

05/2008

774.32

1,512.00

04/2011

846.61

2,553.28

05/2011

3,614.84

437.40

03/2004

544.35

210.00

04/2007

672.97

262.10

09/2010

164.00

262.00

548.54

193.00

10/2008

338.70

359.00

03/2009

870.60

312.86

02/2008

204.43

8,676.00

06/2010

18,304.30

Petroleum
25
26
27

C2-C3 AND LPG RECOVERY FROM LNG, DAHEJ (ONGC)(OIL &


NATURAL GAS CORPORATION LIMITED) - [160100168]
COMPRESSOR STATIONS (VIJAYPUR AND JHABUA) PHASEI(GAS AUTHORITY OF INDIA LIMITED) - [N16000053]
Pipeline Replacement project-2(OIL & NATURAL GAS
CORPORATION LIMITED) - [N16000111]
Railways

28

SURENDRANAGAR-BHAVNAGAR(GC),WR(WESTERN
RAILWAY) - [220100187]
Road Transport & Highways

29

IMPROVEMENT OF ACCESS OF GQ WITHIN CHENNAI


CITY(NHAI) OTHERS(NATIONAL HIGHWAYS AUTHORITY OF
INDIA) - [240106203]
August,2011
Power

30

EST. OF 400/220 KV GIS POOLING STATION NEAR


CHAMER(POWER GRID CORPORATION OF INDIA LIMITED) [N18000040]
Railways

31

AJMER-UDAIPUR-CHITTAURGARH (GC),NWR(NORTH
WESTERN RAILWAY) - [220100185]
Road Transport & Highways

32
33

AYODHYA - LUCKNOW (LMNHP-I) NH-28, KM.45 TO


KM.8.2(NATIONAL HIGHWAYS AUTHORITY OF INDIA) [240106222]
MEERUT-MUZAFFARNAGAR, NH-58 PHASE-III, KM.52.25 TO
KM.131.00(NATIONAL HIGHWAYS AUTHORITY OF INDIA) [240106256]
Telecommunications

34

NIB-II PROJECT RURAL BROADBAND(BHARAT SANCHAR


NIGAM LIMITED) - [N26000037]
Urban Development

35

DELHI MRTS PHASE-II PROJECT(DELHI METRO RAIL


CORPORATION) - [280100002]
September,2011

Month wise List of Completed Project Costing Rs.

150

Crore and above during

2011-2012
Sl. No.

Project
Name

Original Cost
(Rs. Crore)

Original Date
Of
Commissioning

Cumulative
Expenditure
(Rs. Crore)

Petroleum
36

MSQ QUALITY UP GRADATION PROJECT AT BONGAIGAON


REF(INDIAN OIL CORPORATION LIMITED) - [N16000040]

293.60

12/2009

234.81

112.53

03/1996

509.57

643.36

03/2011

786.54

217.00

10/2008

352.26

204.07

06/2011

129.60

230.89

01/2011

98.20

340.00

06/2008

570.00

312.50

03/2009

604.40

4,091.51

12/2008

4,183.00

2,305.30

06/2010

1,266.47

4,429.38

10/2010

2,325.60

238.25

05/2011

220.82

Railways
37
38

RAJKOT-VERAVAL (GC) AND WANSJALIYA-JETALSAR GC


AN(WESTERN RAILWAY) - [220100116]
Sadulpur-Bikaner and Ratangarh-Degana Gauge Canves(NORTH
WESTERN RAILWAY) - [N22000106]
Road Transport & Highways

39

AYODHYA - LUCKNOW (LMNHP-II) KM.93.075 TO KM.45, NH28(NATIONAL HIGHWAYS AUTHORITY OF INDIA) - [240106225]
October,2011
Power

40

TRANSMISSION SYSTEM ASSOCIATED WITH FARAKKAIII(POWER GRID CORPORATION OF INDIA LIMITED) [N18000043]
November,2011

41

WESTERN REGION STRENGHTENING SCHEME-IX(POWER


GRID CORPORATION OF INDIA LIMITED) - [N18000050]
Road Transport & Highways

42
43

RINGBUNDS TO JHAJHANPUR (BR-6)(NATIONAL HIGHWAYS


AUTHORITY OF INDIA) - [N24000030]
THRISSUR TO ANGAMALI (NH-47)(NATIONAL HIGHWAYS
AUTHORITY OF INDIA) - [N24000037]
December,2011
Mines

44

SECOND PHASE EXPANSION OF CAPTIVE


ALUMINIUM,SMELTER AND POWE(NATIONAL ALUMINUM
COMPANY LIMITED (NALCO)) - [100100054]
Petroleum

45
46

HEERA AND SOUTH HEERA RE-DEVELOPMENT PROJECT(OIL


& NATURAL GAS CORPORATION LIMITED) - [N16000024]
DAHEJ-VIJAYPUR PIPE LINE PROJECT(PHASE-II)(GAS
AUTHORITY OF INDIA LIMITED) - [N16000052]
Power

47

TRANSMISSION SYSTEM ASSOCIATEDWITH URI-II(POWER


GRID CORPORATION OF INDIA LIMITED) - [N18000023]

Month wise List of Completed Project Costing Rs.

150

Crore and above during

2011-2012
Sl. No.

Project
Name

Original Cost
(Rs. Crore)

Original Date
Of
Commissioning

Cumulative
Expenditure
(Rs. Crore)

Road Transport & Highways


48
49
50
51
52

GORAKHPUR-AYODHYA (LMNHP-5),NH-28, KM.208.00 TO


KM.164.00(NATIONAL HIGHWAYS AUTHORITY OF INDIA) [240106246]
MADURAI-ARUPKOTTAI-TUTICORIN, KM.138.8 TO KM.264.5,
NH-45 B(NATIONAL HIGHWAYS AUTHORITY OF INDIA) [240106276]
LALITPUR TO SAGAR, NH-26 (NHAI)(NATIONAL HIGHWAYS
AUTHORITY OF INDIA) - [240106299]
JHANSI TO LALITPUR, NH-26(NATIONAL HIGHWAYS
AUTHORITY OF INDIA) - [N24000097]
PONDICHERY - TINDIVANAU NH-66(NATIONAL HIGHWAYS
AUTHORITY OF INDIA) - [N24000100]

227.00

10/2008

403.60

629.00

11/2010

910.00

198.00

11/2008

187.30

276.09

09/2009

295.40

285.00

07/2010

359.40

230.00

12/2010

219.00

601.49

12/2008

496.20

192.48

03/2009

119.45

424.00

03/2009

.00

590.10

03/2009

.00

545.50

03/2010

.00

154.03

03/2010

.00

355.92

03/2010

.00

477.00

03/2010

.00

229.00

03/2010

.00

241.49

09/2009

123.76

625.53

02/2010

.00

624.75

09/2010

.00

170.23

06/2009

.00

584.33

02/2009

403.71

760.20

819.57

677.75

10/2009

461.56

Shipping & Ports


53

Construction & License out the OPERATION, MANAG. &(PORT


TRUST) - [N25000038]
Telecommunications

54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69

GSM EQUIPMENT OF 900K LINES(2G) AND 300K


LINES(3G)(BHARAT SANCHAR NIGAM LIMITED) - [N26000039]
GSM EQUIPMENT OF 216650 LINES(2G) PH-5.1(BHARAT
SANCHAR NIGAM LIMITED) - [N26000040]
Procurement of 2.5G DWDM equipment(BHARAT SANCHAR
NIGAM LIMITED) - [N26000066]
Procurement of 10G (40 chl) DWDM equipment(BHARAT
SANCHAR NIGAM LIMITED) - [N26000067]
Procurement of 10G 40 CHL (12 chi equipped) DWDM(BHARAT
SANCHAR NIGAM LIMITED) - [N26000068]
Procurement of STM-1 SDH equipment(BHARAT SANCHAR
NIGAM LIMITED) - [N26000069]
Procurement of STM-16 MADM equipment(BHARAT SANCHAR
NIGAM LIMITED) - [N26000070]
Procurement of STM-16 ADM equipment(BHARAT SANCHAR
NIGAM LIMITED) - [N26000071]
Procurement of DXC equipment(BHARAT SANCHAR NIGAM
LIMITED) - [N26000074]
GSM equipment of 900000Lines (2G) PunjabPhase V.2(BHARAT
SANCHAR NIGAM LIMITED) - [N26000081]
GSM equipment of 975000Lines (2G) 325000 lines 3(G(BHARAT
SANCHAR NIGAM LIMITED) - [N26000083]
GSM equipment of 1100000Lines (2G) UP East Phase(BHARAT
SANCHAR NIGAM LIMITED) - [N26000084]
GSM equipment of 375000Lines (2G) 75000lines 3(G)(BHARAT
SANCHAR NIGAM LIMITED) - [N26000085]
GSM equipment of 849862Lines (2G) 150138 lines 3(G(BHARAT
SANCHAR NIGAM LIMITED) - [N26000087]
GSM equipment of 1900000Lines (2G) 401700 lines 3((BHARAT
SANCHAR NIGAM LIMITED) - [N26000091]
GSM equipment of 1700000Lines (2G) 234100 lines 3((BHARAT
SANCHAR NIGAM LIMITED) - [N26000092]

Month wise List of Completed Project Costing Rs.

150

Crore and above during

2011-2012
Sl. No.

Project
Name

Original Cost
(Rs. Crore)

Original Date
Of
Commissioning

Cumulative
Expenditure
(Rs. Crore)

January,2012
Railways
70

PRATAPNAGAR-CHOTA UDAIPUR (GC) (WR)(WESTERN


RAILWAY) - [220100322]

148.61

03/2008

260.07

242.00

12/2008

434.10

322.00

06/2009

553.70

418.04

03/2010

343.30

576.00

07/2010

661.40

1,799.94

09/2009

309.79

335.91

03/2009

182.45

366.00

10/2008

227.39

848.70

01/2010

712.86

Road Transport & Highways


71
72
73
74

KASIA TO GORAKHPUR (NH-28)(NHAI)(NATIONAL HIGHWAYS


AUTHORITY OF INDIA) - [240106291]
SITAPUR-LUCKNOW(NATIONAL HIGHWAYS AUTHORITY OF
INDIA) - [N24000036]
KOSI BRIDGE INCLUDING APPROACHES AND GUIDE BOND
AN(NATIONAL HIGHWAYS AUTHORITY OF INDIA) - [N24000090]
TRICHY - DINDIGUAL NH-45(NATIONAL HIGHWAYS
AUTHORITY OF INDIA) - [N24000099]
Telecommunications

75
76
77
78

GSM EQUIPMENT OF 3125K LINES(2G) AND 625K


LINES(3(BHARAT SANCHAR NIGAM LIMITED) - [N26000043]
GSM EQUIPMENT-480K LINES(2G) & 220K LINES(3G)
IN(BHARAT SANCHAR NIGAM LIMITED) - [N26000050]
GSM equipment of 945000Lines (2G) 225000lines 3(G)(BHARAT
SANCHAR NIGAM LIMITED) - [N26000086]
GSM equipment of 1900000Lines (2G) 335500lines 3(G(BHARAT
SANCHAR NIGAM LIMITED) - [N26000094]

Month wise List of Deleted Project Costing Rs. 150

ANNEXURE-I
Crore and above during

2011-2012
Sl. No.

Project
Name

Original Cost
(Rs. Crore)

Original Date
Of
Commissioning

Cumulative
Expenditure
(Rs. Crore)

May,2012
Civil Aviation
1

D/O OF TERMINAL BLDG. AND PAVEMENT WORKS AT


CHENNA(AIRPORT AUTHORITY OF INDIA LIMITED) [N04000056]

535.00

06/2010

143.97

368.72

07/2006

295.47

January,2012
Power
2

TUIRIAL HE PROJECT(NEEPCO)(NORTH EAST ELECTRIC


POWER CORPORATION) - [N16000049]

Summary of projects in the Flash Report


for the month of January, 2012
I. Project Implementation - Current Status:
Number of Projects in Previous Month

587

Number of Projects completed/dropped/frozen in Previous Month

26

Number of Projects completed/dropped/frozen in Current Month

10

Number of Projects with Anticipated greater than Rs. 150

Cr. in Current Month

Number of Projects Added in Current Month

Number of Projects in Current Month

555

II. Brief Analysis


Project Status with respect to Original
Schedule: Out of 555 projects, 5 projects
are ahead of schedule,158 projects are
on schedule and 233 projects are
delayed. Of the balance, 85 projects do
not have fixed dates of commissioning
while 74 projects were sanctioned
without any commissioning date but
subsequently dates of completion were
finalised.
III. Investment Scenario
The
Total
Original
cost
of
implementation of 555 projects when
sanctioned, was of the order of Rs.
713744.45
crore
but
this
was
subsequently revised to Rs. 834456.4
crore implying a cost overrun of 16.9%.
The expenditure incurred on these
projects till January, 2012 is Rs.
363343.03 crore, which is 43.5% of the
revised cost of the projects.

I. Project Added / Completed / Dropped / Frozen


No of Projects in Previous Month
No of Projects Completed/Dropped/Frozen in Previous Month
No of Projects Completed/Dropped/Frozen in Current Month
No of Projects with Anticipated Cost Greater than Rs.150 Cr. In
Current Month
No of Projects added in Current Month
No of Projects in Current Month

587
26
10
1
3
555

II. Project status


Number of Projects

With Respect To

Delayed

Original ( Date )
Latest Approved ( Date )

On
schedule

Ahead

233
241

5
13

Without ODC
but DOC
available

158
203

Without
D.O.C

74
44

85
55

Total
555
555

Delay
(%)
41.98
43.42

III. (A) Project cost


(All Cost/ Expenditure in Rs. crore )

Cost
With
Respect to

No. of
Projects

Cost overrun

Sanctioned

Anticipated

Expenditure

( Crore)

Original ( OCE )
Latest Approved
( RCE )

437
118

576,442.17
190,428.94

620,958.76
213,497.64

238,916.24
124,426.79

38.50
58.30

44,516.59
23,068.70

7.70
12.10

Total ( RCE )

555

766,871.11

834,456.40

363,343.03

43.54

67585.29

8.81

43.50

120,711.95

16.90

Original Cost of All Projects


Original Cost

555

713,744.45

834,456.40

363,343.03

III. (B) Delayed Project cost


(All Cost/ Expenditure in Rs. crore )

Cost
With
Respect to
Original (OCE)
Latest Approved
(RCE)

No. of
Projects
233
241

Sanctioned
370,038.47
367,603.45

Cost overrun
Anticipated
446,717.12
413,237.45

Expenditure
244,377.54
218,772.42

%
54.70
52.90

( Crore)
76,678.65
45,634.00

%
20.70
12.40

IV. Additional Delayed Project cost


(All Cost/ Expenditure in Rs. crore )

Cost
With
Respect to
Latest Approved

No. of
Projects
37

Sanctioned
67,124.73

Cost overrun
Anticipated
71,906.40

Expenditure
32,615.61

%
45.40

( Crore)
4,781.67

%
7.10

Extent of cost overrun in projects with respect to original schedule


S.No.

State

No. of
Projects

Original

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

Andhra Pradesh
Arunachal Pr.
Assam
Bihar
Goa
Gujarat
Haryana
Himachal Pr.
J and K
Karnataka
Kerala
Madhya pradesh
Maharashtra
Manipur
Mizoram
Nagaland
Orissa
Punjab
Rajasthan
Sikkim
Tamil Nadu
Tripura
Uttar Pradesh
West Bengal
Delhi
Chhatisgarh
Jharkhandd
Uttaranchal
Multi State
Total

Projects with cost overrun

Total cost (Rs. Cr.)


Anticipated
cost

Cost
overrun
(%)

No
.

Original
cost

Anticipated
cost

% Incr
Base

33
4
37
26
1
27
10
6
10
25
7
24
51
1
2
1
26
7
15
2
35
3
24
25
3
25
22
6
97

32,855.2
9,512.2
23,895.8
27,578.9
335.6
32,375.1
5,795.4
14,761.2
14,019.4
30,657.6
6,086.2
17,335.6
68,705.3
727.6
1,533.0
850.0
42,465.4
4,613.2
25,357.2
1,648.9
52,241.3
1,522.4
17,544.0
37,585.8
37,985.0
55,916.8
14,396.5
10,025.7
125,418.4

39,238.5
14,153.6
35,508.8
32,829.3
335.6
32,903.3
7,611.8
17,455.4
33,604.4
39,102.5
6,775.2
17,581.8
82,228.7
3,056.9
3,307.1
850.0
45,636.4
5,598.2
26,106.3
3,690.0
60,526.4
2,053.2
21,597.8
46,969.0
37,965.4
59,148.1
15,999.9
11,948.2
130,674.3

19.4
48.8
48.6
19.0
0.0
1.6
31.3
18.3
139.7
27.5
11.3
1.4
19.7
320.2
115.7
0.0
7.5
21.4
3.0
123.8
15.9
34.9
23.1
25.0
-0.1
5.8
11.1
19.2
4.2

13
2
13
15
0
6
3
3
6
10
2
3
18
1
1
0
13
3
4
1
13
2
9
12
0
7
6
3
21

11,677.0
6,441.3
11,923.7
16,731.8
0.0
2,826.5
1,448.2
7,629.8
7,866.5
8,795.3
795.7
2,027.6
29,305.0
727.6
619.3
0.0
33,147.5
761.4
1,684.9
1,339.5
27,364.2
1,234.4
3,729.2
20,281.1
0.0
4,746.6
1,897.3
3,942.3
6,635.4

19,002.1
11,082.7
23,630.9
21,982.3
0.0
3,354.8
3,264.7
10,324.0
27,478.4
17,646.7
1,587.2
2,741.5
45,606.1
3,056.9
2,393.5
0.0
36,510.8
1,746.5
2,818.7
3,380.6
35,649.3
1,765.2
7,783.0
29,664.3
0.0
7,977.9
3,672.5
5,864.9
15,682.9

62.7
72.1
98.2
31.4
0.0
18.7
125.4
35.3
249.3
100.6
99.5
35.2
55.6
320.2
286.5
0.0
10.1
129.4
67.3
152.4
30.3
43.0
108.7
46.3
0.0
68.1
93.6
48.8
136.4

555

713,744.5

834,456.4

16.9

190

215,579.1

345,668.1

60.3

10

Extent of cost overrun in projects with respect to original schedule


S.No.

Sector

No. of
Projects

Original

1
2
3
4
5
6
7
8
9
10
11
12
13
14

Atomic Energy
Civil Aviation
Coal
Fertilisers
Steel
Petrochemicals
Petroleum
Power
Railways
Road Transport & Highways
Shipping & Ports
Telecommunications
Urban Development
Water Resources
Total

Projects with cost overrun

Total cost (Rs. Cr.)


Anticipated
cost

Cost
overrun
(%)

No
.

Original
cost

Anticipated
cost

% Incr
Base

5
5
51
6
16
1
69
96
131
127
25
18
4
1

41,548.3
5,021.6
34,718.7
5,317.4
65,244.8
5,460.6
149,804.8
197,932.5
64,906.1
72,336.6
18,221.4
8,443.6
44,245.2
542.9

46,386.3
5,611.1
38,348.4
5,317.4
71,412.4
8,920.0
158,021.2
213,231.6
134,280.0
74,425.7
19,237.4
8,559.9
49,518.1
1,187.0

11.6
11.7
10.5
0.0
9.5
63.4
5.5
7.7
106.9
2.9
5.6
1.4
11.9
118.6

2
2
12
0
6
1
16
19
101
15
10
3
2
1

16,663.0
3,750.5
13,742.8
0.0
24,028.9
5,460.6
49,968.0
45,642.3
37,225.0
4,435.6
6,294.5
1,315.9
6,509.2
542.9

21,501.0
4,340.0
17,970.2
0.0
30,216.4
8,920.0
65,969.0
61,006.4
106,655.8
7,093.7
7,511.6
1,514.8
11,782.1
1,187.0

29.0
15.7
30.8
0.0
25.8
63.4
32.0
33.7
186.5
59.9
19.3
15.1
81.0
118.6

555

713,744.5

834,456.4

16.9

190

215,579.1

345,668.1

60.3

11

Extent of the time overrun in projects with respect to original schedule


S.
No

Sector

No. of
Projects

Original

1
2
3
4
5
6
7
8
9
10
11
12
13
14

Projects with time overrun

Total cost (Rs. Cr.)


Anticipated
cost

Atomic Energy
Civil Aviation
Coal
Fertilisers
Steel
Petrochemicals
Petroleum
Power
Railways
Road Transport & Highways
Shipping & Ports
Telecommunications
Urban Development
Water Resources

5
5
51
6
16
1
69
96
131
127
25
18
4
1

41,548.3
5,021.6
34,718.7
5,317.4
65,244.8
5,460.6
149,804.8
197,932.5
64,906.1
72,336.6
18,221.4
8,443.6
44,245.2
542.9

46,386.3
5,611.1
38,348.4
5,317.4
71,412.4
8,920.0
158,021.2
213,231.6
134,280.0
74,425.7
19,237.4
8,559.9
49,518.1
1,187.0

Cost
overrun
(%)
11.6
11.7
10.5
0.0
9.5
63.4
5.5
7.7
106.9
2.9
5.6
1.4
11.9
118.6

Total

555

713,744.5

834,456.4

16.9

12

No.

233

3
4
17
2
5
0
31
47
27
78
10
7
1
1

Original
cost

Anticipated
cost

28,983.0
4,395.6
11,824.7
763.0
46,957.9
0.0
84,314.1
124,405.2
22,136.8
27,654.3
8,208.4
3,457.6
6,395.0
542.9

33,821.0
4,985.1
14,994.8
763.0
52,521.9
0.0
92,699.5
139,091.3
52,427.2
29,936.9
9,033.6
3,647.0
11,609.0
1,187.0

370,038.5

446,717.1

Range
(Months)
33983-

51
23
48
9
36

4 - 120
1 - 83
2 - 204
2 - 101
2 - 93
16 - 75
24 - 24
60 - 60

Extent of the time overrun in projects with respect to latest schedule


S.
No

Sector

No. of
Projects

Original

1
2
3
4
5
6
7
8
9
10
11
12
13
14

Projects with time overrun

Total cost (Rs. Cr.)


Anticipated
cost

Atomic Energy
Civil Aviation
Coal
Fertilisers
Steel
Petrochemicals
Petroleum
Power
Railways
Road Transport & Highways
Shipping & Ports
Telecommunications
Urban Development
Water Resources

5
5
51
6
16
1
69
96
131
127
25
18
4
1

41,548.3
5,021.6
34,718.7
5,317.4
65,244.8
5,460.6
149,804.8
197,932.5
64,906.1
72,336.6
18,221.4
8,443.6
44,245.2
542.9

46,386.3
5,611.1
38,348.4
5,317.4
71,412.4
8,920.0
158,021.2
213,231.6
134,280.0
74,425.7
19,237.4
8,559.9
49,518.1
1,187.0

Cost
overrun
(%)
11.6
11.7
10.5
0.0
9.5
63.4
5.5
7.7
106.9
2.9
5.6
1.4
11.9
118.6

Total

555

713,744.5

834,456.4

16.9

13

No.

241

5
4
17
2
8
0
27
36
34
80
12
14
1
1

Original
cost

Anticipated
cost

41,548.3
4,395.6
11,824.7
763.0
39,531.8
0.0
71,544.0
110,821.7
15,014.9
28,080.8
8,583.6
6,592.7
6,395.0
542.9

46,386.3
4,985.1
14,994.8
763.0
41,991.7
0.0
75,417.0
121,114.5
47,950.8
30,529.9
9,536.3
6,772.1
11,609.0
1,187.0

345,638.9

413,237.5

Range
(Months)
03980-

51
23
48
9
9
-

0 - 73
1 - 83
0 - 213
0 - 101
2 - 93
7 - 75
24 - 24
60 - 60

Extent of cost overrun in projects with respect to latest schedule


S.No.

Sector

No. of
projects

Latest
approved

1
2
3
4
5
6
7
8
9
10
11
12
13
14

Atomic Energy
Civil Aviation
Coal
Fertilisers
Steel
Petrochemicals
Petroleum
Power
Railways
Road Transport &
Highways
Shipping & Ports
Telecommunications
Urban Development
Water Resources
Total

Projects with cost overrun

Total cost (Rs. Cr.)


Anticipated
cost

Cost
overrun
(%)

No .

Latest
approved

Anticipated
cost

%
Increase
Base

5
5
51
6
16
1
69
96
131
127

41,548.3
5,228.6
36,331.9
5,317.4
71,120.1
8,920.0
163,049.4
201,774.5
89,130.1
72,503.1

46,386.3
5,611.1
38,348.4
5,317.4
71,412.4
8,920.0
158,021.2
213,231.6
134,280.0
74,425.7

11.6
7.3
5.6
0.0
0.4
0.0
-3.1
5.7
50.7
2.7

2
1
8
0
3
0
3
13
81
14

16,663.0
1,942.5
6,637.3
0.0
598.0
0.0
32,036.9
36,652.4
46,265.6
4,239.1

21,501.0
2,325.0
9,121.4
0.0
910.3
0.0
32,844.0
48,174.4
91,707.3
6,730.7

29.0
19.7
37.4
0.0
52.2
0.0
2.5
31.4
98.2
58.8

25
18
4
1

18,653.2
8,447.5
44,304.1
542.9

19,237.4
8,559.9
49,518.1
1,187.0

3.1
1.3
11.8
118.6

8
1
1
1

6,321.3
250.0
6,395.0
542.9

7,007.1
425.5
11,609.0
1,187.0

10.8
70.2
81.5
118.6

555

766,871.1

834,456.4

8.8

136

158,544.0

233,542.7

47.3

14

Extent of time & cost overrun in projects with respect to latest schedule
S No.

Sector

No. of
projects

Total Cost (Rs. Cr.)


Original

1
2
3
4
5
6
7
8
9
10
11
12
13
14

Atomic Energy
Civil Aviation
Coal
Fertilisers
Steel
Petrochemicals
Petroleum
Power
Railways
Road Transport & Highways
Shipping & Ports
Telecommunications
Urban Development
Water Resources
Total

5
5
51
6
16
1
69
96
131
127
25
18
4
1

41,548.29
5,021.58
34,718.73
5,317.41
65,244.82
5,460.61
149,804.77
197,932.45
64,906.13
72,336.63
18,221.36
8,443.59
44,245.18
542.90

Anticipated
Cost
46,386.29
5,611.07
38,348.38
5,317.41
71,412.36
8,920.00
158,021.15
213,231.64
134,280.01
74,425.72
19,237.40
8,559.89
49,518.08
1,187.00

555

713744.45

834456.4

15

Projects with time & cost overrun

Cost
overrun(%)
11.64
11.74
10.45
0.00
9.45
63.35
5.48
7.73
106.88
2.89
5.58
1.38
11.92
118.64

No.

Original

0
0
1
0
1
0
7
1
2
0
1
0
0
0

0.00
0.00
469.78
0.00
8,692.00
0.00
11,185.02
1,657.00
1,624.47
0.00
277.03
0.00
0.00
0.00

Anticipated
cost
0.00
0.00
706.40
0.00
12,291.00
0.00
20,009.18
2,978.86
4,619.99
0.00
277.03
0.00
0.00
0.00

16.91

13

23905.3

40882.46

Range
(Months)
0- 0
0- 0
44- 44
0- 0
36- 36
0- 0
24- 120
67- 67
62- 92
0- 0
8- 8
0- 0
0- 0
0- 0

Extent of time & cost overrun in projects with respect to original schedule
S No.

Sector

No. of
projects

Total Cost (Rs. Cr.)


Original

1
2
3
4
5
6
7
8
9
10
11
12
13
14

Atomic Energy
Civil Aviation
Coal
Fertilisers
Steel
Petrochemicals
Petroleum
Power
Railways
Road Transport & Highways
Shipping & Ports
Telecommunications
Urban Development
Water Resources
Total

5
5
51
6
16
1
69
96
131
127
25
18
4
1

41,548.29
5,021.58
34,718.73
5,317.41
65,244.82
5,460.61
149,804.77
197,932.45
64,906.13
72,336.63
18,221.36
8,443.59
44,245.18
542.90

Anticipated
Cost
46,386.29
5,611.07
38,348.38
5,317.41
71,412.36
8,920.00
158,021.15
213,231.64
134,280.01
74,425.72
19,237.40
8,559.89
49,518.08
1,187.00

555

713744.45

834456.4

16

Projects with time & cost overrun

Cost
overrun(%)
11.64
11.74
10.45
0.00
9.45
63.35
5.48
7.73
106.88
2.89
5.58
1.38
11.92
118.64

No.

Original

1
0
6
0
1
0
11
14
14
11
5
0
1
1

13,171.00
0.00
5,699.06
0.00
8,692.00
0.00
46,117.51
37,998.08
9,578.12
3,387.01
3,252.85
0.00
6,395.00
542.90

Anticipated
cost
15,824.00
0.00
8,712.38
0.00
12,291.00
0.00
60,527.00
49,484.08
38,825.97
5,536.10
4,180.50
0.00
11,609.00
1,187.00

16.91

65

134833.53

208177.03

Range
(Months)
51- 51
0- 0
9- 48
0- 0
36- 36
0- 0
7- 120
7- 67
45- 201
7- 99
12- 93
0- 0
24- 24
60- 60

V. List of projects completed/dropped/Frozen current month

Now anticipated

Original
Project
Power
TUIRIAL HE PROJECT(NEEPCO)
Railways
PRATAPNAGAR-CHOTA UDAIPUR
(GC) (WR)
Road Transport & Highways
KASIA TO GORAKHPUR (NH28)(NHAI)
KOSI BRIDGE INCLUDING
APPROACHES AND GUIDE BOND AN
TRICHY - DINDIGUAL NH-45
SITAPUR-LUCKNOW
Telecommunications
GSM EQUIPMENT OF 3125K
LINES(2G) AND 625K LINES(3
GSM EQUIPMENT-480K LINES(2G) &
220K LINES(3G) IN
GSM equipment of 945000Lines (2G)
225000lines 3(G)
GSM equipment of 1900000Lines (2G)
335500lines 3(G

DOA

Cost

(All Cost /Expenditure in Rs. crore )

DOC

Cost

DOC

Final
Expenditure

07/1998

368.72

07/2006

913.63

01/2014

295.47

04/2005

148.61

03/2008

227.52

10/2010

260.07

12/2003

242.00

12/2008

242.00

01/2012

434.10

12/2003

418.04

03/2010

418.04

01/2012

343.30

03/2005
03/2005

576.00
322.00

07/2010
06/2009

576.00
322.00

01/2012
01/2012

661.40
553.70

09/2008

1,799.94

09/2009

1,799.94

03/2012

309.79

05/2007

335.91

03/2009

335.91

03/2012

182.45

10/2007

366.00

10/2008

366.00

03/2012

227.39

01/2009

848.70

01/2010

848.70

03/2012

712.86

17

VI. List of projects added

(All Cost in Rs. crore )

Original
Project
Power
SYSTEM STRENTHENING IN RAIPURWARDHA CORRIDOR FOR IPP
PROJEC
TR SYSTEM FOR ESTABLISHMENT
OF 400/220 KV GIS SUBSTATION AT
TUIRIAL HYDRO ELECTRIC PROJECT
(60MW)

DOA

Cost

Anticipated
DOC

Cost

DOC

1/2012

1,422.85

1/2015

1,422.85

1/2015

1/2012

259.28

1/2013

259.28

1/2013

1/2011

913.63

1/2014

913.63

1/2014

VII. Milestones (Cumulative due & achieved)


Total

2398

Achieved up to month

987

18

VIII. List of projects reporting additional delays


Cost ( Rs. Crore)
Project name
Atomic Energy
RAJASTHAN ATOMIC
POWER PROJECT -7 and 8
(2X700 MW) NPCIL
Steel
Rebuilding of coke oven
battery No.1 and 2 (Bokar
SAIL
Petroleum
KARANPUR MORADABADKASHIPUR-RUDRAPUR
PIPELINE PROJECT PHASEGAIL
DEVELOPMENT OF B-46
CLUSTER FIELD ONGC
BRANCH PIPELINE FROM
KSPL VIRAMGAON TO
KANDLA IOCL
HEERA RECONSTRUCTION
ONGC
NEELAM
RECONSTRUCTION ONGC
CONSTRUCTION OF TANKS
AND BLENDING FACILITY AT
VAD IOCL
Development of SB-14 field
ONGC
KOCHI KOOTTANAD
BANGLORE MANGLORE
PIPELINE PH-II GAIL
BNPL SPURLINE
(UTTRANCHAL AND
PUNJAB) GAIL
102 MW WIND POWER
PROJECT ONGC
OFFSHORE GRID
INTERCONNECTIVITY
PROJECT IN MUMBAI HIGH
ONGC
MUMBAI HIGH NORTH
DEVELOPMENT PHASE-II
ONGC

Original

DOC reported

Anticipated

Delay

Original

Last month

This month

(in months)

12/2016

12/2016

03/2017

12,320.00

12,320.00

500.90

500.90

N.A.

01/2012

02/2012

238.68

204.00

01/2012

04/2012

05/2012

1,436.21

1,436.21

07/2010

05/2012

07/2012

250.00

250.00

03/2013

01/2012

03/2012

706.70

706.70

04/2010

12/2011

03/2012

305.08

305.08

04/2011

12/2011

03/2012

267.00

267.00

09/2012

03/2012

06/2012

410.44

410.44

11/2012

01/2013

05/2013

2,915.00

2,915.00

N.A.

12/2012

04/2013

540.92

460.70

N.A.

07/2012

03/2013

1,106.00

1,106.00

06/2012

06/2012

04/2013

10

740.02

740.02

03/2010

03/2012

03/2013

12

7,133.39

6,855.93

09/2012

09/2012

09/2013

12

19

VIII. List of projects reporting additional delays


Cost ( Rs. Crore)
Project name
DEVELOPMENT OF CSERIES FIELDS ONGC
DEVELOPMENT OF B-22
CLUSTER FIELDS ONGC
North Tapti Gas Field
Development ONGC
DEVELOPMENT OF B-193
CLUSTER FIELDS ONGC
Power
WESTERN REGION SYSTEM
STRENGHTENING SCHEMEXI PGCIL
SYSTEM STRENGHTENING XI IN SOUTHERN REGION
PGCIL
BARH STPP STAGE I
(3X660MW) NTPC NTPC
BARH STPP STAGE -II NTPC
TR. SYSTEM ASSOCIATED
WITH CHAMERA III HEP
PGCIL
BONGAIGAON THERMAL
POWER PROJECT NTPC
Trans. System associated with
PALLATANA GBPP & BPT
PGCIL
Railways
RAIL-CUM-ROAD BRIDGE
OVER RIVER
BRAHAMAPUTRA BRIDG
NEFR
Road Transport & Highways
2 LANNING OF MOKAMAMUNGER NHAI
Shipping & Ports
Acquisition of Two nos. of
3060 DWT PORT TRUST
ACQUISITION OF TWO NOS
OF 120 B.P (AH03TYPE)
AHTS SHIPP.
Acquisition of two nos. of 120
B.P SHIPP.
ACQUISITION OF 4 NO. OF
ANCHOR HANDLING CUM
SUPPLY SHIPP.

DOC reported

Delay

Original
3,195.16

Anticipated
2,800.00

Original
N.A.

Last month
03/2012

This month
04/2013

2,323.40

2,920.82

09/2010

03/2012

04/2013

13

589.70

755.76

03/2011

06/2011

10/2012

16

3,248.78

5,633.44

08/2010

06/2012

12/2013

18

409.50

409.50

02/2012

02/2012

03/2012

196.10

196.10

07/2011

02/2012

03/2012

8,692.97

8,693.00

12/2009

10/2014

12/2014

7,341.04
297.37

7,341.04
297.91

08/2013
07/2011

10/2013
03/2012

01/2014
06/2012

3
3

4,375.35

4,375.35

06/2011

10/2013

04/2014

2,144.00

2,144.00

12/2012

12/2012

06/2013

1,000.00

3,230.01

04/2008

12/2014

12/2015

12

351.54

351.54

05/2013

05/2013

03/2014

10

277.03

277.03

12/2011

05/2012

08/2012

241.50

241.50

09/2011

09/2011

12/2011

290.85

305.00

06/2011

01/2012

06/2012

359.44

359.44

04/2011

11/2011

06/2012

20

(in months)
13

VIII. List of projects reporting additional delays


Cost ( Rs. Crore)
Project name
Telecommunications
PROJ.III OF NIB-II OF
MESSAGING STORAGE
BSNL
Assam Telecom Circle, PhaseV.I, 2G & 3G BSNL
GSM equipment of
1867000Lines (2G) 383000
lines 3( BSNL
GSM equipment of
1625000Lines (2G) 325000
lines 3( BSNL
GSM EQUIPMENT OF 390K
LINES(2G) AND 130K
LINES(3G) BSNL

Original

DOC reported

Anticipated

Delay

Original

Last month

This month

(in months)

250.00

425.51

12/2005

12/2011

03/2012

336.81

336.81

01/2009

12/2011

03/2012

868.00

868.00

08/2009

12/2011

03/2012

916.70

930.60

11/2010

12/2011

03/2012

373.94

373.94

12/2008

02/2011

03/2012

13

Number of projects reporting additional delay =

36

21

Trend and Graphical Analysis of All Projects

Trend and Graphical Analysis


Urban Development Sector

Months

Trend and Graphical Analysis


Telecommunications Sector

Months

Trend and Graphical Analysis


Shipping and Ports Sector

Months

Trend and Graphical Analysis


Road Transport and Highways Sector

Months

Trend and Graphical Analysis


Railways Sector

Months

Trend and Graphical Analysis


Power Sector

Months

Trend and Graphical Analysis


Petroleum Sector

Months

Trend and Graphical Analysis


Steel Sector

Months

Trend and Graphical Analysis


Fertilisers Sector

Months

Trend and Graphical Analysis


Coal Sector

Months

Trend and Graphical Analysis


Civil Aviation Sector

Months

Trend and Graphical Analysis


Atomic Energy Sector

Months

Sectorwise analysis of projects


Number of
Sector
Atomic Energy
Civil Aviation
Coal
Fertilisers
Steel
Petrochemicals
Petroleum
Power
Railways
Road Transport & Highways
Shipping & Ports
Telecommunications
Urban Development
Water Resources
Grand total

projects

Cost (Rs. Crore)

5
5
51
6
16
1
69
96
131
127
25
18
4
1

Original
41,548.29
5,021.58
34,718.73
5,317.41
65,244.82
5,460.61
149,804.77
197,932.45
64,906.13
72,336.63
18,221.36
8,443.59
44,245.18
542.90

Latest
41,548.29
5,228.58
36,331.94
5,317.41
71,120.10
8,920.00
163,049.42
201,774.49
89,130.13
72,503.13
18,653.17
8,447.47
44,304.08
542.90

Anticipated
46,386.29
5,611.07
38,348.38
5,317.41
71,412.36
8,920.00
158,021.15
213,231.64
134,280.01
74,425.72
19,237.40
8,559.89
49,518.08
1,187.00

555

713,744.45

766,871.11

834,456.40

22

Sector Wise Details

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original
/Revise
Milestones
Cumm.
d
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
6

10

Atomic Energy
1 KAKRAPAR ATOMIC POWER
PROJECT - 3 and 4 [N02000010]NPCIL,Gujarat

10/2009

11,459.00
-

11,459.00

1,341.00

05/2016

11/2016

6(R1)

0/70

2 KUDANKULAM APP (NPCIL) [020100040]NPCIL,Tamil Nadu

12/2001

13,171.00
-

15,824.00

14,268.00

12/2008
-

03/2013

51(O)

39/106

3 PROTOTYPE FAST BREEDER


REACTOR (BHAVINI, 500 MWE) [020100044]BHAVNI,Tamil Nadu

09/2003

3,492.00
-

5,677.00

3,410.82

09/2010
-

01/2012

16(O)

5/80

4 RAJASTHAN ATOMIC POWER


PROJECT -7 and 8 (2X700 MW) [N02000027]NPCIL,Rajasthan

10/2009

12,320.00
-

12,320.00

860.00

12/2016
-

03/2017

3(O)

0/69

5 URANIUM ORE MINE and


PROCESSING PLANT AT TUMMALAP [N02000007]UCIL,Andhra Pradesh

09/2007

1,106.29
-

1,106.29

1,000.70

04/2011

04/2012

12(R3)

0/0

41,548.29
-

46,386.29

20,880.52

Total

44/325

Civil Aviation
6 C/O INTEGRATED PASSENGER TER.
BULD. NSCBI AIRPORT [N04000037]AAI,West Bengal

08/2008

1,942.51
-

2,325.00

1,730.76

05/2011
-

03/2012

10(O)

0/0

7 C/o new Airport at Pakyong(Sikkim)


Airport - [N04000050]AAI,Sikkim

01/2009

309.46
-

309.46

170.82

01/2011
-

12/2012

23(O)

0/0

8 Construction of New International


Terminal Building - [N04000069]AAI,Goa

05/2010

335.61
-

335.61

68.61

05/2012
-

08/2012

3(O)

0/0

9 D/O KAMARAJ DOMESTIC TER-PH-II


And EXP. ANNA INT. [N04000038]AAI,Tamil Nadu

08/2008

1,808.00
2,015.00

2,015.00

1,598.13

01/2011
-

02/2012

13(O)

0/0

09/2008

626.00
-

626.00

340.12

06/2013
-

06/2013

0(O)

0/0

5,021.58
-

5,611.07

3,908.44

10 GAGAN PROJECT [N04000065]AAI,Multi State


Total

0/0

Coal
11 ADRIYALA SHAFT PROJECT [N06000016]SCCL,Andhra Pradesh

09/2006

212.34
779.26

779.26

229.64

03/2013
09/2012

12/2013

15(R3)

6/22

12 AMLAI OC EXPANSION SECTOR 1.50


MTY - [N06000082]SECL,Chhatisgarh

11/2009

198.59
-

198.59

91.57

03/2016
-

03/2016

0(O)

0/1

13 AMLOHRI EPR (NCL) (6 MTY) [N06000010]NCL,Madhya pradesh

05/2006

1,352.04
-

1,143.54

248.98

03/2014
-

03/2016

24(O)

2/2

23

Sector Wise Details

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original
/Revise
Milestones
Cumm.
d
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
7

14 ANANTA OC EXPANSION PH-III 15.0


Mty - [N06000067]MCL,Orissa

08/2008

207.28
-

207.28

72.00

03/2012

15 ASHOK EXPN.OCP -CCL (10 MTY) [060100096]CCL,Jharkhandd

04/2006

471.66
341.63

341.63

105.51

03/2011
03/2012

03/2013

16 BALRAM OCP EXTENSION,MCL (8.00


Mty) - [N06000044]MCL,Orissa

12/2007

172.08
-

172.08

99.91

03/2010

17 BARSINGSAR TPS (2 125MW) (NLC) [060100089]NLC,Rajasthan

12/2004

1,114.18
1,626.09

1,868.71

1,714.72

06/2009
-

01/2012

18 BHUBANESWARI OCP, MCL (20.0 Mty)


- [N06000034]MCL,Orissa

12/2007

490.00
-

490.10

102.10

03/2017

6/12

19 BINA EXTN. PROJ(6.0 Mtpa) [N06000019]NCL,Multi State

11/2006

168.97
-

168.97

40.35

03/2014
-

03/2014

0(O)

1/2

20 BLOCK-B OCP NCL (3.5 MTY) [N06000009]NCL,Madhya pradesh

06/2006

746.04
-

535.10

141.38

03/2012
-

03/2015

36(O)

0/0

21 Batura OCP (2.0 MTY) [N06000049]SECL,Madhya pradesh

09/2008

203.82
-

203.82

03/2015
-

03/2015

0(O)

0/1

22 CHURCHA ROUG (1.35MTY) [N06000046]SECL,Chhatisgarh

06/2008

462.35
-

462.35

261.83

03/2014

0/4

23 Churi Benti UG [N06000083]CCL,Jharkhandd

06/2007

163.51
-

163.51

33.66

03/2011
03/2012

03/2014

24(R3)

1/2

24 DIPKA EXPANSION OCP (SECL) (2025 MTY) [060100094]SECL,Chhatisgarh

07/2005

1,268.53
-

1,943.66

1,142.56

03/2010
-

03/2014

48(O)

0/13

25 GEVRA EXPANSION OCP (SECL) (25


MTY) - [060100093]SECL,Chhatisgarh

07/2005

1,667.55
-

2,675.67

1,291.82

03/2010
-

03/2014

48(O)

0/15

26 GOPAL PRASAD OCP [N06000042]MCL,Orissa

02/2008

395.87
-

395.87

59.22

03/2015

2/12

27 HINGULA OC-II EXP PH-III (15 MTY) [N06000068]MCL,Orissa

11/2008

475.93
-

479.63

90.84

03/2013

5/7

28 JAGANNATHPUR OCP(3.00 MTY) [N06000075]SECL,Chhatisgarh

09/2008

152.43
-

152.43

03/2015
-

03/2015

0(O)

1/1

29 JALAGAM VENGALA RAO OCP [N06000094]SCCL,Andhra Pradesh

07/2011

447.06
-

447.06

03/2015
-

03/2015

0(O)

0/0

30 JALLARAM SHAFT PROJECT [N06000025]SCCL,Andhra Pradesh

03/2013

467.78
-

467.78

12.31

03/2013
-

03/2013

0(O)

3/83

31 JHANJRA R-VI SEAM PSLW [N06000020]ECL,West Bengal

11/2006

287.18
-

287.17

03/2011
-

03/2015

48(O)

1/5

32 KAKATIYA LAONGWALL [N06000048]SCCL,Multi State

12/2008

453.63
-

453.63

71.05

12/2012
-

03/2015

27(O)

7/44

33 KANIHA OCP, MCL, (10.0 Mty) [N06000035]MCL,Orissa

12/2007

457.77
-

457.77

116.04

03/2013

6/11

34 KARMA OCP [N06000088]CCL,Jharkhandd

06/2009

162.46
-

162.46

31.59

03/2014
-

03/2014

0(O)

0/0

35 KARTALI (EAST) OCP(2.50 MTY) [N06000076]SECL,Chhatisgarh

07/2008

178.44
-

178.44

03/2014
-

03/2014

0(O)

0/1

36 KHADIA EXPANSION OPENCAST


PROJECT 4 TO 10 MTPA,6MT [N06000091]NCL,Uttar Pradesh

06/2011

1,131.28
1,131.28

1,131.28

03/2018
-

03/2018

0(O)

0/0

37 KRISHNASHILA (NCL) (4MTY) [N06000007]NCL,Madhya pradesh

05/2006

789.88
-

741.62

292.07

03/2010
-

03/2013

36(O)

2/2

24

10
-

12(R3)
31(O)

5/7
0/2
4/4
26/26

Sector Wise Details

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original
/Revise
Milestones
Cumm.
d
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
7

38 KULDA OCP (MAHANADI COALFIELDS


LTD) - [060100092]MCL,Orissa

01/2005

302.96
-

302.96

87.85

03/2010
-

03/2012

39 KUSMUNDA EXPN.OCP(SECL)(1015MTY) [N06000008]SECL,Chhatisgarh

06/2006

737.65
-

1,188.31

611.75

03/2013

0/8

40 Kistaram OCP [N06000089]SCCL,Andhra Pradesh

11/2010

242.29
-

242.29

03/2015
-

03/2015

0(O)

0/28

41 MAGADH OC (CCL) [N06000015]CCL,Jharkhandd

07/2006

469.78
706.40

706.40

18.16

07/2012
03/2014

03/2016

24(R3)

1/2

42 MANIKPUR OC EXPANTION (3.50


MTY) - [N06000081]SECL,Chhatisgarh

11/2009

321.42
-

321.50

204.10

03/2014

0/5

43 MANUGURU OC-II EXTENSION


PHASE-II - [N06000080]SCCL,Andhra
Pradesh

03/2010

181.19
-

181.19

31.90

03/2012
-

03/2012

0(O)

8/34

44 Moonidih XV Seam UG [N06000098]BCCL,Jharkhandd

08/2011

1,230.27
-

1,230.27

04/2015
-

04/2015

0(O)

0/0

45 Muraidih UG [N06000096]BCCL,Jharkhandd

02/2011

339.88
-

339.88

04/2014
-

04/2014

0(O)

0/0

46 NEYVELI NEW THERMAL POWER


PROJECT(2x500 MW) [N06000095]NLC,Tamil Nadu

06/2011

5,907.11
-

5,907.11

6.57

12/2015

0/33

47 NIGAHI OC EXPANSION PROJECT 10


MTY TO 15 MTY, SINGRAULI [N06000033]NCL,Madhya pradesh

10/2007

259.40
-

259.40

1.51

03/2012
-

03/2012

0(O)

0/1

48 North Urimari OCP [N06000084]CCL,Jharkhandd

12/2007

179.87
-

179.87

61.24

03/2012
03/2012

03/2014

24(R3)

0/2

49 PELMA OCP(10.00MTY) [N06000045]SECL,Chhatisgarh

07/2008

448.32
-

448.32

03/2015
-

03/2015

0(O)

0/1

50 PENGANGA OC [N06000066]WCL,Maharashtra

10/2008

339.77
-

339.77

0.70

10/2014

0/1

51 Purnadih OCP [N06000085]CCL,Jharkhandd

07/2008

210.98
-

210.98

31.39

03/2013
-

03/2013

0(O)

0/2

52 RAJMAHAL OC EXP. [N06000056]ECL,Multi State

02/2006

50.08
-

153.82

19.96

03/2011
-

03/2014

36(O)

0/3

53 RAMAGUNDAM OC-II EXTENSION [N06000078]SCCL,Andhra Pradesh

12/2009

418.97
-

418.97

79.26

03/2012
-

03/2012

0(O)

21/27

54 RCE OF INDARAM OCP(1.20 MTPA) [N06000093]SCCL,Andhra Pradesh

07/2011

162.76
-

162.76

1.21

03/2015
-

03/2015

0(O)

0/0

55 RKP OCP PHASE-I [N06000079]SCCL,Uttaranchal

03/2010

209.78
-

209.78

20.17

03/2015
-

03/2015

0(O)

4/31

56 Rajrappa RCE OCP [N06000087]CCL,Jharkhandd

12/2009

510.85
-

510.85

282.99

03/2016
-

03/2016

0(O)

1/2

57 SHANTIKHANI LONGWALL PROJSCCL - [N06000017]SCCL,Andhra


Pradesh

10/2006

249.03
-

249.03

43.20

03/2012
-

03/2012

0(O)

11/42

58 TALABIRA OCP [N06000043]MCL,Orissa

03/2008

447.72
-

447.72

34.28

03/2016

1/12

59 TPS-II EXPANSION (1470MW TO


1970MW) (NLC) [060100087]NLC,Tamil Nadu

10/2004

2,030.78
2,453.57

2,453.57

2,361.58

06/2009
-

07/2012

25

10

24(O)

37(O)

9/11

19/24

Sector Wise Details

(Jan,2012)

Date of
Commissioning

Date of
Approval

S.No Project
1

Original /
Revised
Cost
4

Anticipated
Cost
5

Delay
w.r.t.
Original
/Revise
Milestones
Cumm.
d
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
6

60 TUTICORIN THERMAL POWER


PROJECT - [N06000047]NLC,Tamil
Nadu

05/2008

4,904.54
4,909.54

4,909.54

2,489.81

61 Tapin OCP [N06000086]CCL,Jharkhandd

08/2008

264.68
-

264.68

93.47

34,718.73
-

38,348.38

12,730.25

Total

02/2013

03/2012
03/2013

03/2014

10
-

12(R3)

0/39

0/2
153/589

Fertilisers
62 BATHINDA - AMMONIA PLANT
FEEDSTOCK CHANGEOVER PROJ [N08000005]NFL,Punjab

01/2010

1,294.19
-

1,294.19

335.32

01/2013
-

01/2013

0(O)

0/5

63 CAPACITY ENHANCEMENT OF
AMMONIA AND UREA PLANT VIJ [N08000008]NFL,Madhya pradesh

09/2008

438.00
-

438.00

159.38

07/2011
-

04/2012

9(O)

0/0

64 CAPACITY ENHANCEMENT OF
VIJAIPUR-I PLANTS [N08000007]NFL,Madhya pradesh

09/2008

325.00
-

325.00

147.84

07/2011
-

03/2012

8(O)

0/0

65 NANGAL - AMMONIA PLANT


FEEDSTOCK PROJECT [N08000006]NFL,

01/2010

1,478.63
-

1,478.63

413.05

01/2013

8/8

66 PANIPAT - AMMONIA PLANT


FEEDSTOCK CHANGEOVER PROJE [N08000004]NFL,Haryana

01/2010

1,292.84
-

1,292.84

308.72

01/2013
-

01/2013

0(O)

0/5

67 THAL AMMONIA REVAMP PROJECT [N08000003]RCF,Haryana

01/2009

488.75
-

488.75

214.81

04/2012

04/2012

0(R3)

7/22

5,317.41
-

5,317.41

1,579.12

Total

15/40

Steel
68 1.2 MTPA PELLET PLANT DONIMALAI
- [N12000072]NMDC,Karnataka

04/2011

572.00
-

572.00

04/2013
-

04/2013

0(O)

0/0

69 330 TPH BOILER-6 AND AUXILIARY


SYSTEM - [N12000069]RINL,Andhra
Pradesh

07/2007

260.00
-

350.00

231.99

08/2010

03/2012

19(R3)

0/1

70 67.5 MW TG-5 AUX. S'TEM


EMERGENCY POWER REQUIREM [N12000068]RINL,Andhra Pradesh

07/2007

230.00
-

343.58

238.81

02/2011

04/2012

14(R3)

2/3

71 7.0 MTPA KUMARASWAMY IRON ORE


MINE - [N12000073]NMDC,Karnataka

02/2011

898.55
-

898.55

05/2013
-

05/2013

0(O)

0/0

72 700TPD ARI SEPARATION UNIT-4 AT


OXYGEN PLANT-II, BHILLAI [N12000023]SAIL,Chhatisgarh

07/2007

232.93
-

232.93

178.90

05/2011
-

02/2012

9(O)

1/1

73 Augmentation of Iron Ore Storage in


RMHP - [N12000053]RINL,Multi State

05/2008

480.00
-

460.00

176.28

05/2012

12/2012

7(R3)

1/2

74 Bailadila Iron Ore Deposit- IIB(NMDC) [N12000018]NMDC,Chhatisgarh

01/2007

295.89
607.17

607.17

314.31

12/2011

03/2012

3(R3)

15/21

75 COKE OVEN BATTERY NO. 4 PHASEII - [N12000038]RINL,Andhra Pradesh

08/2007

108.00
-

216.68

59.11

10/2012

10/2012

0(R3)

3/4

26

Sector Wise Details

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original
/Revise
Milestones
Cumm.
d
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
7

76 ENHANCEMENT OF PROD. CAP. AT


BOLANI I/O MINES [N12000075]SAIL,Orissa

11/2011

254.55
-

254.55

1.11

11/2013
-

11/2013

0(O)

0/0

77 EXPANSION OF BHILAI STEEL PLANT


- [N12000057]SAIL,Chhatisgarh

09/2008

17,265.00
-

17,265.00

4,575.39

03/2013
-

06/2013

3(O)

17/20

78 EXPANSION OF BOKARO STEEL


PLANT - [N12000055]SAIL,Jharkhandd

01/2008

6,325.00
-

6,325.00

2,367.36

12/2011
-

03/2012

3(O)

10/11

79 EXPANSION OF DURGAPUR STEEL


PLANT - [N12000074]SAIL,Chhatisgarh

06/2009

2,875.00
-

2,875.00

526.87

12/2012
-

12/2012

0(O)

4/6

80 EXPANSION OF IISCO STEEL PLANT [N12000051]SAIL,West Bengal

02/2008

14,443.00
16,408.00

16,408.00

12,663.88

12/2011
-

03/2012

3(O)

13/14

81 EXPANSION OF RINL/VSP FROM 3


MTPY-6.3 MTPY OF LIQUID STEEL [120100067]RINL,Andhra Pradesh

10/2005

8,692.00
12,291.00

12,291.00

9,130.48

10/2009
10/2012

10/2012

0(R3)

57/59

82 EXPENSION OF ROURKELA STEEL


PLANT - [N12000056]SAIL,Chhatisgarh

09/2008

11,812.00
11,812.00

11,812.00

6,321.78

03/2013
-

03/2013

0(O)

5/8

83 Rebuilding of coke oven battery No.1


and 2 (Bokar [N12000033]SAIL,Jharkhandd

10/2007

500.90
-

500.90

355.21

02/2012

3/3

65,244.82
-

71,412.36

37,141.48

5,460.61
8,920.00

8,920.00

3,800.09

5,460.61
-

8,920.00

3,800.09

Total

10

131/153

Petrochemicals
84 ASSAM GAS CRACKER PROJECT [N16000106]BCPL,Assam

04/2006

Total

12/2013

12/2013

0(R3)

9/30
9/30

Petroleum
85 102 MW WIND POWER PROJECT [N16000119]ONGC,Rajasthan

07/2010

1,106.00
-

1,106.00

06/2012
-

04/2013

10(O)

0/0

86 ADDITIONAL DEV. OF D-1 FIELD [N16000086]ONGC,Multi State

01/2010

2,163.64
-

2,163.64

06/2012
-

06/2012

0(O)

0/0

87 ADDITIONAL GAS PROCESSING


FACILITI AT HAZIRA [N16000065]ONGC,Gujarat

02/2008

370.11
-

370.11

04/2011
-

07/2012

15(O)

0/0

88 ADDITIONAL GAS PROCESSING


UNITS AT URAN [N16000064]ONGC,Maharashtra

10/2008

1,797.35
-

977.00

12/2011
-

01/2013

13(O)

0/0

89 ASSAM RENEWAL PROJECT FOR


GROUP A - [N16000061]ONGC,Assam

03/2009

2,465.15
-

2,378.86

523.86

03/2013
-

03/2013

0(O)

0/0

90 Ahmedabad Redevelopment [N16000120]ONGC,Gujarat

11/2010

1,916.10
-

1,916.10

12/2014
-

12/2014

0(O)

0/0

91 Ankleswar Redevelopment [N16000122]ONGC,Gujarat

11/2010

2,189.63
-

2,189.63

12/2014
-

12/2014

0(O)

0/0

92 BAWANA NANGAL PIPE LINE


PROJECT - [N16000050]GAIL,Multi
State

11/2007

1,816.07
-

1,385.00

1,082.05

10/2010
12/2011

03/2012

3(R3)

0/1

93 BNPL SPURLINE (UTTRANCHAL AND


PUNJAB) - [N16000094]GAIL,

12/2009

540.92
-

460.70

171.29

07/2012

03/2013

8(R2)

0/16

27

Sector Wise Details

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original
/Revise
Milestones
Cumm.
d
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
7

94 BRANCH PIPELINE FROM KSPL


VIRAMGAON TO KANDLA [N16000059]IOCL,Gujarat

02/2009

250.00
349.00

250.00

226.70

03/2013
03/2013

03/2012

-12(R1)

0/0

95 BUTADIENE EXTRACTION UNIT


(BDEU) AT PANIPAT [N16000108]IOCL,Haryana

11/2009

341.50
-

341.50

41.18

02/2013

02/2013

0(R3)

29/42

96 CDU/VDU-II - [N16000110]CPCL,Tamil
Nadu

03/2010

333.99
-

333.99

85.97

05/2012

97 COMPRESSOR STATIONS (KAILARAS


AND CHAINSA) [N16000054]GAIL,Multi State

11/2007

1,167.00
-

798.00

686.69

04/2011
12/2011

03/2012

3(R3)

2/2

98 CONSTRUCTION OF 12 OFFSHORE
SUPPLY VESSELS(OSV) [N16000084]ONGC,Multi State

06/2007

736.65
-

736.65

210.71

09/2011
-

12/2012

15(O)

0/0

99 CONSTRUCTION OF NEW PROCESS


COMPLEX MHN [N16000030]ONGC,Maharashtra

01/2007

2,853.29
6,326.40

6,326.40

4,335.28

05/2010
05/2012

05/2012

0(R3)

0/0

100 CONSTRUCTION OF NEW TERMINAL


AT ENNORE CHENNAI [N16000066]HPCL,Tamil Nadu

01/2008

224.00
299.00

299.00

292.80

02/2011
08/2011

101 CONSTRUCTION OF ONE ETP AND


THREE ETPS CUM WATER [N16000127]ONGC,Assam

06/2010

202.94
-

202.94

01/2014
-

01/2014

0(O)

0/0

102 CONSTRUCTION OF TANKS AND


BLENDING FACILITY AT VAD [N16000115]IOCL,Gujarat

02/2009

267.00
-

267.00

188.90

09/2012
09/2012

06/2012

-3(R3)

0/0

103 CONVERSION OF RIG SAGAR


SAMRAT TO MOBILE OFFSHORE [N16000128]ONGC,Maharashtra

03/2011

861.79
-

861.79

05/2013
-

05/2013

0(O)

0/0

104 Construction of 23 Immediate Supply


Vessels (ISV) - [N16000123]ONGC,Multi
State

11/2010

331.20
-

331.20

08/2013
-

08/2013

0(O)

0/0

105 Construction of 6 ETPs [N16000117]ONGC,Gujarat

03/2009

302.26
-

302.26

24.71

09/2012
-

09/2012

0(O)

0/0

106 Construction of one Multipurpose


Support Vessel [N16000103]ONGC,Multi State

01/2010

723.64
-

723.64

03/2013
-

03/2013

0(O)

0/0

107 DABHOL-BANGALORE PIPELINE


PROJECT PHASE-I - [N16000073]GAIL,

06/2009

4,543.43
4,508.38

2,300.00

1,539.07

03/2012
08/2012

08/2012

0(R3)

0/17

108 DE-BOTTLENECKING OF SMPL


(Salaya-Mathura crude pip [N16000089]IOCL,Maharashtra

12/2009

1,584.00
-

1,584.00

7.11

109 DEVELOPMENT OF B-193 CLUSTER


FIELDS [N16000033]ONGC,Maharashtra

06/2007

3,248.78
5,633.44

5,633.44

2,393.39

08/2010
03/2012

12/2013

21(R3)

0/0

110 DEVELOPMENT OF B-22 CLUSTER


FIELDS [N16000032]ONGC,Maharashtra

01/2007

2,323.40
2,920.82

2,920.82

1,173.84

09/2010
03/2012

04/2013

13(R3)

0/0

111 DEVELOPMENT OF B-46 CLUSTER


FIELD [N16000046]ONGC,Maharashtra

06/2007

1,436.21
1,456.96

1,436.21

465.50

07/2010
05/2012

07/2012

2(R3)

0/0

28

10

21/36

0/0

0/0

Sector Wise Details

(Jan,2012)

Date of
Commissioning

Date of
Approval

S.No Project
1

Original /
Revised
Cost
4

Anticipated
Cost

112 DEVELOPMENT OF C-SERIES FIELDS


- [N16000023]ONGC,Maharashtra

08/2006

3,195.16
-

2,800.00

2,520.91

12/2008

04/2013

52(R3)

0/0

113 DIESEL HYDRO TREATMENT


PROJECT,BRPL DHALIGAON [N16000009]BRPL,Assam

06/2006

1,431.91
1,646.39

1,690.13

1,596.80

09/2009
-

08/2011

23(O)

0/0

114 DIESEL HYDROTREATOR PROJECT


AT MUMBAI REFINERY [N16000069]HPCL,Maharashtra

03/2009

3,284.00
2,174.00

2,174.00

715.36

09/2011
05/2012

05/2012

0(R3)

0/0

115 DIESEL HYDROTREATOR PROJECT


AT VISAKH REFINERY [N16000068]HPCL,Andhra Pradesh

03/2009

3,597.00
2,730.00

2,730.00

934.05

09/2011
03/2012

03/2012

0(R3)

0/0

116 Development of BHE and BH-35 Area. [N16000118]ONGC,Multi State

08/2010

372.11
-

372.11

03/2013
-

03/2013

0(O)

0/0

117 Development of Cluster-7 Fields [N16000104]ONGC,Multi State

03/2010

3,241.03
-

3,241.03

1.50

03/2013
-

03/2013

0(O)

0/0

118 Development of SB-14 field [N16000116]ONGC,Multi State

01/2011

410.44
-

410.44

11/2012
-

05/2013

6(O)

0/0

119 Development of WO-16 Cluster Fields [N16000105]ONGC,Multi State

06/2010

2,523.00
-

2,523.00

01/2014
-

01/2014

0(O)

0/0

120 EURO-IV DHDT [N16000109]CPCL,Tamil Nadu

09/2008

2,615.69
-

2,615.69

1,763.29

12/2011

121 Fluidized catalytic cracking unit(FCCU)


revamp - [N16000107]IOCL,Uttar
Pradesh

07/2010

1,000.00
-

1,000.00

59.50

01/2013
01/2013

01/2013

0(R3)

14/18

122 HEERA RECONSTRUCTION [N16000062]ONGC,Maharashtra

05/2008

706.70
-

706.70

686.67

04/2010
-

03/2012

23(O)

0/0

123 HYDROCRACKER REVAMP AND


SETTING UP A NEW CCR AT MU [N16000081]BPCL,Maharashtra

04/2008

825.00
1,827.00

1,827.00

370.68

04/2013

04/2013

0(R3)

0/167

124 INTEGRATED DEV OF G1 and GS-15


(ONGCL) - [160100231]ONGC,Multi
State

04/2003

429.82
2,218.01

2,218.01

1,450.37

04/2006
05/2011

05/2012

12(R3)

0/0

125 INTEGRATED OFFSHORE CRUDE OIL


HANDLING FACILITIES [N16000090]IOCL,Orissa

12/2009

1,492.33
-

1,300.00

928.88

06/2012
06/2012

06/2012

0(R3)

6/8

126 IOR GELEKI (ONGCL) [160100216]ONGC,Assam

09/2001

390.09
1,674.11

1,674.11

1,413.90

03/2007
03/2017

03/2017

0(R3)

6/6

127 IOR LAKWA - LAKHMANI (ONGCL) [160100215]ONGC,Assam

09/2001

345.10
663.69

663.69

595.83

03/2007
03/2014

03/2014

0(R3)

3/3

128 IOR, RUDRASAGAR (ONGCL) [160100217]ONGC,Assam

09/2001

113.90
438.85

438.85

258.24

03/2006
03/2013

03/2013

0(R3)

6/6

129 Integrated Sugar, Ethanol, Cogen Power


Plant at Sugauli [N16000102]HPCL,Bihar

06/2009

613.54
-

727.88

671.52

12/2010
-

06/2011

6(O)

0/0

130 JAGDISHPUR-HALDIA PIPELINE


PROJECT PHASE-I [N16000072]GAIL,Multi State

07/2009

7,596.18
-

7,596.18

2.20

01/2013
-

07/2015

30(O)

0/0

131 JHAJJAR HISSAR PIPE LINE


PROJECT - [N16000051]GAIL,Haryana

11/2007

281.07
-

281.07

3.41

10/2010
-

12/2014

50(O)

0/0

29

Delay
w.r.t.
Original
/Revise
Milestones
Cumm.
d
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
6

10

0/116

Sector Wise Details

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original
/Revise
Milestones
Cumm.
d
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
7

132 KARANPUR MORADABAD-KASHIPURRUDRAPUR PIPELINE PROJECT


PHASE- - [N16000070]GAIL,Multi State

07/2009

238.68
252.37

204.00

155.45

01/2012
-

05/2012

4(O)

3/8

133 KOCHI KOOTTANAD BANGLORE


MANGLORE PIPELINE PH-II [N16000129]GAIL,

06/2009

2,915.00
-

2,915.00

551.11

12/2012

04/2013

4(R3)

0/21

134 KOCHI-KOOTANAD BANGALOREMANGALORE PIPELINE PROJEC [N16000071]GAIL,Multi State

06/2009

348.00
-

261.00

186.75

03/2012
08/2012

03/2012

-5(R3)

1/4

135 MNW-NF BRIDGE PROJECT [N16000045]ONGC,Maharashtra

05/2008

175.21
-

162.12

149.79

03/2009
02/2012

01/2012

-1(R3)

0/0

136 MRPL Phase-III Expansion [N16000114]Mangalore Refin,Karnataka

08/2008

12,412.00
12,160.26

12,160.26

7,726.62

01/2012
-

01/2012

0(O)

0/0

137 MUMBAI HIGH NORTH


DEVELOPMENT PHASE-II [N16000060]ONGC,Maharashtra

01/2009

7,133.39
-

6,855.93

3,018.35

09/2012
-

09/2013

12(O)

0/0

138 MUMBAI HIGH SOUTH


REDEVELOPMENT PH-2 [N16000039]ONGC,Maharashtra

10/2007

5,713.03
8,813.41

8,813.41

6,808.47

05/2010
03/2013

03/2013

0(R3)

0/0

139 Mehesana Redevelopment [N16000121]ONGC,Gujarat

11/2010

3,823.00
-

3,823.00

04/2015
-

04/2015

0(O)

0/0

140 NEELAM RECONSTRUCTION [N16000063]ONGC,Maharashtra

05/2008

305.08
-

305.08

290.05

04/2011
-

03/2012

11(O)

0/0

141 North Tapti Gas Field Development [N16000096]ONGC,Multi State

07/2008

589.70
755.76

755.76

531.38

03/2011
05/2011

10/2012

17(R3)

0/0

142 OFFSHORE GRID


INTERCONNECTIVITY PROJECT IN
MUMBAI HIGH [N16000031]ONGC,Maharashtra

01/2007

740.02
-

740.02

417.93

03/2010
03/2012

03/2013

12(R1)

0/0

143 PARADIP REFINERY PROJECT [N16000058]IOCL,Orissa

02/2009

29,777.00
-

30,426.00

13,027.63

11/2012
-

06/2013

7(O)

57/100

144 PARADIP-RAIPUR-SAMBALPURRANCHI PIPELINE [N16000088]IOCL,Multi State

08/2009

1,793.00
-

1,400.00

544.09

09/2012
09/2012

09/2012

0(R3)

0/11

145 PETROCHEMICAL COMPLEX-II AT


VIJAYPUR AND PATA [N16000112]GAIL,Multi State

08/2010

8,140.00
-

8,140.00

452.61

02/2014
-

02/2014

0(O)

0/0

146 Polypropylene unit [N16000113]Mangalore Refin,Karnataka

05/2009

1,803.78
-

1,803.78

512.67

07/2012
-

07/2012

0(O)

0/0

147 REFRIGERATED LPG STORAGE AT


JNPT - [N16000083]BPCL,Maharashtra

06/2008

304.40
-

304.40

261.76

09/2010
-

09/2011

12(O)

10/60

148 RESITEMENT OF MARKETING


INSTALATION AT VISAKHAPATT [N16000057]HPCL,Andhra Pradesh

01/2009

756.00
898.00

898.00

804.61

09/2011
03/2012

03/2012

0(R3)

0/0

149 REVAMPING OF WIN PLATFORM AT


MH ASSET [N16000044]ONGC,Maharashtra

05/2008

333.40
837.54

656.51

246.28

05/2010
04/2012

05/2012

1(R3)

0/0

150 Up-gradation of Konaban GGS and


Pipeline Grid Project [N16000098]ONGC,Tripura

07/2008

288.04
288.04

288.04

145.16

08/2012
-

08/2012

0(O)

0/0

30

10

Sector Wise Details

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original
/Revise
Milestones
Cumm.
d
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
7

151 VKPL UPGRADATION AND LAYING OF


SPURLINE (TO BHILWARA AND CHI [N16000093]GAIL,

12/2009

463.32
-

330.47

185.36

03/2012

03/2012

152 WIND ENERGY - [N16000126]GAIL,

05/2011

616.00
-

616.00

84.75

03/2012

153 Wax Project - [N16000101]NRL,Assam

06/2010

576.60
-

576.60

20.54

12/2013
12/2013

12/2013

149,804.77
-

158,021.15

63,543.52

Total

10

0(R3)

0(R3)

0/20

0/0
0/0
158/662

Power
154 765 KV POOLING STATION AND
NETWORK WITH DVC AND MA [N18000069]PGCIL,Multi State

08/2008

7,075.33
-

7,075.33

4,495.30

08/2012
-

08/2012

0(O)

0/0

155 765 KV SYSTEM FOR CENTRAL PART


OF NORTHERN GRID PA [N18000068]PGCIL,Multi State

02/2009

1,347.32
-

1,347.32

950.90

02/2012
-

06/2012

4(O)

0/0

156 765KV SYSTEM FOR CENTRAL PART


OF NORTHERN GRID PAR [N18000079]PGCIL,Multi State

11/2009

1,075.12
-

1,075.12

406.30

05/2012
-

05/2012

0(O)

0/0

157 765KV SYSTEM FOR CENTRAL PART


OF NORTHERN REGION G [N18000078]PGCIL,Multi State

07/2009

1,736.36
-

1,736.36

642.00

06/2012
-

06/2012

0(O)

0/0

158 BARH STPP STAGE -II [N18000047]NTPC,Bihar

02/2008

7,341.04
-

7,341.04

3,433.00

08/2013
-

01/2014

5(O)

5/18

159 BARH STPP STAGE I (3X660MW)


NTPC - [180100242]NTPC,Bihar

12/2003

8,692.97
-

8,693.00

6,431.00

12/2009
-

12/2014

60(O)

45/46

160 BONGAIGAON THERMAL POWER


PROJECT - [N18000041]NTPC,Assam

01/2008

4,375.35
-

4,375.35

2,735.00

06/2011
-

04/2014

34(O)

1/29

161 CHAMERA,STAGE-III (NHPC) [180100241]NHPC,Himachal Pr.

08/2005

1,405.63
-

2,084.00

1,724.30

08/2010
04/2012

03/2012

-1(R3)

0/2

162 CHUTAK HYDRO-ELECTRIC


PROJECT (NHPC) [N18000007]NHPC,J and K

08/2006

621.26
-

913.25

718.76

02/2011
10/2012

05/2012

-5(R3)

1/4

163 COMMON SYSTEM ASSOCIATED


WITH ISGS PROJECTS IN
KRISHNAPATTNA [N18000111]PGCIL,Andhra Pradesh

08/2011

1,637.34
-

1,637.34

08/2014
-

08/2014

0(O)

0/0

164 Common System Associated with


Coastal Energen Priv [N18000103]PGCIL,Tamil Nadu

09/2011

1,940.13
-

1,940.13

09/2014
-

09/2014

0(O)

0/0

165 EASTERN REGION STRENGTHENING


SCHEME-I - [N18000004]PGCIL,Multi
State

10/2006

975.96
-

975.66

726.70

10/2009
-

03/2012

29(O)

20/20

166 EASTERN REGION STRENGTHENING


SCHEME-II - [N18000033]PGCIL,Multi
State

12/2007

227.52
-

227.52

139.80

06/2010
06/2010

01/2012

19(R3)

0/0

167 EASTERN REGION TRANSMISSION


SYSTEM-III - [N18000100]PGCIL,Multi
State

07/2010

1,272.80
-

1,272.80

142.00

11/2012
-

11/2012

0(O)

0/0

31

Sector Wise Details

(Jan,2012)

Date of
Commissioning

Date of
Approval

S.No Project
1

Original /
Revised
Cost
4

Anticipated
Cost

168 ESTABLISHMENT OF POOLING


STATIONS AT CHAMPA [N18000101]PGCIL,Chhatisgarh

05/2011

1,961.87
-

1,961.87

31.00

05/2014
-

05/2014

0(O)

0/0

169 Establishment of pooling stations at


Rajgarh [N18000092]PGCIL,Chhatisgarh

12/2010

1,719.52
-

1,719.52

214.60

08/2013
-

08/2013

0(O)

0/0

170 IMMEDIATE EVACUATION SYSTEM


FOR NABINAGAR TPS [N18000082]PGCIL,Bihar

02/2010

215.86
-

215.86

137.30

06/2012
-

03/2012

-3(O)

0/0

171 INTEGRATION OF POOLING STATION


IN CHATTISGARH WITH CENTRAL P [N18000110]PGCIL,Multi State

08/2011

1,391.97
-

1,391.97

12/2013
-

11/2013

-1(O)

0/0

172 INTEGRATION OF POOLING STATION


IN CHATTISGARH WITH CENTRAL P [N18000107]PGCIL,Chhatisgarh

08/2011

1,391.97
-

1,391.97

12/2013
-

12/2013

0(O)

0/0

173 INTERCONNECTION BETWEEN


ELECTTRICAL GRIDS OF INDIA AND B
- [N18000089]PGCIL,Multi State

10/2010

160.32
-

160.32

16.90

10/2012
-

10/2012

0(O)

0/0

174 KAIGA 3&4 TRANSMISSION SYSTEM


(PGCIL) - [180100246]PGCIL,Karnataka

03/2005

596.45
1,007.16

1,007.16

822.50

12/2007
12/2009

175 KAMENG HYDROELECTRIC PROJECT


(NEEPCO) [180100239]NEEPCO,Arunachal Pr.

12/2004

2,496.90
-

2,496.90

1,715.85

05/2013
06/2016

06/2016

0(R3)

2/22

176 KISHANGANGA HEP [N18000031]NHPC,J and K

07/2007

2,238.67
3,642.04

3,642.00

1,131.52

01/2016
01/2016

11/2016

10(R3)

0/2

177 KOLDAM HEP (NTPC) [180100211]NTPC,Himachal Pr.

10/2002

4,527.15
-

4,527.15

4,087.00

04/2009
-

03/2013

47(O)

0/9

178 KOTESHWAR HEP(THDC) [180100184]THDCL,Uttaranchal

04/2000

1,301.56
-

2,283.69

2,574.64

04/2005
-

03/2012

83(O)

10/11

179 KUDANKULAM-APP TRANS. SYSTEM


(PGCIL) - [180100258]PGCIL,Tamil
Nadu

05/2005

1,779.29
-

1,779.29

1,775.08

09/2008
-

06/2012

45(O)

3/38

180 LOHARINAG-PAL HEP(4X150MW) [N18000005]NTPC,Uttaranchal

06/2006

2,895.10
-

2,895.10

685.00

11/2011
-

12/2012

13(O)

6/34

181 MAUDA TRANSMISSION SYSTEM [N18000084]PGCIL,Maharashtra

02/2010

469.38
-

469.38

203.10

10/2012
-

10/2012

0(O)

0/0

182 MOUDA STPP (NTPC) [N18000048]NTPC,Maharashtra

11/2008

5,459.28
-

6,010.89

3,424.00

08/2012
-

03/2013

7(O)

6/16

183 NIMOO BAZGO HYDROELECTRIC


PROJECT - [N18000006]NHPC,J and K

08/2006

611.01
-

936.00

704.32

08/2010
01/2013

01/2013

0(R3)

0/3

184 NORTH- EAST NORTH WESTERN


INTERCONNECTOR I PROJECT [N18000066]PGCIL,Multi State

02/2009

11,130.19
-

11,130.19

3,596.20

08/2013
-

09/2014

13(O)

0/0

185 NORTHERN REGION SYSTEM


STRENGHTENING SCHEME-XIII [N18000054]PGCIL,Multi State

02/2009

317.69
-

317.69

122.40

11/2011
11/2011

06/2012

7(R3)

0/0

186 NORTHERN REGION SYSTEM


STRENGHTENING SCHEME-XIX [N18000056]PGCIL,Multi State

02/2009

410.29
-

410.29

145.30

02/2012
-

12/2012

10(O)

0/0

32

Delay
w.r.t.
Original
/Revise
Milestones
Cumm.
d
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
6

10

0/18

Sector Wise Details

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original
/Revise
Milestones
Cumm.
d
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
7

187 NORTHERN REGION SYSTEM


STRENGHTENING SCHEME-XV [N18000052]PGCIL,Multi State

02/2009

520.48
-

520.48

256.30

11/2011
-

12/2012

13(O)

0/0

188 NORTHERN REGION SYSTEM


STRENGHTENING SCHEME-XVII [N18000058]PGCIL,Rajasthan

02/2009

210.79
-

210.79

167.10

08/2011
-

01/2012

5(O)

0/0

189 NORTHERN REGION SYSTEM


STRENGHTENING SCHEME-XVIII [N18000053]PGCIL,Multi State

02/2009

509.66
-

509.66

306.30

11/2011
-

12/2012

13(O)

0/0

190 NORTHERN REGION SYSTEM


STRENGHTENING SCHEME-XX [N18000088]PGCIL,Multi State

10/2010

182.68
-

182.68

26.80

01/2013
-

01/2013

0(O)

0/0

191 NORTHERN REGION SYSTEM


STRENGTHENING SCHEME XVI [N18000094]PGCIL,Multi State

07/2010

752.64
-

752.64

105.90

07/2013
-

07/2013

0(O)

0/0

192 NORTHERN REGION SYSTEM


STRENGTHENING SCHEME- XXI [N18000095]PGCIL,Multi State

08/2010

1,677.57
-

1,677.57

212.40

04/2013
-

04/2013

0(O)

0/0

193 NORTHERN REGION SYSTEM


STRENGTHENING SCHEME-XXII [N18000091]PGCIL,Multi State

12/2010

209.78
-

209.78

24.70

08/2013
-

08/2013

0(O)

0/0

194 NORTHERN REGION TRANSMISSION


STRENGTHENING SCHEME [N18000083]PGCIL,Multi State

03/2010

965.58
-

965.58

306.50

11/2012
-

11/2012

0(O)

0/0

195 PARBATI H.E.P. STAGE -III (NHPC) [180100250]NHPC,Himachal Pr.

10/2005

2,304.56
-

2,716.00

1,666.39

10/2010
01/2013

01/2013

0(R3)

0/1

196 PARBATI HEP (NHPC) II [180100210]NHPC,Himachal Pr.

09/2002

3,919.59
-

5,524.00

3,461.64

09/2009
07/2014

12/2014

5(R3)

1/20

197 PARE HYDRO ELECTRIC


PROJECT(110 MW) [N18000045]NEEPCO,Arunachal Pr.

12/2008

573.99
-

573.99

280.37

08/2012
08/2013

08/2013

0(R3)

8/18

198 RAMPUR HEP(412 MW) [N18000024]SJVNL,Himachal Pr.

01/2007

2,047.03
-

2,047.03

1,493.95

01/2012
-

09/2013

20(O)

0/0

199 RIHAND STTP STAGE-III (2X500MW)


(NTPC) - [N18000073]NTPC,Uttar
Pradesh

01/2009

6,230.81
-

6,230.81

2,529.00

10/2012
-

03/2013

5(O)

6/16

200 SIMHADRI STPP STAGE -II [N18000032]NTPC,Andhra Pradesh

08/2007

5,103.39
-

5,038.83

4,354.00

05/2011
-

03/2012

10(O)

4/6

201 SIPAT STPP STAGE - I (NTPC) [180100229]NTPC,Chhatisgarh

12/2003

8,323.39
-

8,323.39

7,616.00

12/2009
-

03/2012

27(O)

50/60

202 SUBANSIRI LOWER H.E.P (NHPC) [180100221]NHPC,Arunachal Pr.

09/2003

6,285.33
-

10,667.00

5,312.61

09/2010
08/2014

12/2015

16(R3)

11/11

203 SUPPLEMENTARY TRANSMISSION


ASSOCIATED WITH VAALLUR [N18000097]PGCIL,Multi State

08/2010

170.36
-

170.36

13.10

04/2013
-

04/2013

0(O)

0/0

204 SUPPLEMENTRY TRANSMISSION


ASSOCIATED WITH DVC AND [N18000065]PGCIL,Multi State

08/2008

2,360.95
-

2,360.95

1,790.10

08/2012
-

08/2012

0(O)

0/0

205 SYSTEM STRENGHTENING -XI IN


SOUTHERN REGION [N18000067]PGCIL,Multi State

03/2009

196.10
-

196.10

114.10

07/2011
-

03/2012

8(O)

0/0

33

10

Sector Wise Details

(Jan,2012)

Date of
Commissioning

Date of
Approval

S.No Project
1

Original /
Revised
Cost
4

Anticipated
Cost

206 SYSTEM STRENGTHENING IN


NORTH/WEST PART OF WR FOR IPP
PROJEC [N18000116]PGCIL,Chhatisgarh

12/2011

1,746.65
-

1,746.65

08/2014
-

08/2014

0(O)

0/0

207 SYSTEM STRENTHENING IN RAIPURWARDHA CORRIDOR FOR IPP


PROJEC [N18000117]PGCIL,Chhatisgarh

01/2012

1,422.85
-

1,422.85

01/2015
-

01/2015

0(O)

0/0

208 SYTEM STRENGTHENING OF


SOUTHERN REGION - XIV [N18000115]PGCIL,Multi State

12/2011

297.33
-

297.33

08/2014
-

209 SYTEM STRENGTHENING XIII OF SR


GRID - [N18000109]PGCIL,Multi State

10/2011

487.49
-

487.49

06/2014
-

06/2014

0(O)

0/0

210 System Strengthening -X of SR [N18000086]PGCIL,Multi State

12/2009

276.61
-

276.61

129.50

04/2012
-

04/2012

0(O)

0/0

211 System Strengthening -XII of SR [N18000085]PGCIL,Multi State

02/2010

232.34
-

232.34

46.08

06/2012
-

06/2012

0(O)

0/0

212 System Strengthening in NR for SASAN


& MUNDRA (UMPP) [N18000081]PGCIL,Multi State

12/2009

1,216.83
-

1,216.83

583.30

08/2012
-

08/2012

0(O)

0/0

213 TAPOVAN-VISHNUGAD HEP


(4x130MW) (NTPC) [N18000014]NTPC,Uttaranchal

11/2006

2,978.48
-

2,978.48

1,307.00

03/2013
-

06/2014

15(O)

2/13

214 TEESTA LOW DAM HEP, STAGE-IV


(NHPC) - [180100243]NHPC,West
Bengal

09/2005

1,061.38
-

1,501.75

1,072.97

09/2009
06/2013

06/2013

0(R3)

0/0

215 TEESTA LOW DAM STAGE III


HYDROELECTRIC POWER PROJE [180100222]NHPC,West Bengal

10/2003

768.92
-

1,628.39

1,419.95

03/2007
09/2012

09/2012

0(R3)

25/25

216 TEHRI PUMPED STORAGE


PLANT(1000MW) [N18000010]THDCL,Uttar Pradesh

07/2006

1,657.00
2,978.86

2,978.86

285.17

07/2010
02/2016

02/2016

0(R3)

0/10

217 TR SYSTEM FOR ESTABLISHMENT


OF 400/220 KV GIS SUBSTATION AT [N18000118]PGCIL,Gujarat

01/2012

259.28
-

259.28

01/2013
-

01/2013

0(O)

0/0

218 TR SYSTEM FOR ESTABLISHMENT


OF 400/220 KV GIS SUBSTATION AT [N18000108]PGCIL,Madhya pradesh

07/2011

181.93
-

181.93

07/2013
-

07/2013

0(O)

0/0

219 TR SYSTEM FOR PHASE-I


GENERATION PROJECTS IN
JHARKHAND AND W [N18000113]PGCIL,Multi State

12/2011

2,422.66
-

2,422.66

08/2014
-

08/2014

0(O)

0/0

220 TR. SYSTEM ASSOCIATED WITH


CHAMERA III HEP [N18000064]PGCIL,Multi State

04/2008

297.37
297.91

297.91

307.83

07/2011
-

06/2012

11(O)

0/0

221 TR. SYSTEM ASSOCIATED WITH


MUNDRA ULTRA MEGA POWER
PROJECT - [N18000061]PGCIL,Multi
State

10/2008

4,824.12
-

4,824.12

2,371.70

10/2012
-

10/2012

0(O)

0/0

222 TR. SYSTEM ASSOCIATED WITH


TUTICORIN JV TPS [N18000062]PGCIL,Multi State

02/2009

353.57
-

353.57

219.00

07/2010
02/2012

01/2012

-1(R3)

0/0

34

Delay
w.r.t.
Original
/Revise
Milestones
Cumm.
d
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
6

10

0/0

Sector Wise Details

(Jan,2012)

Date of
Commissioning

Date of
Approval

S.No Project
1

Original /
Revised
Cost
4

Anticipated
Cost

223 TRANS SYSTEM FOR DEVELOPMENT


OF POOLING STN IN NR [N18000077]PGCIL,West Bengal

04/2010

4,404.57
-

4,404.57

01/2015
-

01/2015

0(O)

0/0

224 TRANS SYSTEM FOR PHASE-I GEN


PROJECT IN ORISSA-C [N18000096]PGCIL,Multi State

03/2011

2,569.25
-

2,569.25

154.30

03/2014
-

03/2014

0(O)

0/0

225 TRANSMISSION SY. ASSOCIATED


WITH BARH GENER. PROJECT(P.GR.)
- [180100260]PGCIL,Bihar

12/2005

3,779.46
4,282.59

4,282.59

3,648.00

09/2009
-

06/2012

33(O)

11/30

226 TRANSMISSION SYSTEM


ASSOCIATED WITH KRISHNAPATNAM
- [N18000090]PGCIL,Andhra Pradesh

12/2010

779.21
-

779.21

192.40

08/2013
-

08/2013

0(O)

0/0

227 TRANSMISSION SYSTEM


ASSOCIATED WITH PARBATI-III HEP [N18000018]PGCIL,Himachal Pr.

07/2006

557.24
-

557.24

518.50

01/2010
-

06/2012

29(O)

0/22

228 TRANSMISSION SYSTEM


ASSOCIATED WITH RAMPUR HEP [N18000063]PGCIL,Multi State

02/2009

184.19
-

184.19

139.70

11/2011
-

09/2013

22(O)

0/0

229 TRANSMISSION SYSTEM


ASSOCIATED WITH SASAN ULTRA
ME - [N18000046]PGCIL,Multi State

12/2008

7,031.88
-

7,031.88

2,953.70

12/2012
-

12/2012

0(O)

0/0

230 TRANSMISSION SYSTEM FOR


CONNECTIVITY OF ESSAR POWER
GUJARAT - [N18000114]PGCIL,Gujarat

12/2011

552.44
-

552.44

02/2014
-

02/2014

0(O)

0/0

231 TRANSMISSION SYSTEM FOR


CONNECTIVITY OF MB POWER
LIMITED - [N18000106]PGCIL,Madhya
pradesh

08/2011

425.51
-

425.51

10/2013
-

10/2013

0(O)

0/0

232 TRANSMISSION SYSTEM FOR


ESTABLISHMENT OF 400/220 K [N18000102]PGCIL,Maharashtra

07/2011

181.93
-

181.93

07/2013
-

07/2013

0(O)

0/0

233 TRANSMISSION SYSTEM FOR IPP


GENERATION PROJECTS IN MP AND
CH - [N18000105]PGCIL,Multi State

09/2011

1,366.34
-

1,366.34

12/2013
-

12/2013

0(O)

0/0

234 TRANSMISSION SYSTEM FOR


PHASE-1 GENERATION PROJECTS IN
JHARK [N18000104]PGCIL,Jharkhandd

10/2011

558.26
-

558.26

11/2013
-

11/2013

0(O)

0/0

235 TRANSMISSION SYSTEM FOR


PHASE-I GEN PROJECT IN ORI [N18000087]PGCIL,Orissa

09/2010

2,074.86
-

2,074.86

290.30

03/2013
-

03/2013

0(O)

0/0

236 TRANSMISSION SYSTEM FOR


PHASE-I GEN. PROJECT IN OR [N18000093]PGCIL,Orissa

12/2010

2,743.19
-

2,743.19

258.30

12/2013
-

12/2013

0(O)

0/0

237 TRANSMISSION SYSTEM OF


VINDHYACHAL-IV AND RIHAND-I [N18000076]PGCIL,Multi State

03/2010

4,672.99
-

4,672.99

635.40

11/2012
-

11/2012

0(O)

0/0

238 TRIPURA GAS BASED POWER


PROJECT - [N18000071]NEEPCO,

07/2009

421.01
623.44

623.44

95.88

07/2013

07/2013

0(R3)

0/30

239 TUIRIAL HYDRO ELECTRIC PROJECT


(60MW) [N18000119]NEEPCO,Mizoram

01/2011

913.63
-

913.63

295.47

01/2014
-

01/2014

0(O)

0/0

35

Delay
w.r.t.
Original
/Revise
Milestones
Cumm.
d
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
6

10

Sector Wise Details

(Jan,2012)

Date of
Commissioning

Date of
Approval

S.No Project
1

Original /
Revised
Cost

240 Trans. System associated with


PALLATANA GBPP & BPT [N18000080]PGCIL,Multi State

02/2010

2,144.00
-

2,144.00

547.40

12/2012
-

06/2013

6(O)

0/0

241 Transmission system for transfer of


power from Gen-PART B [N18000099]PGCIL,Multi State

03/2011

1,585.12
-

1,585.12

117.20

11/2013
-

11/2013

0(O)

0/0

242 Transmission system for transfer of


power from Gen. [N18000098]PGCIL,Multi State

05/2010

250.03
-

250.03

34.50

01/2013
-

01/2013

0(O)

0/0

243 URI H.E.P STAGE -II (NHPC) [180100251]NHPC,J and K

08/2005

1,729.29
-

1,794.00

1,653.86

11/2009
02/2013

06/2012

-8(R3)

0/4

244 VINDHYACHAL STTP STAGE-IV


(NTPC) - [N18000072]NTPC,Madhya
pradesh

01/2009

5,915.00
-

5,915.00

2,741.00

10/2012
-

03/2013

5(O)

4/15

245 VISHNUGAD PIPALKOTI HYDRO


ELECTRIC PROJECT [N18000042]THDCL,Uttaranchal

08/2008

2,491.58
2,491.58

3,422.44

238.12

07/2014
-

09/2016

26(O)

4/7

246 WESTERN REGION STRENGHTENING


SCHEME-X - [N18000049]PGCIL,Multi
State

02/2009

664.96
-

664.96

348.90

02/2012
-

02/2012

0(O)

0/0

247 WESTERN REGION STRENGTHENING


SCHEME-II [N18000022]PGCIL,Rajasthan

07/2006

5,221.23
-

5,221.23

3,034.30

07/2010
-

06/2012

23(O)

20/20

248 WESTERN REGION STRENGTHENING


SCHEME-V [N18000035]PGCIL,Maharashtra

12/2007

477.69
-

477.69

387.90

09/2010
-

03/2013

30(O)

0/0

249 WESTERN REGION SYSTEM


STRENGHTENING SCHEME-XI [N18000051]PGCIL,Multi State

02/2009

409.50
-

409.50

95.60

02/2012
02/2012

03/2012

1(R3)

0/0

197,932.45
-

213,231.64

100,092.26

Total

Anticipated
Cost
5

Delay
w.r.t.
Original
/Revise
Milestones
Cumm.
d
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
6

10

245/580

Railways
250 AGARTALA SABROOM, NL, NEFR [N22000099]NEFR,Tripura

04/2008

813.34
-

1,141.75

294.54

03/2014
-

03/2014

251 AGRA-ETAWAH VIA FATEHABAD AND


BAH (NL) NCR - [220100243]NCR,Uttar
Pradesh

04/1999

108.00
214.09

227.42

250.82

12/2009
03/2011

0/0

252 AHMEDNAGAR-PARLI VAIJNATH(NL)


CR - [220100181]CR,Maharashtra

02/1997

353.08
462.67

1,010.00

113.98

0/0

253 ALIGARH-GAZIABAD 3RD LINE


DOUBLING (RVNL) [N22000034]RVNL,Uttar Pradesh

04/2003

230.73
399.73

399.50

317.98

03/2009
12/2008

12/2010

24(R1)

0/0

254 ALUABARI ROAD SILIGURI JUNCTION


VIA GALGALIA, NEFR [N22000082]NEFR,Multi State

12/2006

170.00
-

435.87

359.10

03/2011

03/2011

0(R3)

0/0

255 AMRAVATI-NARKHER NL(CR) [220100118]CR,Maharashtra

06/1994

120.90
284.27

548.95

485.95

06/1999
03/2011

03/2011

0(R3)

0/0

256 ANGAMALI-SABARIMALA (N.L.)(SR) [220100252]SR,Kerala

10/1998

550.00
-

1,214.00

73.75

36

0(O)

0/0

0/0

Sector Wise Details

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original
/Revise
Milestones
Cumm.
d
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
7

257 Ahmedabad-Himmatnagar-Udaipur (WR)


- [N22000121]WR,Gujarat

04/2008

394.13
-

394.14

0.49

03/2013
-

03/2013

258 BANGLORE - SATYAMANGALAM


(NL)(SWR) [220100274]SWR,Karnataka

02/1999

138.00
-

901.62

0.29

259 BANKURA - DAMODAR (GC) (SER) [220100277]SER,West Bengal

03/1998

111.90
789.10

1,173.79

414.38

03/2005
12/2008

03/2016

260 BARDHAMAN-KATWA, ER (GC) [N22000091]ER,West Bengal

04/2007

245.15
-

245.15

183.24

12/2010
03/2011

0/0

261 BELAPUR-SEAWOOD-URAN
ELECTRIF-IED DOUBLE LINE(MTP) [220100164]MRTP,Maharashtra

03/1996

401.81
495.44

1,412.17

172.18

03/2004
12/2010

0/0

262 BHAIRABI SAIRONG, NL, NEFR [N22000100]NEFR,Mizoram

04/2008

619.34
-

2,393.49

3.80

04/2014
-

03/2014

263 BHARUCH-SAMNI-DAHEJ GAUGE


CONVERSIN [N22000081]RVNL,Gujarat

09/2005

200.80
-

200.80

269.02

264 BHOPAL BINA 3D LINE DOUBLING [N22000077]RVNL,Madhya pradesh

09/2007

687.20
-

687.20

03/2010
-

12/2012

33(O)

0/0

265 BILASPUR-URKURA (DL) [220100321]RVNL,Chhatisgarh

04/1997

151.52
-

273.00

03/2009

03/2011

24(R1)

0/0

266 Bandel-Naihati new rail bridge in


replacement of j - [N22000119]ER,West
Bengal

04/1999

207.52
-

207.52

113.58

12/2012
-

12/2012

0(O)

0/0

267 Bhavnagar-workshop facilities for 50 BG


coaches PO - [N22000125]WR,Gujarat

04/2006

117.36
196.95

196.95

176.10

03/2011
-

268 Bhuj-Naliya(GC) with extension from


naliyate vayor - [N22000123]WR,Gujarat

04/2008

318.24
-

468.62

5.99

03/2012
-

03/2012

0(O)

0/0

269 CALICUT-MANGALORE (DL) (SR) [220100151]SR,Multi State

02/1996

240.00
-

579.37

597.49

02/2012

0/0

270 CHANDIGARH-LUDHIANA(NEW BG
LINE),NR - [220100241](NR),Punjab

07/1998

248.44
576.27

1,103.47

825.08

12/2012
-

12/2012

0(O)

0/0

271 CHHAPRA-SETTING UP OF WHEEL


MANUFACTURING PLANT [N22000053]WS&PU,Bihar

03/2005

470.09
1,417.97

1,417.97

944.25

03/2012

0/0

272 CHHINDWARA - NAGPUR (GC)(SECR)


- [220100324]SECR,Madhya pradesh

04/2005

383.79
-

585.93

180.24

12/2013

0/0

273 CONSTRUCTION OF NEW LINE FROM


HARMATI-ITANAGAR/NAR [N22000083]NEFR,Arunachal Pr.

09/1996

156.00
-

415.73

222.85

03/2012

0/0

274 CONV.OF 1500V DC TRACTION TO 25


KV AC,WR [220100233]RE,Maharashtra

07/1996

273.67
1,302.12

1,302.12

608.97

06/2012

0/0

275 DALLI-RAJHARA - RAOGHAT(PART


OF DALLI-RAJHARA-JAGD [220100149]RVNL,Chhatisgarh

04/1995

304.00
-

968.60

92.66

12/2012
-

0/0

276 DAUSA-GANGAPUR CITY(NL),NWR [220100184]NWR,Rajasthan

02/1997

151.84
410.08

410.08

165.07

03/2013

0/0

277 DEOGHAR - SULTANGANJ (INL), ER [220100273]ER,Multi State

04/2000

138.00
519.67

607.09

357.47

12/2012

0/0

37

10

0(O)
-

87(R1)

-1(O)
-

0/0
0/0

0/0

0/0
0/0

0/0

Sector Wise Details

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original
/Revise
Milestones
Cumm.
d
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
7

278 DINDIGUL-POLLACHI-PALGHATPOLLACHI AND COIMBATORE [N22000080]SR,Tamil Nadu

09/2006

343.17
-

900.00

475.81

279 Dakshin-barasat-lakshmikantapur (ER) [N22000116]ER,West Bengal

04/2009

259.51
-

259.51

72.61

12/2011
02/2012

02/2012

0(R3)

0/0

280 ELECTRIFICATION OF KHURJAMEERUT-SAHARANPUR & G'BA [N22000094]RE,Uttar Pradesh

02/2008

171.10
-

171.10

141.55

03/2012
-

03/2012

0(O)

0/0

281 ELECTRIFICATION OF MORADABADROZA - [N22000095]RE,Uttar Pradesh

12/2004

129.17
-

250.00

227.48

03/2011
-

03/2012

12(O)

0/0

282 EXT. OF MRTS FROM VELACHERY


TO STN. THOMAS, MTP [N22000028]MRTP,Tamil Nadu

04/2006

495.74
-

495.74

147.46

06/2013

06/2013

0(R3)

0/0

283 FREIGHT OPERATIONS


INFORMATION SYSTEM (FOIS) [220100009]FOIS,Multi State

03/1984

520.00
634.13

634.13

546.82

03/1995
-

03/2012

204(O)

0/0

284 GADWAL - RAICHUR (NL), SCR [220100270]SCR,Multi State

04/1998

92.63
228.09

270.00

242.14

02/2011

03/2012

13(R3)

0/0

285 GOELKERA-MANOHARPUR,(LD)(SER)
- [N22000045]SER,Jharkhandd

03/1997

186.92
261.70

283.10

36.90

02/2006
-

12/2013

94(O)

0/0

286 GONDA-GORAKHPUR LOOP WITH


ANAND NAGAR-NAUTANWA GC
(NER) - [220100255]NER,Uttar Pradesh

03/2002

381.17
-

863.23

464.52

0/0

287 GONDIA-JABALPUR(GC),(SECR) [220100186]SECR,Multi State

02/1997

386.30
-

1,038.00

570.21

03/1998
-

0/0

288 GULBARGA-BIDAR,SCR(NL) [220100254]SCR,Karnataka

02/1998

242.42
369.70

776.00

303.09

05/2009

0/0

289 GUNA-ETAWAH(NCR), NL [220100007]NCR,Multi State

04/1985

158.77
432.46

540.96

558.07

03/1994
-

12/2011

213(O)

0/0

290 Ghutiasharif-Canning (ER) [N22000117]ER,West Bengal

04/2009

189.97
-

189.97

78.02

12/2011
11/2013

11/2013

0(R3)

0/0

291 HAJIPUR-SUGAULI VIA VAISHALI (NL),


ECR - [220100303]ECR,Bihar

04/2003

324.66
528.65

324.66

172.64

03/2015

292 HARIDASPUR-PARADEEP(NL) [220100285]RVNL,Orissa

04/1996

301.64
-

735.10

205.80

09/2009

12/2011

293 HARNOUT -SET.UP OF W/S TO UND.


POH OF UP TO50 COAC [N22000052]WS&PU,Bihar

04/2003

98.74
224.51

337.30

197.98

03/2012

0/0

294 HASSAN-BANGALORE VIA


SHRAVANA-BELGOLA(NL),SWR [220100183]SWR,Karnataka

02/1997

295.00
412.91

944.55

483.14

0/0

295 HATHUA-BHATNI (N L) (NER) [220100319]NER,Multi State

04/2005

230.03
-

230.03

136.38

0/0

296 HOWRAH-AMTA-CHAMPADANGA NL
(SER) - [220100208]SER,West Bengal

04/1974

31.42
393.46

499.16

153.40

03/2007
03/2007

03/2014

297 HUBLI-ANKOLA(NL),SWR [220100193]SWR,Karnataka

04/1995

227.00
-

997.58

69.17

298 Himmatnagar - Udaipur Gauge


Canvession (NWR) [N22000112]NWR,Rajasthan

04/2008

829.74
-

829.74

1.91

03/2015
-

03/2015

38

10
-

27(R1)

84(R1)
0(O)

0/0

0/0
0/0

0/0
0/0
0/0

Sector Wise Details

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original
/Revise
Milestones
Cumm.
d
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
7

299 JALANDHAR-PATHANKOT-JAMMUTAWI (LD),NR - [220100258](NR),Multi


State

03/2002

409.00
625.30

847.76

823.54

06/2007
-

300 JAYNAGAR-DARBHANGA-NARKATIA
GANJ(GC),ECR [220100240]ECR,Bihar

04/1997

233.00
501.69

903.56

584.97

03/2012

03/2012

0(R3)

0/0

301 JIND-SONEPAT (NL),NR [220100280](NR),Haryana

01/2004

190.81
238.56

500.00

349.46

03/2012

12/2012

9(R3)

0/0

302 JIRIBAM TO IMPHAL


(TUPUI)(NL)(NEFR) [220100288]NEFR,Manipur

04/2003

727.56
-

3,056.85

592.92

03/2011
03/2014

03/2016

24(R3)

0/0

303 Jaipur - Ringus - Churu and Sikar Loharu Guage C [N22000113]NWR,Rajasthan

04/2008

653.19
-

653.19

54.36

03/2014
-

03/2014

0(O)

0/0

304 KADUR-CHIKMAGALURSAKLESHPUR (NL),(SWR) [220100190]SWR,Karnataka

04/1996

157.00
262.82

262.82

212.77

03/2012

03/2012

0(R3)

0/0

305 KANPUR-KASGANJMATHURA(GC),NER [220100197]NER,Uttar Pradesh

03/1997

395.00
1,062.36

1,577.46

1,214.15

02/2012

0/0

306 KAPTANGANJ-THAWE-SIWANCHHAPRA GC (NER) [220100256]NER,Multi State

04/1999

323.40
-

522.56

465.29

1/1

307 KARUR-SALEM(NL),SR [220100191]SR,Tamil Nadu

02/1997

155.55
229.88

712.00

666.27

0/0

308 KATIHAR - JOGBANI (GC)(NEFR) [220100247]NEFR,Bihar

09/2001

100.00
492.98

1,015.84

724.29

12/2010

03/2015

309 KHAGARIA-KUSHESHWAR ASTHAN


(NL) (ECR) - [220100257]ECR,Bihar

04/1997

78.23
162.87

162.87

88.18

310 KHURDA ROAD - BARANG 3RD LINE


(DL) (ECOR) - [220100327]RVNL,Orissa

04/2000

133.41
207.00

225.00

200.91

03/2009

04/2013

311 KHURDA ROAD-BOLANGIR(NL)ECOR


- [220100284]ECOR,Orissa

04/1994

355.38
470.21

1,100.00

184.37

03/2012

0/0

312 KISHANGANJ JALALGARH, NL, NEFR


- [N22000101]NEFR,Bihar

04/2008

282.92
-

359.86

1.23

03/2015

0/0

313 KODERMA GIRIDH (NL), ECR [220100306]ECR,Jharkhandd

04/1996

371.36
-

452.35

385.73

0/0

314 KODERMA-RANCHI VIA BARKAKANA


(NL),ECR [220100222]ECR,Jharkhandd

03/1999

491.19
1,099.20

1,099.20

1,177.98

07/2005
-

0/0

315 KODERMA-TILAIYA (NL), ECR [220100305]ECR,Jharkhandd

04/2002

459.91
418.17

418.17

81.36

0/0

316 KOSI BRIDGE (NL), ECR [220100304]ECR,Bihar

04/2002

323.41
-

341.41

248.07

03/2012

12/2012

317 KOTLPALLI-NARASAPUR (NL) (SCR) [220100265]SCR,Andhra Pradesh

12/2001

330.00
-

695.00

9.41

0/0

318 KOTTUR-HARIHAR(NL),(SWR) [220100212]SWR,Karnataka

04/1995

65.94
302.23

302.23

331.25

03/2011

0/0

319 Katakhal to Bhairabi [N22000126]NEFR,Assam

04/1998

227.90
-

222.92

85.29

12/2012
-

03/2014

39

10
-

51(R3)
49(R1)

9(R3)

15(O)

0/0

0/0
0/0
0/0

0/0

0/0

Sector Wise Details

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original
/Revise
Milestones
Cumm.
d
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
7

320 LALITPUR-SATNA-REWA-SINGRULI
NL, (NCR) - [220100232]NCR,Multi
State

09/1998

925.00
-

925.00

504.78

05/2008
03/2011

321 LANJHIGARH-JUNAGARH NL(ECOR) [220100148]ECOR,Orissa

04/1993

100.00
142.98

227.94

190.98

03/2002
-

03/2012

120(O)

0/0

322 Lumding-SILCHAR Jiribam, BadarpurBaraigram Kumarg [N22000127]NEFR,Assam

04/1996

1,676.31
-

4,027.93

2,903.63

03/2009
-

12/2013

57(O)

0/0

323 MACHERLA-NALGONDA(NL)(SCR) [220100220]SCR,Andhra Pradesh

07/1998

125.00
363.26

458.26

0.35

07/2008
-

0/0

324 MAHARAJGANJ-MASRAKH (NL) - NER


- [220100316]NER,Bihar

04/2003

218.19
-

218.19

143.65

0/0

325 MANDARHILL-DUMKA-RAMPURHAT
(NL),ER - [220100168]ER,Jharkhandd

04/1995

184.00
254.07

675.00

492.19

12/2011

03/2012

326 MANOHARABAD-KOTHPALL NEW


LINE(SCR) - [N22000032]SCR,Andhra
Pradesh

04/2006

378.56
671.82

791.60

0.76

327 MANSI-PURNIA (EXTENSION OF


MANSI-SAHARSA) GAN ECR [N22000002]ECR,Bihar

04/1996

114.01
332.92

427.89

367.91

03/2012

03/2012

328 MAYLADUTHURAI-THIRUVARURKARAIKUDI-THIRU 'PONDI'-A [N22000079]SR,Tamil Nadu

09/2007

404.19
-

900.00

222.13

329 MUMBAI URBAN TRANSPORT


PROJECT PHASE-I, MTP [N22000093]MRTP,Maharashtra

04/2003

3,125.20
4,174.40

4,501.80

4,228.31

06/2011

06/2011

0(R3)

1/1

330 MUMBAI URBAN TRANSPORT


PROJECT PHASE-II, MTP [N22000092]MRTP,Maharashtra

04/2008

5,300.00
-

5,300.00

397.53

03/2014
03/2015

03/2015

0(R3)

0/0

331 MUNEERABADMAHABOOBNAGAR(NL),SCR [220100205]SCR,Multi State

04/1997

218.24
377.32

537.47

99.52

03/2012

332 MUZAFFARPUR-SITAMARHI(NL),ECR
- [220100194]ECR,Bihar

04/1997

100.00
483.62

411.22

432.27

03/2012

03/2012

0(R3)

0/0

333 NANDYAL-YERRAGUNTLA(NL),SCR [220100192]SCR,Andhra Pradesh

03/1996

155.74
164.36

840.32

527.52

02/2009
-

03/2012

37(O)

0/0

334 NANGALDAM-TALWARA(NL),NR [220100188](NR),Multi State

03/1981

37.68
450.00

730.00

334.89

07/2012

07/2012

0(R3)

0/0

335 NEW B.G. LINE FROM ARARIA TO


GALGALIA (THAKURGUNG) [N22000087]NEFR,Bihar

09/2006

300.00
-

529.88

37.89

0/0

336 NEW B.G. LINE FROM TETELIA TO


BYRNIHAT (NATIONAL P [N22000086]NEFR,Assam

09/2006

200.00
-

384.04

91.54

03/2014

0/0

337 NEW MAYNAGURI TO JOGIGHOPA


VIA CHANGRABANDHA (NL), [220100266]NEFR,Multi State

04/2000

733.00
-

1,655.80

1,076.88

12/2008
-

03/2014

338 New BG line Rly line from EklakhiBalurghat includ [220100135]NEFR,West Bengal

04/1983

36.80
274.41

415.23

239.45

03/2015

40

10
-

3(R3)
-

0(R3)

63(O)

0/0

0/0
0/0

0/0

0/0

0/0

0/0

0/0

Sector Wise Details

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original
/Revise
Milestones
Cumm.
d
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
7

339 New Line from Dimapur to


Zubza(Kohima) national pr [N22000124]NEFR,Nagaland

04/2006

850.00
-

850.00

8.44

03/2015
-

03/2015

0(O)

0/0

340 New Work for Construction of Metro


railway - [N22000111]RVNL,West
Bengal

04/2010

2,619.02
-

2,619.02

71.47

03/2016
-

03/2016

0(O)

0/0

341 New Work for Construction of Metro


railway from Ba [N22000109]RVNL,West Bengal

04/2010

2,069.60
-

2,069.60

4.01

03/2014
03/2016

03/2016

0(R3)

0/0

342 New Work for Construction of Metro


railway from NS [N22000110]RVNL,West Bengal

04/2010

3,951.98
-

3,951.98

14.28

03/2016
-

03/2016

0(O)

0/0

343 New Work for Construction of Metro


railway from No [N22000108]RVNL,West Bengal

04/2010

2,397.72
-

2,397.72

8.17

03/2016
-

06/2016

3(O)

0/0

344 OBULAVARIPALLEKRISHNAPATNAM(RVNL) [N22000049]RVNL,Andhra Pradesh

07/2006

743.00
-

732.80

403.06

03/2008
06/2008

345 PALWAL-BHUTESWAR 3RD LINE


DOUBLING(NCR)(RVNL) [N22000027]RVNL,Multi State

04/2005

240.00
-

329.70

309.90

03/2009
12/2009

03/2011

15(R1)

0/0

346 PANSPURA-KHARAGPUR 3D LINE [N22000076]RVNL,West Bengal

09/2007

252.50
529.23

529.23

208.25

02/2010
-

12/2015

70(O)

0/0

347 PATNA GANGA BRIDGE (NL), ECR [220100308]ECR,Bihar

04/2001

624.47
1,389.98

1,389.98

1,134.54

10/2007
12/2012

12/2012

0(R3)

0/0

348 PEDAPALLI-KARIMNAGARNIZAMABAD NL(SCR) [220100106]SCR,Andhra Pradesh

12/1994

124.43
407.78

820.32

538.98

03/2012

0/0

349 Pandabeswar-Chinpai doubling (ER) [N22000118]ER,West Bengal

04/2004

225.68
-

225.68

133.35

12/2010

0/0

350 QUILON-TIRUNELVELI-TENKASIVIRUDHUNAGAR(SR)(GC) [220100263]SR,Multi State

03/1998

280.00
842.35

1,029.00

719.39

03/2013

0/0

351 RAICHUR-GUNTAKAL(DL)(SCR) [220100329]RVNL,Andhra Pradesh

04/2003

136.62
-

221.90

186.79

12/2007
03/2010

12/2010

9(R1)

0/0

352 RAIL-CUM-ROAD BRIDGE AT


MUNGER (NL), ECR [220100307]ECR,Bihar

04/2002

921.00
-

981.00

616.60

03/2009
12/2012

12/2012

0(R3)

0/0

353 RAIL-CUM-ROAD BRIDGE OVER


RIVER BRAHAMAPUTRA BRIDG [220100201]NEFR,Assam

09/1997

1,000.00
1,500.00

3,230.01

2,308.03

04/2008
03/2014

12/2015

21(R3)

0/0

354 RAJATGARH-BARANG(LD),ECOR [220100286]RVNL,Orissa

04/1999

166.16
-

243.40

02/2009

04/2013

50(R1)

0/0

355 RAJPIPLA-ANKELASHWAR, WR (GC) [N22000096]WR,Gujarat

04/2006

196.97
-

196.97

190.24

03/2011
-

03/2012

12(O)

0/0

356 RAMGANJMUNDI-BHOPAL (NL),WCR [220100314]WCR,Madhya pradesh

04/2001

727.13
727.13

1,225.00

215.73

357 RANCHI-LOHARDAGA(GC),SER [220100214]SER,Jharkhandd

04/1997

194.07
-

456.45

295.54

06/2004
-

12/2012

41

10

102(O)

0/0

0/0
0/0

Sector Wise Details

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

358 RANGIA-MURKONGSELEK, (GC)


ALONG WITH LINKED FINGER [220100315]NEFR,Multi State

01/2004

915.70
-

1,717.29

897.04

03/2013

0/0

359 REINGUNTA-GUNTAKAL(RE) [220100260]RVNL,Andhra Pradesh

06/2000

168.34
-

296.20

311.49

04/2003
03/2010

0/0

360 REWARI-ROHTAK (NL),NR [220100279](NR),Haryana

01/2004

149.38
330.23

476.68

509.60

02/2010
02/2011

02/2011

0(R3)

0/0

361 RUPSA-BANGRIPOSI (GC)(SER) [220100323]SER,Orissa

02/1996

57.94
604.04

639.97

176.58

03/1998
08/2005

08/2005

0(R1)

0/0

362 Ramanagram-Mysore doubling with


electrification of [N22000107]SWR,Karnataka

04/2007

482.00
482.70

482.70

254.35

03/2013
-

12/2011

-15(O)

0/0

363 Ratlam-Mhow-Khandwa-Akola (GC) [N22000120]WR,Madhya pradesh

04/2008

603.04
-

603.04

55.27

03/2012
-

03/2012

0(O)

0/0

364 SALKA ROAD -ANUPNAGAR LINE


DOUBLING [N22000075]RVNL,Chhatisgarh

09/2006

324.90
-

324.90

207.45

03/2010
-

03/2012

24(O)

0/0

365 SEVOK RANGPO, NEFR [N22000102]NEFR,Sikkim

04/2008

1,339.48
-

3,380.57

52.63

12/2015
-

12/2015

0(O)

0/0

366 SRIGANGANAGAR-SARUPSAR (GC),


NWR - [220100313]NWR,Rajasthan

04/2001

143.92
258.60

258.60

246.88

03/2011

03/2011

0(R3)

0/0

367 SUKINDA ROAD - ANGUL (NL)(ECOR)


- [220100325]RVNL,Orissa

04/1998

183.23
-

638.00

02/2015
-

368 Suratpura - Hanumangarh Sriganganagar Guage Conv [N22000114]NWR,Rajasthan

04/2008

516.23
-

516.23

149.03

03/2014
-

03/2014

0(O)

0/0

369 TALCHER-BIMALAGARH(NL)(ECOR) [220100328]ECOR,Orissa

04/2005

726.96
810.78

810.78

89.02

03/2013

0/0

370 TAMLUK DIGHA,LINE DOUBLING


(SER) - [N22000097]SER,West Bengal

03/1984

293.97
662.69

723.27

387.66

06/2005
07/2011

06/2015

47(R3)

0/0

371 TARAKESWAR - BISHNUPUR NEW BG


LINE (NL), ER - [220100272]ER,West
Bengal

04/2000

157.96
762.33

762.33

453.25

12/2009

02/2012

26(R1)

0/0

372 TIDIVANAM-NAGARI (NL) [N22000085]SR,Tamil Nadu

09/2006

456.00
582.83

582.83

93.07

0/0

373 TINDIVANAM-GINGEETIRUVANNAMALAI (NL) [N22000084]SR,Tamil Nadu

09/2006

125.00
-

227.40

33.51

0/0

374 TIRUCHIRAPPALI-NAGOREKARAIKKAL(SR)(GC) [220100262]SR,Tamil Nadu

09/1995

100.00
-

548.96

488.57

0/0

375 TOLLYGANJ-GARIA with extension to


Dum Dum-Noapara [220100268]MRTP,West Bengal

03/2000

907.69
3,176.10

3,176.10

3,225.00

12/2006
08/2010

0/0

376 Tinpahar - Sahibganj (ER) [N22000115]ER,Jharkhandd

04/2008

167.73
-

167.73

37.18

03/2012
-

03/2012

0(O)

0/0

377 UDHAMPUR-SRINAGAR-BARAMULLA
(NL),NR - [220100133](NR),J and K

03/1995

2,500.00
8,000.00

20,000.00

7,787.91

03/2001
-

12/2017

201(O)

0/0

378 UTRATIA-ZAFRABAD, NR (LINE


DOUBLING) - [N22000088](NR),Uttar
Pradesh

04/2006

325.00
-

819.40

114.15

03/2010
06/2014

06/2014

0(R3)

0/0

42

Delay
w.r.t.
Original
/Revise
Milestones
Cumm.
d
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
6

10

0/0

Sector Wise Details

(Jan,2012)

Date of
Commissioning

Date of
Approval

S.No Project
1

Original /
Revised
Cost

379 Udhna-Jalgaon with


electrification(doubling) (WR) [N22000122]WR,Gujarat

04/2008

1,389.62
-

1,389.62

218.94

03/2014
-

03/2014

380 VIRAMGAM-BHILDI(WR),GC [220100062]WR,Multi State

04/1990

155.66
356.87

356.87

152.01

03/2010

64,906.13
-

134,280.01

56,595.71

Total

Anticipated
Cost
5

Delay
w.r.t.
Original
/Revise
Milestones
Cumm.
d
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
6

10

0(O)

0/0

0/0
2/2

Road Transport & Highways


381 2 LANNING OF MOKAMA-MUNGER [N24000166]NHAI,Bihar

05/2011

351.54
-

351.54

154.70

05/2013
-

03/2014

10(O)

0/0

382 4 LANING OF NAGPUR-BETUL [N24000155]NHAI,Multi State

02/2011

2,498.76
-

2,498.76

34.56

08/2014
-

08/2014

0(O)

0/0

383 4 LANNING OF AHMEDABAD TO


GODHARA - [N24000167]NHAI,Gujarat

12/2010

1,008.50
-

1,008.50

893.30

06/2013
-

06/2013

0(O)

0/0

384 4 LANNING OF BELGUM-KHANPUR


SECTION AND 2 LANING [N24000153]NHAI,Karnataka

03/2011

359.00
-

359.00

31.09

09/2013
-

09/2013

0(O)

0/0

385 4 LANNING OF GODHARA TO


GUJARAT/MP BORDER [N24000168]NHAI,Gujarat

03/2011

785.50
-

785.50

409.10

08/2013
-

08/2013

0(O)

0/0

386 AGRA-BYPASS(NS-1/UP-1),KM 176.813.03 NH-2,3 - [N24000098]NHAI,Uttar


Pradesh

12/2003

348.16
-

465.50

135.60

09/2007
-

06/2013

69(O)

0/0

387 AGRA-SHIKOHABAD (GQ) KM.199.66KM.250.50 (NH-2) [240101173]NHAI,Uttar Pradesh

04/2000

367.49
-

367.49

453.68

03/2005
-

06/2012

87(O)

0/0

388 AMRITSAR-PATHANKOT [N24000147]NHAI,Punjab

05/2010

705.00
-

705.00

846.50

11/2012
-

06/2013

7(O)

0/0

389 ASSAM/WB BORDER TO GAIRKATTA


(WB-1) - [N24000045]NHAI,West Bengal

12/2003

221.82
-

221.82

261.00

11/2008
-

03/2012

40(O)

0/0

390 AURANG-RAIPUR, NH-6, KM.232 TO


KM.281 - [240106260]NHAI,Chhatisgarh

03/2005

190.00
-

190.00

247.30

01/2009
-

03/2012

38(O)

0/0

391 Armur to kadloor yellareddy [N24000143]NHAI,Andhra Pradesh

02/2010

390.56
-

390.56

616.00

02/2012
-

04/2012

2(O)

0/0

392 BALASORE BHADRAK (REVIVED) KM


136.5 - 199.14 NH-5 [N24000116]NHAI,Orissa

04/2000

228.70
-

228.70

182.03

02/2004
-

07/2012

101(O)

0/0

393 BELGAUM-DHARWAD(NH-4) [N24000158]NHAI,Karnataka

12/2010

480.00
-

480.00

126.40

06/2013

394 BIJNI TO ASSAM /WB.BORDER (NH31.C)(2)(NHAI) [240106293]NHAI,Assam

12/2003

237.80
-

237.80

217.70

06/2008
-

12/2012

54(O)

0/0

395 BIJNI TO ASSAM WB BORDER (NH31.C)(1)(NHAI) [240106290]NHAI,Assam

12/2003

195.00
-

195.00

182.68

06/2008
-

06/2012

48(O)

0/0

396 BIJNI TO ASSAM/WB BORDER PH.II,


KM.30.00 TO 0.00, NH-31 C [240106226]NHAI,Assam

12/2003

230.00
-

230.00

212.78

06/2005
-

12/2011

78(O)

0/0

397 BRAHMPUTRA BRIDGE,NH NO-31 [N24000063]NHAI,Assam

12/2003

217.61
-

217.61

165.80

04/2010
-

12/2012

32(O)

0/0

43

0/1

Sector Wise Details

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original
/Revise
Milestones
Cumm.
d
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
6

03/2013

179.20

02/2010
-

07/2013

41(O)

0/0

852.00

468.00

03/2013
-

03/2013

0(O)

0/0

839.00
-

839.00

08/2013

0/1

11/2010

1,585.00
-

1,585.00

565.90

05/2013
-

05/2013

0(O)

0/0

403 Chennai-Tada(Six lane) [N24000129]NHAI,Tamil Nadu

04/2009

353.37
-

353.37

225.80

10/2011
-

03/2014

29(O)

0/0

404 Chilkaluripet-Vijaywada 6 lane (km 355


to Km 434.1) [N24000132]NHAI,Andhra Pradesh

05/2009

572.30
-

572.30

580.00

10/2011
-

10/2012

12(O)

0/0

405 DAKOBA TO NAGAON (NH-36)(NHAI)


- [240106288]NHAI,Assam

12/2003

225.00
-

225.00

264.70

06/2008
-

03/2012

45(O)

0/0

406 DEEWAPUR TO UP/BIHAR BORDER


(LMNHP-9)-NH-28, KM.402-360.915 [240106244]NHAI,Bihar

12/2003

300.00
-

300.00

170.20

10/2008
-

06/2012

44(O)

0/0

407 DELHI/ HARYANA BORDER TO


ROHTAK - [N24000122]NHAI,Haryana

04/2007

486.00
-

486.00

573.30

05/2010
-

12/2012

31(O)

0/0

408 DEOLI-KOTA [N24000148]NHAI,Rajasthan

01/2011

953.00
-

593.00

256.10

07/2013
-

07/2013

0(O)

0/0

409 DEVELOPMENT OF ADIQUATE ROAD


CONNECTIVITY TO CHENN [N24000173]NHAI,Tamil Nadu

06/2011

600.00
-

600.00

75.85

06/2013
-

06/2013

0(O)

0/0

410 DEVIHALLI-HASSAN [N24000152]NHAI,

12/2010

453.00
-

453.00

166.20

05/2013

0/1

411 DHARAMTUL TO SONAPUR (AS-19) [N24000051]NHAI,Assam

12/2003

200.00
-

200.00

204.70

06/2008
-

06/2012

48(O)

0/0

412 DHARAMTUL TO SONAPUR,KM 205183 (AS-20) - [N24000049]NHAI,Assam

12/2003

160.00
-

160.00

132.10

05/2008
-

06/2012

49(O)

0/0

413 DHOLPUR - MORENA SECTION


(INCLUDING CHAMBOL BRIDGE [N24000108]NHAI,Multi State

12/2003

232.45
-

232.45

173.60

09/2010
-

12/2012

27(O)

0/0

414 Dindigul - Kumli [N24000177]NHAI,Tamil Nadu

09/2011

485.00
-

485.00

08/2013
-

08/2013

0(O)

0/0

415 END OF DURG BYPASSCHHATISGARH/MAHARASHTRA


BORDER [N24000118]NHAI,Chhatisgarh

01/2008

464.00
-

464.00

531.90

01/2011
-

03/2012

14(O)

0/0

416 FORBESGANJ TO SIMRAHI (NH57)(NHAI) - [240106294]NHAI,Bihar

12/2003

332.94
-

332.94

323.30

09/2008
-

03/2012

42(O)

0/0

417 Four Lanning from MP/Maharashtra


Border to nagpur [N24000124]NHAI,Maharashtra

04/2010

1,170.52
-

1,170.52

4.41

06/2011
-

10/2012

16(O)

0/0

398 Bijapur-Hungund Section [N24000137]NHAI,Karnataka

09/2010

748.00
-

748.00

1,214.00

399 CHAMBAL BRIDGE, NH-76 (RJ-5) [N24000068]NHAI,Rajasthan

12/2003

275.00
-

281.31

400 CHENGAPALLI TO COIMBATORE


BYPASS KM-102.035-144.740 KM [N24000144]NHAI,Tamil Nadu

09/2010

852.00
-

401 CHITRADURGA-TUMKUR(NH-4) [N24000157]NHAI,Karnataka

03/2011

402 CUDDAPAH-MYDUKUR-KURNOOL
KM-167.750-356.502 KM [N24000145]NHAI,Andhra Pradesh

44

10
-

0/3

Sector Wise Details

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original
/Revise
Milestones
Cumm.
d
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
7

418 GAGODHAR-GARAMORE(PK-IV,NH15)
KM 245 TO 281.3 AND 308 TO 254 [240106216]NHAI,Gujarat

12/2003

412.78
-

479.54

437.80

11/2007
-

02/2012

51(O)

0/0

419 GANGA BRIDGE TO RAMDEVI


CROSSING PH.II NH-25, KM.75-80.06 [240106221]NHAI,Uttar Pradesh

12/2003

155.00
-

201.66

100.30

09/2008
-

06/2012

45(O)

0/0

420 GANJAM-ICCHAPURUM,NH-5(NHAI) [N24000057]NHAI,Orissa

04/2000

263.27
-

263.27

259.07

02/2004
-

05/2012

99(O)

0/0

421 GARHMUKTESHWAR-MURADABAD
(NHAI) OTHERS KM.93-149.25, NH-24 [240106204]NHAI,Uttar Pradesh

12/2003

275.00
-

275.00

300.00

09/2007
-

06/2012

57(O)

0/0

422 GHAZIABAD-ALIGARH NH-91 [N24000170]NHAI,Uttar Pradesh

02/2011

1,141.00
-

1,141.00

483.10

08/2013
-

08/2013

0(O)

0/0

423 GORAKHPUR BYPASS, NH-28,


PHASE-II EAST-WEST CORRID [N24000085]NHAI,Uttar Pradesh

12/2003

600.24
-

600.24

742.00

10/2009
-

06/2012

32(O)

0/0

424 GUWAHATI TO NALBARI (AS-5) [N24000046]NHAI,Assam

12/2003

198.16
-

198.16

192.90

04/2008
-

12/2012

56(O)

0/0

425 GUWHATI TO NALBARI (AS-4) [N24000038]NHAI,Assam

12/2003

175.96
-

175.96

129.50

04/2008
-

12/2012

56(O)

0/0

426 GWALIOR BYPSS, NH-75,3 [N24000088]NHAI,Madhya pradesh

12/2003

300.93
-

300.93

294.60

10/2009
-

06/2012

32(O)

0/0

427 GWALIOR-JHANSI, NH-75 [N24000089]NHAI,Multi State

12/2003

604.00
-

604.00

470.10

12/2009
-

06/2012

30(O)

0/0

428 Gujarat/Maharashtra BorderSurat-Hazira


Port Section - [N24000125]NHAI,Gujarat

03/2010

1,509.10
-

1,509.10

1,098.00

09/2012
-

09/2012

0(O)

0/0

429 Gurgaon-Kotputli Km 42.70 to 54.4 Km [N24000130]NHAI,Multi State

04/2009

1,673.70
-

1,673.70

2,406.00

10/2011
-

06/2012

8(O)

0/0

430 HALDIA PORT (PORT


CONNECTIVITY) (NH-41) [240104196]NHAI,West Bengal

04/2000

273.00
-

522.00

475.60

03/2005
-

01/2012

82(O)

0/0

431 HAPUR-GARHMUKTESWAR
(OTHERS) KM.58-93, NH-24 [240106205]NHAI,Uttar Pradesh

03/2005

220.00
-

220.00

258.80

09/2007
-

06/2012

57(O)

0/0

432 HARANGAJO TO MAIBANG (AS-23),


KM.126.450 TO KM.140.700 [240106277]NHAI,Assam

12/2003

280.00
-

280.00

244.10

02/2009
-

03/2013

49(O)

0/0

433 HARANGAJO TO MAIBANG, NH-54 [N24000062]NHAI,Assam

12/2003

196.00
-

363.74

07/2009
-

04/2014

57(O)

0/0

434 HARANGAJO TO MAIBANG,km 164.08190.587 NH-54 [N24000061]NHAI,Assam

12/2003

212.00
-

386.10

09/2007
-

04/2014

79(O)

0/0

435 HARIHAR-CHITRADURGA (GQ)


KM.284-KM.207 (NH-4) [240101133]NHAI,Karnataka

04/2000

318.00
-

207.56

177.69

08/2004
-

02/2012

90(O)

0/0

436 HAVERI-HARIHAR (GQ) KM.340KM.284 (NH-4) [240101132]NHAI,Karnataka

04/2000

241.00
-

196.65

167.83

08/2004
07/2010

03/2012

20(R3)

0/0

437 Hazaribagh-Ranchi [N24000141]NHAI,Jharkhandd

08/2010

625.07
-

625.07

758.60

01/2013
-

01/2013

0(O)

0/0

45

10

Sector Wise Details

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original
/Revise
Milestones
Cumm.
d
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
6

03/2013

0/2

1,266.00

10/2012
-

10/2012

0(O)

0/0

388.00

408.50

05/2012
-

05/2012

0(O)

0/0

325.00
-

325.00

138.70

05/2013
-

05/2013

0(O)

0/0

10/2010

1,175.00
-

1,175.00

138.70

04/2013
-

04/2013

0(O)

0/0

443 JAMMU-UDHAMPUR KM.27.5 TO


KM.67.00 - [N24000163]NHAI,J and K

07/2010

1,813.76
-

1,813.76

07/2013
-

07/2013

0(O)

0/0

444 JHAJHARPUR TO DARBANGA (BR-7) [N24000031]NHAI,Bihar

12/2003

340.00
-

340.00

477.10

09/2008
-

03/2012

42(O)

0/0

445 JHANSI TO LALITPUR, NH-25,26 [N24000096]NHAI,Uttar Pradesh

12/2003

355.06
-

355.06

436.10

09/2009
-

02/2012

29(O)

0/0

446 Jaipur-Tonk-Deoli [N24000135]NHAI,Rajasthan

06/2010

792.06
-

792.06

838.20

12/2012
-

12/2012

0(O)

0/0

447 KOTA BYPASS,RJ-4, NH-76 (NHAI) [240106297]NHAI,Rajasthan

12/2003

275.00
-

250.39

278.50

10/2008
-

09/2012

47(O)

0/0

448 KOTWA TO DEWAPUR(10


LMNHP),NH-28 PHASE-II, KM.440 TO
KM.402 - [240106243]NHAI,Bihar

12/2003

240.00
-

240.00

285.60

10/2008
-

03/2012

41(O)

0/0

449 KUNDUPUR-SURATHKAL &


MANGLORE [N24000146]NHAI,Karnataka

09/2010

671.00
-

671.00

173.20

03/2013

0/1

450 Kishangarh-Ajmer-Beawer [N24000128]NHAI,Rajasthan

11/2009

795.00
-

795.00

892.10

05/2012
-

05/2012

0(O)

0/0

451 LAKHNAADON TO MP/MH


BORDER,KM 596.75-653 (NS1/BOT/MP-2),NH7 [N24000094]NHAI,Madhya pradesh

12/2003

407.60
-

407.60

185.50

06/2010
-

10/2012

28(O)

0/0

452 LAKHNADON TO MP/MH BORDER


(NS-1/BOT/MP-2), NH-7 [N24000095]NHAI,Madhya pradesh

12/2003

263.17
-

263.17

233.40

09/2009
-

10/2012

37(O)

0/0

453 LALITPUR TO SAGAR KM 132 TO KM


187, NH-26 (NHAI) [240106300]NHAI,Madhya pradesh

12/2003

225.00
-

225.00

257.50

10/2008
-

04/2012

42(O)

0/0

454 MAIBANG TO LUNDING (AS-24),


KM.111.000 TO KM.126.450 [240106280]NHAI,Assam

12/2003

155.04
-

280.13

65.49

11/2008
-

07/2013

56(O)

0/0

455 MAIBANG TO LUNDING (AS-25),


KM.83.400 TO KM.111.000 [240106278]NHAI,Assam

12/2003

199.81
-

385.13

38.05

04/2009
-

07/2013

51(O)

0/0

456 MAIBANG TO LUNDING (AS-26),


KM.60.500 TO KM.83.400, NH-54 [240106279]NHAI,Assam

12/2003

167.64
-

167.64

2,047.00

11/2008
-

01/2014

62(O)

0/0

457 MAIBANG TO LUNDING (AS-27),


KM.40.000 TO KM.60.500 [240106281]NHAI,Assam

12/2003

200.00
-

200.00

89.64

04/2009
-

03/2013

47(O)

0/0

438 Hungund-Surathkal and MangaloreKnt/Kerala Border [N24000138]NHAI,Karnataka

09/2010

946.00
-

946.00

863.20

439 Hyderabad-Vijaywada Km. 40 to 221.50


Km - [N24000134]NHAI,Andhra Pradesh

04/2010

1,740.00
-

1,740.00

440 Hyderabad-yadgiri N.H no-202 [N24000142]NHAI,Andhra Pradesh

08/2010

388.00
-

441 INDORE-DEWAS(NH-3) [N24000159]NHAI,Madhya pradesh

11/2010

442 Indore-Jhabua-Gujrat/MP [N24000136]NHAI,Madhya pradesh

46

10

Sector Wise Details

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original
/Revise
Milestones
Cumm.
d
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
7

458 MP/Maharashtra Border-Dhula [N24000126]NHAI,Maharashtra

12/2009

835.00
-

835.00

1,069.00

06/2012
-

06/2012

0(O)

0/0

459 MURADABAD-BAREILY [N24000154]NHAI,Uttar Pradesh

04/2010

1,267.00
-

1,267.00

1,110.00

06/2013
-

06/2013

0(O)

0/0

460 Muzafarpur - Sonbarsa [N24000174]NHAI,Bihar

05/2011

511.54
-

511.54

65.78

11/2013
-

11/2013

0(O)

0/0

461 NAGAON TO DHARAMTUL (AS-2) [N24000042]NHAI,Assam

12/2003

264.72
-

264.72

267.80

06/2008
-

06/2012

48(O)

0/0

462 NAGPUR-KONDHALI,NH-6(NHAI) [N24000055]NHAI,Maharashtra

03/2005

168.00
-

168.00

457.30

12/2008
-

06/2012

42(O)

0/0

463 NALBARI T BIJNI (AS-7) [N24000048]NHAI,Assam

12/2003

208.00
-

208.00

235.50

04/2008
-

12/2012

56(O)

0/0

464 NALBARI TO BIJNI (AS-6) [N24000047]NHAI,Assam

12/2003

225.00
-

225.00

188.90

06/2008
-

06/2012

48(O)

0/0

465 NALBARI TO BIJNI (AS-8) [N24000035]NHAI,Assam

12/2003

200.00
-

200.00

266.44

06/2008
-

06/2012

48(O)

0/0

466 NASHRI CHANANI [N24000162]NHAI,J and K

06/2010

2,159.00
-

2,159.00

06/2015
-

06/2015

0(O)

0/0

467 NEELAMANGALAR JUNCTION ON NH4 SMITH NH-48 TO DEVI [N24000103]NHAI,

03/2005

441.00
-

441.00

946.80

02/2012

0/0

468 NEW MANGALORE PORT NH-17 AND


48 - [N24000040]NHAI,Karnataka

04/2000

196.50
363.00

363.00

241.30

06/2011

03/2012

9(R3)

0/0

469 NH CONNECTIVITY TO ICTT


VALLARPADAEU NH - SH [N24000107]NHAI,Kerala

03/2005

557.00
-

557.00

930.90

02/2010
-

05/2012

27(O)

0/0

470 New 4 Lane elevated road from chennai


airport - [N24000139]NHAI,Tamil Nadu

09/2010

1,655.00
-

1,655.00

5.59

09/2013
-

09/2013

0(O)

0/0

471 ORAI TO JHANSI (UP-5),NH-25,


KM.220.0 TO KM.170.0 [240106250]NHAI,Uttar Pradesh

12/2003

340.68
-

340.68

362.10

03/2008
-

03/2012

48(O)

0/0

472 PANIPAT-ROHTAK [N24000151]NHAI,Haryana

04/2011

807.00
-

807.00

575.20

10/2014
-

10/2014

0(O)

0/0

473 PATHANKOT BHOGPUR NH-1A [N24000115]NHAI,Punjab

12/2003

229.00
-

284.00

349.30

05/2010
-

05/2012

24(O)

0/0

474 PATHANKOT- BHOGPUR, KM.26KM.70, NH-1A [240106237]NHAI,Punjab

12/2003

284.00
-

359.00

157.40

05/2008
-

08/2012

51(O)

0/0

475 PATNA-MUZZAFFARPUR [N24000165]NHAI,Bihar

08/2010

671.30
-

671.30

385.20

02/2013
-

02/2013

0(O)

0/0

476 PIMPALGAON-NASIK-GONDE, NH-3


(NHDP-PHASE-III) [N24000123]NHAI,Maharashtra

03/2005

940.00
-

940.00

1,141.00

07/2012
-

07/2012

0(O)

0/0

477 PUNE-SATARA(NH-4) [N24000156]NHAI,Maharashtra

10/2010

1,724.55
-

1,724.55

107.60

03/2013
-

03/2013

0(O)

0/0

478 Panipat-Jalandhar 6 lane(Km 96 to


387.1 km) - [N24000133]NHAI,Haryana

05/2009

1,108.00
-

2,288.00

3,196.00

11/2011
-

06/2012

7(O)

0/0

479 Pune-sholapur,pkg1 [N24000127]NHAI,Maharashtra

11/2009

1,110.00
-

1,110.00

1,802.00

05/2012
-

05/2012

0(O)

0/0

47

10

Sector Wise Details

(Jan,2012)

Date of
Commissioning

Date of
Approval

S.No Project
1

Original /
Revised
Cost
4

Anticipated
Cost

480 QUAZIGUND-BANIHAL KM.220.00 TO


KM.188.00 - [N24000161]NHAI,J and K

07/2010

1,987.00
-

1,987.00

07/2015
-

07/2015

0(O)

0/0

481 RAJMARG CHORAHA TO


LAKHNANDON,KM 297 TO KM 351,
NH-26 (NHAI) [240106304]NHAI,Madhya pradesh

12/2003

251.03
-

251.03

287.80

10/2008
-

12/2012

50(O)

0/0

482 RAJMARG CHORAHA TO


LAKHNANDON,KM 351 TO KM 405.7,
NH-26 (NHA [240106305]NHAI,Madhya pradesh

12/2003

229.91
-

229.91

235.00

10/2008
-

09/2012

47(O)

0/0

483 ROHTAK-BAWAL [N24000169]NHAI,Haryana

05/2011

650.00
-

650.00

11/2013
-

11/2013

0(O)

0/0

484 SAGAR - RAJMARG CHORAHA,KM


211 TO KM 255, NH-26 (NHAI) [240106303]NHAI,Madhya pradesh

12/2003

203.43
-

203.43

217.30

10/2008
-

12/2012

50(O)

0/0

485 SAGAR BY PASS,KM 187 TO KM 211 ,


NH-26 (NHAI) - [240106301]NHAI,Uttar
Pradesh

12/2003

151.30
-

151.30

177.00

10/2008
-

05/2012

43(O)

0/0

486 SALEM - U / UNDRUPET(BOT -1/TN06) NH -68 - [N24000102]NHAI,Tamil


Nadu

03/2005

941.00
-

941.00

1,901.00

01/2011
-

03/2012

14(O)

0/0

487 SAMAIKHIALI - GANDHIDHAM [N24000179]NHAI,Gujarat

09/2010

805.39
-

805.39

209.80

03/2013
-

03/2013

0(O)

0/0

488 SILCHAR-UDARBAND (PH.II) HN-54,


KM.309 TO KM.275 [240100207]NHAI,Assam

12/2003

157.47
-

154.57

186.00

09/2007
-

06/2012

57(O)

0/0

489 SILIGURI TO ISLAMPUR (WB-7) [N24000028]NHAI,West Bengal

12/2003

225.00
-

225.00

177.40

07/2008
-

12/2012

53(O)

0/0

490 SIX LANNING OF HOSURKRISHNAGRI NH-7 KM.33.130 TO [N24000171]NHAI,Tamil Nadu

06/2011

535.00
-

535.00

12/2013
-

12/2013

0(O)

0/0

491 SIX LANNING OF KRISHNAGIRIWALAJHAPET SECTION KM. [N24000172]NHAI,Tamil Nadu

09/2011

1,250.00
-

1,250.00

12/2013
-

12/2013

0(O)

0/0

492 SIX LANNING OF VADAKKANCHERRY


THRISSURESECTION [N24000149]NHAI,Kerala

02/2010

617.00
-

617.00

154.50

08/2012
-

10/2013

14(O)

0/0

493 SONAPUR TO GUWAHTI (AS-3) [N24000044]NHAI,Assam

12/2003

245.00
-

245.00

491.20

03/2008
-

05/2012

50(O)

0/0

494 SUNAKHALA-GANJAM (GQ) KM.338KM.284 (NH-5) [240101153]NHAI,Orissa

04/2000

225.00
-

241.53

91.40

04/2004
-

07/2012

99(O)

0/0

495 Surat- Dahisar(Six Lane) Km 263 to Km


502 - [N24000131]NHAI,Multi State

02/2009

1,693.75
-

1,693.75

2,610.00

08/2011
-

03/2012

7(O)

0/0

496 THANJAUR-TRICHY,NH-67(NHAI) [N24000056]NHAI,Tamil Nadu

03/2005

280.00
-

280.00

581.50

06/2009
-

11/2012

41(O)

0/0

497 TRICHY - KORUR NH-67 [N24000101]NHAI,Tamil Nadu

03/2005

516.00
-

516.00

691.90

07/2010
-

03/2013

32(O)

0/0

498 Talegaon-amravati [N24000140]NHAI,Maharashtra

11/2009

567.00
-

567.00

358.40

11/2013
-

11/2013

0(O)

0/0

48

Delay
w.r.t.
Original
/Revise
Milestones
Cumm.
d
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
6

10

Sector Wise Details

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original
/Revise
Milestones
Cumm.
d
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
7

499 Tirupati - Chennai [N24000178]NHAI,Tamil Nadu

04/2011

571.00
-

571.00

10/2013
-

10/2013

0(O)

0/0

500 Trichy Bypass - [N24000176]NHAI,Tamil


Nadu

05/2010

374.00
-

374.00

33.88

05/2013
-

05/2013

0(O)

0/0

501 UGRADATION OF HYDERABADBANGALORE SECTION [N24000160]NHAI,Karnataka

11/2010

680.00
-

680.00

11/2012

0/2

502 UP/BIHAR BORDER TO KASIA (NH28)(NHAI) - [240106292]NHAI,Uttar


Pradesh

12/2003

227.00
-

227.00

383.00

12/2008
-

03/2012

39(O)

0/0

503 VIJAYAPUR TO PATHANKOT (J&K)


NH-1A KM.16.35 TO KM.50.00 [240106235]NHAI,J and K

12/2003

193.09
-

166.30

184.60

03/2008
-

03/2012

48(O)

0/0

504 VIJAYAPUR TO PATHANKOT (NS35/J&K) NH-1A KM.50 TO KM.80 [240106236]NHAI,J and K

12/2003

166.27
-

193.10

155.10

03/2008
-

03/2012

48(O)

0/0

505 WADNER-DEVDHARI(NS-60/MH)(KM
94-123 KM) [N24000150]NHAI,Maharashtra

02/2011

193.45
-

193.45

29.71

11/2012
-

11/2012

0(O)

0/0

506 ZIRAKPUR(HARYANA) PARWANOO(HIMACHAL PRADESH) [N24000117]NHAI,Multi State

02/2008

295.00
-

295.00

759.90

08/2010
-

03/2012

19(O)

0/0

507 kandla - Mundra port [N24000175]NHAI,Gujarat

01/2011

953.88
-

953.88

100.80

07/2013
-

07/2013

0(O)

0/0

72,336.63
-

74,425.72

53,266.25

Total

10

0/11

Shipping & Ports


508 ACQUISITION OF 4 NO. OF ANCHOR
HANDLING CUM SUPPLY [N25000014]SHIPP.,Maharashtra

10/2007

359.44
-

359.44

358.79

04/2011
06/2011

06/2012

12(R3)

0/0

509 ACQUISITION OF 4 NOS. OF 80655


DWT PANAMAX BULK CA [N25000031]SHIPP.,Maharashtra

08/2008

1,066.91
-

968.35

315.01

09/2012
-

09/2012

0(O)

0/0

510 ACQUISITION OF 6 NOS. OF 57000


DWT HANDYMAX BULK C [N25000033]SHIPP.,Maharashtra

11/2007

1,061.96
1,077.60

1,082.06

987.34

03/2012
-

03/2012

0(O)

0/0

511 ACQUISITION OF TWO NOS OF 120


B.P (AH03TYPE) AHTS [N25000058]SHIPP.,Kerala

12/2010

241.50
-

241.50

157.81

09/2011
-

12/2011

3(O)

0/0

512 Acquisition of 4 nos of 82000 DWT


kamsavmax Bulk carriers [N25000051]SHIPP.,Maharashtra

08/2010

612.72
627.64

627.64

193.11

12/2012
-

12/2012

0(O)

0/0

513 Acquisition of Two nos. of 3060 DWT [N25000043]PORT TRUST,Maharashtra

04/2009

277.03
280.00

277.03

81.40

12/2011
08/2012

08/2012

0(R3)

0/0

514 Acquisition of two nos. of 120 B.P [N25000042]SHIPP.,Maharashtra

04/2009

290.85
305.00

305.00

86.46

06/2011
01/2012

06/2012

5(R3)

0/0

515 Acquisition of two(2) Nos. of 317000


DWT very large crude [N25000053]SHIPP.,Maharashtra

10/2010

966.46
-

994.82

189.92

02/2014
-

02/2014

0(O)

0/0

49

Sector Wise Details

(Jan,2012)

Date of
Commissioning

Date of
Approval

S.No Project
1

Original /
Revised
Cost
4

Anticipated
Cost

516 Acquistion of three(3) nos of 6500TEU


Cellular container [N25000052]SHIPP.,Maharashtra

10/2010

1,028.10
1,012.23

1,028.10

371.96

12/2013
-

12/2013

0(O)

0/0

517 C/O Berthing and Allied Facilities off


tekra near - [N25000037]PORT
TRUST,Gujarat

04/2005

882.00
-

1,060.00

0.16

02/2011
-

03/2013

25(O)

0/0

518 CONST. & DEV. OF 2 OFFSHORE


CONTAINER BERTHS & TER [N25000016]MUMBAI PORT
TRU,Maharashtra

11/2007

1,228.00
-

1,460.00

652.40

12/2010
-

09/2012

21(O)

0/0

519 CONSTRUCTION OF 13 & 14 CARGO


BERTH AT KANDLA [N25000039]PORT TRUST,Gujarat

12/2005

702.00
-

755.50

219.00

03/2011
-

03/2013

24(O)

0/0

520 DEEPENING AND WIDENING OF


MUMBAI HARBOUR CHANNEL A [N25000003]PORT TRUST,Maharashtra

10/2005

800.00
-

800.00

5.75

10/2008
-

0/0

521 DEEPENING OF CHANNEL AT


PARADIP PORT - [N25000004]PORT
TRUST,Orissa

12/2005

154.84
-

253.36

12/2007
01/2009

0/0

522 DEVELOPMENT OF COAL TERMINAL [N25000055]ENNORE PORT LTD,Tamil


Nadu

09/2006

399.13
-

399.13

08/2010
-

0/0

523 DEVELOPMENT OF IRON ORE


TERMINAL - [N25000056]ENNORE
PORT LTD,Tamil Nadu

09/2006

370.00
-

370.00

08/2010
-

0/0

524 ENNORE MANALI EXPRESS WAY,F/O


SPECIAL PURPOSE VEHI [N25000035]SHIPP.,Tamil Nadu

10/2002

150.00
600.00

600.00

67.00

03/2006
-

12/2013

93(O)

0/0

525 ESTABLISHMENT OF VESSEL


TRAFFIC SERVICES IN GULF OF
KUTCH - [250100112]SHIPP.,Gujarat

01/2002

165.00
165.00

165.00

125.00

12/2005
01/2008

10/2011

45(R3)

0/0

526 MARINE LIQUID TERMINALS [N25000054]ENNORE TANK,Tamil


Nadu

10/2004

196.25
-

196.25

06/2006
09/2011

09/2011

0(R2)

0/0

527 Mechanization of coal handling facilities


to 200 - [N25000049]PORT
TRUST,Andhra Pradesh

02/2010

444.10
-

444.10

06/2010
-

11/2012

29(O)

0/0

528 Modification & Strengthening of Existing


Berth No. 1 to 6 - [N25000050]PORT
TRUST,Gujarat

06/2010

277.00
-

277.00

0.04

03/2012
-

03/2012

0(O)

0/0

529 RAIL CONNECTIVITY TO ICTT AT


VALLARPADAM AT COCHIN PORT
TRUS - [N25000059]RVNL,Kerala

03/2007

245.67
298.17

373.22

336.25

04/2009
11/2009

02/2011

15(R3)

0/0

530 SETHUSAMUDRAM SHIP CHANNEL


PROJECT - [250100175]PORT
TRUST,Tamil Nadu

06/2005

2,427.40
-

2,427.40

821.85

10/2008
-

531 SETTING UP OF AN INTERNATIONAL


CRUISE TERMINAL AT [N25000047]PORT TRUST,Kerala

03/2008

375.00
272.50

272.50

01/2009
-

05/2013

50

Delay
w.r.t.
Original
/Revise
Milestones
Cumm.
d
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
6

10

52(O)

0/0

0/0

Sector Wise Details

(Jan,2012)

Date of
Commissioning

Date of
Approval

S.No Project
1

532 SETTING UP OF LNG


REGASIFICATION TERMINAL AT
PUTHU - [N25000048]PORT
TRUST,Kerala

3
03/2009

Total

Original /
Revised
Cost
4

Anticipated
Cost
5

Delay
w.r.t.
Original
/Revise
Milestones
Cumm.
d
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
6

3,500.00
-

3,500.00

18,221.36
-

19,237.40

4,969.25

01/2012
-

03/2012

10

2(O)

0/0

0/0

Telecommunications
533 Assam Telecom Circle, Phase-V.I, 2G &
3G - [N26000062]BSNL,Assam

06/2007

336.81
-

336.81

155.71

01/2009
-

03/2012

38(O)

0/0

534 CONVERGENT BILLING AND


CRM(MUMBAI) [N26000016]MTNL,Maharashtra

01/2006

247.00
-

247.00

75.89

02/2007
-

08/2011

54(O)

0/0

535 CONVERGENT BILLING AND CRMMTNL(DELHI) [N26000011]MTNL,Delhi

12/2005

249.00
229.41

229.41

66.20

02/2007
-

08/2011

54(O)

0/0

536 ERP implementation in BSNL on


Turnkey basis - [N26000096]BSNL,Multi
State

10/2009

384.00
-

384.00

21.80

10/2010
03/2012

07/2012

4(R3)

0/0

537 EXPANSION OF EXISTING 750K GSM


NETWORK PE NO. 992 [N26000029]BSNL,Maharashtra

06/2006

231.38
-

168.30

10/2007
-

0/0

538 Execution of telecom network


requirement of defence [N26000065]BSNL,Multi State

05/2006

1,077.00
-

1,077.00

03/2009
-

0/0

539 FTTH BO-3474 /08-09 in Mumbai [N26000078]MTNL,Maharashtra

04/2010

389.86
-

389.86

3.06

09/2011
-

09/2011

0(O)

0/0

540 GSM EQUIPMENT OF 390K LINES(2G)


AND 130K LINES(3G) [N26000041]BSNL,Punjab

02/2008

373.94
-

373.94

211.36

12/2008
-

03/2012

39(O)

0/0

541 GSM EQUIPMENT OF 700K LINES(2G)


AND 150K LINES(3G) [N26000046]BSNL,Orissa

11/2007

277.34
-

277.34

03/2009
-

02/2011

23(O)

0/0

542 GSM equipment of 1500000Lines (2G)


264700lines 3(G [N26000093]BSNL,Andhra Pradesh

01/2009

922.91
-

922.91

346.90

01/2010
-

12/2011

23(O)

0/0

543 GSM equipment of 1625000Lines (2G)


325000 lines 3( [N26000090]BSNL,Madhya pradesh

11/2009

916.70
930.60

930.60

757.02

11/2010
-

03/2012

16(O)

0/0

544 GSM equipment of 1867000Lines (2G)


383000 lines 3( [N26000089]BSNL,Gujarat

08/2008

868.00
-

868.00

362.62

08/2009
-

03/2012

31(O)

0/0

545 GSM equipment of 200000Lines (2G)


UP(West)Phase V. [N26000082]BSNL,Uttar Pradesh

10/2008

336.84
-

336.84

35.75

10/2009
-

03/2011

17(O)

0/0

546 GSM equipment of 799000Lines (2G)


101000 lines 3(G [N26000088]BSNL,Jharkhandd

03/2008

328.13
-

328.12

164.58

03/2009
-

03/2012

36(O)

0/0

547 Implementation of FTTH, the state of the


art Acces - [N26000073]BSNL,Multi
State

12/2007

152.65
-

152.65

03/2010
-

51

0/0

Sector Wise Details

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original
/Revise
Milestones
Cumm.
d
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
7

548 Implementation of FTTH, the state of the


art access ,gpon eq [N26000072]BSNL,Multi State

12/2007

952.88
-

952.88

03/2010
-

10/2010

7(O)

0/0

549 PROJ.III OF NIB-II OF MESSAGING


STORAGE - [260100099]BSNL,Multi
State

11/2003

250.00
-

425.51

161.31

12/2005
-

03/2012

75(O)

0/0

550 UTTARANCHAL TELECOM CIRCLE


PHASE-VI (2G & 3G) [N26000058]BSNL,Uttaranchal

01/2009

149.15
158.72

158.72

76.55

06/2009
-

12/2011

30(O)

0/0

8,443.59
-

8,559.89

2,438.75

Total

10

0/0

Urban Development
551 BANGALORE METRO RAIL PROJECT
- [N28000008]MRTP,Karnataka

05/2006

6,395.00
-

11,609.00

2,267.57

12/2011
-

12/2013

552 C/o office building for IDBI at bandra


Kurla Compl [N28000048]CPWD,Maharashtra

11/2006

114.18
173.08

173.08

04/2009
-

553 DELHI MRTS PHASE-III [N28000056]DMRC,Delhi

09/2011

35,242.00
-

35,242.00

94.33

03/2016
-

03/2016

0(O)

0/0

554 FARIDABAD EXTENSION [N28000057]DMRC,Delhi

09/2011

2,494.00
-

2,494.00

09/2014
-

09/2014

0(O)

0/0

44,245.18
-

49,518.08

2,361.90

542.90
-

1,187.00

35.49

542.90
-

1,187.00

35.49

0/0

713,744.45

834,456.40

363,343.03

763/2398

Total

24(O)
-

6/6
0/0

6/6

Water Resources
555 PAGLADIYA DAM PROJECT [300100001]MoWR,Assam
Total

Grand Total

01/2001

52

12/2007
-

12/2012

60(O)

0/0

Sector wise current status of projects on theFlash Report


Urban Development
I.Current Status:
Number of Projects
Number of Projects On Schedule
Number of Projects Delayed

4
2
1

Number of Projects Without Date Of Commissioning

II. Brief Analysis


Project Status with respect to Original
Schedule: Out of 4 projects, 2 projects
are on schedule and 1 project are
delayed .1 project do not have fixed
dates of commissioning.

III. Investment Scenario


The
Total
Original
cost
of
implementation of 4 projects when
sanctioned, was of the order of Rs.
44245.18
crore
but
this
was
subsequently revised to Rs. 49518.08
crore implying a cost overrun of 11.9%.
The expenditure incurred on these
projects till January, 2012 is Rs. 2361.9
crore, which is 4.8% of the revised cost
of the projects.

Sector wise current status of projects on theFlash Report


Telecommunications
I.Current Status:
Number of Projects

18

Number of Projects Delayed

Number of Projects Without Date Of Commissioning

11

II. Brief Analysis


Project Status with respect to Original
Schedule: Out of 18 projects, 7 projects
are delayed .11 projects do not have
fixed dates of commissioning.

III. Investment Scenario


The
Total
Original
cost
of
implementation of 18 projects when
sanctioned, was of the order of Rs.
8443.59 crore but this was subsequently
revised to Rs. 8559.89 crore implying a
cost overrun of 1.4%. The expenditure
incurred on these projects till January,
2012 is Rs. 2438.75 crore, which is
28.5% of the revised cost of the
projects.

Sector wise current status of projects on theFlash Report


Shipping & Ports
I.Current Status:
Number of Projects
Number of Projects On Schedule
Number of Projects Delayed

25
6
10

Number of Projects Without Date Of Commissioning

II. Brief Analysis


Project Status with respect to Original
Schedule: Out of 25 projects, 6 projects
are on schedule and 10 projects are
delayed .9 projects do not have fixed
dates of commissioning.

III. Investment Scenario


The
Total
Original
cost
of
implementation of 25 projects when
sanctioned, was of the order of Rs.
18221.36
crore
but
this
was
subsequently revised to Rs. 19237.4
crore implying a cost overrun of 5.6%.
The expenditure incurred on these
projects till January, 2012 is Rs. 4969.25
crore, which is 25.8% of the revised cost
of the projects.

Sector wise current status of projects on theFlash Report


Road Transport & Highways
I.Current Status:
Number of Projects
Number of Projects On Schedule
Number of Projects Delayed

127
39
78

Number of Projects Without Original Date of Commissioning


Number of Projects Without Date Of Commissioning

9
1

II. Brief Analysis


Project Status with respect to Original
Schedule: Out of 127 projects, 39
projects are on schedule and 78 projects
are delayed .1 project do not have fixed
dates of commissioning.9 projects were
sanctioned without any commissioning
date but subsequently dates of
completion were finalised.

III. Investment Scenario


The
Total
Original
cost
of
implementation of 127 projects when
sanctioned, was of the order of Rs.
72336.63
crore
but
this
was
subsequently revised to Rs. 74425.72
crore implying a cost overrun of 2.9%.
The expenditure incurred on these
projects till January, 2012 is Rs.
53266.25 crore, which is 71.6% of the
revised cost of the projects.

Sector wise current status of projects on theFlash Report


Railways
I.Current Status:
Number of Projects
Number of Projects On Schedule
Number of Projects Delayed
Number of Projects Ahead
Number of Projects Without Original Date of Commissioning
Number of Projects Without Date Of Commissioning

II. Brief Analysis


Project Status with respect to Original
Schedule: Out of 131 projects, 1 project
are ahead of schedule, 16 projects are
on schedule and 27 projects are delayed
.54 projects do not have fixed dates of
commissioning.33
projects
were
sanctioned without any commissioning
date but subsequently dates of
completion were finalised.

III. Investment Scenario


The
Total
Original
cost
of
implementation of 131 projects when
sanctioned, was of the order of Rs.
64906.13
crore
but
this
was
subsequently revised to Rs. 134280.01
crore implying a cost overrun of
106.9%. The expenditure incurred on
these projects till January, 2012 is Rs.
56595.71 crore, which is 42.1% of the
revised cost of the projects.

131
16
27
1
33
54

Sector wise current status of projects on theFlash Report


Power
I.Current Status:
Number of Projects
Number of Projects On Schedule
Number of Projects Delayed
Number of Projects Ahead
Number of Projects Without Original Date of Commissioning
Number of Projects Without Date Of Commissioning

II. Brief Analysis


Project Status with respect to Original
Schedule: Out of 96 projects, 2 projects
are ahead of schedule, 44 projects are
on schedule and 47 projects are delayed
.2 projects do not have fixed dates of
commissioning.1 project were sanctioned
without any commissioning date but
subsequently dates of completion were
finalised.

III. Investment Scenario


The
Total
Original
cost
of
implementation of 96 projects when
sanctioned, was of the order of Rs.
197932.45
crore
but
this
was
subsequently revised to Rs. 213231.64
crore implying a cost overrun of 7.7%.
The expenditure incurred on these
projects till January, 2012 is Rs.
100092.26 crore, which is 46.9% of the
revised cost of the projects.

96
44
47
2
1
2

Sector wise current status of projects on theFlash Report


Petroleum
I.Current Status:
Number of Projects
Number of Projects On Schedule
Number of Projects Delayed
Number of Projects Ahead
Number of Projects Without Original Date of Commissioning
Number of Projects Without Date Of Commissioning

II. Brief Analysis


Project Status with respect to Original
Schedule: Out of 69 projects, 2 projects
are ahead of schedule, 22 projects are
on schedule and 31 projects are delayed
.6 projects do not have fixed dates of
commissioning.8
projects
were
sanctioned without any commissioning
date but subsequently dates of
completion were finalised.

III. Investment Scenario


The
Total
Original
cost
of
implementation of 69 projects when
sanctioned, was of the order of Rs.
149804.77
crore
but
this
was
subsequently revised to Rs. 158021.15
crore implying a cost overrun of 5.5%.
The expenditure incurred on these
projects till January, 2012 is Rs.
63543.52 crore, which is 40.2% of the
revised cost of the projects.

69
22
31
2
8
6

Sector wise current status of projects on theFlash Report


Steel
I.Current Status:
Number of Projects
Number of Projects On Schedule
Number of Projects Delayed

16
5
5

Number of Projects Without Original Date of Commissioning

II. Brief Analysis


Project Status with respect to Original
Schedule: Out of 16 projects, 5 projects
are on schedule and 5 projects are
delayed .6 projects were sanctioned
without any commissioning date but
subsequently dates of completion were
finalised.

III. Investment Scenario


The
Total
Original
cost
of
implementation of 16 projects when
sanctioned, was of the order of Rs.
65244.82
crore
but
this
was
subsequently revised to Rs. 71412.36
crore implying a cost overrun of 9.5%.
The expenditure incurred on these
projects till January, 2012 is Rs.
37141.48 crore, which is 52% of the
revised cost of the projects.

Sector wise current status of projects on theFlash Report


Fertilisers
I.Current Status:
Number of Projects
Number of Projects On Schedule
Number of Projects Delayed

6
2
2

Number of Projects Without Original Date of Commissioning

II. Brief Analysis


Project Status with respect to Original
Schedule: Out of 6 projects, 2 projects
are on schedule and 2 projects are
delayed .2 projects were sanctioned
without any commissioning date but
subsequently dates of completion were
finalised.

III. Investment Scenario


The
Total
Original
cost
of
implementation of 6 projects when
sanctioned, was of the order of Rs.
5317.41 crore but this was subsequently
revised to Rs. 5317.41 crore implying a
cost overrun of 0%. The expenditure
incurred on these projects till January,
2012 is Rs. 1579.12 crore, which is
29.7% of the revised cost of the
projects.

Sector wise current status of projects on theFlash Report


Coal
I.Current Status:
Number of Projects
Number of Projects On Schedule
Number of Projects Delayed

51
21
17

Number of Projects Without Original Date of Commissioning


Number of Projects Without Date Of Commissioning

12
1

II. Brief Analysis


Project Status with respect to Original
Schedule: Out of 51 projects, 21 projects
are on schedule and 17 projects are
delayed .1 project do not have fixed
dates of commissioning.12 projects were
sanctioned without any commissioning
date but subsequently dates of
completion were finalised.

III. Investment Scenario


The
Total
Original
cost
of
implementation of 51 projects when
sanctioned, was of the order of Rs.
34718.73
crore
but
this
was
subsequently revised to Rs. 38348.38
crore implying a cost overrun of 10.5%.
The expenditure incurred on these
projects till January, 2012 is Rs.
12730.25 crore, which is 33.2% of the
revised cost of the projects.

Sector wise current status of projects on theFlash Report


Civil Aviation
I.Current Status:
Number of Projects
Number of Projects On Schedule
Number of Projects Delayed

II. Brief Analysis


Project Status with respect to Original
Schedule: Out of 5 projects, 1 project
are on schedule and 4 projects are
delayed .

III. Investment Scenario


The
Total
Original
cost
of
implementation of 5 projects when
sanctioned, was of the order of Rs.
5021.58 crore but this was subsequently
revised to Rs. 5611.07 crore implying a
cost overrun of 11.7%. The expenditure
incurred on these projects till January,
2012 is Rs. 3908.44 crore, which is
69.7% of the revised cost of the
projects.

5
1
4

Sector wise current status of projects on theFlash Report


Atomic Energy
I.Current Status:
Number of Projects

Number of Projects Delayed

Number of Projects Without Original Date of Commissioning

II. Brief Analysis


Project Status with respect to Original
Schedule: Out of 5 projects, 3 projects
are delayed .2 projects were sanctioned
without any commissioning date but
subsequently dates of completion were
finalised.

III. Investment Scenario


The
Total
Original
cost
of
implementation of 5 projects when
sanctioned, was of the order of Rs.
41548.29
crore
but
this
was
subsequently revised to Rs. 46386.29
crore implying a cost overrun of 11.6%.
The expenditure incurred on these
projects till January, 2012 is Rs.
20880.52 crore, which is 45% of the
revised cost of the projects.

ANNEXURES

CENTRAL SECTOR PROJECTS


SN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

STATE_NAME
Andhra Pradesh
Arunachal Pr.
Assam
Bihar
Chhatisgarh
Delhi
Goa
Gujarat
Haryana
Himachal Pr.
J and K
Jharkhandd
Karnataka
Kerala
Madhya pradesh
Maharashtra
Manipur
Mizoram
Multi State
Nagaland
Orissa
Punjab
Rajasthan
Sikkim
Tamil Nadu
Tripura
Uttar Pradesh
Uttaranchal
West Bengal
TOTAL

NO OF
PROJECTS
33
4
37
26
25
3
1
27
10
6
10
22
25
7
24
51
1
2
97
1
26
7
15
2
35
3
24
6
25
555

COST
COST
CUMMULATIVE
ORIGINAL
ANTICIPATED EXPENDITURE
32855.21
39238.54
23105.33
9512.22
14153.62
7531.68
23895.78
35508.80
22346.93
27578.91
32829.32
21877.17
55916.77
59148.12
24461.79
37985.00
37965.41
160.53
335.61
335.61
68.61
32375.09
32903.33
6497.71
5795.35
7611.84
5771.68
14761.20
17455.42
12951.78
14019.35
33604.41
12336.07
14396.48
15999.88
6810.64
30657.64
39102.46
17091.13
6086.17
6775.22
1653.21
17335.55
17581.76
6928.92
68705.33
82228.73
42174.50
727.56
3056.85
592.92
1532.97
3307.12
299.27
125418.36
130674.34
47095.44
850.00
850.00
8.44
42465.41
45636.40
16748.62
4613.20
5598.23
3138.01
25357.18
26106.33
8837.47
1648.94
3690.03
223.45
52241.33
60526.40
35051.24
1522.39
2053.23
535.58
17544.03
21597.83
10581.75
10025.65
11948.21
4901.48
37585.77
46968.96
23561.68
713744.45
834456.40
363343.03

LIST OF PROJECTS IN WHICH EXPENDITURE MORE THEN COST

SN
1
2

PROJ_TITLE

COST
AGENCY ORIGINAL

CUMMULA
TIVE
EXPENDIT
COST
REVISED URE

SECTOR
Atomic
Energy
Coal

NPCIL
NLC

13171.00
1114.18

0.00
1626.09

14268.00
1714.72

Petroleum

HPCL

613.54

0.00

671.52

Power
Power
Power
Power
Power
Power
Power
Railways
Railways
Railways
Railways
Railways
Railways
Railways

NHPC
THDCL
NHPC
PGCIL
NHPC
NHPC
NHPC
NCR
SR
SR
ECR
(NR)
NEFR
RVNL

768.92
1301.56
1061.38
297.37
1405.63
621.26
611.01
158.77
240.00
155.55
491.19
248.44
100.00
136.62

0.00
0.00
0.00
297.91
0.00
0.00
0.00
432.46
0.00
229.88
1099.20
576.27
492.98
0.00

1419.95
2574.64
1072.97
307.83
1724.30
718.76
704.32
558.07
597.49
666.27
1177.98
825.08
724.29
186.79

Railways

NEFR

733.00

0.00

1076.88

18

KUDANKULAM APP (NPCIL)


BARSINGSAR TPS (2 125MW) (NLC)
Integrated Sugar, Ethanol, Cogen Power Plant at Sugauli
and Lauriya
TEESTA LOW DAM STAGE III HYDROELECTRIC
POWER PROJECT (NHPC)
KOTESHWAR HEP(THDC)
TEESTA LOW DAM HEP, STAGE-IV (NHPC)
TR. SYSTEM ASSOCIATED WITH CHAMERA III HEP
CHAMERA,STAGE-III (NHPC)
CHUTAK HYDRO-ELECTRIC PROJECT
NIMOO BAZGO HYDROELECTRIC PROJECT
GUNA-ETAWAH(NCR), NL
CALICUT-MANGALORE (DL) (SR)
KARUR-SALEM(NL),SR
KODERMA-RANCHI VIA BARKAKANA (NL),ECR
CHANDIGARH-LUDHIANA(NEW BG LINE),NR
KATIHAR - JOGBANI (GC)(NEFR)
RAICHUR-GUNTAKAL(DL)(SCR)
NEW MAYNAGURI TO JOGIGHOPA VIA
CHANGRABANDHA (NL),NEFR

19

AGRA-ETAWAH VIA FATEHABAD AND BAH (NL) NCR

Railways

NCR

108.00

214.09

250.82

20

JAYNAGAR-DARBHANGA-NARKATIA GANJ(GC),ECR
RAIL-CUM-ROAD BRIDGE OVER RIVER
BRAHAMAPUTRA BRIDGE AT BOGIBEEL AND LINK
LINES,NEFR
MANDARHILL-DUMKA-RAMPURHAT (NL),ER
KODERMA GIRIDH (NL), ECR
LANJHIGARH-JUNAGARH NL(ECOR)

Railways

ECR

233.00

501.69

584.97

Railways
Railways
Railways
Railways

NEFR
ER
ECR
ECOR

1000.00
184.00
371.36
100.00

1500.00
254.07
0.00
142.98

2308.03
492.19
385.73
190.98

MUMBAI URBAN TRANSPORT PROJECT PHASE-I, MTP


MANSI-PURNIA (EXTENSION OF MANSI-SAHARSA)
GAN ECR
BHARUCH-SAMNI-DAHEJ GAUGE CONVERSIN
RENIGUNTA-GUNTAKAL(RE)
REWARI-ROHTAK (NL),NR
JALANDHAR-PATHANKOT-JAMMU-TAWI (LD),NR
KAPTANGANJ-THAWE-SIWAN-CHHAPRA GC (NER)
KANPUR-KASGANJ-MATHURA(GC),NER
Lumding-SILCHAR Jiribam, Badarpur-Baraigram
Kumarghat national project
CONSTRUCTION OF NEW LINE FROM HARMATIITANAGAR/NARHARIAGUN, NEFR
ALUABARI ROAD SILIGURI JUNCTION VIA GALGALIA,
NEFR
AMRAVATI-NARKHER NL(CR)
PEDAPALLI-KARIMNAGAR-NIZAMABAD NL(SCR)
TIRUCHIRAPPALI-NAGORE-KARAIKKAL(SR)(GC)
HASSAN-BANGALORE VIA SHRAVANABELGOLA(NL),SWR

Railways

MRTP

3125.20

4174.40

4228.31

Railways
Railways
Railways
Railways
Railways
Railways
Railways

ECR
RVNL
RVNL
(NR)
(NR)
NER
NER

114.01
200.80
168.34
149.38
409.00
323.40
395.00

332.92
0.00
0.00
330.23
625.30
0.00
1062.36

367.91
269.02
311.49
509.60
823.54
465.29
1214.15

Railways

NEFR

1676.31

0.00

2903.63

Railways

NEFR

156.00

0.00

222.85

Railways
Railways
Railways
Railways

NEFR
CR
SCR
SR

170.00
120.90
124.43
100.00

0.00
284.27
407.78
0.00

359.10
485.95
538.98
488.57

Railways

SWR

295.00

412.91

483.14

3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39

40
41
42
43
44
45
46
47
48
49
50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

KOTTUR-HARIHAR(NL),(SWR)
RANCHI-LOHARDAGA(GC),SER
GONDIA-JABALPUR(GC),(SECR)
NANDYAL-YERRAGUNTLA(NL),SCR
ELECTRIFICATION OF MORADABAD-ROZA
DINDIGUL-POLLACHI-PALGHAT-POLLACHI AND
COIMBATORE
PALWAL-BHUTESWAR 3RD LINE
DOUBLING(NCR)(RVNL)
GONDA-GORAKHPUR LOOP WITH ANAND NAGARNAUTANWA GC (NER)
TOLLYGANJ-GARIA with extension to Dum Dum-Noapara
and Noapara-NSCB Airport(MTP)
GADWAL - RAICHUR (NL), SCR
JIND-SONEPAT (NL),NR

Railways
Railways
Railways
Railways
Railways

SWR
SER
SECR
SCR
RE

65.94
194.07
386.30
155.74
129.17

302.23
0.00
0.00
164.36
0.00

331.25
295.54
570.21
527.52
227.48

Railways

SR

343.17

0.00

475.81

Railways

RVNL

240.00

0.00

309.90

Railways

NER

381.17

0.00

464.52

MRTP
SCR
(NR)

907.69
92.63
190.81

3176.10
228.09
238.56

3225.00
242.14
349.46

NHAI

412.78

0.00

437.80

NHAI

229.00

0.00

349.30

NHAI

441.00

0.00

946.80

NHAI

748.00

0.00

1214.00

NHAI

792.06

0.00

838.20

NHAI

705.00

0.00

846.50

NHAI

1110.00

0.00

1802.00

NHAI

940.00

0.00

1141.00

NHAI

835.00

0.00

1069.00

NHAI

625.07

0.00

758.60

NHAI

295.00

0.00

759.90

NHAI

190.00

0.00

247.30

NHAI

464.00

0.00

531.90

NHAI

557.00

0.00

930.90

Railways
Railways
Railways
Road
GAGODHAR-GARAMORE(PK-IV,NH15) KM 245 TO
Transport &
281.3 AND 308 TO 254
Highways
Road
Transport &
PATHANKOT BHOGPUR NH-1A
Highways
Road
NEELAMANGALAR JUNCTION ON NH-4 SMITH NH-48 Transport &
TO DEVIHALLI
Highways
Road
Transport &
Bijapur-Hungund Section
Highways
Road
Transport &
Jaipur-Tonk-Deoli
Highways
Road
Transport &
AMRITSAR-PATHANKOT
Highways
Road
Transport &
Pune-sholapur,pkg1
Highways
Road
Transport &
PIMPALGAON-NASIK-GONDE, NH-3 (NHDP-PHASE-III) Highways
Road
Transport &
MP/Maharashtra Border-Dhula
Highways
Road
Transport &
Hazaribagh-Ranchi
Highways
Road
ZIRAKPUR(HARYANA) -PARWANOO(HIMACHAL
Transport &
PRADESH)
Highways
Road
Transport &
AURANG-RAIPUR, NH-6, KM.232 TO KM.281
Highways
Road
END OF DURG BYPASSTransport &
CHHATISGARH/MAHARASHTRA BORDER
Highways
Road
Transport &
NH CONNECTIVITY TO ICTT VALLARPADAEU NH - SH Highways

65

66

67

68

69

70

71

72

73

74

75

76

77

78

79

80

81

82

83

Road
Transport &
Chilkaluripet-Vijaywada 6 lane (km 355 to Km 434.15)
Highways
Road
Transport &
Surat- Dahisar(Six Lane) Km 263 to Km 502
Highways
Road
Transport &
Gurgaon-Kotputli Km 42.70 to 54.4 Km
Highways
Road
Transport &
TRICHY - KORUR NH-67
Highways
Road
Transport &
THANJAUR-TRICHY,NH-67(NHAI)
Highways
Road
Transport &
SALEM - U / UNDRUPET(BOT -1/TN-06) NH -68
Highways
Road
Transport &
Armur to kadloor yellareddy
Highways
Road
RAJMARG CHORAHA TO LAKHNANDON,KM 351 TO
Transport &
KM 405.7, NH-26 (NHA
Highways
Road
SAGAR - RAJMARG CHORAHA,KM 211 TO KM 255, NH- Transport &
26 (NHAI)
Highways
Road
Transport &
SAGAR BY PASS,KM 187 TO KM 211 , NH-26 (NHAI)
Highways
Road
Transport &
LALITPUR TO SAGAR KM 132 TO KM 187, NH-26 (NHAI) Highways
Road
Transport &
JHANSI TO LALITPUR, NH-25,26
Highways
Road
Transport &
KOTA BYPASS,RJ-4, NH-76 (NHAI)
Highways
Road
Transport &
Panipat-Jalandhar 6 lane(Km 96 to 387.1 km)
Highways
Road
Transport &
Kishangarh-Ajmer-Beawer
Highways
Road
Transport &
Hyderabad-yadgiri N.H no-202
Highways
Road
Transport &
NAGPUR-KONDHALI,NH-6(NHAI)
Highways
Road
GORAKHPUR BYPASS, NH-28, PHASE-II EAST-WEST Transport &
CORRIDOR
Highways
Road
RAJMARG CHORAHA TO LAKHNANDON,KM 297 TO
Transport &
KM 351, NH-26 (NHAI)
Highways

NHAI

572.30

0.00

580.00

NHAI

1693.75

0.00

2610.00

NHAI

1673.70

0.00

2406.00

NHAI

516.00

0.00

691.90

NHAI

280.00

0.00

581.50

NHAI

941.00

0.00

1901.00

NHAI

390.56

0.00

616.00

NHAI

229.91

0.00

235.00

NHAI

203.43

0.00

217.30

NHAI

151.30

0.00

177.00

NHAI

225.00

0.00

257.50

NHAI

355.06

0.00

436.10

NHAI

275.00

0.00

278.50

NHAI

1108.00

0.00

3196.00

NHAI

795.00

0.00

892.10

NHAI

388.00

0.00

408.50

NHAI

168.00

0.00

457.30

NHAI

600.24

0.00

742.00

NHAI

251.03

0.00

287.80

84

85

86

87

88

89

90

91

92

93

94

95

96

97

98

99

100

101
102
103

Road
Transport &
UP/BIHAR BORDER TO KASIA (NH-28)(NHAI)
Highways
Road
Transport &
DAKOBA TO NAGAON (NH-36)(NHAI)
Highways
Road
Transport &
DELHI/ HARYANA BORDER TO ROHTAK
Highways
Road
Transport &
ORAI TO JHANSI (UP-5),NH-25, KM.220.0 TO KM.170.0 Highways
Road
Transport &
JHAJHARPUR TO DARBANGA (BR-7)
Highways
Road
Transport &
ASSAM/WB BORDER TO GAIRKATTA (WB-1)
Highways
Road
Transport &
NALBARI TO BIJNI (AS-8)
Highways
Road
Transport &
NALBARI T BIJNI (AS-7)
Highways
Road
Transport &
SONAPUR TO GUWAHTI (AS-3)
Highways
Road
Transport &
DHARAMTUL TO SONAPUR (AS-19)
Highways
Road
Transport &
NAGAON TO DHARAMTUL (AS-2)
Highways
Road
GARHMUKTESHWAR-MURADABAD (NHAI) OTHERS
Transport &
KM.93-149.25, NH-24
Highways
Road
HAPUR-GARHMUKTESWAR (OTHERS) KM.58-93, NH- Transport &
24
Highways
Road
Transport &
HALDIA PORT (PORT CONNECTIVITY) (NH-41)
Highways
Road
KOTWA TO DEWAPUR(10 LMNHP),NH-28 PHASE-II,
Transport &
KM.440 TO KM.402
Highways
Road
Transport &
SILCHAR-UDARBAND (PH.II) HN-54, KM.309 TO KM.275 Highways
Road
Transport &
AGRA-SHIKOHABAD (GQ) KM.199.66-KM.250.50 (NH-2) Highways
Road
MAIBANG TO LUNDING (AS-26), KM.60.500 TO
Transport &
KM.83.400, NH-54
Highways
RAIL CONNECTIVITY TO ICTT AT VALLARPADAM AT
Shipping &
COCHIN PORT TRUST
Ports
67.5 MW TG-5 AUX. S'TEM EMERGENCY POWER
Steel
REQUIREMENT EXP. UNIT

NHAI

227.00

0.00

383.00

NHAI

225.00

0.00

264.70

NHAI

486.00

0.00

573.30

NHAI

340.68

0.00

362.10

NHAI

340.00

0.00

477.10

NHAI

221.82

0.00

261.00

NHAI

200.00

0.00

266.44

NHAI

208.00

0.00

235.50

NHAI

245.00

0.00

491.20

NHAI

200.00

0.00

204.70

NHAI

264.72

0.00

267.80

NHAI

275.00

0.00

300.00

NHAI

220.00

0.00

258.80

NHAI

273.00

0.00

475.60

NHAI

240.00

0.00

285.60

NHAI

157.47

0.00

186.00

NHAI

367.49

0.00

453.68

NHAI

167.64

0.00

2047.00

RVNL

245.67

298.17

336.25

RINL

230.00

0.00

238.81

List of project Without Original Date of Commissioning

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original Milestones
Cumm.
Expendi- Original / AnticiAchieved/
(in
ture
Revised pated months)
Total
6

10

Atomic Energy
1 URANIUM ORE MINE and
PROCESSING PLANT AT TUMMALAP [N02000007]UCIL,Andhra Pradesh

09/2007

1,106.29
-

1,106.29

1,000.70

04/2011

04/2012

12(R3)

0/0

2 KAKRAPAR ATOMIC POWER


PROJECT - 3 and 4 [N02000010]NPCIL,Gujarat

10/2009

11,459.00
-

11,459.00

1,341.00

05/2016

11/2016

6(R1)

0/70

12,565.29
-

12,565.29

2,341.70

Total

0/70

Coal
3 ANANTA OC EXPANSION PH-III 15.0
Mty - [N06000067]MCL,Orissa

08/2008

207.28
-

207.28

72.00

03/2012

5/7

4 TUTICORIN THERMAL POWER


PROJECT - [N06000047]NLC,Tamil
Nadu

05/2008

4,904.54
4,909.54

4,909.54

2,489.81

02/2013

0/39

5 KUSMUNDA EXPN.OCP(SECL)(1015MTY) [N06000008]SECL,Chhatisgarh

06/2006

737.65
-

1,188.31

611.75

03/2013

0/8

6 KANIHA OCP, MCL, (10.0 Mty) [N06000035]MCL,Orissa

12/2007

457.77
-

457.77

116.04

03/2013

6/11

7 HINGULA OC-II EXP PH-III (15 MTY) [N06000068]MCL,Orissa

11/2008

475.93
-

479.63

90.84

03/2013

5/7

8 CHURCHA ROUG (1.35MTY) [N06000046]SECL,Chhatisgarh

06/2008

462.35
-

462.35

261.83

03/2014

0/4

9 MANIKPUR OC EXPANTION (3.50


MTY) - [N06000081]SECL,Chhatisgarh

11/2009

321.42
-

321.50

204.10

03/2014

0/5

10 PENGANGA OC [N06000066]WCL,Maharashtra

10/2008

339.77
-

339.77

0.70

10/2014

1/1

11 GOPAL PRASAD OCP [N06000042]MCL,Orissa

02/2008

395.87
-

395.87

59.22

03/2015

2/12

12 NEYVELI NEW THERMAL POWER


PROJECT(2x500 MW) [N06000095]NLC,Tamil Nadu

06/2011

5,907.11
-

5,907.11

6.57

12/2015

0/33

13 TALABIRA OCP [N06000043]MCL,Orissa

03/2008

447.72
-

447.72

34.28

03/2016

1/12

14 BHUBANESWARI OCP, MCL (20.0 Mty)


- [N06000034]MCL,Orissa

12/2007

490.00
-

490.10

102.10

03/2017

6/12

15,147.41
-

15,606.95

4,049.24

Total

26/151

Fertilisers
15 THAL AMMONIA REVAMP PROJECT [N08000003]RCF,Haryana

01/2009

488.75
-

488.75

214.81

04/2012

04/2012

16 NANGAL - AMMONIA PLANT


FEEDSTOCK PROJECT [N08000006]NFL,Punjab

01/2010

1,478.63
-

1,478.63

413.05

01/2013

0(R3)
-

7/22
0/8

List of project Without Original Date of Commissioning

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Total

Delay
w.r.t.
Original Milestones
Cumm.
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
6

1,967.38
-

1,967.38

627.86

10
7/30

Steel
17 Rebuilding of coke oven battery No.1
and 2 (Bokar [N12000033]SAIL,Jharkhandd

10/2007

500.90
-

500.90

355.21

02/2012

18 Bailadila Iron Ore Deposit- IIB(NMDC) [N12000018]NMDC,Chhatisgarh

01/2007

295.89
607.17

607.17

314.31

12/2011

03/2012

3(R3)

18/21

19 330 TPH BOILER-6 AND AUXILIARY


SYSTEM - [N12000069]RINL,Andhra
Pradesh

07/2007

260.00
-

350.00

231.99

08/2010

03/2012

19(R3)

1/1

20 67.5 MW TG-5 AUX. S'TEM


EMERGENCY POWER REQUIREM [N12000068]RINL,Andhra Pradesh

07/2007

230.00
-

343.58

238.81

02/2011

04/2012

14(R3)

2/3

21 COKE OVEN BATTERY NO. 4 PHASEII - [N12000038]RINL,Andhra Pradesh

08/2007

108.00
-

216.68

59.11

10/2012

10/2012

0(R3)

3/4

22 Augmentation of Iron Ore Storage in


RMHP - [N12000053]RINL,Multi State

05/2008

480.00
-

460.00

176.28

05/2012

12/2012

7(R3)

1/2

1,874.79
-

2,478.33

1,375.71

5,460.61
8,920.00

8,920.00

3,800.09

5,460.61
-

8,920.00

3,800.09

Total

1/3

26/34

Petrochemicals
23 ASSAM GAS CRACKER PROJECT [N16000106]BCPL,Assam

04/2006

Total

12/2013

12/2013

0(R3)

9/30
9/30

Petroleum
24 VKPL UPGRADATION AND LAYING OF
SPURLINE (TO BHILWARA AND CHI [N16000093]GAIL,Multi State

12/2009

463.32
-

330.47

185.36

03/2012

03/2012

25 WIND ENERGY [N16000126]GAIL,Multi State

05/2011

616.00
-

616.00

84.75

03/2012

0/0

26 CDU/VDU-II - [N16000110]CPCL,Tamil
Nadu

03/2010

333.99
-

333.99

85.97

05/2012

21/36

27 BUTADIENE EXTRACTION UNIT


(BDEU) AT PANIPAT [N16000108]IOCL,Haryana

11/2009

341.50
-

341.50

41.18

02/2013

02/2013

0(R3)

29/42

28 BNPL SPURLINE (UTTRANCHAL AND


PUNJAB) - [N16000094]GAIL,Multi State

12/2009

540.92
-

460.70

171.29

07/2012

03/2013

8(R2)

7/16

29 DEVELOPMENT OF C-SERIES FIELDS


- [N16000023]ONGC,Maharashtra

08/2006

3,195.16
-

2,800.00

2,520.91

12/2008

04/2013

52(R3)

0/0

30 HYDROCRACKER REVAMP AND


SETTING UP A NEW CCR AT MU [N16000081]BPCL,Maharashtra

04/2008

825.00
1,827.00

1,827.00

370.68

04/2013

04/2013

0(R3)

0/167

31 KOCHI KOOTTANAD BANGLORE


MANGLORE PIPELINE PH-II [N16000129]GAIL,Multi State

06/2009

2,915.00
-

2,915.00

551.11

12/2012

04/2013

4(R3)

0/21

9,230.89
-

9,624.66

4,011.25

Total

0(R3)

3/20

60/302

List of project Without Original Date of Commissioning

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original Milestones
Cumm.
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
6

07/2013

07/2013

10

Power
32 TRIPURA GAS BASED POWER
PROJECT [N18000071]NEEPCO,Tripura

07/2009

Total

421.01
623.44

623.44

95.88

421.01
-

623.44

95.88

0(R3)

0/30

0/30

Railways
33 CALICUT-MANGALORE (DL) (SR) [220100151]SR,Multi State

02/1996

240.00
-

579.37

597.49

02/2012

0/0

34 KANPUR-KASGANJMATHURA(GC),NER [220100197]NER,Uttar Pradesh

03/1997

395.00
1,062.36

1,577.46

1,214.15

02/2012

0/0

35 TARAKESWAR - BISHNUPUR NEW BG


LINE (NL), ER - [220100272]ER,West
Bengal

04/2000

157.96
762.33

762.33

453.25

12/2009

02/2012

36 PEDAPALLI-KARIMNAGARNIZAMABAD NL(SCR) [220100106]SCR,Andhra Pradesh

12/1994

124.43
407.78

820.32

538.98

03/2012

37 MANDARHILL-DUMKA-RAMPURHAT
(NL),ER - [220100168]ER,Jharkhandd

04/1995

184.00
254.07

675.00

492.19

12/2011

03/2012

3(R3)

0/0

38 KADUR-CHIKMAGALURSAKLESHPUR (NL),(SWR) [220100190]SWR,Karnataka

04/1996

157.00
262.82

262.82

212.77

03/2012

03/2012

0(R3)

0/0

39 MUZAFFARPUR-SITAMARHI(NL),ECR
- [220100194]ECR,Bihar

04/1997

100.00
483.62

411.22

432.27

03/2012

03/2012

0(R3)

0/0

40 MUNEERABADMAHABOOBNAGAR(NL),SCR [220100205]SCR,Multi State

04/1997

218.24
377.32

537.47

99.52

03/2012

41 JAYNAGAR-DARBHANGA-NARKATIA
GANJ(GC),ECR [220100240]ECR,Bihar

04/1997

233.00
501.69

903.56

584.97

03/2012

03/2012

0(R3)

0/0

42 GADWAL - RAICHUR (NL), SCR [220100270]SCR,Multi State

04/1998

92.63
228.09

270.00

242.14

02/2011

03/2012

13(R3)

0/0

43 KHURDA ROAD-BOLANGIR(NL)ECOR
- [220100284]ECOR,Orissa

04/1994

355.38
470.21

1,100.00

184.37

03/2012

44 MANSI-PURNIA (EXTENSION OF
MANSI-SAHARSA) GAN ECR [N22000002]ECR,Bihar

04/1996

114.01
332.92

427.89

367.91

03/2012

03/2012

45 HARNOUT -SET.UP OF W/S TO UND.


POH OF UP TO50 COAC [N22000052]WS&PU,Bihar

04/2003

98.74
224.51

337.30

197.98

03/2012

0/0

46 CHHAPRA-SETTING UP OF WHEEL
MANUFACTURING PLANT [N22000053]WS&PU,Bihar

03/2005

470.09
1,417.97

1,417.97

944.25

03/2012

0/0

47 CONSTRUCTION OF NEW LINE FROM


HARMATI-ITANAGAR/NAR [N22000083]NEFR,Arunachal Pr.

09/1996

156.00
-

415.73

222.85

03/2012

0/0

48 NANGALDAM-TALWARA(NL),NR [220100188](NR),Multi State

03/1981

37.68
450.00

730.00

334.89

07/2012

07/2012

26(R1)

0(R3)

0(R3)

0/0

0/0

0/0

0/0
0/0

0/0

List of project Without Original Date of Commissioning

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original Milestones
Cumm.
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
6

10

49 JIND-SONEPAT (NL),NR [220100280](NR),Haryana

01/2004

190.81
238.56

500.00

349.46

03/2012

12/2012

9(R3)

0/0

50 KOSI BRIDGE (NL), ECR [220100304]ECR,Bihar

04/2002

323.41
-

341.41

248.07

03/2012

12/2012

9(R3)

0/0

51 DAUSA-GANGAPUR CITY(NL),NWR [220100184]NWR,Rajasthan

02/1997

151.84
410.08

410.08

165.07

03/2013

0/0

52 QUILON-TIRUNELVELI-TENKASIVIRUDHUNAGAR(SR)(GC) [220100263]SR,Multi State

03/1998

280.00
842.35

1,029.00

719.39

03/2013

0/0

53 RANGIA-MURKONGSELEK, (GC)
ALONG WITH LINKED FINGER [220100315]NEFR,Multi State

01/2004

915.70
-

1,717.29

897.04

03/2013

0/0

54 TALCHER-BIMALAGARH(NL)(ECOR) [220100328]ECOR,Orissa

04/2005

726.96
810.78

810.78

89.02

03/2013

0/0

55 RAJATGARH-BARANG(LD),ECOR [220100286]RVNL,Orissa

04/1999

166.16
-

243.40

02/2009

04/2013

50(R1)

0/0

56 KHURDA ROAD - BARANG 3RD LINE


(DL) (ECOR) - [220100327]RVNL,Orissa

04/2000

133.41
207.00

225.00

200.91

03/2009

04/2013

49(R1)

0/0

57 EXT. OF MRTS FROM VELACHERY


TO STN. THOMAS, MTP [N22000028]MRTP,Tamil Nadu

04/2006

495.74
-

495.74

147.46

06/2013

06/2013

0(R3)

0/0

58 CHHINDWARA - NAGPUR (GC)(SECR)


- [220100324]SECR,Madhya pradesh

04/2005

383.79
-

585.93

180.24

12/2013

0/0

59 NEW B.G. LINE FROM TETELIA TO


BYRNIHAT (NATIONAL P [N22000086]NEFR,Assam

09/2006

200.00
-

384.04

91.54

03/2014

0/0

60 New BG line Rly line from EklakhiBalurghat includ [220100135]NEFR,West Bengal

04/1983

36.80
274.41

415.23

239.45

03/2015

0/0

61 KATIHAR - JOGBANI (GC)(NEFR) [220100247]NEFR,Bihar

09/2001

100.00
492.98

1,015.84

724.29

12/2010

03/2015

62 HAJIPUR-SUGAULI VIA VAISHALI (NL),


ECR - [220100303]ECR,Bihar

04/2003

324.66
528.65

324.66

172.64

03/2015

0/0

63 KISHANGANJ JALALGARH, NL, NEFR


- [N22000101]NEFR,Bihar

04/2008

282.92
-

359.86

1.23

03/2015

0/0

64 DEOGHAR - SULTANGANJ (INL), ER [220100273]ER,Multi State

04/2000

138.00
519.67

607.09

357.47

12/2012

0/0

65 CONV.OF 1500V DC TRACTION TO 25


KV AC,WR [220100233]RE,Maharashtra

07/1996

273.67
1,302.12

1,302.12

608.97

06/2012

0/0

8,258.03
-

21,995.91

12,312.23

Total

51(R3)

0/0

0/0

Road Transport & Highways


66 NEELAMANGALAR JUNCTION ON NH4 SMITH NH-48 TO DEVI [N24000103]NHAI,Karnataka

03/2005

441.00
-

441.00

946.80

02/2012

67 NEW MANGALORE PORT NH-17 AND


48 - [N24000040]NHAI,Karnataka

04/2000

196.50
363.00

363.00

241.30

06/2011

03/2012

68 UGRADATION OF HYDERABADBANGALORE SECTION [N24000160]NHAI,Karnataka

11/2010

680.00
-

680.00

11/2012

9(R3)
-

0/0

0/0
0/2

List of project Without Original Date of Commissioning

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original Milestones
Cumm.
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
6

10

69 Bijapur-Hungund Section [N24000137]NHAI,Karnataka

09/2010

748.00
-

748.00

1,214.00

03/2013

0/3

70 Hungund-Surathkal and MangaloreKnt/Kerala Border [N24000138]NHAI,Karnataka

09/2010

946.00
-

946.00

863.20

03/2013

0/2

71 KUNDUPUR-SURATHKAL &
MANGLORE [N24000146]NHAI,Karnataka

09/2010

671.00
-

671.00

173.20

03/2013

0/1

72 DEVIHALLI-HASSAN [N24000152]NHAI,Karnataka

12/2010

453.00
-

453.00

166.20

05/2013

0/1

73 BELGAUM-DHARWAD(NH-4) [N24000158]NHAI,Karnataka

12/2010

480.00
-

480.00

126.40

06/2013

0/1

74 CHITRADURGA-TUMKUR(NH-4) [N24000157]NHAI,Karnataka

03/2011

839.00
-

839.00

08/2013

0/1

5,454.50
-

5,621.00

3,731.10

0/11

60,379.91

79,402.96

32,345.06

128/658

Total

Grand Total

List of project Without Date of Commissioning

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Original /
Revised

Anticipated

03/2010

Coal
1 BALRAM OCP EXTENSION,MCL (8.00 Mty) [N06000044]MCL,Orissa

12/2007

172.08
-

Total

172.08
-

Petroleum
2 Integrated Sugar, Ethanol, Cogen Power Plant
at Sugauli - [N16000102]HPCL,Bihar

06/2009

613.54
-

12/2010
-

06/2011

3 DIESEL HYDRO TREATMENT


PROJECT,BRPL DHALIGAON [N16000009]BRPL,Assam

06/2006

1,431.91
1,646.39

09/2009
-

08/2011

4 REFRIGERATED LPG STORAGE AT JNPT [N16000083]BPCL,Maharashtra

06/2008

304.40
-

09/2010
-

09/2011

5 EURO-IV DHDT - [N16000109]CPCL,Tamil


Nadu

09/2008

2,615.69
-

12/2011

6 CONSTRUCTION OF NEW TERMINAL AT


ENNORE CHENNAI [N16000066]HPCL,Tamil Nadu

01/2008

224.00
299.00

02/2011
08/2011

7 DE-BOTTLENECKING OF SMPL (SalayaMathura crude pip [N16000089]IOCL,Maharashtra

12/2009

1,584.00
-

Total

6,773.54
-

Power
8 SYTEM STRENGTHENING OF SOUTHERN
REGION - XIV - [N18000115]PGCIL,Multi
State

12/2011

297.33
-

08/2014
-

9 KAIGA 3&4 TRANSMISSION SYSTEM


(PGCIL) - [180100246]PGCIL,Karnataka

03/2005

596.45
1,007.16

12/2007
12/2009

Total

893.78
-

Railways
10 RUPSA-BANGRIPOSI (GC)(SER) [220100323]SER,Orissa

02/1996

57.94
604.04

03/1998
08/2005

08/2005

11 RAICHUR-GUNTAKAL(DL)(SCR) [220100329]RVNL,Andhra Pradesh

04/2003

136.62
-

12/2007
03/2010

12/2010

12 ALIGARH-GAZIABAD 3RD LINE DOUBLING


(RVNL) - [N22000034]RVNL,Uttar Pradesh

04/2003

230.73
399.73

03/2009
12/2008

12/2010

13 REWARI-ROHTAK (NL),NR [220100279](NR),Haryana

01/2004

149.38
330.23

02/2010
02/2011

02/2011

14 AMRAVATI-NARKHER NL(CR) [220100118]CR,Maharashtra

06/1994

120.90
284.27

06/1999
03/2011

03/2011

15 KOTTUR-HARIHAR(NL),(SWR) [220100212]SWR,Karnataka

04/1995

65.94
302.23

03/2011

16 SRIGANGANAGAR-SARUPSAR (GC), NWR [220100313]NWR,Rajasthan

04/2001

143.92
258.60

03/2011

03/2011

List of project Without Date of Commissioning

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Original /
Revised

Anticipated

17 BILASPUR-URKURA (DL) [220100321]RVNL,Chhatisgarh

04/1997

151.52
-

03/2009

03/2011

18 PALWAL-BHUTESWAR 3RD LINE


DOUBLING(NCR)(RVNL) [N22000027]RVNL,Multi State

04/2005

240.00
-

03/2009
12/2009

03/2011

19 ALUABARI ROAD SILIGURI JUNCTION VIA


GALGALIA, NEFR - [N22000082]NEFR,Multi
State

12/2006

170.00
-

03/2011

03/2011

20 MUMBAI URBAN TRANSPORT PROJECT


PHASE-I, MTP [N22000093]MRTP,Maharashtra

04/2003

3,125.20
4,174.40

06/2011

06/2011

21 GUNA-ETAWAH(NCR), NL [220100007]NCR,Multi State

04/1985

158.77
432.46

03/1994
-

12/2011

22 HARIDASPUR-PARADEEP(NL) [220100285]RVNL,Orissa

04/1996

301.64
-

09/2009

12/2011

23 Ramanagram-Mysore doubling with


electrification of - [N22000107]SWR,Karnataka

04/2007

482.00
482.70

03/2013
-

12/2011

24 VIRAMGAM-BHILDI(WR),GC [220100062]WR,Multi State

04/1990

155.66
356.87

03/2010

25 DALLI-RAJHARA - RAOGHAT(PART OF
DALLI-RAJHARA-JAGD [220100149]RVNL,Chhatisgarh

04/1995

304.00
-

12/2012
-

26 AHMEDNAGAR-PARLI VAIJNATH(NL) CR [220100181]CR,Maharashtra

02/1997

353.08
462.67

27 HASSAN-BANGALORE VIA SHRAVANABELGOLA(NL),SWR [220100183]SWR,Karnataka

02/1997

295.00
412.91

28 GONDIA-JABALPUR(GC),(SECR) [220100186]SECR,Multi State

02/1997

386.30
-

03/1998
-

29 KARUR-SALEM(NL),SR [220100191]SR,Tamil Nadu

02/1997

155.55
229.88

30 HUBLI-ANKOLA(NL),SWR [220100193]SWR,Karnataka

04/1995

227.00
-

31 MACHERLA-NALGONDA(NL)(SCR) [220100220]SCR,Andhra Pradesh

07/1998

125.00
363.26

07/2008
-

32 KODERMA-RANCHI VIA BARKAKANA


(NL),ECR - [220100222]ECR,Jharkhandd

03/1999

491.19
1,099.20

07/2005
-

33 ANGAMALI-SABARIMALA (N.L.)(SR) [220100252]SR,Kerala

10/1998

550.00
-

34 GULBARGA-BIDAR,SCR(NL) [220100254]SCR,Karnataka

02/1998

242.42
369.70

05/2009

35 KHAGARIA-KUSHESHWAR ASTHAN (NL)


(ECR) - [220100257]ECR,Bihar

04/1997

78.23
162.87

36 JALANDHAR-PATHANKOT-JAMMU-TAWI
(LD),NR - [220100258](NR),Multi State

03/2002

409.00
625.30

06/2007
-

37 REINGUNTA-GUNTAKAL(RE) [220100260]RVNL,Andhra Pradesh

06/2000

168.34
-

04/2003
03/2010

38 TIRUCHIRAPPALI-NAGOREKARAIKKAL(SR)(GC) - [220100262]SR,Tamil
Nadu

09/1995

100.00
-

39 KOTLPALLI-NARASAPUR (NL) (SCR) [220100265]SCR,Andhra Pradesh

12/2001

330.00
-

40 BANGLORE - SATYAMANGALAM (NL)(SWR)


- [220100274]SWR,Karnataka

02/1999

138.00
-

List of project Without Date of Commissioning

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Original /
Revised

Anticipated

41 KODERMA-TILAIYA (NL), ECR [220100305]ECR,Jharkhandd

04/2002

459.91
418.17

42 RAMGANJMUNDI-BHOPAL (NL),WCR [220100314]WCR,Madhya pradesh

04/2001

727.13
727.13

43 SUKINDA ROAD - ANGUL (NL)(ECOR) [220100325]RVNL,Orissa

04/1998

183.23
-

02/2015
-

44 MANOHARABAD-KOTHPALL NEW
LINE(SCR) - [N22000032]SCR,Andhra
Pradesh

04/2006

378.56
671.82

45 OBULAVARIPALLEKRISHNAPATNAM(RVNL) [N22000049]RVNL,Andhra Pradesh

07/2006

743.00
-

03/2008
06/2008

46 MAYLADUTHURAI-THIRUVARURKARAIKUDI-THIRU 'PONDI'-A [N22000079]SR,Tamil Nadu

09/2007

404.19
-

47 DINDIGUL-POLLACHI-PALGHAT-POLLACHI
AND COIMBATORE - [N22000080]SR,Tamil
Nadu

09/2006

343.17
-

48 BHARUCH-SAMNI-DAHEJ GAUGE
CONVERSIN - [N22000081]RVNL,Gujarat

09/2005

200.80
-

49 TINDIVANAM-GINGEE-TIRUVANNAMALAI
(NL) - [N22000084]SR,Tamil Nadu

09/2006

125.00
-

50 TIDIVANAM-NAGARI (NL) [N22000085]SR,Tamil Nadu

09/2006

456.00
582.83

51 NEW B.G. LINE FROM ARARIA TO


GALGALIA (THAKURGUNG) [N22000087]NEFR,Bihar

09/2006

300.00
-

52 Bhavnagar-workshop facilities for 50 BG


coaches PO - [N22000125]WR,Gujarat

04/2006

117.36
196.95

03/2011
-

53 BELAPUR-SEAWOOD-URAN ELECTRIF-IED
DOUBLE LINE(MTP) [220100164]MRTP,Maharashtra

03/1996

401.81
495.44

03/2004
12/2010

54 LALITPUR-SATNA-REWA-SINGRULI NL,
(NCR) - [220100232]NCR,Multi State

09/1998

925.00
-

05/2008
03/2011

55 AGRA-ETAWAH VIA FATEHABAD AND BAH


(NL) NCR - [220100243]NCR,Uttar Pradesh

04/1999

108.00
214.09

12/2009
03/2011

56 GONDA-GORAKHPUR LOOP WITH ANAND


NAGAR-NAUTANWA GC (NER) [220100255]NER,Uttar Pradesh

03/2002

381.17
-

57 KAPTANGANJ-THAWE-SIWAN-CHHAPRA
GC (NER) - [220100256]NER,Multi State

04/1999

323.40
-

58 TOLLYGANJ-GARIA with extension to Dum


Dum-Noapara - [220100268]MRTP,West
Bengal

03/2000

907.69
3,176.10

12/2006
08/2010

59 KODERMA GIRIDH (NL), ECR [220100306]ECR,Jharkhandd

04/1996

371.36
-

60 MAHARAJGANJ-MASRAKH (NL) - NER [220100316]NER,Bihar

04/2003

218.19
-

61 HATHUA-BHATNI (N L) (NER) [220100319]NER,Multi State

04/2005

230.03
-

62 BARDHAMAN-KATWA, ER (GC) [N22000091]ER,West Bengal

04/2007

245.15
-

12/2010
03/2011

63 Pandabeswar-Chinpai doubling (ER) [N22000118]ER,West Bengal

04/2004

225.68
-

12/2010

List of project Without Date of Commissioning

(Jan,2012)

Date of
Commissioning
Date of
Approval

S.No Project
1

Total

Original /
Revised
Cost

Original /
Revised

Anticipated

06/2005
-

12/2011

18,819.16
-

Road Transport & Highways


64 BIJNI TO ASSAM/WB BORDER PH.II,
KM.30.00 TO 0.00, NH-31 C [240106226]NHAI,Assam

12/2003

230.00
-

Total

230.00
-

Shipping & Ports


65 RAIL CONNECTIVITY TO ICTT AT
VALLARPADAM AT COCHIN PORT TRUS [N25000059]RVNL,Kerala

03/2007

245.67
298.17

04/2009
11/2009

02/2011

66 MARINE LIQUID TERMINALS [N25000054]ENNORE TANK,Tamil Nadu

10/2004

196.25
-

06/2006
09/2011

09/2011

67 ESTABLISHMENT OF VESSEL TRAFFIC


SERVICES IN GULF OF KUTCH [250100112]SHIPP.,Gujarat

01/2002

165.00
165.00

12/2005
01/2008

10/2011

68 ACQUISITION OF TWO NOS OF 120 B.P


(AH03TYPE) AHTS [N25000058]SHIPP.,Kerala

12/2010

241.50
-

09/2011
-

12/2011

69 DEEPENING AND WIDENING OF MUMBAI


HARBOUR CHANNEL A - [N25000003]PORT
TRUST,Maharashtra

10/2005

800.00
-

10/2008
-

70 DEEPENING OF CHANNEL AT PARADIP


PORT - [N25000004]PORT TRUST,Orissa

12/2005

154.84
-

12/2007
01/2009

71 DEVELOPMENT OF COAL TERMINAL [N25000055]ENNORE PORT LTD,Tamil Nadu

09/2006

399.13
-

08/2010
-

72 DEVELOPMENT OF IRON ORE TERMINAL [N25000056]ENNORE PORT LTD,Tamil Nadu

09/2006

370.00
-

08/2010
-

73 SETHUSAMUDRAM SHIP CHANNEL


PROJECT - [250100175]PORT TRUST,Tamil
Nadu

06/2005

2,427.40
-

10/2008
-

Total

4,999.79
-

Telecommunications
74 GSM EQUIPMENT OF 700K LINES(2G) AND
150K LINES(3G) - [N26000046]BSNL,Orissa

11/2007

277.34
-

03/2009
-

02/2011

75 Implementation of FTTH, the state of the art


access ,gpon eq - [N26000072]BSNL,Multi
State

12/2007

952.88
-

03/2010
-

10/2010

76 GSM equipment of 200000Lines (2G)


UP(West)Phase V. - [N26000082]BSNL,Uttar
Pradesh

10/2008

336.84
-

10/2009
-

03/2011

77 CONVERGENT BILLING AND CRMMTNL(DELHI) - [N26000011]MTNL,Delhi

12/2005

249.00
229.41

02/2007
-

08/2011

78 CONVERGENT BILLING AND CRM(MUMBAI)


- [N26000016]MTNL,Maharashtra

01/2006

247.00
-

02/2007
-

08/2011

79 FTTH BO-3474 /08-09 in Mumbai [N26000078]MTNL,Maharashtra

04/2010

389.86
-

09/2011
-

09/2011

80 UTTARANCHAL TELECOM CIRCLE PHASEVI (2G & 3G) - [N26000058]BSNL,Uttaranchal

01/2009

149.15
158.72

06/2009
-

12/2011

List of project Without Date of Commissioning

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Original /
Revised

Anticipated

81 GSM equipment of 1500000Lines (2G)


264700lines 3(G - [N26000093]BSNL,Andhra
Pradesh

01/2009

922.91
-

01/2010
-

12/2011

82 EXPANSION OF EXISTING 750K GSM


NETWORK PE NO. 992 [N26000029]BSNL,Maharashtra

06/2006

231.38
-

10/2007
-

83 Execution of telecom network requirement of


defence - [N26000065]BSNL,Multi State

05/2006

1,077.00
-

03/2009
-

84 Implementation of FTTH, the state of the art


Acces - [N26000073]BSNL,Multi State

12/2007

152.65
-

03/2010
-

04/2009
-

Total

4,986.01
-

Urban Development
85 C/o office building for IDBI at bandra Kurla
Compl - [N28000048]CPWD,Maharashtra

11/2006

114.18
173.08

Total

114.18
-

Grand Total

36,988.54

LIST OH AHEAD PROJECTS as on 31-01-2012


SN
1
2
3

4
5

PROJECT
BHAIRABI SAIRONG, NL, NEFR
IMMEDIATE EVACUATION SYSTEM FOR NABINAGAR TPS
BRANCH PIPELINE FROM KSPL VIRAMGAON TO KANDLA
INTEGRATION OF POOLING STATION IN CHATTISGARH
WITH CENTRAL PART OF WR FOR IPP GENERATION
PROJECTS IN
Construction of tanks and blending facility at vadinar

DOA
04/2008
02/2010
02/2009

DOC
ORGINAL
04/2014
06/2012
03/2013

DOC
REVISED
N.A.
N.A.
03/2013

DOC
COST
COST
ANTICIPATED ORGINAL ANTICIPATED
03/2014
619.34
2393.49
03/2012
215.86
215.86
03/2012
250.00
250.00

08/2011
02/2009

12/2013
09/2012

N.A.
09/2012

11/2013
06/2012

1391.97
267.00

1391.97
267.00

LIST OF ON SCHEDULED PROJECTS as on 31-01-2012


SN PROJECTS
1
2
3
4
5
6

SECTOR

AGENCY DOA

DOC
COST
DOC
DOC
ANTICIPA COST
ANTICIPA
ORGINAL REVISED TED
ORGINAL TED

27
28

GAGAN PROJECT
Muraidih UG Turn-key Project
Moonidih XV Seam UG
Purnadih OCP
KARMA OCP
Rajrappa RCE OCP
NIGAHI OC EXPANSION PROJECT 10 MTY TO 15 MTY,
SINGRAULI
KHADIA EXPANSION OPENCAST PROJECT(4 TO 10
MTPA,6MTPA INCREMENTAL)
BINA EXTN. PROJ(6.0 Mtpa)
RANAGUNDAM OC-II EXTENSION
JALAGAM VENGALA RAO OCP
RCE OF INDARAM OCP(1.20 MTPA)
RKP OCP PHASE-I
Kistaram OCP
MANUGURU OC-II EXTENSION PHASE-II
JALLARAM SHAFT PROJECT
SHANTIKHANI LONGWALL PROJ-SCCL
JAGANNATHPUR OCP(3.00 MTY)
PELMA OCP(10.00MTY)
AMLAI OC EXPANSION SECTOR 1.50 MTY
KARTALI (EAST) OCP(2.50 MTY)
Batura OCP (2.0 MTY)
BATHINDA - AMMONIA PLANT FEEDSTOCK
CHANGEOVER PROJECT
PANIPAT - AMMONIA PLANT FEEDSTOCK
CHANGEOVER PROJECT
PETROCHEMICAL COMPLEX-II AT VIJAYPUR AND
PATA
KOCHI-KANJIRKOD BANGALORE-MANGALORE
PIPELINE PROJECT PHASE-I
Fluidized catalytic cracking unit(FCCU) revamp at Mathura
Refinery
PARADIP-RAIPUR-SAMBALPUR- RANCHI PIPELINE

Petroleum
Petroleum

IOCL
IOCL

07/2010
08/2009

01/2013
09/2012

01/2013
09/2012

01/2013
09/2012

1000.00
1793.00

1000.00
1400.00

29

Integrated crude Oil handling facilities at Paradip(2nd SPM) Petroleum

IOCL

12/2009

06/2012

06/2012

06/2012

1492.33

1300.00

7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

Civil Aviation AAI


Coal
BCCL
Coal
BCCL
Coal
CCL
Coal
CCL
Coal
CCL

09/2008
02/2011
08/2011
07/2008
06/2009
12/2009

06/2013
04/2014
04/2015
03/2013
03/2014
03/2016

N.A.
N.A.
N.A.
N.A.
N.A.
N.A.

06/2013
04/2014
04/2015
03/2013
03/2014
03/2016

626.00
339.88
1230.27
210.98
162.46
510.85

626.00
339.88
1230.27
210.98
162.46
510.85

Coal

NCL

10/2007

03/2012

N.A.

03/2012

259.40

259.40

Coal
Coal
Coal
Coal
Coal
Coal
Coal
Coal
Coal
Coal
Coal
Coal
Coal
Coal
Coal

NCL
NCL
SCCL
SCCL
SCCL
SCCL
SCCL
SCCL
SCCL
SCCL
SECL
SECL
SECL
SECL
SECL

06/2011
11/2006
12/2009
07/2011
07/2011
03/2010
11/2010
03/2010
03/2013
10/2006
09/2008
07/2008
11/2009
07/2008
09/2008

03/2018
03/2014
03/2012
03/2015
03/2015
03/2015
03/2015
03/2012
03/2013
03/2012
03/2015
03/2015
03/2016
03/2014
03/2015

N.A.
N.A.
N.A.
N.A.
N.A.
N.A.
N.A.
N.A.
N.A.
N.A.
N.A.
N.A.
N.A.
N.A.
N.A.

03/2018
03/2014
03/2012
03/2015
03/2015
03/2015
03/2015
03/2012
03/2013
03/2012
03/2015
03/2015
03/2016
03/2014
03/2015

1131.28
168.97
418.97
447.06
162.76
209.78
242.29
181.19
467.78
249.03
152.43
448.32
198.59
178.44
203.82

1131.28
168.97
418.97
447.06
162.76
209.78
242.29
181.19
467.78
249.03
152.43
448.32
198.59
178.44
203.82

Fertilisers

NFL

01/2010

01/2013

N.A.

01/2013

1294.19

1294.19

Fertilisers

NFL

01/2010

01/2013

N.A.

01/2013

1292.84

1292.84

Petroleum

GAIL

08/2010

02/2014

N.A.

02/2014

8140.00

8140.00

Petroleum

GAIL

06/2009

03/2012

08/2012

03/2012

348.00

261.00

DOA
08/2008

01/2012

N.A.

01/2012

Petroleum
Petroleum
Petroleum
Petroleum

AGENCY
Mangalore
Refin
Mangalore
Refin
NRL
ONGC
ONGC

DOC
COST
DOC
DOC
ANTICIPA COST
ANTICIPA
ORGINAL REVISED TED
ORGINAL TED

05/2009
06/2010
03/2009
06/2010

07/2012
12/2013
03/2013
01/2014

N.A.
12/2013
N.A.
N.A.

07/2012
12/2013
03/2013
01/2014

1803.78
576.60
2465.15
2523.00

1803.78
576.60
2378.86
2523.00

Petroleum

ONGC

03/2011

05/2013

N.A.

05/2013

861.79

861.79

Petroleum
Petroleum
Petroleum
Petroleum
Petroleum
Petroleum
Petroleum

ONGC
ONGC
ONGC
ONGC
ONGC
ONGC
ONGC

06/2010
03/2009
11/2010
11/2010
11/2010
08/2010
03/2010

01/2014
09/2012
04/2015
08/2013
12/2014
03/2013
03/2013

N.A.
N.A.
N.A.
N.A.
N.A.
N.A.
N.A.

01/2014
09/2012
04/2015
08/2013
12/2014
03/2013
03/2013

202.94
302.26
3823.00
331.20
2189.63
372.11
3241.03

202.94
302.26
3823.00
331.20
2189.63
372.11
3241.03

Petroleum
Petroleum

ONGC
ONGC

01/2010
11/2010

03/2013
12/2014

N.A.
N.A.

03/2013
12/2014

723.64
1916.10

723.64
1916.10

Petroleum
Petroleum
Power

ONGC
07/2008
ONGC
01/2010
NEEPCO 01/2011

08/2012
06/2012
01/2014

N.A.
N.A.
N.A.

08/2012
06/2012
01/2014

288.04
2163.64
913.63

288.04
2163.64
913.63

Power
Power

PGCIL
PGCIL

08/2008
02/2009

08/2012
02/2012

N.A.
N.A.

08/2012
02/2012

7075.33
664.96

7075.33
664.96

Power

PGCIL

08/2010

04/2013

N.A.

04/2013

1677.57

1677.57

Power

PGCIL

01/2012

01/2013

N.A.

01/2013

259.28

259.28

Power

PGCIL

01/2012

01/2015

N.A.

01/2015

1422.85

1422.85

Power

PGCIL

12/2011

08/2014

N.A.

08/2014

1746.65

1746.65

Power

PGCIL

12/2011

02/2014

N.A.

02/2014

552.44

552.44

Power

PGCIL

08/2011

10/2013

N.A.

10/2013

425.51

425.51

SN PROJECTS

SECTOR

30

MRPL Phase-III Expansion

Petroleum

31
32
33
34

Polypropylene unit
Wax Project
ASSAM RENEWAL PROJECT FOR GROUP A
Development of WO-16 Cluster Fields
CONVERSION OF RIG SAGAR SAMRAT TO MOBILE
OFFSHORE PRODUCTION UNIT(MOPS)
CONSTRUCTION OF ONE ETP AND THREE ETPS CUM
WATER INJECTION PLANTS(WIP)
Construction of 6 ETPs
Mehesana Redevelopment
Construction of 23 Immediate Supply Vessels (ISV)
Ankleswar Redevelopment
Development of BHE and BH-35 Area.
Development of Cluster-7 Fields

35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55

Construction of one Multipurpose Support Vessel (MSV)


Ahmedabad Redevelopment
Up-gradation of Konaban GGS and Pipeline Grid Project,
Tripura
ADDITIONAL DEV. OF D-1 FIELD
TUIRIAL HYDRO ELECTRIC PROJECT (60MW)
765 KV POOLING STATION AND NETWORK WITH DVC
AND MAITHON RBC
WESTERN REGION STRENGHTENING SCHEME-X
NORTHERN REGION SYSTEM STRENGTHENING
SCHEME- XXI
TR SYSTEM FOR ESTABLISHMENT OF 400/220 KV GIS
SUBSTATION AT MAGARWADA IN UT DD
SYSTEM STRENTHENING IN RAIPUR-WARDHA
CORRIDOR FOR IPP PROJECTS IN CHHATTISGARH
SYSTEM STRENGTHENING IN NORTH/WEST PART OF
WR FOR IPP PROJECTS IN CHATTISGARH
TRANSMISSION SYSTEM FOR CONNECTIVITY OF
ESSAR POWER GUJARAT LIMITED
TRANSMISSION SYSTEM FOR CONNECTIVITY OF MB
POWER LIMITED

12412.00 12160.26

SN PROJECTS
TRANSMISSION SYSTEM FOR IPP GENERATION
56 PROJECTS IN MP AND CHATTISGARH

57

58
59
60
61
62
63

64
65
66

67
68
69
70
71
72
73
74

Common System Associated with Coastal Energen Private


Limited and Ind-Barath Power Madras Limited LT
TRANSMISSION SYSTEM FOR PHASE-1 GENERATION
PROJECTS IN JHARKHAND AND WEST BENGAL-PARTA
TRANSMISSION SYSTEM FOR ESTABLISHMENT OF
400/220 KV GIS SUB STATION AT KALA IN UT DNH
TR SYSTEM FOR PHASE-I GENERATION PROJECTS IN
JHARKHAND AND WEST BENGAL-PART-A
SUPPLEMENTARY TRANSMISSION ASSOCIATED WITH
VAALLUR TPS
System Strengthening -XII of SR
Transmission system for transfer of power from Gen.proj in
sikkim to NR/WR part-A
COMMON SYSTEM ASSOCIATED WITH ISGS
PROJECTS IN KRISHNAPATTNAM OF ANDHRA
PRADESH(PGCIL)
SYTEM STRENGTHENING XIII OF SR GRID
TR SYSTEM FOR ESTABLISHMENT OF 400/220 KV GIS
SUBSTATION AT KALA IN UT DNH
INTEGRATION OF POOLING STATION IN
CHATTISGARH WITH CENTRAL PART OF WR FOR IPP
GENERATION PROJECTS IN
NORTHERN REGION SYSTEM STRENGTHENING
SCHEME XVI
TRANSMISSION SYSTEM ASSOCIATED WITH
KRISHNAPATNAM PART A
TRANSMISSION SYSTEM FOR PHASE-I GEN. PROJECT
IN ORISSA-B
TRANSMISSION SYSTEM OF VINDHYACHAL-IV AND
RIHAND-III Gen Project
MAUDA TRANSMISSION SYSTEM
System Strengthening in NR for SASAN & MUNDRA
(UMPP)
765KV SYSTEM FOR CENTRAL PART OF NORTHERN
GRID PART-III

SECTOR

AGENCY DOA

DOC
COST
DOC
DOC
ANTICIPA COST
ANTICIPA
ORGINAL REVISED TED
ORGINAL TED

Power

PGCIL

09/2011

12/2013

N.A.

12/2013

1366.34

1366.34

Power

PGCIL

09/2011

09/2014

N.A.

09/2014

1940.13

1940.13

Power

PGCIL

10/2011

11/2013

N.A.

11/2013

558.26

558.26

Power

PGCIL

07/2011

07/2013

N.A.

07/2013

181.93

181.93

Power

PGCIL

12/2011

08/2014

N.A.

08/2014

2422.66

2422.66

Power
Power

PGCIL
PGCIL

08/2010
02/2010

04/2013
06/2012

N.A.
N.A.

04/2013
06/2012

170.36
232.34

170.36
232.34

Power

PGCIL

05/2010

01/2013

N.A.

01/2013

250.03

250.03

Power
Power

PGCIL
PGCIL

08/2011
10/2011

08/2014
06/2014

N.A.
N.A.

08/2014
06/2014

1637.34
487.49

1637.34
487.49

Power

PGCIL

07/2011

07/2013

N.A.

07/2013

181.93

181.93

Power

PGCIL

08/2011

12/2013

N.A.

12/2013

1391.97

1391.97

Power

PGCIL

07/2010

07/2013

N.A.

07/2013

752.64

752.64

Power

PGCIL

12/2010

08/2013

N.A.

08/2013

779.21

779.21

Power

PGCIL

12/2010

12/2013

N.A.

12/2013

2743.19

2743.19

Power
Power

PGCIL
PGCIL

03/2010
02/2010

11/2012
10/2012

N.A.
N.A.

11/2012
10/2012

4672.99
469.38

4672.99
469.38

Power

PGCIL

12/2009

08/2012

N.A.

08/2012

1216.83

1216.83

Power

PGCIL

11/2009

05/2012

N.A.

05/2012

1075.12

1075.12

SN PROJECTS
TRANSMISSION SYSTEM FOR PHASE-I GEN PROJECT
75 IN ORISSA-PART A
NORTHERN REGION SYSTEM STRENGHTENING
76 SCHEME-XX
Establishment of pooling stations at Rajgarh and raipur for
77 IPP generation projects in chattisgarh
INTERCONNECTION BETWEEN ELECTTRICAL GRIDS
78 OF INDIA AND BANGLADESH -INDIAN PORTION
TRANS SYSTEM FOR DEVELOPMENT OF POOLING
STN IN NR PART OF WEST BENGAL AND TRANSFER
79 OF POWER FROM BHU
80 System Strengthening -X of SR
Transmission system for transfer of power from Gen.proj in
81 sikkim to NR/WR part-B
NORTHERN REGION SYSTEM STRENGTHENING
82 SCHEME-XXII
TRANS SYSTEM FOR PHASE-I GEN PROJECT IN
83 ORISSA-C
84 EASTERN REGION TRANSMISSION SYSTEM-III
ESTABLISHMENT OF POOLING STATIONS AT CHAMPA
AND RAIGARH FOR IPP GENERATION PROJECT IN
85 CHHATTISGARH
NORTHERN REGION TRANSMISSION
86 STRENGTHENING SCHEME
765KV SYSTEM FOR CENTRAL PART OF NORTHERN
87 REGION GRID PART-II
SUPPLEMENTRY TRANSMISSION ASSOCIATED WITH
88 DVC AND MAITHON RBC
TR. SYSTEM ASSOCIATED WITH MUNDRA ULTRA
89 MEGA POWER PROJECT
TRANSMISSION SYSTEM ASSOCIATED WITH SASAN
90 ULTRA MEGA POWER PROJECT
91 CHANDIGARH-LUDHIANA(NEW BG LINE),NR
92 Tinpahar - Sahibganj (ER)
Bandel-Naihati new rail bridge in replacement of jubilee
93 bridge no.8 (ER)
New Line from Dimapur to Zubza(Kohima) national project
94 (NEFR)
95 AGARTALA SABROOM, NL, NEFR
96 SEVOK RANGPO, NEFR

SECTOR

AGENCY DOA

DOC
COST
DOC
DOC
ANTICIPA COST
ANTICIPA
ORGINAL REVISED TED
ORGINAL TED

Power

PGCIL

09/2010

03/2013

N.A.

03/2013

2074.86

2074.86

Power

PGCIL

10/2010

01/2013

N.A.

01/2013

182.68

182.68

Power

PGCIL

12/2010

08/2013

N.A.

08/2013

1719.52

1719.52

Power

PGCIL

10/2010

10/2012

N.A.

10/2012

160.32

160.32

Power
Power

PGCIL
PGCIL

04/2010
12/2009

01/2015
04/2012

N.A.
N.A.

01/2015
04/2012

4404.57
276.61

4404.57
276.61

Power

PGCIL

03/2011

11/2013

N.A.

11/2013

1585.12

1585.12

Power

PGCIL

12/2010

08/2013

N.A.

08/2013

209.78

209.78

Power
Power

PGCIL
PGCIL

03/2011
07/2010

03/2014
11/2012

N.A.
N.A.

03/2014
11/2012

2569.25
1272.80

2569.25
1272.80

Power

PGCIL

05/2011

05/2014

N.A.

05/2014

1961.87

1961.87

Power

PGCIL

03/2010

11/2012

N.A.

11/2012

965.58

965.58

Power

PGCIL

07/2009

06/2012

N.A.

06/2012

1736.36

1736.36

Power

PGCIL

08/2008

08/2012

N.A.

08/2012

2360.95

2360.95

Power

PGCIL

10/2008

10/2012

N.A.

10/2012

4824.12

4824.12

Power
Railways
Railways

PGCIL
(NR)
ER

12/2008
07/1998
04/2008

12/2012
12/2012
03/2012

N.A.
N.A.
N.A.

12/2012
12/2012
03/2012

7031.88
248.44
167.73

7031.88
1103.47
167.73

Railways

ER

04/1999

12/2012

N.A.

12/2012

207.52

207.52

Railways
Railways
Railways

NEFR
NEFR
NEFR

04/2006
04/2008
04/2008

03/2015
03/2014
12/2015

N.A.
N.A.
N.A.

03/2015
03/2014
12/2015

850.00
813.34
1339.48

850.00
1141.75
3380.57

SECTOR

AGENCY DOA

DOC
COST
DOC
DOC
ANTICIPA COST
ANTICIPA
ORGINAL REVISED TED
ORGINAL TED

Railways
Railways

NWR
NWR

04/2008
04/2008

03/2014
03/2015

N.A.
N.A.

03/2014
03/2015

653.19
829.74

653.19
829.74

Railways

NWR

04/2008

03/2014

N.A.

03/2014

516.23

516.23

Railways

RE

02/2008

03/2012

N.A.

03/2012

171.10

171.10

Railways

RVNL

04/2010

03/2016

N.A.

03/2016

2619.02

2619.02

Railways
Railways
Railways

RVNL
WR
WR

04/2010
04/2008
04/2008

03/2016
03/2012
03/2014

N.A.
N.A.
N.A.

03/2016
03/2012
03/2014

3951.98
603.04
1389.62

3951.98
603.04
1389.62

105 Bhuj-Naliya(GC) with extension from naliyate vayor (WR)


106 Ahmedabad-Himmatnagar-Udaipur (WR)

WR
WR

04/2008
04/2008

03/2012
03/2013

N.A.
N.A.

03/2012
03/2013

318.24
394.13

468.62
394.14

107

NHAI

11/2009

11/2013

N.A.

11/2013

567.00

567.00

NHAI

01/2011

07/2013

N.A.

07/2013

953.00

593.00

NHAI

11/2009

05/2012

N.A.

05/2012

795.00

795.00

NHAI

04/2010

10/2012

N.A.

10/2012

1740.00

1740.00

NHAI

04/2011

10/2014

N.A.

10/2014

807.00

807.00

NHAI

04/2010

06/2013

N.A.

06/2013

1267.00

1267.00

NHAI

10/2010

03/2013

N.A.

03/2013

1724.55

1724.55

NHAI

09/2010

03/2013

N.A.

03/2013

852.00

852.00

SN PROJECTS
Jaipur - Ringus - Churu and Sikar - Loharu Guage
97 Conversion (NWR)
98 Himmatnagar - Udaipur Gauge Canvession (NWR)
Suratpura - Hanumangarh - Sriganganagar Guage
99 Conversion (NWR)
ELECTRIFICATION OF KHURJA-MEERUT100 SAHARANPUR & G'BAD-MEERUT
New Work for Construction of Metro railway from Joka to
101 Binoy Badal Dinesh Bagh.
New Work for Construction of Metro railway from NSCB
102 Airport to New Garia VIA Rajarhat (MTP)
103 Ratlam-Mhow-Khandwa-Akola (GC)
104 Udhna-Jalgaon with electrification(doubling) (WR)

108

109

110

111

112

113

114

Railways
Railways
Road
Transport &
Talegaon-amravati
Highways
Road
Transport &
DEOLI-KOTA
Highways
Road
Transport &
Kishangarh-Ajmer-Beawer
Highways
Road
Transport &
Hyderabad-Vijaywada Km. 40 to 221.50 Km
Highways
Road
Transport &
PANIPAT-ROHTAK
Highways
Road
Transport &
MURADABAD-BAREILY
Highways
Road
Transport &
PUNE-SATARA(NH-4)
Highways
Road
CHENGAPALLI TO COIMBATORE BYPASS KM-102.035- Transport &
144.740 KM
Highways

SN PROJECTS

SECTOR
Road
New 4 Lane elevated road from chennai airportTransport &
115 maduravoyal NH no.4
Highways
Road
Transport &
116 Jaipur-Tonk-Deoli
Highways
Road
Transport &
117 Pune-sholapur,pkg1
Highways
Road
Transport &
118 PIMPALGAON-NASIK-GONDE, NH-3 (NHDP-PHASE-III) Highways
Road
Transport &
119 MP/Maharashtra Border-Dhula
Highways
Road
Transport &
120 Indore-Jhabua-Gujrat/MP
Highways
Road
Transport &
121 Hazaribagh-Ranchi
Highways
Road
Transport &
122 Gujarat/Maharashtra BorderSurat-Hazira Port Section
Highways
Road
CUDDAPAH-MYDUKUR-KURNOOL KM-167.750-356.502 Transport &
123 KM
Highways
Road
Transport &
124 2 Laning of Muzaffarpur - Sonbarsa
Highways
Road
DEVELOPMENT OF ADIQUATE ROAD CONNECTIVITY Transport &
125 TO CHENNAI- ENNORE PORT CONNECTIVITY
Highways
Road
SIX LANNING OF KRISHNAGIRI- WALAJHAPET
Transport &
126 SECTION KM.0.00 TO KM.148.3 NH-46
Highways
Road
SIX LANNING OF HOSUR- KRISHNAGRI NH-7 KM.33.130 Transport &
127 TO KM.93.00
Highways

AGENCY DOA

DOC
COST
DOC
DOC
ANTICIPA COST
ANTICIPA
ORGINAL REVISED TED
ORGINAL TED

NHAI

09/2010

09/2013

N.A.

09/2013

1655.00

1655.00

NHAI

06/2010

12/2012

N.A.

12/2012

792.06

792.06

NHAI

11/2009

05/2012

N.A.

05/2012

1110.00

1110.00

NHAI

03/2005

07/2012

N.A.

07/2012

940.00

940.00

NHAI

12/2009

06/2012

N.A.

06/2012

835.00

835.00

NHAI

10/2010

04/2013

N.A.

04/2013

1175.00

1175.00

NHAI

08/2010

01/2013

N.A.

01/2013

625.07

625.07

NHAI

03/2010

09/2012

N.A.

09/2012

1509.10

1509.10

NHAI

11/2010

05/2013

N.A.

05/2013

1585.00

1585.00

NHAI

05/2011

11/2013

N.A.

11/2013

511.54

511.54

NHAI

06/2011

06/2013

N.A.

06/2013

600.00

600.00

NHAI

09/2011

12/2013

N.A.

12/2013

1250.00

1250.00

NHAI

06/2011

12/2013

N.A.

12/2013

535.00

535.00

SN PROJECTS

128 GHAZIABAD-ALIGARH NH-91

129 ROHTAK-BAWAL

130 4 LANNING OF GODHARA TO GUJARAT/MP BORDER

131 4 LANNING OF AHMEDABAD TO GODHARA

132 PATNA-MUZZAFFARPUR

133 SAMAIKHIALI - GANDHIDHAM

134 Tirupati - Tiruthani - Chennai

135 2 laning of Dindigul - Perigulam Theni- kumili

136 Two laning of Trichy - Karaikudi and Trychi Bypass

137 Kandla - Mundra port

138 JAMMU-UDHAMPUR KM.27.5 TO KM.67.00

139 NASHRI CHANANI

140 QUAZIGUND-BANIHAL KM.220.00 TO KM.188.00

SECTOR
Road
Transport &
Highways
Road
Transport &
Highways
Road
Transport &
Highways
Road
Transport &
Highways
Road
Transport &
Highways
Road
Transport &
Highways
Road
Transport &
Highways
Road
Transport &
Highways
Road
Transport &
Highways
Road
Transport &
Highways
Road
Transport &
Highways
Road
Transport &
Highways
Road
Transport &
Highways

AGENCY DOA

DOC
COST
DOC
DOC
ANTICIPA COST
ANTICIPA
ORGINAL REVISED TED
ORGINAL TED

NHAI

02/2011

08/2013

N.A.

08/2013

1141.00

1141.00

NHAI

05/2011

11/2013

N.A.

11/2013

650.00

650.00

NHAI

03/2011

08/2013

N.A.

08/2013

785.50

785.50

NHAI

12/2010

06/2013

N.A.

06/2013

1008.50

1008.50

NHAI

08/2010

02/2013

N.A.

02/2013

671.30

671.30

NHAI

09/2010

03/2013

N.A.

03/2013

805.39

805.39

NHAI

04/2011

10/2013

N.A.

10/2013

571.00

571.00

NHAI

09/2011

08/2013

N.A.

08/2013

485.00

485.00

NHAI

05/2010

05/2013

N.A.

05/2013

374.00

374.00

NHAI

01/2011

07/2013

N.A.

07/2013

953.88

953.88

NHAI

07/2010

07/2013

N.A.

07/2013

1813.76

1813.76

NHAI

06/2010

06/2015

N.A.

06/2015

2159.00

2159.00

NHAI

07/2010

07/2015

N.A.

07/2015

1987.00

1987.00

SN PROJECTS

AGENCY DOA

DOC
COST
DOC
DOC
ANTICIPA COST
ANTICIPA
ORGINAL REVISED TED
ORGINAL TED

141

NHAI

11/2010

05/2013

N.A.

05/2013

325.00

325.00

NHAI

02/2011

08/2014

N.A.

08/2014

2498.76

2498.76

NHAI

03/2011

09/2013

N.A.

09/2013

359.00

359.00

NHAI

02/2011

11/2012

N.A.

11/2012

193.45

193.45

NHAI
PORT
TRUST

08/2010

05/2012

N.A.

05/2012

388.00

388.00

06/2010

03/2012

N.A.

03/2012

277.00

277.00

SHIPP.

11/2007

03/2012

N.A.

03/2012

1061.96

1082.06

SHIPP.

08/2008

09/2012

N.A.

09/2012

1066.91

968.35

SHIPP.

10/2010

02/2014

N.A.

02/2014

966.46

994.82

SHIPP.

10/2010

12/2013

N.A.

12/2013

1028.10

1028.10

SHIPP.
NMDC
NMDC
SAIL

08/2010
04/2011
02/2011
09/2008

12/2012
04/2013
05/2013
03/2013

N.A.
N.A.
N.A.
N.A.

12/2012
04/2013
05/2013
03/2013

SAIL
SAIL

11/2011
06/2009

11/2013
12/2012

N.A.
N.A.

11/2013
12/2012

DMRC

09/2011

03/2016

N.A.

03/2016

DMRC

09/2011

09/2014

N.A.

09/2014

142

143

144

145
146
147
148
149
150
151
152
153
154

SECTOR
Road
Transport &
INDORE-DEWAS(NH-3)
Highways
Road
Transport &
4 LANING OF NAGPUR-BETUL
Highways
Road
4 LANNING OF BELGUM-KHANPUR SECTION AND 2
Transport &
LANING OF KHANPUR-KNT/GOA BORDER
Highways
Road
Transport &
WADNER-DEVDHARI(NS-60/MH)(KM 94-123 KM)
Highways
Road
Transport &
Hyderabad-yadgiri N.H no-202
Highways
Shipping &
Modification & Strengthening of Existing Berth No. 1 to 6
Ports
ACQUISITION OF 6 NOS. OF 57000 DWT HANDYMAX
Shipping &
BULK CARRIERS
Ports
ACQUISITION OF 4 NOS. OF 80655 DWT PANAMAX
Shipping &
BULK CARRIERS
Ports
Acquisition of two(2) Nos. of 317000 DWT very large crude Shipping &
carriers from M/S Jiangsu rongsheng heavy
Ports
Acquistion of three(3) nos of 6500TEU Cellular container
Shipping &
vessels from M/S stx shipbuilding co. ltd.
Ports
Acquisition of 4 nos of 82000 DWT kamsavmax Bulk
Shipping &
carriers from M/S Jiangsu Eastern Heavy Industries
Ports
1.2 MTPA PELLET PLANT DONIMALAI
Steel
7.0 MTPA KUMARASWAMY IRON ORE MINE
Steel
EXPENSION OF ROURKELA STEEL PLANT
Steel

155 ENHANCEMENT OF PROD. CAP. AT BOLANI I/O MINES Steel


156 EXPANSION OF DURGAPUR STEEL PLANT
Steel
Urban
Developmen
157 DELHI MRTS PHASE-III
t
Urban
Developmen
158 FARIDABAD EXTENSION
t

612.72
627.64
572.00
572.00
898.55
898.55
11812.00 11812.00
254.55
2875.00

254.55
2875.00

35242.00 35242.00

2494.00

2494.00

List of Delay Project w.r.t Original

Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original Milestones
Cumm.
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
6

10

Atomic Energy
1 PROTOTYPE FAST BREEDER
REACTOR (BHAVINI, 500 MWE) [020100044]BHAVNI,Tamil Nadu

09/2003

3,492.00
-

5,677.00

3,410.82

09/2010
-

01/2012

16

2 KUDANKULAM APP (NPCIL) [020100040]NPCIL,Tamil Nadu

12/2001

13,171.00
-

15,824.00

14,268.00

12/2008
-

03/2013

51

3 RAJASTHAN ATOMIC POWER


PROJECT -7 and 8 (2X700 MW) [N02000027]NPCIL,Rajasthan

10/2009

12,320.00
-

12,320.00

860.00

12/2016
-

03/2017

28,983.00
-

33,821.00

18,538.82

Total

Civil Aviation
4 D/O KAMARAJ DOMESTIC TER-PH-II
And EXP. ANNA INT. [N04000038]AAI,Tamil Nadu

08/2008

1,808.00
2,015.00

2,015.00

1,598.13

01/2011
-

02/2012

13

5 C/O INTEGRATED PASSENGER TER.


BULD. NSCBI AIRPORT [N04000037]AAI,West Bengal

08/2008

1,942.51
-

2,325.00

1,730.76

05/2011
-

03/2012

10

6 Construction of New International


Terminal Building - [N04000069]AAI,Goa

05/2010

335.61
-

335.61

68.61

05/2012
-

08/2012

7 C/o new Airport at Pakyong(Sikkim)


Airport - [N04000050]AAI,Sikkim

01/2009

309.46
-

309.46

170.82

01/2011
-

12/2012

23

4,395.58
-

4,985.07

3,568.32

Total

Coal
8 BARSINGSAR TPS (2 125MW) (NLC) [060100089]NLC,Rajasthan

12/2004

1,114.18
1,626.09

1,868.71

1,714.72

06/2009
-

01/2012

31

9 KULDA OCP (MAHANADI COALFIELDS


LTD) - [060100092]MCL,Orissa

01/2005

302.96
-

302.96

87.85

03/2010
-

03/2012

24

10 TPS-II EXPANSION (1470MW TO


1970MW) (NLC) [060100087]NLC,Tamil Nadu

10/2004

2,030.78
2,453.57

2,453.57

2,361.58

06/2009
-

07/2012

37

11 ASHOK EXPN.OCP -CCL (10 MTY) [060100096]CCL,Jharkhandd

04/2006

471.66
341.63

341.63

105.51

03/2011
03/2012

03/2013

24

12 KRISHNASHILA (NCL) (4MTY) [N06000007]NCL,Madhya pradesh

05/2006

789.88
-

741.62

292.07

03/2010
-

03/2013

36

13 ADRIYALA SHAFT PROJECT [N06000016]SCCL,Andhra Pradesh

09/2006

212.34
779.26

779.26

229.64

03/2013
09/2012

12/2013

14 GEVRA EXPANSION OCP (SECL) (25


MTY) - [060100093]SECL,Chhatisgarh

07/2005

1,667.55
-

2,675.67

1,291.82

03/2010
-

03/2014

48

15 DIPKA EXPANSION OCP (SECL) (2025 MTY) [060100094]SECL,Chhatisgarh

07/2005

1,268.53
-

1,943.66

1,142.56

03/2010
-

03/2014

48

16 RAJMAHAL OC EXP. [N06000056]ECL,Multi State

02/2006

50.08
-

153.82

19.96

03/2011
-

03/2014

36

List of Delay Project w.r.t Original

Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original Milestones
Cumm.
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
6

10

17 Churi Benti UG [N06000083]CCL,Jharkhandd

06/2007

163.51
-

163.51

33.66

03/2011
03/2012

03/2014

36

18 North Urimari OCP [N06000084]CCL,Jharkhandd

12/2007

179.87
-

179.87

61.24

03/2012
03/2012

03/2014

24

19 Tapin OCP [N06000086]CCL,Jharkhandd

08/2008

264.68
-

264.68

93.47

03/2012
03/2013

03/2014

24

20 BLOCK-B OCP NCL (3.5 MTY) [N06000009]NCL,Madhya pradesh

06/2006

746.04
-

535.10

141.38

03/2012
-

03/2015

36

21 JHANJRA R-VI SEAM PSLW [N06000020]ECL,West Bengal

11/2006

287.18
-

287.17

03/2011
-

03/2015

48

22 KAKATIYA LAONGWALL [N06000048]SCCL,Multi State

12/2008

453.63
-

453.63

71.05

12/2012
-

03/2015

27

23 AMLOHRI EPR (NCL) (6 MTY) [N06000010]NCL,Madhya pradesh

05/2006

1,352.04
-

1,143.54

248.98

03/2014
-

03/2016

24

24 MAGADH OC (CCL) [N06000015]CCL,Jharkhandd

07/2006

469.78
706.40

706.40

18.16

07/2012
03/2014

03/2016

44

11,824.69
-

14,994.80

7,913.65

Total

Fertilisers
25 CAPACITY ENHANCEMENT OF
VIJAIPUR-I PLANTS [N08000007]NFL,Madhya pradesh

09/2008

325.00
-

325.00

147.84

07/2011
-

03/2012

26 CAPACITY ENHANCEMENT OF
AMMONIA AND UREA PLANT VIJ [N08000008]NFL,Madhya pradesh

09/2008

438.00
-

438.00

159.38

07/2011
-

04/2012

763.00
-

763.00

307.22

Total

Steel
27 700TPD ARI SEPARATION UNIT-4 AT
OXYGEN PLANT-II, BHILLAI [N12000023]SAIL,Chhatisgarh

07/2007

232.93
-

232.93

178.90

05/2011
-

02/2012

28 EXPANSION OF IISCO STEEL PLANT [N12000051]SAIL,West Bengal

02/2008

14,443.00
16,408.00

16,408.00

12,663.88

12/2011
-

03/2012

29 EXPANSION OF BOKARO STEEL


PLANT - [N12000055]SAIL,Jharkhandd

01/2008

6,325.00
-

6,325.00

2,367.36

12/2011
-

03/2012

30 EXPANSION OF RINL/VSP FROM 3


MTPY-6.3 MTPY OF LIQUID STEEL [120100067]RINL,Andhra Pradesh

10/2005

8,692.00
12,291.00

12,291.00

9,130.48

10/2009
10/2012

10/2012

36

31 EXPANSION OF BHILAI STEEL PLANT


- [N12000057]SAIL,Chhatisgarh

09/2008

17,265.00
-

17,265.00

4,575.39

03/2013
-

06/2013

46,957.93
-

52,521.93

28,916.01

Total

Petroleum
32 MNW-NF BRIDGE PROJECT [N16000045]ONGC,Maharashtra

05/2008

175.21
-

162.12

149.79

03/2009
02/2012

01/2012

34

33 BAWANA NANGAL PIPE LINE


PROJECT - [N16000050]GAIL,Multi
State

11/2007

1,816.07
-

1,385.00

1,082.05

10/2010
12/2011

03/2012

17

List of Delay Project w.r.t Original

Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original Milestones
Cumm.
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
6

10

34 COMPRESSOR STATIONS (KAILARAS


AND CHAINSA) [N16000054]GAIL,Multi State

11/2007

1,167.00
-

798.00

686.69

04/2011
12/2011

03/2012

11

35 RESITEMENT OF MARKETING
INSTALATION AT VISAKHAPATT [N16000057]HPCL,Andhra Pradesh

01/2009

756.00
898.00

898.00

804.61

09/2011
03/2012

03/2012

36 HEERA RECONSTRUCTION [N16000062]ONGC,Maharashtra

05/2008

706.70
-

706.70

686.67

04/2010
-

03/2012

23

37 NEELAM RECONSTRUCTION [N16000063]ONGC,Maharashtra

05/2008

305.08
-

305.08

290.05

04/2011
-

03/2012

11

38 DIESEL HYDROTREATOR PROJECT


AT VISAKH REFINERY [N16000068]HPCL,Andhra Pradesh

03/2009

3,597.00
2,730.00

2,730.00

934.05

09/2011
03/2012

03/2012

39 INTEGRATED DEV OF G1 and GS-15


(ONGCL) - [160100231]ONGC,Multi
State

04/2003

429.82
2,218.01

2,218.01

1,450.37

04/2006
05/2011

05/2012

73

40 CONSTRUCTION OF NEW PROCESS


COMPLEX MHN [N16000030]ONGC,Maharashtra

01/2007

2,853.29
6,326.40

6,326.40

4,335.28

05/2010
05/2012

05/2012

24

41 REVAMPING OF WIN PLATFORM AT


MH ASSET [N16000044]ONGC,Maharashtra

05/2008

333.40
837.54

656.51

246.28

05/2010
04/2012

05/2012

24

42 DIESEL HYDROTREATOR PROJECT


AT MUMBAI REFINERY [N16000069]HPCL,Maharashtra

03/2009

3,284.00
2,174.00

2,174.00

715.36

09/2011
05/2012

05/2012

43 KARANPUR MORADABAD-KASHIPURRUDRAPUR PIPELINE PROJECT


PHASE- - [N16000070]GAIL,Multi State

07/2009

238.68
252.37

204.00

155.45

01/2012
-

05/2012

44 DEVELOPMENT OF B-46 CLUSTER


FIELD [N16000046]ONGC,Maharashtra

06/2007

1,436.21
1,456.96

1,436.21

465.50

07/2010
05/2012

07/2012

24

45 ADDITIONAL GAS PROCESSING


FACILITI AT HAZIRA [N16000065]ONGC,Gujarat

02/2008

370.11
-

370.11

04/2011
-

07/2012

15

46 DABHOL-BANGALORE PIPELINE
PROJECT PHASE-I [N16000073]GAIL,Multi State

06/2009

4,543.43
4,508.38

2,300.00

1,539.07

03/2012
08/2012

08/2012

47 North Tapti Gas Field Development [N16000096]ONGC,Multi State

07/2008

589.70
755.76

755.76

531.38

03/2011
05/2011

10/2012

19

48 CONSTRUCTION OF 12 OFFSHORE
SUPPLY VESSELS(OSV) [N16000084]ONGC,Multi State

06/2007

736.65
-

736.65

210.71

09/2011
-

12/2012

15

49 ADDITIONAL GAS PROCESSING


UNITS AT URAN [N16000064]ONGC,Maharashtra

10/2008

1,797.35
-

977.00

12/2011
-

01/2013

13

50 IOR, RUDRASAGAR (ONGCL) [160100217]ONGC,Assam

09/2001

113.90
438.85

438.85

258.24

03/2006
03/2013

03/2013

84

51 OFFSHORE GRID
INTERCONNECTIVITY PROJECT IN
MUMBAI HIGH [N16000031]ONGC,Maharashtra

01/2007

740.02
-

740.02

417.93

03/2010
03/2012

03/2013

36

List of Delay Project w.r.t Original

Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original Milestones
Cumm.
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
6

10

52 MUMBAI HIGH SOUTH


REDEVELOPMENT PH-2 [N16000039]ONGC,Maharashtra

10/2007

5,713.03
8,813.41

8,813.41

6,808.47

05/2010
03/2013

03/2013

34

53 DEVELOPMENT OF B-22 CLUSTER


FIELDS [N16000032]ONGC,Maharashtra

01/2007

2,323.40
2,920.82

2,920.82

1,173.84

09/2010
03/2012

04/2013

31

54 102 MW WIND POWER PROJECT [N16000119]ONGC,Rajasthan

07/2010

1,106.00
-

1,106.00

06/2012
-

04/2013

10

55 Development of SB-14 field [N16000116]ONGC,Multi State

01/2011

410.44
-

410.44

11/2012
-

05/2013

56 PARADIP REFINERY PROJECT [N16000058]IOCL,Orissa

02/2009

29,777.00
-

30,426.00

13,027.63

11/2012
-

06/2013

57 MUMBAI HIGH NORTH


DEVELOPMENT PHASE-II [N16000060]ONGC,Maharashtra

01/2009

7,133.39
-

6,855.93

3,018.35

09/2012
-

09/2013

12

58 DEVELOPMENT OF B-193 CLUSTER


FIELDS [N16000033]ONGC,Maharashtra

06/2007

3,248.78
5,633.44

5,633.44

2,393.39

08/2010
03/2012

12/2013

40

59 IOR LAKWA - LAKHMANI (ONGCL) [160100215]ONGC,Assam

09/2001

345.10
663.69

663.69

595.83

03/2007
03/2014

03/2014

84

60 JHAJJAR HISSAR PIPE LINE


PROJECT - [N16000051]GAIL,Haryana

11/2007

281.07
-

281.07

3.41

10/2010
-

12/2014

50

61 JAGDISHPUR-HALDIA PIPELINE
PROJECT PHASE-I [N16000072]GAIL,Multi State

07/2009

7,596.18
-

7,596.18

2.20

01/2013
-

07/2015

30

62 IOR GELEKI (ONGCL) [160100216]ONGC,Assam

09/2001

390.09
1,674.11

1,674.11

1,413.90

03/2007
03/2017

03/2017

120

84,314.10
-

92,699.51

43,396.50

Total

Power
63 EASTERN REGION STRENGTHENING
SCHEME-II - [N18000033]PGCIL,Multi
State

12/2007

227.52
-

227.52

139.80

06/2010
06/2010

01/2012

19

64 NORTHERN REGION SYSTEM


STRENGHTENING SCHEME-XVII [N18000058]PGCIL,Rajasthan

02/2009

210.79
-

210.79

167.10

08/2011
-

01/2012

65 TR. SYSTEM ASSOCIATED WITH


TUTICORIN JV TPS [N18000062]PGCIL,Multi State

02/2009

353.57
-

353.57

219.00

07/2010
02/2012

01/2012

18

66 KOTESHWAR HEP(THDC) [180100184]THDCL,Uttaranchal

04/2000

1,301.56
-

2,283.69

2,574.64

04/2005
-

03/2012

83

67 SIPAT STPP STAGE - I (NTPC) [180100229]NTPC,Chhatisgarh

12/2003

8,323.39
-

8,323.39

7,616.00

12/2009
-

03/2012

27

68 CHAMERA,STAGE-III (NHPC) [180100241]NHPC,Himachal Pr.

08/2005

1,405.63
-

2,084.00

1,724.30

08/2010
04/2012

03/2012

19

69 EASTERN REGION STRENGTHENING


SCHEME-I - [N18000004]PGCIL,Multi
State

10/2006

975.96
-

975.66

726.70

10/2009
-

03/2012

29

70 SIMHADRI STPP STAGE -II [N18000032]NTPC,Andhra Pradesh

08/2007

5,103.39
-

5,038.83

4,354.00

05/2011
-

03/2012

10

List of Delay Project w.r.t Original

Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original Milestones
Cumm.
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
6

10

71 WESTERN REGION SYSTEM


STRENGHTENING SCHEME-XI [N18000051]PGCIL,Multi State

02/2009

409.50
-

409.50

95.60

02/2012
02/2012

03/2012

72 SYSTEM STRENGHTENING -XI IN


SOUTHERN REGION [N18000067]PGCIL,Multi State

03/2009

196.10
-

196.10

114.10

07/2011
-

03/2012

73 CHUTAK HYDRO-ELECTRIC
PROJECT (NHPC) [N18000007]NHPC,J and K

08/2006

621.26
-

913.25

718.76

02/2011
10/2012

05/2012

15

74 URI H.E.P STAGE -II (NHPC) [180100251]NHPC,J and K

08/2005

1,729.29
-

1,794.00

1,653.86

11/2009
02/2013

06/2012

31

75 KUDANKULAM-APP TRANS. SYSTEM


(PGCIL) - [180100258]PGCIL,Tamil
Nadu

05/2005

1,779.29
-

1,779.29

1,775.08

09/2008
-

06/2012

45

76 TRANSMISSION SY. ASSOCIATED


WITH BARH GENER. PROJECT(P.GR.)
- [180100260]PGCIL,Bihar

12/2005

3,779.46
4,282.59

4,282.59

3,648.00

09/2009
-

06/2012

33

77 TRANSMISSION SYSTEM
ASSOCIATED WITH PARBATI-III HEP [N18000018]PGCIL,Himachal Pr.

07/2006

557.24
-

557.24

518.50

01/2010
-

06/2012

29

78 WESTERN REGION STRENGTHENING


SCHEME-II [N18000022]PGCIL,Rajasthan

07/2006

5,221.23
-

5,221.23

3,034.30

07/2010
-

06/2012

23

79 NORTHERN REGION SYSTEM


STRENGHTENING SCHEME-XIII [N18000054]PGCIL,Multi State

02/2009

317.69
-

317.69

122.40

11/2011
11/2011

06/2012

80 TR. SYSTEM ASSOCIATED WITH


CHAMERA III HEP [N18000064]PGCIL,Multi State

04/2008

297.37
297.91

297.91

307.83

07/2011
-

06/2012

11

81 765 KV SYSTEM FOR CENTRAL PART


OF NORTHERN GRID PA [N18000068]PGCIL,Multi State

02/2009

1,347.32
-

1,347.32

950.90

02/2012
-

06/2012

82 TEESTA LOW DAM STAGE III


HYDROELECTRIC POWER PROJE [180100222]NHPC,West Bengal

10/2003

768.92
-

1,628.39

1,419.95

03/2007
09/2012

09/2012

66

83 LOHARINAG-PAL HEP(4X150MW) [N18000005]NTPC,Uttaranchal

06/2006

2,895.10
-

2,895.10

685.00

11/2011
-

12/2012

13

84 NORTHERN REGION SYSTEM


STRENGHTENING SCHEME-XV [N18000052]PGCIL,Multi State

02/2009

520.48
-

520.48

256.30

11/2011
-

12/2012

13

85 NORTHERN REGION SYSTEM


STRENGHTENING SCHEME-XVIII [N18000053]PGCIL,Multi State

02/2009

509.66
-

509.66

306.30

11/2011
-

12/2012

13

86 NORTHERN REGION SYSTEM


STRENGHTENING SCHEME-XIX [N18000056]PGCIL,Multi State

02/2009

410.29
-

410.29

145.30

02/2012
-

12/2012

10

87 PARBATI H.E.P. STAGE -III (NHPC) [180100250]NHPC,Himachal Pr.

10/2005

2,304.56
-

2,716.00

1,666.39

10/2010
01/2013

01/2013

27

88 NIMOO BAZGO HYDROELECTRIC


PROJECT - [N18000006]NHPC,J and K

08/2006

611.01
-

936.00

704.32

08/2010
01/2013

01/2013

29

89 KOLDAM HEP (NTPC) [180100211]NTPC,Himachal Pr.

10/2002

4,527.15
-

4,527.15

4,087.00

04/2009
-

03/2013

47

List of Delay Project w.r.t Original

Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original Milestones
Cumm.
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
6

10

90 WESTERN REGION STRENGTHENING


SCHEME-V [N18000035]PGCIL,Maharashtra

12/2007

477.69
-

477.69

387.90

09/2010
-

03/2013

30

91 MOUDA STPP (NTPC) [N18000048]NTPC,Maharashtra

11/2008

5,459.28
-

6,010.89

3,424.00

08/2012
-

03/2013

92 VINDHYACHAL STTP STAGE-IV


(NTPC) - [N18000072]NTPC,Madhya
pradesh

01/2009

5,915.00
-

5,915.00

2,741.00

10/2012
-

03/2013

93 RIHAND STTP STAGE-III (2X500MW)


(NTPC) - [N18000073]NTPC,Uttar
Pradesh

01/2009

6,230.81
-

6,230.81

2,529.00

10/2012
-

03/2013

94 TEESTA LOW DAM HEP, STAGE-IV


(NHPC) - [180100243]NHPC,West
Bengal

09/2005

1,061.38
-

1,501.75

1,072.97

09/2009
06/2013

06/2013

45

95 Trans. System associated with


PALLATANA GBPP & BPT [N18000080]PGCIL,Multi State

02/2010

2,144.00
-

2,144.00

547.40

12/2012
-

06/2013

96 PARE HYDRO ELECTRIC


PROJECT(110 MW) [N18000045]NEEPCO,Arunachal Pr.

12/2008

573.99
-

573.99

280.37

08/2012
08/2013

08/2013

12

97 RAMPUR HEP(412 MW) [N18000024]SJVNL,Himachal Pr.

01/2007

2,047.03
-

2,047.03

1,493.95

01/2012
-

09/2013

20

98 TRANSMISSION SYSTEM
ASSOCIATED WITH RAMPUR HEP [N18000063]PGCIL,Multi State

02/2009

184.19
-

184.19

139.70

11/2011
-

09/2013

22

99 BARH STPP STAGE -II [N18000047]NTPC,Bihar

02/2008

7,341.04
-

7,341.04

3,433.00

08/2013
-

01/2014

100 BONGAIGAON THERMAL POWER


PROJECT - [N18000041]NTPC,Assam

01/2008

4,375.35
-

4,375.35

2,735.00

06/2011
-

04/2014

34

101 TAPOVAN-VISHNUGAD HEP


(4x130MW) (NTPC) [N18000014]NTPC,Uttaranchal

11/2006

2,978.48
-

2,978.48

1,307.00

03/2013
-

06/2014

15

102 NORTH- EAST NORTH WESTERN


INTERCONNECTOR I PROJECT [N18000066]PGCIL,Multi State

02/2009

11,130.19
-

11,130.19

3,596.20

08/2013
-

09/2014

13

103 BARH STPP STAGE I (3X660MW)


NTPC - [180100242]NTPC,Bihar

12/2003

8,692.97
-

8,693.00

6,431.00

12/2009
-

12/2014

60

104 SUBANSIRI LOWER H.E.P (NHPC) [180100221]NHPC,Arunachal Pr.

09/2003

6,285.33
-

10,667.00

5,312.61

09/2010
08/2014

12/2015

63

105 TEHRI PUMPED STORAGE


PLANT(1000MW) [N18000010]THDCL,Uttar Pradesh

07/2006

1,657.00
2,978.86

2,978.86

285.17

07/2010
02/2016

02/2016

67

106 KAMENG HYDROELECTRIC PROJECT


(NEEPCO) [180100239]NEEPCO,Arunachal Pr.

12/2004

2,496.90
-

2,496.90

1,715.85

05/2013
06/2016

06/2016

37

107 VISHNUGAD PIPALKOTI HYDRO


ELECTRIC PROJECT [N18000042]THDCL,Uttaranchal

08/2008

2,491.58
2,491.58

3,422.44

238.12

07/2014
-

09/2016

26

108 KISHANGANGA HEP [N18000031]NHPC,J and K

07/2007

2,238.67
3,642.04

3,642.00

1,131.52

01/2016
01/2016

11/2016

10

109 PARBATI HEP (NHPC) II [180100210]NHPC,Himachal Pr.

09/2002

3,919.59
-

5,524.00

3,461.64

09/2009
07/2014

12/2014

63

List of Delay Project w.r.t Original

Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Total

Delay
w.r.t.
Original Milestones
Cumm.
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
6

124,405.20
-

139,091.25

81,994.83

10

Railways
110 Dakshin-barasat-lakshmikantapur (ER) [N22000116]ER,West Bengal

04/2009

259.51
-

259.51

72.61

12/2011
02/2012

02/2012

111 FREIGHT OPERATIONS


INFORMATION SYSTEM (FOIS) [220100009]FOIS,Multi State

03/1984

520.00
634.13

634.13

546.82

03/1995
-

03/2012

204

112 LANJHIGARH-JUNAGARH NL(ECOR) [220100148]ECOR,Orissa

04/1993

100.00
142.98

227.94

190.98

03/2002
-

03/2012

120

113 NANDYAL-YERRAGUNTLA(NL),SCR [220100192]SCR,Andhra Pradesh

03/1996

155.74
164.36

840.32

527.52

02/2009
-

03/2012

37

114 SALKA ROAD -ANUPNAGAR LINE


DOUBLING [N22000075]RVNL,Chhatisgarh

09/2006

324.90
-

324.90

207.45

03/2010
-

03/2012

24

115 ELECTRIFICATION OF MORADABADROZA - [N22000095]RE,Uttar Pradesh

12/2004

129.17
-

250.00

227.48

03/2011
-

03/2012

12

116 RAJPIPLA-ANKELASHWAR, WR (GC) [N22000096]WR,Gujarat

04/2006

196.97
-

196.97

190.24

03/2011
-

03/2012

12

117 RANCHI-LOHARDAGA(GC),SER [220100214]SER,Jharkhandd

04/1997

194.07
-

456.45

295.54

06/2004
-

12/2012

102

118 RAIL-CUM-ROAD BRIDGE AT


MUNGER (NL), ECR [220100307]ECR,Bihar

04/2002

921.00
-

981.00

616.60

03/2009
12/2012

12/2012

45

119 PATNA GANGA BRIDGE (NL), ECR [220100308]ECR,Bihar

04/2001

624.47
1,389.98

1,389.98

1,134.54

10/2007
12/2012

12/2012

62

120 BHOPAL BINA 3D LINE DOUBLING [N22000077]RVNL,Madhya pradesh

09/2007

687.20
-

687.20

03/2010
-

12/2012

33

121 Ghutiasharif-Canning (ER) [N22000117]ER,West Bengal

04/2009

189.97
-

189.97

78.02

12/2011
11/2013

11/2013

23

122 GOELKERA-MANOHARPUR,(LD)(SER)
- [N22000045]SER,Jharkhandd

03/1997

186.92
261.70

283.10

36.90

02/2006
-

12/2013

94

123 Lumding-SILCHAR Jiribam, BadarpurBaraigram Kumarg [N22000127]NEFR,Assam

04/1996

1,676.31
-

4,027.93

2,903.63

03/2009
-

12/2013

57

124 HOWRAH-AMTA-CHAMPADANGA NL
(SER) - [220100208]SER,West Bengal

04/1974

31.42
393.46

499.16

153.40

03/2007
03/2007

03/2014

84

125 NEW MAYNAGURI TO JOGIGHOPA


VIA CHANGRABANDHA (NL), [220100266]NEFR,Multi State

04/2000

733.00
-

1,655.80

1,076.88

12/2008
-

03/2014

63

126 Katakhal to Bhairabi [N22000126]NEFR,Assam

04/1998

227.90
-

222.92

85.29

12/2012
-

03/2014

15

127 UTRATIA-ZAFRABAD, NR (LINE


DOUBLING) - [N22000088](NR),Uttar
Pradesh

04/2006

325.00
-

819.40

114.15

03/2010
06/2014

06/2014

51

128 MUMBAI URBAN TRANSPORT


PROJECT PHASE-II, MTP [N22000092]MRTP,Maharashtra

04/2008

5,300.00
-

5,300.00

397.53

03/2014
03/2015

03/2015

12

129 TAMLUK DIGHA,LINE DOUBLING


(SER) - [N22000097]SER,West Bengal

03/1984

293.97
662.69

723.27

387.66

06/2005
07/2011

06/2015

120

List of Delay Project w.r.t Original

Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original Milestones
Cumm.
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
6

10

130 RAIL-CUM-ROAD BRIDGE OVER


RIVER BRAHAMAPUTRA BRIDG [220100201]NEFR,Assam

09/1997

1,000.00
1,500.00

3,230.01

2,308.03

04/2008
03/2014

12/2015

92

131 PANSPURA-KHARAGPUR 3D LINE [N22000076]RVNL,West Bengal

09/2007

252.50
529.23

529.23

208.25

02/2010
-

12/2015

70

132 BANKURA - DAMODAR (GC) (SER) [220100277]SER,West Bengal

03/1998

111.90
789.10

1,173.79

414.38

03/2005
12/2008

03/2016

132

133 JIRIBAM TO IMPHAL


(TUPUI)(NL)(NEFR) [220100288]NEFR,Manipur

04/2003

727.56
-

3,056.85

592.92

03/2011
03/2014

03/2016

60

134 New Work for Construction of Metro


railway from Ba [N22000109]RVNL,West Bengal

04/2010

2,069.60
-

2,069.60

4.01

03/2014
03/2016

03/2016

24

135 New Work for Construction of Metro


railway from No [N22000108]RVNL,West Bengal

04/2010

2,397.72
-

2,397.72

8.17

03/2016
-

06/2016

136 UDHAMPUR-SRINAGAR-BARAMULLA
(NL),NR - [220100133](NR),J and K

03/1995

2,500.00
8,000.00

20,000.00

7,787.91

03/2001
-

12/2017

201

22,136.80
-

52,427.15

20,566.91

Total

Road Transport & Highways


137 HALDIA PORT (PORT
CONNECTIVITY) (NH-41) [240104196]NHAI,West Bengal

04/2000

273.00
-

522.00

475.60

03/2005
-

01/2012

82

138 HARIHAR-CHITRADURGA (GQ)


KM.284-KM.207 (NH-4) [240101133]NHAI,Karnataka

04/2000

318.00
-

207.56

177.69

08/2004
-

02/2012

90

139 GAGODHAR-GARAMORE(PK-IV,NH15)
KM 245 TO 281.3 AND 308 TO 254 [240106216]NHAI,Gujarat

12/2003

412.78
-

479.54

437.80

11/2007
-

02/2012

51

140 JHANSI TO LALITPUR, NH-25,26 [N24000096]NHAI,Uttar Pradesh

12/2003

355.06
-

355.06

436.10

09/2009
-

02/2012

29

141 HAVERI-HARIHAR (GQ) KM.340KM.284 (NH-4) [240101132]NHAI,Karnataka

04/2000

241.00
-

196.65

167.83

08/2004
07/2010

03/2012

91

142 VIJAYAPUR TO PATHANKOT (J&K)


NH-1A KM.16.35 TO KM.50.00 [240106235]NHAI,J and K

12/2003

193.09
-

166.30

184.60

03/2008
-

03/2012

48

143 VIJAYAPUR TO PATHANKOT (NS35/J&K) NH-1A KM.50 TO KM.80 [240106236]NHAI,J and K

12/2003

166.27
-

193.10

155.10

03/2008
-

03/2012

48

144 KOTWA TO DEWAPUR(10


LMNHP),NH-28 PHASE-II, KM.440 TO
KM.402 - [240106243]NHAI,Bihar

12/2003

240.00
-

240.00

285.60

10/2008
-

03/2012

41

145 ORAI TO JHANSI (UP-5),NH-25,


KM.220.0 TO KM.170.0 [240106250]NHAI,Uttar Pradesh

12/2003

340.68
-

340.68

362.10

03/2008
-

03/2012

48

146 AURANG-RAIPUR, NH-6, KM.232 TO


KM.281 - [240106260]NHAI,Chhatisgarh

03/2005

190.00
-

190.00

247.30

01/2009
-

03/2012

38

147 DAKOBA TO NAGAON (NH-36)(NHAI)


- [240106288]NHAI,Assam

12/2003

225.00
-

225.00

264.70

06/2008
-

03/2012

45

List of Delay Project w.r.t Original

Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original Milestones
Cumm.
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
6

10

148 UP/BIHAR BORDER TO KASIA (NH28)(NHAI) - [240106292]NHAI,Uttar


Pradesh

12/2003

227.00
-

227.00

383.00

12/2008
-

03/2012

39

149 FORBESGANJ TO SIMRAHI (NH57)(NHAI) - [240106294]NHAI,Bihar

12/2003

332.94
-

332.94

323.30

09/2008
-

03/2012

42

150 JHAJHARPUR TO DARBANGA (BR-7) [N24000031]NHAI,Bihar

12/2003

340.00
-

340.00

477.10

09/2008
-

03/2012

42

151 ASSAM/WB BORDER TO GAIRKATTA


(WB-1) - [N24000045]NHAI,West Bengal

12/2003

221.82
-

221.82

261.00

11/2008
-

03/2012

40

152 SALEM - U / UNDRUPET(BOT -1/TN06) NH -68 - [N24000102]NHAI,Tamil


Nadu

03/2005

941.00
-

941.00

1,901.00

01/2011
-

03/2012

14

153 ZIRAKPUR(HARYANA) PARWANOO(HIMACHAL PRADESH) [N24000117]NHAI,Multi State

02/2008

295.00
-

295.00

759.90

08/2010
-

03/2012

19

154 END OF DURG BYPASSCHHATISGARH/MAHARASHTRA


BORDER [N24000118]NHAI,Chhatisgarh

01/2008

464.00
-

464.00

531.90

01/2011
-

03/2012

14

155 Surat- Dahisar(Six Lane) Km 263 to Km


502 - [N24000131]NHAI,Multi State

02/2009

1,693.75
-

1,693.75

2,610.00

08/2011
-

03/2012

156 LALITPUR TO SAGAR KM 132 TO KM


187, NH-26 (NHAI) [240106300]NHAI,Madhya pradesh

12/2003

225.00
-

225.00

257.50

10/2008
-

04/2012

42

157 Armur to kadloor yellareddy [N24000143]NHAI,Andhra Pradesh

02/2010

390.56
-

390.56

616.00

02/2012
-

04/2012

158 SAGAR BY PASS,KM 187 TO KM 211 ,


NH-26 (NHAI) - [240106301]NHAI,Uttar
Pradesh

12/2003

151.30
-

151.30

177.00

10/2008
-

05/2012

43

159 SONAPUR TO GUWAHTI (AS-3) [N24000044]NHAI,Assam

12/2003

245.00
-

245.00

491.20

03/2008
-

05/2012

50

160 GANJAM-ICCHAPURUM,NH-5(NHAI) [N24000057]NHAI,Orissa

04/2000

263.27
-

263.27

259.07

02/2004
-

05/2012

99

161 NH CONNECTIVITY TO ICTT


VALLARPADAEU NH - SH [N24000107]NHAI,Kerala

03/2005

557.00
-

557.00

930.90

02/2010
-

05/2012

27

162 PATHANKOT BHOGPUR NH-1A [N24000115]NHAI,Punjab

12/2003

229.00
-

284.00

349.30

05/2010
-

05/2012

24

163 SILCHAR-UDARBAND (PH.II) HN-54,


KM.309 TO KM.275 [240100207]NHAI,Assam

12/2003

157.47
-

154.57

186.00

09/2007
-

06/2012

57

164 AGRA-SHIKOHABAD (GQ) KM.199.66KM.250.50 (NH-2) [240101173]NHAI,Uttar Pradesh

04/2000

367.49
-

367.49

453.68

03/2005
-

06/2012

87

165 GARHMUKTESHWAR-MURADABAD
(NHAI) OTHERS KM.93-149.25, NH-24 [240106204]NHAI,Uttar Pradesh

12/2003

275.00
-

275.00

300.00

09/2007
-

06/2012

57

166 HAPUR-GARHMUKTESWAR
(OTHERS) KM.58-93, NH-24 [240106205]NHAI,Uttar Pradesh

03/2005

220.00
-

220.00

258.80

09/2007
-

06/2012

57

167 GANGA BRIDGE TO RAMDEVI


CROSSING PH.II NH-25, KM.75-80.06 [240106221]NHAI,Uttar Pradesh

12/2003

155.00
-

201.66

100.30

09/2008
-

06/2012

45

List of Delay Project w.r.t Original

Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original Milestones
Cumm.
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
6

10

168 DEEWAPUR TO UP/BIHAR BORDER


(LMNHP-9)-NH-28, KM.402-360.915 [240106244]NHAI,Bihar

12/2003

300.00
-

300.00

170.20

10/2008
-

06/2012

44

169 BIJNI TO ASSAM WB BORDER (NH31.C)(1)(NHAI) [240106290]NHAI,Assam

12/2003

195.00
-

195.00

182.68

06/2008
-

06/2012

48

170 NALBARI TO BIJNI (AS-8) [N24000035]NHAI,Assam

12/2003

200.00
-

200.00

266.44

06/2008
-

06/2012

48

171 NAGAON TO DHARAMTUL (AS-2) [N24000042]NHAI,Assam

12/2003

264.72
-

264.72

267.80

06/2008
-

06/2012

48

172 NALBARI TO BIJNI (AS-6) [N24000047]NHAI,Assam

12/2003

225.00
-

225.00

188.90

06/2008
-

06/2012

48

173 DHARAMTUL TO SONAPUR,KM 205183 (AS-20) - [N24000049]NHAI,Assam

12/2003

160.00
-

160.00

132.10

05/2008
-

06/2012

49

174 DHARAMTUL TO SONAPUR (AS-19) [N24000051]NHAI,Assam

12/2003

200.00
-

200.00

204.70

06/2008
-

06/2012

48

175 NAGPUR-KONDHALI,NH-6(NHAI) [N24000055]NHAI,Maharashtra

03/2005

168.00
-

168.00

457.30

12/2008
-

06/2012

42

176 GORAKHPUR BYPASS, NH-28,


PHASE-II EAST-WEST CORRID [N24000085]NHAI,Uttar Pradesh

12/2003

600.24
-

600.24

742.00

10/2009
-

06/2012

32

177 GWALIOR BYPSS, NH-75,3 [N24000088]NHAI,Madhya pradesh

12/2003

300.93
-

300.93

294.60

10/2009
-

06/2012

32

178 GWALIOR-JHANSI, NH-75 [N24000089]NHAI,Multi State

12/2003

604.00
-

604.00

470.10

12/2009
-

06/2012

30

179 Gurgaon-Kotputli Km 42.70 to 54.4 Km [N24000130]NHAI,Multi State

04/2009

1,673.70
-

1,673.70

2,406.00

10/2011
-

06/2012

180 Panipat-Jalandhar 6 lane(Km 96 to


387.1 km) - [N24000133]NHAI,Haryana

05/2009

1,108.00
-

2,288.00

3,196.00

11/2011
-

06/2012

181 SUNAKHALA-GANJAM (GQ) KM.338KM.284 (NH-5) [240101153]NHAI,Orissa

04/2000

225.00
-

241.53

91.40

04/2004
-

07/2012

99

182 BALASORE BHADRAK (REVIVED) KM


136.5 - 199.14 NH-5 [N24000116]NHAI,Orissa

04/2000

228.70
-

228.70

182.03

02/2004
-

07/2012

101

183 PATHANKOT- BHOGPUR, KM.26KM.70, NH-1A [240106237]NHAI,Punjab

12/2003

284.00
-

359.00

157.40

05/2008
-

08/2012

51

184 KOTA BYPASS,RJ-4, NH-76 (NHAI) [240106297]NHAI,Rajasthan

12/2003

275.00
-

250.39

278.50

10/2008
-

09/2012

47

185 RAJMARG CHORAHA TO


LAKHNANDON,KM 351 TO KM 405.7,
NH-26 (NHA [240106305]NHAI,Madhya pradesh

12/2003

229.91
-

229.91

235.00

10/2008
-

09/2012

47

186 LAKHNAADON TO MP/MH


BORDER,KM 596.75-653 (NS1/BOT/MP-2),NH7 [N24000094]NHAI,Madhya pradesh

12/2003

407.60
-

407.60

185.50

06/2010
-

10/2012

28

187 LAKHNADON TO MP/MH BORDER


(NS-1/BOT/MP-2), NH-7 [N24000095]NHAI,Madhya pradesh

12/2003

263.17
-

263.17

233.40

09/2009
-

10/2012

37

10

List of Delay Project w.r.t Original

Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original Milestones
Cumm.
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
6

10

188 Four Lanning from MP/Maharashtra


Border to nagpur [N24000124]NHAI,Maharashtra

04/2010

1,170.52
-

1,170.52

4.41

06/2011
-

10/2012

16

189 Chilkaluripet-Vijaywada 6 lane (km 355


to Km 434.1) [N24000132]NHAI,Andhra Pradesh

05/2009

572.30
-

572.30

580.00

10/2011
-

10/2012

12

190 THANJAUR-TRICHY,NH-67(NHAI) [N24000056]NHAI,Tamil Nadu

03/2005

280.00
-

280.00

581.50

06/2009
-

11/2012

41

191 BIJNI TO ASSAM /WB.BORDER (NH31.C)(2)(NHAI) [240106293]NHAI,Assam

12/2003

237.80
-

237.80

217.70

06/2008
-

12/2012

54

192 SAGAR - RAJMARG CHORAHA,KM


211 TO KM 255, NH-26 (NHAI) [240106303]NHAI,Madhya pradesh

12/2003

203.43
-

203.43

217.30

10/2008
-

12/2012

50

193 RAJMARG CHORAHA TO


LAKHNANDON,KM 297 TO KM 351,
NH-26 (NHAI) [240106304]NHAI,Madhya pradesh

12/2003

251.03
-

251.03

287.80

10/2008
-

12/2012

50

194 SILIGURI TO ISLAMPUR (WB-7) [N24000028]NHAI,West Bengal

12/2003

225.00
-

225.00

177.40

07/2008
-

12/2012

53

195 GUWHATI TO NALBARI (AS-4) [N24000038]NHAI,Assam

12/2003

175.96
-

175.96

129.50

04/2008
-

12/2012

56

196 GUWAHATI TO NALBARI (AS-5) [N24000046]NHAI,Assam

12/2003

198.16
-

198.16

192.90

04/2008
-

12/2012

56

197 NALBARI T BIJNI (AS-7) [N24000048]NHAI,Assam

12/2003

208.00
-

208.00

235.50

04/2008
-

12/2012

56

198 BRAHMPUTRA BRIDGE,NH NO-31 [N24000063]NHAI,Assam

12/2003

217.61
-

217.61

165.80

04/2010
-

12/2012

32

199 DHOLPUR - MORENA SECTION


(INCLUDING CHAMBOL BRIDGE [N24000108]NHAI,Multi State

12/2003

232.45
-

232.45

173.60

09/2010
-

12/2012

27

200 DELHI/ HARYANA BORDER TO


ROHTAK - [N24000122]NHAI,Haryana

04/2007

486.00
-

486.00

573.30

05/2010
-

12/2012

31

201 HARANGAJO TO MAIBANG (AS-23),


KM.126.450 TO KM.140.700 [240106277]NHAI,Assam

12/2003

280.00
-

280.00

244.10

02/2009
-

03/2013

49

202 MAIBANG TO LUNDING (AS-27),


KM.40.000 TO KM.60.500 [240106281]NHAI,Assam

12/2003

200.00
-

200.00

89.64

04/2009
-

03/2013

47

203 TRICHY - KORUR NH-67 [N24000101]NHAI,Tamil Nadu

03/2005

516.00
-

516.00

691.90

07/2010
-

03/2013

32

204 AGRA-BYPASS(NS-1/UP-1),KM 176.813.03 NH-2,3 - [N24000098]NHAI,Uttar


Pradesh

12/2003

348.16
-

465.50

135.60

09/2007
-

06/2013

69

205 AMRITSAR-PATHANKOT [N24000147]NHAI,Punjab

05/2010

705.00
-

705.00

846.50

11/2012
-

06/2013

206 MAIBANG TO LUNDING (AS-25),


KM.83.400 TO KM.111.000 [240106278]NHAI,Assam

12/2003

199.81
-

385.13

38.05

04/2009
-

07/2013

51

207 MAIBANG TO LUNDING (AS-24),


KM.111.000 TO KM.126.450 [240106280]NHAI,Assam

12/2003

155.04
-

280.13

65.49

11/2008
-

07/2013

56

11

List of Delay Project w.r.t Original

Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Delay
w.r.t.
Original Milestones
Cumm.
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
6

10

208 CHAMBAL BRIDGE, NH-76 (RJ-5) [N24000068]NHAI,Rajasthan

12/2003

275.00
-

281.31

179.20

02/2010
-

07/2013

41

209 SIX LANNING OF VADAKKANCHERRY


THRISSURESECTION [N24000149]NHAI,Kerala

02/2010

617.00
-

617.00

154.50

08/2012
-

10/2013

14

210 MAIBANG TO LUNDING (AS-26),


KM.60.500 TO KM.83.400, NH-54 [240106279]NHAI,Assam

12/2003

167.64
-

167.64

2,047.00

11/2008
-

01/2014

62

211 Chennai-Tada(Six lane) [N24000129]NHAI,Tamil Nadu

04/2009

353.37
-

353.37

225.80

10/2011
-

03/2014

29

212 2 LANNING OF MOKAMA-MUNGER [N24000166]NHAI,Bihar

05/2011

351.54
-

351.54

154.70

05/2013
-

03/2014

10

213 HARANGAJO TO MAIBANG,km 164.08190.587 NH-54 [N24000061]NHAI,Assam

12/2003

212.00
-

386.10

09/2007
-

04/2014

79

214 HARANGAJO TO MAIBANG, NH-54 [N24000062]NHAI,Assam

12/2003

196.00
-

363.74

07/2009
-

04/2014

57

27,654.27
-

29,936.86

33,572.61

Total

Shipping & Ports


215 SETTING UP OF LNG
REGASIFICATION TERMINAL AT
PUTHU - [N25000048]PORT
TRUST,Kerala

03/2009

3,500.00
-

3,500.00

01/2012
-

03/2012

216 ACQUISITION OF 4 NO. OF ANCHOR


HANDLING CUM SUPPLY [N25000014]SHIPP.,Maharashtra

10/2007

359.44
-

359.44

358.79

04/2011
06/2011

06/2012

14

217 Acquisition of two nos. of 120 B.P [N25000042]SHIPP.,Maharashtra

04/2009

290.85
305.00

305.00

86.46

06/2011
01/2012

06/2012

12

218 Acquisition of Two nos. of 3060 DWT [N25000043]PORT TRUST,Maharashtra

04/2009

277.03
280.00

277.03

81.40

12/2011
08/2012

08/2012

219 CONST. & DEV. OF 2 OFFSHORE


CONTAINER BERTHS & TER [N25000016]MUMBAI PORT
TRU,Maharashtra

11/2007

1,228.00
-

1,460.00

652.40

12/2010
-

09/2012

21

220 Mechanization of coal handling facilities


to 200 - [N25000049]PORT
TRUST,Andhra Pradesh

02/2010

444.10
-

444.10

06/2010
-

11/2012

29

221 C/O Berthing and Allied Facilities off


tekra near - [N25000037]PORT
TRUST,Gujarat

04/2005

882.00
-

1,060.00

0.16

02/2011
-

03/2013

25

222 CONSTRUCTION OF 13 & 14 CARGO


BERTH AT KANDLA [N25000039]PORT TRUST,Gujarat

12/2005

702.00
-

755.50

219.00

03/2011
-

03/2013

24

223 SETTING UP OF AN INTERNATIONAL


CRUISE TERMINAL AT [N25000047]PORT TRUST,Kerala

03/2008

375.00
272.50

272.50

01/2009
-

05/2013

52

224 ENNORE MANALI EXPRESS WAY,F/O


SPECIAL PURPOSE VEHI [N25000035]SHIPP.,Tamil Nadu

10/2002

150.00
600.00

600.00

67.00

03/2006
-

12/2013

93

12

List of Delay Project w.r.t Original

Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Anticipated
Cost

Total

Delay
w.r.t.
Original Milestones
Cumm.
Achieved/
Expendi- Original / Antici(in
Total
ture
Revised pated months)
6

8,208.42
-

9,033.57

1,465.21

Telecommunications
225 PROJ.III OF NIB-II OF MESSAGING
STORAGE - [260100099]BSNL,Multi
State

11/2003

250.00
-

425.51

161.31

12/2005
-

03/2012

75

226 GSM EQUIPMENT OF 390K LINES(2G)


AND 130K LINES(3G) [N26000041]BSNL,Punjab

02/2008

373.94
-

373.94

211.36

12/2008
-

03/2012

39

227 Assam Telecom Circle, Phase-V.I, 2G &


3G - [N26000062]BSNL,Assam

06/2007

336.81
-

336.81

155.71

01/2009
-

03/2012

38

228 GSM equipment of 799000Lines (2G)


101000 lines 3(G [N26000088]BSNL,Jharkhandd

03/2008

328.13
-

328.12

164.58

03/2009
-

03/2012

36

229 GSM equipment of 1867000Lines (2G)


383000 lines 3( [N26000089]BSNL,Gujarat

08/2008

868.00
-

868.00

362.62

08/2009
-

03/2012

31

230 GSM equipment of 1625000Lines (2G)


325000 lines 3( [N26000090]BSNL,Madhya pradesh

11/2009

916.70
930.60

930.60

757.02

11/2010
-

03/2012

16

231 ERP implementation in BSNL on


Turnkey basis - [N26000096]BSNL,Multi
State

10/2009

384.00
-

384.00

21.80

10/2010
03/2012

07/2012

21

3,457.58
-

3,646.98

1,834.40

6,395.00
-

11,609.00

2,267.57

12/2011
-

12/2013

24

6,395.00
-

11,609.00

2,267.57

542.90
-

1,187.00

35.49

12/2007
-

12/2012

60

542.90
-

1,187.00

35.49

370,038.47

446,717.12

244,377.54

Total

Urban Development
232 BANGALORE METRO RAIL PROJECT
- [N28000008]MRTP,Karnataka

05/2006

Total

Water Resources
233 PAGLADIYA DAM PROJECT [300100001]MoWR,Assam
Total

Grand Total

01/2001

13

10

List of Projects Without Milestones

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Original /
Revised

Anticipated

04/2011

04/2012

Atomic Energy
1 URANIUM ORE MINE and PROCESSING PLANT
AT TUMMALAP - [N02000007]UCIL,Andhra Pradesh

09/2007

Total

1,106.29
1,106.29
-

Civil Aviation
2 D/O KAMARAJ DOMESTIC TER-PH-II And EXP.
ANNA INT. - [N04000038]AAI,Tamil Nadu

08/2008

1,808.00
2,015.00

01/2011
-

02/2012

3 C/O INTEGRATED PASSENGER TER. BULD.


NSCBI AIRPORT - [N04000037]AAI,West Bengal

08/2008

1,942.51
-

05/2011
-

03/2012

4 Construction of New International Terminal Building [N04000069]AAI,Goa

05/2010

335.61
-

05/2012
-

08/2012

5 C/o new Airport at Pakyong(Sikkim) Airport [N04000050]AAI,Sikkim

01/2009

309.46
-

01/2011
-

12/2012

6 GAGAN PROJECT - [N04000065]AAI,Multi State

09/2008

626.00
-

06/2013
-

06/2013

Total

5,021.58
-

Coal
7 KARMA OCP - [N06000088]CCL,Jharkhandd

06/2009

162.46
-

03/2014
-

03/2014

8 Muraidih UG - [N06000096]BCCL,Jharkhandd

02/2011

339.88
-

04/2014
-

04/2014

9 BLOCK-B OCP NCL (3.5 MTY) [N06000009]NCL,Madhya pradesh

06/2006

746.04
-

03/2012
-

03/2015

10 RCE OF INDARAM OCP(1.20 MTPA) [N06000093]SCCL,Andhra Pradesh

07/2011

162.76
-

03/2015
-

03/2015

11 JALAGAM VENGALA RAO OCP [N06000094]SCCL,Andhra Pradesh

07/2011

447.06
-

03/2015
-

03/2015

12 Moonidih XV Seam UG [N06000098]BCCL,Jharkhandd

08/2011

1,230.27
-

04/2015
-

04/2015

13 KHADIA EXPANSION OPENCAST PROJECT 4 TO


10 MTPA,6MT - [N06000091]NCL,Uttar Pradesh

06/2011

1,131.28
1,131.28

03/2018
-

03/2018

Total

4,219.75
-

Fertilisers
14 CAPACITY ENHANCEMENT OF VIJAIPUR-I
PLANTS - [N08000007]NFL,Madhya pradesh

09/2008

325.00
-

07/2011
-

03/2012

15 CAPACITY ENHANCEMENT OF AMMONIA AND


UREA PLANT VIJ - [N08000008]NFL,Madhya
pradesh

09/2008

438.00
-

07/2011
-

04/2012

Total

763.00
-

Steel

List of Projects Without Milestones

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Original /
Revised

Anticipated

16 1.2 MTPA PELLET PLANT DONIMALAI [N12000072]NMDC,Karnataka

04/2011

572.00
-

04/2013
-

04/2013

17 7.0 MTPA KUMARASWAMY IRON ORE MINE [N12000073]NMDC,Karnataka

02/2011

898.55
-

05/2013
-

05/2013

18 ENHANCEMENT OF PROD. CAP. AT BOLANI I/O


MINES - [N12000075]SAIL,Orissa

11/2011

254.55
-

11/2013
-

11/2013

Total

1,725.10
-

Petroleum
19 Integrated Sugar, Ethanol, Cogen Power Plant at
Sugauli - [N16000102]HPCL,Bihar

06/2009

613.54
-

12/2010
-

06/2011

20 DIESEL HYDRO TREATMENT PROJECT,BRPL


DHALIGAON - [N16000009]BRPL,Assam

06/2006

1,431.91
1,646.39

09/2009
-

08/2011

21 MNW-NF BRIDGE PROJECT [N16000045]ONGC,Maharashtra

05/2008

175.21
-

03/2009
02/2012

01/2012

22 MRPL Phase-III Expansion - [N16000114]Mangalore


Refin,Karnataka

08/2008

12,412.00
12,160.26

01/2012
-

01/2012

23 RESITEMENT OF MARKETING INSTALATION AT


VISAKHAPATT - [N16000057]HPCL,Andhra Pradesh

01/2009

756.00
898.00

09/2011
03/2012

03/2012

24 BRANCH PIPELINE FROM KSPL VIRAMGAON TO


KANDLA - [N16000059]IOCL,Gujarat

02/2009

250.00
349.00

03/2013
03/2013

03/2012

25 HEERA RECONSTRUCTION [N16000062]ONGC,Maharashtra

05/2008

706.70
-

04/2010
-

03/2012

26 NEELAM RECONSTRUCTION [N16000063]ONGC,Maharashtra

05/2008

305.08
-

04/2011
-

03/2012

27 DIESEL HYDROTREATOR PROJECT AT VISAKH


REFINERY - [N16000068]HPCL,Andhra Pradesh

03/2009

3,597.00
2,730.00

09/2011
03/2012

03/2012

28 WIND ENERGY - [N16000126]GAIL,Multi State

05/2011

616.00
-

03/2012

29 INTEGRATED DEV OF G1 and GS-15 (ONGCL) [160100231]ONGC,Multi State

04/2003

429.82
2,218.01

04/2006
05/2011

05/2012

30 CONSTRUCTION OF NEW PROCESS COMPLEX


MHN - [N16000030]ONGC,Maharashtra

01/2007

2,853.29
6,326.40

05/2010
05/2012

05/2012

31 REVAMPING OF WIN PLATFORM AT MH ASSET [N16000044]ONGC,Maharashtra

05/2008

333.40
837.54

05/2010
04/2012

05/2012

32 DIESEL HYDROTREATOR PROJECT AT MUMBAI


REFINERY - [N16000069]HPCL,Maharashtra

03/2009

3,284.00
2,174.00

09/2011
05/2012

05/2012

33 ADDITIONAL DEV. OF D-1 FIELD [N16000086]ONGC,Multi State

01/2010

2,163.64
-

06/2012
-

06/2012

34 CONSTRUCTION OF TANKS AND BLENDING


FACILITY AT VAD - [N16000115]IOCL,Gujarat

02/2009

267.00
-

09/2012
09/2012

06/2012

35 DEVELOPMENT OF B-46 CLUSTER FIELD [N16000046]ONGC,Maharashtra

06/2007

1,436.21
1,456.96

07/2010
05/2012

07/2012

36 ADDITIONAL GAS PROCESSING FACILITI AT


HAZIRA - [N16000065]ONGC,Gujarat

02/2008

370.11
-

04/2011
-

07/2012

37 Polypropylene unit - [N16000113]Mangalore


Refin,Karnataka

05/2009

1,803.78
-

07/2012
-

07/2012

38 Up-gradation of Konaban GGS and Pipeline Grid


Project - [N16000098]ONGC,Tripura

07/2008

288.04
288.04

08/2012
-

08/2012

39 Construction of 6 ETPs - [N16000117]ONGC,Gujarat

03/2009

302.26
-

09/2012
-

09/2012

List of Projects Without Milestones

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Original /
Revised

Anticipated

40 North Tapti Gas Field Development [N16000096]ONGC,Multi State

07/2008

589.70
755.76

03/2011
05/2011

10/2012

41 CONSTRUCTION OF 12 OFFSHORE SUPPLY


VESSELS(OSV) - [N16000084]ONGC,Multi State

06/2007

736.65
-

09/2011
-

12/2012

42 ADDITIONAL GAS PROCESSING UNITS AT URAN


- [N16000064]ONGC,Maharashtra

10/2008

1,797.35
-

12/2011
-

01/2013

43 OFFSHORE GRID INTERCONNECTIVITY


PROJECT IN MUMBAI HIGH [N16000031]ONGC,Maharashtra

01/2007

740.02
-

03/2010
03/2012

03/2013

44 MUMBAI HIGH SOUTH REDEVELOPMENT PH-2 [N16000039]ONGC,Maharashtra

10/2007

5,713.03
8,813.41

05/2010
03/2013

03/2013

45 ASSAM RENEWAL PROJECT FOR GROUP A [N16000061]ONGC,Assam

03/2009

2,465.15
-

03/2013
-

03/2013

46 Construction of one Multipurpose Support Vessel [N16000103]ONGC,Multi State

01/2010

723.64
-

03/2013
-

03/2013

47 Development of Cluster-7 Fields [N16000104]ONGC,Multi State

03/2010

3,241.03
-

03/2013
-

03/2013

48 Development of BHE and BH-35 Area. [N16000118]ONGC,Multi State

08/2010

372.11
-

03/2013
-

03/2013

49 DEVELOPMENT OF C-SERIES FIELDS [N16000023]ONGC,Maharashtra

08/2006

3,195.16
-

12/2008

04/2013

50 DEVELOPMENT OF B-22 CLUSTER FIELDS [N16000032]ONGC,Maharashtra

01/2007

2,323.40
2,920.82

09/2010
03/2012

04/2013

51 102 MW WIND POWER PROJECT [N16000119]ONGC,Rajasthan

07/2010

1,106.00
-

06/2012
-

04/2013

52 Development of SB-14 field [N16000116]ONGC,Multi State

01/2011

410.44
-

11/2012
-

05/2013

53 CONVERSION OF RIG SAGAR SAMRAT TO


MOBILE OFFSHORE [N16000128]ONGC,Maharashtra

03/2011

861.79
-

05/2013
-

05/2013

54 Construction of 23 Immediate Supply Vessels (ISV) [N16000123]ONGC,Multi State

11/2010

331.20
-

08/2013
-

08/2013

55 MUMBAI HIGH NORTH DEVELOPMENT PHASE-II [N16000060]ONGC,Maharashtra

01/2009

7,133.39
-

09/2012
-

09/2013

56 DEVELOPMENT OF B-193 CLUSTER FIELDS [N16000033]ONGC,Maharashtra

06/2007

3,248.78
5,633.44

08/2010
03/2012

12/2013

57 Wax Project - [N16000101]NRL,Assam

06/2010

576.60
-

12/2013
12/2013

12/2013

58 Development of WO-16 Cluster Fields [N16000105]ONGC,Multi State

06/2010

2,523.00
-

01/2014
-

01/2014

59 CONSTRUCTION OF ONE ETP AND THREE ETPS


CUM WATER - [N16000127]ONGC,Assam

06/2010

202.94
-

01/2014
-

01/2014

60 PETROCHEMICAL COMPLEX-II AT VIJAYPUR


AND PATA - [N16000112]GAIL,Multi State

08/2010

8,140.00
-

02/2014
-

02/2014

61 JHAJJAR HISSAR PIPE LINE PROJECT [N16000051]GAIL,Haryana

11/2007

281.07
-

10/2010
-

12/2014

62 Ahmedabad Redevelopment [N16000120]ONGC,Gujarat

11/2010

1,916.10
-

12/2014
-

12/2014

63 Ankleswar Redevelopment [N16000122]ONGC,Gujarat

11/2010

2,189.63
-

12/2014
-

12/2014

64 Mehesana Redevelopment [N16000121]ONGC,Gujarat

11/2010

3,823.00
-

04/2015
-

04/2015

List of Projects Without Milestones

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Original /
Revised

Anticipated

65 JAGDISHPUR-HALDIA PIPELINE PROJECT


PHASE-I - [N16000072]GAIL,Multi State

07/2009

7,596.18
-

01/2013
-

07/2015

66 CONSTRUCTION OF NEW TERMINAL AT


ENNORE CHENNAI - [N16000066]HPCL,Tamil
Nadu

01/2008

224.00
299.00

02/2011
08/2011

67 DE-BOTTLENECKING OF SMPL (Salaya-Mathura


crude pip - [N16000089]IOCL,Maharashtra

12/2009

1,584.00
-

Total

98,440.35
-

Power
68 EASTERN REGION STRENGTHENING SCHEME-II
- [N18000033]PGCIL,Multi State

12/2007

227.52
-

06/2010
06/2010

01/2012

69 NORTHERN REGION SYSTEM STRENGHTENING


SCHEME-XVII - [N18000058]PGCIL,Rajasthan

02/2009

210.79
-

08/2011
-

01/2012

70 TR. SYSTEM ASSOCIATED WITH TUTICORIN JV


TPS - [N18000062]PGCIL,Multi State

02/2009

353.57
-

07/2010
02/2012

01/2012

71 WESTERN REGION STRENGHTENING SCHEMEX - [N18000049]PGCIL,Multi State

02/2009

664.96
-

02/2012
-

02/2012

72 WESTERN REGION SYSTEM STRENGHTENING


SCHEME-XI - [N18000051]PGCIL,Multi State

02/2009

409.50
-

02/2012
02/2012

03/2012

73 SYSTEM STRENGHTENING -XI IN SOUTHERN


REGION - [N18000067]PGCIL,Multi State

03/2009

196.10
-

07/2011
-

03/2012

74 IMMEDIATE EVACUATION SYSTEM FOR


NABINAGAR TPS - [N18000082]PGCIL,Bihar

02/2010

215.86
-

06/2012
-

03/2012

75 System Strengthening -X of SR [N18000086]PGCIL,Multi State

12/2009

276.61
-

04/2012
-

04/2012

76 765KV SYSTEM FOR CENTRAL PART OF


NORTHERN GRID PAR - [N18000079]PGCIL,Multi
State

11/2009

1,075.12
-

05/2012
-

05/2012

77 NORTHERN REGION SYSTEM STRENGHTENING


SCHEME-XIII - [N18000054]PGCIL,Multi State

02/2009

317.69
-

11/2011
11/2011

06/2012

78 TR. SYSTEM ASSOCIATED WITH CHAMERA III


HEP - [N18000064]PGCIL,Multi State

04/2008

297.37
297.91

07/2011
-

06/2012

79 765 KV SYSTEM FOR CENTRAL PART OF


NORTHERN GRID PA - [N18000068]PGCIL,Multi
State

02/2009

1,347.32
-

02/2012
-

06/2012

80 765KV SYSTEM FOR CENTRAL PART OF


NORTHERN REGION G - [N18000078]PGCIL,Multi
State

07/2009

1,736.36
-

06/2012
-

06/2012

81 System Strengthening -XII of SR [N18000085]PGCIL,Multi State

02/2010

232.34
-

06/2012
-

06/2012

82 SUPPLEMENTRY TRANSMISSION ASSOCIATED


WITH DVC AND - [N18000065]PGCIL,Multi State

08/2008

2,360.95
-

08/2012
-

08/2012

83 765 KV POOLING STATION AND NETWORK WITH


DVC AND MA - [N18000069]PGCIL,Multi State

08/2008

7,075.33
-

08/2012
-

08/2012

84 System Strengthening in NR for SASAN & MUNDRA


(UMPP) - [N18000081]PGCIL,Multi State

12/2009

1,216.83
-

08/2012
-

08/2012

85 TR. SYSTEM ASSOCIATED WITH MUNDRA


ULTRA MEGA POWER PROJECT [N18000061]PGCIL,Multi State

10/2008

4,824.12
-

10/2012
-

10/2012

86 MAUDA TRANSMISSION SYSTEM [N18000084]PGCIL,Maharashtra

02/2010

469.38
-

10/2012
-

10/2012

List of Projects Without Milestones

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Original /
Revised

Anticipated

87 INTERCONNECTION BETWEEN ELECTTRICAL


GRIDS OF INDIA AND B - [N18000089]PGCIL,Multi
State

10/2010

160.32
-

10/2012
-

10/2012

88 TRANSMISSION SYSTEM OF VINDHYACHAL-IV


AND RIHAND-I - [N18000076]PGCIL,Multi State

03/2010

4,672.99
-

11/2012
-

11/2012

89 NORTHERN REGION TRANSMISSION


STRENGTHENING SCHEME [N18000083]PGCIL,Multi State

03/2010

965.58
-

11/2012
-

11/2012

90 EASTERN REGION TRANSMISSION SYSTEM-III [N18000100]PGCIL,Multi State

07/2010

1,272.80
-

11/2012
-

11/2012

91 TRANSMISSION SYSTEM ASSOCIATED WITH


SASAN ULTRA ME - [N18000046]PGCIL,Multi State

12/2008

7,031.88
-

12/2012
-

12/2012

92 NORTHERN REGION SYSTEM STRENGHTENING


SCHEME-XV - [N18000052]PGCIL,Multi State

02/2009

520.48
-

11/2011
-

12/2012

93 NORTHERN REGION SYSTEM STRENGHTENING


SCHEME-XVIII - [N18000053]PGCIL,Multi State

02/2009

509.66
-

11/2011
-

12/2012

94 NORTHERN REGION SYSTEM STRENGHTENING


SCHEME-XIX - [N18000056]PGCIL,Multi State

02/2009

410.29
-

02/2012
-

12/2012

95 NORTHERN REGION SYSTEM STRENGHTENING


SCHEME-XX - [N18000088]PGCIL,Multi State

10/2010

182.68
-

01/2013
-

01/2013

96 Transmission system for transfer of power from Gen.


- [N18000098]PGCIL,Multi State

05/2010

250.03
-

01/2013
-

01/2013

97 TR SYSTEM FOR ESTABLISHMENT OF 400/220


KV GIS SUBSTATION AT [N18000118]PGCIL,Gujarat

01/2012

259.28
-

01/2013
-

01/2013

98 WESTERN REGION STRENGTHENING SCHEMEV - [N18000035]PGCIL,Maharashtra

12/2007

477.69
-

09/2010
-

03/2013

99 TRANSMISSION SYSTEM FOR PHASE-I GEN


PROJECT IN ORI - [N18000087]PGCIL,Orissa

09/2010

2,074.86
-

03/2013
-

03/2013

100 NORTHERN REGION SYSTEM STRENGTHENING


SCHEME- XXI - [N18000095]PGCIL,Multi State

08/2010

1,677.57
-

04/2013
-

04/2013

101 SUPPLEMENTARY TRANSMISSION ASSOCIATED


WITH VAALLUR - [N18000097]PGCIL,Multi State

08/2010

170.36
-

04/2013
-

04/2013

102 TEESTA LOW DAM HEP, STAGE-IV (NHPC) [180100243]NHPC,West Bengal

09/2005

1,061.38
-

09/2009
06/2013

06/2013

103 Trans. System associated with PALLATANA GBPP &


BPT - [N18000080]PGCIL,Multi State

02/2010

2,144.00
-

12/2012
-

06/2013

104 NORTHERN REGION SYSTEM STRENGTHENING


SCHEME XVI - [N18000094]PGCIL,Multi State

07/2010

752.64
-

07/2013
-

07/2013

105 TRANSMISSION SYSTEM FOR ESTABLISHMENT


OF 400/220 K - [N18000102]PGCIL,Maharashtra

07/2011

181.93
-

07/2013
-

07/2013

106 TR SYSTEM FOR ESTABLISHMENT OF 400/220


KV GIS SUBSTATION AT [N18000108]PGCIL,Madhya pradesh

07/2011

181.93
-

07/2013
-

07/2013

107 TRANSMISSION SYSTEM ASSOCIATED WITH


KRISHNAPATNAM - [N18000090]PGCIL,Andhra
Pradesh

12/2010

779.21
-

08/2013
-

08/2013

108 NORTHERN REGION SYSTEM STRENGTHENING


SCHEME-XXII - [N18000091]PGCIL,Multi State

12/2010

209.78
-

08/2013
-

08/2013

109 Establishment of pooling stations at Rajgarh [N18000092]PGCIL,Chhatisgarh

12/2010

1,719.52
-

08/2013
-

08/2013

110 RAMPUR HEP(412 MW) [N18000024]SJVNL,Himachal Pr.

01/2007

2,047.03
-

01/2012
-

09/2013

List of Projects Without Milestones

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Original /
Revised

Anticipated

111 TRANSMISSION SYSTEM ASSOCIATED WITH


RAMPUR HEP - [N18000063]PGCIL,Multi State

02/2009

184.19
-

11/2011
-

09/2013

112 TRANSMISSION SYSTEM FOR CONNECTIVITY


OF MB POWER LIMITED [N18000106]PGCIL,Madhya pradesh

08/2011

425.51
-

10/2013
-

10/2013

113 Transmission system for transfer of power from GenPART B - [N18000099]PGCIL,Multi State

03/2011

1,585.12
-

11/2013
-

11/2013

114 TRANSMISSION SYSTEM FOR PHASE-1


GENERATION PROJECTS IN JHARK [N18000104]PGCIL,Jharkhandd

10/2011

558.26
-

11/2013
-

11/2013

115 INTEGRATION OF POOLING STATION IN


CHATTISGARH WITH CENTRAL P [N18000110]PGCIL,Multi State

08/2011

1,391.97
-

12/2013
-

11/2013

116 TRANSMISSION SYSTEM FOR PHASE-I GEN.


PROJECT IN OR - [N18000093]PGCIL,Orissa

12/2010

2,743.19
-

12/2013
-

12/2013

117 TRANSMISSION SYSTEM FOR IPP GENERATION


PROJECTS IN MP AND CH [N18000105]PGCIL,Multi State

09/2011

1,366.34
-

12/2013
-

12/2013

118 INTEGRATION OF POOLING STATION IN


CHATTISGARH WITH CENTRAL P [N18000107]PGCIL,Chhatisgarh

08/2011

1,391.97
-

12/2013
-

12/2013

119 TUIRIAL HYDRO ELECTRIC PROJECT (60MW) [N18000119]NEEPCO,Mizoram

01/2011

913.63
-

01/2014
-

01/2014

120 TRANSMISSION SYSTEM FOR CONNECTIVITY


OF ESSAR POWER GUJARAT [N18000114]PGCIL,Gujarat

12/2011

552.44
-

02/2014
-

02/2014

121 TRANS SYSTEM FOR PHASE-I GEN PROJECT IN


ORISSA-C - [N18000096]PGCIL,Multi State

03/2011

2,569.25
-

03/2014
-

03/2014

122 ESTABLISHMENT OF POOLING STATIONS AT


CHAMPA - [N18000101]PGCIL,Chhatisgarh

05/2011

1,961.87
-

05/2014
-

05/2014

123 SYTEM STRENGTHENING XIII OF SR GRID [N18000109]PGCIL,Multi State

10/2011

487.49
-

06/2014
-

06/2014

124 COMMON SYSTEM ASSOCIATED WITH ISGS


PROJECTS IN KRISHNAPATTNA [N18000111]PGCIL,Andhra Pradesh

08/2011

1,637.34
-

08/2014
-

08/2014

125 TR SYSTEM FOR PHASE-I GENERATION


PROJECTS IN JHARKHAND AND W [N18000113]PGCIL,Multi State

12/2011

2,422.66
-

08/2014
-

08/2014

126 SYSTEM STRENGTHENING IN NORTH/WEST


PART OF WR FOR IPP PROJEC [N18000116]PGCIL,Chhatisgarh

12/2011

1,746.65
-

08/2014
-

08/2014

127 NORTH- EAST NORTH WESTERN


INTERCONNECTOR I PROJECT [N18000066]PGCIL,Multi State

02/2009

11,130.19
-

08/2013
-

09/2014

128 Common System Associated with Coastal Energen


Priv - [N18000103]PGCIL,Tamil Nadu

09/2011

1,940.13
-

09/2014
-

09/2014

129 TRANS SYSTEM FOR DEVELOPMENT OF


POOLING STN IN NR - [N18000077]PGCIL,West
Bengal

04/2010

4,404.57
-

01/2015
-

01/2015

130 SYSTEM STRENTHENING IN RAIPUR-WARDHA


CORRIDOR FOR IPP PROJEC [N18000117]PGCIL,Chhatisgarh

01/2012

1,422.85
-

01/2015
-

01/2015

131 SYTEM STRENGTHENING OF SOUTHERN


REGION - XIV - [N18000115]PGCIL,Multi State

12/2011

297.33
-

08/2014
-

List of Projects Without Milestones

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Original /
Revised

Anticipated

Total

94,354.56
-

Railways
132 RUPSA-BANGRIPOSI (GC)(SER) [220100323]SER,Orissa

02/1996

57.94
604.04

03/1998
08/2005

08/2005

133 RAICHUR-GUNTAKAL(DL)(SCR) [220100329]RVNL,Andhra Pradesh

04/2003

136.62
-

12/2007
03/2010

12/2010

134 ALIGARH-GAZIABAD 3RD LINE DOUBLING (RVNL)


- [N22000034]RVNL,Uttar Pradesh

04/2003

230.73
399.73

03/2009
12/2008

12/2010

135 REWARI-ROHTAK (NL),NR [220100279](NR),Haryana

01/2004

149.38
330.23

02/2010
02/2011

02/2011

136 AMRAVATI-NARKHER NL(CR) [220100118]CR,Maharashtra

06/1994

120.90
284.27

06/1999
03/2011

03/2011

137 KOTTUR-HARIHAR(NL),(SWR) [220100212]SWR,Karnataka

04/1995

65.94
302.23

03/2011

138 SRIGANGANAGAR-SARUPSAR (GC), NWR [220100313]NWR,Rajasthan

04/2001

143.92
258.60

03/2011

03/2011

139 BILASPUR-URKURA (DL) [220100321]RVNL,Chhatisgarh

04/1997

151.52
-

03/2009

03/2011

140 PALWAL-BHUTESWAR 3RD LINE


DOUBLING(NCR)(RVNL) - [N22000027]RVNL,Multi
State

04/2005

240.00
-

03/2009
12/2009

03/2011

141 ALUABARI ROAD SILIGURI JUNCTION VIA


GALGALIA, NEFR - [N22000082]NEFR,Multi State

12/2006

170.00
-

03/2011

03/2011

142 GUNA-ETAWAH(NCR), NL - [220100007]NCR,Multi


State

04/1985

158.77
432.46

03/1994
-

12/2011

143 HARIDASPUR-PARADEEP(NL) [220100285]RVNL,Orissa

04/1996

301.64
-

09/2009

12/2011

144 Ramanagram-Mysore doubling with electrification of [N22000107]SWR,Karnataka

04/2007

482.00
482.70

03/2013
-

12/2011

145 CALICUT-MANGALORE (DL) (SR) [220100151]SR,Multi State

02/1996

240.00
-

02/2012

146 KANPUR-KASGANJ-MATHURA(GC),NER [220100197]NER,Uttar Pradesh

03/1997

395.00
1,062.36

02/2012

147 TARAKESWAR - BISHNUPUR NEW BG LINE (NL),


ER - [220100272]ER,West Bengal

04/2000

157.96
762.33

12/2009

02/2012

148 Dakshin-barasat-lakshmikantapur (ER) [N22000116]ER,West Bengal

04/2009

259.51
-

12/2011
02/2012

02/2012

149 FREIGHT OPERATIONS INFORMATION SYSTEM


(FOIS) - [220100009]FOIS,Multi State

03/1984

520.00
634.13

03/1995
-

03/2012

150 PEDAPALLI-KARIMNAGAR-NIZAMABAD NL(SCR) [220100106]SCR,Andhra Pradesh

12/1994

124.43
407.78

03/2012

151 LANJHIGARH-JUNAGARH NL(ECOR) [220100148]ECOR,Orissa

04/1993

100.00
142.98

03/2002
-

03/2012

152 MANDARHILL-DUMKA-RAMPURHAT (NL),ER [220100168]ER,Jharkhandd

04/1995

184.00
254.07

12/2011

03/2012

153 KADUR-CHIKMAGALUR-SAKLESHPUR
(NL),(SWR) - [220100190]SWR,Karnataka

04/1996

157.00
262.82

03/2012

03/2012

154 NANDYAL-YERRAGUNTLA(NL),SCR [220100192]SCR,Andhra Pradesh

03/1996

155.74
164.36

02/2009
-

03/2012

List of Projects Without Milestones

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Original /
Revised

Anticipated

155 MUZAFFARPUR-SITAMARHI(NL),ECR [220100194]ECR,Bihar

04/1997

100.00
483.62

03/2012

03/2012

156 MUNEERABAD-MAHABOOBNAGAR(NL),SCR [220100205]SCR,Multi State

04/1997

218.24
377.32

03/2012

157 JAYNAGAR-DARBHANGA-NARKATIA
GANJ(GC),ECR - [220100240]ECR,Bihar

04/1997

233.00
501.69

03/2012

03/2012

158 GADWAL - RAICHUR (NL), SCR [220100270]SCR,Multi State

04/1998

92.63
228.09

02/2011

03/2012

159 KHURDA ROAD-BOLANGIR(NL)ECOR [220100284]ECOR,Orissa

04/1994

355.38
470.21

03/2012

160 MANSI-PURNIA (EXTENSION OF MANSISAHARSA) GAN ECR - [N22000002]ECR,Bihar

04/1996

114.01
332.92

03/2012

03/2012

161 HARNOUT -SET.UP OF W/S TO UND. POH OF UP


TO50 COAC - [N22000052]WS&PU,Bihar

04/2003

98.74
224.51

03/2012

162 CHHAPRA-SETTING UP OF WHEEL


MANUFACTURING PLANT [N22000053]WS&PU,Bihar

03/2005

470.09
1,417.97

03/2012

163 SALKA ROAD -ANUPNAGAR LINE DOUBLING [N22000075]RVNL,Chhatisgarh

09/2006

324.90
-

03/2010
-

03/2012

164 CONSTRUCTION OF NEW LINE FROM HARMATIITANAGAR/NAR - [N22000083]NEFR,Arunachal Pr.

09/1996

156.00
-

03/2012

165 ELECTRIFICATION OF KHURJA-MEERUTSAHARANPUR & G'BA - [N22000094]RE,Uttar


Pradesh

02/2008

171.10
-

03/2012
-

03/2012

166 ELECTRIFICATION OF MORADABAD-ROZA [N22000095]RE,Uttar Pradesh

12/2004

129.17
-

03/2011
-

03/2012

167 RAJPIPLA-ANKELASHWAR, WR (GC) [N22000096]WR,Gujarat

04/2006

196.97
-

03/2011
-

03/2012

168 Tinpahar - Sahibganj (ER) [N22000115]ER,Jharkhandd

04/2008

167.73
-

03/2012
-

03/2012

169 Ratlam-Mhow-Khandwa-Akola (GC) [N22000120]WR,Madhya pradesh

04/2008

603.04
-

03/2012
-

03/2012

170 Bhuj-Naliya(GC) with extension from naliyate vayor [N22000123]WR,Gujarat

04/2008

318.24
-

03/2012
-

03/2012

171 NANGALDAM-TALWARA(NL),NR [220100188](NR),Multi State

03/1981

37.68
450.00

07/2012

07/2012

172 RANCHI-LOHARDAGA(GC),SER [220100214]SER,Jharkhandd

04/1997

194.07
-

06/2004
-

12/2012

173 CHANDIGARH-LUDHIANA(NEW BG LINE),NR [220100241](NR),Punjab

07/1998

248.44
576.27

12/2012
-

12/2012

174 JIND-SONEPAT (NL),NR [220100280](NR),Haryana

01/2004

190.81
238.56

03/2012

12/2012

175 KOSI BRIDGE (NL), ECR - [220100304]ECR,Bihar

04/2002

323.41
-

03/2012

12/2012

176 RAIL-CUM-ROAD BRIDGE AT MUNGER (NL), ECR


- [220100307]ECR,Bihar

04/2002

921.00
-

03/2009
12/2012

12/2012

177 PATNA GANGA BRIDGE (NL), ECR [220100308]ECR,Bihar

04/2001

624.47
1,389.98

10/2007
12/2012

12/2012

178 BHOPAL BINA 3D LINE DOUBLING [N22000077]RVNL,Madhya pradesh

09/2007

687.20
-

03/2010
-

12/2012

179 Bandel-Naihati new rail bridge in replacement of j [N22000119]ER,West Bengal

04/1999

207.52
-

12/2012
-

12/2012

List of Projects Without Milestones

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Original /
Revised

Anticipated

180 DAUSA-GANGAPUR CITY(NL),NWR [220100184]NWR,Rajasthan

02/1997

151.84
410.08

03/2013

181 QUILON-TIRUNELVELI-TENKASIVIRUDHUNAGAR(SR)(GC) - [220100263]SR,Multi


State

03/1998

280.00
842.35

03/2013

182 RANGIA-MURKONGSELEK, (GC) ALONG WITH


LINKED FINGER - [220100315]NEFR,Multi State

01/2004

915.70
-

03/2013

183 TALCHER-BIMALAGARH(NL)(ECOR) [220100328]ECOR,Orissa

04/2005

726.96
810.78

03/2013

184 Ahmedabad-Himmatnagar-Udaipur (WR) [N22000121]WR,Gujarat

04/2008

394.13
-

03/2013
-

03/2013

185 RAJATGARH-BARANG(LD),ECOR [220100286]RVNL,Orissa

04/1999

166.16
-

02/2009

04/2013

186 KHURDA ROAD - BARANG 3RD LINE (DL) (ECOR)


- [220100327]RVNL,Orissa

04/2000

133.41
207.00

03/2009

04/2013

187 EXT. OF MRTS FROM VELACHERY TO STN.


THOMAS, MTP - [N22000028]MRTP,Tamil Nadu

04/2006

495.74
-

06/2013

06/2013

188 Ghutiasharif-Canning (ER) - [N22000117]ER,West


Bengal

04/2009

189.97
-

12/2011
11/2013

11/2013

189 CHHINDWARA - NAGPUR (GC)(SECR) [220100324]SECR,Madhya pradesh

04/2005

383.79
-

12/2013

190 GOELKERA-MANOHARPUR,(LD)(SER) [N22000045]SER,Jharkhandd

03/1997

186.92
261.70

02/2006
-

12/2013

191 Lumding-SILCHAR Jiribam, Badarpur-Baraigram


Kumarg - [N22000127]NEFR,Assam

04/1996

1,676.31
-

03/2009
-

12/2013

192 HOWRAH-AMTA-CHAMPADANGA NL (SER) [220100208]SER,West Bengal

04/1974

31.42
393.46

03/2007
03/2007

03/2014

193 NEW MAYNAGURI TO JOGIGHOPA VIA


CHANGRABANDHA (NL), - [220100266]NEFR,Multi
State

04/2000

733.00
-

12/2008
-

03/2014

194 NEW B.G. LINE FROM TETELIA TO BYRNIHAT


(NATIONAL P - [N22000086]NEFR,Assam

09/2006

200.00
-

03/2014

195 AGARTALA SABROOM, NL, NEFR [N22000099]NEFR,Tripura

04/2008

813.34
-

03/2014
-

03/2014

196 BHAIRABI SAIRONG, NL, NEFR [N22000100]NEFR,Mizoram

04/2008

619.34
-

04/2014
-

03/2014

197 Jaipur - Ringus - Churu and Sikar - Loharu Guage C


- [N22000113]NWR,Rajasthan

04/2008

653.19
-

03/2014
-

03/2014

198 Suratpura - Hanumangarh - Sriganganagar Guage


Conv - [N22000114]NWR,Rajasthan

04/2008

516.23
-

03/2014
-

03/2014

199 Udhna-Jalgaon with electrification(doubling) (WR) [N22000122]WR,Gujarat

04/2008

1,389.62
-

03/2014
-

03/2014

200 Katakhal to Bhairabi - [N22000126]NEFR,Assam

04/1998

227.90
-

12/2012
-

03/2014

201 UTRATIA-ZAFRABAD, NR (LINE DOUBLING) [N22000088](NR),Uttar Pradesh

04/2006

325.00
-

03/2010
06/2014

06/2014

202 New BG line Rly line from Eklakhi-Balurghat includ [220100135]NEFR,West Bengal

04/1983

36.80
274.41

03/2015

203 KATIHAR - JOGBANI (GC)(NEFR) [220100247]NEFR,Bihar

09/2001

100.00
492.98

12/2010

03/2015

204 HAJIPUR-SUGAULI VIA VAISHALI (NL), ECR [220100303]ECR,Bihar

04/2003

324.66
528.65

03/2015

List of Projects Without Milestones

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Original /
Revised

Anticipated

03/2014
03/2015

03/2015

282.92
-

03/2015

04/2008

829.74
-

03/2015
-

03/2015

208 New Line from Dimapur to Zubza(Kohima) national pr


- [N22000124]NEFR,Nagaland

04/2006

850.00
-

03/2015
-

03/2015

209 TAMLUK DIGHA,LINE DOUBLING (SER) [N22000097]SER,West Bengal

03/1984

293.97
662.69

06/2005
07/2011

06/2015

210 RAIL-CUM-ROAD BRIDGE OVER RIVER


BRAHAMAPUTRA BRIDG [220100201]NEFR,Assam

09/1997

1,000.00
1,500.00

04/2008
03/2014

12/2015

211 PANSPURA-KHARAGPUR 3D LINE [N22000076]RVNL,West Bengal

09/2007

252.50
529.23

02/2010
-

12/2015

212 SEVOK RANGPO, NEFR [N22000102]NEFR,Sikkim

04/2008

1,339.48
-

12/2015
-

12/2015

213 BANKURA - DAMODAR (GC) (SER) [220100277]SER,West Bengal

03/1998

111.90
789.10

03/2005
12/2008

03/2016

214 JIRIBAM TO IMPHAL (TUPUI)(NL)(NEFR) [220100288]NEFR,Manipur

04/2003

727.56
-

03/2011
03/2014

03/2016

215 New Work for Construction of Metro railway from Ba [N22000109]RVNL,West Bengal

04/2010

2,069.60
-

03/2014
03/2016

03/2016

216 New Work for Construction of Metro railway from NS


- [N22000110]RVNL,West Bengal

04/2010

3,951.98
-

03/2016
-

03/2016

217 New Work for Construction of Metro railway [N22000111]RVNL,West Bengal

04/2010

2,619.02
-

03/2016
-

03/2016

218 New Work for Construction of Metro railway from No


- [N22000108]RVNL,West Bengal

04/2010

2,397.72
-

03/2016
-

06/2016

219 UDHAMPUR-SRINAGAR-BARAMULLA (NL),NR [220100133](NR),J and K

03/1995

2,500.00
8,000.00

03/2001
-

12/2017

220 VIRAMGAM-BHILDI(WR),GC - [220100062]WR,Multi


State

04/1990

155.66
356.87

03/2010

221 DALLI-RAJHARA - RAOGHAT(PART OF DALLIRAJHARA-JAGD - [220100149]RVNL,Chhatisgarh

04/1995

304.00
-

12/2012
-

222 AHMEDNAGAR-PARLI VAIJNATH(NL) CR [220100181]CR,Maharashtra

02/1997

353.08
462.67

223 HASSAN-BANGALORE VIA SHRAVANABELGOLA(NL),SWR - [220100183]SWR,Karnataka

02/1997

295.00
412.91

224 GONDIA-JABALPUR(GC),(SECR) [220100186]SECR,Multi State

02/1997

386.30
-

03/1998
-

225 KARUR-SALEM(NL),SR - [220100191]SR,Tamil


Nadu

02/1997

155.55
229.88

226 HUBLI-ANKOLA(NL),SWR [220100193]SWR,Karnataka

04/1995

227.00
-

227 MACHERLA-NALGONDA(NL)(SCR) [220100220]SCR,Andhra Pradesh

07/1998

125.00
363.26

07/2008
-

228 KODERMA-RANCHI VIA BARKAKANA (NL),ECR [220100222]ECR,Jharkhandd

03/1999

491.19
1,099.20

07/2005
-

229 ANGAMALI-SABARIMALA (N.L.)(SR) [220100252]SR,Kerala

10/1998

550.00
-

205 MUMBAI URBAN TRANSPORT PROJECT PHASEII, MTP - [N22000092]MRTP,Maharashtra

04/2008

5,300.00
-

206 KISHANGANJ JALALGARH, NL, NEFR [N22000101]NEFR,Bihar

04/2008

207 Himmatnagar - Udaipur Gauge Canvession (NWR) [N22000112]NWR,Rajasthan

10

List of Projects Without Milestones

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Original /
Revised

Anticipated

230 GULBARGA-BIDAR,SCR(NL) [220100254]SCR,Karnataka

02/1998

242.42
369.70

05/2009

231 KHAGARIA-KUSHESHWAR ASTHAN (NL) (ECR) [220100257]ECR,Bihar

04/1997

78.23
162.87

232 JALANDHAR-PATHANKOT-JAMMU-TAWI (LD),NR [220100258](NR),Multi State

03/2002

409.00
625.30

06/2007
-

233 REINGUNTA-GUNTAKAL(RE) [220100260]RVNL,Andhra Pradesh

06/2000

168.34
-

04/2003
03/2010

234 TIRUCHIRAPPALI-NAGORE-KARAIKKAL(SR)(GC) [220100262]SR,Tamil Nadu

09/1995

100.00
-

235 KOTLPALLI-NARASAPUR (NL) (SCR) [220100265]SCR,Andhra Pradesh

12/2001

330.00
-

236 DEOGHAR - SULTANGANJ (INL), ER [220100273]ER,Multi State

04/2000

138.00
519.67

12/2012

237 BANGLORE - SATYAMANGALAM (NL)(SWR) [220100274]SWR,Karnataka

02/1999

138.00
-

238 KODERMA-TILAIYA (NL), ECR [220100305]ECR,Jharkhandd

04/2002

459.91
418.17

239 RAMGANJMUNDI-BHOPAL (NL),WCR [220100314]WCR,Madhya pradesh

04/2001

727.13
727.13

240 SUKINDA ROAD - ANGUL (NL)(ECOR) [220100325]RVNL,Orissa

04/1998

183.23
-

02/2015
-

241 MANOHARABAD-KOTHPALL NEW LINE(SCR) [N22000032]SCR,Andhra Pradesh

04/2006

378.56
671.82

242 OBULAVARIPALLE-KRISHNAPATNAM(RVNL) [N22000049]RVNL,Andhra Pradesh

07/2006

743.00
-

03/2008
06/2008

243 MAYLADUTHURAI-THIRUVARUR-KARAIKUDITHIRU 'PONDI'-A - [N22000079]SR,Tamil Nadu

09/2007

404.19
-

244 DINDIGUL-POLLACHI-PALGHAT-POLLACHI AND


COIMBATORE - [N22000080]SR,Tamil Nadu

09/2006

343.17
-

245 BHARUCH-SAMNI-DAHEJ GAUGE CONVERSIN [N22000081]RVNL,Gujarat

09/2005

200.80
-

246 TINDIVANAM-GINGEE-TIRUVANNAMALAI (NL) [N22000084]SR,Tamil Nadu

09/2006

125.00
-

247 TIDIVANAM-NAGARI (NL) - [N22000085]SR,Tamil


Nadu

09/2006

456.00
582.83

248 NEW B.G. LINE FROM ARARIA TO GALGALIA


(THAKURGUNG) - [N22000087]NEFR,Bihar

09/2006

300.00
-

249 Bhavnagar-workshop facilities for 50 BG coaches PO


- [N22000125]WR,Gujarat

04/2006

117.36
196.95

03/2011
-

250 BELAPUR-SEAWOOD-URAN ELECTRIF-IED


DOUBLE LINE(MTP) [220100164]MRTP,Maharashtra

03/1996

401.81
495.44

03/2004
12/2010

251 LALITPUR-SATNA-REWA-SINGRULI NL, (NCR) [220100232]NCR,Multi State

09/1998

925.00
-

05/2008
03/2011

252 CONV.OF 1500V DC TRACTION TO 25 KV AC,WR


- [220100233]RE,Maharashtra

07/1996

273.67
1,302.12

06/2012

253 AGRA-ETAWAH VIA FATEHABAD AND BAH (NL)


NCR - [220100243]NCR,Uttar Pradesh

04/1999

108.00
214.09

12/2009
03/2011

254 GONDA-GORAKHPUR LOOP WITH ANAND


NAGAR-NAUTANWA GC (NER) [220100255]NER,Uttar Pradesh

03/2002

381.17
-

11

List of Projects Without Milestones

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Original /
Revised

Anticipated

12/2006
08/2010

371.36
-

04/2003

218.19
-

258 HATHUA-BHATNI (N L) (NER) [220100319]NER,Multi State

04/2005

230.03
-

259 BARDHAMAN-KATWA, ER (GC) [N22000091]ER,West Bengal

04/2007

245.15
-

12/2010
03/2011

260 Pandabeswar-Chinpai doubling (ER) [N22000118]ER,West Bengal

04/2004

225.68
-

12/2010

255 TOLLYGANJ-GARIA with extension to Dum DumNoapara - [220100268]MRTP,West Bengal

03/2000

907.69
3,176.10

256 KODERMA GIRIDH (NL), ECR [220100306]ECR,Jharkhandd

04/1996

257 MAHARAJGANJ-MASRAKH (NL) - NER [220100316]NER,Bihar

Total

61,457.53
-

Road Transport & Highways


261 BIJNI TO ASSAM/WB BORDER PH.II, KM.30.00 TO
0.00, NH-31 C - [240106226]NHAI,Assam

12/2003

230.00
-

06/2005
-

12/2011

262 HALDIA PORT (PORT CONNECTIVITY) (NH-41) [240104196]NHAI,West Bengal

04/2000

273.00
-

03/2005
-

01/2012

263 HARIHAR-CHITRADURGA (GQ) KM.284-KM.207


(NH-4) - [240101133]NHAI,Karnataka

04/2000

318.00
-

08/2004
-

02/2012

264 GAGODHAR-GARAMORE(PK-IV,NH15) KM 245 TO


281.3 AND 308 TO 254 - [240106216]NHAI,Gujarat

12/2003

412.78
-

11/2007
-

02/2012

265 JHANSI TO LALITPUR, NH-25,26 [N24000096]NHAI,Uttar Pradesh

12/2003

355.06
-

09/2009
-

02/2012

266 NEELAMANGALAR JUNCTION ON NH-4 SMITH


NH-48 TO DEVI - [N24000103]NHAI,Karnataka

03/2005

441.00
-

02/2012

267 HAVERI-HARIHAR (GQ) KM.340-KM.284 (NH-4) [240101132]NHAI,Karnataka

04/2000

241.00
-

08/2004
07/2010

03/2012

268 VIJAYAPUR TO PATHANKOT (J&K) NH-1A


KM.16.35 TO KM.50.00 - [240106235]NHAI,J and K

12/2003

193.09
-

03/2008
-

03/2012

269 VIJAYAPUR TO PATHANKOT (NS-35/J&K) NH-1A


KM.50 TO KM.80 - [240106236]NHAI,J and K

12/2003

166.27
-

03/2008
-

03/2012

270 KOTWA TO DEWAPUR(10 LMNHP),NH-28


PHASE-II, KM.440 TO KM.402 [240106243]NHAI,Bihar

12/2003

240.00
-

10/2008
-

03/2012

271 ORAI TO JHANSI (UP-5),NH-25, KM.220.0 TO


KM.170.0 - [240106250]NHAI,Uttar Pradesh

12/2003

340.68
-

03/2008
-

03/2012

272 AURANG-RAIPUR, NH-6, KM.232 TO KM.281 [240106260]NHAI,Chhatisgarh

03/2005

190.00
-

01/2009
-

03/2012

273 DAKOBA TO NAGAON (NH-36)(NHAI) [240106288]NHAI,Assam

12/2003

225.00
-

06/2008
-

03/2012

274 UP/BIHAR BORDER TO KASIA (NH-28)(NHAI) [240106292]NHAI,Uttar Pradesh

12/2003

227.00
-

12/2008
-

03/2012

275 FORBESGANJ TO SIMRAHI (NH-57)(NHAI) [240106294]NHAI,Bihar

12/2003

332.94
-

09/2008
-

03/2012

276 JHAJHARPUR TO DARBANGA (BR-7) [N24000031]NHAI,Bihar

12/2003

340.00
-

09/2008
-

03/2012

277 NEW MANGALORE PORT NH-17 AND 48 [N24000040]NHAI,Karnataka

04/2000

196.50
363.00

06/2011

03/2012

12

List of Projects Without Milestones

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Original /
Revised

Anticipated

278 ASSAM/WB BORDER TO GAIRKATTA (WB-1) [N24000045]NHAI,West Bengal

12/2003

221.82
-

11/2008
-

03/2012

279 SALEM - U / UNDRUPET(BOT -1/TN-06) NH -68 [N24000102]NHAI,Tamil Nadu

03/2005

941.00
-

01/2011
-

03/2012

280 ZIRAKPUR(HARYANA) -PARWANOO(HIMACHAL


PRADESH) - [N24000117]NHAI,Multi State

02/2008

295.00
-

08/2010
-

03/2012

281 END OF DURG BYPASSCHHATISGARH/MAHARASHTRA BORDER [N24000118]NHAI,Chhatisgarh

01/2008

464.00
-

01/2011
-

03/2012

282 Surat- Dahisar(Six Lane) Km 263 to Km 502 [N24000131]NHAI,Multi State

02/2009

1,693.75
-

08/2011
-

03/2012

283 LALITPUR TO SAGAR KM 132 TO KM 187, NH-26


(NHAI) - [240106300]NHAI,Madhya pradesh

12/2003

225.00
-

10/2008
-

04/2012

284 Armur to kadloor yellareddy [N24000143]NHAI,Andhra Pradesh

02/2010

390.56
-

02/2012
-

04/2012

285 SAGAR BY PASS,KM 187 TO KM 211 , NH-26


(NHAI) - [240106301]NHAI,Uttar Pradesh

12/2003

151.30
-

10/2008
-

05/2012

286 SONAPUR TO GUWAHTI (AS-3) [N24000044]NHAI,Assam

12/2003

245.00
-

03/2008
-

05/2012

287 GANJAM-ICCHAPURUM,NH-5(NHAI) [N24000057]NHAI,Orissa

04/2000

263.27
-

02/2004
-

05/2012

288 NH CONNECTIVITY TO ICTT VALLARPADAEU NH


- SH - [N24000107]NHAI,Kerala

03/2005

557.00
-

02/2010
-

05/2012

289 PATHANKOT BHOGPUR NH-1A [N24000115]NHAI,Punjab

12/2003

229.00
-

05/2010
-

05/2012

290 Pune-sholapur,pkg1 [N24000127]NHAI,Maharashtra

11/2009

1,110.00
-

05/2012
-

05/2012

291 Kishangarh-Ajmer-Beawer [N24000128]NHAI,Rajasthan

11/2009

795.00
-

05/2012
-

05/2012

292 Hyderabad-yadgiri N.H no-202 [N24000142]NHAI,Andhra Pradesh

08/2010

388.00
-

05/2012
-

05/2012

293 SILCHAR-UDARBAND (PH.II) HN-54, KM.309 TO


KM.275 - [240100207]NHAI,Assam

12/2003

157.47
-

09/2007
-

06/2012

294 AGRA-SHIKOHABAD (GQ) KM.199.66-KM.250.50


(NH-2) - [240101173]NHAI,Uttar Pradesh

04/2000

367.49
-

03/2005
-

06/2012

295 GARHMUKTESHWAR-MURADABAD (NHAI)


OTHERS KM.93-149.25, NH-24 [240106204]NHAI,Uttar Pradesh

12/2003

275.00
-

09/2007
-

06/2012

296 HAPUR-GARHMUKTESWAR (OTHERS) KM.58-93,


NH-24 - [240106205]NHAI,Uttar Pradesh

03/2005

220.00
-

09/2007
-

06/2012

297 GANGA BRIDGE TO RAMDEVI CROSSING PH.II


NH-25, KM.75-80.06 - [240106221]NHAI,Uttar
Pradesh

12/2003

155.00
-

09/2008
-

06/2012

298 DEEWAPUR TO UP/BIHAR BORDER (LMNHP-9)NH-28, KM.402-360.915 - [240106244]NHAI,Bihar

12/2003

300.00
-

10/2008
-

06/2012

299 BIJNI TO ASSAM WB BORDER (NH-31.C)(1)(NHAI)


- [240106290]NHAI,Assam

12/2003

195.00
-

06/2008
-

06/2012

300 NALBARI TO BIJNI (AS-8) [N24000035]NHAI,Assam

12/2003

200.00
-

06/2008
-

06/2012

301 NAGAON TO DHARAMTUL (AS-2) [N24000042]NHAI,Assam

12/2003

264.72
-

06/2008
-

06/2012

302 NALBARI TO BIJNI (AS-6) [N24000047]NHAI,Assam

12/2003

225.00
-

06/2008
-

06/2012

13

List of Projects Without Milestones

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Original /
Revised

Anticipated

303 DHARAMTUL TO SONAPUR,KM 205-183 (AS-20) [N24000049]NHAI,Assam

12/2003

160.00
-

05/2008
-

06/2012

304 DHARAMTUL TO SONAPUR (AS-19) [N24000051]NHAI,Assam

12/2003

200.00
-

06/2008
-

06/2012

305 NAGPUR-KONDHALI,NH-6(NHAI) [N24000055]NHAI,Maharashtra

03/2005

168.00
-

12/2008
-

06/2012

306 GORAKHPUR BYPASS, NH-28, PHASE-II EASTWEST CORRID - [N24000085]NHAI,Uttar Pradesh

12/2003

600.24
-

10/2009
-

06/2012

307 GWALIOR BYPSS, NH-75,3 [N24000088]NHAI,Madhya pradesh

12/2003

300.93
-

10/2009
-

06/2012

308 GWALIOR-JHANSI, NH-75 - [N24000089]NHAI,Multi


State

12/2003

604.00
-

12/2009
-

06/2012

309 MP/Maharashtra Border-Dhula [N24000126]NHAI,Maharashtra

12/2009

835.00
-

06/2012
-

06/2012

310 Gurgaon-Kotputli Km 42.70 to 54.4 Km [N24000130]NHAI,Multi State

04/2009

1,673.70
-

10/2011
-

06/2012

311 Panipat-Jalandhar 6 lane(Km 96 to 387.1 km) [N24000133]NHAI,Haryana

05/2009

1,108.00
-

11/2011
-

06/2012

312 SUNAKHALA-GANJAM (GQ) KM.338-KM.284 (NH5) - [240101153]NHAI,Orissa

04/2000

225.00
-

04/2004
-

07/2012

313 BALASORE BHADRAK (REVIVED) KM 136.5 199.14 NH-5 - [N24000116]NHAI,Orissa

04/2000

228.70
-

02/2004
-

07/2012

314 PIMPALGAON-NASIK-GONDE, NH-3 (NHDPPHASE-III) - [N24000123]NHAI,Maharashtra

03/2005

940.00
-

07/2012
-

07/2012

315 PATHANKOT- BHOGPUR, KM.26-KM.70, NH-1A [240106237]NHAI,Punjab

12/2003

284.00
-

05/2008
-

08/2012

316 KOTA BYPASS,RJ-4, NH-76 (NHAI) [240106297]NHAI,Rajasthan

12/2003

275.00
-

10/2008
-

09/2012

317 RAJMARG CHORAHA TO LAKHNANDON,KM 351


TO KM 405.7, NH-26 (NHA [240106305]NHAI,Madhya pradesh

12/2003

229.91
-

10/2008
-

09/2012

318 Gujarat/Maharashtra BorderSurat-Hazira Port


Section - [N24000125]NHAI,Gujarat

03/2010

1,509.10
-

09/2012
-

09/2012

319 LAKHNAADON TO MP/MH BORDER,KM 596.75653 (NS-1/BOT/MP-2),NH7 [N24000094]NHAI,Madhya pradesh

12/2003

407.60
-

06/2010
-

10/2012

320 LAKHNADON TO MP/MH BORDER (NS-1/BOT/MP2), NH-7 - [N24000095]NHAI,Madhya pradesh

12/2003

263.17
-

09/2009
-

10/2012

321 Four Lanning from MP/Maharashtra Border to nagpur


- [N24000124]NHAI,Maharashtra

04/2010

1,170.52
-

06/2011
-

10/2012

322 Chilkaluripet-Vijaywada 6 lane (km 355 to Km 434.1)


- [N24000132]NHAI,Andhra Pradesh

05/2009

572.30
-

10/2011
-

10/2012

323 Hyderabad-Vijaywada Km. 40 to 221.50 Km [N24000134]NHAI,Andhra Pradesh

04/2010

1,740.00
-

10/2012
-

10/2012

324 THANJAUR-TRICHY,NH-67(NHAI) [N24000056]NHAI,Tamil Nadu

03/2005

280.00
-

06/2009
-

11/2012

325 WADNER-DEVDHARI(NS-60/MH)(KM 94-123 KM) [N24000150]NHAI,Maharashtra

02/2011

193.45
-

11/2012
-

11/2012

326 BIJNI TO ASSAM /WB.BORDER (NH31.C)(2)(NHAI) - [240106293]NHAI,Assam

12/2003

237.80
-

06/2008
-

12/2012

327 SAGAR - RAJMARG CHORAHA,KM 211 TO KM


255, NH-26 (NHAI) - [240106303]NHAI,Madhya
pradesh

12/2003

203.43
-

10/2008
-

12/2012

14

List of Projects Without Milestones

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Original /
Revised

Anticipated

328 RAJMARG CHORAHA TO LAKHNANDON,KM 297


TO KM 351, NH-26 (NHAI) [240106304]NHAI,Madhya pradesh

12/2003

251.03
-

10/2008
-

12/2012

329 SILIGURI TO ISLAMPUR (WB-7) [N24000028]NHAI,West Bengal

12/2003

225.00
-

07/2008
-

12/2012

330 GUWHATI TO NALBARI (AS-4) [N24000038]NHAI,Assam

12/2003

175.96
-

04/2008
-

12/2012

331 GUWAHATI TO NALBARI (AS-5) [N24000046]NHAI,Assam

12/2003

198.16
-

04/2008
-

12/2012

332 NALBARI T BIJNI (AS-7) - [N24000048]NHAI,Assam

12/2003

208.00
-

04/2008
-

12/2012

333 BRAHMPUTRA BRIDGE,NH NO-31 [N24000063]NHAI,Assam

12/2003

217.61
-

04/2010
-

12/2012

334 DHOLPUR - MORENA SECTION (INCLUDING


CHAMBOL BRIDGE - [N24000108]NHAI,Multi State

12/2003

232.45
-

09/2010
-

12/2012

335 DELHI/ HARYANA BORDER TO ROHTAK [N24000122]NHAI,Haryana

04/2007

486.00
-

05/2010
-

12/2012

336 Jaipur-Tonk-Deoli - [N24000135]NHAI,Rajasthan

06/2010

792.06
-

12/2012
-

12/2012

337 Hazaribagh-Ranchi - [N24000141]NHAI,Jharkhandd

08/2010

625.07
-

01/2013
-

01/2013

338 PATNA-MUZZAFFARPUR - [N24000165]NHAI,Bihar

08/2010

671.30
-

02/2013
-

02/2013

339 HARANGAJO TO MAIBANG (AS-23), KM.126.450


TO KM.140.700 - [240106277]NHAI,Assam

12/2003

280.00
-

02/2009
-

03/2013

340 MAIBANG TO LUNDING (AS-27), KM.40.000 TO


KM.60.500 - [240106281]NHAI,Assam

12/2003

200.00
-

04/2009
-

03/2013

341 TRICHY - KORUR NH-67 - [N24000101]NHAI,Tamil


Nadu

03/2005

516.00
-

07/2010
-

03/2013

342 CHENGAPALLI TO COIMBATORE BYPASS KM102.035-144.740 KM - [N24000144]NHAI,Tamil


Nadu

09/2010

852.00
-

03/2013
-

03/2013

343 PUNE-SATARA(NH-4) [N24000156]NHAI,Maharashtra

10/2010

1,724.55
-

03/2013
-

03/2013

344 SAMAIKHIALI - GANDHIDHAM [N24000179]NHAI,Gujarat

09/2010

805.39
-

03/2013
-

03/2013

345 Indore-Jhabua-Gujrat/MP [N24000136]NHAI,Madhya pradesh

10/2010

1,175.00
-

04/2013
-

04/2013

346 CUDDAPAH-MYDUKUR-KURNOOL KM-167.750356.502 KM - [N24000145]NHAI,Andhra Pradesh

11/2010

1,585.00
-

05/2013
-

05/2013

347 INDORE-DEWAS(NH-3) [N24000159]NHAI,Madhya pradesh

11/2010

325.00
-

05/2013
-

05/2013

348 Trichy Bypass - [N24000176]NHAI,Tamil Nadu

05/2010

374.00
-

05/2013
-

05/2013

349 AGRA-BYPASS(NS-1/UP-1),KM 176.8-13.03 NH-2,3


- [N24000098]NHAI,Uttar Pradesh

12/2003

348.16
-

09/2007
-

06/2013

350 AMRITSAR-PATHANKOT [N24000147]NHAI,Punjab

05/2010

705.00
-

11/2012
-

06/2013

351 MURADABAD-BAREILY - [N24000154]NHAI,Uttar


Pradesh

04/2010

1,267.00
-

06/2013
-

06/2013

352 4 LANNING OF AHMEDABAD TO GODHARA [N24000167]NHAI,Gujarat

12/2010

1,008.50
-

06/2013
-

06/2013

15

List of Projects Without Milestones

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Original /
Revised

Anticipated

353 DEVELOPMENT OF ADIQUATE ROAD


CONNECTIVITY TO CHENN [N24000173]NHAI,Tamil Nadu

06/2011

600.00
-

06/2013
-

06/2013

354 MAIBANG TO LUNDING (AS-25), KM.83.400 TO


KM.111.000 - [240106278]NHAI,Assam

12/2003

199.81
-

04/2009
-

07/2013

355 MAIBANG TO LUNDING (AS-24), KM.111.000 TO


KM.126.450 - [240106280]NHAI,Assam

12/2003

155.04
-

11/2008
-

07/2013

356 CHAMBAL BRIDGE, NH-76 (RJ-5) [N24000068]NHAI,Rajasthan

12/2003

275.00
-

02/2010
-

07/2013

357 DEOLI-KOTA - [N24000148]NHAI,Rajasthan

01/2011

953.00
-

07/2013
-

07/2013

358 JAMMU-UDHAMPUR KM.27.5 TO KM.67.00 [N24000163]NHAI,J and K

07/2010

1,813.76
-

07/2013
-

07/2013

359 kandla - Mundra port - [N24000175]NHAI,Gujarat

01/2011

953.88
-

07/2013
-

07/2013

360 4 LANNING OF GODHARA TO GUJARAT/MP


BORDER - [N24000168]NHAI,Gujarat

03/2011

785.50
-

08/2013
-

08/2013

361 GHAZIABAD-ALIGARH NH-91 [N24000170]NHAI,Uttar Pradesh

02/2011

1,141.00
-

08/2013
-

08/2013

362 Dindigul - Kumli - [N24000177]NHAI,Tamil Nadu

09/2011

485.00
-

08/2013
-

08/2013

363 New 4 Lane elevated road from chennai airport [N24000139]NHAI,Tamil Nadu

09/2010

1,655.00
-

09/2013
-

09/2013

364 4 LANNING OF BELGUM-KHANPUR SECTION


AND 2 LANING - [N24000153]NHAI,Karnataka

03/2011

359.00
-

09/2013
-

09/2013

365 SIX LANNING OF VADAKKANCHERRY


THRISSURESECTION - [N24000149]NHAI,Kerala

02/2010

617.00
-

08/2012
-

10/2013

366 Tirupati - Chennai - [N24000178]NHAI,Tamil Nadu

04/2011

571.00
-

10/2013
-

10/2013

367 Talegaon-amravati - [N24000140]NHAI,Maharashtra

11/2009

567.00
-

11/2013
-

11/2013

368 ROHTAK-BAWAL - [N24000169]NHAI,Haryana

05/2011

650.00
-

11/2013
-

11/2013

369 Muzafarpur - Sonbarsa - [N24000174]NHAI,Bihar

05/2011

511.54
-

11/2013
-

11/2013

370 SIX LANNING OF HOSUR- KRISHNAGRI NH-7


KM.33.130 TO - [N24000171]NHAI,Tamil Nadu

06/2011

535.00
-

12/2013
-

12/2013

371 SIX LANNING OF KRISHNAGIRI- WALAJHAPET


SECTION KM. - [N24000172]NHAI,Tamil Nadu

09/2011

1,250.00
-

12/2013
-

12/2013

372 MAIBANG TO LUNDING (AS-26), KM.60.500 TO


KM.83.400, NH-54 - [240106279]NHAI,Assam

12/2003

167.64
-

11/2008
-

01/2014

373 Chennai-Tada(Six lane) - [N24000129]NHAI,Tamil


Nadu

04/2009

353.37
-

10/2011
-

03/2014

374 2 LANNING OF MOKAMA-MUNGER [N24000166]NHAI,Bihar

05/2011

351.54
-

05/2013
-

03/2014

375 HARANGAJO TO MAIBANG,km 164.08-190.587


NH-54 - [N24000061]NHAI,Assam

12/2003

212.00
-

09/2007
-

04/2014

376 HARANGAJO TO MAIBANG, NH-54 [N24000062]NHAI,Assam

12/2003

196.00
-

07/2009
-

04/2014

377 4 LANING OF NAGPUR-BETUL [N24000155]NHAI,Multi State

02/2011

2,498.76
-

08/2014
-

08/2014

16

List of Projects Without Milestones

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Original /
Revised

Anticipated

378 PANIPAT-ROHTAK - [N24000151]NHAI,Haryana

04/2011

807.00
-

10/2014
-

10/2014

379 NASHRI CHANANI - [N24000162]NHAI,J and K

06/2010

2,159.00
-

06/2015
-

06/2015

380 QUAZIGUND-BANIHAL KM.220.00 TO KM.188.00 [N24000161]NHAI,J and K

07/2010

1,987.00
-

07/2015
-

07/2015

Total

67,519.63
-

Shipping & Ports


381 RAIL CONNECTIVITY TO ICTT AT VALLARPADAM
AT COCHIN PORT TRUS [N25000059]RVNL,Kerala

03/2007

245.67
298.17

04/2009
11/2009

02/2011

382 MARINE LIQUID TERMINALS [N25000054]ENNORE TANK,Tamil Nadu

10/2004

196.25
-

06/2006
09/2011

09/2011

383 ESTABLISHMENT OF VESSEL TRAFFIC


SERVICES IN GULF OF KUTCH [250100112]SHIPP.,Gujarat

01/2002

165.00
165.00

12/2005
01/2008

10/2011

384 ACQUISITION OF TWO NOS OF 120 B.P


(AH03TYPE) AHTS - [N25000058]SHIPP.,Kerala

12/2010

241.50
-

09/2011
-

12/2011

385 ACQUISITION OF 6 NOS. OF 57000 DWT


HANDYMAX BULK C [N25000033]SHIPP.,Maharashtra

11/2007

1,061.96
1,077.60

03/2012
-

03/2012

386 SETTING UP OF LNG REGASIFICATION


TERMINAL AT PUTHU - [N25000048]PORT
TRUST,Kerala

03/2009

3,500.00
-

01/2012
-

03/2012

387 Modification & Strengthening of Existing Berth No. 1


to 6 - [N25000050]PORT TRUST,Gujarat

06/2010

277.00
-

03/2012
-

03/2012

388 ACQUISITION OF 4 NO. OF ANCHOR HANDLING


CUM SUPPLY - [N25000014]SHIPP.,Maharashtra

10/2007

359.44
-

04/2011
06/2011

06/2012

389 Acquisition of two nos. of 120 B.P [N25000042]SHIPP.,Maharashtra

04/2009

290.85
305.00

06/2011
01/2012

06/2012

390 Acquisition of Two nos. of 3060 DWT [N25000043]PORT TRUST,Maharashtra

04/2009

277.03
280.00

12/2011
08/2012

08/2012

391 CONST. & DEV. OF 2 OFFSHORE CONTAINER


BERTHS & TER - [N25000016]MUMBAI PORT
TRU,Maharashtra

11/2007

1,228.00
-

12/2010
-

09/2012

392 ACQUISITION OF 4 NOS. OF 80655 DWT


PANAMAX BULK CA [N25000031]SHIPP.,Maharashtra

08/2008

1,066.91
-

09/2012
-

09/2012

393 Mechanization of coal handling facilities to 200 [N25000049]PORT TRUST,Andhra Pradesh

02/2010

444.10
-

06/2010
-

11/2012

394 Acquisition of 4 nos of 82000 DWT kamsavmax Bulk


carriers - [N25000051]SHIPP.,Maharashtra

08/2010

612.72
627.64

12/2012
-

12/2012

395 C/O Berthing and Allied Facilities off tekra near [N25000037]PORT TRUST,Gujarat

04/2005

882.00
-

02/2011
-

03/2013

396 CONSTRUCTION OF 13 & 14 CARGO BERTH AT


KANDLA - [N25000039]PORT TRUST,Gujarat

12/2005

702.00
-

03/2011
-

03/2013

397 SETTING UP OF AN INTERNATIONAL CRUISE


TERMINAL AT - [N25000047]PORT TRUST,Kerala

03/2008

375.00
272.50

01/2009
-

05/2013

398 ENNORE MANALI EXPRESS WAY,F/O SPECIAL


PURPOSE VEHI - [N25000035]SHIPP.,Tamil Nadu

10/2002

150.00
600.00

03/2006
-

12/2013

17

List of Projects Without Milestones

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Original /
Revised

Anticipated

399 Acquistion of three(3) nos of 6500TEU Cellular


container - [N25000052]SHIPP.,Maharashtra

10/2010

1,028.10
1,012.23

12/2013
-

12/2013

400 Acquisition of two(2) Nos. of 317000 DWT very large


crude - [N25000053]SHIPP.,Maharashtra

10/2010

966.46
-

02/2014
-

02/2014

401 DEEPENING AND WIDENING OF MUMBAI


HARBOUR CHANNEL A - [N25000003]PORT
TRUST,Maharashtra

10/2005

800.00
-

10/2008
-

402 DEEPENING OF CHANNEL AT PARADIP PORT [N25000004]PORT TRUST,Orissa

12/2005

154.84
-

12/2007
01/2009

403 DEVELOPMENT OF COAL TERMINAL [N25000055]ENNORE PORT LTD,Tamil Nadu

09/2006

399.13
-

08/2010
-

404 DEVELOPMENT OF IRON ORE TERMINAL [N25000056]ENNORE PORT LTD,Tamil Nadu

09/2006

370.00
-

08/2010
-

405 SETHUSAMUDRAM SHIP CHANNEL PROJECT [250100175]PORT TRUST,Tamil Nadu

06/2005

2,427.40
-

10/2008
-

Total

18,221.36
-

Telecommunications
406 GSM EQUIPMENT OF 700K LINES(2G) AND 150K
LINES(3G) - [N26000046]BSNL,Orissa

11/2007

277.34
-

03/2009
-

02/2011

407 Implementation of FTTH, the state of the art access


,gpon eq - [N26000072]BSNL,Multi State

12/2007

952.88
-

03/2010
-

10/2010

408 GSM equipment of 200000Lines (2G)


UP(West)Phase V. - [N26000082]BSNL,Uttar
Pradesh

10/2008

336.84
-

10/2009
-

03/2011

409 CONVERGENT BILLING AND CRM-MTNL(DELHI) [N26000011]MTNL,Delhi

12/2005

249.00
229.41

02/2007
-

08/2011

410 CONVERGENT BILLING AND CRM(MUMBAI) [N26000016]MTNL,Maharashtra

01/2006

247.00
-

02/2007
-

08/2011

411 FTTH BO-3474 /08-09 in Mumbai [N26000078]MTNL,Maharashtra

04/2010

389.86
-

09/2011
-

09/2011

412 UTTARANCHAL TELECOM CIRCLE PHASE-VI (2G


& 3G) - [N26000058]BSNL,Uttaranchal

01/2009

149.15
158.72

06/2009
-

12/2011

413 GSM equipment of 1500000Lines (2G) 264700lines


3(G - [N26000093]BSNL,Andhra Pradesh

01/2009

922.91
-

01/2010
-

12/2011

414 PROJ.III OF NIB-II OF MESSAGING STORAGE [260100099]BSNL,Multi State

11/2003

250.00
-

12/2005
-

03/2012

415 GSM EQUIPMENT OF 390K LINES(2G) AND 130K


LINES(3G) - [N26000041]BSNL,Punjab

02/2008

373.94
-

12/2008
-

03/2012

416 Assam Telecom Circle, Phase-V.I, 2G & 3G [N26000062]BSNL,Assam

06/2007

336.81
-

01/2009
-

03/2012

417 GSM equipment of 799000Lines (2G) 101000 lines


3(G - [N26000088]BSNL,Jharkhandd

03/2008

328.13
-

03/2009
-

03/2012

418 GSM equipment of 1867000Lines (2G) 383000 lines


3( - [N26000089]BSNL,Gujarat

08/2008

868.00
-

08/2009
-

03/2012

419 GSM equipment of 1625000Lines (2G) 325000 lines


3( - [N26000090]BSNL,Madhya pradesh

11/2009

916.70
930.60

11/2010
-

03/2012

420 ERP implementation in BSNL on Turnkey basis [N26000096]BSNL,Multi State

10/2009

384.00
-

10/2010
03/2012

07/2012

421 EXPANSION OF EXISTING 750K GSM NETWORK


PE NO. 992 - [N26000029]BSNL,Maharashtra

06/2006

231.38
-

10/2007
-

18

List of Projects Without Milestones

(Jan,2012)

Date of
Commissioning

S.No Project
1

Date of
Approval

Original /
Revised
Cost

Original /
Revised

Anticipated

422 Execution of telecom network requirement of defence


- [N26000065]BSNL,Multi State

05/2006

1,077.00
-

03/2009
-

423 Implementation of FTTH, the state of the art Acces [N26000073]BSNL,Multi State

12/2007

152.65
-

03/2010
-

Total

8,443.59
-

Urban Development
424 FARIDABAD EXTENSION [N28000057]DMRC,Delhi

09/2011

2,494.00
-

09/2014
-

09/2014

425 DELHI MRTS PHASE-III - [N28000056]DMRC,Delhi

09/2011

35,242.00
-

03/2016
-

03/2016

426 C/o office building for IDBI at bandra Kurla Compl [N28000048]CPWD,Maharashtra

11/2006

114.18
173.08

04/2009
-

12/2007
-

12/2012

Total

37,850.18
-

Water Resources
427 PAGLADIYA DAM PROJECT [300100001]MoWR,Assam

01/2001

Total

542.90
542.90
-

Grand Total

399,665.82

19

Abbreviations used in the report


AAI
AERB
AIBP
AIR
APW
ATU
BCM
BHEL
BHPV
BLU
BOLT
BPST
CCEA
CCU
CDS
CDU
CEA
CEC
CHP
CLW
CMPDI
COS
COR
CPP
CRIS
CRL
CSL
CTU
DAE
DB
DCME
DGMS
DHDS
DOC
DOT
DVC
ECL
EIL
EMP
EOT
ESP
FCCU
FE
FOIS
FPU
GAIL
GC
GDS
GIS
GT
GTPP
HCU
HEC
HEMM
HEP
HPCL
HRT
HSCL
HVDC
IAAI
ICT
IDC
IFFCO
IMG
IOC
IPCL
KV
L&T
LEP
LOI

Airport Authority of India


Atomic Energy Regulatory Board
Accelerated Irrigation Benefit Programme
All India Radio
Active Process Water
Atomic Treating Unit
Billion Cubic Meter
Bharat Heavy Electricals Ltd.
Bharat Heavy Plates & Vessel Ltd.
Boiler Light Up
Build , Operate, Lease & Transfer
Bureau of Parliamentary Studies & Training
Cabinet Committee on Economic Affairs
Catalytic Cracking Unit
Crude Distribution System
Crude Distillation Unit
Central Electricity Authority
Central Empowered Committee
Coal Handling Plant
Chittaranjan Locomotive Works
Central Mine Planning & Design Institute
Committee of Secretaries
Cost Overrun
Captive Power Plant
Centre for Railway Information System
Cochin Refinery Ltd.
Cochin Shipyard Ltd.
Crude Topping Unit
Department of Atomic Energy
Dumb Barges
Digital Circuit Multiplexiing Equipment
Director General Mines Safety
Diesel Hydro Desulphurisation project
Date of Commissioning
Department of Telecommunication
Damodar Valley Corporation
Eastern Coalfields Ltd.
Engineers India Ltd.
Enivronment Management Plan
Electrical Overhead travelling crane
Electrostatic Precipitator
Fluidised catalytic Cracker Unit
Foreign Exchange
Freight Generation Information System
Feed Preparation Unit
Gas Authority of India Ltd.
Gauge Conversion
Gateway Digital Switch
Gas Insulated Station
Gas Turbine
Gas Turbine Power Plant
Hydro- cracker Unit
Heavy Engineering Corporation
Heavy Equipment & Mining Machinery
Hydro Electric Project
Hindustan Petrochemicals Ltd.
Head Race Tunnel
Hindustan Steel Construction Ltd.
High Voltage Direct Current
International Airport Authority of India
Inter Connecting Transformer
Interest During construction
Indian Farmer Fertilizer Co-operative
Inter Ministrial Group
Indian Oil Corporation
Indian Petrochemicals Ltd.
Kilo Volts.
Larsen & Toubro
Life Extension Program
Letter of Intent

LPG
LSTK
MAMC
MFL
MGCL
MIS
MMSCMD
MMT
MOE&F
MT
MTY
MU
MW
NALCO
NBCC
NCL
NEC
NEEPCO
NFL
NH
NHPC
NIRE
NIT
NJPC
NLC
NMDC
NPC
NRL
OB
OC
OECF
ONGC
OPGC
P&M
PERT
PHT
PIB
PSLW
QRC
RAPP
RCE
RCF
ROB
ROH
RTU
SAIL
SCI
SDH
SG
SP
ST
STPS
SSS
SUR
SWSU
TBM
TG
TPA
TPS
TOR
TPY
UG
ULDCS
VDU
WHRB

Liquified Petroleum Gas


Lump sum Turnkey contract
Minning & Allied Machinery Copn.
Madras Fertilizer Ltd.
Madras Gas Cracker Complex
Management Information System
Million Metric Standard Cubic Meter day
Million Metric Tonnes
Ministry of Environment & Forest
Metric Tonnes
Metric Tonne per year
Million Unit
Mega Watts
National Aluminium Company
National Building Construction Copn.
Northern coalfields Ltd
North East Council
North-Eastern Electric Power Corporation
National Fertilizer Ltd.
National Highway
National Hydro-Electric Power Corporation
National Institute of Renewable Energy
Notice Inviting Tender
Nathpa Jhakri Power Corpn.
Neyveli Lignite Corpn.
National Mineral Development Corpn.
Nuclear Power Corporation
Numaligarh Refinery Ltd.
Over burden
Opencast
Overseas Economic Co-operation Fund
Oil & Natural Gas Commission
Orissa Power Generation Corporation
Plant & Machinery
Project Evaluation & Review Technique
Primary Heat Transport
Public Investment Board
Powered Support Longwall
Quick Roll Changer
Rajasthan Atomic Power Plant
Revised Cost Estimates
Railway Coach Factory
Road Over bridge
Regular Overhauling
Remote Terminal Unit
Steel Authority of India Ltd.
Shipping Corporation of India
Synchronous Digital Hierarchy
Steam Generator
Self Propelled
Steam Turbine
Super Thermal Power Station
Sardar Swaran Singh
Sulphur Recovery Unit
Sour Water Stripping Unit
Tunnel Boring Machine
Turbo Generator
Tonnes Per Annum
Thermal Power Station
Time Overrun
Tonnes per year
Under Ground
Unified Load Despatch & Communication Scheme
Vaccum Distillation Unit
Waste Heat Recovery Boiler