A ABSTRACT of rates of 33 KV / 11 KV / LT Lines 1
B Rates for CENTRALIZED MATERIALS 2 - 11
C Cost Data for Hilly and Tribal areas as adopted by Irrigation Department in the State 12
1 33 KV Line over 9.1 Mts. PSCC Poles at 105 Mts.Span WL 280 Kgs 13
2 33 KV Line over 9.1 Mts. PSCC Poles at 80 Mts.Span WL 280 Kgs 14
3 11 KV Line over 8 Mts. PSCC Poles at 60 Mts.Span WL 140 Kgs 15
4 11 KV Line over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs 16
5 11 KV Line over 8 Mts. PSCC Poles at 60 Mts.Span WL 140 Kgs 17
6 11 KV Line over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs 18
7 6.3 KV Line over 8 Mts. PSCC Poles at 90 Mts.Span WL 140 Kgs 19
8 6.3 KV Line over 8 Mts. PSCC Poles at 90 Mts.Span WL 200 Kgs 20
9 LT 3 Ph.5 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs 21
10 LT 3 Ph.5 Wire line (Horizontal) over 8 Mts. PSCC Poles at 60 Mts.Span WL 200 Kgs 22
11 LT 3 Ph.5 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs 23
12 LT 3 Ph.5 Wire line (Horizontal) over 8 Mts. PSCC Poles at 60 Mts.Span WL 200 Kgs 24
13 LT 3 Ph.4 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs 25
14 LT 3 Ph.4 Wire line (Horizontal) over 8 Mts. PSCC Poles at 60 Mts.Span WL 200 Kgs 26
15 LT 3 Ph.4 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs 27
16 LT 3 Ph.4 Wire line (Horizontal) over 8 Mts. PSCC Poles at 60 Mts.Span WL 200 Kgs 28
17 LT 1 Ph. 3 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs 29
18 LT 1 Ph. 2 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs 30
19 L.T.AB Cable (3x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs 31
20 L.T.AB Cable (2x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs 32
21 L.T.AB Cable (1x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs 33
22 L.T.AB Cable (3x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs 34
23 L.T.AB Cable (2x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs 35
24 L.T.AB Cable (1x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs 36
25 Erection of 100 KVA 11/433 KV Conventional Distribution Transformer 37
26 Erection of 16 KVA 11/433 KV Conventional Distribution Transformer on single pole structure 38
27 Erection of 63 KVA 11/433 KV Conventional Distribution Transformer 39
28 Erection of 25 KVA 11/433 KV Conventional Distribution Transformer on single pole structure 40
29 Erection of 40 KVA 11/433 KV Conventional Distribution Transformer on single pole structure 41
30 Erection of 15 KVA 6.3/0-240V CSP Transformer(Oil immersed) on 9.1Mtr PSCC Pole 42
31 Erection of 15 KVA 6.3/0-240V CSP Transformer(Oil immersed) on 8 Mts PSCC Pole 43
32 Erection of 15 KVA 6.3/0-240V Amorphous metal core Transformer(Oil immersed) on 8 Mts PSCC Pole 44
33 Release of single phase Agl. Service erected on support 45
34 Release of poly phase Agl. Service erected on support 46
35 Release of 1 ph ( high quality). Domestic & non-domestic service 47
36 Release of 1 ph (electronic). Domestic & non-domestic service 48
37 Release of 1 ph Domestic & non-domestic service 49
38 Release of 3 ph. ( electronic meter) Domestic & non-domestic service 50
39 Release of 3 ph. (electronic meter) Domestic & non-domestic service 51
40 Release of poly phase ( high quality) Indl.service upto 15 HP 52
41 Release of Industrial service with poly phase CT operated meter upto 15 HP 53
42 Release of Industrial service with poly phase CT operated meter above 15 HP 55
43 Release of Street light service (1 -ph electonic meter) 55
44
Erection of 33/11 KV Sub-station with1 No.Power Transformer & 3 Nos. 11 KV feeders
( with 11 KV 2 MVAR Capacitor Bank)
56
INDEX
Sl.
No.
Particulars of items
Wind.pr.
in kg/m2
W.Load
in kg.
Type of pole
being used
No. of
poles/
KM
Span
in
Mtrs.
Size of Conductor
Cost in
Rs.
1 33 KV Line 75 280 9.1 Mtr. PSCC 12 105 100 Sqmm AAAC 377330
2 33 KV Line 100 280 9.1 Mtr. PSCC 14 80 100 Sqmm AAA 395410
3 11 KV Line 75 140 8 Mtr PSCC 18 60 55 Sqmm AAAC 240990
4 11 KV Line 100 200 8 Mtr PSCC 17 65 55 Sqmm AAA 245700
5 11 KV Line 75 140 8 Mtr PSCC 18 60 34 Sqmm AAA 194290
6 11 KV Line 100 200 8 Mtr PSCC 17 65 34 Sqmm AAA 199000
7 6.3 KV Line 75 140 8 Mtr PSCC 13 90 34 Sqmm AAAC 126560
8 6.3 KV Line 100 200 8 Mtr PSCC 13 90 34 Sqmm AAA 133120
9 L.T. 3Ph 5 Wire Line(Horizontal) 75 140 8 Mtr PSCC 16 65 3x55+2x34 Sqmm AAA 270360
10 L.T. 3Ph 5 Wire Line(Horizontal) 100 200 8 Mtr PSCC 18 60 3x55+2x34 Sqmm AAA 286190
11 L.T. 3Ph 5 Wire Line(Horizontal) 75 140 8 Mtr PSCC 16 65 5x34 Sqmm AAAC 223660
12 L.T. 3Ph 5 Wire Line(Horizontal) 100 200 8 Mtr PSCC 18 60 5x34 Sqmm AAAC 239490
13 L.T. 3Ph 4 Wire Line(Horizontal) 75 140 8 Mtr PSCC 16 65 3x55+1x34 Sqmm AAA 240100
14 L.T. 3Ph 4 Wire Line(Horizontal) 100 200 8 Mtr PSCC 15 60 3x55+1x34 Sqmm AAA 244460
15 L.T. 3Ph 4 Wire Line(Horizontal) 75 140 8 Mtr PSCC 16 65 4x34 Sqmm AAA 193410
16 L.T. 3Ph 4 Wire Line(Horizontal) 100 200 8 Mtr PSCC 15 60 4x34 Sqmm AAA 197800
17 L.T. 1Ph 3 Wire Line(Horizontal) 75 140 8 Mtr PSCC 16 65 34 Sqmm AAA 162460
18 L.T. 1Ph 2 Wire Line(Horizontal) 75 140 8 Mtr PSCC 16 65 2x34 Sqmm AAA 132740
19 L.T. AB Cable 75 140 8 Mtr PSCC 16 65 3x16+25 Sqmm 147640
20 L.T. AB Cable 75 140 8 Mtr PSCC 16 65 2x16+25 Sqmm 131480
21 L.T. AB Cable 75 140 8 Mtr PSCC 16 65 1x16+25 Sqmm 115630
22 L.T. AB Cable 100 200 8 Mtr PSCC 16 65 3x16+25 Sqmm 155720
23 L.T. AB Cable 100 200 8 Mtr PSCC 16 65 2x16+25 Sqmm 139550
24 L.T. AB Cable 100 200 8 Mtr PSCC 16 65 1x16+25 Sqmm 123700
25 Erection of 100KVA Conventional Distribution transformer 251040
26 Erection of 63 KVA Conventional Distribution transformer 2,12,910
27 Erection of 3-Ph 16KVA Conventional Distribution transformer 120770
28 Erection of 3-Ph 25KVA Conventional Distribution transformer 138070
29 Erection of 3-Ph 40KVA Conventional Distribution transformer 174140
30 Erection of 15 KVA S-Ph 6.3 KV/0-240V CSP Oil Immersed Transformer 62870
31 Erection of 15 KVA S-Ph 6.3 KV/0-240V Amorphous metal core Transformer 48270
32 Erection of S-Ph 15 KVA CSP Transformer 9.1M PSCC Pole 51540
33 Release of Single phase Agl. Service erected on support 3120
34 Release of poly phase Agl. Service erected on support 6870
35 Release of single phase domestic and non domestic service with High Quality meter 3660
36 Release of single phase domestic and non domestic service with High Quality meter 3200
37 Release of single phase domestic and non domestic service with High Quality meter 3520
38 Release of single phase domestic and non domestic service with 3 Phase Energy meter 8490
39 Release of single phase domestic and non domestic service with Electronic meter 8340
40 Release of poly phase Industrial service upto 15 H.P with Energy meter 10530
41 Release of poly phase industrial service upto 15 HP with CT meter 12860
42 Release of poly phase Industrial service upto 15 H.P with C.T. operated meter 12860
43 Release of Single Phase Street light service with Electronic Meter 3310
44 Erection of 33/11 K.V. Substation with 1x5MVA power transformer & 3 Nos. 11KV feeders 10912000
Abstract of schedule of rates for 2013-14 with modified rates : Cost Data per Km of 33/11 KV/LT Lines
DATA FOR R.E. SCHEMES
1
Sl.
No.
Name of the Material Unit Rupees
SUBHEAD-I : SUPPORTS AND FIXTURES, IRON, STEEL AND
CEMENT
1 RS J oists 150 x 150mm MT 56155
2 RS J oists 175 x 85mm MT 56402
3 RS J oists 150 x 75mm MT 55347
4 11 mts. PSCC poles 365 Kgs Each 6016
5 9.1 mts. PSCC poles 280 Kgs. Each 3105
6 8 mts. PSCC poles 140 Kgs. Each 1504
7 8 mts. PSCC poles 200 Kgs. Each 1844
8 8 mts. PSCC poles 300 Kgs. Each 2006
9 11 mts. Spun Poles Each 11000
10 12.5 mts. Spun Poles Each 12802
11 Rail poles upto 7 Mtrs MT 84506
12 52 Kg (105 lb) Rails (up to 13 mtrs. length) MT 46895
13 MS Channel 100 x 50mm MT 55000
14 MS Channel 75 x 40mm MT 55000
15 MS Angle 65 x 65 x 6mm MT 54500
16 MS Angle 50 x 50 x 6mm MT 54500
17 MS Flat 50 x 6mm MT 55200
18 MS Flat 75 x 8mm MT 55200
19 MS Rod 20mm MT 55536
20 MS Rod 16mm MT 55250
21 Cement MT 5800
22 HT Steel wire-4mm MT 60743
23 GI Stay wire 7/3.15 mm MT 63738
24 GI Stay wire 7/2.5 mm MT 65104
25 GI Wire 4 mm MT 59819
26 GI Bolts and Nuts with Washers full thread(5/8"X6', 7', 9') MT 80628
27 GI Bolts and Nuts with Washers full thread(5/8" X 2 1/2 ', 3', 4') MT 80628
28 C R Sheet 1.6mm MT 42000
29 M S Plate 12mm/6mm MT 36600
30 Torsteel 10mm/12mm MT 34200
COST DATA OF CENTRALISED MATERIALS FOR
R.E. AND DISTRIBUTION WORKS
2013-14
2
Sl. No Name of the Material
REC Specification
No.
Unit Rupees
SUBHEAD-II : INSULATORS AND HARDWARE
1 33 KV Pin Insulator 13/1979 E 183
2 33 KV GI Pin -do- E 156
3 33 KV Post Insulator Stack -do- E 920
4 33 KV String Insulator Fittings (B&S) -do- E 188
5 33 KV polymer disc insulator/string insulator (B&S) E 649
6 11 KV Pin Insulator 3/1971(R-1993) E 32
7 11 KV GI Pin -do- E 53
8 11 KV Post Insulator -do- E 226
9 11 KV String Insulator (B&S) -do- E 224
10 11 KV String Insulator (C&T) -do- E 192
11 11 KV String Insulator Fittings (C&T) 3/1991(R-1993) E 80
12 11 KV Polymer string insulator (C&T) E 137
13 LT Pin Insulator
4/1972 D-1
(R-1979)
E 10
14 LT GI Pin -do- E 26
15 LT Shackle Insulator -do- E 10
16 LT Shackle Hardware -do- E 34
17 HT Guy Insulator 21/1981 E 28
18 LT Guy Insulator -do- E 15.75
19 33 KV Solid Core Insulators -do- E 1113
20 11 KV Solid Core Insulators for AB Switches -do- E 216
21 11 KV Solid Core Insulators for 11 KV HG Fuse sets E 117
22 1.53 Mts Channel Cross arms without clamp E 1418
23 1.07 Mts Channel Cross arms without clamp E 511
24 11KV Tapping Cross arm E 508
3
Sl. No Name of the Material
REC Specification
No.
Unit Rupees
25 Top clamp with cleat (for 33 KV) E 375
26 Top clamp with cleat (for 11 KV) E 214
27 Top clamp for LT E 208
28 Stay set with clamp (for 33 KV) E 1076
29 Stay set with clamp (for 11 KV) E 424
30 Stay set with clamp (for 6.3 KV) E 358
31 Stay set with clamp (for LT) E 394
32 LT 3-Ph Cross arm (for 5 Wire line) E 487
33 LT 3-Ph Cross arm (for 4 Wire line) E 416
34 LT S-Ph Cross arm (for 3 Wire line) E 319
35 LT S-Ph Cross arm (for 2 Wire line) E 268
36 Back Clamp for 9.1 Mts PSCC pole E 172
37 Back Clamp for 8 Mts PSCC pole E 123
38 D Clamp for 8.0 M poles E 132
39 Bracing set with double X arms with 9.1 Mts PSCC poles set 4158
40 Bracing set with double X arms with 8 Mts PSCC poles set 3564
41 DPC aluminium Winding Wire 1.25 mm Kg 193
42 DPC aluminium Winding Wire 1.6 mm Kg 193
4
Sl. No Name of the Material
REC Specification
No.
Unit Rupees
SUBHEAD - III : CONDUCTORS
1 ACSR Zebra Conductor KM 235223
2 200 Sq.mm Panther Conductor KM 130957
37/3.0 Sq.mm ACSR
1/1971(R-1993)
3 100 Sq.mm AAA Conductor or 33/1984(R-1993) KM 49166
7/4.26 AAAC
4 55 Sq.mm AAA Conductor or -do- KM 28149
7/3.15 AAAC/RABBIT
5 34 Sq.mm AAA Conductor or -do- KM 17870
7/2.50 AAAC/Weasel
SUBHEAD-IV : CABLES
SUBHEAD-IV : (A) LT XLPE SINGLE CORE CABLES
1 2.50 Sq.mm 26/1993(R-1987) KM 2627
2 4.00 Sq.mm - do - KM 4172
3 6.00 Sq.mm - do - KM 5253
4 10.00 Sq.mm - do - KM 8343
5 25.00 Sq.mm - do - KM 23072
6 50.00 Sq.mm - do - KM 38146
7 70.00 Sq.mm - do - KM 49955
8 95.00 Sq.mm - do - KM 61350
9 120.00 Sq.mm - do - KM 73725
10 150.00 Sq.mm - do - KM 94500
11 185.00 Sq.mm - do - KM 115710
SUBHEAD-IV : (B) LT PVC SINGLE CORE CABLES
1 25.00 Sq.mm KM 22104
2 50.00 Sq.mm KM 40479
3 70.00 Sq.mm KM 52839
4 120.00 Sq.mm KM 77250
SUBHEAD-IV : (C) LT CONTROL CABLES
1 2 X 2.5 Sq.mm (Cu) KM 36889
2 4 X 2.5 Sq.mm (Cu) KM 83997
3 10 x 2.5 Sq.mm (Cu) KM 167596
4 4 x 4.0 Sq.mm (AL) KM 25000
5
Sl. No Name of the Material
REC Specification
No.
Unit Rupees
SUBHEAD-IV : (D) ) LT XLPE CABLES
1 3 1/2 X 300 sqmm LT XLPE cable KM 659613
2 3 1/2 X 185 sqmm LT XLPE cable KM 448114
3 3 1/2 X 150 sqmm LT XLPE cable KM 358432
4 3 1/2 X 120 sqmm LT XLPE cable KM 320330
5 3 1/2 X 95 sqmm LT XLPE cable KM 242739
6 3 1/2 X 70 sqmm LT XLPE cable KM 183620
7 3 1/2 X 50 sqmm LT XLPE cable KM 143795
8 3 1/2 X 25 sqmm LT XLPE cable KM 87742
SUBHEAD -IV: (E) LT AERIAL BUNCHED CABLES
1 1 x 16+25 Sq.mm 32/1984 KM 25750
2 2 x 16+25 Sq.mm XLPE AB Cable KM 36427
3 3 x 16+25 Sq.mm XLPE AB Cable KM 47316
4 3 x 70 +1x16 +1x50 Sqmm XLPE AB, Cable KM 167000
SUBHEAD -IV: (F) LT AERIAL BUNCHED CABLE FITTINGS
1 Suspension Clamp with eye hook 32/1984 E 175
2 LT Connector with Insulator Cover - do - E 82
3 Dead-end Clamp with eye hooks - do - E 113
SUBHEAD -IV: (G) 11 KV XLPE POWER CABLES
1 3 x 35 Sq.mm 63/1993 KM 288226
2 3 x 95 Sq.mm - do - KM 454303
3 3 x 120 Sq.mm - do - KM 576934
4 3 x 185 Sq.mm - do - KM 673986
5 3 x 300 Sq.mm - do - KM 1001492
6
11 KV 3CX35 Sq.mm Heat shrinkable Cable Termination Kits suitable for
Indoor type.
E
5763
7
11 KV 3CX35 Sq.mm Heat shrinkable Cable Termination Kits suitable for
Outdoor type.
E
9910
6
Sl. No Name of the Material
REC Specification
No.
Unit Rupees
8
11 KV 3CX185 Sq.mm Heat shrinkable Cable Termination Kits suitable for
Indoor type.
E
8914
9
11 KV 3CX185 Sq.mm Heat shrinkable Cable Termination Kits suitable for
Outdoor type.
E
11958
10
11KV 3x300 Sqmm Heat shrinkable cable Termination Kits suitable for
Indoor type.
E
8775
11
11KV 3x300 Sqmm Heat shrinkable cable Termination Kits suitable for
Outdoor type.
E
13411
12
33KV 3X185Sqmm heat shrinkable cable Termination Kits suitable for
Outdoor type.
E
23637
13
33KV 3X400Sqmm heat shrinkable cable Termination Kits suitable for
Indoor type.
E
20565
14
33KV 3X400Sqmm heat shrinkable cable Termination Kits suitable for
Outdoor type.
E
31176
SUBHEAD - IV (H)11 KV AB Cable (Aluminum)
1 3x35+35 Sqmm. KM 219898
2 3x70+70 Sqmm. KM 318653
3 3x120+70 Sqmm. KM 476000
4 3x185+70 Sqmm. KM 429020
SUBHEAD -IV: (I) 33 KV XLPE POWER CABLES
1 3 x 400 Sq.mm 63/1993 KM 1621767
2 3 x 185 Sq.mm KM 1156566
SUBHEAD -V: POWER TRANSFORMERS, CAPACITORS AND
TRASFORMER OIL
1 33/11 KV 3.15 MVA Power Transformer E 2856190
2 33/11 KV 5 MVA Power Transformer 7/1974(R-1993) E 3169500
3 33/11 KV 8 MVA Power Transformer E 4230597
4 33/11 KV 12.5 MVA Power Transformer E 5588956
5 Transformer Oil KL 82396
SUBHEAD -VI: DISTRIBUTION TRANSFORMERS
1 S-Ph 5 KVA DTR 6.3 KV/0-240 V E 23436
2 1-Phase 10kVA 11kV/250V (CSP) (Aluminium) E 27501
3 S-Ph 15 KVA CSP DTR 6.3 KV/0-240V (Al) E 34595
4 S-Ph 15 KVA CSP DTR 6.3 KV/230-0-230V (Al) E 37522
7
Sl. No Name of the Material
REC Specification
No.
Unit Rupees
5 1-Phase 25 KVA (CSP) (Copper) E 43590
6
3-Ph 16 KVA Amorphous/CRGO core conventional type copper wound DTR
with BEE 5 star rating Conventional DTR (Cu)
E 60485
7
3-Ph 25 KVA Amorphous/CRGO core conventional type copper wound DTR
with BEE 5 star ratingConventional DTR (Cu)
E 70115
8
3-Ph 40 KVA Amorphous/CRGO core conventional type copper wound DTR
with BEE 5 star rating Conventional DTR (Cu)
E 96748
9
3-Ph 63 KVA Amorphous/CRGO core conventional type copper wound DTR
with BEE 5 star ratingConventional DTR (Cu)
E 103237
10
3-Ph 100 KVA Amorphous/CRGO core conventional type copper wound DTR
with BEE 5 star rating Conventional DTR (Cu)
E 135423
11
3-Ph 160 KVA Amorphous/CRGO core conventional type copper wound DTR
with BEE 5 star rating Conventional DTR (Cu)
E 211348
12 250 KVA CSP DTR (Cu) E 315618
13 315 KVA CSP DTR (Cu) Conventional E 492077
14 500 KVA Conventional (Al) E 531833
15 Single Phase 15 KVA Transformer (Amorphous) E 37522
SUBHEAD -VII: SWITCH CONTROL AND PROTECTIVE GEAR
(A) 33KV & 11KV VCBs
1 33 KV VCB with CRPs & CTs ratio (400-200-100/1-1-1A) 12/1979(R-1993) E 418319
2 33KV Feeder VCBs with CTs & CR panels 413788
4 11 KV VCB with CTs & Panels (Feeder Control) 22/1983 E 215550
5 11 KV VCB with CTs & Panels ( LV Control ) without differential protection E 234179
6 11 KV VCB with CTs & Panels ( LV Control ) with differential protection E 270430
(B) 33KV & 11KV CTs
1 33 KV CTs 400-200-100/1-1-1A ratio 0.2s class accuracy E 23394
2 33 KV CTs 400-200-100/1-1A ratio 0.2S class accuracy E 19839
3 33 KV CTs (200-100/1-1A) 0.2 class accuracy E 23394
4 33 KV CTs (100-50/1-1A) 0.2S class accuracy E 20029
8
Sl. No Name of the Material
REC Specification
No.
Unit Rupees
5 11 KV feeder CTs (400-200-100/1-1A) (0.2S class) E 16758
6 11 KV CTs (50-25/1-1A) 59/1993 E 14640
7 11 KV CTs 200-100/5-5A E 14463
8 11 KV CTs 400-200/1-1A E 13564
9 11 KV CTs 200-100/1-1A E 13125
10 11 KV CTs (600-300/1-1-0.577A) E 14758
(C) 33KV & 11KV PTs - CTs
1 33 KV PT (Single Phase) class 0.5 E 18960
2 33 KV PT (Single Phase) class 0.2 E 19570
3 33 KV PT (Three Phase) of 0.5 class accuracy E 44263
4 11 KV PT (3 Phase) 60/1993 E 15789
5 11KV C.T.P.T. set 10/5A 28998
(D) AB Switches, LAs, HG Fuse sets, Batteries, Capacitors, RMUs etc.
1 33 KV 800 Amps AB Switch Double break with solid core insulator E 42000
2 11 KV 800 Amps AB Switch Double break with insulators 43/1987 E 19949
4 11 KV 400 Amps AB Switch Double break with insulators E 13738
5 11 KV 200 Amps AB Switch (Tilting) E 8250
6 11 KV 200 Amps AB Switch (Horizontal) E 7349
7 30 KV 10 KA Metal Oxide Lightning Arrester (station type)
16/1981
(R-55/1987)
E 3081
8 33 KV Line type Lighting Arrester E 1670
9 9 KV 10 KA Metal Oxide Lighting Arrester E 1724
10 9 KV 5 KA Metal Oxide Lighting Arrester 55/1987 E 310
11 33 KV HG Fuse set Set 9450
12 11 KV HG Fuse Set Set 1889
13 6.3 KV HG Fuse Set Set 457
14 LT HG Fuse Set Set 1313
15 24 Volts 40 AH Battery set including Battery charger E 15900
9
Sl. No Name of the Material
REC Specification
No.
Unit Rupees
16 24V, 40 AH Batteries with chargers of conventional type E 18770
17 24 Volts 40 AH Battery set without Battery charger E 6371
18 12 V, 40 AH SMF Batteries cells E 3244
19 12 V, 80 AH SMF Batteries cells E 8475
20 220 V, 80 AH SMF Batteries and Chargers & DCDB E 194054
21 220 V, 80 AH SMF Batteries E 117887
22 LT Switched capacitors
a 1x9 KVAR E 2548
b 1x10 KVAR E 2614
23 11 KV 2 MVAR Capacitor banks with associated equipment
a Type A E 1000000
b Type B with 40 Mtrs HT UG cable E 895869
c Type C (Indoor Type) with HT UG cable E 1295000
24 Sectionalizers E 588444
25 Auto - Reclosures E 925206
26 11 KV 3 Way RMU (Conventional) E 171658
27 11 KV 3 Way RMU (SF6) E 366000
28 11 KV SF6 5 Way RMU E 735000
29 33 KV Indoor twin feeder control panel E 285007
30 33KV twin feeder control and relay panel (220V DC) E 142850
31 Indoor type VCB with control panel (LV) E 376368
32 Indoor type VCB with control panel (feeder) E 274818
33 11 VCB for bus coupler E 210677
34 11KV switch Fuse unit (SFU) E 100000
35 33KV switch Fuse unit (SFU) E 200000
36 33KV 3-way RMU without VCB E 1020110
37 33KV 3-way RMU with VCB E 1445325
38 11KV metering panel with CTS& PTS (Indoor) E 150000
39 33KV metering panel with CTS&PTS (Indoor) E 300000
SUBHEAD -VIII: ENERGY METERS AND METERING EQUIPMENT
1 a) LT Single Phase High quality Meter Class 1 accuracy ( 5-20A) E 730
b) 1 Ph 5-30 Meter IR port, Sup Capacitor - PP Box E 819
c) LT Single Phase Electronic Energy Meter 2.5 - 10A E 447
10
Sl. No Name of the Material
REC Specification
No.
Unit Rupees
d) LT Single Phase Class 1 accuracy (push fit type box Non push fit type TC)
5-30A
E 846
2 a) Three Phase Electronic Meter 10 - 40A with P P Box E 1869
b) Three Phase High Quality Meter 10 - 40A (Counter type display without
Box)
E 2150
3 a) LT 3-Ph Class-0.5 Accuracy CT Operated Electronic TVR Meter 200/5A E 6899
b) LT 3-Ph Class-0.5 Accuracy CT Operated Electronic TVR Meter 125/5A E 6525
c) LT TVR METER 125/5A CTS IN PP BOX. 0.5S ACCR WITH DLMSDL 6840
4 a) HT Trivector Meter 0.5 class accuracy(10/5A) E 4244
b) HT Trivector Meter 0.5 class accuracy (200/1,100/1A) E 3746
c) HTTVR3P4W11KV/110V 10/5A 0.5S 30M DLMS-C E 3401
d) HTTVR 3P4W 33KV/110V 200/1A 0.2S 30MIN IPDLMS 10100
5 11 KV Metering cubicles
a) 10/5 A class 0.2S class accuracy E 39327
b) 20/5 A/ 0.2S class accuracy E 39015
c) 30/5A 0.5S class accuracy E 22977
d) 40/5A 0.5S class accuracy E 30609
e) 75/5 A 0.2S accuracy E 39015
f) 60/5 A 0.2S accuracy E 39015
6 Moulded Box for Single Phase service E 250
7 Moulded Box for 3 Phase service E 420
8 Moulded box for CT Meter(Poly phase) E 1647
9 HT Meter Box E 5731
10 A Type Distribution type BOX E 7558
11 B Type Distribution type BOX E 2500
12 SMC Meter Box with fixing clamps (3 phase meters) E 6750
13 SMC Meter Box with fixing clamps (S- phase meters) E 408
SUBHEAD -IX: EARTHING MATERIALS
1 GI Earth pipe 40 mm , (1.8 mts. Length) E 418
2 GI Earth pipe 40 mm (2.5 mts. Length) E 475
3 CI Earth pipe 80mm dia, (2.5 mts. Length) E 2471
SUBHEAD -X: OTHER MATERIALS
1 Hand Held Computers with Printer E 8145
2 CMRI E 30700
11
Note:
1
2
3
COST DATA FOR HILLY AND TRIBAL AREAS
AS ADOPTED BY IRRIGATION DEPARTMENT IN THE STATE
No extrapercentageis permissiblein respect of Forest producesuch as Bamboo,
Rellu grass and all materials obtained from outside the Agency/Tribal.
Theextrapercentageunder Agency/Tribal areas allowancemay beallowedonthe
labour component and on the labour charges in the rates for conveyance of
materials.
Theextrapercentageoncost of materialsinAgency/Tribal areascanbeallowedon
the labour component only, if they are manufactured in the Agency/Tribal areas
itself except Forest produce.
a. 25%extraisallowedfor theworkslocatedwithintheinterior Agency/ Tribal limits.
(i.e.) for the works located within and upto 16 Kilometers fromany all weather route
inside Agency/Tribal.
a. 40%extrais allowedfor theworks locatedwithintheinterior Agency / Tribal Area
i.e., for the works located beyond 16 Kilometers from any all weather route inside
Agency/Tribal.
For hilly and tribal areas, the following EXTRA RATES are allowed over and above
approved cost data of labour.
12
Sl.
No.
Particulars Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
1 9.1 M PSCC Pole 12 3105 Each 37260
2 1.53M Cross Arm (Channel) without clamps 10 1418 Each 14180
3 Top Clamp with cleat 10 375 Each 3750
4 Back Clamp 10 172 Each 1720
5 Stay sets with clamps 6 1076 Each 6456
6 Bracing Set with double cross arm 1 4158 Set 4158
7 100 Sq.mm AAA Conductor 3.06 49166 K.M. 150448
8 33 KV Pin - Insulator with Pin 33 339 Each 11187
9
Strain Insulator set with metal parts( 3x 11 KV B&S
Insulator with 33 KV Hard ware fitting)
6 860 Set 5160
10 Concreting of Pole, Stay sets & Base concreting LS LS LS 16940
11
Misc. Items like coil earthing, pipe earthing, danger-
boards, bolts & nuts, etc.
LS LS LS 3300
Total Cost of Material 254559
3% storage & handling charges on items (1) to (9) 234319 7030
3% Contingencies on Materials 7637
Labour 63640
Transport 12728
11% Estt. & Genl. Charges On Materials 28001
1% cess 3736
Total 377331
or say 3,77,330
1. R.E.C. - Construction Standard No. M11/1979 (R-1989)
Costdata per Km of 33 KV Line with 100 Sq.mm AAA Conductor over 9.1 Mts.
PSCC Poles at 105 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 280 Kgs.
13
Sl.
No.
Particulars Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
1 9.1 M PSCC Pole 14 3105 Each 43470
2 1.53M Cross Arm (Channel) without clamps 12 1418 Each 17016
3 Top Clamp with cleat 12 375 Each 4500
4 Back Clamp 12 172 Each 2064
5 Stay sets with clamps 6 1076 Each 6456
6 Bracing Set with double cross arm 1 4158 Set 4158
7 100 Sq.mm AAA Conductor 3.06 49166 K.M. 150448
8 33 KV Pin - Insulator with Pin 39 339 Each 13221
9 Strain Insulator set with metal parts 6 860 Set 5160
10 Concreting of Pole, Stay sets & Base concreting LS LS LS 16940
11
Misc. Items like coil earthing, pipe earthing, danger-
boards, bolts & nuts, etc.
LS LS LS 3300
Total Cost of Material 266733
3% storage & handling charges on items (1) to (9) 246493 7395
3% Contingencies on Materials 8002
Labour 66683
Transport 13337
11% Estt. & Genl. Charges On Materials 29341
1% cess 3915
Total 395405
or say 3,95,410
2. R.E.C. - Construction Standard No. M11/1979 (R-1989)
Costdata per Km of 33 KV Line with 100 Sq.mm AAA Conductor over 9.1 Mts.
PSCC Poles at 80 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 280 Kgs.
14
Sl.
No.
Particulars Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
1 8.0 M PSCC Pole 18 1504 Each 27072
2 1.07M Cross Arm (Channel) without clamps 16 511 Each 8176
3 Top Clamp with cleat 16 214 Each 3424
4 Back Clamp 16 123 Each 1968
5 Stay sets with clamps 6 424 Each 2544
6 Bracing Set with double cross arm 1 3564 Set 3564
7 55 Sq.mm AAA Conductor 3.06 28149 K.M. 86136
8 11 KV Pin - Insulator with Pin 51 85 Each 4335
9 Strain Insulator set with metal parts 6 272 Set 1632
10 Concreting of Pole, Stay sets & Base concreting LS LS LS 19556
11
Misc. Items like coil earthing, pipe earthing, danger-
boards, bolts & nuts, etc.
LS LS LS 4400
Total Cost of Material 162807
3% storage & handling charges on items (1) to (9) 138851 4166
3% Contingencies on Materials 4884
Labour 40702
Transport 8140
11% Estt. & Genl. Charges On Materials 17909
1% cess 2386
Total 240994
or say 2,40,990
PSCC Poles at 60 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
3. R.E.C. - Construction Standard No. A-5/1972
Costdata per Km of 11 KV Line with 55 Sq.mm AAA Conductor over 8 Mts.
15
Sl.
No.
Particulars Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
1 8.0 M PSCC Pole 17 1844 Each 31348
2 1.07M Cross Arm (Channel) without clamps 15 511 Each 7665
3 Top Clamp with cleat 15 214 Each 3210
4 Back Clamp 15 123 Each 1845
5 Stay sets with clamps 6 424 Each 2544
6 Bracing Set with double cross arm 1 3564 Set 3564
7 55 Sq.mm AAA Conductor 3.06 28149 K.M. 86136
8 11 KV Pin - Insulator with Pin 48 85 Each 4080
9 Strain Insulator set with metal parts 6 272 Set 1632
10 Concreting of Pole, Stay sets & Base concreting LS LS LS 19556
11
Misc. Items like coil earthing, pipe earthing, danger-
boards, bolts & nuts, etc.
LS LS LS 4400
Total Cost of Material 165980
3% storage & handling charges on items (1) to (9) 142024 4261
3% Contingencies on Materials 4979
Labour 41495
Transport 8299
11% Estt. & Genl. Charges On Materials 18258
1% cess 2433
Total 245704
or say 2,45,700
4. R.E.C. - Construction Standard No. A-5/1972
Costdata per Km of 11 KV Line with 55 Sq.mm AAA Conductor over 8 Mts.
PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
16
Sl.
No.
Particulars Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
1 8 M PSCC Pole 18 1504 Each 27072
2 1.07M Cross Arm (Channel) without clamps 16 511 Each 8176
3 Top Clamp with cleat 16 214 Each 3424
4 Back Clamp 16 123 Each 1968
5 Stay sets with clamps 6 424 Each 2544
6 Bracing Set with double cross arm 1 3564 Set 3564
7 34 Sq.mm AAA Conductor 3.06 17870 K.M. 54682
8 11 KV Pin - Insulator with Pin 51 85 Each 4335
9 Strain Insulator set with metal parts 6 272 Set 1632
10 Concreting of Pole, Stay sets & Base concreting LS LS LS 19556
11
Misc. Items like coil earthing, pipe earthing, danger-
boards, bolts & nuts, etc.
LS LS LS 4400
Total Cost of Material 131353
3% storage & handling charges on items (1) to (9) 107397 3222
3% Contingencies on Materials 3941
Labour 32838
Transport 6568
11% Estt. & Genl. Charges On Materials 14449
1% cess 1924
Total 194294
or say 1,94,290
5. R.E.C. - Construction Standard No. A-5/1972
Costdata per Km of 11 KV Line with 34 Sq.mm AAA Conductor over 8 Mts.
PSCC Poles at 60 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
17
Sl.
No.
Particulars Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
1 8 PSCC Pole 17 1844 Each 31348
2 1.53M Cross Arm (Channel) without clamps 15 511 Each 7665
3 Top Clamp with cleat 15 214 Each 3210
4 Back Clamp 15 123 Each 1845
5 Stay sets with clamps 6 424 Each 2544
6 Bracing Set with double cross arm 1 3564 Set 3564
7 34 Sq.mm AAA Conductor 3.06 17870 K.M. 54682
8 11 KV Pin - Insulator with Pin 48 85 Each 4080
9 Strain Insulator set with metal parts 6 272 Set 1632
10 Concreting of Pole, Stay sets & Base concreting LS LS LS 19556
11
Misc. Items like coil earthing, pipe earthing, danger-
boards, bolts & nuts, etc.
LS LS LS 4400
Total Cost of Material 134526
3% storage & handling charges on items (1) to (9) 110570 3317
3% Contingencies on Materials 4036
Labour 33631
Transport 6726
11% Estt. & Genl. Charges On Materials 14798
1% cess 1970
Total 199005
or say 1,99,000
PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
6. R.E.C. - Construction Standard No. A-5/1972
Costdata per Km of 11 KV Line with 34 Sq.mm AAA Conductor over 8 Mts.
18
Sl.
No.
Particulars Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
1 8 M PSCC Pole 13 1504 Each 19552
2 Top Clamp with cleat 10 214 Each 2140
3 D clamp 10 132 Each 1320
4 MS Stay sets 6 358 Each 2148
5 34 Sq.mm AAA Conductor 2.04 17870 K.M. 36455
6 11 K.V.Pin-Insulator with Pin 11 85 Each 935
7 Strain Insulator set 4 272 Set 1088
8 Concreting of Pole,Stay sets & Base concreting L.S. 19556
9 Misc. Items like coil earthing,
pipe earthings, danger-boards, bolts L.S. 2500
& nuts, etc.
Total Cost of Material 85694
3% storage & handling charges on items (1) to (7) 63638 1909
3% Contingencies on Materials 2571
Labour 21423
Transport 4285
11% Estt. & Genl. Charges On Materials 9426
1% cess 1253
Total 126561
or say 1,26,560
PSCC Poles at 90 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
7. R.E.C. - Construction Standard No. A-17/1972
Costdata per Km of 6.3 KV S-ph Line with 34 Sq.mm AAA Conductor over 8 Mts.
19
Sl.
No.
Particulars Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
1 8 M PSCC Pole 13 1844 Each 23972
2 Top Clamp with cleat 10 214 Each 2140
3 D clamp 10 132 Each 1320
4 MS Stay sets 6 358 Set 2148
5 34 Sq.mm AAA Conductor 2.04 17870 K.M. 36455
6 11 K.V.Pin-Insulator with Pin 11 85 Each 935
7 Strain Insulator set 4 272 Set 1088
8 Concreting of Pole,Stay sets &
Base concreting L.S. 19556
9 Misc. Items like coil earthing,
pipe earthings, danger-boards, bolts L.S. 2500
& nuts, etc.
Total Cost of Material 90114
3% storage & handling charges on items (1) to (7) 68058 2042
3% Contingencies on Materials 2703
Labour 22528
Transport 4506
11% Estt. & Genl. Charges On Materials 9913
1% cess 1318
Total 133124
or say 1,33,120
8. R.E.C. - Construction Standard No. A-17/1972
Costdata per Km of 6.3 KV S-ph Line with 34 Sq.mm AAA Conductor over 8 Mts.
PSCC Poles at 90 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
20
Sl.
No.
Particulars Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
1 8 M PSCC Pole 16 1504 Each 24064
2 L.T. 3 Phase cross arms 18 487 Each 8766
3 Back Clamp 18 123 Each 2214
4 Stay sets 4 394 Each 1576
5 55 Sq.mm AAA Conductor 3.06 28149 K.M. 86136
6 34 Sq.mm AAA Conductor 2.04 17870 K.M. 36455
7 Shakle Insulator set 42 44 Set 1848
8 L.T.pin insulator with pin 48 36 Set 1728
9 C.I. Knob 16 12 Each 192
10 Concreting of Pole,Stay sets &
Base concreting L.S. 16016
11 Misc. Items like coil earthing,
pipe earthings, danger-boards, bolts L.S. 3500
& nuts, etc.
Total Cost of Material 182495
3% storage & handling charges on items (1) to (9) 162979 4889
3% Contingencies on Materials 5475
Labour 45624
Transport 9125
11% Estt. & Genl. Charges On Materials 20074
1% cess 2677
Total 270359
or say 2,70,360
9. R.E.C. - Construction Standard No. B-5/1972
Costdata per Km of LT 3-Ph 5 Wire Line(Horizontal formation ) with
3 x 55 Sq.mm + 2 x 34 Sq.mm AAAC over 8 Mts.
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
21
Sl.
No.
Particulars Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
1 8 M PSCC Pole 18 1844 Each 33192
2 L.T. 3 Phase cross arms 20 487 Each 9740
3 Back Clamp 20 123 Each 2460
4 LT Stay sets 4 394 Each 1576
5 55 Sq.mm AAA Conductor 3.06 28149 K.M. 86136
6 34 Sq.mm AAA Conductor 2.04 17870 K.M. 36455
7 Shakle Insulator set 42 44 Set 1848
8 L.T.pin insulator with pin 56 36 Set 2016
9 C.I. Knob 18 12 Each 216
10 Concreting of Pole,Stay sets & L.S. 16016
Base concreting
11 Misc. Items like coil earthing,
pipe earthings, danger-boards, bolts L.S. 3500
& nuts, etc.
Total Cost of Material 193155
3% storage & handling charges on items (1) to (9) 173639 5209
3% Contingencies on Materials 5795
Labour 48289
Transport 9658
11% Estt. & Genl. Charges On Materials 21247
1% cess 2834
Total 286186
or say 2,86,190
3 x 55 Sq.mm + 2 x 34 Sq.mm AAAC over 8 Mts.
PSCC Poles at 60 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
10. R.E.C. - Construction Standard No. B-5/1972
Costdata per Km of LT 3-Ph 5 Wire Line(Horizontal formation ) with
22
Sl.
No.
Particulars Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
1 8 M PSCC Pole 16 1504 Each 24064
2 L.T. 3 Phase cross arms 18 487 Each 8766
3 Back Clamp 18 123 Each 2214
4 LT Stay sets 4 394 Each 1576
5 34 Sq.mm AAA Conductor 5.10 17870 K.M. 91137
6 Shakle Insulator set 42 44 Set 1848
7 L.T.pin insulator with pin 48 36 Set 1728
8 C.I. Knob 16 12 Each 192
9 Concreting of Pole,Stay sets &
Base concreting L.S. 16016
10 Misc. Items like coil earthing,
pipe earthings, danger-boards, bolts L.S. 3500
& nuts, etc.
Total Cost of Material 151041
3% storage & handling charges on items (1) to (8) 131525 3946
3% Contingencies on Materials 4531
Labour 37760
Transport 7552
11% Estt. & Genl. Charges On Materials 16615
1% cess 2214
Total 223659
or say 2,23,660
5 x 34 Sq.mm AAAC over 8 Mts.
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
11. R.E.C. - Construction Standard No. B-5/1972
Costdata per Km of LT 3-Ph 5 Wire Line(Horizontal formation ) with
23
Sl.
No.
Particulars Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
1 8 M PSCC Pole 18 1844 Each 33192
2 L.T. 3 Phase cross arms 20 487 Each 9740
3 Back Clamp 20 123 Each 2460
4 LT Stay sets 4 394 Each 1576
5 34 Sq.mm AAA Conductor 5.10 17870 K.M. 91137
6 Shakle Insulator set 42 44 Set 1848
7 L.T.pin insulator with pin 56 36 Set 2016
8 C.I. Knob 18 12 Each 216
9 Concreting of Pole,Stay sets &
Base concreting L.S. 16016
10 Misc. Items like coil earthing,
pipe earthings, danger-boards, bolts L.S. 3500
& nuts, etc.
Total Cost of Material 161701
3% storage & handling charges on items (1) to (8) 142185 4266
3% Contingencies on Materials 4851
Labour 40425
Transport 8085
11% Estt. & Genl. Charges On Materials 17787
1% cess 2371
Total 239486
or say 2,39,490
5 x 34 Sq.mm AAAC over 8 Mts.
PSCC Poles at 60 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
12. R.E.C. - Construction Standard No. B-5/1972
Costdata per Km of LT 3-Ph 5 Wire Line(Horizontal formation ) with
24
Sl.
No.
Particulars Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
1 8 M PSCC Pole 16 1504 Each 24064
2 L.T. 3 Phase cross arms 18 416 Each 7488
3 Back Clamp 18 123 Each 2214
4 LT Stay sets 4 394 Each 1576
5 55 Sqmm AAA Conductor 3.06 28149 K.M. 86136
6 34 Sq.mm AAA Conductor 1.02 17870 K.M. 18227
7 Shakle Insulator set 32 44 Set 1408
8 L.T.pin insulator with pin 36 36 Set 1296
9 C.I. Knob 16 12 Each 192
10 Concreting of Pole,Stay sets &
Base concreting L.S. 16016
11 Misc. Items like coil earthing,
pipe earthings, danger-boards, bolts L.S. 3500
& nuts, etc.
Total Cost of Material 162117
3% storage & handling charges on items (1) to (9) 142601 4278
3% Contingencies on Materials 4864
Labour 40529
Transport 8106
11% Estt. & Genl. Charges On Materials 17833
1% cess 2377
Total 240104
or say 2,40,100
3 x 55 Sq.mm + 1 x 34 Sqmm AAAC over 8 Mts.
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
13. R.E.C. - Construction Standard No. B-12/1981
Costdata per Km of LT 3-Ph 4 Wire Line(Horizontal formation ) with
25
Sl.
No.
Particulars Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
1 8 M PSCC Pole 15 1844 Each 27660
2 L.T. 3 Phase cross arms 17 416 Each 7072
3 Back Clamp 17 123 Each 2091
4 LT Stay sets 4 394 Each 1576
5 55 Sqmm AAA Conductor 3.06 28149 K.M. 86136
6 34 Sq.mm AAA Conductor 1.02 17870 K.M. 18227
7 Shakle Insulator set 32 44 Set 1408
8 L.T.pin insulator with pin 33 36 Set 1188
9 C.I. Knob 15 12 Each 180
10 Concreting of Pole,Stay sets &
Base concreting L.S. 16016
11 Misc. Items like coil earthing,
pipe earthings, danger-boards, bolts L.S. 3500
& nuts, etc.
Total Cost of Material 165054
3% storage & handling charges on items (1) to (9) 145538 4366
3% Contingencies on Materials 4952
Labour 41264
Transport 8253
11% Estt. & Genl. Charges On Materials 18156
1% cess 2420
Total 244464
or say 2,44,460
14. R.E.C. - Construction Standard No. B-12/1981
Costdata per Km of LT 3 Ph 4 Wire Line(Horizontal formation ) with
3 x 55 Sq.mm + 1 x 34 Sqmm AAAC over 8 Mts.
PSCC Poles at 60 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
26
Sl.
No.
Particulars Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
1 8 M PSCC Pole 16 1504 Each 24064
2 L.T. 3 Phase cross arms 18 416 Each 7488
3 Back Clamp 18 123 Each 2214
4 LT Stay sets 4 394 Each 1576
5 34 Sq.mm AAA Conductor 4.08 17870 K.M. 72910
6 Shakle Insulator set 32 44 Set 1408
7 L.T.pin insulator with pin 36 36 Set 1296
8 C.I. Knob 16 12 Each 192
9 Concreting of Pole,Stay sets &
Base concreting L.S. 16016
10 Misc. Items like coil earthing,
pipe earthings, danger-boards, bolts L.S. 3500
& nuts, etc.
Total Cost of Material 130664
3% storage & handling charges on items (1) to (8) 111148 3334
3% Contingencies on Materials 3920
Labour 32666
Transport 6533
11% Estt. & Genl. Charges On Materials 14373
1% cess 1915
Total 193406
or say 1,93,410
15. R.E.C. - Construction Standard No. B-12/1981
Costdata per Km of LT 3-Ph 4 Wire Line(Horizontal formation )
with 4 x 34 Sqmm AAAC over 8 Mts.
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
27
Sl.
No.
Particulars Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
1 8 M PSCC Pole 15 1844 Each 27660
2 L.T. 3 Phase cross arms 17 416 Each 7072
3 Back Clamp 17 123 Each 2091
4 LT Stay sets 4 394 Each 1576
5 34 Sq.mm AAA Conductor 4.08 17870 K.M. 72910
6 Shakle Insulator set 32 44 Set 1408
7 L.T.pin insulator with pin 33 36 Set 1188
8 C.I. Knob 17 12 Each 204
9 Concreting of Pole,Stay sets &
Base concreting L.S. 16016
10 Misc. Items like coil earthing,
pipe earthings, danger-boards, bolts L.S. 3500
& nuts, etc.
Total Cost of Material 133625
3% storage & handling charges on items (1) to (8) 114109 3423
3% Contingencies on Materials 4009
Labour 33406
Transport 6681
11% Estt. & Genl. Charges On Materials 14699
1% cess 1958
Total 197802
or say 1,97,800
16. R.E.C. - Construction Standard No. B-12/1981
Costdata per Km of LT 3-Ph 4 Wire Line(Horizontal formation )
PSCC Poles at 60 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
with 4 x 34 Sqmm AAAC over 8 Mts.
28
Sl.
No.
Particulars Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
1 8 M PSCC Pole 16 1504 Each 24064
2 L.T. 1 Phase cross arms 18 319 Each 5742
3 Back Clamp 18 123 Each 2214
4 LT Stay sets 4 394 Each 1576
5 34 Sq.mm AAA Conductor 3.06 17870 K.M. 54682
6 Shakle Insulator set 22 44 Set 968
7 L.T.pin insulator with pin 24 36 Set 864
8 C.I. Knob 16 12 Each 192
9 Concreting of Pole,Stay sets &
Base concreting L.S. 16016
10 Misc. Items like coil earthing,
pipe earthings, danger-boards, bolts L.S. 3500
& nuts, etc.
Total Cost of Material 109818
3% storage & handling charges on items (1) to (8) 90302 2709
3% Contingencies on Materials 3295
Labour 27455
Transport 5491
11% Estt. & Genl. Charges On Materials 12080
1% cess 1608
Total 162455
or say 1,62,460
Note : Substitute the cost of 8 mts PSCC pole in above data for wind pressure of 100 kgs/Sqmts,
and working load of 200 kgs
Costdata per Km of LT S-Ph 3 Wire Line(Horizontal formation )
with 34 Sqmm AAAC over 8 Mts.
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
17. R.E.C. - Construction Standard No. B-14/1981
29
Sl.
No.
Particulars Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
1 8 M PSCC Pole 16 1504 Each 24064
2 L.T. 1 Phase cross arms 18 268 Each 4824
3 Back Clamp 18 123 Each 2214
4 LT Stay sets 4 394 Each 1576
5 34 Sq.mm AAA Conductor 2.04 17870 K.M. 36455
6 Shakle Insulator set 12 44 Set 528
7 L.T.pin insulator with pin 12 36 Set 432
8 C.I. Knob 16 12 Each 192
9 Concreting of Pole,Stay sets &
Base concreting L.S. 16016
10 Misc. Items like coil earthing,
pipe earthings, danger-boards, bolts L.S. 3500
& nuts, etc.
Total Cost of Material 89801
3% storage & handling charges on items (1) to (8) 70285 2109
3% Contingencies on Materials 2694
Labour 22450
Transport 4490
11% Estt. & Genl. Charges On Materials 9878
1% cess 1314
Total 132736
or say 1,32,740
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
Costdata per Km of LT S-Ph 2 Wire Line(Horizontal formation )
with 2 x 34 Sqmm AAAC over 8 Mts.
18. R.E.C. - Construction Standard No. B-14/1981
30
Sl.
No.
Particulars Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
1 8 M PSCC Pole 16 1504 Each 24064
2 Suspension clamp assembly with eye hook 12 175 Each 2100
3 Dead end clamp assembly with eye hook 6 113 Each 678
4 LT Stay sets 4 394 Set 1576
5 L.T. A.B. Cable 3 x 16 +25 Sqmm 1 47316 K.M. 47316
6 Insulated connectors with covers 56 82 Each 4592
7 Concreting of Pole,Stay concreting &
Base concreting L.S. 16016
8 Misc. Items like coil earthing,
bolts & nuts, etc. L.S. 3500
Total Cost of Material 99842
3% storage & handling charges on items (1) to (6) 80326 2410
3% Contingencies on Materials 2995
Labour 24961
Transport 4992
11% Estt. & Genl. Charges On Materials 10983
1% cess 1462
Total 147644
or say 1,47,640
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
19. R.E.C. - Construction Standard No. B-32/1984
Costdata per Km of LT line with 3 x 16 + 25 Sqmm AB Cable over 8 Mts.
31
Sl.
No.
Particulars Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
1 8 M PSCC Pole 16 1504 Each 24064
2 Suspension clamp assembly with eye hook 12 175 Each 2100
3 Dead end clamp assembly with eye hook 6 113 Each 678
4 LT Stay sets 4 394 Set 1576
5 L.T. A.B. Cable 2 x 16 +25 Sqmm 1 36427 K.M. 36427
6 Insulated connectors with covers 56 82 Each 4592
7 Concreting of Pole,Stay concreting &
Base concreting L.S. 16016
8 Misc. Items like coil earthing,
bolts & nuts, etc. L.S. 3500
Total Cost of Material 88953
3% storage & handling charges on items (1) to (6) 69437 2083
3% Contingencies on Materials 2669
Labour 22238
Transport 4448
11% Estt. & Genl. Charges On Materials 9785
1% cess 1302
Total 131477
or say 1,31,480
20. R.E.C. - Construction Standard No. B-32/1984
Costdata per Km of LT line with 2 x 16 + 25 Sqmm AB Cable over 8 Mts.
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
32
Sl.
No.
Particulars Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
1 8 M PSCC Pole 16 1504 Each 24064
2 Suspension clamp assembly with eye hook 12 175 Each 2100
3 Dead end clamp assembly with eye hook 6 113 Each 678
4 LT Stay sets 4 394 Set 1576
5 L.T. A.B. Cable 1 x 16 +25 Sqmm 1 25750 K.M. 25750
6 Insulated connectors with covers 56 82 Each 4592
7 Concreting of Pole,Stay concreting &
Base concreting L.S. 16016
8 Misc. Items like coil earthing,
bolts & nuts, etc. L.S. 3500
Total Cost of Material 78276
3% storage & handling charges on items (1) to (6) 58760 1763
3% Contingencies on Materials 2348
Labour 19569
Transport 3914
11% Estt. & Genl. Charges On Materials 8610
1% cess 1145
Total 115625
or say 1,15,630
21. R.E.C. - Construction Standard No. B-32/1984
Costdata per Km of LT line with 1 x 16 + 25 Sqmm AB Cable over 8 Mts.
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
33
Sl.
No.
Particulars Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
1 8 M PSCC Pole 16 1844 Each 29504
2 Suspension clamp assembly with eye hook 12 175 Each 2100
3 Dead end clamp assembly with eye hook 6 113 Each 678
4 LT Stay sets 4 394 Set 1576
5 L.T. A.B. Cable 3 x 16 +25 Sqmm 1 47316 K.M. 47316
6 Insulated connectors with covers 56 82 Each 4592
7 Concreting of Pole,Stay concreting &
Base concreting L.S. 16016
8 Misc. Items like coil earthing,
bolts & nuts, etc. L.S. 3500
Total Cost of Material 105282
3% storage & handling charges on items (1) to (6) 85766 2573
3% Contingencies on Materials 3158
Labour 26321
Transport 5264
11% Estt. & Genl. Charges On Materials 11581
1% cess 1542
Total 155721
or say 1,55,720
Costdata per Km of LT line with 3 x 16 + 25 Sqmm AB Cable over 8 Mts.
PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
22. R.E.C. - Construction Standard No. B-32/1984
34
Sl.
No.
Particulars Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
1 8 M PSCC Pole 16 1844 Each 29504
2 Suspension clamp assembly with eye hook 12 175 Each 2100
3 Dead end clamp assembly with eye hook 6 113 Each 678
4 LT Stay sets 4 394 Set 1576
5 L.T. A.B. Cable 2 x 16 +25 Sqmm 1 36427 K.M. 36427
6 Insulated connectors with covers 56 82 Each 4592
7 Concreting of Pole,Stay concreting &
Base concreting L.S. 16016
8 Misc. Items like coil earthing,
bolts & nuts, etc. L.S. 3500
Total Cost of Material 94393
3% storage & handling charges on items (1) to (6) 74877 2246
3% Contingencies on Materials 2832
Labour 23598
Transport 4720
11% Estt. & Genl. Charges On Materials 10383
1% cess 1382
Total 139554
or say 1,39,550
23. R.E.C. - Construction Standard No. B-32/1984
Costdata per Km of LT line with 2 x 16 + 25 Sqmm AB Cable over 8 Mts.
PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
35
Sl.
No.
Particulars Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
1 8 M PSCC Pole 16 1844 Each 29504
2 Suspension clamp assembly with eye hook 12 175 Each 2100
3 Dead end clamp assembly with eye hook 6 113 Each 678
4 LT Stay sets 4 394 Set 1576
5 L.T. A.B. Cable 1 x 16 +25 Sqmm 1 25750 K.M. 25750
6 Insulated connectors with covers 56 82 Each 4592
7
Concreting of Pole,Stay concreting & Base
concreting
L.S. 16016
8 Misc. Items like coil earthing, bolts & nuts, etc. L.S. 3500
Total Cost of Material 83716
3% storage & handling charges on items (1) to (6) 64200 1926
3% Contingencies on Materials 2511
Labour 20929
Transport 4186
11% Estt. & Genl. Charges On Materials 9209
1% cess 1225
Total 123702
or say 1,23,700
PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
24. R.E.C. - Construction Standard No. B-32/1984
Costdata per Km of LT line with 1 x 16 + 25 Sqmm AB Cable over 8 Mts.
36
Sl. No. Particulars
Cost of Material
(Rs.)
Labour & Transport
(Rs.)
1 11 KV/433V 100KVA Conventional Transformer 135423 3,213
2 Erection of 11 KV AB Switch (200A) 7349 909
3 D.P.Structure (Including all Earthing) 28810 9,702
4 Erection of 11 KV H.G. Fuse set 1889 388
5
Installation of L.T.H.G. Fuse sets (2 Nos.) including
connections
2626 726
6
LT Metering arrangements with CTs including cable
connections and cleat arrangement
8895 940
7 Installation of A type distribuion box 7558 162
8 Installation of HT Lightening Arrestors 5172 605
9 Misc. Items 500
Total Cost of Material 1,98,222 16,645
3% storage & handling charges on items (1) to (8) 5932
3% Contingencies on Materials 5947
Labour & Transport 16,645
11% Estt. & Genl. Charges on Materials 21804
1% cess 2485
2,51,035
or say : 2,51,040
25. R.E.C. - CONSTRUCTION STANDARD SPECIFICATION NO. F3&F4/1981
COST DATA FOR ERECTION OF 100KVA-11KV/433V CONVENTIONAL TRANSFORMER
Total Cost in Rs.
37
Sl. No. Particulars
Cost of Material
(Rs.)
Labour & Transport
(Rs.)
1
11 KV/433V 63KVA Conventional Distribution
Transformer
103237 3,213
2 Erection of 11 KV AB Switch (200A) 7349 909
3 D.P.Structure (Including all Earthing) 28810 9,702
4 Erection of 11 KV H.G. Fuse set 1889 388
5
Installation of L.T.H.G. Fuse sets (2 Nos.) including
connections
2626 726
6
LT Metering arrangements with CTs including cable
connections and cleat arrangement
8895 940
7 Installation of A type distribuion box 7558 162
8
Installation of HT Lightning Arrestors with earth
connection
5172 605
9 Misc. Items 420
Total Cost of Material 1,65,956 16,645
3% storage & handling charges on items 1 to 8 4,966
3% Contingencies on Materials 4,979
Labour & Transport 16,645
11% Estt. & Genl. Charges on Materials 18255
1% cess 2,108
Total Cost in Rs. 2,12,909
or say : 2,12,910
26. COST DATA FOR ERECTION OF 63KVA-11KV/433V CONVENTIONAL TRANSFORMER
38
Sl. No. Particulars
Cost of Material
(Rs.)
Labour & Transport
(Rs.)
1
11 KV/433V 16KVA Conventional Distribution
Transformer
60485 613
2 Erection of 11 KV AB Switch (200A) 7349 909
3
Single Pole.Structure with 9.1Mtr PSCC Pole
(Including Earthing)
13248 3,448
4 Erection of 11 KV H.G. Fuse set 1889 388
5
CT Distribution box including CT wiring with 1x25
sqmm XLPE cable and cleat wiring
12640 253
6
Misc. Items(Danger boards,Bolts &Nuts,Concreting
etc.)
1650 214
Total Cost of Material 97261 5825
3% storage & handling charges on items (1) to (5) 2,868
3% Contingencies on Materials 2,918
Labour & Transport 5,825
11% Estt. & Genl. Charges on Materials 10699
1% cess 1,196
Total Cost in Rs. 1,20,767
or say : 1,20,770
27. Cost Data For Erection of 3 Phase 16 KVA-11KV/433V
Conventional Distribution Transformer On Single Pole Structure
39
Sl. No. Particulars
Cost of Material
(Rs.)
Labour & Transport
(Rs.)
1
11 KV/433V 25KVA Conventional Distribution
Transformer
70115 673
2 Erection of 11 KV AB Switch (200A) 7349 909
3
Single Pole.Structure with 9.1Mtr PSCC Pole
(Including Earthing)
13248 3,448
4 Erection of 11 KV H.G. Fuse set 1889 388
5
CT Distribution box including CT wiring with 1x50
sqmm XLPE cable and cleat wiring
17766 252
6
Misc. Items(Danger boards,Bolts &Nuts,Concreting
etc.)
1500 196
Total Cost of Material 1,11,866 5,866
3% storage & handling charges on items (1) to (5) 3,311
3% Contingencies on Materials 3,356
Labour & Transport 5,866
11% Estt. & Genl. Charges on Materials 12305
1% cess 1,367
Total Cost in Rs. 1,38,072
or say : 1,38,070
28. Cost Data For Erection of 3 Phase 25 KVA-11KV/433V
Conventional Distribution Transformer On Single Pole Structure
40
Sl. No. Particulars
Cost of Material
(Rs.)
Labour & Transport
(Rs.)
1
11 KV/433V 40KVA Conventional Distribution
Transformer
96748 542
2 Erection of 11 KV AB Switch (200A) 7349 909
3
Single Pole.Structure with 9.1Mtr PSCC Pole
(Including Earthing)
13248 3,448
4 Erection of 11 KV H.G. Fuse set 1889 388
5
CT Distribution box including CT wiring with 1x70
sqmm XLPE cable and cleat wiring
21781 238
6
Misc. Items(Danger boards,Bolts &Nuts,Concreting
etc.)
1500 196
Total Cost of Material 1,42,514 5,721
3% storage & handling charges on items (1) to (5) 4,230
3% Contingencies on Materials 4,275
Labour & Transport 5,721
11% Estt. & Genl. Charges on Materials 15677
1% cess 1,724
Total Cost in Rs. 1,74,142
or say : 1,74,140
29. Cost Data For Erection of 3 Phase 40 KVA-11KV/433V
Conventional Distribution Transformer On Single Pole Structure
41
Sl. No. Particulars
Cost of Material
(Rs.)
Labour & Transport
(Rs.)
1 9.1 Mtr PSCC Pole 3105 994
2 15KVA Single Phase CSP Distribution Transformer 34595 285
3 Mounting arrangements for transformer 2743 618
4
Earthing with 1No 2.5 Mts Long 75 mm CI earth
pipe
3134 431
5
Distribution box with 1 No 100A Fuse unit and cleat
wiring with 50 sqmm XLPE cable & LT side arm
with strut
6401 303
6
Misc. Items(Danger boards,Bolts &Nuts,Concreting
etc.)
1000
Total Cost of Material 50,978 2,631
3% storage & handling charges on items (1) to (5) 1,499
3% Contingencies on Materials 1,529
Labour & Transport 2,631
11% Estt. & Genl. Charges on Materials 5608
1% cess 622
Total Cost in Rs. 62,868
or say : 62,870
30. Cost Data For Erection of Single Phase 15 KVA-6.3KV/0-240V
CSP Transformer(Oil immersed) On 9.1Mtr PSCC Pole Support
42
Sl.No. Particulars Qty.
Rate in
Rs.
Per Unit
Amount in
Rs.
1 15KVA Single Phase CSP Distribution Transformer 1 No. 34,595 Each 34,595
2 Mounting arrangements for Transformer 1 Set 2,743 Each 2,743
3 Pipe earthing 1 No. 808 Each 808
4 Misc. Items L.S. L.S. L.S. 500
Total Cost of Material 38,646
3% storage & handling charges on items (1) to (3) 1,144
3% Contingencies on Materials 1,159
Labour & Transport 2,592
11% Estt. & Genl. Charges On Materials 4,251
1% Cess 478
Total Cost in Rs. 48,271
Or say : 48,270
31. R.E.C. - CONSTRUCTION STANDARD SPECIFICATION NO. F3&F4/1981
COST DATA FOR ERECTION OF 15KVA SINGLE PHASE 6.3KV/0-240V
C.S.P TRANSFORMER (OIL IMMERSED) ON EXISTING 8M PSCC SUPPORT
43
Sl.No. Particulars Qty.
Rate in
Rs.
Per Unit
Amount in
Rs.
1
15 KVA Oil Immersed Single Phase 6.3KV/0-240V
Amorphous Metal Core Transformer
1 No. 37,522 Each 37,522
2 Mounting arrangements for Transformer 1 Set 2,743 Each 2,743
3 Pipe earthing 1 No. 808 Each 808
4 Misc. Items L.S. L.S. L.S. 500
Total Cost of Material 41,573
3% storage & handling charges on items (1) to (3) 1,232
3% Contingencies on Materials 1,247
Labour & Transport 2,403
11% Estt. & Genl. Charges On Materials 4,573
1% Cess 510
Total Cost in Rs. 51,539
Or say : 51,540
COST DATA FOR ERECTION OF 15KVA SINGLE PHASE 6.3KV/0-240V
AMORPHOUS METAL CORE C.S.P TRANSFORMER (OIL IMMERSED)
ON EXISTING 8M PSCC SUPPORT
32. R.E.C. - CONSTRUCTION STANDARD SPECIFICATION NO. F3&F4/1981
44
Sl.No. Particulars Qty.
Rate in
Rs.
Per Unit
Amount
in Rs.
1 1 Phase (5-20A) Energy meter 1 730 Each 730
2 1 Phase 15A M.C.B./Fuse Unit 1 120 Each 120
3 P.V.C. Cable 6 Sq.mm Single Core 20 28 Each 560
4 Moulded Distribution Box 1 250 Each 250
5 P.V.C. Bends 38mm 1 22 Each 22
6 Bolts, Nuts etc. L.S. L.S. L.S. 80
Total Cost of Material 1,762
3% Contingencies 53
Labour & Transport 1,076
11% Estt. & Genl. Charges 194
1% Cess 31
Total Cost in Rs. 3,115
Or say : 3,120
33. R.E.C. - CONSTRUCTION STANDARD SPECIFICATION NO. H1&H3/1981
COST DATA FOR SINGLE PHASE AGRICULTURE SERVICE ERECTED ON SUPPORT
45
Sl.No. Particulars Qty.
Rate in
Rs.
Per Unit
Amount
in Rs.
1 3 Phase (10A-40A ) Energy meter 1 1,869 Each 1,869
2 3 Phase 40A M.C.B./Fuse Unit (3 Nos.) 1 729 Each 729
3 P.V.C. Cable 6 Sq.mm Single Core 30 28 Each 840
4 Moulded Distribution Box 1 420 Each 420
5 Installation of 2KVAR Capacitor 1 500 1 500
6
Misc. items such as Bolts, Nuts & Board
etc.
L.S. L.S. L.S. 80
Total Cost of Material 4,438
3% Contingencies 133
Labour & Transport 1,739
11% Estt. & Genl. Charges 488
1% Cess 68
Total Cost in Rs. 6,866
Or say : 6,870
34. R.E.C. - CONSTRUCTION STANDARD SPECIFICATION NO. H6&H8/1981
COST DATA FOR RELEASE OF POLY PHASE AGRICULTURE SERVICE ERECTED ON
SUPPORT
46
Qty . Amount Qty. Amount
1
Single Phase electronic Energy Meter
5-30A
846 1 846 846
2 15A M.C.B./Fuse Unit 120/E 1 120 120
3 P.V.C. Cable single core 2.5 Sq.mm 20/M 60 1200 1200
4 Moulded Distribution Box 250/E 1 250 250
5 G.I. Wire No.8 60/Kg 1 Kg. 60 60
6 P.V.C. Pipe 20mm 25/M 2 M 50 50
7 P.V.C. Bends 20mm 5/E 2 Nos. 10 10
8 Misc. L.S 85 85
Total 1216 1405 2621
3% Contingencies on Materials 36 42 79
Labour & Transport 202 430 633
11% Estt. & Genl. Charges 134 155 288
1% Cess 36
Total Cost in Rs. 1589 2032 3,657
Or say : 3,660
Note :
Item Nos. 4 to 7 are to be borne &
arranged by the Consumer.
35. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H1 TO H3/1981
COST DATA FOR DOMESTIC AND NON-DOMESTIC SERVICE CONNECTION (SINGLE PHASE)
WITH QUALITY METER
Sl. No. Particulars Rate
Chargable to Chargable to Amount in
Rs.
47
Qty . Amount Qty. Amount
1
Single Phase electronic Energy Meter
2.5-10A
447 1 447 447
2 15A M.C.B./Fuse Unit 115/E 1 120 120
3 P.V.C. Cable single core 2.5 Sq.mm 20/M 60 1200 1200
4 Moulded Distribution Box 250/E 1 250 250
5 G.I. Wire No.8 60/Kg 1 Kg. 60 60
6 P.V.C. Pipe 20mm 25/M 2 M 50 50
7 P.V.C. Bends 20mm 5/E 2 Nos. 10 10
8 Misc. L.S 85 85
Total 817 1405 2222
3% Contingencies on Materials 25 42 67
Labour & Transport 202 430 633
11% Estt. & Genl. Charges 90 155 244
1% Cess 32
Total Cost in Rs. 1134 2032 3,197
Or say : 3,200
Note :
Item Nos. 4 to 7 are to be borne &
arranged by the Consumer.
36. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H1 TO H3/1981
COST DATA FOR DOMESTIC AND NON-DOMESTIC SERVICE CONNECTION (SINGLE PHASE)
WITH ELECTRONIC METER
Sl. No. Particulars Rate
Chargable to
DISCOM
Chargable to
Consumer
Amount in
Rs.
48
Qty . Amount Qty. Amount
1
Single Phase Quality Energy Meter
5-20A
730 1 730 730
2 15A M.C.B./Fuse Unit 120/E 1 120 120
3 P.V.C. Cable single core 2.5 Sq.mm 20/M 60 1200 1200
4 Moulded Distribution Box 250/E 1 250 250
5 G.I. Wire No.8 60/Kg 1 Kg. 60 60
6 P.V.C. Pipe 20mm 25/M 2 M 50 50
7 P.V.C. Bends 20mm 5/E 2 Nos. 10 10
8 Misc. L.S 85 85
Total 1100 1405 2505
3% Contingencies on Materials 33 42 75
Labour & Transport 202 430 633
11% Estt. & Genl. Charges 121 155 276
1% Cess 35
Total Cost in Rs. 1456 2032 3,523
Or say : 3,520
Note :
Item Nos. 4 to 7 are to be borne &
arranged by the Consumer.
37. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H1 TO H3/1981
COST DATA FOR DOMESTIC AND NON-DOMESTIC SERVICE CONNECTION (SINGLE PHASE)
WITH QUALITY METER
Sl. No. Particulars Rate
Chargable to
DISCOM
Chargable to
Consumer
Amount in
Rs.
49
Qty . Amount Qty. Amount
1
Three Phase electronic Energy Meter 10-
40A
1869 1 1869 1869
2 3 Phase 60A M.C.B./Fuse Unit 955/E 1 955 955
3 Moulded Distribution Box 420/E 1 420 420
4 P.V.C. Cable single core 6 Sq.mm 28/M 120 3360 3360
5 G.I. Wire No.8 60/Kg 1 Kg. 60 60
6 P.V.C. Pipe 20mm 25/M 2 M 50 50
7 P.V.C. Bends 20mm 5/E 2 Nos. 10 10
8 Misc. L.S 95 95
Total 3244 3575 6819
3% Contingencies on Materials 97 107 205
Labour & Transport 202 430 633
11% Estt. & Genl. Charges 357 393 750
1% Cess 84
Total Cost in Rs. 3901 4506 8,490
Or say : 8,490
Note :
Item Nos. 4 to 7 are to be borne &
arranged by the Consumer.
Rate
Chargable to
DISCOM
Chargable to
Consumer
Amount in
Rs.
38. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H1 TO H3/1981
COST DATA FOR DOMESTIC AND NON-DOMESTIC SERVICE CONNECTION (THREE PHASE)
Sl. No. Particulars
50
Qty . Amount Qty. Amount
1
3 Phase Electronic Energy Meter Housed
in box 10-40A
1869 1 1869 1869
2 3 phase 60A M.C.B./Fuse Unit 955/E 1 955 955
3 P.V.C. Cable single core 6 Sq.mm 28/M 120 Mts. 3360 3360
4 G.I. Wire No.8 60/Kg 1 Kg. 60 60
5 P.V.C. Pipe 20mm 25/M 2 M 50 50
6 P.V.C. Bends 20mm 5/E 2 Nos. 10 10
7 Misc. L.S 95 95
Total 2824 3575 6399
3% Contingencies on Materials 85 107 192
Labour & Transport 405 557 961
11% Estt. & Genl. Charges 311 393 704
1% Cess 83
Total Cost in Rs. 3624 4632 8,339
Or say : 8,340
Note :
Item Nos. 4 to 7 are to be borne &
arranged by the Consumer.
Sl. No. Particulars Rate
Chargable to
DISCOM
Chargable to
Consumer
Amount in
Rs.
COST DATA FOR DOMESTIC AND NON-DOMESTIC SERVICE CONNECTION (THREE PHASE)
WITH ELECTRONIC METER
39. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H1 TO H3/1981
51
Qty . Amount Qty. Amount
1
Poly Phase Energy Meter housed 10 -
40A
1869 1 1869 1869
2 3 phase 60A M.C.B./Fuse unit 955/E 1 955 955
3 Moulded Box for CT Meter 1647/E 1 1647 1647
4 P.V.C. Cable single core 10 Sq.mm 43/M 80 3440 3440
5 G.I. Wire No.8 60/Kg 1 Kg. 60 60
6 P.V.C. Pipe 38mm 41.4/M 2 M 83 83
7 P.V.C. Bends 38mm 22/E 2 Nos. 44 44
8
Misc. items viz. link clips, wooden box,
Bolts & Nuts.
L.S 75 125 200
Total 4546 3752 8298
3% Contingencies 136 113 249
Labour & Transport 405 557 961
11% Estt. & Genl. Charges 500 413 913
1% Cess 104
Total Cost in Rs. 5587 4834 10,525
Or say : 10,530
40. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H-5/1981
POLY PHASE SERVICE CONNECTION CHARGES FOR
ERECTION OF 1 NO. INDUSTRIAL SERVICE (UPTO 15 H.P.)
Sl. No. Particulars Rate
Chargable to
DISCOM
Chargable to
Consumer
Amount in
Rs.
52
Qty . Amount Qty. Amount
1
L.T. 3-Phase class-0.5 Accuracy CT
Operated Electronic TVR Meter Housed in
a box
6525 1 6525 6525
2 P.V.C. Cable single core 10 Sq.mm 43/M 80 3440 3440
3 G.I. Wire No.8 60/Kg 1 Kg. 60 60
4 P.V.C. Pipe 38mm 41.4/M 2 M 83 83
5 P.V.C. Bends 38mm 22/E 2 Nos. 44 44
6
Misc. items viz. link clips, wooden box,
Bolts & Nuts.
L.S 75 100 175
Total 6600 3727 10327
3% Contingencies 198 112 310
Labour & Transport 405 557 961
11% Estt. & Genl. Charges 726 410 1136
1% Cess 127
Total Cost in Rs. 7929 4805 12,861
Or say : 12,860
41. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H-5/1981
COST DATA FOR POLY PHASE SERVICE CONNECTION CHARGES FOR
ERECTION OF 1 NO. INDUSTRIAL SERVICE (UPTO 15 H.P.) (C T METER)
Sl. No. Particulars Rate
Chargable to
DISCOM
Chargable to
Consumer
Amount in
Rs.
53
Qty. Amount Qty. Amount
1
L.T. 3-Phase class-0.5 Accuracy CT
Operated Electronic TVR Meter Housed in
a box
6525 1 6525 6525
2 P.V.C. Cable single core 10 Sq.mm 43/M 80 3440 3440
3 G.I. Wire No.8 60/Kg 1 Kg. 60 60
4 P.V.C. Pipe 38mm 41.4/M 2 M 83 83
5 P.V.C. Bends 38mm 22/E 2 Nos. 44 44
6
Misc. items viz. link clips, wooden box,
Bolts & Nuts.
L.S 75 100 175
Total 6600 3727 10327
3% Contingencies 198 112 310
Labour & Transport 405 557 961
11% Estt. & Genl. Charges 726 410 1136
1% Cess 127
Total Cost in Rs. 7929 4805 12,861
Or say : 12,860
42. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H-5/1981
COST DATA FOR POLY PHASE SERVICE CONNECTION FOR
ERECTION OF 1 NO. INDUSTRIAL SERVICE (ABOVE 15 H.P.) (C.T. METER)
Sl. No. Particulars Rate
Chargable to
DISCOM
Chargable to
Consumer
Amount in
Rs.
54
Sl. No. Particulars Qty.
Rate
in Rs.
Per Unit
Amount
in Rs.
1 LT 1 phase Electronic Meter 5-30A 1 No. 846 Each 846
2 1 phase 15A M.C.B./Fuse Unit 1 No. 120 Each 120
3 Light sensitive switch 1 No. 400 Each 400
4 P.V.C. Cable 4 Sq.mm Single Core 15 M 30 Each 450
5 P.V.C. Pipe 25mm 2 Mts 39.5 Each 79
6 P.V.C. Bends 25mm 2 No. 6.0 Each 12
7 Moulded Distribution Box 1 No. 250 Each 250
8 Wooden, plugs, clamps, bolts, L.S. L.S. L.S. 50
nuts link clips etc
Total 2,207
3% Contingenics 66
Labour & Transport 759
11% Estt. & Genl. Charges 243
1% Cess 33
Total Cost in Rs. 3,308
Or say : 3,310
43. COST DATA FOR STREET LIGHT SERVICE CONNECTION (SINGLE PHASE)
55
Sl.
No
Particulars Qty.
Rate
(Rs. in lakhs)
Unit
Amount
(Rs. in lakhs)
1 (a) Lands and Rights LS
As per local
conditions
0.000
(b) Plantation of Trees LS LS 0.061
2
Control Roomand Consumer service centre
(including furniture)
LS LS 5.000
3 Station Auxillaries
a)
Peripheral, Security Fencing, Approach road, retaing wall around switchward with gravel
filling, gate and bore well
LS LS 10.000
b) Yard lighting 0.600
c) Fire fighting Equipment LS LS 0.660
d) P&T Phone and wireless set LS LS 1.500
4 Foundations for structures, PTRs & breakers LS LS 3.000
5 Bus bars, J umpers, Connectors claps etc. LS LS 1.200
6 Control Cables LS LS 1.080
7 Structural Steel 15 0.562 MT 8.423
8 Transformers
a) 33/11KV, 5 MVA Power Transformer 1 31.695 Each 31.695
b) 11KV/ 415V 16KVA Stn. Transformer 1 0.605 Each 0.605
9 Circiut Breakres (including trivector meters)
a) 20 KA 11 kv feeder VCB including Control panel and CTs (NF=3) 3 2.156 Each 6.467
b) 20 KA 11 kv LV VCB including Control panel and CTs 1 2.342 Each 2.342
10 Control Circiut Panels
a) AC Supply Panel 1 0.330 Each 0.330
b) DC Aunnciation Panel 1 0.330 Each 0.330
11 Instrument Transformers
a) 11kv P.T (3 Phase) 1 0.158 Each 0.158
12 Lightning Arrestors
a) 33KV 10KA 6 0.031 Each 0.185
b) 11KV Line Type (NFX3) 9 0.017 Each 0.155
c) 11KV Station Type 10 KA 3 0.017 Each 0.052
13 Isolating Switches
a) 33KV 800A double break centrally operated Horizantal AB Switch 3 0.420 Each 1.260
b) 11KV 800A double break centrally operated Horizantal AB Switch (NT X 1+1) 2 0.199 Each 0.399
c) 11KV 400A Horizantal AB Switch (NF X 2+2) 8 0.137 Each 1.099
d) 11KV 200A Horizantal AB Switch for station transformer 1 0.073 Each 0.073
e) 33KV Horn Gap Fuse Set (1XNT) 1 0.095 Each 0.095
14 2MVAR 11KV Capacitor Bank along with Associated Equipment 1 10.000 Each 10.000
15 24V, 40 AH Battery Set including Battery Charger 4 0.159 Each 0.636
16 Earthing of PTR, VCBs, AB Swicthes, Strucutres with 75x8mm GI Flat LS 1.815
Sub Total 89.219
17 Erection and transport and commissioning charges on items 7 to 15 at 10% 6.430
18 Contingencies on items 7 to 15 at 3% 1.929
19 T&P Charges on items No. 7 to 15 at 1% 0.643
20 Establishment and General Charges at 11% 9.814
21 1% Cess 1.080
109.115
109.120
Note :
44. DETAILED ESTIMATE FOR ERECTION OF 1No. 33/11 KV SUBSTATION
WITH (NT) X 5 MVA POWER TRANSFORMERS AND NF = 3 NO. 11 KV FEEDERS
NF =No. of 11 KV Feeders, The number of outgoing feeders at substation limited to the demand in MVA i.e. if substation demand is 5 MVA, the
number of feeders should not exceed five.
Total Rs. in Lakhs
Or say (Rs. lakhs)
56