Khurais Al Crude Increment-300Mbcd: Residential & Industrial Complex
Khurais Al Crude Increment-300Mbcd: Residential & Industrial Complex
Khurais Al Crude Increment-300Mbcd: Residential & Industrial Complex
PMT OPRNS
AAN SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AHB
ENGG CERT
GJB
BI-10-01506
ISSUED FOR CONSTRUCTION
DESCRIPTION
00
DISCIPLINE
ENGINEER
MARTE COMETA
DATE:
06/26/16
PROJECT
ENGINEER
GEORGE JACOB
DATE:
CERTIFIED
06/26/16
ISSUED FOR CONSTRUCTION
GEORGE JACOB
06/26/16
DATE:
CONSTRUCTION
AGENCY
ALI HASSAN AL-BAGGAL
06/26/16
JUNE 2016
DATE:
OPERATIONS
AYMAN ABDULLATIF AL-NAMI
DATE:
06/26/16
CONTROL NUMBER
VERIFICATION
PREPARED BY:
EDSD
MUSTANG-HDP
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
TECHNICAL SPECIFICATION FOR FIRE WATER SYSTEMS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AHB
TABLE OF CONTENTS
ENGG CERT
00
06/26/16
DATE:
CONSTRUCTION
AGENCY
ALI HASSAN AL-BAGGAL
DATE:
06/26/16
OPERATIONS
AYMAN ABDULLATIF AL-NAMI
DATE:
06/26/16
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
TECHNICAL SPECIFICATION FOR FIRE WATER SYSTEMS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AHB
1.0 GENERAL
ENGG CERT
GJB
A. Provide all labor, material, tools, and equipment; fabricate, furnish and
install all fire protection systems complete and in place, including all
associated hardware as specified herein, and as indicated on drawings for
a complete and proper installation. Items required for this work include, but
are not necessarily limited to:
ISSUED FOR CONSTRUCTION
DESCRIPTION
and approvals.
0007
7. Connection to site fire and raw water main at designated locations outside
NO.
REV
the building.
00
DISCIPLINE
ENGINEER
MARTE COMETA 8. Protection of materials and protective coatings.
DATE: 06/26/16
PROJECT 9. Cleaning, testing, and adjusting.
ENGINEER
GEORGE JACOB
06/26/16
10. Record Drawings of work installed.
DATE:
CERTIFIED
GEORGE JACOB
06/26/16
1.2 Submittals
DATE:
CONSTRUCTION
AGENCY
ALI HASSAN AL-BAGGAL
A. General: In compliance with Saudi Aramco Requirements, submit
06/26/16
followings items for Company Representative’s review and
DATE:
OPERATIONS
approval.
AYMAN ABDULLATIF AL-NAMI
B. Manufacturer’s Data:
DATE:
06/26/16
CONTROL NUMBER
this Specification.
EDSD
trade names, illustrations, and descriptive data for each article proposed. All
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
pertinent data for each article shall be underlined in each copy of each
00
TECHNICAL SPECIFICATION FOR FIRE WATER SYSTEMS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AHB
by SAUDI ARAMCO, shall become the basis for inspecting and accepting or
rejecting actual installation procedures used on the work.
5. All fire protection equipment shall be approved from FrPD. Fire protection
equipment shall be from regulated vendor list which is available in SAES-U-
ISSUED FOR CONSTRUCTION
101. In case the equipment are not listed in the SAES-U-101, then separate
submittal material shall be submitted to FrPD for approval purpose.
DESCRIPTION
6. All fire protection equipment shall be listed for its intended use and
application.
1. Dimensioned locations of fire and raw water mains and fire hydrant locations
JO/EWO
10-01506-
00
DATE: 06/26/16
5. Hangers and equipment supports.
PROJECT
ENGINEER
GEORGE JACOB
6. Working drawings for the entire sprinkler installation in accordance with
06/26/16
NFPA 13 and NFPA 13R.
DATE:
CERTIFIED
GEORGE JACOB 7. Verify job conditions by examining all contract documents so as to be fully
06/26/16 aware of all work required under this Specification, and examine the work of
DATE:
CONSTRUCTION
other Divisions or Sections for interferences and conditions affecting the
AGENCY
ALI HASSAN AL-BAGGAL
work of this Specification.
06/26/16
DATE: 8. Drawings shall show other major piping, ductwork, lighting fixtures, structural
OPERATIONS
AYMAN ABDULLATIF AL-NAMI
elements, and equipment that shall be coordinated with the fire system(s)
arrangement(s).
DATE:
06/26/16
CONTROL NUMBER
elements of the building. Do not locate piping and heads directly under light
EDSD
10. System hydraulic calculations shall be included with the shop drawing
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
submittals.
OF THIS DRAWING IS COVERED, FOR ALL
TECHNICAL SPECIFICATION FOR FIRE WATER SYSTEMS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.3 Quality Assurance
AHB
A. Industry Codes and Standards: Comply with all applicable codes and standards
ENGG CERT
GJB
00
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
TECHNICAL SPECIFICATION FOR FIRE WATER SYSTEMS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4. General Instructions & Miscellaneous Standards
AHB
Control Requirements
B. Piping material shall bear label, stamp, or other markings of special testing agency.
C. Comply with FMG’s “Approval Guide” or UL’s “Fire Protection Equipment Directory”
for fire service main products.
JO/EWO
10-01506-
0007
00
the work.
DISCIPLINE
ENGINEER
MARTE COMETA
DATE: 06/26/16
2.0 DRAWINGS
PROJECT
ENGINEER
GEORGE JACOB 2.1 Project Drawings
06/26/16
DATE:
CERTIFIED All the project drawings are listed on the drawing control sheet DD-178177. The
GEORGE JACOB
Contractor shall refer to Construction Scope of Work DE-178178 for understanding
DATE:
06/26/16 and execution of work as per this and Construction Specifications. The Contractor
CONSTRUCTION
AGENCY
shall refer & construct in conformance to the IFC drawings and documents.
ALI HASSAN AL-BAGGAL
DATE:
06/26/16
OPERATIONS 3.0 PRODUCTS
AYMAN ABDULLATIF AL-NAMI
DATE:
06/26/16 3.1 General
CONTROL NUMBER
VERIFICATION
B. All products shall be inspected at time of delivery for damage and for compliance
DATE:
BY:
with specifications.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
C. Any products that are damaged or found not to be in accordance with the
OF THIS DRAWING IS COVERED, FOR ALL
TECHNICAL SPECIFICATION FOR FIRE WATER SYSTEMS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
D. All products shall be handled and stored as recommended by the manufacturer to
AHB
E. Pipes, fittings, valves, fire hydrants and fire hose reels shall be stored with ends
sealed until ready for installation.
MCC
F. All other materials used which have not been specified by SAUDI ARAMCO, must
be approved by SAUDI ARAMCO Representative prior to use.
G. All the Fire Protection Sub Systems shall be supplied as Packages to avoid
ISSUED FOR CONSTRUCTION
incompatibility risks.
DESCRIPTION
H. List of Materials or Material Take-Off sheets are prepared for the project and are
included in the design package for reference only and the items or quantities listed
therein are not exact. Exact quantities will be provided by the Contractor to
complete the work. The fact that one or more items are not listed in the take-off
lists or if the quantities are not exactly listed does not relieve the contractor of his
responsibility to provide all necessary material to complete the project without any
extra cost to Saudi Aramco. Wherever the material specifications in Construction
specifications and the material take-off list do not match, the construction
specifications shall be considered correct over the material take-off lists.
JO/EWO
10-01506-
0007
00
shall be ASTM A106 or API 5L Grade B carbon steel, 2” and larger shall be
DISCIPLINE externally and internally coated with fusion bonded epoxy (FBE).
ENGINEER
MARTE COMETA
DATE: 06/26/16
3.3 Aboveground Piping Material
PROJECT
ENGINEER
GEORGE JACOB A. Pipes
06/26/16
DATE:
CERTIFIED 1. Piping Material Specification for above ground fire water mains and risers
GEORGE JACOB
shall be fusion bonded epoxy (FBE) carbon steel.
06/26/16
DATE:
CONSTRUCTION
AGENCY
2. For above ground pipes intended for Sprinkler systems, pipes shall be in
ALI HASSAN AL-BAGGAL
accordance with NFPA 13 Table 6.3.1.1, NFPA 13R Table 5.2.1 and SAES-
DATE:
06/26/16 S-050.
OPERATIONS
AYMAN ABDULLATIF AL-NAMI
a. Steel Pipe: ASTM A53 for Sprinkler System piping below 8” and API
DATE:
06/26/16 STD 5L Grade B for 8” and above. Sprinkler System piping shall be
Schedule 40 Galvanized Steel Pipe.
CONTROL NUMBER
VERIFICATION
EDSD
B. Fittings
DATE:
BY:
1. For above ground pipe fittings intended for Sprinkler systems, pipefittings
shall be in accordance with NFPA 13 Table 6.4.1, NFPA 13R Table 5.2.9
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
and SAES-S-050.
BY DRAWING COMPLETION CERTIFICATE
00
a. Steel Fittings: ASME B16.9 wrought steel, butt welded, ASME B16.25
TECHNICAL SPECIFICATION FOR FIRE WATER SYSTEMS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
butt weld ends, ASTM A234 wrought carbon steel and alloy steel,
AHB
ASME B16.5 steel flanges and fittings, ASME B16.11 forged steel
socket welded and threaded.
ENGG CERT
GJB
A. Transition Fittings: Manufactured fitting or coupling same size as, with pressure
rating at least equal to and ends compatible with, piping to be joined.
ISSUED FOR CONSTRUCTION
A. Sprinkler Heads
00
DISCIPLINE
ENGINEER
4. Pendent type, actuated by heat response element ½” orifice size ½” NPT
MARTE COMETA brass polished chrome. 175oF temperature rating corrosion resistance lead
DATE: 06/26/16 coating, Standard Spray, Quick response, UL, FM approved.
PROJECT
ENGINEER
GEORGE JACOB 5. Upright type, actuated by heat response element ½” orifice size ½” NPT
DATE:
06/26/16 brass polished chrome. 154oF temperature rating corrosion resistance lead
CERTIFIED coating, Standard Spray, Quick response, UL, FM approved.
GEORGE JACOB
06/26/16
DATE: 6. Upright type, actuated by heat response element ½” orifice size ½” NPT
CONSTRUCTION
AGENCY
brass polished chrome. 175oF temperature rating corrosion resistance lead
ALI HASSAN AL-BAGGAL
coating, Standard Spray, Quick response, UL, FM approved.
DATE:
06/26/16
OPERATIONS 7. Side-wall type, actuated by heat response element ½” orifice size ½” NPT
AYMAN ABDULLATIF AL-NAMI
brass polished chrome. 154oF temperature rating corrosion resistance lead
DATE:
06/26/16 coating, Extended Spray with a minimum coverage of 4.9 meters x 4.9
meters, Quick response, UL, FM approved.
CONTROL NUMBER
VERIFICATION
EDSD
8. Provide approved type guards where heads are installed in locations where
damage to head is likely to occur, and in all locations where heads are
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
10. Install, at each riser, a locked metal cabinet containing 6 spare sprinklers or
TECHNICAL SPECIFICATION FOR FIRE WATER SYSTEMS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
more depending on the total quantity of sprinklers as stated on NFPA-13
AHB
The stock of spare sprinklers shall include all types and ratings installed
and shall be as follows:
a. For protected facilities having under 300 sprinklers—no
fewer than six sprinklers of each type.
ISSUED FOR CONSTRUCTION
11. All sprinklers shall be permanently marked with one or two English
uppercase alphabetic characters to identify the manufacturer, immediately
followed by three or four numbers, to uniquely identify a sprinkler as to K-
factor or orifice shape, deflector characteristic, pressure rating, and thermal
sensitivity.
JO/EWO
10-01506-
Sprinklers identification for areas with exposed pipe shall have SSU
0007
lettering and sprinklers for areas with unexposed pipe (suspended ceiling)
shall have SSP letting with double escutcheon plate.
06/26/16
DATE
00
DISCIPLINE
ENGINEER
Refer to Section 4.3 of this for Specification.
MARTE COMETA
DATE: 06/26/16 1. Provide sleeves at all points where piping passes through walls and floors.
PROJECT
ENGINEER Space between pipe and sleeves shall be filled with Teflon rope or glass
GEORGE JACOB fiber material to avoid sound transmission and chrome-plated escutcheons
DATE:
06/26/16 shall be provided at floor and on each side of wall.
CERTIFIED
GEORGE JACOB
2. Connect to site fire protection main at designated tie-in points outside of
06/26/16
DATE: building. Extend through foundation wall and up through building at least 6”
CONSTRUCTION
AGENCY above floor. Provide adapter as required between two different materials.
ALI HASSAN AL-BAGGAL
DATE:
06/26/16 C. Risers:
OPERATIONS
AYMAN ABDULLATIF AL-NAMI
Each riser shall include the following:
DATE:
06/26/16
CONTROL NUMBER
1. Gate valve shutoff; UL approved, 175 psi cold water, IBBM, flat-faced
VERIFICATION
chrome or brass, as selected, with 4” check valve and automatic ball drip.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
3. Approved alarm check valve, for wet type sprinkler system complete with
00
surge chamber, pressure gauges, test piping, main drain piping, tappings
for alarms, retard chamber and exterior mounted water motor gong alarms.
TECHNICAL SPECIFICATION FOR FIRE WATER SYSTEMS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AHB
Water motor alarm shall be of the approved weatherproof and guarded type, to
sound locally on the flow of water in each sprinkler system to which it is connected.
MCC
Alarms shall be mounted on the outside of the outlet walls of each building, at a
location shown on the drawings as directed by SAUDI ARAMCO.
E. Pressure Switch:
Pressure switches with circuit opener or closer shall be provided for the automatic
ISSUED FOR CONSTRUCTION
transmittal of an alarm over the facility fire alarm system and connected into the fire
alarm system. Alarm actuating device shall be of the mechanical diaphragm
DESCRIPTION
controlled water pressure type with retard device adjustable from 10 to 60 seconds
and shall be of a type which instantly recycles when the pressure is released on
the diaphragm.
F. Tamper Switch:
Tamper proof switch shall be single pole, double throw cast aluminum type, rated
for use on OS&Y gate valve. All parts shall be non-ferrous and it shall be rated for
15 amps at 125/250 VAC.
JO/EWO
10-01506-
0007
G. Flow Switch:
06/26/16
DATE
Flow switch shall be dual type, rated for service in water flow signaling of fire
extinguishing systems. It shall operate under a rated pressure of 300 psi with 1-5
NO.
REV
00
psi differential operation and 2-20 psi adjustment range. Switch shall have two
DISCIPLINE
ENGINEER
single pole double throw snap action.
MARTE COMETA
DATE:
06/26/16 I. Universal spanner wrench # T-464
OPERATIONS Escutcheon plate #589 either 1.5” or 2.5”
AYMAN ABDULLATIF AL-NAMI
1/2” sprinkler head, brass, pendent UL/FM
DATE:
06/26/16
CONTROL NUMBER
J. Identification Signs:
VERIFICATION
EDSD
Hydraulic design data nameplates shall be permanently affixed to the riser of each
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
system.
00
K. Inspector’s test and drain valve positive positioning of handle for off, test or drain.
TECHNICAL SPECIFICATION FOR FIRE WATER SYSTEMS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Integral sight glass, U.L. listed and ULC approved. May be installed horizontally or
AHB
L. Main Drains:
MCC
Drain shall be provided on the ground floor as shown on the drawings. Provide a
gate valve and a pipe cap at the lowest end of the pipe.
M. Pipe Hangers:
ISSUED FOR CONSTRUCTION
A. FE-1: Portable Carbon Dioxide Type (CO2), 10 lbs., for Class B & C (10-B:C). As
per 9 COM 6000001302.
B. FE-2: Portable Pressurized ABC Multi-purpose Dry Chemical, 10 lbs., for Class A,
B & C (4A, 80B:C). As per 9 COM 6000001302.
JO/EWO
10-01506-
C. FE-3: Hand Type ABC Cartridge Multi-purpose Dry Chemical, 25 lbs., for Class A,
0007
D. FE-6: Hand Type Class K Kitchen Extinguisher, 2.5 gallons, for class A & K (2
A:K). As per 9 COM 6000001302.
NO.
REV
00
DISCIPLINE
ENGINEER
MARTE COMETA 3.7 Fire Hydrant – UL 264
DATE: 06/26/16
PROJECT
ENGINEER
A. Fire Hydrant shall be Wet Barrel Type, as per 9 COM 6000001310; Fire Hydrant
GEORGE JACOB shall meet or exceeds the requirement of AWWA C503. The outlet configuration
06/26/16
DATE: shall include 2 nos. 2-1/2 inch NH standard threads hose nozzle and 1 no. 5 inch
CERTIFIED
GEORGE JACOB storz pumper connection. Fire Hydrant body shall be single casted ductile iron to
06/26/16 ASTM A536 and bronze stem. Inside coating shall be wet epoxy and outside
DATE:
CONSTRUCTION coating shall be fbe polyester. End connection shall be 6 inch flanged to ASME
AGENCY
ALI HASSAN AL-BAGGAL
B16.5. Fire Hydrant shall be rated for 200psi working pressure. Fire hydrant shall
DATE:
06/26/16 be UL listed and FM approved.
OPERATIONS
AYMAN ABDULLATIF AL-NAMI
B. Manufacturers
DATE:
06/26/16
CONTROL NUMBER
1. As per SAES-U-101
VERIFICATION
EDSD
Gate valve shall be Non-rising type as per 9COM 6000001380; Iron body bronze
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
mounted, bolted bonnet, non-rising stem. Valve shall be FBE coated internally and
00
externally. Pressure Rating 250 PSI. End connection shall be flanged to ASME
TECHNICAL SPECIFICATION FOR FIRE WATER SYSTEMS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B16.5. Gate Valve shall be UL listed and FM approved.
AHB
ENGG CERT
Upright Indicator Posts for use with non-rising stem indicator post style valve.
Indicator Post shall be UL listed and FM approved.
MCC
C. Manufacturers
ISSUED FOR CONSTRUCTION
1. As per SAES-U-101
DESCRIPTION
4.0 EXECUTION
4.1 General
B. Examine the areas and conditions under which work of this Section shall be
performed. Correct conditions detrimental to the proper and timely completion of
JO/EWO
10-01506-
the work. Do not proceed until unsatisfactory conditions have been correct.
0007 06/26/16
C. Lay out work to avoid obstruction with all existing services. Fire Hydrant, Post
DATE
Indicator Valve and Fire Hose Reel locations to be verified before installing, using
existing utility plans and sections.
NO.
REV
00
DISCIPLINE
ENGINEER D. Avoid interference with structure and the work of other trades. Do not make
MARTE COMETA
changes from approved drawings unless acceptable to SAUDI ARAMCO.
DATE: 06/26/16
PROJECT
ENGINEER E. Install piping so as to allow complete drainage of each system. Provide drain and
GEORGE JACOB test connections as required.
06/26/16
DATE:
CERTIFIED
GEORGE JACOB
F. Fire water network with associated equipments shall be installed by a qualified
installer specializing in installation of fire protection specialties. The installer shall
06/26/16
DATE:
have been qualified for at least 5 years in the installation of fire protection systems.
CONSTRUCTION
AGENCY
ALI HASSAN AL-BAGGAL
4.2 Examination
DATE:
06/26/16
OPERATIONS
AYMAN ABDULLATIF AL-NAMI
A. Contractor shall field verify site condition and dimensions before starting any work.
06/26/16
DATE: B. Proceed with installation only after unsatisfactory conditions have been corrected.
CONTROL NUMBER
VERIFICATION
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
TECHNICAL SPECIFICATION FOR FIRE WATER SYSTEMS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
C. Use approved fittings to make changes in direction, branch take-offs from mains,
AHB
E. Select system components with pressure rating equal to or greater than system
operating pressure.
F. Install sleeves for pipes passing through concrete and masonry walls and concrete
floor.
ISSUED FOR CONSTRUCTION
H. Install unions adjacent to each valve in pipes NPS 2 and smaller. Unions are not
required on flanged device or in piping installations using grooved joints.
I. Install flanges or flange adapters on valves, apparatus, and equipment having NPS
2-1/2 and larger connections.
J. The entire piping system shall be flushed to remove all foreign matter from the
system.
JO/EWO
10-01506-
0007
A. Install listed fire-protection valves, unlisted general-duty valves, and trim controls,
and specialties according to NFPA and Saudi Aramco FrPD Requirements.
NO.
REV
00
DISCIPLINE
ENGINEER
B. Post indicator valve shall be clearly marked and labeled. Install permanent
MARTE COMETA identification signs for each valve.
DATE: 06/26/16
PROJECT
ENGINEER
C. Install protective bollards as indicated on the drawings around the post indicator
GEORGE JACOB valve.
06/26/16
DATE:
CERTIFIED
GEORGE JACOB
4.5 Fire Hydrant Installation
06/26/16
DATE:
CONSTRUCTION
AGENCY
A. Install fire hydrant in compliance with SAES-M-100 and NFPA 24.
ALI HASSAN AL-BAGGAL
DATE:
06/26/16 B. Install each fire hydrant anchor with restrained joints or thrust blocks, and support
OPERATIONS in upright position.
AYMAN ABDULLATIF AL-NAMI
DATE:
06/26/16 C. Install protective guard rails around the fire hydrant as indicated on the relevant
drawings.
CONTROL NUMBER
VERIFICATION
EDSD
D. Install fire hydrant in such a way that pumper connection should face the main road
for easy access to fire engine.
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
4.6 Connections
00
TECHNICAL SPECIFICATION FOR FIRE WATER SYSTEMS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AHB
B. Furnish two sets of chart of valves, fire hydrant, arranged by system and
designated by service and number. Type the charts to be approved by the owner.
ISSUED FOR CONSTRUCTION
A. Perform the following tests and inspections and prepare test reports:
JO/EWO
10-01506-
1. Leak Test: After installation, charge system and test for leaks. Repair leaks and
0007
2. Test and adjust controls and safeties. Replace damaged and malfunctioning
controls and equipment.
NO.
REV
00
DISCIPLINE
ENGINEER
3. Flush, test and inspect fire water network in according to NFPA 24, “Systems
MARTE COMETA Inspection, Testing and Maintenance”.
DATE: 06/26/16
PROJECT
ENGINEER 4. Verify that equipment hose threads are same as local fire department
GEORGE JACOB equipment.
06/26/16
DATE:
CERTIFIED B. Report Test Results promptly and in writing to Saudi Aramco Representative.
GEORGE JACOB
06/26/16
DATE: 4.9 Cleaning and Protection
CONSTRUCTION
AGENCY
ALI HASSAN AL-BAGGAL
A. Clean dirt and debris from installing equipments.
DATE:
06/26/16
OPERATIONS B. Protect fire hydrants and valves assembly from damage until substantial
AYMAN ABDULLATIF AL-NAMI
completion.
DATE:
06/26/16
CONTROL NUMBER
A. Clean, pre-treat, prime and point new sprinkler system including valves, piping,
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
TECHNICAL SPECIFICATION FOR FIRE WATER SYSTEMS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
outlined in chapter 14 “System Inspection, Testing and Maintenance” of NFPA 24
AHB
(Latest Edition).
ENGG CERT
GJB
1. Contractor shall notify the Saudi Aramco Representative of the time and date of
when the testing shall be performed.
2. The Contractor shall submit and complete and sign the appropriate
Contractor's Material and Test Certificate(s) similar to Figure 10.10.1 of NFPA
ISSUED FOR CONSTRUCTION
3. Contractor shall perform all tests which shall be witnessed by Fire Protection
Dept. / Fixed Systems Group, Loss Prevention, the Project Engineer, the
Contractor and the Proponent.
1. Preliminary Tests
period of four (4) hours in accordance with NFPA 13 Sec.10.10.2.2. When tests
0007
have been completed and corrections made, submit a signed and dated
certificate, similar to that specified in NFPA 24 or Saudi Aramco approved one,
06/26/16
DATE
00
DATE:
06/26/16 A. Engage a factory-authorized service representative to train Owner’s maintenance
CONTROL NUMBER
personnel to adjust, operate and maintain fire hydrant and specialty valves.
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
TECHNICAL SPECIFICATION FOR FIRE WATER SYSTEMS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION