PG 2 NTPC REQ
PG 2 NTPC REQ
PG 2 NTPC REQ
SOLAPUR SUPER THERMAL POWER PROJECT (2x660 MW) STEAM GENERATOR PACKAGE
CLAUSE NO.
1.00.00 1.01.00
GENERAL The Contractor shall provide Control & Instrumentation system for control, monitoring and operation of the systems, equipment etc. covered under these specifications, in all regimes of operation in safe and most efficient manner. The scope of work for the equipment, material and system to be furnished in accordance with this specification shall include design, engineering, manufacture, fabrication, assembly, pre-shipment testing at manufacturer's works, proper packing for transportation, delivery at plant site, unloading, storage, installation, interconnection with related plant and equipment, calibration, testing, commissioning and putting the Control and Instrumentation System together with all accessories, auxiliaries and associated equipment as specified hereinafter in a fully operational condition and in the manner acceptable to the Employer as covered under this specification. The Contractor shall also provide all material, equipment and services which may not be specifically stated in the specifications but are required for completeness of the equipment/systems furnished by the Contractor and for meeting the intent and requirements of these specifications. The work shall be consistent with modern power plant practices and shall be in compliance with all applicable codes, standards guidelines and safety requirements in force on the date of award of the contract. The requirements of statutory Authorities (e.g. MOEF, Inspector of Factories, IBR, TAC, CPCB/SPCB/CERC etc with regard to various plant areas like main plant, Fuel Oil Plant/System, Chlorinating Plant, Fire fighting system, Emission measurements etc.) shall be complied even if not actually spelt out. It shall be the responsibility of the Contractor to coordinate with Employer and offer Control and Instrumentation System to meet the actual requirements of the plant and furnish a complete system as per clause 1.01.00 above, and also to coordinate with other system vendors for proper interfacing of Control and Instrumentation system vendors with all other related equipment and systems. The following clauses describe the brief scope of supplies only. The detailed technical specifications are stipulated under various Control and Instrumentation Sub-sections, Part B, Section-VI of the specification as well as in various other Parts of the Technical Specifications. Contract quantities shall be as specified under Appendix-I to Subsection-IIIC of Part-A, Section-VI and as required to make the system complete. Unless explicitly stated to be common for all the unit(s), the Contractor shall provide all system/equipment described in this specification for each of the unit(s). DISTRIBUTED DIGITAL CONTROL, MONITORING & INFORMATION SYSTEM (DDCMIS) Latest state of the art microprocessor based Distributed Digital Control, Monitoring & Information System (DDCMIS) meeting the previous clause shall be provided comprising of the following as a minimum and meeting all requirements specified under Sub-section DDCMIS of Part -B, Section-VI of Technical Specification. Control system (Including its Measurement system) The control system shall broadly consist of the following system(s):The SG C&I system comprising of Burner Management system (BMS), Secondary Air Damper Control (SADC), Soot Blowers Controls, Aux. PRDS control, SCAPH drain tank level control, Separator Drain Control System, Atomising Steam/Air Pressure Control, Fuel oil
1.02.00
1.03.00
1.04.00
1.05.00
2.00.00 2.01.00
SOLAPUR SUPER THERMAL POWER PROJECT (2X660 MW) STEAM GENERATOR PACKAGE
PAGE 1 OF 8
CLAUSE NO.
2.02.03
The functional grouping of the above system(s) shall be as per Drawing No. 0000-101/102POI-A-009. In addition to the controls indicated in the above drawing, all controls except those indicated in exclusions at clause no 2.17.00 are to be provided in this package. The above system(s) shall include their respective measurement system for signal acquisition, conditioning and signal distribution of various types of inputs/outputs, meeting specification requirements including respective Hardware requirements as stipulated in Subsection IV;I-2(DDCMIS), Part-B, Section-VI of Technical Specification. Human - Machine Interface & Plant Information System (HMIPIS) HMIPIS configured around latest state-of-the art servers/Workstations with open architecture supporting OPC/TCP/IP protocols, etc. shall be provided. Any of the two options of HMIPIS as detailed out in Sub-section DDCMIS of part -B, Section-VI of Technical Specification shall be supplied. This will include the following as a minimum: Operator Work Station (OWS), mounted on Control Desk (UCD). (LVS Work Stations in Central Control Room shall be provided by Employer.) Processing Stations (Servers/Workstations) in redundant configuration as per DDCMIS Supplier's standard practice shall be used for historical storage and retrieval and long term storage and retrieval of data. Network ready Colour laser printers for taking printout of logs/reports colour hardcopy and for plotting curves/graphs etc. The quantity of peripherals of HMIPIS shall be as specified under Appendix-I to SubsectionIIIC of Part-A, Section-VI. Data Communication System System Bus connecting Control System and HMIPIS. Other bus systems for connecting various systems/subsystems of DDCMIS like Cubicle Bus, Local Bus, I/O Bus ( Including Remote I/O Bus) soft links (including those from Field Bus based temperature transmitter) as well as within systems/sub-systems of DDCMIS. All the bus systems shall be redundant except for back plane buses which can be non-redundant. System programming, diagnostics & documentation facility The programmer station shall be provided for configuration/tuning/structuring of control system and program development /modification of HMIPIS for each of the unit(s). A Workstation based system documentation facility for automatic generation of system documentation shall be provided for each of the unit(s) to achieve paperless documentation for the project. The diagnostic system shall have elaborate diagnostics facility giving details of fault in individual channels of I/O modules, other modules and cabinets on Monitors in form of display and text messages. Power Supplies Redundant power packs/ supplies for powering the systems described above in system cabinets with necessary auctioneering and distribution.
2.02.04
2.03.00 2.03.01
2.03.02
2.03.03
2.03.04
2.03.05
2.04.00 2.04.01
2.05.00 2.05.01
2.06.00 2.06.01
SOLAPUR SUPER THERMAL POWER PROJECT (2X660 MW) STEAM GENERATOR PACKAGE
PAGE 2 OF 8
CLAUSE NO.
2.07.00
(b.)
2.08.00
Signal Exchange Bidder shall provide all the required signal exchange between SG-C&I control system and BOP-C&I/TG-C&I DDCMIS as per Sub-Sec-IV, I-2(DDCMIS), Part-B, Section-VI of Technical Specification.
2.09.00 2.09.01
Warranty and Annual Maintenance Contract Warranty and Annual Maintenance Contract (AMC) for DDCMIS, as per Sub-section IV;I2(DDCMIS), Part -B, Section-VI of Technical Specification.
3.00.00
MAIN EQUIPMENT RELATED CONTROL & INSTRUMENTATION SYSTEM Other special C&I systems shall be provided by bidder including but not limited to the following as a minimum as per the requirement of Sub-section-IV;I-3,SG Related Control & Instrumentation System Part -B, Section-VI of Technical Specification. Flame Monitoring System and Flame Detector Testing Kit. Coal-Feeder Control & Instrumentation. Electromatic safety valves. Furnace temperature probes. Acoustic Pyrometer. Furnace and Flame Viewing System.
Acoustic Steam Leak Detection System Level switching system for Driplegs employing conductivity type probes.
SOLAPUR SUPER THERMAL POWER PROJECT (2X660 MW) STEAM GENERATOR PACKAGE
PAGE 3 OF 8
CLAUSE NO.
4.00.00
MEASURING INSTRUMENTS (PRIMARY & SECONDARY) The following shall be provided as a minimum, meeting specification requirements of Subsection IV;I-4 MEAS INST of Part-B, Section-VI of Technical Specification.
4.01.00
Primary instruments like Microprocessor based transmitters employing HART protocol, thermocouples & RTDs along with temperature transmitters, pressure/diff. pressure/temperature/flow switches & gauges, flow sensing elements (orifice plates, flow nozzles, impact head type elements etc), Ultrasonic, Radar type level transmitters, positive displacement type flow transmitters, Oxygen analysers etc. for: (a) Main plant and auxiliary plant, as indicated in enclosed tender diagrams (P&I Ds / flow schemes) as a minimum. Integral to equipment which are not indicated in the tender drawings, but are required for control, monitoring and operation of the equipment / plant systems for which no P&IDs are enclosed, all the instruments shall be provided to meet the actual system requirements and meeting redundancy and other requirements specified under technical specifications subject to Employer's approval. For Binary and analog inputs required in major equipment (e.g. Furnace) protection triple-sensing devices shall be provided. Binary and analog inputs, which are, required for protection of more than one equipment as well as protection signals for HT Drives (fed by a supply feeder of ratings 3.3 kV onwards) etc., triple sensing devices shall be provided. For modulating control of drives supplied by the bidder and control by Employers control system, redundant field instruments are to be provided. For other critical binary and analog inputs required for protection and interlock purpose of other equipment (e.g. those interlocks which may result in loss of generation, non-availability of a major equipment etc.), triple sensors shall be provided. Temperature elements, electronic transmitters etc. are to be provided for all the cases. Use of process actuated switches is acceptable only in the cases as indicated in the tender drawings. All instruments on SG scope of piping/ducts/equipments shall be provided by the contractor (unless indicated otherwise).
(b)
(c)
(d)
(e)
(f)
(g) 4.02.00
Head mounted/ Rack mounted/ Enclosure mounted temperature transmitters (TTs) for temperature elements (TEs) in Contractors scope are to be provided by the contractor as per the following. a) In case of multiple measurement of temperature for any application resulting in trip/protection, where logic implementation tolerates failure of one TE (e.g., 2v3, 2v4, etc.), for only one of such TEs, dual TT is to be provided. In case of other applications where single TE causing trip/ protection (either part of single measurement or part of multiple measurement not tolerating failure of any TE, e.g., 1v2, 1v3, 1v4, etc.), for each of such TEs, dual-input TT shall be provided.
SOLAPUR SUPER THERMAL POWER PROJECT (2X660 MW) STEAM GENERATOR PACKAGE
PAGE 4 OF 8
CLAUSE NO.
b) c)
d)
5.00.00
ELECTRIC POWER SUPPLY SYSTEM Sets of Microprocessor based modular 24 VDC power supply system shall be used for powering the control systems including its network devices. For number of sets, refer Appendix-I to Subsection-IIIC of Part-A, Section-VI. Contractor shall provide power supply distribution panels/cabinets/boxes for sub distribution of DC/Main UPS/Utility feeders on as required basis. The power supply distribution box shall include change over circuitry, switch fuse units, MCBs , terminal blocks etc. suitable for application.
6.00.00 6.01.00
PROCESS CONNECTION & PIPING Process connection & piping including all impulse piping, sample piping, pneumatic piping/tubing, valves, valve manifolds, fittings and all other accessories required for proper installation & completeness of impulse piping system, sampling piping system and air supply system, as stipulated under Sub-section PCP, Part-B, Section-VI of Technical Specification. For all the instruments in contractors scope of supply, Local Instrument Enclosure (LIEs) shall be provided to group & mount transmitters, process actuated switches and temperature transmitters in open and dust prone environment like Boiler/Mill area. Local instrument Racks (LIRs) shall be provided to group & mount transmitters, process actuated switches and temperature transmitters in cleaner areas like TG hall. LIE/LIRs are not required for Fuel Oil applications and off site areas.
6.02.00
SOLAPUR SUPER THERMAL POWER PROJECT (2X660 MW) STEAM GENERATOR PACKAGE
PAGE 5 OF 8
CLAUSE NO.
7.00.00
7.01.00
7.02.00
7.03.00
8.00.00 8.01.00
8.02.00
9.00.00 9.01.00
02
Fuel Oil Pressurization / Heating System (FOPH) & Fuel oil unloading system
Independent control system in SG-C&I based Hardware. I/O count for Fuel oil unloading system is 200 binary and
SOLAPUR SUPER THERMAL POWER PROJECT (2X660 MW) STEAM GENERATOR PACKAGE
PAGE 6 OF 8
CLAUSE NO.
04
(Instrumentation in Contractor's scope) 06 Equipment Water System Cooling Control from Station C&I System
10.00.00 10.01.00
TYPE TEST REQUIREMENT The type tests to be conducted for C&I systems & equipments shall be as detailed out in Sub-Section-IV;I-9, C&I TYPE TEST, Part-B, Section-VI of Technical Specification.
11.00.00 11.01.00
PLANT PERFORMANCE ANALYSIS, DIAGNOSIS & OPTIMIZATION SOFTWARE The Contractor shall provide a PC based On-line Plant Performance Analysis, Diagnosis & Optimization system (PADO) for the station, which will provide proper guidance to the plant operator. The PADO system shall provide the following functions in a modular and seamlessly integrated environment, using a common plant model and a dynamically shared database. (i) Performance analysis and monitoring of systems and components.
11.02.00
SOLAPUR SUPER THERMAL POWER PROJECT (2X660 MW) STEAM GENERATOR PACKAGE
PAGE 7 OF 8
CLAUSE NO.
Details regarding software, hardware, instruments etc are elaborated in PADO sub-section. TOOLS & TACKLES The Contractor shall furnish a complete new set of all special tools and tackles of reputed make and model which are required for erection, ease in maintenance to have minimum down time, testing and calibration of all the equipments and systems to be provided by the Contractor under this specification for C&I systems. MANDATORY SPARES Mandatory spares shall be provided as per the list indicated in Subsection-VII in Part A of Technical specification.
13.00.0
SOLAPUR SUPER THERMAL POWER PROJECT (2X660 MW) STEAM GENERATOR PACKAGE
PAGE 8 OF 8
CLAUSE NO.
The scope of C&I systems under this specification (SG-C&I system) is covered in Part-A and Part-B of this specification. The purpose of this appendix is to supplement the scope given in Part-A and Part-B of technical specification and is not intended to give total Scope. The Contract quantities of many subsystems covered under Part-A and Part-B of technical specification are generally not reproduced here to avoid duplication. However, in case of any conflict or repetition, the more stringent requirements among them are to be complied with.
SOLAPUR SUPER THERMAL POWER PROJECT (2X660 MW) STEAM GENERATOR PACKAGE
PAGE 1 OF 11
CLAUSE NO.
1.00.00
HT LT MOD/MOV MOVI/MODI DSOV SSOV Elect Breakers (Non-Synch) Elect Breakers (Synch) Modulating Drive Pneumatic operated on-off drive
1X2* 1 1 1
2 1 1 1 3 3 1 2
4+ 2 3 3 3 3 3 3 4+ 2
2 2 2 2 2 1 2 1X2
1 1X2*
SOLAPUR SUPER THERMAL POWER PROJECT (2X660 MW) STEAM GENERATOR PACKAGE
PAGE 2 OF 11
CLAUSE NO.
1.01.00 1.
2.
3. 4.
5. 6.
7.
8. 9.
(ii)
10.
Redundancy in binary and analog outputs for drives shall be as per Table-II
SOLAPUR SUPER THERMAL POWER PROJECT (2X660 MW) STEAM GENERATOR PACKAGE
PAGE 3 OF 11
CLAUSE NO.
4 5
6 8 9 10 11 12
Also, please note that: 1. Output signals to other systems shall remain as per interlock and protection philosophy. 2. Output signals for indications on mosaic items/local panels (as applicable) shall not be redundant. 11. The contact rating of DO (contact) type outputs shall be as follows. The contact rating for such outputs for SG DDCMIS shall be minimum 60VA, and shall be suitable for contact interrogation at 24 V DC. For such outputs for other DDCMIS systems, relays shall be provided for each of such outputs, and the rating of contacts of the relays shall be as specified in Part-B of specification. Additional note for TableDrive I/Os (*) The on/off status of HT drives of Unit DDCMIS will be wired to DI modules in parallel. The open/ close status of sync type electrical breakers of Unit DDCMIS will be connected in parallel to DI and DISOE modules. For these types of drives in other DDCMIS systems the status will be connected to only one DI module. 2.00.00 The following back-up instrumentation and Secondary instruments shall be provided by the Employer under Station C&I package as a minimum for SG package applications. The exact quantity of the back-up instrumentation shall be as finalised during detailed engineering in consultation with the Contractor. Contractor has to supply all the required input output modules in SG C&I part of DDCMIS for interface of these modules without any cost implication to the employer. The quantity indicated here is for each unit. (i) (ii) 2 PB + 3 LED EMERGENCY TRIP PB 10 nos. 5 nos.
12.
SOLAPUR SUPER THERMAL POWER PROJECT (2X660 MW) STEAM GENERATOR PACKAGE
PAGE 4 OF 11
CLAUSE NO.
3.00.00
4.00.00
LIST OF AREAS FOR WHICH SOFT SIGNALS ARE TO BE CONNECTED TO SG C&I OR BOP C&I Sl No Area System to which Connected SG C&I System of each unit Minimum Qty of links/ Location Two nos. per unit Type Qty of signals
1.
Field bus / Profibus/other industry standard bus for temperature transmitter RS 485/ RS232 20 per charger
2.
5.00.00
Control Systems of the auxiliary systems shall be provided with connectivity to DDCMIS systems as follows: Sl No. Description of the system System to which to be connected Station wide LAN under BOP C&I BOP C&I for supervisory control of all compressors. If any signals are required for control or monitoring and the same are not available through link, the same shall be hardwired to BOP C&I . Remarks
1.
2.
3.
BOP C&I
4.
SG C&I
(if applicable)
6.00.00 7.00.00
The quantities of other equipments related to Control System, HMIPIS etc is enclosed at Annexure-1 to this APPENDIX. 24 V DC POWER SUPPLY SYSTEM 24 V DC Power Supply system shall be of continuous duty for the following estimated loads:
SOLAPUR SUPER THERMAL POWER PROJECT (2X660 MW) STEAM GENERATOR PACKAGE
PAGE 5 OF 11
CLAUSE NO.
Common
b. Any other load of Contractor supplied system/equipment requiring 24 V DC supply II. Auxiliary Boiler (if applicable):- 24 V DC for all Contractors load including
* * * 2 sets
a. Control system equipment located in Auxiliary Boiler building. III. Fuel Oil Pressurizing system :- 24 V DC for all Contractors load including a. Control system equipment located in Fuel Oil pump house * 10 A -2 sets
The rating marked * are for instrument/equipment/system being supplied by Contractor. The Bidder shall estimate the requirement of these and provide additional capacity margin of 5% of the estimated Contractors load for all the items and thereafter add the Employers loads to get the load for the entire system. Note: 1. Control system would cover as a minimum, controllers, I/Os, associated modules etc. as well as, data communication system & Network devices (like LAN Switches), related to control system associated relays and solenoid valves driven by 24 V DC system, etc;. Any other loads of Contractor requiring 24 V DC supply shall also be included in this calculation. The configuration of Sl. no. I (i.e. UNIT SG C&I) shall be as per cl 1.03.00 (A), Subsection-IV I-5 of Part-B (Electrical Power Supply) and configuration of Sl. no. II & III (i.e. Auxiliary Boiler & Fuel Oil Pressurizing system) shall be as per cl 1.03.00 (B), Subsection-IV I-5 of Part-B (Electrical Power Supply). Power supply of integral microprocessor based control system like compressors shall be redundant with battery back-up and shall be as per with manufacturers standard practice subjected to the approval of Employer during detailed engineering. One set of manual discharge resistance bank of adequate capacity shall be provided per unit for the main plant 24V DC system of SG C&I control system.
2.
3.
4.
SOLAPUR SUPER THERMAL POWER PROJECT (2X660 MW) STEAM GENERATOR PACKAGE
PAGE 6 OF 11
CLAUSE NO.
7.01.00 7.02.00
8.00.00 8.01.00
PROCESS CONNECTION AND PIPING The Contractor shall provide, install and test all required material which is necessary for proper installation and interconnection of the equipment/systems furnished by the Contractor as per this specification and their integration with Employer's main equipment/systems as per Technical Specification requirements and its sub-clauses, enclosed installation drawings and other applicable clauses on as required basis. The Contractor shall furnish, within his quoted lump sum price, all hardware and accessories to ensure that the equipment/systems furnished against this specification form a complete and operational system meeting the intent and requirement of this specification. The Bidder shall note that no price adjustments shall be applicable for the equipment and services furnished as per this sub-section since the Contractor has to furnish these equipment/services on as required basis. Local Instrument Enclosures (LIEs) and Local Instrument Racks (LIRs) a) Local Instrument Enclosures (LIEs) complete with all fittings, mountings & accessories etc for each unit on as required basis. Local Instrument Racks (LIRs) complete with all fittings, mountings & accessories etc. for each unit on as required basis.
8.02.00
8.03.00
b)
9.00.00
The following contract quantities of equipments for local operation shall be furnished for the following systems.
Sl No 1
Application and location Operation of Compressors of Mill reject system Operation of Compressors of Instrument air system
1 no per compressor
Minimum specifications of Graphical Interface unit shall be as follows: Sl No. 1. Description Power supply 24 V DC/as per manufacturers standard practice for Air compressors
SOLAPUR SUPER THERMAL POWER PROJECT (2X660 MW) STEAM GENERATOR PACKAGE
PAGE 7 OF 11
CLAUSE NO.
4.
IP-65 for extremely dust prone area, otherwise IP55. Enclosure shall be provided to prevent ingress of dust. Function keys and numeric keys Interface with SG C&I systems Ability to operate drives locally using function keys Ability to do programming Graphics display including alarms and operator guidance messages
5. 6. 7.
10.00.0
Furniture for control areas as defined below shall be provided: Sl no Area Item Description 1. Auxiliary Boiler building (if applicable) a.Chair b.Keypad, Locker set 2. Mill reject Control Room a.Chair b.Keypad, Locker set 3. Fuel Oil pump control room house a.Chair b.Keypad, Locker set c.Computer table
11.00.0
For other equipment/system/items like Measuring Instruments, Control Valves and Actuators, Other SG C&I systems, PADO system and Instrumentation and Power supply cables, contract quantities shall be governed by corresponding Sub-sections in Part-B.
SOLAPUR SUPER THERMAL POWER PROJECT (2X660 MW) STEAM GENERATOR PACKAGE
PAGE 8 OF 11
CLAUSE NO.
Sl no
Item name
DDCMIS BASED FOPH Auxiliary boiler (if applicable) Common qty On as required basis s per drg no. 0000101/102-POI-A009 on as required basis
Remarks
1 1.1
Qty/unit On as required basis, minimum number as per drg no. 0000101/102-POI-A009 on as required basis
1.2
1.3
1.4
1.5
Control Cabinets for housing Control system hardware Control Cabinets for housing Remote I/O hardware (wherever specified / applicable) Marshalling Cabinets, , Termination cabinets, Relay Cabinets Relays
Nos.
on required basis
as
Nos.
on as required basis
on required basis
as
on as required basis
Nos.
on as required basis
on required basis
as
on as required basis
Nos.
1.6
Cubicles for mounting network components & power supply distribution equipment. Human Machine Interface Redundant Servers (Only for Alternative 1)
Nos.
as
as
2.1
Sets
SOLAPUR SUPER THERMAL POWER PROJECT (2X660 MW) STEAM GENERATOR PACKAGE
PAGE 9 OF 11
CLAUSE NO.
Sl no 2.2
2.3
Programming station
Nos.
2.4
Nos.
1*
1*
2.5 2.6
Nos. Nos.
NIL 3
NIL NIL
NIL NIL Including that for flame camera. Each set will include component s for respective remote I/O & FGs.
2.7
Suitable redundant interfaces and redundant links for connectivity between Unit LAN, stationwide LAN, and DDCMIS sub systems, unit / station PLCs, PC stations, PADO, Remote Service Centre as applicable .
sets
SOLAPUR SUPER THERMAL POWER PROJECT (2X660 MW) STEAM GENERATOR PACKAGE
PAGE 10 OF 11
CLAUSE NO.
Sl no 2.8
2.9
required
As required basis
As basis
required
2.1
required
2.11
2 nos per unit for local operation of Mill Reject system(unitised part)
3 3.1
nos
3.2
Laser jet colour printer (A4 size) Software Software for DDCMIS meeting requirements specified under item SYSTEM SOFTWARE REQUIREMEN TS, subsection DDCMIS, Part B, Section VI of technical specifications
As basis
required
As required basis
As basis
required
SOLAPUR SUPER THERMAL POWER PROJECT (2X660 MW) STEAM GENERATOR PACKAGE
PAGE 11 OF 11