11 KV 4P for Tapping point on main 11 KV line on 140 Kg 8 Mtr long PCC pole
S. No
1 1
Description
2
Pit digging, transportation of pole from dump location to pole pit & complete pole erection with earthing for PCC pole 140 Kg 8.0 M long
4 4
5 700
Fixing of DC cross arm 4 feet centre 2a galvanized channel 100x50x6 mm 2.2 M (53.4 kg) 2b
Alternate DC Channel 8 ft Centre (2.8 mtr) and 56.3 kg
Set
50 50 10
Set Nos
3 Fixing of 11KV pin insulator with GI Pin Fixing of Horizontal and cross bracing set 4 feet centre with 4 back clamps made out 4 of horizontal and cross bracing galvanized angle 50x50x6 mm (45 Kg) 5 Installation of 11KV disc insulator 6 Installation of 11KV strain hardware Pit digging & erection of stay set 16mm 7 complete with turn buckle, stay insulator and anchor plate. Fixing of Stay clamp of galvanized flat 8 50x6mm (1.35 Kg) Fixing of Stay wire 7/3.15 mm. (5.5 kg per 9 stay) maximum 10 11KV Danger Board 11 Anti-climbing devices 12
Set
50
9 9 4 4 22
1 4 6 4
15
250
10 10
-
13 Earthing of pole (coil earth) Concreting for pole and base padding @ 0.5 & 0.05 cmt per pole respectively 14 (Concrete mixture 1:3:6) with civil materials
350
2,300
Cmt.
2,300 10 5
materials
16 Numbering of four Pole 17 Fixing of PG clamp
Additional Items 1 2 ABC XYZ
Page 1 of 4
Page 2 of 4
S. No
Description
1 2 1 140 Kg., 8.0 Mtrs. long PCC poles 2 11 KV Pin insulator with GI pin 3 11KV Disc Insulator with Hardware 4 5 Galvanised Stay set 16 mm. complete with turn buckle , stay insulator and anchor plate Stay Clamp galvanised 50x6 mm flat(1.35Kg)
4 1 3 6 2 2 11 1 1 6 1 4 0 1 0.5 0.6 3 1
5 700 10 15
250
6 Stay wire 7/3.15mm (5.5Kg) per stay set 7 11KV Danger board 8 Anticlimbing device 9 Fixing of PG clamp 10a Horizontal Cross arm DC Channel 1.2 mtr with strain plates (24kg) (1set = 2Nos)
10 10 5 50 -
10b Fish Plate 11 Back Clamp Galvanised MS Flat 50x6 (1.1 kg) 12 Pole Top Bracket
20
2,300 2,300 350
Cement concreting for Pole and base 13 padding @0.5 & 0.05cmt per pole respectively (Concrete mixture (1:3:6)
14
Cement concreting for Stay @0.3 cmt per stay (Concrete mixture (1:3:6)
Cmt. Kg Set
15 Galvanised nuts & Bolts with washers 16 Earthing Set (Coil earth)
Additional Items 1 2 ABC XYZ