MODIFICATION IN THE VENT LINE OF THE RESERVOIR TANK OF LINE THE FUEL SYSTEM. .
February 7 2008 SB-Ibis-002
OBLIGATORY
AIRCRAFTS AFFECTED AFFECTED: All the aircrafts Magic type and Urraco type presenting pressurization problems in the fuels reservoir tank.
REASON: In some cases problems have been observed in the pressurization reservoir tank of the fuel system due to that the Drain relief valve is not sufficie to relieve the sufficient pressure in the system, which can lead to a motor halt due to lack of motor fuel. fuel
SUBJECT: Perform a modification in the pressure relief Drain line (to Drain gas) of the reservoir tank.
COMPLIANCE: Immediate. DANGER: Failure to comply with these instructions could damage the system, instructions damage the aircraft, cause personal injuries or even death death.
EXECUTION/INSTRUCTIONS: EXECUTION/INSTRUCTIONS EXECUTION. Owners of affected aircrafts, service centers, and distribution centers.
SB-Ibis-002
INSTRUCTIONS. from the gas line to drain the gas the reservoir tank i removed is with a "T" line that is taken to the highest part of one of the main tanks which is the superior line of the visual meter, this coupling is done by another T" at this point, the hose couplings are adjusted properly with their respective clamp. clamp NOTE: To verify more clearly check out the attached drawing. ify
TANK 1
Fuel Line to Reservoir Tank Fuel Line to Reservoir Tank
TANK 2
Visual Meter
Visual Meter
RESERVOIR TANK
DRAIN Vent