Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

GENERAL GUIDE TO THE Polution Prevention PDF

Download as pdf or txt
Download as pdf or txt
You are on page 1of 97

These guidelines are an introduction to both pollution prevention and the guidance notes on this subject produced by the

Environment Agency for


England & Wales, the Scottish Environment Protection Agency and the Environment and Heritage Service in Northern Ireland. These bodies are
referred to in these notes as the Agency or Agencies. Each site and potential source of pollution should be assessed individually and we advise you to
consult your local Agency office. Contact details are listed at the end of these guidelines.
Note that in these guidelines the term oil separator is used. This has the same meaning as oil interceptor.
1. INTRODUCTION
Businesses and individuals are responsible for complying with environmental regulations and for preventing
pollution of air, land and water. Many thousands of pollution incidents occur each year, originating from factories,
farms, transport activities and even homes. Each incident is an offence and can result in prosecution as well as
environmental damage. However, most cases are avoidable, given careful planning of operations, responsible waste
management and suitable facilities to reduce the risk of spillage - along with simple precautions to deal with any
spillages, in case they occur.
Responsible waste management can ensure that you comply with the relevant regulations, while minimising waste
can reduce the amount of waste produced, which in turn cuts the risk of environmental damage and the costs of
waste disposal.
The series of Pollution Prevention Guidance notes (known as PPGs), of which this is the first, provides practical advice
that will help you to avoid causing pollution, minimise waste and comply with the requirements of the law. Often
the necessary measures cost little, especially if you think about them early on, for example at the design stage, and
can save you money, too. In contrast, the fines for failing to comply with the relevant regulations or the costs of
cleaning up pollution (which are recovered from the polluter wherever possible) can be very high.
The guidance notes cover either a topic of relevance to many sectors, such as oil storage or the use of pressure
washers, or are specific to a particular type of site, such as schools, vehicle-servicing garages or hospitals. In general,
they are cross-referenced to reduce repetition; the guidance on hospitals, for example, refers to the guidance on oil
storage and does not repeat it in detail. You may therefore need several different guidance notes for any one site or
operation. Additional guidance on complying with environmental regulations is available - see Reference 1.
2. AVAILABILITY
The PPGs are published jointly by the three principal environmental regulators in the UK, and appear on the
Environment Agency and SEPA web sites. A full list of PPGs and small numbers of them can be ordered, free of
charge, from the local Agency offices (listed at the end of these guidelines). Bulk supplies are also available, although
a charge to cover printing costs may be made.
3. LEGAL FRAMEWORK
The Agencies are responsible for protecting controlled waters from pollution, for preventing waste management
from polluting the environment, causing harm to human health and detriment to local amenity and for regulating
radioactive substances (except in Northern Ireland). The release of the most seriously polluting substances to water,
land or air from prescribed processes may be subject to additional regulation under the system of Integrated
Pollution Control introduced by the Environmental Protection Act 1990.
Controlled waters include all watercourses, lakes, lochs, canals, coastal waters and water contained in
underground strata (or groundwater), and it is an offence to pollute such waters - deliberately or accidentally. In
addition, the formal consent of the Agency is required for many discharges to controlled waters, including direct
discharges and discharges to soakaways. Such consents are granted subject to conditions, and are not issued
automatically.
Any other waste produced on a site will be subject to the Duty of Care (Reference 2) and may also be subject to
control under the Waste Management Licensing Regulations 1994. In addition, certain wastes are defined as
Special Wastes and are subject to more rigorous controls (Reference 3). Advice is available from the Agencies.
P O L L U T I O N
P R E V E N T I O N
G U I D E L I N E S
GENERAL GUIDE TO THE
PREVENTION OF POLLUTION:
PPG1
The Agencies are also responsible for implementing the legislation on packaging, which affects companies with an
annual turnover above 2 million and handling more than 50 tonnes of packaging per year (see Reference 4).
All discharges to the foul sewer (see 4a) require authorisation by the sewerage undertaker and may be subject to
the terms and conditions of a trade effluent consent.
4. SITE DRAINAGE
a. Drai nage
Most existing sites will have two types of drain. Surface water drains, including land drains and most road drains,
should carry only uncontaminated rainwater, as they will lead to a local river, stream or soakaway. The foul water
drain is designed to carry contaminated waste water safely to a storage lagoon, treatment system or sewage works
for treatment. In the case of an isolated house, or a small community biological treatment plant, care should be
taken not to overload this by disposing of disinfectant or grease down the foul drain (see PPG4 Reference 5). Prior
agreement from the local sewerage undertaker is required before you connect to the public foul water system.
Where significant work is being undertaken on an existing site or a new development, the Agencies encourage the
consideration of an alternative approach for surface drainage, which uses a combination of techniques known
collectively as Sustainable Drainage Systems (SuDS). This approach has significant environmental benefits and may
also have lower installation costs. See Reference 6 for further details.
b. Surf ace wat er t reat ment
Surface water can be contaminated with silt, heavy metals, chemicals and oil, which can be damaging in
watercourses and groundwater. In many cases, it will require treatment by controlling the pollution at its source or
just before the discharge point. SuDS may provide a suitable solution (see Reference 6). In areas where there is a
high risk of oil pollution, it may be necessary to install an oil separator to protect the surface water system and
reduce the risk of pollution. See separate guidelines for details (PPG3 - Reference 7).
c. Wrong connect i ons
Wrongly connected effluents can cause severe pollution problems, which can be difficult to remedy. Sources of dirty
water, such as sinks and toilets, should be connected to the foul sewer and the nearest drain. Manhole covers and
gullies should be clearly marked, by colour coding, with red for foul and blue for surface water, and site drainage
plans should be readily accessible.
d. Garage f orecourt s and f uel del i very areas
Because of the potential for pollution from these areas, oil separation is required. Effluent resulting from the cleaning
of forecourts must not be discharged to surface water drains, watercourses or soakaways. Details of surface water
disposal and other potentially polluting activities are included in PPG7 Reference 8.
e. Cl eani ng act i vi t i es
Wash waters from mobile pressure washers should not be discharged to surface water drains, watercourses or
soakaways. Even if described as bio-degradable, detergents are not suitable for discharge to surface drains, so such
activities should be carried out in designated areas draining to the foul sewer (subject to the approval of the local
sewerage undertaker). Alternatively, closed loop vehicle wash recycling systems are available. See PPG13 - Reference
9 for further details.
f . Sewage di sposal
All foul sewage should pass to the local foul sewer if possible. If not, other arrangements should be discussed with
your local Agency office (see PPG4 - Reference 5). Most alternatives will normally require the formal consent of the
Agency.
g. Chemi cal st orage areas
Drainage from such areas presents special problems and you should consult fully with your local Agency office to
minimise the pollution risks.
5. WASTE STORAGE AND DISPOSAL
a. Reduce, re-use and recycl e
Methods to reduce the amount of waste generated in the first place, together with the re-use and recycling of
wastes, must be considered. There is scope for significant savings, as the costs of raw materials and waste disposal
continue to rise. Advice on waste minimisation and local initiatives can be obtained from your nearest Agency office.
Independent advice on this and on any other environmental problem is available free through the Envirowise
Helpline on 0800 585794.
b. Dut y of Care and wast e l egi sl at i on
To prevent fly-tipping, producers of waste must ensure that it remains under their control and is passed on only to
a registered waste carrier and is accompanied by a full description. Some wastes, such as used mineral oil, are subject
to the Special Waste Regulations, which impose additional controls on movement and disposal (Reference 3).
Contact your local Agency office for further advice.
c. St orage
All wastes must be stored in designated areas that are isolated from surface drains and bunded to contain any
spillages. Rubbish compactors should be covered to prevent the build-up of contaminated rainwater and drained
to the foul sewer to prevent polluting liquid entering the surface water drains. Compactor hydraulics should be
maintained in good order.
6. DELIVERIES AND SECURITY
a. Del i ver i es
Special care should be taken during deliveries, particularly when hazardous materials are involved. Deliveries should
be supervised at all times, tanks and containers should be labelled with the nature and volume of their contents,
and the levels should be checked before delivery to prevent overfilling.
b. Del i very areas
Where possible, loading and unloading areas should be roofed and drained to the foul sewer. If not, they should be
clearly marked and isolated from the surface water drainage system, either by catch-pits or sumps with isolating
valves. Cut-off valves in the drainage system and raised kerb surrounds may be needed. Delivery pipes should be
fitted with automatic cut-off valves to prevent overfilling. You are recommended to consult with the Agency.
c. Secur i t y
Vandalism and theft are frequent causes of pollution. Lockable valves should be fitted on all storage tanks, fences
should be secure, and doors and gates kept locked. Where possible, materials should be stored under cover and
potential pollutants should be transferred into safe storage without delay.
7. OIL STORAGE AND PIPELINES
The storage of oil at industrial, commercial, institutional and institutional residential premises in England is to be the
subject of new regulations due to be introduced in late 2000. Similar regulations for Wales and Scotland are under
consideration. These will introduce statutory minimum storage standards. PPG2 - Reference 10 covers above ground
oil storage, with the key points listed below;
a. St orage
Any oil storage tank and oil stored in drums should be sited on an impervious base within an oil-tight bund with no
drainage outlet. All fill pipes, draw pipes and sight gauges should be enclosed within the bund, and the tank vent
pipe should be directed downwards into it. Advice is available on the construction of bund walls (References 11 and
12) and the storage and disposal of used oils (PPG8 - Reference 13).
b. Pi pel i nes
Site pipelines in an accessible position above the ground where possible, as underground tanks and pipelines may
be subject to damage and corrosion. Where a pipeline has to be laid underground, it should be corrosion resistant
and placed in a protective sleeve or a duct with open grating covers for inspection purposes, and should be tested
regularly. Underground pipeline connections should be minimised and, where used, should have access points for
inspection. Underground tanks and pipelines may be subject to special restrictions where there is a risk to
groundwaters.
8. CONTINGENCY PLANS
Spillages and run-off water from fire-fighting may have the potential to cause enormous damage to controlled
waters (see PPG18 - Reference 14). It is recommended that appropriate spill kits or absorbent materials are held on
site. It is essential that staff know what to do in an emergency. An up-to-date drainage plan should be maintained,
hazards identified and a contingency plan drawn up, giving advice on what action to take and who to inform. These
plans should be displayed clearly and regular exercises undertaken. Guidance on the development of a pollution
incident response plan and a template plan are provided in PPG21 - Reference 15.
9. CONSTRUCTION AND DEMOLITION
Detailed guidance is available on construction and demolition (PPG6 - Reference 16). It is important to note that
the prior approval of the Agency must be obtained where site de-watering might result in a discharge to controlled
waters. Any discharge must be free from solids in suspension, oil or other polluting materials. Silt is a non-toxic
pollutant and, in the absence of other contaminants, silty water may be disposed of by pumping to the foul sewer,
a settlement tank or over a grassed area. However, if any other contaminant is present, you should consult the
Agency on its disposal.
10. AGRICULTURE
Agricultural activities have resulted in significant water pollution in the past, and continue to have the potential to
cause such damage unless properly managed. Detailed guidance on preventing pollution from agricultural activities
is available (see Reference 17).
11. GROUNDWATER POLLUTION
Spillage, incorrect storage of chemicals or waste materials or unsuitable disposal activities can result in pollutants
seeping through the soil, causing serious harm to groundwater which is a vital source of drinking water.
Chlorinated solvents are the most widespread and severe cause of groundwater pollution, and handling them
requires special care. The Agencies have strong powers to take action relating to the storage, handling, use or
disposal of certain dangerous substances posing a risk of contaminating groundwaters. The prior authorisation of
the Agency is required before you dispose of wastes containing certain dangerous substances into or onto land, and
advice on this is available from your local Agency office.
HO-5/01-20K-C-BFOX
E ME R G E N C Y H OT L I N E
0800 80 70 60
The 24-hour emergency hotline number for reporting all
environmental incidents relating to air, land and water in
England, Wales, Scotland and Northern Ireland.
Printed on Cyclus TCF Recycled Paper.
12. REFERENCES
1. NetRegs - www.environment-agency.gov.uk/netregs
2. Waste Management - The Duty of Care - A Code of Practice Revised 1996): ISBN 0-11-753210-X:
The Stationery Office Tel. 08706 005522
3. A guide to the Special Waste Regulation: Environment Agency
A guide to the Special Waste Regulations 1996: SEPA
A guide to the Special Waste Regulations (Northern Ireland) 1998: Environment and Heritage Service
4. Producer responsibility obligations (packaging waste) Regulations 1997: SEPA/Environment Agency
5. PPG4: Disposal of sewage where no mains drainage is available
6. Sustainable Urban Drainage an introduction: SEPA/Environment Agency/EHS(NI)
7. PPG3: Use and design of oil separators in surface water drainage systems
8. PPG7: Fuelling stations: construction and operation
9. PPG13: The use of high pressure water and steam cleaners
10. PPG2: Above ground oil storage tanks
11. Masonry bunds for oil storage tanks
12. Concrete bunds for oil storage tanks
13. PPG8: Safe storage and disposal of used oils
14. PPG18: Managing fire water and major spillages
15. PPG21: Pollution incident response planning
16. PPG6: Working at demolition and construction sites
17. Codes of Good Agricultural Practice for the Protection of Water, Soil and Air:
MAFF Publications, Telephone: 0645 556000
Prevention of Environmental Pollution from Agricultural Activity:
The Scottish Executive Rural Affairs Department (SERAD), Edinburgh
Water - Preventing Pollution, series of 11 leaflets: Department of Agriculture and Rural Development for
Northern Ireland
References 3-16 are available from the Agency
ENVIRONMENT &
HERITAGE SERVICE
SCOTTISH
ENVIRONMENT
PROTECTION AGENCY
AREA OFFICES
ANGLIAN
Kingfisher House
Goldhay Way
Orton Goldhay
Peterborough PE2 5ZR
Tel: 01733 371 811
Fax: 01733 231 840
MIDLANDS
Sapphire East
550 Streetsbrook Road
Solihull B91 1QT
Tel: 0121 711 2324
Fax: 0121 711 5824
NORTH EAST
Rivers House
21 Park Square South
Leeds LS1 2QG
Tel: 0113 244 0191
Fax: 0113 246 1889
NORTH WEST
Richard Fairclough House
Knutsford Road
Warrington WA4 1HG
Tel: 01925 653 999
Fax: 01925 415 961
CORPORATE OFFICE
Erskine Court
The Castle Business Park
Stirling FK9 4TR
Tel: 01786 457 700
Fax: 01786 446 885
World Wide Web: http: //www.sepa.org.uk
HIGHLANDS, ISLAND
AND GRAMPIAN AREA
Graesser House
Fodderty Way
Dingwall Business Park
Dingwall IV15 9XB
Tel: 01349 862 021
Fax: 01349 863 987
SOUTH WEST AREA
SEPA West
5 Redwood Crescent
Peel Park
East Kilbride G74 5PP
Tel: 01355 574 200
Fax: 01355 574 688
SOUTH EAST AREA
Clearwater House
Heriot-Watt Research Park
Avenue North
Riccarton
Edinburgh EH14 4AP
Tel: 0131 449 7296
Fax: 0131 449 7277
Calvert House,
23 Castle Place,
Belfast
BT1 1FY
Tel: 028 9025 4868
Fax: 028 9025 4777
ENVIRONMENT AGENCY
REGIONAL OFFICES
HEAD OFFICE
Rio House, Waterside Drive, , Aztec West
Almondsbury, Bristol BS32 4UD.
Tel: 01454 624 400 Fax: 01454 624 409
World Wide Web: http: //www.environment-agency.gov.uk
SOUTHERN
Guildbourne House
Chatsworth Road
Worthing
West Sussex BN11 1LD
Tel: 01903 832 000
Fax: 01903 821 832
SOUTH WEST
Manley House
Kestrel Way
Exeter EX2 7LQ
Tel: 01392 444 000
Fax: 01392 444 238
THAMES
Kings Meadow House
Kings Meadow Road
Reading RG1 8DQ
Tel: 0118 953 5000
Fax: 0118 950 0388
WELSH
Rivers House
St Mellons Business Park
St Mellons
Cardiff CF3 0EY
Tel: 029 2077 0088
Fax: 029 2079 8555
All the Agencies pollution prevention guidance notes are available on the web sites listed below.
PPG 2 page 1
PPG2
April 2010
Environment Alliance - working together
POLLUTION PREVENTION GUIDELINE
ABOVE GROUND OIL STORAGE TANKS: PPG2
These guidelines are produced by the Environment Agency for England and Wales, the Northern Ireland
Environment Agency and the Scottish Environment Protection Agency (referred to as we or us).
Pollution Prevention Guidelines (PPGs) are based on relevant legislation and current good practice. Following
the guidelines will help you to manage your environmental responsibilities to prevent pollution and comply
with the law.
Following these guidelines will help you comply with the requirements of the Control of Pollution (Oil Storage)
(England) Regulations 2001 (OSR England) and the Water Environment (Oil Storage) (Scotland) Regulations
2006.
If you cause pollution or allow it to occur, you may be committing a criminal offence.
You can find our contact details at the end of these guidelines.
This document is produced in accordance with the Code of Practice on Guidance on Regulation 2008, (see
Section 15).
1. Introduction
These guidelines will help you look after your above ground oil storage tanks safely and to minimise the risk of
causing pollution. Theyre good practice advice for tank owners and users but may also be of use to others. Weve
tried to avoid too much technical information; if you need more detailed information, we have referenced where
you can find this throughout the guidance.
The pollution prevention principles below apply to all above ground oil storage, but these guidelines are
specifically written for domestic and small or medium sized commercial oil storage. We refer to legislation that
you must follow in England Scotland and Wales.
The guidance covers:
installation of new or replacement tanks
compliance with legal requirements for existing tanks
current good practice.
For information and guidance on other types of storage please see References 1 to 5 (Section 14):
underground oil storage
drums
intermediate bulk containers
large industrial oil tanks
tank farms
forecourt oil storage
storage for dispensing into vehicles.
In the case of forecourt oil storage, only suitably-qualified competent contractors approved for working on
hazardous sites should be used to install or perform maintenance on your oil tanks. Guidance for oil refineries
and distribution depots is available from the Energy Institute, contact details in Section 15.
PPG 2 page 2
2. Background
Oil is among the most common pollutants in the UK. Cleaning up oil spills can be difficult and expensive. Dealing
with a spill will cause you and maybe your neighbours a great deal of inconvenience. Make sure you have
insurance cover, not just to replace the lost oil. Your policy should include:
environmental clean up for accidental oil loss;
a high enough liability limit to cover you if neighbouring land and/or boreholes are affected;
the costs of cleaning up oil on your own property.
By following these guidelines you will reduce the risk of pollution caused by the poor storage of oil in above
ground tank installations, poorly maintained tanks and unsuitable filling practices.
3. Legal background
In England and Wales, it is against the law to cause water pollution and there are specific regulations that
may apply to your oil storage tank. Non compliance with these regulations is an offence and may result in
enforcement action being taken against you.
In Scotland, the storage of oil is regulated by the Water Environment (Oil Storage) (Scotland) Regulations 2006,
(OSR Scotland), as detailed below. Where oil storage results in pollution of the water environment, this may
constitute an offence under the Water Environment (Controlled Activities) (Scotland) Regulations 2005, as
amended. Non compliance with these regulations may result in enforcement action being taken against you.
a) Control of Pollution (Oil Storage) Regulations
In England, above ground oil storage is regulated by the Control of Pollution (Oil Storage) (England) Regulations
2001, (OSR England). Oils covered by these regulations include petrol, diesel, vegetable, synthetic and mineral
oils. They apply to most industrial, commercial and institutional sites storing oil in containers over 200 litres
and to private dwellings with containers storing more than 3,500 litres. The Environment Agency is responsible
for enforcing these regulations throughout England and may serve an Anti Pollution Works Notice requiring
inadequate facilities to be brought up to standard. Answers to a number of frequently asked questions are
available on our web site at www.environment-agency.gov.uk/osr
In Scotland, oil storage is regulated by the Water Environment (Oil Storage) (Scotland) Regulations 2006 (OSR
Scotland). These regulations apply to any kind of oil including petrol, diesel, mineral oil, heating oil, lubricating
oil, waste oil, vegetable and plant oil but dont include uncut bitumen. They apply to the storage of any volume
of oil, with more prescriptive requirements applying to industrial, commercial and institutional sites storing oil
in containers of 200 litres and over and to private dwellings with containers storing more than 2,500 litres of oil.
The Scottish Environment Protection Agency (SEPA), is responsible for enforcing these regulations throughout
Scotland and may serve an Enforcement Notice requiring inadequate facilities to be brought up to standard.
Throughout this guidance weve highlighted text indicating areas that must be complied with under both the
English and Scottish oil storage regulations. There are tables covering what you must do where these regulations
differ. Where the term must is used, this refers to your legal requirement under the OSR England or OSR
Scotland where they apply (see References 6 and 7).
OSR England applies to: OSR Scotland applies to:
Above ground oil storage in containers over 200 litres.
Private domestic oil tanks over 3,500 litres.
Portable containers of less than 200 litres*.
Above ground oil storage in containers of 200 litres or
more.
Domestic oil tanks over 2500 litres.
Waste oil storage - see PPG8, Reference 8.
Oil stored on farms - see Reference 9.
Oil stored in buildings - see Section 6.
PPG 2 page 3
* In Scotland any oil storage container must be strong enough not to leak in ordinary use. Portable containers
with a storage capacity under 200 litres dont have to comply with the more prescriptive requirements of the OSR
Scotland, such as secondary containment, which apply to the remainder of the list in the table.
The differences in implementation timescales between OSR England and OSR Scotland are:
OSR England - exemptions OSR Scotland - exemptions
Waste mineral oil storage - see Reference 8.
Oil stored on farms for agricultural heat and power
- see Reference 9.
Oil stored in buildings. Follow good practice
recommendations.
Oil stored wholly underground.
Premises used for refining oil.
Premises used for the onward distribution of oil to
other places.
Oil stored in accordance with PPC Part A permits.
Oil distribution depots for onward distribution to other
places.
Oil stored wholly underground, unless its in a building.
OSR England OSR Scotland phased implementation
All nonexempt oil storage in England must comply
with the Control of Pollution (Oil Storage) (England)
Regulations 2001.
New non-exempt tanks installed after 1 April 2006
must comply.
Tanks within 10 metres of surface water or 50 metres of
any borehole or well must comply.
After April 2010 all remaining tanks must comply.
Appendix A contains a checklist to help you decide whether improvements are needed to your oil storage system
to comply with the OSR in England and Scotland. You must consider the timescales for the Regulations to decide
when your oil storage must comply.
Similar regulations will be introduced in Northern Ireland and may follow in Wales. You can contact us for more
advice.
b) Building Regulations
Oil tanks connected to fixed combustion appliances, like central heating boilers and cookers, need to comply
with the building regulations that apply in England, Northern Ireland, Scotland or Wales (Reference 10). These
regulations include requirements for both environmental protection and fire safety. If youre having a new or
replacement oil tank fitted or having your tank altered, you should check with your local authority (usually your
local council) to see how these Regulations apply to your oil storage tank, or you can have the tank installed by a
member of a professional scheme (see Section 15).
Even if your oil tank isnt covered by any of the Regulations above, following these guidelines is good practice
and will minimise the risk of your oil causing pollution. In some sensitive locations, we may ask for more
stringent environment protection measures than are described here.
4. Deciding where to put your tank
You should think about environmental and fire protection, access, maintenance and security requirements before
deciding where to put a new or replacement oil storage tank.
Avoid high risk locations
We recommend that you dont store oil in high risk locations; these are:
within 50 metres of a spring, well or borehole;
within 10 metres of a watercourse;
places where spilt oil could enter open drains, loose fitting manhole covers or soak into the ground
where it could pollute groundwater;
places where a spill could run over hard ground to enter a watercourse or soak into the ground where it
could pollute groundwater;
places where tank vent pipe outlets cant be seen from the filling point;
above roof level as spilt oil can run down guttering which is connected to surface water systems.
PPG 2 page 4
Oil spilt in these locations will pollute surface waters and groundwaters. If these locations are unavoidable then
check with us before you arrange for a new tank to be installed, as we may require additional environmental
protection, e.g. overfill prevention device or oil separator on the surface water drainage system.
We recommend at all sites that you have secondary containment for your oil storage tanks wherever you put
them, even if its not required by OSR or Building Regulations, (see Section 5c).
You should or, if OSR applies must, ensure that steps are taken, to minimise the risk of damage to the secondary
containment system by impact or collision.
You should consider access for maintenance and deliveries to the tank (filling). Check with your local oil delivery
company before making the final decision on where to place a tank. They need to take into account pollution
prevention and health and safety aspects of filling your tank. This includes where they can safely park the oil
tanker, where the delivery pipes will run and access to the tank. They will also be able to give advice relating to
height of the fill point above ground and delivery pipe sizing.
Avoid storing oil in areas at risk from flooding
Containers may float in a flood which could cause pipelines to break and oil to be spilled. If theres no
alternative, consider raising tanks above predicted flood water levels as long as this doesnt compromise the
tank integrity, safe delivery and handling of your oil. You could also secure your tank so it cant lift as water rises
around it. Contact a competent installer, (see Section 15) for advice on securing your tank. Contact us to check if
your tank is in an area at risk from flooding. In England, Scotland and Wales you can check our websites for flood
maps, which provide details of flood risk areas.
5. Oil storage tanks
Before choosing a new or replacement tank, you should check the following:
if there are any legal requirements you must comply with;
that it meets minimum manufacturing standards;
the type of tank is suited to your requirements.
Also consider the:
type of oil to be stored
need for secondary containment
location of the tank
safe filling and dispensing
safe installation and routine maintenance
intended use.
If youre replacing a tank youll also have to consider what to do with your old one.
a) Manufacturing and Quality Standards
There are recognised British Standard and trade association tank standards for different types of tank. Your tank
manufacturer, supplier or installer should advise you on the minimum design and manufacturing standards under
the appropriate accredited quality assurance scheme. It should comply with BS EN ISO 9001 (Reference 11).
Plastic and steel tanks and tank systems manufactured to OFTEC Standards, OFS T100 and OFS T200 respectively,
meet these requirements.
Please note that compliance with standards for construction and manufacture doesnt guarantee compliance with
OSR. Other aspects such as pipework, location and deliveries, also affect OSR compliance.
Choose a tank that:
is expected to last at least 20 years, with proper maintenance, before it needs to be replaced;
is made of a material that is suitable for the type of oil stored;
is of sufficient strength and structural integrity to ensure that it wont burst or leak in ordinary use;
has a way of preventing drain down by gravity e.g. top off-take and / or isolating check valves.
Check the recommended maintenance needed for your tank with the manufacturer.
PPG 2 page 5
b) Types of oil storage tank
There are a number of different types of oil storage tanks available. Above ground oil tanks are usually made
from steel or polyethylene (plastic). They can be single skinned, double skinned or have a built in bund
(integrally bunded) as a complete containment system.
Single skinned tanks are tanks made from one layer of steel or plastic. Single skinned tanks must be put into a
secondary containment system, often referred to as a bund.
Double skinned tanks have two layers of steel or plastic with a very small space between them; any ancillary
equipment is positioned outside the second skin. The space between the two layers is not enough to contain
110% of the oil your tank can hold. If you choose a double skinned tank, it will not be compliant with the OSR
England or OSR Scotland unless its installed in a constructed secondary containment system.
Integrally bunded tanks have a primary container manufactured with integral secondary containment (see
Section 5c and Figure 2) that can hold a minimum of 110% of the volume of oil the inner tank is designed for
(Reference 12). Ancillary equipment will also be positioned within the secondary containment.
Figure 1. shows a diagrammatic example of a single skinned oil tank in an open bund that is constructed in situ.
The diagram shows both fixed and flexible draw-off pipes. For tanks in open bunds, we recommend there is a
minimum distance of 750 mm between the tank and the bund wall and 600 mm between the tank and the base to
allow access for external inspection and maintenance.
Figure 1. Example of a single skinned oil tank within an open bund
PPG 2 page 6
Figure 2. Example of integrally bunded tank (could be constructed of metal or polyethylene and may not be this
shape and design)
Figures 1 and 2 arent drawn to scale or engineering drawings. They are for illustration only. Different
configurations exist depending on the manufacturer, type of tank and installation.
c) Secondary Containment (also known as bunds)
Secondary containment is an area around a tank and its ancillary equipment designed to contain any loss of oil
and to prevent it from escaping to the environment. It can be manufactured as part of an integrally bunded tank
system or built on site ready for the tank to be put into it. Your tank may need to have secondary containment by
law depending on where it is and what its used for. But to protect the environment we recommend you should
bund all tanks as it is good environmental practice .
Secondary containment must hold at least 110% of the volume of oil the tank is designed to contain.
The extra 10% margin is intended to take into account a range of factors, including:
loss of the total tank contents, for example due to vandalism or an accident;
sudden tank failure or leaks;
overfilling;
containment of fire-fighting agents;
dynamic factors such as overtopping caused by surge and wave action following tank failure;
an allowance for rainfall during an oil spill incident.
If you have more than one oil storage tank in the system, the secondary containment must be capable of storing
110% of the biggest tanks capacity or 25% of the total capacity, whichever is the greater.
Secondary containment must be impermeable to oil and water with no direct outlet :
connecting it to any drain, sewer or watercourse;
discharging onto a yard or unmade ground.
Figure 2. Shows a diagrammatic example of an integrally bunded oil tank. These tanks are manufactured off site
and installed onto a suitably constructed base. The diagram shows a fixed draw-off pipe, overfill prevention
device and oil monitoring between the tank and secondary containment.
PPG 2 page 7
Ideally, any pipework to fill or empty your tank shouldnt pass through the secondary containment floor or walls
(the bund). If this is unavoidable, the joint between pipe and bund should be sealed with a material that is
resistant to attack by the oil stored, so that the containment remains leak-proof.
Dont store anything in the secondary containment as this will reduce the volume available in the event of a spill
and can cause a fire risk if it becomes soaked in oil.
For agricultural oil storage in England, Northern Ireland and Wales it is a legal requirement that bunds are
expected to remain impermeable, with proper maintenance, for at least 20 years, (see Reference 9).
If youre considering an integrally bunded tank system, check with the manufacturer to make sure that it is
designed to provide at least 110% secondary containment capacity. Some tank systems may not provide enough
capacity if your tank is overfilled. Be aware that it isnt easy to see into the secondary containment section of
an integrally bunded tank. We recommend your tank is fitted with an overfill prevention device and secondary
containment sensors that detect if oil has collected in the bund from an incorrect delivery, overfill or inner tank
problem and to warn you if additional maintenance is needed.
6. Installing tanks
You should have your tank installed by a suitably-qualified tank installer whos registered with a professional
scheme for the type of tank youre having installed. They will make sure that tanks are installed according to the
relevant standards and good practice. Professional schemes are run by a number of organisations (see Section
15 for more details).
Tanks should be sited on an appropriately designed and constructed base or support with sufficient room around
it to protect the tank from fire in the surrounding area, see BS 5410 (Reference 13). Check what you need for your
tank with the tank manufacturer or competent installer.
To prevent pollution, the delivery and dispensing area around your tank should have an impermeable surface and
be isolated from surface water drainage systems.
Make sure you keep the manufacturers and installers information for your tank. Leave all the markings and
stickers on your tank when its installed. These include tank manufacturer, make, model and capacity markings.
Many oil tanks come supplied with an Oil Care Campaign tank sticker that gives information about what to do if
you have an oil spill. It may be a legal requirement for your tank to have this. If your tank doesnt have an Oil
Care Campaign tank sticker, you can get one from us. If you have more than one tank, label all your tanks and
their fill points clearly, with the type of product stored and tank capacity.
You should protect your oil storage tank from the risk of fire. Building Regulations (Reference 10) allow for
fire protection by using approved distance between the tank and surrounding structures or by a physical fire
protection barrier. Dont store any materials close to your tank or in the secondary containment.
Tanks within buildings in Scotland these must comply with OSR Scotland. In England and Wales follow all good
practice recommendations to prevent pollution. Building Regulations are likely to apply.
For tanks in constructed secondary containment
If your tank is being installed in a constructed bund, the bund should be built using reinforced materials, with no
damp-proof course and rendered impermeable to oil. There are detailed specifications and drawings available for
constructed bunds using concrete and masonry (References 14, 15 and 16). These will make sure your masonry
or concrete bunds are constructed to be oil tight and fit for purpose.
Your bund should be designed to reduce the risk of oil escaping beyond the containment area if your tank
developed a hole (known as jetting).
To reduce the chance of this happening:
keep the tank as low as possible within the bund;
increase the height of the bund walls;
leave space between the tank and bund walls;
dont put one tank above another.
PPG 2 page 8
A constructed bund should also have a sump fitted into the base so you can remove rainwater for safe and legal
disposal, (see Figure 1).
The Construction Industry Research and Information Association (CIRIA) suggests in locations with high rainfall,
110% capacity in an open bund may not be enough to provide protection from loss of oil (see Reference 14).
They give an alternative method to calculate the size of secondary containment needed for tanks in open bunds
in locations with high rainfall. The method for calculating bund capacity depends on the risk of polluting water.
If youre in any doubt about the sensitivity of a site, consult us.
7. Ancillary equipment
These are the fittings and pipework that all tanks will have, e.g. a vent pipe, but others may be needed according
to the tank type, location or use.
For example:
a heating oil tank may have a fixed draw off pipe;
a tank used for refuelling may have a pump and flexible hose to deliver oil;
a tank with a remote fill point or in a sensitive location may have an overfill prevention device.
Ancillary equipment, e.g. valves, filters, sight gauges, vent pipes, must be within the secondary containment
system so any discharges of oil are retained.
Many of these fittings are shown in Figures 1 and 2 above and are discussed below.
An oil tank user guide Get to know your oil tank, might also be useful to you, Reference 17.
a) Measuring tank contents
You need to be able to measure how much oil is left in your tank so you can order the right amount when your
tank needs refilling and to monitor how fast you use your oil. There are many products available to measure tank
contents including electronic, float and hydrostatic gauges, sight or visual gauges and dip sticks. Some are read
at the tank others remotely. Ask the tank manufacturer or a qualified competent tank installer for advice on a
suitable system for your tank. If storing flammable liquids (as classed by Health and Safety Executive (HSE)),
your gauge should be safe for use with the product you store.
Sight gauges
must be located in the secondary containment;
must be properly supported so it cant come loose;
must be fitted with a valve that closes automatically when the gauge isnt in use;
valves should never be kept open;
valves should only be opened when taking contents readings.
Delivery drivers should close sight gauge valves at the end of their delivery. After your tank has been filled,
check that the sight gauge is shut and isnt leaking. Sight gauge tubes arent suitable for use with integrally
bunded oil tanks.
Dipstick - only use it in the tank for which it is intended.
b) Pipework
All pipework should be:
made of a material suitable for use with the oil youre storing;
supported so its secure and cant come loose;
positioned or protected to minimise the chances of damage by impact or collision;
protected against corrosion;
where appropriate, insulated to prevent freezing up and frost damage.
Vent pipe
This allows oil vapour and air to escape from the tank when it is being filled and allows air in when fuel is being
drawn off.
PPG 2 page 9
We recommend that tanks (including those in buildings) are installed so that vent pipes can be easily seen during
deliveries; and that the vent pipes are within and discharge into the secondary containment system.
Legal requirements:
OSR England OSR Scotland
Vent pipes must be arranged so that any discharge is
directed vertically downwards into the bund.
Vent pipes (including those on tanks within buildings)
must be within the secondary containment system.
The tank must be fitted with an automatic overfill
protection device, if the filling operation is controlled
from a place where it is not reasonably practicable to
see the tank and any vent pipe.
The tank must be fitted with an automatic overfill
protection device (which may include an alarm
sounding device) if the filling operation is controlled
from a place where it is not reasonably practical to
observe the tank or any vent pipe.
Fill point
The fill point is where the tanker delivery pipework connects to fill the tank. There are different arrangements
depending on tank type, size and location.
Coupling - If your tank fill point has a serviceable screw fitting or other fixed coupling, it must be used when
filling the tank. The fill point should have a lockable fill cap with a chain and be marked clearly with the product
type, tank capacity and, where appropriate, tank number. The cap should be replaced to the pipe after each
delivery to protect it from damage and unauthorised use.
Position we recommend your fill point should be at the tank and within the secondary containment system
(OSR England only) or in a suitable cabinet with a drip tray to catch any oil spilled during deliveries. Where your
fill point is outside the secondary containment system, a drip tray must be used to catch any oil spilled during
deliveries.
Fill point drip trays should be:
clean, free from water and other debris before each use;
large enough to hold all the oil that could be lost when the fill point shut off valve has been closed and
the delivery hose is disconnected;
able to be moved without risk of spilling the oil - we recommend your drip tray holds at least 3 litres, but
it may need to be larger;
checked after each delivery and if necessary safely emptied before being put away; we recommend you
ask your oil delivery company to do this for you;
kept somewhere safe where they cant collect rain water when not in use.
Remote fill - if theres no alternative and you have to have a fill point which isnt near the tank (or it isnt practical
to see the tank and vent pipe), a remote fill point will be needed. Your registered, competent tank installer (see
Section 15) can advise you about standards required for remote fill points. If you have a remote filling point and
the vent pipe cant be seen during delivery you must have an overfill prevention device.
Shut-off valves should be fitted to extended fill pipes because they can retain oil after the delivery.
If you have more than one tank - provide separate fill pipes for each tank, unless theyre connected by a balance
pipe with a greater flow capacity than the fill pipe. Each fill pipe should have its own fill point shut off valve, and
be marked with its corresponding tank/compartment number, volume and type of oil.
Pipework to take oil from your tank (draw-off or supply pipe)
The general points above apply. Whenever possible, site supply pipework above ground to make it easier to
inspect and repair. We recommend using tanks that have top outlet off take pipes; and that feed lines should
have anti siphon and isolating valves to prevent the tank contents draining down because of leaks, damage, theft
or vandalism.
Use pumped dispensing from oil storage tanks for refuelling to reduce the chance of oil spills. If you cant avoid
gravity dispensing then tanks should be properly supported and installed. Suitable secondary containment for
PPG 2 page 10
the tank and its ancillary equipment should be designed to reduce the chance of oil jetting from the high tank in
the event of an overfill or damage.
Consider the risk to the user from working at height (to fill, inspect, maintain and draw-off), suitable ladders,
railings and other health and safety equipment may be necessary.
Filters or isolating valves used to protect the draw-off pipe or downstream equipment in a gravity-feed system
arent considered ancillary to the container. Where practicable, locate this equipment within the secondary
containment system. We recommend that valves should be lockable or have removable hand wheels.
Flexible delivery pipes
These should only be used where you need to move the end delivery point, for example when fuelling vehicles.
Fit the pipe with a tap or valve at the delivery end, which closes automatically when not in use; we recommend
you use a trigger nozzle designed to dispense oil. Where the pipe isnt fitted with an automatic shut-off device, it
mustnt be possible to fix the tap or valve in the open position. The pipe must either:
have a lockable valve where it leaves the tank which is locked when not in use and be kept in the
secondary containment; or
must be in an enclosed secure cabinet which is locked shut when not in use and has a drip tray.
Dispensing pumps should be:
positioned to minimise the risk of damage by collision;
fitted with a valve in its feed line that prevents the tank contents emptying if theres damage to the
pump or feed line;
protected from unauthorised use.
Pumps are not ancillary to the oil tank. You should ensure any oil that could leak from a pump is contained
either by a bund or drip tray. Pumps for oil with a flash point below 55C should never be within the secondary
containment system because of the risk of explosion. If your pump is within the secondary containment, check
its positioned above the 110% containment level so it cant become submerged.
Underground pipework
These should be avoided where possible as they cant easily be checked for damage or leaks and have a greater
risk of causing pollution. You should only use underground pipe work where you cant fit pipes above ground. If
you do have them we recommend they should:
be double skinned pipes
be within concrete ducting
have as few joints as possible
be marked clearly on site plans and when possible on the ground.
Underground pipework must also be protected against corrosion and from physical damage like that caused by
excessive surface loading, ground movement or ground disturbance. If mechanical joints have to be used, they
must be readily accessible for inspection under a hatch or cover.
You must have adequate facilities for detecting leaks from underground pipework. If you use a continuous leak
detection device, it should be maintained and tested regularly (in Scotland at least every 5 years). Keep a record
of the test results and any maintenance work completed.
If you dont have a continuous leak detection system you must test:
pipework before use
pipework with mechanical joints every five years
all other pipe work at least every ten years.
These are minimum requirements and its good practice to do this more frequently.
c) Overfill prevention devices
We recommend the use of overfill prevention devices to safeguard against spills. These can be electronic or
mechanical which either sound an alarm and/or give a visual warning or automatically stop the oil delivery into
the tank. They may be a legal requirement depending on tank location, fill point and vent pipe arrangements.
PPG 2 page 11
8. Safe deliveries to your tank
All your tanks should be labelled with the capacity and type of oil they contain and should be individually
numbered to help identify them.
Before you order an oil delivery:
check how much oil is in the tank,
work out the spare capacity
decide how much oil you need but make sure you dont over order.
Supervise all deliveries. Ensure that whoever is supervising the delivery knows about the tank, its equipment
and what to do if theres a spill. If you have more than one tank, make sure the correct tank is being filled. The
Federation of Petroleum Suppliers (FPS) produces information on safe deliveries. For additional information, see
Section 15.
If your tank is filled from a place where it is not practicable to see the tank and any vent pipe, it may need to have
a remote fill point fitted. Where a tank has a remote filling point and the vent pipe cant be seen during the filling
operation you must have an automatic overfill prevention device fitted to your tank. We dont recommend remote
filling points unless there isnt an alternative. Your registered, competent tank installer, (see Section 15) can
advise you about standards required for remote fill points.
If your tank has a serviceable screw fitting or other fixed coupling, it must be used when filling the tank. Your fill
point should have a lockable fill cap with a chain and be marked clearly with the product type, tank capacity and,
where appropriate, tank number. Make sure the cap is replaced to the pipe after each delivery to protect if from
damage and unauthorised use, (see Section 7b for more information on fill points).
Dealing with spillages
The area around your tank where deliveries are made and, if applicable, oil is dispensed should have an
impermeable surface and be isolated from surface water drainage systems. This will prevent oil and/or
contaminated water getting into the soil and groundwater. If any oil is spilt during an oil delivery, you should
make sure that it cant run into a surface water drainage system.
You should consider if you need a suitably sized oil separator to direct oily liquid away from surface waters and
prevent oil escaping from your site. This will reduce the risk of any spilt oil causing pollution if theres a spill.
Also check with us to see if environmental sensitivities in your local area mean drainage from this area should
pass through an oil separator of an approved design (see PPG 3: Reference 18).
9. Check legal compliance for your existing tanks
There may be legal requirements that your existing tank (including home heating tanks) need to comply with for
the OSR England, OSR Scotland or Building Regulations. The checklist in Appendix A will help you check your
tank for most OSR England and OSR Scotland requirements.
a) Secondary containment capacity
Make sure your secondary containment has the capacity to take at least 110% of the volume your oil tank can
hold.
For integrally bunded tanks, you can contact the tank manufacturer with the model of your tank; this information
should be on your tank somewhere. They should be able to confirm the secondary containment capacity.
For single or double skinned tanks within a constructed secondary containment system, you can calculate the
bund volume yourself. You can take account of any volume taken up by tank supports within the bund and
consider the volume taken up by any of the primary tank, pipework or pumps. Advice on calculating bund
capacity is given in Appendix B.
PPG 2 page 12
10. Looking after your tank
The oil tank user guide Get to know your oil tank, Reference 17, contains simplified guidance on looking after
your tank. Make sure you have a copy as it includes space for you to record essential information about your tank
including when its last annual check was.
Maintenance
Your tank manufacturer will be able to tell you what regular maintenance your tank needs. Use a registered
competent technician to check your tanks, secondary containment and pipework every year and remove any
condensation water that has accumulated within the tank. You should receive a written report on the state of
your tank after the inspection is completed. Any repairs or alterations detailed in the report should be done by a
registered, competent technician straightaway.
You should also inspect all accessible parts of your tank, secondary containment, ancillary equipment and
pipework regularly, for signs of damage or leaks. If youre unsure how frequently you should do this, contact us
for advice. If you notice any damage, you should have it repaired or replaced immediately.
To make sure a constructed bund retains its integrity, use a reputable company to repair any defects in the bund
wall or lining promptly.
Keep a log of the inspections, any repair work on your tanks and whos done it.
Record oil usage. Regularly make a note of how much oil is in your tank and compare this to your previous usage.
Contact us if you need advice about methods of monitoring your oil use and how often. If youre suddenly using
more oil and you cant explain why, this could indicate a problem with your tank or pipework. You should ask a
registered, competent technician to check your tank and pipework for faults and make any repairs immediately.
Removing rain water. If you have a tank in an open bund, check the bund after heavy rainfall. If theres no
rainwater in the bund, it might not be sealed properly and you should have it inspected and repaired. If rain water
has collected in your bund, it will reduce the amount of oil it can contain. If its necessary to remove accumulated
rainwater, we recommend you do this with a manually operated pump or by bailing from the sump. Advice on
disposal of bund water from domestic oil storage is available, (see Reference 19). In remote locations, you could
use automatic systems that can distinguish between the oil and water in the bund. If you install one of these
systems, you need to contact us for advice on where you can dispose of the discharge.
In the long term, it may be more cost-effective to construct a roof over the tank and secondary containment.
Water taken out of the bund might be contaminated. Any accumulated water, oil or debris should be removed
and disposed of in line with waste management legislation. In all cases where wastes are removed, as the waste
producer you are obliged under the Duty of Care (see Reference 20) to describe the waste accurately and dispose
of it properly.
In England and Wales, waste contaminated with oil is classed as hazardous waste unless you can show there is
under 0.1% oil.
In Scotland, waste contaminated with oil is classed as special waste, unless you can show there is under 0.1% oil.
To establish if enough oil is present to make a waste special, a generic threshold of 0.1% may be used; however,
if the result is below this, there may still be other hazards that make the waste special, such as flammability or
toxicity, or the presence of other contaminants; for further information, see Reference 21.
A consignment note system applies for disposal of these hazardous or special wastes. For more details about
waste oils, see either PPG8 (Reference 8) or our websites.
Dont use bunds as a store for materials or wastes as this will reduce their capacity and create a fire hazard.
What you should do with your old tank
Make sure that a tank is fully drained, degassed and certified when its taken out of use and before its removed.
Only suitably qualified and competent technicians should do this work. Never carry out work that heats the
tank until after it has been degassed and the appropriate certificate issued (see Reference 22). Under waste
management legislation, decommissioned tanks taken off site must be removed by a licensed waste carrier
PPG 2 page 13
and must be accompanied by a waste transfer note. Tanks can only be disposed of at an appropriately licensed
facility. Contact us to find your nearest site.
After your tank has been decommissioned or removed, check that the surrounding soil or groundwater hasnt
been contaminated. This can include testing surface and subsurface soil and groundwater samples for products
relating to what you were storing. If contamination is found, take action as soon as possible to remove the
pollution. Make sure you repeat the testing after the work has been done to ensure all the contamination has
been removed. For more information see Reference 1 or contact us.
11. Mobile bowsers
Mobile bowsers are oil storage containers that can dispense oil and are designed to be moved, either being
towed or lifted onto another vehicle, but which cant move under their own power. As well as the requirements
for the storage container (Section 5) and secondary containment (Section 5c) above, the following apply to mobile
bowsers:
Any flexible pipe, tap or valve must be fitted with a lock where it leaves the container and be locked shut
when not in use.;
Flexible delivery pipes must be fitted with manually operated pumps or a valve at the delivery end that
closes automatically when not in use. We recommend you use a nozzle designed to dispense oil;
The pump or valve must have a lock and be locked shut when not in use.
More detailed information is also available in References 6 and 7.
12. Security
Your oil storage areas should be secured to prevent theft and vandalism. Permanent taps or valves through
which oil can be discharged to open areas should be locked when not in use. Display a notice telling users to
keep valves, nozzles and trigger guns locked when theyre not in use. Pumps should also be protected from
unauthorised use.
Valve taps or levers should be corrosion resistant, strong enough to be tamperproof when locked and marked
to show whether they are open or closed. When not in use, they should be locked shut. If the tank is being
decommissioned then any valve taps or levers should be fitted with a blanking cap or plug.
13. Oil spills
An oil spill from your tank is likely to cause pollution; this will damage the environment and your reputation. Keep
a spill kit with commercial sorbent products, sand or earth close to your oil storage to deal with spills, and make
sure you or your staff know how to use it safely. Our incident response planning guidance PPG21, Reference 23,
tells you how to draw up a plan. These guidelines set out best practice for producing an incident response plan
to deal with an environmental incident on your site. Following a plan will help prevent or reduce environmental
damage if an incident occurs.
If you have a spill, take immediate action to stop the oil getting into any drains or watercourses. If you can, soak
up the spilt oil with the contents of your spill kit, without putting yourself in danger. Dont hose the spillage
down or use any detergents to try to get rid of it; you could make the pollution worse. Notify us by calling the
Emergency Hotline on 0800 80 70 60. If oil soaks into the ground, the soil soaked in oil should be removed, by
a professional company, so it doesnt cause long term pollution. Store any materials that are soaked in oil in
containers that wont let the oil run away until it can be correctly and legally disposed of. Surface and subsurface
soil and groundwater samples may need to be taken and tested for products relating to the incident. For details
on how to legally dispose of materials soaked in oil, see Reference 8.
PPG 2 page 14
14. References
You should make sure that the references and other sources of guidance are still current.
1. PPG27: Installation, decommissioning and removal of underground storage tanks
2. PPG26: Storage and handling of drums and intermediate bulk containers
3. PPG7: Refuelling facilities
4. Containment of bulk hazardous liquids at COMAH establishments Containment policy
5. Buncefield task group final report
6. Oil storage regulations leaflet. Environment Agency.
Leaflet on Scottish Oil Storage Regulations - Your questions answered. SEPA
7. Guidance note for the Control of Pollution (Oil Storage) (England) Regulations 2001. Department for
Environment, Food and Rural Affairs (DEFRA), tel: 0870 1226 236
Guidance note for Water Environment (Oil Storage) (Scotland) Regulations 2006. Scottish Executive.
Scottish Government, tel: 08457 741741 or 0131 556 8400, www.scotland.gov.uk
8. PPG8: Safe storage and disposal of used oils
9. In England and Wales, Code of good agricultural practice for the protection of water, with addendum.
Defra/Environment Agency (Defra Publications, Tel: 08459 556000; http://www.defra.gov.uk)
In Northern Ireland, Code of good agricultural practice for the prevention of pollution of water,
Department of Agriculture and Rural Development for Northern Ireland (DARD). tel: 028 9052 4592.
http://www.dardni.gov.uk
In Scotland, Prevention of Environmental Pollution from Agricultural Activity (code of good practice)
PEPFAA Code (Scottish Government. Tel: 08457 741 741 or 0131 556 8400. http://www.scotland.gov.
uk)
10. In England and Wales, The Building Regulations 2000, Combustion appliances and fuel storage systems
Approved Document J
In Northern Ireland, The Building (Amendment) Regulations (Northern Ireland) 2006 Technical booklet L
In Scotland, Building (Scotland) Act 2003 Sections 3.23 & 3.24 Domestic, Sections 3.23 & 3.24 Non
Domestic
11. BS EN ISO 9001. Quality management systems Requirements. BSI
12. Above-ground proprietary prefabricated oil storage tank systems. C535. ISBN 0-8601-7535-9.
Construction Industry Research and Information Association (CIRIA)
13. BS 5410 -1:1997 Code of practice for oil firing. Installations up to 45 kW output capacity for space
heating and hot water supply purposes. British Standards Institution (BSI).
BS 5410 -2: 1978 Code of practice for oil firing. Installations of 44kW and above output capacity for
space heating, hot water and steam supply purposes. BSI
BS 5410 -3: Code of practice for oil firing. Installations for furnaces, kilns, ovens and other industrial
purposes. BSI
14. Construction of bunds for oil storage tanks. R 163. ISBN 0-8601-7468-9. CIRIA
15. Concrete bunds for oil storage tanks. Agencies/CIRIA
16. Masonry bunds for oil storage tanks. Agencies/CIRIA
17. Get to know your oil tank. Oil Care Campaign
18. PPG3: The use and design of oil separators in surface water drainage systems
PPG 2 page 15
19. Guidance on the disposal of condensate and bund water. Joint OFTEC/WaterUK/Environment Agency/
SEPA publication.
20. Waste management, the Duty of Care, a code of practice (revised 1996), ISBN 0-11-753210X. The
Stationery Office.
21. Special Waste Advisory Note 04 - Oil Contaminated Wastes. SEPA - on SEPA
22. Cleaning and gas freeing of tanks containing flammable residues. Guidance note CS15. ISBN 0-7176-
2166-9. Health and Safety Executive (HSE)
23. PPG21: Pollution incident response planning
References 1, 2, 3, 4, 6, 8, 14, 15, 16, 17, 18,and 23 are available from us.
References 5 and 22 are available from HSE: Tel: 01787 881 165
References 7 9, 19 and 21 are available from Defra the Scottish Government and Department of Agriculture and
Rural Development (DARD) for Northern Ireland
References 10 and 20 are available from The Stationery Office (TSO) Tel: 0870 600 5522
References 12 and 14 are available from CIRIA, Tel: 020 8996 9001
References 11, 13, 14 and 15 are available from the BSI: Tel: 020 8996 7413
All Pollution Prevention Guidance Notes (PPGs) are available to download from our websites at:
www.environment-agency.gov.uk/ppg
www.sepa.org.uk/about_us/publications/guidance/ppgs.aspx
www.ni-environment.gov.uk
15. Additional information
Code of Practice on Guidance on Regulation 2008 from The Department for Enterprise and Regulatory Reform
(BERR) website: www.berr.gov.uk
Professional schemes for qualified tank installers;
APHC (Association of Plumbing and Heating Contractors),
BESCA (Building Engineering Services Competence Accreditation Limited),
NAPIT (National Association for Professional Inspectors and Testers) Certification Limited,
NICEIC (National Inspection Council for Electrical Installation Certification) and
OFTEC (Oil Firing Technical Association Ltd)
A range of Oil Care Campaign literature and stickers, covering the complete life cycle of oil, are available from us.
Contact the Oil Bank Line at www.oilbankline.org.uk or on 08708 506 506 for details of your nearest oil recycling
bank.
NetRegs is a web based resource that gives small and medium size businesses in the UK free environmental
guidance. It will help you understand what you need to do to comply with environmental legislation, such as the
oil storage regulations, and protect the environment. It may even help save you money by showing you ways to
use your resources more efficiently. Take a look at www.netregs.gov.uk
Energy Institute.
Tel: 020 7467 7100 www.energyinst.org.uk
Design, Construction, Modification, maintenance and Decommissioning of filling Stations ISBN 0-85293-419X.
Available from the Energy Institute.
Association of Plumbing and Heating Contractors. (England and Wales).
Tel: 024 7647 0626 www.competentpersonsscheme.co.uk
Scottish and Northern Ireland Plumbing Employers Federation (SNIPEF)
Telephone: 0131 225 2255 www.snipef.org
Building Engineering Services Competence Accreditation Limited. (England and Wales).
PPG 2 page 16
Tel: 0800 652 5533 www.besca.org.uk
The Construction Licensing Executive (CLE) (Scotland)
Telephone: 0131 445 9210 www.clescotland.co.uk
National Association for Professional Inspectors and Testers Certification Limited.
Tel: 0870 4441392 www.napit.org.uk
National Inspection Council for Electrical Installation Certification.
Tel: 0870 013 0382 www.niceic.org.uk
Oil Firing Technical Association.
Tel: 0845 65 85 080. www.oftec.org.uk
Federation of Petroleum Suppliers (FPS) Briefing Notes.
www.fpsonline.co.uk
Making an oil delivery through a property.
Information your oil distributor will need to know when you place an order.
PPG 2 page 17
Appendix A Checklist for oil storage tanks
Completing this checklist will help you decide if you need to improve your oil storage facilities to comply with
the Oil Storage Regulations (OSR) England and Scotland. If youre not sure of the answer, dont guess get
professional help and advice.
If your tank is exempt from the OSR, we recommend you follow these guidelines as fully as possible to reduce the
risk of your oil causing pollution. There are other requirements for the Building Regulations that your tank may
need to comply with. Check with your local authority for details.
For each time your answer is an x refer to the guidance or contact your registered tank manufacturer, registered,
competent technician, delivery company or us to find how to correct this point.
General requirements or Comments
Is the tank fit for purpose and in good condition (unlikely to leak or burst
in ordinary use)?
e.g. polyethylene isnt
deformed or cracked, e.g.
metal isnt rusty
Is the tank situated more than 10m from a watercourse or 50m from a well
or borehole? If unsure, contact us.
Is the tank within a secondary containment system?
Is the tank/containment system located or protected so an impact or
collision cant damage it?
Secondary containment: storage capacity or Comments
For a single tank, is the secondary containment at least 110% of the
maximum storage capacity of the tank?
See calculation table, page
18
For two or more tanks in one secondary containment system, is the
secondary containment at least 110% of the biggest tanks maximum
storage capacity, or 25% of the total maximum storage capacity of all the
tanks, whichever is the greatest?
Secondary containment: integrity or Comments
Is the secondary containment impermeable to water and oil? For masonry, concrete and
steel containment
Is the secondary containment system intact and without openings or
valves for drainage?
Get any cracks or other
damage repaired.
Are any draw-off pipes/feed lines and fill pipes that pass through the
secondary containment sealed adequately?
Tank ancillary equipment or Comments
Are all valves, sight gauges, vent pipes and taps within the secondary
containment system?
If the tank has a sight gauge, is it properly supported and fitted with a
British Standard valve that closes automatically when the gauge isnt in
use?
Are fill and draw-off pipes/feed lines located or protected from impact or
collision damage?
And, if applicable, are they protected from corrosion and frost damage?
And, if above ground, are they supported properly?
Are vent pipes, taps and valves arranged so that any oil lost will be
retained within the containment system?
Are all taps and valves fixed to the storage tank, through which oil can be
discharged to the open, fitted with locks and locked shut when not in use?
Deliveries to the tank (filling) or Comments
Is the fill pipe situated within the secondary containment system or, if not,
is a drip tray big enough to contain any oil that remains in the pipework
after filling available?
Empty the drip tray after
the tank is filled.
PPG 2 page 18
Can the tank and vent be seen from the point where the filling operation is
controlled or, if not, is the tank fitted with an automatic overfill prevention
device?
If the tank has a screw fitting or other fixed coupling, is it in good
condition?
Are fittings/couplings being used when the tank is filled? You need to discuss this
with your oil supplier.
Underground pipes (for filling and/or draw off) or Comments
Are underground pipes for filling, draw-off or feed protected from physical
damage?
Are all mechanical joints situated at a place accessible for inspection? For example, under a hatch
or cover.
Are there adequate facilities for detecting leaks?
If permanent leak detection is provided, is it maintained in working order
and tested at appropriate intervals?
If permanent leak detection isnt provided, have the pipes been tested
before use?
Is pipework with mechanical joints tested for leaks every five years?
Is all other pipework tested for leaks every ten years?
Flexible draw-off pipes (for draw off) or Comments
Is the flexible draw-off pipe fitted with a tap, valve or nozzle at the
delivery end that closes automatically when not in use?
If the tap or valve can
be fixed in the open
position, it should have an
automatic shut-off device.
Is the pipe kept within the secondary containment system when not in use
or enclosed in a secure cabinet equipped with a drip tray?
Is there a lockable valve where the pipe leaves the container which is
locked shut when not in use?
Pumped draw-off (non-gravity draw-off) or Comments
Is the pump fitted with a check valve in the feed line to the pump?
Is the pump protected from unauthorised use and locked or isolated when
not in use?
Is the pump located or protected from impact or collision damage?
If you cant answer a question or have crosses in the second column, its likely that your oil storage installation
needs to be upgraded to comply with the OSR unless it is exempt. The OSR England are fully in force and you
must upgrade your oil storage now. To avoid the risk of pollution, take action to upgrade your oil storage as soon
as possible.
PPG 2 page 19
Appendix B Calculation of capacity for tanks in open secondary
containment systems
Weve included this so you can check your existing secondary containment meets the minimum requirements of
the OSR.
Calculate the capacity of a tank located within an existing open containment system by making the measurements
shown in the table below. If the tank supports, or the primary tank, take up significant space, take this into
account in the calculation.
Where the tank is enclosed within a proprietary system, refer to the manufacturer for this information.
Calculation Result
Maximum capacity of primary tank(s)
If unknown, use tank length x width x depth in metres and multiply by 1,000 to
convert to litres.
litres A
Containment capacity = length x width x depth of secondary container in metres. m3
Then multiply by 1,000 to convert to litres litres B
Volume lost in secondary containment by tank supports (if significant) in cubic
metres.
m3
Then multiply by 1,000 to convert to litres litres C
Actual containment capacity = B C (C = 0 if tank supports dont occupy a
significant volume).
litres D
Minimum containment capacity (110%) = (110/100) x A litres E
If D is equal or greater than E, then the containment system volume is adequate and will comply with the OSR. We
may require additional containment volume in some environmentally sensitive situations.
If D is less than E, then the containment system capacity is insufficient and will not comply with the OSR.
For installations where the tank takes up a significant part of the bund, the capacity available in the event of
overfilling may be inadequate. Youll need to consider delivery procedures and alarm systems to manage this
risk.
PPG 2 page 20
Would you like to find out more about us, or about your environment?
Then call us on incident hotline floodline
08708 506 506 (Mon-Fri 8-6) 0800 80 70 60 (24hrs) 0845 988 1188
Environment first: This publication is printed on paper made
from 100 per cent previously used waste. By-products from
making the pulp and paper are used for composting and fertiliser,
for making cement and for generating energy.
Environment Agency
www.environment-agency.gov.uk
HEAD OFFICE
Rio House
Waterside Drive
Aztec West
Almondsbury
Bristol BS32 4UD
Tel: 01454 624 400
Fax: 01454 624 409
Scottish Environment Protection Agency
www.sepa.org.uk
CORPORATE OFFICE
Erskine Court
The Castle Business Park
Stirling FK9 4TR
Tel: 01786 457 700
Fax: 01786 446 885
Northern Ireland Environment Agency
www.ni-environment.gov.uk
HEAD OFFICE
Klondyke Building
Cromac Avenue
Gasworks Business Park
Lower Ormeau Road
Belfast BT7 2JA
Tel: 0845 302 0008
PMHO0909BQSQ-E-E
Corrections to:
Above Ground Oil Storage Tanks - PPG2 (version of April 2010)
Please note corrections in page 2, Section 3a, of this PPG. The changes are
presented in bold, below. These corrections apply in Scotland.
- In page 2, Section 3a, the second paragraph should read:
In Scotland, oil storage is regulated by the Water Environment (Oil Storage) (Scotland)
Regulations 2006 (OSR Scotland). These regulations apply to any kind of oil including
petrol, diesel, mineral oil, heating oil, lubricating oil, waste oil, vegetable and plant oil but
dont include uncut bitumen. They apply to the storage of any volume of oil, except
private dwellings storing oil in a container with a capacity of 2,500 litres of oil or
less. The Scottish Environment Protection Agency (SEPA), is responsible for enforcing
these regulations throughout Scotland and may serve an Enforcement Notice requiring
inadequate facilities to be brought up to standard.
- In page 2, the table at the bottom has had changes in the column for Scotland and should
be:
OSR England applies to: OSR Scotland
OSR England applies to: OSR Scotland applies to:
OSR England applies to OSR Scotland applies to
Above ground oil storage in containers over
200 litres.
Private domestic oil tanks over 3,500 litres.
All above ground oil storage (except
domestic oil tanks of 2500 litres or less).
Portable containers of less than 200 litres*.
Waste oil storage - see PPG8, Reference 8.
Oil stored on farms - see Reference 9.
Oil stored in buildings - see Section 6.
pollution prevention guidelines
Use and design of oil separators in surface water drainage systems: PPG 3
These guidelines will help you decide if you need an oil separator at your site and, if so, what size and type
of separator is appropriate.
Following the good practice described does not remove your obligation to comply with relevant legislation
and to prevent pollution from your site. Pollution of the environment is a criminal offence and compliance
with one or more Guidance Note is not a defence to such offences. You should check the references to other
sources of guidance to ensure they are still current.
These guidelines are produced jointly by the Environment Agency for England and Wales, the Scottish
Environment Protection Agency, and the Environment and Heritage Service for Northern Ireland. You should
consider the needs of each site individually and we advise you to contact us for advice as early as possible.
The Construction Products Regulations 1991 dictate the essential requirements that an oil separator must
fulfil to be supplied legally in the UK. Where the word must is used in this guidance, compliance with that
particular part of the guidance is a legal requirement under these regulations. The Trading Standards
Authorities enforce these regulations.
Throughout these guidelines we use the term separator rather than the term interceptor. These terms
have the same meaning.
In these guidelines, the word oil means liquid hydrocarbons that float on water such as diesel, petrol and
engine oil.
PPG3
April 2006
1. Introduction
a. How do oil separators work?
Oil separators can be fitted to surface water drainage systems to protect the environment from pollution by
oils. They separate the oil from the water, and then retain the oil safely until it is removed. They are installed
to contain oil leaks from vehicles and plant and accidental spillages. To be effective, oil separators need to be
correctly designed, installed and maintained.
b. Where are separators needed?
Surface water may be contaminated by oil at a number of different sites. These sites need to have measures
in place to prevent this oil from polluting the environment. These sites include:
car parks typically larger than 800m
2
in area or for 50 or more car parking spaces
smaller car parks discharging to a sensitive environment
areas where goods vehicles are parked or manoeuvred
vehicle maintenance areas
roads
industrial sites where oil is stored or used
refuelling facilities
any other site with a risk of oil contamination.
Trapped gully pots can provide adequate protection for car parks that are too small to justify the installation
of a separator, but thay must be properly maintained.
Environment Alliance working together
You might not need an oil separator if you use sustainable drainage systems (SUDS). The SUDS approach should be
used on all sites to minimise the impact of the development on the environment. In Scotland, the use of the SUDS
approach is a legal requirement. Techniques that control pollution close to the source, such as permeable surfaces
or infiltration trenches, can offer a suitable means of treatment for run-off from low risk areas such as roofs, car
parks, and non-operational areas. In higher risk areas you might need other SUDS facilities such as constructed
ponds, wetlands or swales. For detailed information on SUDS, see references 1-4. Where there is a high risk of oil
contamination, it may be appropriate to use an oil separator as part of the SUDS scheme.
If you do need an oil separator, you will need to consider where it will discharge. It is important to speak to us as
early as possible if you plan to discharge to surface water drains, to a watercourse or to the ground, as you might
require our consent. In Northern Ireland any discharge from an oil separator will require consent. We do not issue
these consents automatically and, if we allow a discharge, we might impose strict controls on the level of polluting
substances in it such as oils. If you install a separator discharging to surface water you will need a Class 1 separator
(see Section 3a)
If your separator will discharge to a foul sewer, you must contact your local sewer provider before doing so. For
discharges to foul sewer you will need a Class 1 or Class 2 separator (see Section 3a). If your separator will
discharge to a surface water sewer that is owned by the sewer provider, you must also contact them before you
connect to that sewer.
Drainage from areas such as scrapyards, storage and handling areas for chemicals (solvents, acids etc), and
washing bays are likely to be contaminated with substances other than oil, and should normally drain to the
foul sewer with the approval of the sewer provider. The local sewer provider might require the discharge to have
a separator and you must consult them. Discharge from such areas is not suitable for drainage to surface water
drains, a watercourse or to the ground.
Drainage containing detergents should not pass to a separator that discharges to surface water because the
detergents prevent the separator from working properly.
For general guidance on preventing pollution from your site, see Reference 9.
2. Choosing the right separator
Use the flow chart to help you select the appropriate system for your site. More than one separator might be
required on larger sites or a site with many activities. You will need to consider the local circumstances and risk
factors including:
the discharge point of your proposed separator
the environmental sensitivity of your location
activities on your site
We advise that SUDS should be incorporated into the surface water drainage whenever possible and in
Scotland, this is a legal requirement. This may remove the requirement for an oil separator.
Notes to accompany the flowchart
1
You must seek prior permission from your local sewer provider before you decide which separator to install
and before you make any discharge.
2
You must seek prior permission from us before you decide which separator to install.
3
In this case, if it is considered that there is a low risk of pollution a source control SUDS scheme may be
appropriate.
4
In certain circumstances, the sewer provider may require a Class 1 separator for discharges to sewer to
prevent explosive atmospheres from being generated.
5
Drainage from higher risk areas such as vehicle maintenance yards and goods vehicle parking areas should
be connected to foul sewer in preference to surface water.
6
In certain circumstances, a separator may be one of the devices used in the SUDS scheme. Ask us for
advice.
2 PPG3
PPG3 3
3. Separator standards and types
The UK has adopted a two-part European Standard (BS EN 858-1:2002 and BS EN 858-2:2003; Reference 5) for
the design, use, selection, installation, operation and maintenance of prefabricated oil separators. The
Construction Products Regulations require that new prefabricated separators (made off site and then installed)
must satisfy certain essential requirements. Demonstration of fulfilment of these requirements can be provided
by compliance with the mandated clauses of BS EN 858-1. You can obtain a list of separators through our
websites that identifies the separators for which evidence of oil separating performance has been supplied,
examined and accepted. When using this list, you must check on the website that you are using the current
version, as it will be updated regularly.
The use of SUDS should be considered at all sites and they should be incorporated where
suitable. SUDS can be used to polish the effluent from these separators before it enters
the environment.
6
Source control
SUDSshould be
considered
where possible
Is there a risk of oil contaminating
the drainage from the site?
Riskof
infrequent light
contamination
and potential for
small spills only
e.g. car park
Riskof regular
contamination of
surface water run
off with oil and/
or riskof larger
spills e.g. vehicle
maintenance
area, Goods
Vehicle parking or
vehicle
manoeuvring
5
Drainage will
also contain
dissolved oils,
detergents or
degreasers such
as vehicle wash
water and trade
effluents e.g.
industrial sites
Separator not
required
Very low riskof
oil
contamination
e.g. roof water
By-pass
separator with
alarm required.
Class 1 if
discharge to
surface water
2
,
3
Class 2 if
discharge to
foul sewer.
1
Source control
SUDSmust be
considered and
incorporated
where suitable
Full retention
separator with
alarm required
Class 1 if
discharge to
surface water
2
Class 2 if
discharge to
foul sewer
1
Trade effluents
must be directed
to the foul
sewer.
1
It may need to
pass through a
separator before
discharge to
sewer to remove
free oils.
Full retention
forecourt
separator with
alarm required.
Class 1 if
discharge to
surface water
2
Class 1 or 2 if
discharge to
foul sewer
1
,
4
Clean water
should not be
passed
through the
separator
unless the size
of the unit is
increased
accordingly
Fuel oils are
delivered to and
dispensed on
site e.g. retail
fuel forecourts
YES
If not suitable
YES NO
YES YES YES
YES
YES
YES YES
4 PPG3
a. Separator classes
BSEN 858 refers to two classes of separator, based on performance under standard test conditions.
Class 1 separators are designed to achieve a discharge concentration of less than 5 mg/litre of oil under standard
test conditions. These separators are required for discharges to surface water drains and the water environment. Many
Class 1 separators contain coalescing devices, which draw the oil droplets together and facilitate the separation.
Class 2 separators are designed to achieve a discharge concentration of less than 100 mg/litre of oil under standard
test conditions. They are suitable for dealing with discharges where a lower quality requirement applies such as
discharges to the foul sewer (but check first with your sewer provider).
Both classes can be produced as full retention, bypass or forecourt separators (see below).
The oil concentration limits of 5 mg/litre and 100 mg/litre only apply under standard test conditions. You should not
expect separators to always perform within these limits under field conditions. In addition, these levels of oil might be
too high in some environmentally sensitive areas to allow the discharge to pass into the water environment without
additional treatment.
b. Full retention separators
Full retention separators treat the full flow that can be delivered by the drainage system. The full flow is normally
equivalent to the flow generated by a rainfall intensity of 65 mm/hour
Full retention separators are used where there is a risk of regular contamination with oil and a foreseeable risk of
significant spillages e.g. vehicle maintenance areas and retail fuel forecourts.
You need to consider the flow rates of potential spillages delivered to the separator from the drainage system and the
oil storage volume of the separator needs to be sufficient to retain the entire spillage. See Section 9 for more
information about preparing for emergencies.
On large sites, some short-term storage upstream of the separator might be an acceptable means of limiting the flow
rate and the size of separator needed. Any surface water stored cannot be pumped through the separator unless the
separator is specifically designed to receive pumped inflows and a low-shear, non-emulsifying pump is used.
c. Bypass separators
Bypass separators fully treat all flows, for the area served, generated by rainfall rates of up to 6.5 mm/hour. This covers
most rainfall events. Flows above this rate are allowed to bypass the separator. These separators are used when it is
considered an acceptable risk not to provide full treatment for high flows, e.g. where only small spillages can occur and
the risk of spillage is small such as on short stay car parks.
In cases where a large spillage might occur, it is not acceptable to use a by-pass separator. The only exception to this is
a major trunk road where the size and type of spillage is impossible to foresee and the surface area drained makes it
impractical to provide a full retention separator. For major trunk roads a SUDSapproach incorporating a number of
SUDStechniques is likely to be more appropriate.
On sites where high levels of silt are likely to enter the separator, the build up of silt must not be allowed to
compromise the operation of either the separator or the by-pass device. On such sites (e.g. major trunk roads and
quarries) an adequately sized silt separation chamber should be installed upstream of the separator and appropriate
management systems put in place to monitor the situation and remove the silt when necessary. The use of SUDS
techniques can minimise the amount of silt in the surface water run-off.
d. Forecourt separators
This document uses the term forecourt to refer to all forms of liquid-fuel dispensing outlets, both retail and non-retail,
including those where only diesel is dispensed. A forecourt separator must be a full retention separator, large enough
to serve the catchment area of the site and have a sufficient oil storage volume to retain any foreseeable spillages.
It is important to install a forecourt separator of an appropriate size. On a forecourt where tanker deliveries are received,
a separator with an oil storage capacity of 7,600 litres will meet the requirements of BSEN 858-2, clause 4.3.6. If a
smaller unit is proposed, the size should be determined by undertaking a risk assessment incorporating catchment
size, potential spillages during delivery, and other risks such as safety issues. If the compartment size of the tanker that
delivers to your site is greater that 7,600 litres your separator should be sized accordingly.
For detailed information on the design of fuel dispensing forecourts see Reference 10.
PPG3 5
4. Separator size
a. Nominal size
Separators are tested in accordance with the standard test procedure in the European Standard. Each separator is
allocated a nominal size (NS) on the basis of the test results. Full retention and bypass separators are referred to as
NS and NSB, respectively.
The nominal size of a full retention separator that is required for a catchment area (A) is obtained using the
following formula:
NS = 0.018 x A (in m
2
)
For a bypass separator, the formula is:
NSB = 0.0018 x A (in m
2
)
In addition, capacity for silt storage (C) must be provided for all separators either as an integral part of the
separator or as a separate upstream unit according to the following:
C (in litres) = NS x 100 or C (in litres) = NSB x 100
Silt capacity for a bypass separator must be provided either upstream of the separator or in the bypass weir
chamber, and not in the main oil separating chamber.
Separators must be designed such that when the silt chamber or silt area of the separator is full of silt, this will not
affect the operation of the separator, the skim pipe or the by-pass device.
b. Oil storage capacity
The oil storage capacity is defined as the volume of separated oil that can be stored in the separator without any of
the stored oil entering the inlet or outlet of the separator. The oil storage volume (V) is given by the following:
V (in litres) = NS x 10 or V (in litres) = NSB x 15
On sites where significant oil spillages are foreseeable, make sure the oil storage capacity is sufficient to retain any
such spillage and a separator larger than that identified in Section 4a may be required.
c. Minimum size
The minimum working capacity (which excludes any provision for silt deposition) of a separator should be 1,000
litres; though for forecourts, it is likely that risk assessment will indicate the need for a larger separator. For bypass
separators, the minimum capacity is defined as the working capacity of the oil separating chamber only.
5. Closure devices and alarms
a. Closure devices
If too much oil is allowed to accumulate inside a separator, it will not work effectively and oil will escape. To avoid
this, full retention separators must be provided with an automatic closure device that will prevent flow passing
through the separator when the quantity of oil in the separator exceeds the oil storage volume (V).
Also, during emptying or maintenance the separator should be isolated to prevent the escape of waste oil. Open
all isolation valves when the operation is complete.
Do not fit automatic closure devices to bypass separators unless they have been designed specifically to operate
on such separators.
If the automatic closure device is activated the operator should be alerted by a high level alarm so that immediate
maintenance can be carried out.
b. Automatic Warning Devices/Alarm systems
Separators must be provided with a robust device to provide visual and audible warning (if necessary to a remotely
located supervisory point) when the level of oil reaches 90 per cent of the oil storage volume (V) under static liquid
level conditions. This automatic warning device indicates that the separator is in need of immediate emptying for it to
continue to work effectively.
6 PPG3
Also, as the build up of silt will prevent the separator from working effectively, we recommend that you install a silt
level alarm or another suitable device in your separator to alert you to the build-up of excessive levels of silt. In many
cases, oil and silt alarms can be fitted to an existing separator. Silt alarms are most useful on those sites where high
volumes of silt are likely to enter the separator, such as quarries, builders yards and major trunk roads.
Further equipment can be fitted to the separator, alongside a closure device and warning device, to alert the site
operator to the routine maintenance requirements of the separator. This equipment might, for example, indicate when
the next inspection is due and such separator management systems will ensure that the separator continues to
receive the appropriate level of attention.
Any electrical device used within a separator or used to monitor sensors placed within a separator must be
intrinsically safe and certified to a suitable explosion protection standard. The location of the monitoring device, such
as the alarm or separator management system control panel, must be located within a safe area and conform to the
requirements of BS EN 60079-10. For this reason it is important to always use qualified technicians who are familiar
with the installation, calibration and servicing of intrinsically safe equipment. Regular maintenance and testing of
equipment is essential.
6. Installation and labelling
a. Installation
Any clean water should be discharged downstream of the separator. If any clean water is drained through your
separator, you will need to consider this extra water volume when selecting the separator type and size.
If the discharge for the separator is subject to the controls of a permit to discharge granted by us, a sampling
chamber will be required downstream of the separator, to allow representative samples to be taken.
Provide separators with sufficient access points to allow for the inspection and cleaning of all internal chambers.
Keep access to the separator clear and do not use this area for storage.
If the separator is installed to retain flammable liquids, provide appropriate ventilation.
b. Labelling
Provide separators with a visible and durable label that can be read after installation and which contains the
following information:
manufacturers reference number and oil storage capacity
year of manufacture volume of separator
bypass/full retention silt storage capacity
unique identifier for the design of separator oil level warning device details
(name or number) depth of oil storage
class of separator closure device details.
nominal size
Mark the position of all separators clearly on all drainage plans and identify the separator on the ground by
marking the manhole cover Separator.
7. Maintenance and use
To prevent pollution and minimise your costs, you need to manage your separator effectively. To make this easy, all
parts of the separator that have to be regularly maintained must be accessible at all times.
Every six months, or in accordance with manufacturers instructions, experienced personnel should:
Physically inspect the integrity of the separator and all mechanical parts
Assess the depth of accumulated oil and silt
Service all electrical equipment such as alarms and separator management systems
Check the condition of any coalescing device and replace it if necessary
Some heavily used or high-risk sites might require more frequent inspections.
PPG3 7
Keep a detailed log of when the separator is inspected, maintained, emptied and serviced. Also record specific
events relating to the separator system such as cleaning, repairs, accidents and incidents.
All sites should empty their separator as soon as a significant quantity of oil and/or silt has built up. The retained
waste, including the silt, must be removed and the separator must be refilled with clean water before being put
back in to service to prevent damage and to prevent oil passing through it. In addition to normal emptying of the
separator, it will also need to be emptied right away if oil or silt levels exceed 90 per cent of the storage volume of
the separator and the alarm is activated (see Section 5b). When the oil or silt reaches this level or after a spillage,
employ a registered waste removal company to empty the separator (see Section 8 for information about waste
management). For all waste removal operations you must make sure that the waste removal company has
experience in emptying separators and that they do not allow any of the contents to escape from the outlet during
emptying.
Every five years it is recommended that separators be emptied and given a general inspection to test the integrity
and performance of the system. The separator must be refilled with clean water following such an inspection.
Information on separator maintenance is in Part 2 of the European Standard (Reference 5).
8. Waste management
All waste must be handled, stored and disposed of correctly to avoid pollution. Waste oil is designated as
hazardous/special waste and as a waste producer and holder, you are responsible for complying with the
Hazardous Waste (England and Wales) Regulations 2005, the Special Waste Amendment (Scotland) Regulations
2004, or the Hazardous Waste (Northern Ireland) Regulations 2005 (see Reference 11).
You may need to register as a producer of hazardous/special waste, and you should refer to our websites for
guidance. You must follow the Duty of Care Code of Practice (Reference 6) which requires you to make sure that
the waste oil:
does not escape from your control
is transferred only to a registered waste carrier to be sent for recycling or disposal at a suitably licensed
facility
is accompanied by an appropriate transfer note with a full written description of the waste
Detailed guidance on how to comply with the regulations governing waste handling, storage and disposal is
given in Reference 6. The detail of the Regulations themselves is in Reference 11.
The NetRegs website (www.netregs.gov.uk) provides information on waste legislation and how you can comply
with it. In addition, you can contact our local office for advice or visit the waste sections of our websites.
9. Emergencies
Draw up a Pollution Incident Response Plan (PIRP) that includes all oil separators. Reference 7 offers advice on
how to produce or update such a plan. Keep a spill kit on site.
Do not use a separator as the primary method of containing a large oil spill from above ground oil storage; this
should be protected by a secondary containment system (see Reference 8 for details).
We recommend that all oil deliveries to the site be supervised.
Notify us immediately in the event of an emergency using the emergency hotline number 0800 80 70 60.
PMHO-0406-BIYL-E-E Printed on Recycled Paper
Environment Agency
www.environment-agency.gov.uk
HEAD OFFICE
Rio House
Waterside Drive
Aztec West
Almondsbury
Bristol BS32 4UD
Tel: 01454 624 400
Fax: 01454 624 409
Scottish Environment Protection Agency
www.sepa.org.uk
CORPORATE OFFICE
Erskine Court
The Castle Business Park
Stirling FK9 4TR
Tel: 01786 457 700
Fax: 01786 446 885
Environment and Heritage Service
www.ehsni.gov.uk
HEAD OFFICE
Calvert House
23 Castle Place
Belfast BT1 1FY
Tel: 028 9025 4868
Fax: 028 9025 4777
Would you like to find out more about us, or about your environment?
Then call us on incident hotline floodline
08708 506 506 (Mon-Fri 8-6) 0800 80 70 60 (24hrs) 0845 988 1188
10. References
1. Sustainable Drainage Systems (SUDS) an introduction. www.environment-agency.gov.uk/suds
SUDS Setting the scene in Scotland from:www.sepa.org.uk/publications/leaflets/suds/index.htm
2. www.ciria.org/suds
3. Sustainable urban drainage systems - design manual for Scotland and Northern Ireland.
CIRIA C521. ISBN 0-86017-521-9.
Sustainable urban drainage systems - design manual for England and Wales. CIRIA C522. ISBN 0-86017-522-7.
CIRIA C521 and C522 are due to be replaced by a new SUDS Manual in autumn 2006. Please make sure you
refer to the current guidance.
CIRIA Tel: 020 7549 3300. www.ciria.org
4. British Water Technical Guidance Guidance to proprietary sustainable drainage systems and
components SUDS. ISBN 1 9034810 4 10.
British Water Tel: 020 7967 4554 www. britishwater.co.uk
5. BS EN 858-1:2002. Separator systems for light liquids (e.g. oil and petrol). Principles of product
design, performance and testing, marking and quality control.
BS EN 858-2:2003. Separator systems for light liquids (e.g. oil and petrol). Selection of nominal
size, installation, operation and maintenance.
BSI. Tel: 020 8996 9001. www.bsi-global.com
6. Waste management, the Duty of Care, a code of practice (revised 1996). ISBN 0-11-753210X.
The Stationery Office. Tel: 0870 600 5522
7. PPG21: Pollution incident response planning. www.environment-agency.gov.uk/ppg or
www.sepa.org.uk/guidance/ppg/
8. PPG2: Above ground oil storage tanks. www.environment-agency.gov.uk/ppg or
www.sepa.org.uk/guidance/ppg/
9. Pollution Prevention Pays. Getting your site right industrial and commercial pollution prevention.
Available to download from the Preventing Pollution page of the business area of
www.environment-agency.gov.uk
10. Design, construction, modification, maintenance and decommissioning of filling stations, 2005,
ISBN 0 85293 419 X: Association for Petroleum and Explosives Administration/Energy Institute
Portland Customer Services Tel: 01206 796 351
11. Hazardous Waste (England and Wales) Regulations 2005, SI 894, ISBN 0 110726 855
Hazardous Waste (Northern Ireland) Regulations 2005, SR 300, ISBN 0 33796 064 X
Special Waste Amendment (Scotland) Regulations 2004, SSI 112, ISBN 0 11069 0303
All available from The Stationery Office Tel: 0870 600 5522
PPG 5 page 1
PPG5
October 2007
Environment Alliance - working together
Pollution Prevention Guidelines
Works and maintenance in or near water: PPG5
These guidelines are produced jointly by the Environment Agency for England and Wales, the Environment and
Heritage Service for Northern Ireland and the Scottish Environment Protection Agency, referred to here as we or us.
These guidelines cover construction and maintenance works in, near or liable to affect surface waters and
groundwaters.
Surface waters include rivers, streams/burns, dry ditches, lakes/lochs, loughs, reservoirs, ponds, canals,
estuaries and coastal waters.
Groundwater is all water below the surface of the ground in the saturation zone and in direct contact with the
ground or subsoil.
You should consider these guidelines on a site by site basis, and we advise you to consult us for help. You can
find contact details at the end of these guidelines.
Pollution Prevention Guidelines (PPGs) are based on relevant legislation and good practice. They will help you
manage your environmental responsibilities and protect the environment.
Following these guidelines doesnt remove your responsibility to comply with the law and prevent pollution.
If you cause or allow pollution you may be committing a criminal offence. It is in the operators interest to
follow the PPGs because they constitute current best practice and following them will minimise threat to the
environment.
1. Introduction
1.1 Legal requirements
Your construction and maintenance activities in or near water have the potential to cause serious pollution or
impact on the bed and banks of a watercourse and on the quality and quantity of the water. Some activities with
the potential for affecting watercourses or groundwater may require either consent in England and Wales under
the Water Resources Act 1991 or an authorisation in Scotland under the Water Environment (Controlled Activities)
(Scotland) Regulations 2005 (also referred to as CAR) - see reference 1. In Scotland depending on the nature of the
activity there are three levels of authorisation.
Types of activity that may impact upon the bed and banks of a watercourse or of a wetland include:
repairs, maintenance or improvements to any structure in , over or above main river ( as defined in the Water
Resources Act 1991 )
erection or construction of any structure, either permanent or temporary, in, over or above main river
diversion of flows
works within the river channel or a lake/loch
works within the vicinity of a river, or loch or wetland (in Scotland)
any works likely to increase the risk of flooding
works within 10.0metres of a Main River watercourse or flood defence (in England, Northern Ireland and Wales).
There may be local variations in this distance e.g. in Environment Agency Midlands region it is 8.0 metres.
Contact us at the planning stage of your project to confirm this.
PPG 5 page 2
Types of activity that have the potential to cause pollution of groundwater include:
use of potentially polluting substances near groundwater abstraction boreholes (within Source Protection
Zones in England and Wales, and within 50 metres in Scotland)
use of potentially polluting substances near wells and springs
use of potentially polluting substances in areas where groundwater is vulnerable, e.g. high groundwater table
and thin covering soil
sub-water table construction using materials containing potential pollutants (in Scotland)
Types of activity that may remove water from sensitive parts of the water environment or affect other water users
include:
dewatering of excavations, particularly abstraction of large amounts of groundwater
You should contact us early on in your project as the time-scale for obtaining consent or authorisation for these
activities can take up to four months from receipt of the application. Check the NetRegs website - see web site
list- for information on your legal environmental obligations; in Scotland, read also references 2 and 3.
1.2 Planning
Most pollution incidents are avoidable. With careful planning you can reduce the risk of your work causing
pollution. Most of the measures needed to prevent pollution cost very little, especially if they are included at
the planning stage of any scheme or project. We suggest the following framework for managing environmental
hazards on your site; some of the items may be legal requirements.
Plan to protect your
Environment
Identify all
site specific
environmental
hazards and
sensitivities
(*See list below)
Write and implement
an environmental
management
plan reference 8
to include waste
management
section 7 and
incident response
section 8
reference 9
Identify all
interested
groups e.g.
Regulators, Local
Authorities, nature
conservations
bodies, sewerage
providers
Carry out a full
Environmental
Impact Assessment
(** See reference
below)
Identify your legal
obligation and what
permissions/
authorisations
you need. These
can take up to four
months to issue
Continually monitor
and review the
environmental
impact of your work
and update your
management plan
as necessary
Identify any special
procedures or
control measures
to protect the
environment
Use sustainable
drainage systems
(SUDs) as part of
your design and
construction control
measures section
2.2a and references
6 & 7
* Some examples of site specific environmental hazards and sensitivities:
oil or chemical pipelines
mains water supply pipelines
high voltage fluid filled cables
downstream abstractors
high amenity areas
fish farms
sensitive habitats e.g. wetlands
** Environmental impact assessments may be a legal requirement of your project as part of the planning process.
You should contact your Local Authority planning department for advice on this part of your project. In England
PPG 5 page 3
see the Communities and Local Government web site and reference 4; in Scotland see reference 5 or its
update and Appendix 8 of reference 4
Reference 8 covers many of the above points in detail.
You can get information on local surface and groundwater water sensitivity from us before you start any work.
In addition to preventing pollution of surface waters and groundwaters you should take precautions to prevent
blocking of channels and culverts, and erosion of the riverbank or bed. This information should form part of the
environmental impact assessment and site management plan.
1.3 Pollution prevention
If you cause pollution you will be responsible for the cost of the clean up. This can be expensive particularly if
groundwater has become contaminated. There may be additional costs associated with our incident response
and/or fines through the criminal courts or civil claims.
Following these good practice guidelines will help you reduce the likelihood of an incident. If one does occur
contact us immediately on our hotline number 0800 80 70 60. A rapid response to incidents will help to minimise
the environmental impact and could reduce your overall costs - see section 8 and reference 9.
Potential pollutants from your type of works could include:
silt - section 2
cement and concrete - section 3
chemicals and solvents -section 4
bridge cleaning debris - section 5
herbicides - section 6
waste materials (including hazardous waste or special waste in Scotland) - section 7
Our PPG6 guidance document covers construction and demolition sites -reference 10. Also, the NetRegs website
- web site list - has guidance, specific for the Construction sector, on environmental regulations and good practice.
You should check these references to find the information that applies to your project.
2. Silt
Silt pollution is a major cause of environmental incidents. It can damage and kill aquatic life by smothering and
suffocating and can cause flooding by blocking culverts and channels.
2.1 Activities that can cause silt pollution
If you can prevent water becoming contaminated in the first place, then it reduces the risk of pollution and the
overall cost of your control measures. To avoid silt pollution you should, wherever possible, use methods of work
that reduce or eliminate working in the channel and that do not contaminate surface water.
Silt and
contaminated water
can be caused by
Disturbance of river
bed or bank
De watering and
pumping
of excavations
Run off from
exposed ground
Plant washing
Roads and river
crossings
Section 2.1 a Section 2.1b Section 2.1c Section 2.1d
PPG 5 page 4
2.1a Disturbance of the river bed / working in the river channel
When you have considered all other options and working in the channel is still necessary, such as in dredging
operations, contact us as early as possible in your planning stages to discuss appropriate pollution control
measures. Permission for this type of work may take up to four months to obtain. The risk of silt pollution causing
an incident will depend on many factors including: -
likelihood of silt being disturbed
what the river bed is made of, e.g. silt or gravel
the conditions in which the work is carried out, e.g. hot weather and low flows
Silt pollution caused by working in surface waters can be minimised or prevented by keeping water out of the
works area using appropriate isolation techniques, such as coffer dams and by-pass channels.
2.1b Disposal of water from excavations, dewatering and pumping
Problems with disposal of water from the above activities may be minimised or avoided by:
preventing water from entering excavations, by using cut off ditches
considering the impact on groundwater if you use well point dewatering or cut off walls
using pump sumps in excavations
supporting inlet hoses above the bed
discharging on to hard surfaces (concrete slabs/gravel) in to surface waters
use of appropriate pump rates to avoid disturbance of bed or bank the maximum rate should be set after
consideration of the flow of the river, the location of the discharge and the risk of erosion
protection of the pump inlet to avoid drawing in aquatic life and other debris
minimising disturbance of standing water
2.1c Exposed ground and stockpiles
Soil stripping and vegetation removal at the start of a project can increase the volume of contaminated surface
water run-off. It can also reduce the area of vegetated land available for disposal of silty water.
You should:
minimise the amount of exposed ground and soil stockpiles from which the water drains and the period of time
such water drains this is also a legal requirement in Scotland (see General Binding Rules in reference 1)
only remove vegetation from the area that needs to be exposed in the near future
seed or cover stockpiles
use silt fences at the toe of the slope, made from geotextiles, to reduce silt transport
collect run-off in lagoons and allow suspended solids to settle before disposal - reference 3
2.1d On-site working
The movement and maintenance of plant on site can generate silt and oil contaminated water. Sources of silt such
as plant and wheel washing and site roads and river crossings carry a high risk of causing pollution.
Plant and wheel washing
To reduce the pollution risk make sure that:
plant and wheel washing is carried out in a designated area of hard standing at least 10 metres from any
watercourse or surface water drain
run-off is collected in a sump - recycle and reuse water where possible
settled solids are removed regularly
discharge of contained water goes to foul sewer (if possible) with prior permission from your local sewerage
provider section 2.2e - or
tanker off site for authorised disposal section 2.2f
PPG 5 page 5
Site roads and river crossings
Run off from site roads and river crossings can contain high levels of silt. Reduce the pollution risk by:
brushing or scraping roads to reduce dust and mud deposits
putting small dams in artificial roadside ditches to retain silt
using existing permanent bridges or pipe crossings for river crossing
if necessary building temporary bridges - but not fording rivers
working from the bank where possible not in the river
2.2 Disposal of contaminated water - treatment and disposal methods
Where run off water is contaminated with silt or other pollutants such as oil this water must not be pumped or
allowed to flow directly or indirectly in to surface waters or groundwater without treatment.
If a discharge to surface waters, groundwater, soakaways or surface water sewers is necessary it may require
consent or authorisation from us. Contact us early in the planning stage of your project as a consent or
authorisation could take up to four months to issue. If we issue a consent or authorisation it will limit volume,
amount of silt and the presence of any oil in the discharge, and may have conditions for additional substances.
The choice of method for the treatment and disposal of contaminated water will depend on:
the volume of water
the area of land available for storage, treatment or discharge
the amount and type of silt
the presence of other substances in the water
the conditions of any consent or authorisation
Treatment and disposal methods include:
Contaminated
Water treatment and
disposal
Sustainable
Drainage Systems
(SUDS) Section 2.2a
Pump to grassland
Section 2.2d
Settlement Lagoons
Section 2.2b
Filtration
Section 2.2c
Tanker off site
Section 2.2f
Discharge to sewer
Section 2.2e
PPG 5 page 6
2.2a Sustainable Drainage Systems (SUDS)
Sustainable drainage is the practice of controlling surface water runoff as close to its origin as possible by
slowing flows, allowing adequate settlement and biological action to take place before water is discharged to a
watercourse or to ground. It uses softer engineering solutions to imitate natural drainage rather than traditional
piped drainage solutions. Sustainable drainage methods used both in the construction phase and in the design
of the project will:
reduce flood risk from development within a river catchment
minimise diffuse pollution arising from surface water runoff
minimise the risk of pollution to groundwater
minimise environmental damage, such as bank erosion and damage to habitats
maintain or restore the natural flow regime of the receiving watercourse
maintain recharge to groundwater
achieve environmental enhancements, improvement to wildlife habitats, amenity and landscape quality
Some examples of source control methods are shown in the following list:
Examples of source control sustainable drainage systems
Porous surface pavements water permeates through in to the soil or sub-surface reservoir which can then
be allowed to discharge slowly rather than directly running off. This will minimise the volume of water that
you might need to treat and can also recharge groundwater. Porous pavements need to be protected during
installation from blocking by excessive silt contaminated water.
Infiltration trenches a shallow excavated trench backfilled with stone to make an underground reservoir. Run
off is diverted in to the trench and then filters in to the subsoil. The closer to the source the more effective this
method will be.
Infiltration basins a shallow surface impoundment where water is stored until it gradually infiltrates in to the
soil of the basin floor. The performance of the basin depends largely on the permeability of the soil and the
depth of the water table
Filter drains or French drains - these are similar to infiltration trenches but also allow movement of run off
slowly towards a watercourse allowing time for filtration, storage and some loss of water due to evaporation /
infiltration.
Swales grassed wide shallow depressions which lead water overland from a drained surface in to storage or
discharge system. They provide temporary storage for run off reducing high flows. Solids are retained and oily
residues and organic matter broken down in the top layer of the soil and vegetation.
Filter strips vegetated sections of land designed to accept run off as an overland sheet flow. To be effective
they should be 5 15 metres wide and are best employed on the upstream end of a drainage system. They are
most effective at removing excess solids and pollutants before discharging to downstream system.
Other SUDS can be considered including ponds, detention basins (dry ponds) and wetlands.
At the planning stage of your project consider how your drainage can be managed by using SUDS. Pollution
removal by these methods is achieved by sedimentation, adsorption, absorption, filtration and microbial action.
In Scotland, discharges of water run-off from construction sites are required to be treated by either a Sustainable
Urban Drainage System (SUDS) or an equivalent equipped to avoid pollution. However, the final SUD System
cannot be an equivalent and must be a recognised SUD System (see General Binding Rule 10 in reference 1).
For more information on SUDS see the CIRIA website in the websites list and references 6 and 7.
PPG 5 page 7
2.2b Settlement lagoons or tanks
To be effective a settlement lagoon or tank should retain contaminated water long enough for silt to settle
out. The length of time will depend on the type of silt, with finer clay solids taking longer to settle . If you use
flocculants to aid settlement you must discuss this option with us before use. Flocculants can themselves be
polluting and/or toxic and need careful use and monitoring to be effective. The checklist below gives guidance on
lagoon/tank operation.
Table 1 gives guidance on the volume of lagoon or tank needed for a three-hour settlement at a defined rate of
inlet discharge.
Typical dimension of a settlement lagoon / tank for a three hour settling time
Pump Diameter Discharge rate in to the lagoon Length Width
6 inch pump 3000 l/min 60m 20m
6000 l/min 80m 27m
4 inch pump 1000 l/min 30m 10m
2500 l/min 50m 17m
Assuming a tank / lagoon depth of 1 m , where length = three times the width
Table 1: Settlement pond dimensions - the size of the tank/lagoon is determined by the rate of introduction of
water .
Settlement lagoon / tank a checklist
maintain a constant pumped inlet rate
minimise the inlet flow as much as possible by using energy dissipaters or rip rap
position inlet pipe work vertically to dissipate energy
provide lined inlet chamber to reduce velocity of flow
line the inlet chamber and outlet weir with materials like geotextiles , brickwork ,polythene or timber
have a long outlet weir to minimise disturbance
two or three lagoons in series will increase silt retention
clean inlet chamber regularly
monitor discharge quality frequently
See reference 8 for more detail.
2.2c Filtration
If you do not have the space for lagoons and the water is contaminated with course silt you may be able to use
tanks filled with filter material. Single sized aggregates 510 mm, geotextiles or straw bales can be used as a
filter. You must monitor carefully the inlet pump rate and discharge quality.
2.2d Pump to grassland
You must have our permission and the landowners before planning to use this method of disposal. The discharge
rate must match the rate of infiltration in to the soil which will vary with the type soil, amount of vegetation cover
and the gradient.
2.2e Discharge to sewer
If discharge to a foul sewer is possible you will require the permission of the local sewerage provider. You should
approach them at an early stage in the project. They may issue a consent/authorisation limiting the volume and
content of the discharge.
PPG 5 page 8
2.2f Tanker off site
If no other disposal routes are available then contaminated water can be collected and disposed off site by tanker.
This may be a costly option and must be discussed with us at the planning stage of your project.
3. Concrete and cement
Fresh concrete and cement are very alkaline and corrosive and can cause serious pollution. Concrete and cement
mixing and washing areas should:
be sited 10 metres from any watercourse or surface water drain to minimise the risk of run off entering a
watercourse
have settlement and re-circulation systems for water reuse, to minimise the risk of pollution and reduce water
usage
have a contained area for washing out and cleaning of concrete batching plant or ready mix lorries; see section
2.1d above
collect wash waters and, where necessary, discharge to the foul sewer (you must have permission from the
local sewerage undertaker for this), or contain wash water for authorised disposal off site
Wash waters from concrete and cement works should never be discharged in to the water environment.
4. Oil and chemicals
In England, oil storage containers (e.g. tanks, IBCs, drums and mobile bowsers) greater than 200 litres must
comply with the Control of Pollution (Oil Storage) (England) Regulations 2001 - reference 11. Similar legislation is
expected in Northern Ireland.
In Scotland, storage must be compliant with the Water Environment (Oil Storage) (Scotland) Regulations 2006
- reference 12 -; these regulations apply to the storage of any volume of any kind of oil, with more prescriptive
requirements applying to industrial, commercial and institutional sites storing over 200 litres of oil.
4.1 Storage - general
Make sure fuel, oil and chemical storage on site is secure. Site the storage on an impervious base within a
secondary containment system such as a bund. The base and bund walls should be impermeable to the material
stored and able to contain at least 110% of the volume stored. Site the storage area above any flood water level
and where possible away from high-risk locations (such as within 10 metres of a watercourse or 50 metres of
a well, borehole or spring), to minimise the risk of a spill entering the water environment. Detailed guidelines
concerning above ground oil storage tanks can found in our guidance PPG2 - reference 13 - and in PPG 26
reference 14.
Keep a spill kit with sand, earth or commercial products that are approved for your stored materials, close to your
storage area. Train staff on how to use these correctly.
Remove damaged leaking or empty drums from site immediately and dispose any drums via a registered waste
disposal contractor
PPG 5 page 9
4.2 Security
You should secure your site against theft and vandalism. Statistics show that damage from vandalism is a
common cause of pollution. You cant use vandalism as a defence if you are taken to court because of a pollution
incident
Therefore take action to secure your site by
fitting lockable valves and trigger guns on pipework from storage containers
installing anti siphon valves in pipework between containers and pumps
installing armoured hoses
storing tanks drums and mobile bowsers in a locked container or compound when not in use
considering lighting, alarm or CCTV systems for your site or compound
installing lockable fencing around the site or employing security staff
4.3 Refuelling
The risk of spilling fuel is at its greatest during refuelling of plant. To minimise this risk:-
refuel mobile plant in a designated area, on an impermeable base away from drains or watercourses
use a bunded bowser
supervise all refuelling and bulk deliveries
check the available capacity in the tank before refuelling
dont jam open a delivery valve
check hoses and valves regularly for signs of wear
turn off valves after refuelling and lock them when not in use
position drip trays under pumps to catch minor spills
keep a spill kit with sand, earth or commercial products for containment of spillages
provide incident response training to your staff and contractors
4.4 Biodegradable oils
If possible use biodegradable chainsaw chain bar lubricant and biodegradable hydraulic oil in plant when working
in or near watercourses. The Environment Agency and its contractors use biodegradable oils for their own
operations. Biodegradable oils are less toxic than most of the synthetic oil but should still be stored and used to
the same standards as other oils.
4.5 Trade materials
Sealant, coatings, adhesives and glazings can be toxic to plants and animals if released in to the environment.
Select, store and use these materials carefully to save resources and protect the environment. You must not use
sealant and glazing compounds containing asbestos. You should
use water based or low solvent products
avoid products containing lead as a drying agent and those containing hazardous solvents (toluene or
chlorinated hydrocarbons )
provide safe and secure storage
For guidance on general storage see our Pollution Prevention Pays. Getting your site right pack and DVD -
reference 15.
PPG 5 page 10
5. Bridge maintenance and structures over water.
Work to maintain bridges or other structures over or next to watercourses has a high risk of causing pollution. The
maintenance work itself may require authorisation from us and you should contact us at an early stage in your
plans to agree the most appropriate method of working and to agree an environmental management plan.
You may need authorisations if the bridge crosses a main river. Contact us prior to starting your work to confirm
this.
5.1 Pollutant containment
Dust, debris and wastewater are the most common pollutants produced by structure maintenance. You should
choose a containment system designed to reduce the risk of pollution from your work. The system should take
account of the sensitivity of the environment. The type of containment you need will depend on the sensitivity of
the site.
Methods of containment include:
air or water impenetrable walls
rigid or flexible framing lined as necessary
fully sealed joints
airlocks or resealable entryways
negative air pressure (achieved by forced or natural air flow) and
exhaust air filtration
In sealed containment areas you should provide filtered ventilation to prevent the build-up of dust and minimise
the possibility of air escaping through breaches of the containment.
Use physical cleaning instead of liquid chemicals such as caustic and acid solutions. Contain wastewaters from
surface washings and agree the disposal method with us as part of the environmental management plan before
you start work. In some circumstances, you may be able to use a barge with a wastewater containment facility for
working over water, or dispose to foul sewer with prior permission of the local sewerage undertaker. You should
contact us early on in the planning stages of the project so we can advise on pollution prevention methods.
The containment facility must be designed so that the structure does not obstruct the river flow beneath it to such
an extent that it increases the risk of flooding to an unreasonable level.
5.2 Paint removal
Paint removal methods include:-
abrasive blast cleaning
blasting in a closed circuit
preparation by various types of wet abrasive blasting or water jetting
chemical stripping and
hand or power tool cleaning
Abrasive blasting produces the greatest level of dust and debris. The use of vacuum attachments on power tools
can reduce dust generation. Water cleaning methods produce less debris, but generate run-off, which needs to be
contained and treated. We can advise you on the best method of treatment.
Sample existing coatings for hazardous materials (e.g. lead) before starting to remove them. This can help
determine the level of containment you will need. The level of containment needed depends on:
the amount of paint to be removed
the type and concentration of the hazardous materials
the sensitivity of the surrounding environment
PPG 5 page 11
5.3 Surface cleaning
If you are using high-pressure water or steam cleaners see our guidance in PPG 13 - reference 16 - before starting
work. You should avoid using grit blasting with slag-derived grit as they can contain significant levels of heavy
metals such as copper. These can be toxic if they get in to the water environment. Reduce the potential for
contamination by using garnet, low silica abrasive or recycled glass media with vacuum attachments.
5.4 Painting
Our advice for painting is much the same as for paint removal although the volume of waste and size of operations
will be less. Remove dust and debris by sweeping or vacuum cleaning before painting. Paints can be applied on-
site using brush, conventional spray or airless spray. Consider using electrostatic spray units to reduce the loss of
product by over-spraying.
Carefully consider the type of paint you use. Although water based solvent free paints have lower environmental
impact they may require more frequent application. Solvent-based paints could have a higher environmental
impact but will last longer and require less maintenance. The decision to use water or solvent-based paints
should be based on the environmental sensitivity of the area/surrounding environment and ease of access to the
structure.
6. Herbicide use
In England, Northern Ireland and Wales you must have our written approval to use herbicides in or near waters.
This takes two weeks from the date we receive the application. Only approved herbicides may be used, and
only by authorised contractors. If approval is given you, as the applicant, and the contractor are responsible for
ensuring that the interests of other river users are not adversely affected.
In Scotland, aerial application of herbicides in or near the water environment needs approval from us; also, you
should consult with us on any other application of herbicide in or near the water environment, as pollution caused
by such herbicide use will be deemed an unauthorised activity and enforcement action may be taken against the
person responsible.
PPG 5 page 12
7. Waste management
Legal waste storage and disposal are essential for effective pollution prevention.
Under the Duty of Care - reference 17 - you have a legal duty to make sure any waste you produce does not escape
from your control. Waste must be transferred to an authorised registered or exempt waste carrier or waste
manager. It must be accompanied by a full description of the waste and a waste transfer note and be disposed of
lawfully.
Hazardous wastes, or special wastes in Scotland, such as oily wastes, acids, solvents and solvent-based products,
have particular legal requirements and their movement must be accompanied by a consignment note - reference
18. Everyone involved in the transfer of the waste, including us, must keep copies of the consignment notes for
proof of legal disposal.
If you are a hazardous waste producer located in England or Wales you must register with the Environment Agency
as a Hazardous Waste Producer. For further advice contact us on 08708 502 858 or go to our web site. There is no
such requirement in Northern Ireland or Scotland.
Find out how these waste regulations affect your site. Check the Guidance by Environmental Topic section of the
NetRegs website (in web site list) for information on waste legislation and how you can comply. In Scotland see
also reference 19.
Draw up a site waste management plan.
Site waste management plan checklist
Carry out a waste minimisation audit to identify where you can reduce the volume of waste you produce -
contact Envirowise for free advice, on 0800 585794 or using its website (see websites list below)
Reuse materials or use products that can be reused many times
Substitute materials for less hazardous ones e.g biodegradable lubricants and water based paints
Recycle waste where possible In England, Northern Ireland and Wales contact your local council or waste
contractor for recycling facilities. In Scotland in the first instance check the Waste Awareness website (www.
wasteawarebusiness.com) to identify waste recycling facilities in your area. Also contact your local council,
waste contractor, or the Scottish Industrial Symbiosis Programme (www.nisp.org.uk/)
Segregate different wastes for recycling, hazardous waste and general waste and label them. Do not mix or
dilute hazardous wastes
Store waste in suitable containers of sufficient capacity to avoid loss, overflow or spillage
Store waste in designated areas, isolated completely from surface water drains and areas which discharge
directly to the water environment.
Cover or enclose skips unless they are stored undercover or within a building.
Take waste off your site frequently; do not allow large quantities to accumulate.
PPG 5 page 13
8. Incident response
You should immediately report to us any incidents that have had or that could have had an environmental impact.
Use our hotline number 0800 80 70 60 to report all incidents.
Incidents include spillages (oils and chemicals), contaminated run-off, flooding, riverbed disturbance, damage to
underground services, damage to habitats, poor waste disposal and storage. If in doubt report it.
You should produce an Incident Response Plan as part of the environmental impact management of your work.
Include the following: -
list of key external and internal contacts
reporting procedures
site plan including drainage and location of storage/refuelling areas
list of stored materials
details of local environmental sensitivities, e.g. abstractors, high amenity areas and fish farms
location of spill equipment
procedures for spill containment and remediation
Train your staff and contractors in the use of spill equipment and how to manage and dispose of waste materials
legally.
If you are using oil and chemicals in close proximity to a watercourse, store a suitable spill kit or absorbent
materials nearby. Provide appropriate temporary storage for any oils and chemicals. Contain all spillages using
absorbents such as sand, soil or commercially available booms or pads and notify us immediately, using the
emergency hotline number above.
For full guidance on Incident Response planning use our PPG 21 - reference 9.
PPG 5 page 14
9. References
All the Pollution Prevention Guidance notes (PPGs) are available at:
- www.environment-agency.gov.uk/ppg
- www.sepa.org.uk/guidance/ppg
You can also order the Pollution Prevention Pays pack at the first of these sites.
1. The Water Environment (Controlled Activities) (Scotland) Regulations 2005 A Practical Guide. SEPA 2007
in SEPA website and in print version obtainable from SEPA.
2. Prevention of Pollution from Civil Engineering Contracts; Special Requirements (SG 31). SEPA 2006 - in
SEPA website.
3. Prevention of Pollution from Civil Engineering Contracts Guidelines for Special Requirements (SG-32).
SEPA 2006.
4. Environmental Impact Assessment: Guide to Procedures. Department for Communities and Local
Government. ISBN 0 72 772960 8
5. The Environmental Impact Assessment (Scotland) Regulations 1999, Circular 15/1999 in Scottish
Government website.
6. The SUDS Manual. CIRIA C697. ISBN 0 86017 697 5
7. Site Handbook for the Construction of SUDS. CIRIA C698. ISBN 0 86017 698 3.
8. Environmental Good Practice on Site. CIRIA C502 1999. ISBN 0 86017 502 2
9. PPG21: Pollution Incident Response Planning.
10. PPG 6: Working at Construction and Demolition sites.
11. Guidance note for the Control of Pollution (Oil Storage) (England) Regulations 2001 in Defra website and
in print.
12. Guidance note for the Water Environment (Oil Storage) (Scotland) Regulations2006 Scottish Government
in Scottish Government website and in print.
13. PPG2: Above Ground Oil Storage Tanks.
14. PPG26: Storage and Handling of Drums and Intermediate Bulk Containers.
15. Pollution Prevention Pays. Getting your Site Right Industrial and Commercial Pollution Prevention. in
Environment Agency website.
16. PPG 13: Vehicle Washing and Cleaning.
17 Waste Management, The Duty of Care, A Code of Practice (Revised 1996). The Stationary Office. ISBN 0
11- 753210X.
18. Hazardous Waste (England and Wales) Regulation 2005 Statutory
Instrument 2005 No 894. ISBN 0 110726 855
Hazardous Waste (Northern Ireland) Regulations 2005, SR 300. ISBN 0 33796 064 X
Special Waste Regulations 1996, SI972. ISBN 0 11 054565 6
Special Waste Amendment (Scotland) Regulations 2004, SSI 112. ISBN 0 11069 0303
PPG 5 page 15
19. The Small Environmental Guide for Construction Workers. SEPA and CIRIA 2006 in SEPA website and in
paper version obtainable from SEPA
Websites
Environment Agency: www.environment-agency.gov.uk
Environment and Heritage Service for Northern Ireland: www.ehsni.gov.uk
Scottish Environment Protection Agency: www.sepa.org.uk
Department for Environment Food and Rural Affairs: www.defra.gov.uk
Communities and Local Government (England and Wales): http://www.communities.gov.uk/
Scottish Government: http://www.scotland.gov.uk/
Envirowise: www.envirowise.gov.uk
NetRegs: www.netregs.gov.uk
Construction Industry Research and Information Association : www.ciria.org.uk
PPG 5 page 16
Our contact details
In England and Wales please contact your Local Development Control team through National Customer Contact
Centre (NCCC) on 08708 506 506 or at enquires@environment-agency.gov.uk for details on any of the topics
covered in this document.
Environment Agency
www.environment-agency.gov.uk
HEAD OFFICE
Rio House
Waterside Drive
Aztec West
Almondsbury
Bristol BS32 4UD
Tel: 01454 624 400
Fax: 01454 624 409
Scottish Environment Protection Agency
www.sepa.org.uk
CORPORATE OFFICE
Erskine Court
The Castle Business Park
Stirling FK9 4TR
Tel: 01786 457 700
Fax: 01786 446 885
Environment and Heritage Service
www.ehsni.gov.uk
HEAD OFFICE
17 Antrim Road
Lisburn
County Antrim BT28 3AL
Tel: 028 9262 3100
Fax: 028 9267 6054
Environment first: This publication is printed on paper made
from 100 per cent previously used waste. By-products from
making the pulp and paper are used for composting and fertiliser,
for making cement and for generating energy.
PMHO1107BNKG-E-E
These guidelines are intended to assist those in the construction and demolition industry with responsibility for managing the
environmental impact of their activities. Compliance with these should minimise the effect of the work on the environment.
The guidelines are jointly produced by the Environment Agency for England and Wales, the Scottish Environment Protection Agency
and the Environment and Heritage Service in Northern Ireland, referred to as the Agency or Agencies.
Sites are considered according to individual circumstances and early consultation with your local Agency office is advisable.
Contact details will be found at the end of these guidelines.
1. LEGAL FRAMEWORK
a. The Agencies are responsible for both the protection of controlled waters from pollution and for the
prevention of pollution of the environment, harm to human health and detriment to local amenity by
waste management activities under the Environmental Protection Act 1990.
Controlled waters include all watercourses, lakes, locks, coastal waters and water contained in
underground strata (or groundwater) and it is an offence to pollute such waters, either deliberately
or accidentally. In addition, the formal consent of the Agency is required for many discharges to
controlled waters, including both direct discharges and discharges to soakaways. Such consents are
granted subject to conditions and are not granted automatically.
b. All discharges to the public foul sewer require authorization by the sewerage undertaker and may be
subject to the terms and conditions of a trade effluent consent.
c. Any other waste produced on a construction site will be subject to the Duty of Care (Reference 1) under
the Environmental Protection Act 1990 and may also be subject to control under the Waste
Management Licensing Regulations 1994. In addition certain hazardous wastes are subject to the
Special Waste Regulations 1996. Separate legislation applies in Northern Ireland. Advice is available
from the Agencies.
2. INTRODUCTION
Most pollution incidents are avoidable. Careful planning can reduce the risk of pollution. Most of the
measures needed to prevent pollution cost very little, especially if they are included at the planning
stage. In contrast, the costs of cleaning up a pollution incident can be very high. Moreover, pollution
prevention and waste minimisation measures may offer substantial economic benefits. These include
reducing the need for expensive raw materials, fewer site accidents and a reduced risk of prosecution
for environmental offences. Introduction of pollution prevention measures is the first step, but for these
to be effective, managers must be committed and employees must understand why they are needed
and be suitably trained. Further guidance on the control of water pollution from construction sites
(Reference 2) and a video for use in training sessions is available (Reference 3).
Where a watercourse runs through or adjacent to a site, extra care will be needed, for example to
prevent waste from the site being deposited in the watercourse. Additional guidance for such sites is
available from the Agencies (PPG5 - Reference 4).
3. PLANNING AND PREPARATION
a. In planning and carrying out any works, precautions must be taken to ensure the complete protection
of watercourses and groundwater against pollution. These should include an investigation of past use
of the site to ensure that the operations will not disturb contaminated land and a survey of the siting
and contents of all storage tanks and pipelines. The Industry profiles published by DETR (Reference 5)
will assist in identifying potential contamination and ways to reduce their impact, based on former
industrial uses of the site. If there is any contaminated land on site, the Local Authority and local Agency
officer should be consulted on its remediation or disposal.
P O L L U T I O N
P R E V E N T I O N
G U I D E L I N E S
WORKING AT CONSTRUCTION
AND DEMOLITION SITES:
PPG6
b. Any underground services on the site should be identified and clearly marked before demolition or
construction work begins and precautions taken to prevent damage to them. Old storage tanks should
be checked and safely emptied before they are moved.
c. Arrange a site meeting with the local Agency officer before work commences. The advice given both
before work starts and during the operations may prevent serious problems arising.
d. Vandalism and theft are common causes of pollution. Sites should be adequately protected by secure
fences and locked access where possible.
4. SITE DRAINAGE
In developed areas it is likely that there will be two types of drainage from a site. It is recommended
that manholes on site are colour coded, for example using blue for surface water and red for foul.
a. Surf ace Wat er
The surface water drain is designed to carry uncontaminated rainwater directly to a local stream, river
or soakaway. In some cases this may be some distance from the site. Nothing which could cause
pollution, including silty water, should enter the surface water drains.
b. Foul Wat er
The foul water drain carries contaminated water to a sewage works for treatment before discharge to
a watercourse or soakaway. It may be possible to pump dirty water to a foul sewer, provided the
approval of the water undertaker has been received. Where no foul sewer is available, alternative
arrangements will be necessary for sewage disposal. See PPG4 - Reference 6.
5. DELIVERIES
Special care should be taken during deliveries, especially when fuels and hazardous materials are being
handled. Ensure that all deliveries are supervised by a responsible person, that storage tank levels are
checked before delivery to prevent overfilling and that the product is delivered to the correct tank. Put
in place a contingency plan and suitable materials to deal with any incident. Ensure that employees
know what to do in the event of a spillage. If properly dealt with, a spillage need not result in pollution.
6. STORAGE
Many of the materials used in construction operations, such as oil, chemicals, cement, lime, cleaning
materials and paint have the potential to cause serious pollution.
a. Fuel s, oi l s and chemi cal s
All fuel, oil and chemical storage must be sited on an impervious base within a bund and secured. The
base and bund walls must be impermeable to the material stored and of an adequate capacity. Detailed
guidelines concerning above ground oil storage tanks are available (PPG2 - Reference 7). Storage at or
above roof level should be avoided.
Leaking or empty oil drums must be removed from the site immediately and disposed of via a licensed
waste disposal contractor.
b. Secur i t y
All valves and trigger guns should be protected from vandalism and unauthorised interference and
should be turned off and securely locked when not in use. Any tanks or drums should be stored in a
secure container or compound, which should be kept locked when not in use. Bowsers should be
stored within site security compounds when not in use.
c. Marki ng
The contents of any tank should be clearly marked on the tank, and a notice displayed requiring that
valves and trigger guns be locked when not in use.
d. Removal
Before any tank is moved or perforated at the end of a contract or particularly during demolition works,
all contents and residues must be emptied by a competent operator (see 7c) for safe disposal. Pipes
may contain significant quantities of oil or chemicals, and should be carefully drained and then capped,
or valves closed, to prevent spillage.
7. WASTE MANAGEMENT
The correct handling, storage and disposal of waste materials is vital if environmental harm and public
complaint are to be avoided. Schemes which aim to minimise waste and increase recycling are not only
beneficial to the environment but can also reduce costs. The Duty of Care (Reference 1) requires waste
producers to ensure that waste does not escape from their control and is passed only to an authorised
person accompanied by a full written description.
Consider how noise and dust emissions can be minimised and do not burn waste on site, as this will
cause both pollution and annoyance to neighbours.
a. Wast e mi ni mi sat i on
Waste disposal is increasingly costly. Waste minimisation involves reducing the volume of waste
produced, reusing the material again (without reprocessing) or recycling (which involves an element
of reprocessing). All of these can bring benefits to the environment and significant savings in terms of
management time, wasted materials, transport and disposal charges and landfill tax. Further details
on waste minimisation for the construction industry will be found in References 8 & 9. Note that
concrete crushing plant may require authorisation from the local authority.
b. Wast e t reat ment and st orage
All wastes must be stored in designated areas which are isolated from surface drains. Under some
circumstances, for example if storing or treating material from a contaminated site, a waste management
licence may be required. Skips should be covered to prevent dust and litter being blown out and
rainwater accumulation and should be regularly inspected and replaced when full. Where possible,
separate skips should be provided so that wastes can be segregated for recycling or to prevent cross
contamination. Used chemical containers may need special handling and the manufacturers instructions
should be followed. If plant maintenance is carried out on site, used oil should be stored in a bunded
area for collection. Oil and fuel filters should also be stored in a designated bin in a bunded area for
separate collection and recycling (PPG8 - Reference 10). Used oil and filters are special waste - see 7c.
c. Wast e di sposal
Under the Duty of Care, the waste producer has a duty to ensure that the waste contractor who
removes the waste is registered with the Agency. A written description of the waste must be given to
the contractor. Certain hazardous wastes are defined as being special wastes and a more rigorous
consignment note system applies. If there is any doubt, contact the Agency for advice.
8. SILT
Water containing silt should never be pumped directly into a river, stream or surface water drain. Silty
water can arise from excavations, exposed ground, stockpiles, plant and wheel washing and site roads.
a. Excavat i ons
Where possible prevent water from entering excavations. Use cut-off ditches to prevent entry of surface
water and well point dewatering or cut-off walls for ground water. Use the corner of the excavation as
a pump sump and avoid disturbing that corner. Do not allow personnel or plant to disturb water in the
excavation.
b. Exposed ground and st ockpi l es
Minimise the amount of exposed ground and stockpiles. Stockpiles can be seeded or covered and silt
fences constructed from a suitable geotextile may be useful.
c. Pl ant and wheel washi ng
Wheel washes and plant washing facilities should be securely constructed with no overflow and the effluent
should be contained for proper treatment and disposal. A detailed guidance note on the use of pressure
washers is available (PPG13 - Reference 11).
d. Si t e roads
These should be regularly brushed or scraped and kept free from dust and mud deposits. In dry
weather dust suppression measures may be required.
e. Deal i ng wi t h si l t y wat er
Always ensure that adequate provision for dealing with silty water is included in the site working plan.
All discharges off the site will require approval. Where possible discharge to the foul sewer (see section
4b). Discharges to streams, watercourses or soakaways must have the approval of the Agency, which
should be obtained well in advance. (A discharge consent can take up to four months to obtain, or
even longer for difficult cases). Suitable treatment will be required, which could involve the use of a
settlement lagoon or tank or a grassed area.
E ME R G E N C Y H OT L I N E
0800 80 70 60
The 24-hour emergency hotline number for reporting all
environmental incidents relating to air, land and water in
England, Wales, Scotland and Northern Ireland.
ENVIRONMENT &
HERITAGE SERVICE
SCOTTISH
ENVIRONMENT
PROTECTION AGENCY
REGIONAL OFFICES
ANGLIAN
Kingfisher House
Goldhay Way
Orton Goldhay
Peterborough PE2 5ZR
Tel: 01733 371 811
Fax: 01733 231 840
MIDLANDS
Sapphire East
550 Streetsbrook Road
Solihull B91 1QT
Tel: 0121 711 2324
Fax: 0121 711 5824
NORTH EAST
Rivers House
21 Park Square South
Leeds LS1 2QG
Tel: 0113 244 0191
Fax: 0113 246 1889
NORTH WEST
Richard Fairclough House
Knutsford Road
Warrington WA4 1HG
Tel: 01925 653 999
Fax: 01925 415 961
HEAD OFFICE
Erskine Court
The Castle Business Park
Stirling FK9 4TR
Tel: 01786 457 700
Fax: 01786 446 885
World Wide Web: http: //www.sepa.org.uk
NORTH REGION HQ
Graesser House
Fodderty Way
Dingwall Business Park
Dingwall IV15 9XB
Tel: 01349 862 021
Fax: 01349 863 987
WEST REGION HQ
SEPA West
5 Redwood Crescent
Peel Park
East Kilbride G74 5PP
Tel: 01355 574 200
Fax: 01355 574 688
EAST REGION HQ
Clearwater House
Heriot-Watt Research Park
Avenue North
Riccarton
Edinburgh EH14 4AP
Tel: 0131 449 7296
Fax: 0131 449 7277
Calvert House,
23 Castle Place,
Belfast
BT1 1FY
Tel: 028 9025 4868
Fax: 028 9025 4777
ENVIRONMENT AGENCY
REGIONAL OFFICES
HEAD OFFICE
Rio House, Waterside Drive, , Aztec West
Almondsbury, Bristol BS32 4UD.
Tel: 01454 624 400 Fax: 01454 624 409
World Wide Web: http: //www.environment-agency.gov.uk
SOUTHERN
Guildbourne House
Chatsworth Road
Worthing
West Sussex BN11 1LD
Tel: 01903 832 000
Fax: 01903 821 832
SOUTH WEST
Manley House
Kestrel Way
Exeter EX2 7LQ
Tel: 01392 444 000
Fax: 01392 444 238
THAMES
Kings Meadow House
Kings Meadow Road
Reading RG1 8DQ
Tel: 0118 953 5000
Fax: 0118 950 0388
WELSH
Rivers House
St Mellons Business Park
St Mellons
Cardiff CF3 0EY
Tel: 029 2077 0088
Fax: 029 2079 8555
All the Agencies pollution prevention guidance notes are available on the web sites listed below.
Printed on Cyclus TCF Recycled Paper. HO-03/01-10K-C-AUDJ
9. REFUELLING
The risk of spilling of fuel is at its greatest during refuelling of plant. Where possible, refuel mobile plant
in a designated area, preferably on an impermeable surface and away from any drains or watercourses.
Keep a spill kit available. Never leave a vehicle unattended during refuelling or jam open a delivery
valve. Check hoses and valves regularly for signs of wear and ensure that they are turned off and
securely locked when not in use. Diesel pumps and similar equipment should be placed on drip trays
to collect minor spillages. These should be checked regularly and any accumulated oil removed for
disposal.
10. CONCRETE
Concrete is highly alkaline and corrosive and can have a devastating impact on watercourses. It is
essential to take particular care with all works involving concrete and cement especially if working near
a river, stream or surface water drain. Suitable provision should be made for the washing out of
concrete mixing plant or ready mix concrete lorries. Such washings must not be allowed to flow into
any drain or watercourse.
11. EMERGENCIES
In the event of a spillage on site, the material should be contained (using an absorbent material such
as sand or soil or commercially available booms) and the Agency notified immediately using the
emergency hotline number listed at the end of this guidance.
12. REFERENCES
1. Waste Management- The Duty of Care - A code of practice (revised 1996).
ISBN 0-11-753210-X: The Stationery Office: Telephone 08706 005522
2. Building a cleaner future training video pack: CIRIA/Environment Agency Price 50.
To order, telephone 08487 337700
3. Control of pollution from construction sites: C532
4. PPG5: Working in or near rivers
5. DETR Industry Profiles: DETR Publications Sales Centre, Telephone 01709 891318
6. PPG4: Disposal of sewage where no mains drainage is available
7. PPG2: Above ground oil storage tanks
8. Waste Minimisation and Recycling in Construction - A site handbook: SP133
9. Managing materials and components on site: SP146
References 3, 8 and 9 are published by CIRIA (Construction Industry Research and Information
Association) Telephone 020 7222 8891
10. PPG8: Safe storage and disposal of used oils
11. PPG13: High pressure water and steam cleaners
References 3,5,6,9 & 10 are available free of charge, from the Agencies
Pollution Prevention Guidelines
Safe Storage and disposal of used oils: PPG8
These guidelines are intended to help everyone that handles used oils from people carrying out a single engine oil change to large
industrial users. They are jointly produced by the Environment Agency for England and Wales, the Scottish Environment Protection
Agency and the Environment and Heritage Service in Northern Ireland, referred to here as the Agency or Agencies. Compliance
with these guidelines will help to reduce the risk of oil pollution of surface waters, groundwater, sewers and drains.
Many sites where waste oil is stored are regulated under the Pollution Prevention and Control Regulations (Reference 1), collectively
described in this guidance as the PPC Regulations, and the Waste Management Licensing Regulations (Reference 2). These
Regulations cover the storage of waste mineral oils and are intended to protect the whole environment. There may be additional
requirements under these Regulations that are not mentioned in this guidance. You should check with your local Agency office for
further pollution prevention measures.
In England, the storage of waste oils (except waste mineral-based oils) is covered by the Control of Pollution (Oil Storage) (England)
Regulations 2001. These Regulations are made under the Water Resources Act 1991 and are intended to protect the water
environment. Highlighted text in these guidelines indicates areas that must be complied with under these Regulations.
Similar regulations are expected to be introduced in Scotland during 2004 and may follow in Wales and Northern Ireland. Further
advice may be obtained from your local Agency office. Contact details can be found at the end of these guidelines.
Environmental Alliance working together
PPG8
February 2004
Under the Environmental Protection Act 1990
1
and the PPC Regulations, the Agencies are responsible for
protecting controlled waters from pollution and for preventing pollution of the environment and harm to
human health from waste management activities. Controlled waters include all watercourses, canals, lakes,
lochs, coastal waters and water contained in underground strata (groundwater). Under the Duty of Care
(see Reference 3), those responsible for waste must keep it safely and prevent its illegal disposal by others.
A waste minimisation review will help you save money on raw materials and waste disposal costs. Further
advice on waste minimisation and initiatives in your area can be obtained from your local Agency office. Free
independent information on waste minimisation including publications, events, site visits and specific
advice is available from Envirowise. Visit the Envirowise website at www.envirowise.gov.uk or call the
Environment and Energy Helpline on 0800 585794.
The Oil Care Campaign provides information about the safe delivery, use, management and disposal of oils.
Further information can be obtained by contacting your local Agency office or by visiting the websites given
at the end of this document.
Oil is a highly visible form of pollution. It harms plants and animals, damages rivers, groundwaters and the
soil, and can destroy natural habitats and drinking water supplies. It is the most commonly reported type of
water pollution and causes over 16% of all pollution incidents annually.
Careless disposal of oil into drainage systems, onto land or to watercourses or groundwaters is an offence,
and the person responsible may be prosecuted and fined if found guilty. Because of the way it spreads, even
a small quantity of oil can cause a lot of harm, 10 litres of oil can completely cover the surface of a one-
hectare lake.
Cleaning up oil pollution can be expensive and the Agencies have the power to recover the cost from the
polluter. Used oil may have other hazardous properties; for example, used engine oil is classified as
carcinogenic and should be handled and stored with care. Yet, with proper procedures and good practice
many of the oil pollution incidents can easily be avoided.
Do not tip oil into any drains or onto land as this will result in the pollution of rivers and groundwater
or cause land contamination. Do not burn waste oil on a bonfire as this pollutes the air.
1
The Waste and Contaminated Land (Northern Ireland) Order 1997 in Northern Ireland
1. General
2. Oil in the environment
Engine oil
Used oils such as engine and gearbox oil from vehicle or machine maintenance may be derived from either
mineral or synthetic sources. Take these oils to an oil bank for recycling. Oil banks can be found at most civic
amenity sites. For the location of your nearest oil bank, contact the Oil Bank Helpline on freephone 0800
663366 or visit www.oilbankline.org.uk for information. Alternatively, contact your local authority recycling
officer who should be able to tell you. Do not mix used oil with other substances such as white spirit, paint or
solvents, as this makes recycling extremely difficult.
Vegetable oil
Used household oil can be disposed of in the general household waste. Oils and fats should be allowed to
cool before being put into the bin. They can be soaked into normal household rubbish or put into rigid
plastic containers. Alternatively, small amounts of vegetable cooking oil or animal fat can be used to prepare
food for birds by soaking or frying pieces of bread in the used oil.
Some civic amenity sites have facilities for the collection of vegetable oil. Contact your local authority
recycling officer for details.
Used vegetable oils must not be put into ordinary oil recycling banks at most sites as this makes the
entire contents of the oil bank non-recyclable.
Used mineral oil from commercial and industrial sources will be classified as hazardous waste and may also
be special waste under the Special Waste Regulations (Reference 4), which impose additional specific legal
requirements for its movement, recovery and disposal. Movement of the waste must be accompanied by a
consignment note a copy of which must be kept by everyone involved in the transfer, including the
Agencies; further guidance is given in A guide to the Special Waste Regulations 1996 (Reference 5).
The Special Waste Regulations are due to be replaced to fully implement the Hazardous Waste Directive
(91/689/EEC) in the UK. This will, amongst other things, extend the range of wastes defined as hazardous. It
is important to note that many wastes, which are not currently classed as special, may however be
hazardous. The new definition of hazardous waste already applies to certain legislation including the Duty of
Care (Reference 6), the Landfill Regulations (Reference 7) and the PPC Regulations (Reference 1). For the
Duty of Care, any waste must additionally be described in a transfer note by reference to the appropriate
code or category in the European Waste Catalogue.
Seek advice on the management of oil waste and wastes containing oils from specialist contractors or from
your local Agency office. Alternatively visit the NetRegs website (www.netregs.co.uk).
Industrial oil
Used oil is a useful substance that, when recovered, can be used as a fuel and save resources; it should be
treated as such. Larger quantities of used oil such as hydraulic fluid or lubricants from lorries, buses or
mechanical plant should be stored securely to await collection by a registered waste carrier. There are
specialist companies that will collect used cutting oils, and then treat and recover the oil. Emulsified cutting
oils are highly polluting in water and great care should be taken in their disposal; contact a specialist
contractor for advice.
Vegetable oil
Cooking oils from commercial users, such as caterers and fish and chip shops, must not be disposed of with
the general waste stream. The waste oils are not hazardous or special waste, but are subject to the Duty of
Care. These waste oils can be collected by specialist contractors.
Used vegetable oil must not be disposed of to the surface water drain and may not be discharged to the foul
sewer without the prior approval of the sewer provider.
Garages and workshops
Sites such as garages can generate large quantities of used oil. This oil can be collected by a registered waste
carrier or, as an alternative in England and Wales, it may be feasible to use it as a fuel for space heating. This
will require adequate storage to balance the supply with seasonal demands and will require an appropriate
burner. Such installations require authorisation from the local authority. Further information on handling
wastes from garages is given in PPG19 (Reference 8).
Transformers
Electrical transformers may use specialist oil. When spent, used transformer oil is a hazardous waste. Older
transformers are likely to contain polychlorinated biphenyls (PCBs), a harmful toxin that persists in the
environment. If PCBs are present, the transformer oil is also likely to be classified as special waste and will
require a consignment note for its movement. Seek advice on the disposal of transformer oil from specialist
waste contractors.
3. Disposing of domestic
used oil
a.
b.
4. Disposing of commercial
and industrial used oil
a.
b.
c.
d.
In all cases, care must be taken to avoid spillage when transferring waste oil to storage facilities. Any spills
should be dealt with using absorbent materials. The Agencies recommend that waste oil tanks and
pipework are installed above ground whenever possible. This enables regular maintenance checks to be
carried out more easily and leaks to be identified earlier.
Above ground storage
In England, the above ground storage of oils (excluding waste mineral oils) in containers over 200 litres is
covered by the Control of Pollution (Oil Storage) (England) Regulations 2001. These Regulations include the
storage of waste synthetic and vegetable oils. Similar regulations are expected to follow in the rest of the UK.
Guidelines for above ground oil storage tanks are given in PPG2 (Reference 9) and guidelines for oil stored in
drums or intermediate bulk containers (IBCs) in PPG26 (Reference 10).
Storage or treatment of waste oils may be subject to the PPC Regulations. For further information in England
and Wales, see Reference 11. In Scotland, contact you local Agency office. Storage of waste mineral oils is
covered by exemptions under the Waste Management Licensing Regulations 1994 (as amended). These
allow oil to be stored without a licence if the container does not exceed 3,000 litres and is able to prevent oil
escaping to the ground or a drain. Further details are given in Reference 3.
Regardless of whether they are covered by the legislation described above, all oil storage facilities should be
sited on an impervious base within an oil-tight secondary containment system such as a bund. The bund
walls should be constructed without a damp-proof course or drainage outlet from the bund itself. As a
minimum, the bund should be capable of containing 110% of the volume of the oil container. Where more
than one container is stored, the bund capacity should be at least 110% of the largest tank or 25% of the
total storage capacity, whichever is the greater. Fill pipes, funnels, draw pipes and sight gauges should be
enclosed within the secondary containment system, and any tank vent pipe should be directed downwards
into it.
Removal of bund waste
Where oil is stored within a bunded area, rainwater and oil residues can build up. This build-up reduces the
storage capacity of the bund and should be removed regularly by bailing from the sump or using a manually
operated pump. This residue is likely to be contaminated with oil and, as such, may be hazardous waste and
may also be classified as special waste. Where classified as special waste, it must be consigned under the
Special Waste Regulations as described in Section 4. It is often cheaper in the long term to provide a roof for
the storage facility to prevent the accumulation of rainwater.
Underground tanks and pipes
The storage of used oils below ground is primarily covered by the Groundwater Regulations 1998 and
accompanying Groundwater Protection Codes (Reference 12). These documents should be consulted
whenever an underground facility is present or planned. It is good practice to provide underground oil
storage facilities with measures to protect them against damage and corrosion such as a double-skin tank,
double-wall piping or laying pipework in a conduit. Regular inspection and testing is vital to identify and
repair any damage or leaks.
When underground waste oil storage is used or proposed, it is essential that the local environmental risks
around the site are taken into account. This may affect the engineering or operational requirements
necessary to reduce the chance of leaks or to identify them. Factors to consider include the local
groundwater vulnerability, the proximity of water abstraction points (Source Protection Zones), and the age
and storage capacity of any facility. Further information about local environmental factors is available on the
Agencies websites or from your local Agency office. Further information on storage and leak detection
systems is given in PPG13 (Reference 13), Reference 14 and PPG7 (Reference 15)
Oily water waste
Water contaminated with oil, such as that found in an interceptor or inside a bund wall, is hazardous waste
and, unless the concentration of oil is very low, may need to be classified as special. Such waste will need to
be dealt with by a specialise contractor and again will need to be accompanied by a consignment note.
Immediate action
If you store or use any oil, you should consider the risks of a spillage and prepare a Pollution Response
Emergency Plan (see PPG21; Reference 16). Keep a stock of absorbent materials (e.g. sand, earth or
commercial products) on site to deal with spillages and train staff in their use.
If there is a spill, immediate action should be taken to contain the oil to prevent it entering any drains,
watercourses, unmade ground or porous surfaces. Notify the Agencies by calling the Emergency Hotline on
0800 80 70 60. Do not hose the spillage down or use any detergents.
Used oil absorbents
Where absorbents, (e.g. sand, oil pads or booms) have been used to absorb a leak or contain a spill, the
contaminated waste absorbent is likely to be classified as hazardous waste. It may also be special waste if it
has been used to absorb an oil that is itself classified as special. These wastes must be disposed of at a suitably
authorised waste management facility.
5. Waste oil storage and
pipelines
a
b.
c.
d.
6. Dealing with spills
a.
b.
Pollution Prevention Guidance notes (PPGs) are available to download from the Agencies
websites, see details below.
Environment Agency
www.environment-agency.gov.uk
Scottish Environment
Protection Agency
www.sepa.org.uk
Environment and
Heritage Service
www.ehsni.gov.uk
HEAD OFFICE
Rio House
Waterside Drive
Aztec West
Almondsbury
Bristol BS32 4UD
Tel: 01454 624 400
Fax: 01454 624 409
CORPORATE OFFICE
Erskine Court
The Castle Business Park
Stirling FK9 4TR
Tel: 01786 457 700
Fax: 01786 461 425
HEAD OFFICE
Calvert House
23 Castle Place
Belfast BT1 1FY
Tel: 028 9025 4868
Fax: 028 9025 4777
The 24-hour emergency hotline number
for reporting all environmental incidents
relating to air, land and water in England,
Wales, Scotland and Northern Ireland
Environmental Alliance working together HO-03/04-10K-BHTN-AMP-EP146D
Pollution Prevention and Control (England and Wales) Regulations 2000
Pollution Prevention and Control (Scotland) Regulations 2000
Pollution Prevention and Control Regulations (Northern Ireland) 2003
Waste Management Licensing Regulations 1994 (apply in England, Wales and Scotland)
Waste Management Licensing Regulations (Northern Ireland) 2003
Waste Management, the Duty of Care, a code of practice (revised 1996). ISBN 0-11-753210X. The
Stationery Office. Tel: 0870 6005 522 (see also www.defra.gov.uk/environment/waste/management/doc/)
Special Waste Regulations 1996 (as amended) (apply in England, Wales and Scotland)
Special Waste Regulations (Northern Ireland) 1998
A guide to the Special Waste Regulations 1996
Environment Protection (Duty of Care) Regulations 1991 (apply in England, Wales and Scotland)
Controlled Waste (Duty of Care) Regulations (Northern Ireland) 2002
Landfill (England and Wales) Regulations 2002
Landfill (Scotland) Regulations 2003
Landfill Regulations (Northern Ireland) 2003
PPG19: Garages and vehicle service centres
PPG2: Above ground oil storage tanks.
PPG26: Storage and handling of drums and intermediate bulk containers
Interpretation of Schedule 1 to the PPC Regulations. Environment Agency IPPC Regulatory Guidance
Series No. 4
Groundwater Protection Code: petrol stations and other fuel dispensing facilities involving underground
storage tanks. Department for Environment, Food and Rural Affairs (DEFRA). Tel: 0870 1226 236 or
http://www.defra.gov.uk/environment/water/quality/oilstore/index.htm
Underground storage tanks for liquid hydrocarbons: code of practice for the owners and operators of
underground storage tanks (and pipelines). Scottish Executive Environment Group Paper 2003/27. Tel:
0131 556 8400 or www.scotland.gov.uk/publications
PPG 27: Installation, decommissioning and removal of underground storage tanks
Wetstock reconciliation at fuel storage facilities
PPG 7 Refuelling facilities (an update is planned for June 2004)
PPG21 Pollution incident response planning
References 5, 811 and 1316 are available from the Agencies.
References 1, 2, 4, 6 and 7 are available from The Stationery Office (Tel: 0870 600 5522) or visit
www.legislation.hmso.gov.uk
Oil Care Campaign contact details:
England and Wales Scotland Northern Ireland
www.environment-agency.gov.uk/oilcare www.oilcare.org please use Environment Agency website
7. References 1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
8. Additional information
PPG 13 page 1
PPG13
July 2007
Environment Alliance - working together
pollution prevention guidelines
Vehicle washing and cleaning: PPG13
These guidelines are jointly produced by the Environment Agency for England and Wales, the Scottish
Environment Protection Agency, and the Environment and Heritage Service for Northern Ireland (referred to
here as we or us).
Following this good practice guidance doesnt remove your responsibility to comply with the law and prevent
pollution from your activities. Causing or allowing pollution is a criminal offence; compliance with this or
any guidance isnt a defence. You should make sure that the references to other sources of guidance are still
current; use updated guidance if it exists.
This guidance covers vehicle washing and cleaning by all methods, including:
automatic wash systems
washing by hand
using high pressure or steam cleaners
at all sites including:
retail premises
business and industrial premises
public and private car parks
former petrol filling stations
This guidance also applies to washing and cleaning plant, machinery, equipment and boats as the principles
are generally the same. It doesnt cover household activities but our good practice advice would be to use a
commercial facility (car wash) that re-uses water, or hand wash with a bucketful of water and a sponge without
using detergent, traffic film removers, degreasants or other proprietary cleaners. We discourage the use of
hose-pipes or high pressure cleaners for car washing at home. Contact us if you need further advice.
Following this guidance will help you plan and deal with liquid and solid waste, reduce the risk of causing
pollution, and, by using water wisely, could save you money.
1. Introduction
Effluent and run-off from vehicle washing and cleaning activities can damage the environment and pollute rivers,
streams, burns and groundwater. Dirt, brake dust, traffic film residue and oil that is washed off are all pollutants.
The cleaning agents you use (including those labelled biodegradable or traffic film removers) are very poisonous to
river life. If you cause pollution, you are breaking the law and spoiling your environment.
Dirty water or run-off from vehicle washing and cleaning carried out as a business or industrial activity is called
trade effluent. Whether youre cleaning just one vehicle or responsible for a large lorry fleet, you must arrange for
collection and disposal of effluent to prevent pollution. Its illegal to discharge trade effluent to the environment or
into drains without permission.
PPG 13 page 2
1.1 Find out about drainage systems and get a drainage plan
Understanding your drainage system is the key to preventing pollution. Most areas have what is known as a
separate drainage system where there are two types of drain:
Surface water or clean water drains should only carry uncontaminated rainwater; they lead directly to
ditches, streams, burns, rivers and soakaways. Roof water, car park, road and some yard drainage is
usually connected to the surface water drainage system
Foul water drains carry contaminated water (sewage and/or trade effluent) safely to a sewage
treatment facility, which is either owned privately or by the local sewage treatment provider. Any
system designed to carry foul water is called a foul water drainage system
Drains (surface water and foul) are also known as sewers. Your local sewer provider is the organisation with the
legal responsibility to provide public sewerage and sewage treatment facilities in your area. Drains owned by the
local sewer provider are known as mains drainage, main sewers or public sewerage systems.
Older, urban areas might have a combined drainage system that has one drain, carrying both foul and surface
water to a sewage treatment facility.
Techniques called sustainable drainage systems (SUDS) are now used as a better way of dealing with surface
water run-off, rather than using piped outfalls to rivers, streams or burns. In Scotland, the use of SUDS is a legal
requirement for surface water disposal. These systems must be protected from contamination in the same way as
piped surface water drainage systems. See reference 1 for more information on SUDS.
To prevent pollution, dont allow washing or cleaning effluent, runoff or cleaning chemicals to enter oil separators,
drains or gullies connected to the surface water drainage system. You need to have a good, up-to-date drainage
plan of your whole site, including areas where vehicle washing and cleaning will take place. If you dont have a
plan, you cant be sure that drainage is connected to the right system. If there is no in-house expertise to do this,
use a reputable drainage consultant or consulting engineering company.
In Scotland, General Binding Rules (GBRs) apply to discharges into surface water drainage systems. See reference
2. Under the GBRs:
trade effluent mustnt be discharged into any surface water drainage system; and
detergents or other pollutants mustnt be disposed of into , or onto surfaces that drain into, any
surface water drainage system
1.2 Protecting our groundwater supplies
In some parts of the UK, over 70% of the drinking water is supplied from natural underground reservoirs in
porous rocks, called aquifers. Cleaning up groundwater is difficult and very expensive so you must protect it from
pollution. Never carry out washing or cleaning on unmade ground or other porous surfaces where run-off could
soak down through the soil and pollute valuable groundwater resources, always check with your local office for
advice.
In some very sensitive groundwater areas, we might ask for more stringent pollution prevention measures than
those detailed in this guidance note. In some cases, this might mean we wont allow this activity to take place at
all.
1.3 General advice on drainage, trade effluent, environmental legislation and good practice
For more general information on drainage, trade effluent and good environmental practices see reference 3. The
NetRegs website has information about the environmental regulations you must comply with, and good practice
recommendations that you should follow, for trade effluent, preventing water pollution, efficient water use and
other relevant topics. See reference 4.
PPG 13 page 3
2. What kind of vehicle washing and cleaning are you doing?
Think about what youre doing and the best way to manage your cleaning activity and any effluent.
Are you:
washing and cleaning your own business vehicles and plant on your own premises?
What do you need to wash or clean, and where? If you use a vehicle cleaning business or contractor
to work on your site, its your responsibility to provide appropriate facilities such as those detailed in
section 3. Using washing equipment that re-uses water might be more cost effective, as would using a
nearby commercial wash facility.
allowing washing and cleaning to be carried out for commercial gain by someone else on
land or premises that you own?
Are you giving clear instructions about where and how the washing and cleaning is to be carried out and
how solid and liquid waste should be dealt with? Have you provided appropriate facilities? As a
landowner or landlord, you are responsible for:
trade effluent and surface water discharges
pollution caused by site contractors, service providers and tenants. You must provide good
environmental practices and guidelines and make sure that site operators follow them; see section
3, 4 and 5. If you allow washing and cleaning to take place in an unsuitable area, you might be
prosecuted for permitting pollution
washing and cleaning vehicles as your business?
Where and how will you carry out your business? If you offer an on-site vehicle washing and cleaning
service (including franchises), you must use a designated washing area that has proper drainage
arrangements if run-off is produced from your activities; see section 3. If there isnt a designated
area, your activities might cause pollution and you will be responsible even though you dont own the
site. If your business involves washing cars by hand see section 4. What solid wastes will you produce
and what arrangements have you made for its correct disposal? See section 5.
3. Requirements for all vehicle washing and cleaning activities
Activities that produce run-off from the vehicle onto the ground and use cleaning and valeting products should
be carried out in areas that are clearly marked and isolated from surface water drainage systems, unmade ground
and porous surfaces. These areas are called designated washing bays.
A designated washing bay should be designed so that run-off is:
isolated using channels, gullies, gradient (fall on the surface) and kerbs
directed to a silt trap or settlement tank to remove larger particles of silt and sediment
either collected in a sealed system for reuse, discharged to the public foul sewer with prior permission
of the local sewer provider or collected in a sealed system for authorised disposal
You should also:
have procedures for everyone, including contractors, that cover where and how vehicle washing and
cleaning should be carried out and what to do in a spillage emergency
provide notices for designated washing bays saying what theyre for and that washing and cleaning
should only be carried out in the bay
consider whether a fence or barrier is required to prevent spray or wind drift out of the designated area
have procedures and equipment which minimises water use and solid waste production
PPG 13 page 4
3.1 Reduce, reuse and recycle resource efficiency and waste minimisation
You should consider ways to reduce the volume of water you use for washing and cleaning, and the amount of
liquid and solid waste you produce. Recycling effluent and reusing the water is the best environmental option for
dealing with vehicle washing and cleaning effluent. Use washing equipment that has a collection and re-use or re-
circulation process. These systems usually require regular, off-site removal of some water, silt or sludge so waste
management licensing legislation will apply; see section 3.2 and 5
A waste minimisation review will help you save money on raw materials and waste disposal costs. Free,
independent and practical advice on how to minimise waste is available from Envirowise; this includes free
publications, events, site visits and waste reviews. See reference 5.
3.2 Connecting and discharging to a public foul sewer
If recycling and reuse isnt possible, discharging all the vehicle washing and cleaning effluent to a public
foul sewer is generally the next best environmental option as the effluent is carried to a purpose-built and
closely monitored sewage treatment plant. You need permission from your local sewer provider to discharge
vehicle washing and cleaning effluent to a public foul sewer. Permission (a consent or agreement) isnt given
automatically so you must talk to your sewer provider before you make any connection or discharge. If you dont
have their consent, youre breaking the law. See reference 6 to find your local sewer provider.
Youre likely to pay for this discharge; the amount depends on volume and chemical composition. You should give
your local sewer provider an accurate site drainage plan to support your proposals. You might have to cover your
designated washing bay to prevent clean rainwater adding to the volume of effluent. You might also be required to
provide an oil separator for the discharge.
3.3 What happens if a public foul sewer isnt available?
If you cant recycle water or connect to a suitable public foul sewer, youll have to consider these options:
carry out washing and cleaning activities on another site that does have proper facilities
collect all the effluent in a sealed system for off-site removal as a liquid waste. Waste management
licensing legislation will apply; see section 5
install your own trade effluent treatment system. The system must be designed, manufactured
and installed to treat washing effluent to a good enough quality to discharge to the environment (to
land or watercourse) or to a private surface water sewer. You need our permission (a consent or
authorisation) for this and an annual charge is payable. We dont give permission automatically so
you must talk to us before you buy any equipment or make any connection or discharge. A discharge of
treated effluent to a public surface water sewer needs the prior permission of the local sewer provider,
which may not be given in some areas. A suitably designed and installed sustainable drainage
solution, such as a reedbed, might be an acceptable, cost effective alternative. See reference 7 for
more information
3.4 Using and storing cleaning chemicals
Only use biodegradable washing and cleaning products. This will help treatment processes when
effluent is discharged to the foul sewer
Follow the manufacturers environmental and health & safety information, such as for the COSHH
(Control of Substances Hazardous to Health) Regulations
Use non-corrosive products. Corrosive products, such as traffic film remover, can damage paintwork,
metal surfaces, ground coverings and drains
Store all detergents, emulsifiers and other cleaning agents in suitable bunded or containment
facilities, within a locked storage area or building away from any surface water drains
Only use the minimum amount needed for a job diluted to the appropriate working strength. Never
use undiluted concentrates
Prepare working strength solutions in the storage area, never in areas that drain to the surface water
system
PPG 13 page 5
3.5 Dealing with spillages of cleaning chemicals
Produce a spillage response plan; test and use it (see reference 8)
Deal with all spillages immediately; follow the manufacturers health and safety advice
Keep suitable spill kits where cleaning chemicals are stored and used, and make sure everyone knows
how to use them. Make sure kits are replenished after use
Stop spillages from entering drains, channels, gullies, watercourses and unmade ground. Use
proprietary sorbent materials, sand or drain mats
Make sure your spillage response plan includes information about how to recover, handle and correctly
dispose of all waste produced from a spillage. Make sure you deal with all waste safely and legally
(see section 5)
Tell us immediately if you have a pollution emergency using the free emergency hotline number
0800 807060
See reference 8 for more information on storage, training and emergencies.
4. Good practice for different washing and cleaning methods
4.1 High pressure washers (jet washers) and steam cleaning
High pressure washers (including jet washers) and steam cleaners are effective at removing dirt, grease and
coatings from vehicles, machinery and surfaces. But they use large volumes of water (500 7,200 litres an hour),
often at high temperatures and containing cleaning chemicals. If you are cleaning vehicles and plant with a high-
pressure washer (jet wash) or steam cleaner, you must use a designated washing bay.
If you use a pressure washer to clean roads, yard surfaces, other equipment or in areas where the drainage isnt
collected or connected to the foul sewer, you must stop run-off from entering surface water drains. See section 3
for good practice advice for dealing with this runoff. Never allow run-off containing cleaning chemicals, detergents
or emulsifiers to enter surface water drains as this will cause pollution and prevent oil separators from working
properly. See reference 9 for more information.
4.2 Washing and valeting by hand
If you wash, clean or valet vehicles by hand, or are responsible for a site where this service is offered, you must
have good site management procedures and practices in place to avoid pollution. You should use designated
wash bays as detailed in section 3, or make sure that you have other satisfactory arrangements in place.
However, it may be acceptable to clean or valet private cars by hand in areas such as car parks, without designated
wash bays (roving activities), if:
only clean water is used and no detergents or cleaning chemicals
or your working method doesnt produce any runoff from the vehicle
or the runoff from the vehicle is contained, collected or treated in some way and dealt with or disposed
of legally
and you can show us that the proposed activity will not adversely affect separators and SUDS, or
damage the environment at any time
Remember that in Scotland, General Binding Rules (GBRs) prohibit the discharge of trade effluent and detergents
to surface water drains. In England, Northern Ireland and Wales, we (or the sewer provider) may not allow roving
hand car washing (as described above) to take place because of the environmental sensitivity of the site or other
factors which makes the activity likely to cause environmental harm. You are advised to contact us before you
set up or start a roving washing operation to find out if your proposals are acceptable from an environmental
protection point of view. If you dont you could make costly mistakes.
PPG 13 page 6
If we do agree (in England, Northern Ireland and Wales) to roving activities (as described above), you must also
have:
clear, well understood procedures
good working practices
close management control at all times
and:
only use the minimum amount of water
never use hoses or high pressure washers
dont carry out roving activities where dirty water or other runoff could enter or be washed by rain into
surface water drains
make sure that buckets and containers of dirty water/effluent are emptied into clearly marked and
agreed points connected to the foul sewer. This water is also a trade effluent and you need permission
from the local sewer provider to dispose to a public foul sewer; see section 3.3 and 3.4
and, where you are producing no noticeable runoff from the vehicle or collecting it in some way:
apply the minimum amount of cleaning product and ensure no spray drift
use cleaning and valeting chemicals diluted to appropriate working strengths; never use undiluted
concentrates
dont use products that are unsuitable for hand washing, e.g. commercial traffic film remover
Please note washing very dirty vehicles, commercial vehicles or engine compartments by hand must only be
carried out in designated wash bays.
4.3 Automatic vehicle washing systems
These systems use a variety of techniques but generally involve the use of water jets and rotating brushes, and
they often have a drying facility. Its possible to get systems which filter, re-circulate and re-use most of the water
but they still require a connection to the foul sewer for overflow and filter backwash water. As with all discharges
to the public foul sewer, this would be regarded as a trade effluent and its disposal requires permission from
the local sewer provider. If no foul sewer is available, youll have to consider the options in section 3.3. Waste
management legislation applies to the disposal of solid trade waste, silt and sump sludge from these systems.
See section 5.
4.4 Cleaning platforms
In this system, a vehicle is driven onto a mobile or static cleaning platform, which has an integral containment
sump for holding wash water. Cleaning chemicals are sprayed or applied by hand onto the vehicle, which is
then sponged and wiped dry. The wash water is either discharged to a foul drain or settled and passed through
a series of filters and tanks where its cleaned and then circulated for re-use. When using this system, you must
contain wash water and cleaning chemicals to prevent them entering surface water drains. Waste management
legislation applies to the disposal of solid trade waste, silt and sump sludge. See section 5.
4.5 Cleaning methods that dont use water
Technologies for hand washing that dont use water on site have been developed. Vehicles are sprayed with a
product which cleans the surface and applies a polish in one application. Towels and micro-fibre materials are
used to remove dirt and polish the vehicle. Used towelling is machine washed off site.
Providing no liquid effluent or application spray drift is produced, this method is unlikely to cause water pollution
on site. The cleaning agent must be used as intended and stored safely. You must follow the requirements for
general hand washing in section 4.2 where appropriate and consider how you will prevent spray drift from landing
on hard surfaces draining to surface water drains. Waste management legislation applies to the storage and
disposal of solid trade waste, such as used polishing cloths and empty containers. See section 5.
PPG 13 page 7
You must follow the manufacturers recommendations for handling and using these products including the need to
use appropriate personal protective equipment.
5. Waste management and your legal duty of care
Waste produced from vehicle washing and cleaning businesses can include, for example, water contaminated with
oil, detergents or silt; silt, sludge, empty containers, product packaging, washing and polishing materials such as
cloths.
There are strict legal requirements for the storage, movement and disposal of business waste. You have a duty of
care to make sure that any waste you produce:
does not escape from your control
is transferred only to a registered waste carrier for recycling or disposal at a suitably licensed facility
is accompanied by a transfer note with a full description of what it is
is disposed of lawfully
Disposing of hazardous waste (such as oily wastes, acids, solvents and solvent-based products) has stricter
requirements. You must find out if any of the waste you produce is classified as hazardous or, in Scotland, special
waste; if it is, and you are in England, Northern Ireland or Wales, you must register with us. The NetRegs website
(reference 4) explains how to comply with waste legislation. Alternatively, contact us for advice or visit our
websites.
Useful References
1. Sustainable drainage systems (SUDS) an introduction - for England and Wales; download or order from
www.environment-agency.gov.uk/suds which has other useful information.
SUDS Setting the scene in Scotland, from: www.sepa.org.uk/publications/leaflets/suds/index.htm
More UK wide information and publications can be obtained from CIRIA, the Construction Information and
Research Association at www.ciria.org/suds
2. The Water Environment (Controlled Activities) (Scotland) Regulations 2005, download from:
www.sepa.org.uk/wfd/regimes/index.htm
3. Pollution prevention pays, getting your site right industrial and commercial pollution prevention;
download or order from www.environment-agency.gov.uk/ppg
4. NetRegs website - www.netregs.gov.uk - provides free information on environmental regulations that
small and medium sized businesses have to comply with, and relevant good practice. Visit the Water and
Waste sections of NetRegs Guidance by Environmental Topic to obtain more information on the issues
mentioned in this PPG.
5. Envirowise www.envirowise.gov.uk or call the Environment and Energy Helpline on 0800 585794. Ask
for your free copy of IT 313 Waste Wise - Increased Profits at Your Fingertips. This is an interactive CD-Rom
with all the information you need to minimise waste and save money.
6. Water UK the industry association representing all UK water and wastewater service suppliers.
www.water.org.uk/home/resources-and-links/links/water-operators/sewerage-operators
PPG 13 page 8
Would you like to find out more about us, or about your environment?
Then call us on incident hotline floodline
08708 506 506 (Mon-Fri 8-6) 0800 80 70 60 (24hrs) 0845 988 1188
Environment first: This publication is printed on paper made
from 100 per cent previously used waste. By-products from
making the pulp and paper are used for composting and fertiliser,
for making cement and for generating energy.
Environment Agency
www.environment-agency.gov.uk
HEAD OFFICE
Rio House
Waterside Drive
Aztec West
Almondsbury
Bristol BS32 4UD
Tel: 01454 624 400
Fax: 01454 624 409
Scottish Environment Protection Agency
www.sepa.org.uk
CORPORATE OFFICE
Erskine Court
The Castle Business Park
Stirling FK9 4TR
Tel: 01786 457 700
Fax: 01786 446 885
Environment and Heritage Service
www.ehsni.gov.uk
HEAD OFFICE
17 Antrim Road
Lisburn
County Antrim BT28 3AL
Tel: 028 9262 3100
Fax: 028 9267 6054
7. PPG 4: Treatment and disposal of sewage where no foul sewer is available.
www.environment-agency.gov.uk/ppg or www.sepa.org.uk/guidance/ppg/index.htm
8. PPG 21: Pollution incident response planning.
www.environment-agency.gov.uk/ppg or www.sepa.org.uk/guidance/ppg/index.htm
9. PPG 3: Use and design of oil separators in surface water drainage systems.
www.environment-agency.gov.uk/ppg or www.sepa.org.uk/guidance/ppg/index.htm
PMHO0307BMDX-E-E
These guidance notes have been drawn up to assist in the identification of the equipment and techniques available to prevent and
mitigate damage to the water environment caused by fires and major spillages. They are jointly produced by the Environment Agency
for England and Wales, the Scottish Environment Protection Agency (SEPA) and the Environment and Heritage Service for Northern
Ireland, referred to as the Agency or Agencies. Please contact your local Agency Office for further information.
Contact details will be found at the end of these guidelines.
1. INTRODUCTION
a. The Agencies guidance on industrial sites (PPG11-Reference 1) provides basic advice on pollution
prevention. This guidance document gives examples of good practice for the protection of the
environment in the management of run-off generated in the event of fire (or fire water) and major
spillages. It aims to help site operators consider what is appropriate for a specific site, taking into
account the risks and site layout. It is intended principally for those with responsibility for both new and
existing, medium to large sites. However, much of the information will be relevant for smaller sites,
especially those where high risk activities are carried out. It focuses on containment strategies, physical
structures that can be used to contain firewater and spillages (so called secondary containment
facilities) and equipment. Other approaches to protect the environment, such as operational and
management controls, should also be considered. All of these measures, physical, operational and
managerial should be supported by contingency or pollution incident response plans (see PPG21-
Reference 2) to reduce the impact of any unplanned event that does occur.
b. Most industrial and commercial sites have the potential to cause significant environmental harm and
to threaten water supplies and public health. Spillages of chemicals and oil are obvious threats.
However, materials which are non-hazardous to humans, such as milk and beer, may also cause serious
environmental problems, as can the run-off generated in the event of a fire. The environmental damage
may be long term and, in the case of groundwater, may persist for decades or even longer. Rivers,
sewers, culverts, drains, water distribution systems and other services all present routes for the
conveyance of pollutants off-site and the effects of a discharge may be evident some distance away. In
many cases, major pollution incidents can be prevented, if appropriate pollution prevention measures
are in place or immediately available. Contingency planning is the key to success and both preventative
measures and incident response strategies need to be carefully addressed. In the event of an incident
the Agency must be contacted immediately.
c. Pollutants may escape from the site into the water environment by a number of pathways. These
include:-
i. the sites surface water drainage system, either directly or via off-site surface water sewers.
ii. direct run-off into nearby watercourses or onto ground, with potential risk to groundwaters.
iii. via the foul drainage system, with pollutants either passing unaltered through a sewage
treatment works or affecting the performance of the works, resulting in further environmental
damage.
iv. through atmospheric deposition, such as vapour plumes.
The information in this guidance note is based on CIRIA (Construction Industry Research and
Information Association) Report 164 (Reference 3), which contains detailed information on hazard
identification, risk assessment and secondary containment systems.
2. CONTAINMENT SYSTEMS
On any site there may be one or more levels of containment. In deciding the appropriate level of
containment a risk assessment will be helpful. The operator should consider the hazardous materials on
site, the risks posed by accidents, fire, flooding and vandalism, likely failure mode of the primary
containment, the sensitivity of the receiving environment and the importance of preventing any
resultant discharge to it.
POL L U T I ON
PREVEN T I ON
GU I DEL I N ES
MANAGING FIRE WATER
AND MAJOR SPILLAGES:
PPG18
a. Pri mary contai nment
This is the tank or vessel in which the material is stored. It is, therefore, the first line of defence, and
must be fit for the purpose. Temporary storage vessels should not be used for long term storage.
b. Secondary contai nment
Depending on the way they provide protection, secondary containment systems may be categorised
broadly as local, remote or combined (both). Local containment is, in most cases, a bund. For further
details see the Agencies guidance on bunding, PPG2 - Reference 4.
3. REMOTE CONTAI NMENT SYSTEMS
In many cases, primary and local containment (bunding) will prevent an incident from causing
pollution. However, where local containment is not provided, or risk assessment indicates that
additional security is required, for example to contain firewater run-off, which may amount to
thousands of cubic metres, then remote containment systems may be employed. These may be used
in isolation, or in combination with local containment, for anything from a small area, covering part of
a site, to a number of large individual installations. They may be required to protect both surface and
foul water drainage systems. The following sections describe the types of system available and the
factors to be taken into account when using them.
In calculating the capacity for remote containment systems, the operator should consider the following
factors and the extent to which they apply to his site. Detailed technical guidance on remote
containment systems, the methodologies for calculating fire water volume (section iii), allowances for
rainfall and dynamic effects will be found in Reference 3.
i. Primary capacity - 100% of primary capacity. Consider the possible failure modes and where
appropriate, include the capacity of all primary tanks in multi-tank installations.
ii. Rainfall - subject to operational procedures, in order to calculate the volume to be contained,
allow for a 10 year return, 8 days rainfall prior to the incident, and a 10 year return, 24 hour
rainfall, plus an allowance for rain falling directly on to remote containment and areas of the
site draining into it, immediately after the incident. The post-incident component and the
allowance for dynamic effects (see v) are not additive.
iii. Fire fighting and cooling water - Allowance for extinguishing and cooling water delivered
through fixed and non-fixed installations based on BS5306, VCI, CEA, ICI and Institute of
Petroleum (Reference 5) methodologies, with appropriate adjustments in the light of the
particular circumstances. Consultation with the regulators and the fire service essential.
iv. Foam - Allow a freeboard of not less than 100 mm.
v. Dynamic effects - this is to allow for the initial surge of liquid and for wind-blown waves.
In the absence of detailed analysis, allow 250mm ( 750 mm for earth walled bunds).
a. Contai nment Lagoons
Where the site topography and the ground and soil conditions are suitable, earth banked containment
basins (or lagoons) can provide cost effective, remote secondary containment systems, particularly for
the retention of firewater. Lagoons may be constructed either above or below the surrounding ground
level and formation level is often determined by the economic advantage of balancing cut and fill.
To protect groundwater, the lagoon should be substantially impermeable. In some situations this will
require the use of an impermeable membrane or other suitable liner to ensure that it does not leak in
the event of an incident occurring. In situations where a membrane is not required, it is recommended
that a minimum of 1 metre of engineered clay, with a maximum permeability of 1x10
-9
m/sec, is used
to line the lagoon.
Lagoons should be constructed so that they can be isolated in an emergency from the main drainage
system. Flood defence installations, such as a balancing lagoon or shared, off-site flood storage facilities
may be used to contain fire-fighting run-off, providing that they incorporate shut-off devices. If
pumped storage or transfer facilities are in use, a back-up power supply should be considered.
b. Tanks
Purpose-built tanks may be used for the containment of fire-fighting run-off or spillages. Although most
tanks are not designed specifically for the containment of spillages or firewater, the UK standards for
liquid storage tanks and vessels are high and many of these are suitable for use as secondary
containment. They may be more expensive to construct than lagoons, but this can be offset by the
smaller land area required. In addition, a tank may facilitate firewater reuse in appropriate
circumstances (see Section 4.d.iv).
The actual type, size, design standards and protective finishes of the tank will be influenced by the sites
risk rating, the retention time, the quantity and the nature of the materials stored. Where available, an
economical option might be to make use of an adequate redundant or spare tank.
Tanks can be constructed both above and below ground. The various types available are listed below.
Other materials used include stainless steel, aluminium and plastic. The last two are limited by their
poor resistance to fire.
The tank will need to be protected from corrosion and aggressive conditions. This may be provided by
a range of coatings, including bitumastic paints, epoxy coatings and rubber and glass linings. These
will be determined by the substance to be contained, as well as other corrosive influences.
In all cases, it is recommended that a minimum freeboard of 300 mm is provided as a buffer capacity.
No overflows should be permitted within the freeboard depth. Tanks that are open to rainwater will
require regular monitoring and emptying to maintain the necessary containment capacity. The most
onerous loading conditions should be considered for design purposes. The overall depth of the tank
including freeboard, should be taken as the minimum design depth when assessing the static head of
contained liquids.
In some emergency situations it may be possible to use storm tanks on the sewerage system, at a
sewage treatment works (STW) or at other effluent treatment facilities. This will require consultation
with the sewerage undertaker or treatment plant operator. This option should only be used as a last
resort and should not be relied upon, as the tanks may be full in the event of a storm. The effects of
the discharge on the STW should also be considered, as damage to the treatment process may result
in greater environmental harm, due to the discharge of raw or partially treated sewage, as well as the
contaminated run-off. Alternative means of disposal may need to be considered if the contained
material is unsuitable for treatment at the STW.
c. Shut- off val ves and penstocks
Shut-off valves or penstocks which can isolate part or the whole of a site facilitate the retention of
spillages or fire-fighting run-off on site. Their effectiveness depends on the capacity of the drainage
system. They may be operated manually or triggered by means of automatic sensors. As a general rule,
simple systems are best.
Automatic sensors and closure devices may be used to ensure a rapid response on sites where an
incident might not be immediately noticed. It is vital that such devices are properly maintained and
regularly tested. In the event of an incident, it is essential to verify that they have functioned properly
as soon as possible, either by inspection or the use of telemetry. In all cases, consideration should be
given to the consequences of overflows from gullies and other entry points to the drainage system.
d. Oi l separators
Oil separators are devised to contain spillages of hydrocarbons and other, lighter than water, immiscible
liquids. They will not contain soluble substances such as soluble oils and their action is adversely
affected if degreasing agents or detergents, such as those used in some fire fighting foams, are present.
If separators are to be used to contain large spillages, bypass type separators should not be used.
Separators may also be fitted with a penstock valves at both inlet and outlet to provide flexibility in
handling spillages. See PPG3-Reference 6, for further details.
Above ground tanks Below ground tanks
proprietary cylindrical tanks as used reinforced masonry tanks
for agricultural waste
welded steel tanks as used for oil, in situ reinforced concrete
petroleum and other liquid products
sectional steel rectangular liquid tanks formed with embedded sheet
storage tanks piling walls
reinforced plastic tanks reinforced plastic tanks
reinforced concrete tanks welded steel tanks as used for oil,
petroleum and other liquid products
reinforced concrete/masonry tanks deep shaft tanks
4. EMERGENCY CONTAI NMENT SYSTEMS
Although permanent containment facilities should be provided at many sites, there may be
circumstances where a spillage cannot be dealt with by such facilities, for example if it occurs outside
a bunded area. In other cases, particularly at smaller sites, firewater containment facilities may be
impracticable because of cost and space considerations. In such cases, temporary containment systems
or pollution control materials should be considered.
If reliance is placed on these secondary measures, consideration of some other form of local
containment may be necessary to provide sufficient time to prepare them. Their use and location must
be clearly marked in the pollution incident response plan and indicated on site with durable signs
explaining their use. Examples of emergency containment measures include:
a. Sacri fi ci al areas
This method relies on the conveyance of firewater to a remote, designated sacrificial area, designed to
allow infiltration and to prevent run-off. Design details are included in Reference 3. The contaminant
is contained within a layer of permeable soil or porous media and should be prevented from dispersing
into other strata or groundwater by an impermeable lining system which should be capable of
containing both vertical and horizontal flow. The area may also be used for other purposes, such as car
parking or as a sports ground. The stormwater drainage serving the area must be capable of being shut
off quickly and effectively during an incident, until the contamination is dealt with. After use, if the area
has been contaminated, the permeable material should be excavated and removed for disposal.
Such an area could also be used for controlling stormwater run-off from the site, which helps in the
management of flooding and pollution from surface run-off. The Agency encourages this form of
development (see Reference 7).
b. Bundi ng of vehi cl e parki ng and other hard standi ngs
Impermeable yards, roads and parking areas can be converted to temporary lagoons using sandbags,
suitably excavated soil or sand from emergency stockpiles to form perimeter bunds. Permanently
installed bunding, in the form of either a low kerb or roll-over bunds around suitable impermeable
areas, the entire site, or just the sensitive area, is a better option. In the event of an incident, all drain
inlets, such as gullies, within the area, must be sealed to prevent the escape of the pollutant. See
Section 5e for details of suitable drain sealing equipment. If appropriate, a liner may be used to improve
the impermeability of the land surface.
c. Pi ts and trenches
Pits or trenches may be used where other methods have failed or no other method is available. Their
use should be considered carefully due to the risk of groundwater contamination. If possible, a liner
should be employed, particularly in areas of high groundwater vulnerability, although the effect of the
substances being contained on the liner will need to be considered. If no liner is used, the
contaminated ground will need to be removed promptly to a disposal site. Pits and trenches may also
be used to add reagents for neutralising harmful substances.
d. Portabl e tanks, overdrums and tankers
Portable storage tanks made from synthetic rubber, polymers and other materials come in a wide
variety of sizes. The portability of the tanks allows them to be moved rapidly to the fire or spillage
location, or to where any run-off has been contained. If a portable tank is to be used during an incident,
the following measures need to be considered:
i. As part of the pollution incident response plan, suitable points in the drainage systems must be
pre-selected at which the drainage pipe can be blocked and a man-hole chamber used as a
pump sump to transfer contaminated waters to the tank. A suitable pump, which may need to
be flame-proof, will also be required.
ii. Locations for the erection of portable tanks must be pre-selected (areas such as car parks are
most suitable), ensuring that there is both sufficient space and an adequate foundation.
iii. Larger sizes become increasingly unwieldy and will need to be supported by a frame.
iv. Consideration may also be given in the pollution incident response plan to the re-use of the
collected water to tackle the fire. This should take into account the materials present on site
and the risks to equipment, through contamination, and to the safety of fire crews.
v. Overdrums, which are designed primarily to safely store leaking or damaged drums, can also
be used as a temporary store for a small quantity of a spilt liquid.
vi. Re-usable liners are available for overdrums and portable tanks. These must be resistant to
attack by the stored substances.
vii. Vacuum or similar mobile tankers may also be used for collecting and containing small spills
5. EMERGENCY MATERIALS AND EQUIPMENT
A wide variety of products are available to deal with spillages or to contain spills in emergency
containment areas, some of which are listed below. Any materials or equipment used must be well
maintained and strategically placed at accessible locations which are clearly marked with durable
notices explaining their use. The pollution incident response plan should identify pollution prevention
equipment and materials and their location. The Agency does have emergency equipment and
facilities, but these may not always be available.
a. Sand and earth.
These are versatile containment materials which may be used to soak up spillages of oil and chemicals
and used in sand bags to block off drains or to direct flows to a predetermined collection point. Sand
should be kept dry and a shovel should be available. Contaminated material must be properly disposed
of and must not be washed into the drainage system.
b. Proprietary absorbents
These serve a similar purpose to sand. They are available as granules, sheets, pillows or a loose powder.
Although most absorbents are designed for hydrocarbon spills, products are available for chemical
spills.
c. Sealing devices and substances for damaged containers
These devices and materials are designed for use when a tank, storage drum, valve or pipe has been
punctured or damaged. Leak sealing devices may take the form of a pad or clamp which is put over
the damaged area like a plaster, or they may be preshaped, inserted into the damaged area and then
inflated. Leak sealing putties are also available, ready made or supplied in a dry powder form for mixing
with water. These are applied over the damaged area to form a temporary seal. A more permanent
method may be required before moving the damaged vessel.
d. Drain seals
There are several types of drain seal, including those which can be used to seal a drainage grid by
covering or blocking the drain and those which fit in a pipe. The use of a pipe seal may enable the
drains to be used as a retention system, which may provide a significant volume of containment. Drain
seals should be kept in a readily accessible location close to where they would be used. Care should be
taken in their installation to avoid exposure to hazardous conditions and to ensure the contained liquid
does not overflow from gullies or elsewhere on the drainage system.
e. Booms
Booms designed for use on watercourses may also be used to isolate drains or divert or contain
spillages. There are two types of booms. Absorbent booms are filled with absorbent material which can
be suitable for hydrocarbons, aqueous chemicals or both. Plastic physical barrier booms can be inflated
with air or water.
6. WASTE MANAGEMENT
Measures should be in place to dispose of, as soon as possible, any spillage, contaminated material or
fire fighting water. Where re-use is possible, the spilled material should be returned to storage on site.
If off-site disposal is required, a registered waste carrier should be used, although if a foul sewer is
available it may be possible to discharge to it with the approval of the local sewerage undertaker. It
may be possible to treat hydrocarbon contaminated water using site oil separators, but the presence
of foam can adversely affect their efficiency.
The movement of the waste will need to be documented with a transfer note under the Duty of Care
Regulations 1991 (Reference 8), or if it is a special waste, with a special waste consignment note under
the Special Waste Regulations 1996. The producer will need to keep these notes for a statutory period
of two years for transfer notes or three years for consignment notes.
In the case of special waste consignments, there is normally a requirement for three days notice to be
given to the Agency prior to movement. In an emergency this may be waived, providing the local
Agency office is contacted.
7. FIRE-FIGHTING STRATEGIES AND RUN-OFF MANAGEMENT
The Plan may consider fire fighting strategies and possible methods of reducing the amount of
firewater run-off generated, for example by the use of sprays rather than jets, controlled burn and the
possible re-cycling of fire-fighting water, where safe and practicable to do so. Advice on this should be
sought from the Fire Service, based on best fire-fighting practice.
HO-6/00-12K-C-BBUD Printed on Cyclus TCF Recycled Paper.
8. REFERENCES
1. PPG11 - Preventing pollution at industrial sites
2. PPG21 - Pollution incident response planning
3. Design of Containment Systems for the Prevention of Water Pollution from Industrial Incidents - CIRIA
Report 164: Construction Industry Research and Information Association: Telephone 020 7222 8891
4. PPG2 - Above ground oil storage
5. Fire precautions at petroleum refineries and bulk storage installations, Institute of Petroleum Model
Code of Safe Practice, Part 19
6. PPG3 - The use and design of oil separators
7. Sustainable urban drainage an introduction: Environment Agency/SEPA/Environment and
Heritage Service
8. Waste Management - The Duty of Care - A Code of Practice: ISBN 0-11-753210-X: The Stationery
Office, Telephone 08706 005522
Other useful source documents
9. A Guide to the Control of Major Accident Hazard Regulations 1999; L 111
HSE Books, Telephone 01787 881165
10. Code of Practice for the Safe Design and Operation of Timber Treatment Plant; Environment
Agency/British Wood Preserving and Damp Proofing Association, 1998: Telephone 020 8519 2588
11. Inspection and Approval of Agrochemical Stores by Environmental Protection Officers and Fire Officers
in connection with BASIS Registration Ltd: BASIS (Registration) Ltd 2000: Telephone 01335 343945.
12. Environmental guidelines for petroleum distribution installations: Institute of Petroleum,
ISBN 0 85293 166 2
13. Design, construction and operation of distribution installations: Institute of Petroleum Model Code of
Safe Practice, Part 2
Reference 1,2,4,6 & 7 are available free of charge from your local Agency office.
References 5, 12 & 13 are available from the Institute of Petroleum, telephone 020 7467 7100
EMERGENCY HOTLI NE
0800 80 70 60
The 24-hour emergency hotline number for reporting all
environmental incidents relating to air, land and water in
England, Wales, Scotland and Northern Ireland.
ENVIRONMENT &
HERITAGE SERVICE
SCOTTISH
ENVIRONMENT
PROTECTION AGENCY
REGIONAL OFFICES
ANGLIAN
Kingfisher House
Goldhay Way
Orton Goldhay
Peterborough PE2 5ZR
Tel: 01733 371 811
Fax: 01733 231 840
MIDLANDS
Sapphire East
550 Streetsbrook Road
Solihull B91 1QT
Tel: 0121 711 2324
Fax: 0121 711 5824
NORTHEAST
Rivers House
21 Park Square South
Leeds LS1 2QG
Tel: 0113 244 0191
Fax: 0113 246 1889
NORTHWEST
Richard Fairclough House
Knutsford Road
Warrington WA4 1HG
Tel: 01925 653 999
Fax: 01925 415 961
HEAD OFFICE
Erskine Court
The Castle Business Park
Stirling FK9 4TR
Tel: 01786 457 700
Fax: 01786 446 885
World Wide Web: http: //www.sepa.org.uk
NORTH REGION HQ
Graesser House
Fodderty Way
Dingwall Business Park
Dingwall IV15 9XB
Tel: 01349 862 021
Fax: 01349 863 987
WEST REGION HQ
SEPA West
5 Redwood Crescent
Peel Park
East Kilbride G74 5PP
Tel: 01355 574 200
Fax: 01355 574 688
EAST REGION HQ
Clearwater House
Heriot-Watt Research Park
Avenue North
Riccarton
Edinburgh EH14 4AP
Tel: 0131 449 7296
Fax: 0131 449 7277
Calvert House,
23 Castle Place,
Belfast
BT1 1FY
Tel: 028 9025 4868
Fax: 028 9025 4777
ENVIRONMENT AGENCY
REGIONAL OFFICES
HEAD OFFICE
Rio House, Waterside Drive, Aztec West
Almondsbury, Bristol BS32 4UD.
Tel: 01454 624 400 Fax: 01454 624 409
World Wide Web: http: //www.environment-agency.gov.uk
SOUTHERN
Guildbourne House
Chatsworth Road
Worthing
West Sussex BN11 1LD
Tel: 01903 832 000
Fax: 01903 821 832
SOUTHWEST
Manley House
Kestrel Way
Exeter EX2 7LQ
Tel: 01392 444 000
Fax: 01392 444 238
THAMES
Kings Meadow House
Kings Meadow Road
Reading RG1 8DQ
Tel: 0118 953 5000
Fax: 0118 950 0388
WELSH
Rivers House
St Mellons Business Park
St Mellons
Cardiff CF3 0EY
Tel: 029 2077 0088
Fax: 029 2079 8555
All theAgenciespollution prevention guidancenotesareavailableon theweb siteslisted below.
Printed on Cyclus TCF Recycled Paper.
PPG 21 page 1
PPG21
March 2009
Pollution Prevention Guidelines
Incident Response Planning: PPG 21
These guidelines are produced jointly by the Environment Agency for England and Wales, the Northern Ireland
Environment Agency and the Scottish Environment Protection Agency (SEPA), referred to here as we or us. They
have been written in accordance with the Code of Practice on Guidance on Regulation 2008 from the Department
for Enterprise and Regulatory Reform (BERR) reference 1.
Pollution Prevention Guidelines (PPGs) are based on relevant legislation and reflect current best practice.
Following the guidelines will help you to manage your environmental responsibilities to prevent pollution and
comply with the law.
If you cause pollution or allow it to occur, you may be committing a criminal offence. Should this happen, our
response will be guided by our enforcement and prosecution policy.
1.0 Introduction
These guidelines set out best practice for producing an incident response plan to deal with an environmental
incident on your site. Following such a plan will help you to prevent or reduce environmental damage if such
an incident occurs. The guidelines set out:
why you need a plan;
what information you should include;
who should be involved in its production;
what supporting procedures you may need to implement the plan;
what the plan should look like by providing a template (at the end of these guidelines).
They are aimed at those sites which do not have a statutory duty to prepare such plans. They may be used to
supplement guidance for sites controlled under the Control of Major Accident Hazards Regulations 1999 (COMAH)
reference 2, and the Environmental Permitting Regulations 2007 reference 3 under these regulations there is a
statutory obligation to have an incident response plan in place.
As well as using these guidelines to produce your plan, you should seek further advice from your regulator on the
specific requirements for each site operated under these regulations. In England and Wales please contact our
National Customer Contact Centre on 08708 506 506. In Scotland and Northern Ireland, please contact the
regulators at the websites provided. The NetRegs web site also provides guidance on the legal requirements
of these regulations in all UK countries. A list of websites is provided at the end of these guidelines.
1.1 Who should read these guidelines?
This guidance is for:
site operators of industrial and commercial premises to help them produce an incident response plan;
other organisations, authorities and individuals whose site or operations pose a potential risk to the
environment and who should have a incident response plan;
the Fire and Rescue Service and others who may be involved in the production of, and/or have an interest in,
such plans for example, the Health and Safety Executive, Maritime and Coastguard Agency, Government
Decontamination Service, public health officials and insurers/underwriters.
Environment Alliance working together
PPG 21 page 2
The next section tells you how to assess the risk your site may pose to the environment and what level of plan
you need to help reduce that risk.
1.2 Why have a plan?
Many industrial and commercial sites have the potential to cause significant environmental harm which could
threaten water supplies, public health and wild life in the event of an environmental incident for example fire,
explosion or spillage. These include sites that:
store, use or process toxic and/or polluting substances such as chemicals, oils, food or beverages
contain hazardous materials such as asbestos within the fabric of the building;
contain or store materials which would give rise to hazardous products in the event of a fire, for example,
toxic smoke from burning plastic.
Causes of environmental incidents on your site include:
delivery and use of materials;
overfilling containment vessels;
plant or equipment failure;
containment failure;
fires, explosions or failure to contain fire fighting water;
wrong connections of sewers and pipes;
incompatible materials coming in contact;
uncontrolled reactions;
discharge of partially-treated or raw effluent;
vandalism;
flooding of part or all of your site.
Any of these incidents could affect:
drainage systems, surface waters, aquatic ecosystems, groundwater and soil;
air quality by producing toxic fumes and airborne pollutants which may damage human health, wild and
domestic animals and ecosystems;
thermal radiation which can harm people and the environment.
The impacts may be immediate and long lasting; you may be responsible for the costs of cleanup. This can be
expensive particularly if you contaminate groundwater. There may be additional costs too associated with our
incident response and/or fines or costs through the criminal and/or civil courts. Your companys business
reputation may suffer.
To identify the risk your site poses to the environment we recommend you undertake a simple risk screening
assessment. Our PPG 28 Controlled Burn guidance (reference 4) provides detailed advice on how to do this
and applies to all sites, not just those where controlled burn is relevant.
Where this assessment indicates that your site could cause an environment incident you can reduce the
likelihood of such an incident occurring by following our Pollution Prevention Guidelines.
Our Pollution Prevention Pays Getting Your Site Right guidance (reference 6) and PPG1 A General Guide to
Pollution Prevention (reference 7) will provide you with guidance on general pollution prevention and correct
storage of materials.
Whilst our PPG 18 Managing fire water and major spillages (reference 5) will help you identify the equipment
and techniques you can use to mitigate the impact of any fire or major spillage on your site.
But you cant completely remove the risk of an incident occurring which could cause pollution. We therefore
recommend that all sites produce an incident response plan. It doesnt have to be complicated it could be very
simple as the level of risk should influence the size complexity and details of your plan.
Your plan may just cover how you deal with environmental incidents or be part of a more comprehensive incident
response plan for the site for example COMAH on-site and off-site plans for example COMAH emergency plans.
PPG 21 page 3
The incident response plan may support the work of Local Resilience Forums in England and Wales, in Scotland,
the Strategic Co-ordinating Group and in Northern Ireland the Northern Ireland Civil Contingencies Framework
and the development of their local risk registers which are a statutory obligation under the Civil Contingencies
Act 2004 reference 8 and at the UK Resilience web site in the list.
The information in the plan may also help the emergency responders produce their own response plan for your
site, for example Fire and Rescue Service Operational Incident Response Plans or 7(2)(d) reference 9 and in the
web site list.
2.0 The planning cycle
The planning cycle is the continuous process of assessing the risk of your site and preparing for incidents.
The process is supported by procedures that make sure your plan works (validation), that you review and revise
it regularly and that your staff and contractors are prepared and trained. The key elements of the planning
cycle are:
preparing the plan;
activating and responding;
plan testing/training;
reviewing and training.
The following diagram shows how each stage of the planning cycle links to and supports the next one. This
ensures that you keep the plan up to date, it remains effective and that you communicate it to your staff and
contractors who show that they understand it.
Diagram 1 shows the seven stage of the Planning Cycle as a process of continuous improvement.
Diagram 1 The Planning Cycle
1. Gathering
information and risk
assessing your site
6. Learning lessons
from exercise and
incident debriefs
2. Preparing
your plan
3. Consulting on
your plan both
internally and
externally
5. Testing and
exercising your plan
(validation)
4. Publishing and
communicating your
plan internally and
externally
7. Reviewing,
revising and
maintaining
your plan
PPG 21 page 4
2.1 Preparation
The following sections suggest the type of information youll need to complete your plan. The suggested template
for your incident response plan can be found at the end of these guidelines.
2.1a Cover page
This should give:
details of the site: name, full postal address, national grid reference/location and any contact details;
a summary of the main business activities carried out on site;
objectives of the plan;
the date the plan was signed off, by whom and the version number;
the person whos responsible for its review, distribution and implementation;
a distribution list of your staff and external organisations that hold copies.
2.1b External and internal contact lists
The external contacts list should contain 24-hour contact details for all those organisations or companies that
may need to be involved during or after an incident. For example:
emergency services;
your environmental regulator;
local authority;
local water company/authority;
the Health and Safety Executive;
local health care providers/Health Protection Agency;
specialist clean-up contractors;
sources of specialist advice e.g. UK Government Decontamination Service, the National Chemicals Emergency
Centre (see website list);
chemical suppliers and manufacturers.
The internal contacts list will reflect the organisational structure of your company and the response procedures
you have in place. The names/positions on the template are suggestions only.
If your site isnt staffed outside office hours, you must identify contact details for key holders.
2.1c Site chemical, product and waste inventory
You should maintain an up-to-date record of all substances stored on-site, together with an indication of the
maximum quantity likely to be stored. Attach product data sheets and COSHH reference 10 assessments for
any substances posing a risk to people and/or the environment.
You should mark on the site plan all stores, bulk storage vessels, drums or containers that you use for storing
oils, chemicals or other potentially polluting materials. If you regularly store oils or chemicals or hold them away
from fixed installations or storage areas in any significant quantity (for example, in production areas), you should
indicate their whereabouts on the site plan. Our PPGs references 11 and 12 provide advice on safe storage. If you
have chemical process lines, include these on the plan. Make sure that all emergency responders can access this
inventory and, if possible, distribute it as part of your emergency planning process.
2.1d Pollution prevention equipment inventory
Record the equipment and materials you have on site to deal with pollution incidents references 5 and 6.
For example:
absorbents;
drain mats/covers;
pipe blockers;
booms;
pumps;
over drums.
PPG 21 page 5
If any equipment requires special training to use it, include the contact details of staff members who are trained
in its use.
2.1e Site plan
This should be a clear diagram of the site showing layout and access details, along with a schematic
representation of the site drainage arrangements. Features that you should show are:
the layout of buildings;
access routes and meeting points for emergency services;
the location of process areas and any on-site treatment facilities for trade effluent or domestic sewage;
areas or facilities you use to store raw materials, products and wastes (include details of tank sizes and
products stored);
bunded areas, with details of products stored and estimated retention capacity;
location of hydrants, fireboxes and pollution prevention equipment and materials;
any watercourse, spring, borehole or well located within or near the site;
areas of porous or unmade ground;
site drainage foul, surface and trade effluent drainage systems including features such as:
inspection points to detect pollution;
oil separators/interceptors reference 13 PPG3;
firewater/spillage containment systems;
balancing tanks;
pollution control devices (shut-off valves/penstocks fitted in drains);
sacrificial containment areas such as car parks;
other areas suitable for portable storage tanks, for blocking drains and temporary storage of firewater.
You should provide a brief description of how all facilities operate and make sure theyre clearly
labelled above ground (see section 2.2)
2.1f How to produce a drainage plan
You should use the standard/conventional features of drainage plans. This will make them easier for other
organisations to use and for your own staff to understand.
Use red for foul sewers.
Use blue for surface water sewers, watercourses and soakaways.
Use the same convention for drain covers and grips.
Number the drain covers to help identify them.
Distinguish between separate or combined system (Red C = Combined).
Mark the location, depth and construction details of any soakaways or depth for boreholes and wells.
Indicate the direction of flow for all sewers.
Identify the sewage treatment works/sewage pumping station to which your site connects.
Identify all surface water outfalls from the site.
Identify suitable points for installing pollution control booms or for constructing a dam either at the outfalls
or on the receiving watercourse.
Consider installing permanent boom anchor points at a suitable location, taking into account possible
flow conditions.
Whilst you are drawing up your drainage plan, use the opportunity to check for any mis-connections from your
site, for example, a foul sewer that is linked or connected into a watercourse. This is illegal and may also lead
you to respond incorrectly during a spillage.
In many cases, youll need additional drainage plans to provide detailed information. You should attach these
to your response plan and refer to them in it.
PPG 21 page 6
2.2 Activation and response
Once youve written your plan, develop supporting emergency procedures to check the plan works if theres
an incident. Make sure all relevant staff and contractors are aware of these procedures and the plan.
Examples of the information to include are:
procedures for alerting key staff;
standby/rota systems;
clearly defined roles and responsibilities;
names of staff and contractors trained in incident response;
the types and location of emergency response equipment available and appropriate personal protective
equipment (PPE) to be worn;
a system of response coordination;
off-site support.
The actual level of your response will depend on your site. Consider what could happen on your site as a worst
case scenario and develop procedures to deal with it. The checklist below gives some suggestions on procedures.
Procedures Checklist
Clearly define the circumstances when the plan should be activated. This will depend on the nature of your
site and the type of the incident.
Ensure all relevant staff know how and when to contact other emergency responders: emergency services,
us, local authority, sewage undertaker and other organisations identified in your emergency plan.
Consider the impact that an incident on your site could have on the environment outside your boundary:
nearby properties, downstream abstractors, agricultural land or environmentally sensitive sites. Once
identified, agree contact procedures with them if possible.
Put in place staff evacuation procedures your local authority emergency planning department will help
you with these.
Identify any special methods you need to deal with substances posing particular health or
environmental risk.
Develop a fire fighting strategy with your local fire and rescue service; if a controlled burn is an agreed
option, state this clearly. The same applies to the use of foam (see reference 4 for further advice).
Staff should be trained in the use of spill kits, drain blockers and other pollution control equipment and the
operation of pollution control devices.
Identify procedures for recovering spilled product and the safe handling and legal disposal of any waste
associated with the incident.
You should have staff available who are trained to deal with media enquiries.
PPG 21 page 7
2.3 Plan testing
Once your plan is completed, test it regularly by exercising; at some sites for example COMAH sites, it is a legal
requirement. Exercises are vital to:
validate the whole plan does it work?;
develop your staffs and contractors competencies in emergency response;
test your standard procedures.
You can design exercises to be discussion based, table top or live. You can set them up to test the whole plan
or critical elements within it such as:
contacts lists;
the activation process;
equipment;
information management.
Where resources permit, include external partners/responders as this helps validate your plan.
The frequency of testing and exercising should be related to the environmental risk your site poses, staff turnover,
the introduction of new processes or materials and conclusions from any previous exercises or incidents.
The effectiveness of any site incident response plan will depend on staff training. You should make sure that all
staff and contractors working on-site are aware of the plan which you should make available electronically and in
hard copy. All staff should know their role and responsibilities and the relevant procedures if an incident occurs
(see section 2.2). Maintain and regularly review records of all staff training.
Your staff training should include:
awareness of the potential for harm to people and the environment from the materials held on-site;
information on the sensitivity of the environment surrounding the site;
the environmental responsibilities of your business;
use of the correct personal protective equipment and any appropriate and/or necessary health and
safety training;
reporting procedures if theres a risk of surface water, groundwater or land contamination;
reporting to the local water/sewerage undertaker if a discharge to the foul or combined sewer is involved;
safe and correct use of all spill clean-up equipment or pollution prevention structures and/or devices on site;
safe handling and legal disposal of contaminated materials and wastes resulting from an incident, including
arrangements for using specialist contractors and services;
appropriate and safe decontamination.
2.4 Review and maintenance
Your plan must remain effective and up to date so record any lessons learnt from exercises or actual incidents in
post exercise/incident debriefs. Use recommendations from the debriefs or from staff and contractors to improve
your plan. Even if you havent carried out an exercise, its good practice to review the plan regularly we suggest as
a minimum every 34 years (in line with Environment Permitting Regulations and COMAH guidance) and
communicate all changes to your staff and other responders.
PPG 21 page 8
3. Waste
Waste material associated with an incident will come under the Duty of Care reference 14. This means you have
a legal duty to make sure that any waste the incident produces does not escape your control and that you dispose
of it legally, safely and properly.
You must transfer such waste to an authorised registered waste carrier or exempt waste carrier or waste manager.
A full description of the waste and a waste transfer note must accompany it. The waste must be disposed
of lawfully.
If the waste is hazardous waste (or special waste in Scotland) reference 15, for example oil waste, acids and/or
solvents, additional requirements will apply and its movement must be accompanied by a consignment note.
Everyone involved in the transfer of this waste must keep a copy of the consignment notes for proof of
legal disposal.
You must include procedures in your plan for dealing with any waste arising in an incident. Contact us for
further details.
4. Distribution and revision
If you wish, you may contact us at the local office to discuss your plan. Once youve taken into account any
relevant comments, distribute copies of the completed plan to the organisations recorded on its front page. Keep
a copy of the plan on site in an easily accessible location away from the main building such as a gatehouse or a
dedicated firebox to which the emergency services can readily gain access. A notice at the site entrance should
indicate the location of the plan.
We will treat any information supplied in your plan as confidential. With your permission, we may discuss the
response to an incident with the other organisations who have received a copy of the plan from you.
PPG 21 page 9
5. References
All the Pollution Prevention Guidance notes (PPGs) are available at:
www.environment-agency.gov.uk/ppg
www.sepa.org.uk/guidance/ppg
www.ni-environment.gov.uk/ppg
You can also order the Pollution Prevention Pays pack at the first of these sites.
1. Code of Practice on Guidance on Regulation 2008 from Department for Enterprise and Regulatory
Reform (BERR) website (in list below)
2. The Control of Major Accidents Hazards Regulations (COMAH) Statutory Instrument 1999 No 743
The Control of Major Accident Hazard Regulations (Northern Ireland) 2000 SR 2000 No 93
HSE guidance Emergency response and spill control from HSE website
HSE guidance HS(G)191 Emergency Planning for Major Incidents Control of Major Accident Hazards
Regulation 1999
3. Environmental Permitting (England and Wales) 2007 Regulations (SI2007 No 3538)
4. PPG28: Controlled Burn
5. PPG18: Managing Fire Water and Major Spillages
6. Pollution Prevention Pays pack and DVD from Environment Agency website
7. PPG1: General Guide to Pollution Prevention
8. Civil Contingencies Act 2004 (c36) and Civil Contingencies a short guide: Cabinet Office publication
9. Fire and Rescue Service Act 2004
10. The Control of Substances Hazardous to Health Regulations 2002 (SI No 2267) (as amended).
Approved Code of Practice and guidance L5 (Fifth edition) HSE Books 2005. ISBN 0 7176 2981 3
11. PPG2: Above Ground Oil Storage
12. PPG26: Storage and handling of drums & intermediate bulk containers
13. PPG3: Use and design of Oil Separators in Surface Water Sewers
14. Waste Management, The Duty of Care, A Code of Practice (Revised 1996). The Stationery Office.
ISBN 0 and 11753210X
15. The Hazardous Waste (England and Wales) Regulations 2005 SI 894. ISBN 0 110726 855
The List of Wastes (England) Regulations 2005; SI 2005 895; ISBN 0110726847
The List of Wastes (England) (Amendment) Regulations 2005; SI 2005 1673; ISBN 0010730011
The Hazardous Waste (Wales) Regulations 2005; SI 2005 1806 (W.138); ISBN 0110911717
The List of Wastes (Wales) Regulations 2005; SI 2005 1820 (W.148); ISBN 0110911725
Hazardous Waste (Northern Ireland) Regulations 2005, SR 300; ISBN 0 33796 064 X
The List of Waste Regulations (Northern Ireland) 2005, SR 301; ISBN 0 33796 095 X
Special Waste Regulations 1996, SI972. ISBN 0 11 054565 6
Special Waste Amendment (Scotland) Regulations 2004, SSI 112. ISBN 0 11069 0303
PPG 21 page 10
Di]ZgjhZ[jahdjgXZhd[^c[dgbVi^dc/
Fire and Rescue Service Manual Volume 2 Fire Service Operations Environmental Protection, The Stationery
Office. ISBN 978 0 11 341316 4
CIRIA 164
CIRIA Report 164, 1997, P A Mason, H J Amies, P R Edwards, G Rose, G Sangarapillai, Design of containment
systems for the prevention of water pollution from industrial incidents. ISBN 0 86017 476 X
Safety and environmental standards for fuel storage sites Buncefield Standards Task Group (BSTG) Final report
July 2007: www.hse.gov.uk/comah/buncefield
Useful websites:
Environment Agency: www.environment-agency.gov.uk
Northern Ireland Environment Agency: www.ni-environment.gov.uk
Scottish Environment Protection Agency: www.sepa.org.uk
Department for Environment Food and Rural Affairs: www.defra.gov.uk
Health and Safety Executive: www.hse.gov.uk
Buncefield Report: www.buncefieldinvestigation.gov.uk
Maritime and Coastguard Agency: www.mcga.gov.uk
The National Chemical Emergency Centre: www.the-ncec.com
UK Government Decontamination Service: www.defra.gov.uk/gds
Communities and Local Government (England and Wales): www.communities.gov.uk
UK Resilience: Civil Contingencies Secretariat: www.ukresilience.info and www.preparingforemergencies.gov.uk
Scottish Government: www.scotland.gov.uk
NetRegs: www.netregs.gov.uk
Construction Industry Research and Information Association: www.ciria.org.uk
The Stationery Office: www.tsoshop.co.uk
The Department for Enterprise and Regulatory Reform: www.berr.gov.uk
Business Link Practical Guidance for business: www.businesslink.gov.uk
PPG 21 page 11
Our contact details
In England and Wales please contact the National Customer Contact Centre (NCCC) on 08708 506 506 or at
enquires@environment-agency.gov.uk for details on any of the topics covered in this document. In Scotland
or Northern Ireland please use the website for each regulator.
Environment Agency
www.environment-agency.gov.uk
HEAD OFFICE
Rio House
Waterside Drive
Aztec West
Almondsbury
Bristol BS32 4UD
Tel: 01454 624 400
Fax: 01454 624 409
Scottish Environment Protection Agency
www.sepa.org.uk
CORPORATE OFFICE
Erskine Court
The Castle Business Park
Stirling FK9 4TR
Tel: 01786 457 700
Fax: 01786 446 885
Northern Ireland Environment Agency
www.ni-environment.gov.uk
HEAD OFFICE
17 Antrim Road
Lisburn
County Antrim BT28 3AL
Tel: 028 9262 3100
Fax: 028 9267 6054
Environment first: This publication is printed on paper made
from 100 per cent previously used waste. By-products from
making the pulp and paper are used for composting and fertiliser,
for making cement and for generating energy.
PMHO0309BPNA-E-E
nvironment Aencylncldent kespcnse Plan 13
Incident Response PIan
incident response pIan
1empIate for an incident response pIan
use thls template tc help ycu ldentlfy all the relevant lnfcrmatlcn ycu need tc effectlvely respcnd tc an lncldent
cn ycur slte. lt ls nct lntend as a descrlptlcn cf all the prccedures ycu need tc actlvate the plan. Ycu shculd
ldentlfy, develcp and reccrd these separately uslng the guldance ln Sectlcn 2.2 - Actlvatlcn and respcnse.
The template ls a gulde cnly and can be mcdlfed tc take ln tc acccunt any slte speclfc requlrements and
cperatlcnal needs. we reccmmend dlscusslng ycur plan where pcsslble wlth relevant external crganlsatlcns
partlcularly the emergency servlces and us tc maxlmlse cc cperatlcn durlng an lncldent. Unce ln place ycu can
use lt as a basls fcr suppcrtlng the plannlng cycle and malntaln effectlve and safe respcnse tc lncldents.
Incident Response PIan
hame and address of company]Location of site hCR:
Map references:
Link to map:
0verview of the activities on site:
IncIude the number of empIoyees at different times of the day.
escription of surroundin area:
ate and version of pIan: hame or position of person responsibIe for compiIin]
approvin the pIan:
1/ nvironment Aencylncldent kespcnse Plan
Review date: ate of next exercise:
0b|ectives of the pIan:
List of externaI oranisation consuIted in the preparation of the pIan with contact detaiIs:
istribution Iist number of copies of the pIan and version:
Incident Response PIan
nvironment Aencylncldent kespcnse Plan 15
merency services (fire]
PoIice]AmbuIance)
LocaI poIice
LocaI hospitaI]hR5 1rust
nvironmentaI ReuIator
Incident hotIine
nvironment ReuIator
LocaI contact
LocaI Authority merency
PIannin epartment
LocaI water company]authority
Iectricity company
Cas company
waste manaement contractor
5peciaIist advice
5peciaIist cIean up contractor
hames and positions of staff
authorised]trained to activate and
co ordinate the pIan
0ther staff:
Manain irector
5ite Manaer
nvironmentaI Manaer
ReaIth and 5afety Manaer
Incident Response PIan
Contact 0fce hours 0ut of hours
InternaI contacts
xternaI contacts
16 nvironment Aencylncldent kespcnse Plan
Incident Response PIan
1rade name]
substance
5oIid]Iiquid]
as or powder
0h number Maximum
amount
Location
marked on
site pIan
1ype of
containment
ReIevant
heaIth and
environmentaI
properties
ChemicaI Product and waste Inventory
nvironment Aencylncldent kespcnse Plan 17
Incident Response PIan
1ype Location Amount 5taff contact
PoIIution Prevention quipment Inventory (on and off site-resources)
18 nvironment Aencylncldent kespcnse Plan
Incident Response PIan
5ite PIan
Sectlcns 2.1e and 2.1f cf the guldance tells ycu hcw tc prcduce bcth a slte plan and a dralnage plan.
These shculd be kept wlth the rest cf the plan ready tc use durlng an lncldent respcnse.
nvironment Aencylncldent kespcnse Plan 19
Environment first: This publication is printed on paper made
from 100 per cent previously used waste. By-products from
making the pulp and paper are used for composting and fertiliser,
for making cement and for generating energy.
PMHO0309BPNA-E-E
Our contact details
In England and Wales please contact the National Customer Contact Centre (NCCC) on 08708 506 506 or at
enquires@environment-agency.gov.uk for details on any of the topics covered in this document. In Scotland
or Northern Ireland please use the website for each regulator.
Environment Agency
www.environment-agency.gov.uk
HEAD OFFICE
Rio House
Waterside Drive
Aztec West
Almondsbury
Bristol BS32 4UD
Tel: 01454 624 400
Fax: 01454 624 409
Scottish Environment Protection Agency
www.sepa.org.uk
CORPORATE OFFICE
Erskine Court
The Castle Business Park
Stirling FK9 4TR
Tel: 01786 457 700
Fax: 01786 446 885
Northern Ireland Environment Agency
www.ni-environment.gov.uk
HEAD OFFICE
17 Antrim Road
Lisburn
County Antrim BT28 3AL
Tel: 028 9262 3100
Fax: 028 9267 6054
The Agencies publish guidance on fixed oil storage tanks and for containers directly connected to
a point of use (PPG2; Reference 2). However, other containers of oil, chemical or other potentially
polluting materials that are handled or stored incorrectly can also lead to pollution, through
accidental leakage or spillage. In most cases, such incidents can be prevented if appropriate
measures are taken at an early stage.
A wide variety of potentially polluting liquids are routinely distributed, stored or collected in
containers ranging in capacity from a few litres up to drums of 205 litres (45 gallon) capacity and
IBCs of 1,000 litres. These materials must be stored in accordance with the appropriate legislation,
Health and Safety Executive (HSE) requirements and any other relevant guidelines such as those
issued by the Fire Service. Individual containers should be clearly labelled with the nature of their
contents and any hazard they pose, and dedicated stores should display appropriate warning
signs at access points. The quantity of materials stored should be kept to a working minimum.
A detailed and up-to-date product inventory should be maintained, containing such information
as product types, trade names, UN numbers, Control of Substances Hazardous to Health (COSHH)
Regulations data, volumes, and location on site or within the store.
These notes provide guidance on options that will reduce the risk of pollution of land, surface
waters, groundwaters, sewers and drains. They apply to containers of not more than 1,000 litres
capacity that are not directly connected to a part of a process or other point of use, irrespective of
the number of containers stored.
In some circumstances, the risks associated with particular materials involve additional
requirements. These include the following:
Hazardous substances
During the handling of drums and IBCs, particularly during dispensing, there is the potential for
workers to be exposed to the contents. This may occur as a result of minor leaks or emissions,
or from spillages. Under the COSHH Regulations 2002, employers are required to carry out a
suitable and sufficient assessment of the risks to their employees health and the steps needed to
reduce any identified risk. Reference 3 gives guidance on minimising the health risks arising from
the use of hazardous substances.
Flammable liquids
Flammable liquids are defined by the Chemicals (Hazardous Information and Packaging for
Supply) Regulations 2002 as liquids with a flash point of 55C and below. The storage and use
of flammable liquids (including highly flammable liquids and petroleum products) are subject
to specific health and safety legislation. Reference 4 gives details of the relevant legislation and
guidance on the safe storage of flammable liquids. Additional guidance on the safe use, handling
and dispensing of flammable liquids is also available (Reference 5).
1. Introduction
2. Special
requirements
a.
b.
Pollution Prevention Guidelines
storage & handling of drums & intermediate bulk containers: PPG 26
These notes are intended to assist all who deal with the storage and handling of drums and Intermediate Bulk
Containers (IBCs). The guidelines are basic requirements to protect the environment. Additional requirements
may be imposed by legislation such as the Environmental Protection Act 1990 and the Environment Act 1995.
In England, the storage of oils (except waste mineral oils) in containers over 200 litres in capacity, on industrial,
commercial and institutional sites, is subject to specific regulations (Reference 1). Where these regulations may
apply, the text in this document has been highlighted. Similar regulations are expected to be introduced in
Scotland during 2004 and may follow in Northern Ireland and Wales. Further advice may be obtained by
contacting your local Agency office, details of which appear at the end of these guidelines. These notes have been
produced by the Environment Agency for England and Wales, the Scottish Environment Protection Agency and the
Environment and Heritage Service in Northern Ireland, which are referred to here as the Agency or Agencies.
Environmental Alliance working together
PPG26
February 2004
Pesticides
Pesticides should be stored in accordance with the Food and Environment Protection Act 1985
(FEPA) and the Control of Pesticide Regulations 1986 (COPR) as amended. Statutory bunding
requirements apply. Where more than 200 litres (200 kg) of pesticides approved for agricultural
use are kept for sale or supply, their storage should be supervised by someone holding a
certificate of competence. The pesticide store and management arrangements must be
inspected annually, as a minimum, by an independent expert. Registration and certification by
BASIS Registration Limited (Reference 6) ensures compliance. Further guidance on pesticide
storage is available (References 7, 8 and 9)
Timber treatment chemicals
Timber treatment compounds are also pesticides and are subject to FEPA and COPR
requirements. See Reference 10 for sector-specific guidance.
Vandalism, overfilling, failure of storage structures, fires and contaminated firewater, and
incorrect or damaged drainage systems can all give rise to pollution. However, a large proportion
of incidents involving drums and IBCs occur during the delivery and subsequent handling of
containers, for example forklift damage or spillages. To minimise these risks where practical,
delivery, handling and transfer or decanting areas should be designated, marked as such and
isolated from the surface water drainage system, possibly with the use of ramps, sumps or
drainage shut-off valves. Delivery and handling areas should be impermeable to the products
handled and the provision of a roof or canopy will greatly simplify the management of surface
water in these areas. Forklift drivers should be suitably trained, and deliveries (loading and
unloading) should be supervised properly. Any damaged containers or spillage should be
reported immediately for appropriate action to be taken (see Section 7). Use drum carriers,
drum taps, funnels and containers with lids (as appropriate) to minimise the risk of spillage
during handling and transfer.
The primary storage container should be of sufficient strength and integrity to ensure that,
in normal circumstances, it is unlikely to burst or leak. Damaged or unsuitable containers
should be repaired or removed from use as soon as they are identified. Hazardous substances
should be stored according to relevant legislation (see Section 2a). Unless recommended
otherwise, primary containers should be stored inside or protected from the elements by another
method. Steel drums stored outside in a vertical position are at risk of rusting and contamination
from rainwater, while plastic containers can age and become brittle. We do not recommend the
multiple storage of drums directly on top of one another because this greatly increases the risk
of drums splitting under pressure or falling over.
A secondary containment system is designed to catch leaks from the primary container or spillages
when in use. A suitable secondary containment system should be provided, as this will
significantly reduce the risk of a spill resulting in pollution. It will also allow the controlled recovery
or treatment of any spilled material, and may prevent the spread of burning liquids. Containment
methods include a bund (which can be around, or incorporated into, a storage facility), a drip tray,
kerbs and any other system that will prevent a spilled product escaping. The system chosen will
depend on factors such as site sensitivity, existing on-site facilities and operational needs, the
quantities and nature of materials stored, and their location within the site.
Siting
Containers without secondary containment should not be kept within 10 metres of a
watercourse or 50 metres of a borehole or well. As an additional precaution, it is
recommended that no containers are stored within these areas. The proximity of storage areas to
surface water drains, source protection zones protecting groundwater abstraction points or flood
plains should also be considered in determining the level of secondary containment provided.
The location of source protection zones and flood plains can be checked on the Agency websites
or by contacting your local Agency office.
c.
d.
3. Delivery and
handling
4. Primary container
5. Secondary
containment
systems
a.
b.
c.
Table 1. Storage Options
Capacity
The capacity of secondary containment facilities should take account of the maximum volume of
product that could be stored at any one time. If a fixed fire-fighting system is in place, additional
provision will be required for the quantity of fire-fighting media likely to be used. In general, for
multiple container storage, containment facilities should have sufficient capacity to contain
at least 25% of the total volume of the containers being stored, or 110% of the largest
container, whichever is the greater. Drip trays may only be used for drum storage, not for
IBCs, and must be capable of containing 25% of the volume of the container. Where
containers are stored inside a building, it is recommended (and may be required by law in the case
of agrochemicals such as pesticides) that containment facilities should be proportionate to the
risk. The risk may be substantial, for example in the case of agricultural stores, and the capacity
should be between 110% and 185% of the maximum storage capacity. With large external stores,
25% containment capacity may result in low containment walls, which are quickly overwhelmed
by rainfall or fire-fighting agents. An additional 100 mm height on the walls, known as freeboard,
is therefore recommended.
Construction
Secondary containment can be provided by using prefabricated systems generally made from
steel or plastic, or by in-situ construction using concrete or masonry, kerbs, ramps or sloped
floors to provide containment. All containment system walls and floors should be impervious
and resistant to attack from the materials stored. There should be no drainage outlet.
Concrete and masonry structures should not have a damp-proof course. Floor joints should be
avoided but, where they are required for constructional purposes, great care must be taken to
ensure that the joint sealing results in a complete and lasting liquid-proof seal. Sealants must be
able to withstand attack from any material likely to be stored. A sloping floor together with a
sump cast in the base slab will ease the recovery of spilled product and any accumulated
rainwater. Ensure that gradients are within the safe working limits recommended by the
manufacturer for any forklift trucks used.
See Table 1 for details of the various storage options and prefabricated systems.
Storage Option Description Uses Notes
Drip tray Simple container placed under Ideal for single drums in storage or
a single drum to contain at their point of use.
minor leaks and spillages.
Dispensing Proprietary system used for Good where products need to be
sump trolley transporting and then stored next to their point of use.
dispensing a single drum. Fully bunded when in horizontal
position.
Sump pallets Pallets to hold two or four Containers are kept off the ground
drums with a sump to contain and containment is provided.
spills.
Decking Decking units allow containers Proprietary units can be added to
to stand off the ground on a cover the floor area required, either
grid while providing in the area of use or in a dedicated
containment underneath. store.
Drum racking Racks specifically for the May have integral bunding or
storage of drums, normally otherwise can be used in dedicated
in pairs or rows of four. stores. Drums are normally stored
off the ground and in their
horizontal position on the rack.
In this position, drums should be
orientated so that both bungs are
covered with product (i.e. at 3 and
9 oclock) and extra care will be
needed to watch for leaks.
Table 1. Storage Options
contd
d.
Storage Option Description Uses Notes
Conventional The racking found in most For use in dedicated stores where
racking systems warehouses, with the addition secondary containment is provided.
of chocks to keep drums Drums should be orientated as
in place. above.
Dedicated Purpose-built, prefabricated Ideal where substantial storage
internal store or adapted (e.g. freight capacity is required. Containment
container) store. can be provided by means of
stepped or ramped access, kerbing,
bund walls, sloping floors or use of
a proprietary system.
Dedicated Purpose-built external storage Useful for storing large quantities
external store area incorporating of materials, particularly where
containment design features. ventilation is an issue. Containment
provided as above. In addition,
containers should be protected
from the elements by roofing
(which will also prevent rainwater
accumulating) and be stored off
the ground. Consider the need for
fencing for security and to prevent
containers being ejected in the
case of fire.
Design considerations
The design features of any chosen storage option be it a prefabricated system, purpose-built
or adapted system such as a converted freight container should take into account aspects of
containment, security and safety measures including:
means of containment and system integrity;
separation from ignition sources, process areas, occupied buildings and site boundaries;
fire resistance, including the effects of fire on the containment system;
impermeability and resistance to attack from materials stored;
nature of the product, e.g. toxicity;
fixed fire-fighting systems;
security;
signage;
ventilation at high and low level (above secondary containment);
manual handling;
the need to segregate products;
all relevant legislation;
site environmental sensitivity.
Services such as electricity supply should be carried over the secondary containment system
rather than penetrating it. Mains water supply (except water-based fixed fire-fighting systems
and safety shower/eye wash stations) should not enter the containment area of the store and
there should be no drainage discharge.
External walls next to any racked storage should be strong enough to withstand the force of
the rack, or its contents, falling against them. In clad buildings where racking extends above
any containment system, provision should be made to prevent a high level leak running down
between the cladding and the containment wall. Containers should not be stored at such a
height or proximity that they might fall outside the containment system.
Containment facilities should be inspected regularly, and checked at least weekly, to ensure that
rainwater does not build up and that the bund or drip tray is clean and clear of product and
debris. Keep a log of inspections and cleaning. Any accumulated rainwater should be pumped or
bailed out only under controlled circumstances and, if contaminated, should be disposed of in
accordance with legislation (for example by a registered waste carrier). Any structural or other
defects should be repaired promptly using the appropriate technique to ensure the containment
system retains its integrity.
Spill kits containing materials such as leak-sealing putty, over-drums, drain seals, oil or chemical
absorbents and personal protective equipment (PPE) should be on site. These should be located
both within or near the storage area and remote from it (in case during an event it is not possible
to reach the equipment near the storage containers). All staff should be trained in the use of this
equipment. Consider providing a quarantine area where leaking containers can be placed
safely. It is advisable to have a leak-sealing kit available at delivery and handling areas or other
high-risk locations to seal leaking drums temporarily. It is also recommended that vehicles
transporting drums and IBCs carry a spill kit. Do not flush away spilt material or use dispersants.
Contain any spillage for proper off-site disposal, for example by a registered waste carrier and, in
high-risk areas, consider the use of cut-off or isolation valves in the drainage system. A detailed
site drainage plan should be kept available to assist in the event of a spillage or fire. A site incident
response plan (PPG21; Reference 11) should be drawn up to deal with leaking containers and
spillages, and all staff should be trained in its application, in the use of related equipment and in
the relevant health and safety issues. Report any spillage to the Agencies on the Emergency
Hotline, 0800 80 70 60.
Carry out a waste minimisation review and consider methods to reduce the volume of waste you
produce. Contact Envirowise on the Environment and Energy Helpline (0800 585794) for free
advice and publications.
Containers must always be clearly labelled with their contents. All waste and waste containers
should be stored in designated areas, which are isolated completely from surface water drains
or direct discharge to the environment. The area should be able to contain spillages. Empty
containers should not be allowed to accumulate, but should be collected by the supplier (where
possible), dealt with using suitable on-site facilities or removed as soon as possible by a registered
waste carrier to a licensed waste management facility. Local Agency offices hold lists of
companies that specialise in the disposal of waste chemicals, oils or empty containers. For further
information on the storage and disposal of waste oils see reference 12 (PPG8). It must be
remembered that everyone has a Duty of Care under the Environmental Protection Act to ensure
that all waste is transported and disposed of safely and legally and that it does not escape the
control of the waste producer.
Guidance note for the Control of Pollution (Oil Storage) (England) Regulations 2001.
Department for Environment, Food and Rural Affairs (DEFRA).
www.defra.gov.uk/environment/water/quality/oilstore/index.htm
Pollution Prevention Guidance Note (PPG) 2: Above ground oil storage tanks
HSG193 COSHH Essentials: Easy steps to control chemicals. ISBN 0-7176-2737-3
HSG51 Storage of flammable liquids in containers. ISBN 0-7176-1471-9
HSG140 Safe use and handling of flammable liquids. ISBN 0-7176-0967-7
BASIS (Registration) Limited, 34 St John Street, Ashbourne, Derbyshire, DE6 1GH.
Tel: 01335 343945
PPG9: Prevention of pollution by pesticides
6. Maintenance
7. Dealing with
spillages
8. Waste management
9. References 1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
10. Other relevant
publications
Guidance on storing pesticides for farmers and other professional users. HSE Guidance Note
AIS16 (This document is available in Welsh as Guidance Note AIS16W).
Code of practice for the safe use of pesticides on farms and holdings (Green Code). PB3528.
Defra Publications, Admail 6000, London, SW1A 2XX. Tel: 08459 556 000
Timber Treatment Installations 2003 - Code of practice for safe design and operation.;
Environment Agency/British Wood Preserving and Damp Proofing Association,
Tel: 01332 225 100; www.bwpda.co.uk
PPG21: Incident response planning
PPG8: Storage and disposal of used oils
References 35 and 8 may be obtained from: HSE Books, PO Box 1999, Sudbury,
Suffolk CO10 2WA. Tel: 01787 881165.
Cost-effective management of lubricating and hydraulic oils GG227 Envirowise,
Tel: 0800 585794; www.envirowise.gov.uk.
PPG11: Preventing pollution at industrial sites
PPG18: Managing firewater run-off and major spillages
Pollution Prevention Pays booklet
These notes are for guidance only and following the good practice described does not remove the
readers obligation to ensure relevant legislation is complied with at all times and that their activities
do not result in the release of polluting matter to the environment. Pollution of the environment is a
criminal offence and compliance with one or more Guidance Note(s) is not a defence to such offences.
It is recommended that references to other sources of guidance are checked to ensure they are still
current.
Pollution Prevention Guidance notes (PPGs) are available to download from the Agencies
websites, see details below.
Environment Agency
www.environment-agency.gov.uk
Scottish Environment
Protection Agency
www.sepa.org.uk
Environment and
Heritage Service
www.ehsni.gov.uk
HEAD OFFICE
Rio House
Waterside Drive
Aztec West
Almondsbury
Bristol BS32 4UD
Tel: 01454 624 400
Fax: 01454 624 409
CORPORATE OFFICE
Erskine Court
The Castle Business Park
Stirling FK9 4TR
Tel: 01786 457 700
Fax: 01786 461 425
HEAD OFFICE
Calvert House
23 Castle Place
Belfast BT1 1FY
Tel: 028 9025 4868
Fax: 028 9025 4777
The 24-hour emergency hotline number
for reporting all environmental incidents
relating to air, land and water in England,
Wales, Scotland and Northern Ireland
Environmental Alliance working together HO-02/04-12K-BHTN-AMP-EP146A

You might also like