Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

05-Multi-Cell Prestressed Box Girder Bridge Design As Per AASHTO

Download as pdf or txt
Download as pdf or txt
You are on page 1of 36

midas Civil

Introduction to MIDAS Civil

Integrated Solution System for Bridge and Civil Engineering

Product Overview

Product Overview

02

Why midas Civil


Project Applications

04
15

midas

Civil

midas Civil
Application Areas

Overview

Integrated Solution System for Bridge and Civil Engineering

Cable stayed bridge & Extra-dosed bridge Staged segmental post-tensioned bridge Curved steel plate and composite girder bridge Conventional bridge (Skewed slab, Frame & Culvert) Suspension bridge

Integral bridge Subway structure Tunnel structures Sewage treatment plant Heat of hydration for mass concrete

Advanced Technology

MIDAS Information Technology Co., Ltd.

Why midas Civil

Product Overview

02

Why midas Civil


Project Applications

04
15

midas

Civil

midas Civil

Why midas Civil

Integrated Solution System for Bridge and Civil Engineering

What is midas Civil? FEM FBM BEM 2-D 3-D

Structural Engineer General Purpose Special Purpose Bridge Underground Structure Building Geotechnical Engineer

Plant

Tunnel

Dam

Analysis and Design


Analysis only

midas Civil

Why midas Civil

Integrated Solution System for Bridge and Civil Engineering

What kind of bridge type can midas Civil handle?


Conventional Bridge

Staged Segmental Bridge

Cable-stayed Bridge & Suspension Bridge

midas Civil

Why midas Civil

Integrated Solution System for Bridge and Civil Engineering

Can Seismic Analysis be performed in midas Civil?


Response Spectrum Analysis

Pushover Analysis
- 4 Basic (P, V, M & PMM) Hinges - FEMA, Eurocode, Multi-linear type hinge - RC, Steel, SRC, Masonry material types - Load or Displacement Option - Demand Spectrums and Performance Points

Boundary NL Time History Analysis


- Damper, Isolator, Gap, Hook

Inelastic Time History Analysis

midas Civil

Why midas Civil

Integrated Solution System for Bridge and Civil Engineering

Can rail-structure interaction be simulated?

Multi-linear type Elastic Link Dynamic Analysis on High-speed Train

Multi-linear type elastic link

Dynamic Nodal Load for High-speed Train

midas Civil

Why midas Civil

Integrated Solution System for Bridge and Civil Engineering

How to simulate the effect of nonlinear soil property in Integral bridge?


Static Analysis

Nonlinear point spring support to represent the stiffness of the backfill and soil

Dynamic Analysis

General Link for Soil-Structure interaction (6x6 stiffness, mass, and damping matrix)

midas Civil

Why midas Civil

Integrated Solution System for Bridge and Civil Engineering

Does midas Civil support code check as per AASHTO LRFD ?


Function
Concrete Material DB Material DB Steel Material DB Time dependent materials

American Standard
ASTM ASTM AASHTO(2006) CEB-FIP (1990), 1978)

European Standard
Eurocode2:2004 Eurocode3:2005 Eurocode 2:2004

Section DB

Steel Section DB
Response Spectrum Function

AISC
User-defined AASHTO(2006) CEB-FIP (1990, 1978) AASHTO LRFD & Standard Permit Vehicle

UNI, BS, DIN


Eurocode 8:2004 Eurocode 2:2004 Eurocode 1:2005

Load

Prestress losses Moving Load

Load Combination
Concrete Frame Design (ULS & SLS) Steel Frame Design (ULS & SLS) Design Irregular Section Check

AASHTO-LRFD 07
AASHTO-LRFD 5th ed. AASHTO-LRFD 5th ed. AASHTO-LRFD 5th ed.

Eurocode 0:2002
Eurocode 2:2004 (Pier design) Eurocode 3:2005 (released in 2012, Nov.) Eurocode 2:2005

Bridge Load Rating


PSC Design Irregular Section Check (GSD module)

AASHTO-LRFR:2005
AASHTO-LRFD 6th ed. (released in 2012, July) AASHTO-LRFD (released in 2012, July)

Eurocode 2:2005 Eurocode 2, 3, 4

midas Civil

Why midas Civil

Integrated Solution System for Bridge and Civil Engineering

Can analysis and design result report be generated?

midas Civil

Why midas Civil

Integrated Solution System for Bridge and Civil Engineering

Can Wind-Induced Vibration of long-span bridge be simulated in midas Civil? For detail analysis such as CFD, fatigue, and cracking analysis, we have Advanced Nonlinear and Detail Analysis Software, midas FEA.

CFD

Fatigue Analysis

Cracking Analysis

midas Civil

Why midas Civil

Integrated Solution System for Bridge and Civil Engineering

How long time do we need to spend to run the software? Intuitive User Interface
- Works Tree (Input summary with powerful modeling capabilities) - Task Pane (Guides the work procedure for Advanced analysis) - Models created and changed with ease - Built-in Section property Calculator

Online training Offline Training Task Pane Regular training Basic Introduction Advanced Applications Company visitExcel & training Compatible Table Works Customized Sessions Customized training Tree

Online Training

Midas Training Service - Free Online Training (Twice a


month) for basic introduction and advanced features
Offline Training

- In-house courses with specialized training programs - Web base Q & A system

midas Civil

Why midas Civil

Integrated Solution System for Bridge and Civil Engineering

How many engineers are using midas software worldwide?


Midas Civil has been sold more than 70 countries, 8000 licenses worldwide.

Project Applications

Product Overview

02

Why midas Civil


Project Applications

05
15

midas

Civil

15

Project Applications

20 Bridge Project Applications selected worldwide

Bridging Your Innovations to Realities

6 Bridges from Europe 6 Bridges from Americas 8 Bridges from Asia

midas

Civil

16

Project Applications

20 Bridge Project Applications selected worldwide

Bridging Your Innovations to Realities

Ironton-Russell Bridge
Overall bridge length Main span Tower height 1,900 ft 950 ft 519 ft

Location

Crossing the Ohio River between Ironton and Russell, USA


Roadway Bridge

Function/usage

Designer
Cost of construction Number of elements and element types used

Michael Baker, Jr., Inc.


$110 Million Truss (Cable): 70 Beam: 2088 Shell: 2730

Type of analysis

Construction Stage Analysis with Time-Dependent Effects Unknown Load Factor Analysis Eigenvalue Analysis Thermal Analysis Vehicle Load Optimization

midas

Civil

17

Project Applications

20 Bridge Project Applications selected worldwide

Bridging Your Innovations to Realities

Weirton-Steubenville Bridge

Overall bridge length

1,965 ft

Main span
Tower height Location Function/usage Contractor

820 ft
365 ft

Crossing the Ohio River between Weirton (West Virginia) and Steubenville (Ohio)
Roadway Bridge S.J. Groves & Sons Co.

Designer
Consultant Year of completion Cost of construction Number of elements and element types used

Michael Baker, Jr., Inc.


T.Y. Lin International 1989 (Health Monitoring, 2005) $30 Million Truss (Cable): 52 Beam: 484 Shell: 13312 Construction Stage Analysis Cable Tension Optimization

Type of analysis

midas

Civil

18

Project Applications

20 Bridge Project Applications selected worldwide

Bridging Your Innovations to Realities

La Jabalina Bridge

Overall bridge length Location Function/usage Designer Number of elements and element types used

191 m Durango, Mexico Roadway Bridge TRIADA SA de CV Beam: 63 Tendon Profile: 64

Type of analysis

Construction Stage Analysis with Time-Dependent Effects Response Spectrum Analysis Eigen Value Analysis Vehicle Load Optimization

midas

Civil

19

Project Applications

20 Bridge Project Applications selected worldwide

Bridging Your Innovations to Realities

El Marquz Bridge

Overall bridge length Location Function/usage Designer Number of elements and element types used

102 m Michoacn, Mexico Roadway Bridge COPECSA de CV

Beam: 2224

Type of analysis

Response Spectrum Analysis Eigen Value Analysis Vehicle Load Optimization

midas

Civil

20

Project Applications

20 Bridge Project Applications selected worldwide

Bridging Your Innovations to Realities

Tarango Bridge

Overall bridge length Location Function/usage Designer Number of elements and element types used

206 m Mexico City Roadway Bridge Carlos Fernandez Casado S de RL Truss (Cable): 176 Beam: 1653

Type of analysis

Construction Stage Analysis with Time-Dependent Effects Response Spectrum Analysis Eigen Value Analysis Vehicle Load Optimization

midas

Civil

21

Project Applications

20 Bridge Project Applications selected worldwide

Bridging Your Innovations to Realities

Avenida Suba - Avenida Boyac Bridge

Overall bridge length Location Function/usage Designer Number of elements and element types used

370 m Cali, Colombia Roadway Bridge Gregorio Renteria Beam: 153 Tendon Profile: 140

Type of analysis

Construction Stage Analysis with Time-Dependent Effects Response Spectrum Analysis Eigen Value Analysis Vehicle Load Optimization

midas

Civil

22

Project Applications

20 Bridge Project Applications selected worldwide

Bridging Your Innovations to Realities

Lange Wapper Bridge

Overall bridge length Main span Tower height Location Function/usage Consultant

1,520 m 600 m 150 m Antwerp, Belgium Roadway Bridge IC+E, TUDelft

Number of elements and element types used

Solid: 7930 (concrete deck) Shell: 7733 (crossbeams web) Beam: 20151 (crossbeams flange, trusss top and bottom chord and diagonal) Truss: 128 (Stay cables)

Type of analysis

Construction Stage Analysis Cable Tension Optimization Vehicle Load Optimization

FE model by
midas

N. Lfgren
23

Civil

Project Applications

20 Bridge Project Applications selected worldwide

Bridging Your Innovations to Realities

TU Delft / Movares Research Project on Train-Structure Interaction

Overall bridge length


Main span Tower height

400 m
200 m 75 m (60 m above the deck)

Function/usage
Consultant

Railway Bridge
Movares Nederland BV

Number of elements and element types used

Truss: 56 (Stay cables) Beam: 582 (Deck and Tower)

type of analysis

Static Analysis Vehicle Load Optimization Time History Analysis

FE model by

A. Steenbrink

midas

Civil

24

Project Applications

20 Bridge Project Applications selected worldwide

Bridging Your Innovations to Realities

Korabelny Farvater Bridge

Overall bridge length Main span Tower height Location Function/usage Designer Consultant Year of completion Cost of construction Number of elements and element types used

620 m 310 m 128 m Saint-Petersburg, Russia Roadway Bridge Institute Strojproject Freyssinet International Under design $ 20 Million Truss (Cable): 104 Beam: 4063 Shell: 2288 Static Analysis Vehicle Load Optimization Eigenvalue Analysis

Type of analysis

midas

Civil

25

Project Applications

20 Bridge Project Applications selected worldwide

Bridging Your Innovations to Realities

Lazarevsky Bridge

Overall bridge length Main span Tower height Location Function/usage Contractor Designer Year of completion Cost of construction Number of elements and element types used

120 m 120 m 26 m Saint-Petersburg Roadway Bridge Mostostroj 6 Institute Strojproject 2009 $ 30 Million Truss: 10 Beam: 903 Shell: 637 Static Analysis Vehicle Load Optimization Eigenvalue Analysis Construction Stage Analysis

Type of analysis

midas

Civil

26

Project Applications

20 Bridge Project Applications selected worldwide

Bridging Your Innovations to Realities

Basarab viaduct Bridge

Overall bridge length Main span Location Function/usage Designer Number of elements and element types used

1478.5 m 125 m Bucharest, Romania Roadway / Tramway Bridge C&T Enginreering Srl Beam: 3073 Plate: 549

Type of analysis

Nonlinear dynamic time history analysis with Lead Rubber Bearing Isolators (LRB) and Viscous Dampers

midas

Civil

27

Project Applications

20 Bridge Project Applications selected worldwide

Bridging Your Innovations to Realities

Sernyi Bridge

Overall bridge length Main span Tower height Location Function/usage Designer Year of completion Cost of construction Number of elements and element types used

248 m 144 m 66 m and 48 m Saint-Petersburg , Russia Roadway Bridge Institute Strojproject Under design $ 50 Million

Truss (Cable): 40 Beam: 1633 Shell: 926


Static Analysis Vehicle Load Optimization

Type of analysis

midas

Civil

28

Project Applications

20 Bridge Project Applications selected worldwide

Bridging Your Innovations to Realities

Nga Tu So Overfly Bridge

Overall bridge length Location Function/usage Designer Number of elements and element types used

189 m HaNoi, Vietnam Roadway Bridge VINACONEX, CIPHanoi Truss (Cable): 16 Beam: 308

Type of analysis

Construction Stage Analysis with Time-Dependent Effects Response Spectrum Analysis Eigen Value Analysis Vehicle Load Optimization

midas

Civil

29

Project Applications

20 Bridge Project Applications selected worldwide

Bridging Your Innovations to Realities

Thuan Phuoc Bridge

Overall bridge length Location Function/usage Designer Number of elements and element types used

654 m Da Nang, Vietnam Roadway Bridge Tecco533, CIPHanoi Truss (Cable): 266 Beam: 82

Type of analysis

Response Spectrum Analysis Eigen Value Analysis Large Displacement Analysis Vehicle Load Optimization

midas

Civil

30

Project Applications

20 Bridge Project Applications selected worldwide

Bridging Your Innovations to Realities

Bang Hwa Bridge

Overall bridge length Location Function/usage Designer Year of completion

2559 m Seoul, South Korea Roadway Bridge Sam An Engineering 2000

Cost of construction Number of elements and element types used

$ 0.2 Billion

Beam: 2603

Type of analysis

Eigen Value Analysis Response Spectrum Analysis Vehicle Load Optimization

midas

Civil

31

Project Applications

20 Bridge Project Applications selected worldwide

Bridging Your Innovations to Realities

Kum Ga Bridge 7 Spans of Extradosed bridge

Overall bridge length Location Function/usage Designer Number of elements and element types used

795 m Chung Ju, South Korea Roadway Bridge Chung Suk Engineering Truss (Cable): 144 Beam: 644

Type of analysis

Construction Stage Analysis with Time-Dependent Effects Cable Tension Optimization Geometric Nonlinear Analysis Vehicle Load Optimization

midas

Civil

32

Project Applications

20 Bridge Project Applications selected worldwide

Bridging Your Innovations to Realities

Young Jong Bridge Worlds 1st 3D self-anchored suspension bridge

Overall bridge length Tower height Location Function/usage Designer Year of completion Cost of construction Number of elements and element types used

4420 m 107 m Incheon, South Korea Roadway / Railway Bridge U Sin Corporation 2000 $ 0.9 Billion Truss (Cable): 162 Beam: 1930

Type of analysis

Response Spectrum Analysis Eigen Value Analysis Large Displacement Analysis Vehicle Load Optimization

midas

Civil

33

Project Applications

20 Bridge Project Applications selected worldwide

Bridging Your Innovations to Realities

Incheon 2nd Bridge 5th Longest Cable Stayed Bridge

Overall bridge length Main span Tower height Location Function/usage Designer Year of completion Cost of construction Number of elements and element types used

1480 m 800 m 230 m Incheon, South Korea Roadway Bridge Seoyeong Engineering and Chodai Co., Ltd 2009 $ 2.4 Billion Truss (Cable): 176 Beam: 1653

Type of analysis

Construction Stage Analysis with Time-Dependent Effects Cable Tension Optimization Geometric Nonlinear Analysis Vehicle Load Optimization

midas

Civil

34

Project Applications

20 Bridge Project Applications selected worldwide

Bridging Your Innovations to Realities

Stonecutters Bridge 2nd Longest Cable Stayed Bridge

Overall bridge length Main span Tower height

1600 m 1018 m 295 m Between Tsing Yi and Kowloon City, Hong Kong, China Roadway Bridge Ove Arup & Partners $355 Million Truss (Cable): 224 Beam: 1638 Construction Stage Analysis with Time-Dependent Effects Cable Tension Optimization Geometric Nonlinear Analysis Eigenvalue Analysis Thermal Analysis Buckling Analysis
35

Location

Function/usage Designer Cost of construction Number of elements and element types used

Type of analysis

midas

Civil

Project Applications

20 Bridge Project Applications selected worldwide

Bridging Your Innovations to Realities

Sutong Bridge Longest Cable Stayed Bridge

Overall bridge length Main span Tower height

8206 m 1088 m 306 m Crossing Yangtze River in China between Nantong and Changshu Roadway Bridge Jiangsu Province Communications Planning and Design Institute $750 Million

Location

Function/usage Designer Cost of construction

Number of elements and element types used

Truss (Cable): 272 Beam: 760


Construction Stage Analysis with Time-Dependent Effects Cable Tension Optimization Geometric Nonlinear Analysis Eigenvalue Analysis Thermal Analysis Buckling Analysis

Type of analysis

midas

Civil

36

You might also like