Stowe ATRAA Carrara Project Presentation
Stowe ATRAA Carrara Project Presentation
Stowe ATRAA Carrara Project Presentation
Australias largest privately owned Electrical & Communications Contractor 100+ year old Company Family y Owned 1600 Employees Australia wide $400M + annual turnover Covering the Industrial, Construction and Client based electrical sectors
Project Overview
Project Title Location Commencement Completion Program Total Hours Average Man Peak Man Metricon Stadium Solar Halo BIPV System Gold Coast July 2010 April 2011 9 Months 22,000 Man Hours 15 35
BIPV module selection Structural steel manufacture Glass fixing requirements to satisfy wind loads Glass testing g to ensure safety y & maintenance Tight construction timelines Guarantee Guarantee the system performance Nearly 580 BIPV modules with 290 combinations of orientation and inclination
Modules had to be re-engineered Optimised solar electrical design 6 lighting towers surrounding the stadium A specialised p structure was required q to fabricate the bays y Solar City y ARUP engineers provided independent witness testing
Design Objective: Guaranteed Performance, with 270 different panel azimuths and 6 giant manmade trees Design Constraint: Fixed budget & architecture. Value Engineering: Intelligent Wiring & Modelling or Increase cell density by 14% == $$$
Design Approach: Split p Bays y into half? Split Bays into thirds & wire bays into pairs. Design Complexity: Bays of 6, 14, 18 panels 2MPPT (unbalanced)
Air freight 36 BIPV modules Accelerate the installation process from lessons learned
Monitoring System-
Managing Contractor Watpac Project Manager Adam Kamine CEC Accredited Beenleigh Steel Steel Fabrication Tony Ansell G James Glazing Specialist Peter Jones Stowe Installation Team Solar Gary Risk Business Development Manager Michael Knowles Gold Coast Manager Les McMahon
Preparation
Glazing
On Site Production
PV Wiring Installation CEC Accredited Shaun Brookes Darren Eather Dean Richardson